STATE OF QATAR ANNEX 2: PRICING DOCUMENTS BILL NO. 25.

03 - M
ASHGHAL SECTION 3: BILLS OF QUANTITIES

ITEM ITEM DESCRIPTION CESMM3 UNIT QTY Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

BILL NO. 25.03 - MSE WALLS

Design and Build Reinforced Soil Wall / MSE wall


complete with any other necessary work as
required

Levelling pad

A Levelling pad complete including all relevant F900.1 m 2,466


earthworks, concrete, rebars, formworks,
waterproofing, joints, finishes, etc. to complete the
works.

Counter balance slab/ Parapet Supporting slab

B Counter balance slab complete including all relevant F900.2 m 2,271


earthworks, concrete, rebars, formworks,
waterproofing, joints, finishes, etc. to complete the
works.

Coping beam (for MSE walls near abutment seat)

C Coping complete including all relevant earthworks, F900.3 m 85


concrete, rebars, formworks, waterproofing, joints,
finishes, etc. to complete the works.

Barrier

Project ID: IA 2018 C 033 G May 2018


A2: S3: B25.03/1
Construction of Duhail Intersection and Al Gharrafa Street (P007 C7 P1) Rev. 1
STATE OF QATAR ANNEX 2: PRICING DOCUMENTS BILL NO. 25.03 - M
ASHGHAL SECTION 3: BILLS OF QUANTITIES

ITEM ITEM DESCRIPTION CESMM3 UNIT QTY Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate
D Concrete barrier; including concrete, formworks, X194 m 2,271
reinforcement, joints, transition, protective coatings,
including all necessary fixing, etc. to complete the
works

Carried to Collection page

BILL NO. 25.03 - MSE WALLS

Design and Build Reinforced Soil Wall / MSE wall


complete with any other necessary work as
required

CLASS H: PRECAST CONCRETE

Segmental units

A MSE wall panels with pigment additive and H900 m² 18,860


architectural pattern (coating system measured
separately) including all cast-in attachments and
steel reinforcement (rate to include all specialist
fitment and accessories, placing and attaching
reinforcing strips, all sealants, compressible
material, fixing all friction strips and pins, all
joints to adjacent structure, bituminous paint,
production and submission of shop drawings,
trial panels etc. complete) as shown on
Drawings and Specifications

Project ID: IA 2018 C 033 G May 2018


A2: S3: B25.03/2
Construction of Duhail Intersection and Al Gharrafa Street (P007 C7 P1) Rev. 1
STATE OF QATAR ANNEX 2: PRICING DOCUMENTS BILL NO. 25.03 - M
ASHGHAL SECTION 3: BILLS OF QUANTITIES

ITEM ITEM DESCRIPTION CESMM3 UNIT QTY Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate
B Surface finish of MSE walls, including painting, Z499 m² 16,395
protective coating, colours and wall textures, etc.
complete as approved by the Engineer

Carried to Collection page

BILL NO. 25.03 - MSE WALLS

Wall barrier with varying height complete; including


barrier on top, earthworks, concrete, formworks,
reinforcement, joints, transition, protective coatings,
waterproofing, including all necessary fixing, etc. to
complete the works.

A Wall barrier at Wall 1 X195.1 m 100

B Wall barrier at Wall 2 X195.2 m 100

C Wall barrier at Wall 3 X195.3 m 86

D Wall barrier at Wall 4 X195.4 m 46

E Wall barrier at Wall 5 X195.5 m 86

Project ID: IA 2018 C 033 G May 2018


A2: S3: B25.03/3
Construction of Duhail Intersection and Al Gharrafa Street (P007 C7 P1) Rev. 1
STATE OF QATAR ANNEX 2: PRICING DOCUMENTS BILL NO. 25.03 - M
ASHGHAL SECTION 3: BILLS OF QUANTITIES

ITEM ITEM DESCRIPTION CESMM3 UNIT QTY Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

F Wall barrier at Wall 6 X195.6 m 120

G Wall barrier at Wall 8 X195.7 m 85

H Wall barrier at Wall 10 X195.8 m 85

J Wall barrier at Wall 11 X195.9 m 90

K Wall barrier at Wall 12 X195.10 m 84

L Wall barrier at Wall 13 X195.11 m 64

Carried to Collection page

Project ID: IA 2018 C 033 G May 2018


A2: S3: B25.03/4
Construction of Duhail Intersection and Al Gharrafa Street (P007 C7 P1) Rev. 1
STATE OF QATAR ANNEX 2: PRICING DOCUMENTS BILL NO. 25.03 - M
ASHGHAL SECTION 3: BILLS OF QUANTITIES

ITEM ITEM DESCRIPTION CESMM3 UNIT QTY Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

COLLECTION

Page A2: S3: B25.03/1

Page A2: S3: B25.03/2

Page A2: S3: B25.03/3

Project ID: IA 2018 C 033 G May 2018


A2: S3: B25.03/5
Construction of Duhail Intersection and Al Gharrafa Street (P007 C7 P1) Rev. 1
STATE OF QATAR ANNEX 2: PRICING DOCUMENTS BILL NO. 25.03 - M
ASHGHAL SECTION 3: BILLS OF QUANTITIES

ITEM ITEM DESCRIPTION CESMM3 UNIT QTY Rate (QAR)


Ref. Labour Plant Materials Overhead Profit Total Rate

TOTAL FOR Carried to Main Works Summary


BILL NO. 25.03 - MSE WALLS

Project ID: IA 2018 C 033 G May 2018


A2: S3: B25.03/6
Construction of Duhail Intersection and Al Gharrafa Street (P007 C7 P1) Rev. 1
BILL NO. 25.03 - MSE WALLS

AMOUNT
(QAR)

Project ID: IA 2018 C 033 G May 2018


A2: S3: B25.03/7
Construction of Duhail Intersection and Al Gharrafa Street (P007 C7 P1) Rev. 1
BILL NO. 25.03 - MSE WALLS

AMOUNT
(QAR)
-

Project ID: IA 2018 C 033 G May 2018


A2: S3: B25.03/8
Construction of Duhail Intersection and Al Gharrafa Street (P007 C7 P1) Rev. 1
BILL NO. 25.03 - MSE WALLS

AMOUNT
(QAR)
-

Project ID: IA 2018 C 033 G May 2018


A2: S3: B25.03/9
Construction of Duhail Intersection and Al Gharrafa Street (P007 C7 P1) Rev. 1
BILL NO. 25.03 - MSE WALLS

AMOUNT
(QAR)

Project ID: IA 2018 C 033 G May 2018


A2: S3: B25.03/10
Construction of Duhail Intersection and Al Gharrafa Street (P007 C7 P1) Rev. 1
BILL NO. 25.03 - MSE WALLS

AMOUNT
(QAR)

Project ID: IA 2018 C 033 G May 2018


A2: S3: B25.03/11
Construction of Duhail Intersection and Al Gharrafa Street (P007 C7 P1) Rev. 1
BILL NO. 25.03 - MSE WALLS

AMOUNT
(QAR)

Project ID: IA 2018 C 033 G May 2018


A2: S3: B25.03/12
Construction of Duhail Intersection and Al Gharrafa Street (P007 C7 P1) Rev. 1