Date: (Original) Issue Date
PRODUCTION CONTROL PLAN 08/04/2014 22/05/2019
Customer: Key Contact/Phone: Core Team:
HK72-130B28-AA* HK72-130B28-AA*
Main Floor Carpet Rear - 5 Seat Sliding (& Japan) HK72-130B28-BA* HK72-130B28-BA*
Main Floor Carpet Rear - 7 Seat Sliding (& Japan) HK72-130B28-CA* HK72-130B28-CA* UEB3 E 50151867 000
Main Floor Carpet Rear - 5 Seat Fixed (& Japan) HK72-130B28-DA* HK72-130B28-DA* 12/04/16
HK72-130B28-EA* HK72-130B28-EA*
HK72-130B28-FA* HK72-130B28-FA*
Supplier / Plant: Supplier Code: Control Plan Issued By:
AUTONEUM GB LTD
STOKE ON TRENT
STAFFORDSHIRE
D0N7B Simon Edwards
ENGLAND
Date (Revision) Revision Details Revised By Date (Revision) Revision Details Revised By
08/04/2014 Control Plan compiled Sam Prince 20/04/2017 (9) Reviewed & Updated for PRSS 08-17, PRSS 09-17 & PRSS 11-17 T.Biddulph
10/06/14 (2) Drawing updates Sam Prince 06/06/2017 (10) CCC marking check location corrected S.Edwards
26/09/14 (3) Drawing updates, clip detection added Sam Prince 15/02/2018 (11) Annual Review T.Biddulph
17/12/14 (4) Checking frequencies revised Sam Prince 27/02/2018 (12) Reviewed for PRSS 93-17 - Incorrect Part labels. K.Pepper
Removal of Anti Sub block Check from inspection. Now included
08/10/2015 (5) Jim Birks 13/03/2018 (13) Minor corrections following process Audit. S.Edwards
in Op 40 - Fit EPP Blocks and Apply Foam
PRSS 72-15 Incorrect part labels - Include the 1st of label
18/01/16 (6) K.Pepper 22/10/2018 (14) Reviewed for PRSS 106/116-18 J.Birks
validation check
28/04/2016 (7) Updated for 17MY Simon Edwards 05/12/2018 (15) Reviewed for PRSS 138-18 (Foam Bleed)
T.Biddulph /
14/02/2017 Scheduled Review 22/05/2019 (16) Reviewed for PRSS 62-19 (Missing Stud) J.Birks
S.Edwards
Visual inspection
Check incoming Visual check on
as defined in Quarantine delivery, inform
Damaged goods for damage Goods Inwards incoming Every
Preparation No Damage 100% Receiving Logistics Manager & Quality,
packaging to packaging or Personnel materials & delivery
Receive Raw Material Inspection possible Supplier collection
material packaging
Pre-Laminated Carpet Blank Procedure
Ebony Confirm that Visual check that Visual inspection
Lunar materials delivered goods received as defined in Quarantine delivery, inform
Delivery note Goods Inwards
OP 10 Correct to Order comply with comply with the 100% Each batch Receiving Logistics Manager & Quality,
Poly/Iso compliance Personnel
10.1 Suppliers delivery Delivery Note Inspection possible Supplier collection
note Procedure
Assembled Parts
Submarine Block
Incoming
Clips
Confirm materials materials to be Quarantine material, dispose
Rear clips Delivered Each Verification to C of
Correct to Order are correct to Supplier checked against 100% of in line with NCP / CAR
Materials delivery C
specifications Certificate of System
Conformance
Visual
FIFO procedure to
assessment to Handling, Storage Quarantine material, dispose
Conforms to be supported to Each
Material Blanks Stores Personnel check date 100% & Packing of in line with NCP / CAR
Specification maintain function delivery
sequence, Procedure System
of raw materials
process audits
Material Storage
10.2
Visual
FIFO procedure to
assessment to Handling, Storage Quarantine material, dispose
Conform to be supported to Each
Bought Out Parts Stores Personnel check date 100% & Packing of in line with NCP / CAR
Specification maintain function delivery
sequence, Procedure System
of raw materials
process audits
Handling, Storage
Visual
FIFO procedure to Every & Packing
assessment to Return material to stores &
Issue Materials to production First In / First Out be supported to batch Procedure
10.3 Stock rotation Stores personnel check date 100% issue correct stock level to
cell (FIFO) maintain function issued to Identification and
sequence, shop floor
of raw materials shop floor Traceability
process audits
Procedure
Parts to be
Stored to Prevent available in the Each Handling, Storage
Material Storage
10.4 All Materials Damage and production area to Associates Visual 100% Production & Packing Obtain Material from stores
Production Area
deterioration facilitate Run Procedure
Production
As defined on the
Load correct tool Tool correctly Tool correctly Each Process Record Reset tool as appropriate.
Tool Change Process Record
for Part Number loaded and loaded and 100% Production Sheet / Standard
Associate Sheet / Standard
being produced functional functional Run Ops Inform Tool Maintenance.
Ops
Tool No's. Check that tooling As defined on the Each Process Record Raise maintenance requisition
Tool Change
Press Tool 5 Fixed is clean & in good Process Record 100% Production Sheet form if required, cleaning or
Associate
Change/Maintenance 5/7 Slide working order Sheet Run repair to be carried out
Tool
Tool fit for use Visual check to
maintenance
Check that correct confirm tool Each Process Record
Production Replace tooling with correct
Part tool is fitted to complies with 100% Production Sheet / Shop
Associate tool to manufacture parts
Press parts to be Run Order
produced
Plant to undergo
Maintenance
periodic checks As defined Total Productive Raise maintenance requisition
Maintenance checks carried out
incorporating 12 100% in TPM Maintenance form (contingency plans may
Department & recorded in
monthly overhaul plan Procedure have to be implemented)
machine logbook
Planned (if necessary)
maintenance
Maintenance
Each Raise maintenance requisition
Plant to undergo Production checks to be Process Record
100% Production form & inform Maintenance
daily checks Associates carried out & Sheet & TPM
Run Dept.
recorded
At each
Correct press Generic program Production tooling Process Record
Carpet program Not Applicable 100% Stop / Call / Wait
program for all parts Associate change Sheet
over
At each
start up
Visual check of Check set up to Process
Manually set to and after
Press maintenance & set up Press Refer to Process Production settings against Process Record Record Sheet and reset, if
Cycle/Dwell Time Process Record N/A each
Record Sheet Associates Process Record Sheet necessary, consult Team
Sheet product
Sheet Leader & Process Engineer
change
over
At each
start up
Visual check of Check set up to Process
and after
Tool Refer to Process Generic setting for Production settings against Process Record Record Sheet and reset, if
N/A each
Temperature Record Sheet all parts Associates Process Record Sheet necessary, consult Team
product
Sheet Leader & Process Engineer
change
over
10.5
At each
start up
Visual check of Check set up to Process
Manually set to and after
Press Opening Refer to Process Production settings against Process Record Record Sheet and reset, if
Process Record N/A each
Height. Record Sheet Associates Process Record Sheet necessary, consult Team
Sheet product
Sheet Leader & Process Engineer
change
over
Load correct tool Tool correctly Tool correctly As defined on the Each Reset tool as appropriate.
Tool Change Process Record
for Part Number loaded and loaded and Process Record 100% Production
Associate Sheet
being produced functional functional Sheet Run Inform Tool Maintenance.
At each
start up
Verification of Process Record Check set up to Process
Manually set to Tool Change and after
Shot weight - Refer to Process settings against Sheet Record Sheet and reset, if
Process Record Associate / Team N/A each
Booth 1 Record Sheet Process Record necessary, consult Team
Sheet Leader product
Sheet Leader & Process Engineer
change
over
At each
start up
Verification of Process Record Check set up to Process
Foam Booth 1 Manually set to Tool Change and after
Shot weight - Refer to Process settings against Sheet Record Sheet and reset, if
Process Record Associate / Team N/A each
Booth 2 Record Sheet Process Record necessary, consult Team
Foam Booth 2 Sheet Leader product
Sheet Leader & Process Engineer
change
Foam Booth set up over
Foam Tool
5 Fixed
At each
5/7 Slide start up
Verification of Process Record Check set up to Process
Manually set to Production and after
Refer to Process settings against Sheet Record Sheet and reset, if
Cycle/Dwell Time Process Record Associates / N/A each
Record Sheet Process Record necessary, consult Team
Sheet Team Leader product
Sheet Leader & Process Engineer
change
over
At each
start up
Verification of Process Record Check set up to Process
and after
Refer to Process Generic setting for Production settings against Sheet Record Sheet and reset, if
C0² Charging N/A each
Record Sheet all parts Associates Process Record necessary, consult Team
product
Sheet Leader & Process Engineer
change
over
Visual check to
At start of
Check that correct confirm nest
Water Jet Nest Nest loaded and Production each Process Record Replace nest with correct nest
Water jet nest nest is fitted to complies with 100%
functional Associate production Sheet to manufacture parts
water jet parts to be
5 Fixed run
produced
Water Jet set up
Visual check to
5/7 Slide At start of
Correct program Check correct confirm plug Process Record
Water jet Production each Replace program plug with
plug program plug is complies with 100% Sheet / Binary
program Associate production correct plug
fitted parts to be Plug board
run
produced
Load Pre-
Load Pre- Each
laminated Blank Production Visual Re-position material as
Correctly loaded Laminated Blank 100% material Standard Ops
on heater belt Associate assessment instructed
Pile Up Film Down blank
Op20 Heat Pre-Laminated Blank
Each
Stop production, inform Team
1 off formed Production Automated length of Process governed
Op 30 Form part Press Cycle Press Cycles 100% Leader & Process Engineer
Rear/press cycle Associate process material by press cycle
for machine reset
fed into tool
Verification of
Shop Order /
Verify Raw Correct EPP Production materials to Shop Each batch Request correct material from
Check materials 100% Process Record
Material Block is used Associate Order / Process of material raw material storage area
Sheet
Record Sheet
Correct Rework As per Rework Team Leader / Visual As per Rework Re- Inspect & Re-Introduce /
Foam Rework 100% As required
Method Instruction SPO assessment Instruction Scrap Part
Visual check of
Mat Clips Check materials to materials to Process Record
Verify raw Production Each batch Request correct material from
Rear Clips Process Record Process Record 100% Sheet / Shop
materials Associate of material raw material storage area
Sheet / Shop Order Sheet / Shop Order
Order
Std Ops
Mat clips fit to 2 clips in both foot Check clips fitted Each Inspection
Clips fitted into Production Standard
both rear carpet wells securely by pull 100% formed Refit clip as per specification
water jet cut slots Associates
foot wells test carpet
Std Ops
Each Inspection
Production Standard
Clip detection rig 100% formed Refit clip as per specification
Associates
carpet
Std Ops
Op 60 Fit Mat Clips Clipping Fixture Poka yoke device Each Inspection
Production
fitted to clipping 100% formed Standard Refit clip as per specification
Associates
rig carpet
Human readable
Label detail characters legible Production Visual Std Ops / Visual
100% Each Label Stop / Call / Wait
legible. and barcodes Associates assessment Standard
uninterrupted
Std Ops
Clips fitted into Poka yoke device Each Inspection
Fit Rear mating clips (7 Seat Additional 7 Seat Rear clips fitted Clips fitted in rear Production
60a water jet cut fitted to clipping 100% formed Standard Refit clip as per specification
Only) Clipping Fixture to rear of carpet of carpet Associates
holes rig carpet
Each
Production Visual Inspection
Contour Contour stability 100% formed
Associates assessment Standard
carpet
Identify Condition any defects
reject & record as per
1st / Last off /
Standard Ops . Any three
Periphery After Breaks Checking Fixture /
Each consecutive defects Stop /
& Approved 3D Production Checking fixture Inspection
formed Call / Wait
cut out Checking Fixture Associates check All 4 Cavities & Standards
carpet
dimensions visually during
production
Checking Fixture
Autoneum
Quality STJLR51.5341 &
personnel to Drawing / Annual
STJLR51.5341 & As specified in
acquire part(s) Validation Raise NCR, inform Quality
Annual Testing Drawing Customer Every Year
and Schedule Manager
Specification
arrange testing
with accredited Sufficient parts Pass / Fail
Material source
Testing Laboratory to complete all
Performance. Autoneum tests
Quality
STJLR51.5341 /
personnel to
As specified in Annual Validation
acquire part(s) Raise NCR, inform Quality
Flammability CC 80mm/min Customer Every Year Schedule
and Manager
Specification
arrange testing
Pass / Fail
with accredited
source