BARANGAY SP TITLE ACTUAL GRANT DELIVERED ACTUAL TOTAL ACTUAL DATE DURATIO HH

UTILIZED LCC PROJECT COST START DATE COMPLETED N SERVED

Construction of Amilongan Barangay Health


Amilongan Station (BHS) 905,153.50 158,181.00 1,063,334.50
Apaya Construction of Apaya Level II Water System
437,639.97 64,120.00 501,759.97 11-Dec-15 27-Aug-16 260 81

Daddaay Construction of 280 Lim. PCCP along Daddaay


Proper to Dagdag FMR
797,228.00 113,498.00 910,726.00
TOTAL 2,140,021.47 335,799.00 2,475,820.47

SECOND CYCLE

BARANGAY SP TITLE ACTUAL GRANT DELIVERED ACTUAL TOTAL ACTUAL DATE DURATIO
UTILIZED LCC PROJECT COST START DATE COMPLETED N

Amilongan Improvement of Amilongan Irrigation System


442,603.00 23,300.00 465,903.00
Batbato Construction of Batbato Slope Protection
1,143,496.20 72,275.00 1,215,771.20
Daddaay Construction of Daddaay Proper FMR and
Dagdag FMR 921,106.50 48,910.00 970,016.50
Kiat Construction of Aguiwas Access Road 552,626.40 36,075.00 588,701.40
TOTAL 2,617,229.10 157,260.00 3,240,392.10

THIRD CYCLE AND ADDITIONAL FUNDING

BARANGAY SP TITLE ACTUAL GRANT DELIVERED ACTUAL TOTAL ACTUAL DATE DURATIO
UTILIZED LCC PROJECT COST START DATE COMPLETED N

Anaao Improvement of Anaao Level II Water System


448,543.00 9,400.00 457,943.00
Apang Construction of Apang Cable Footbridge
2,351,680.22 204,303.78 2,555,984.00
Apaya Construction of Apaya Slope Protection
738,774.50 16,000.00 754,774.50
Alilem Daya Construction of 1 Unit Dug-well
272,793.00 6,200.00 278,993.00
Daddaay Construction of Abatan-Dagdag Farm to
Market Road 1,399,748.06 32,555.00 1,432,303.06
TOTAL 2,411,315.56 54,755.00 5,479,997.56

FOURTH CYCLE

BARANGAY SP TITLE ACTUAL GRANT DELIVERED ACTUAL TOTAL ACTUAL DATE DURATIO
UTILIZED LCC PROJECT COST START DATE COMPLETED N

Dalawa Construction of Sitio Guilong Access Road


2,194,777.00 33,600.00 2,228,377.00
Kiat Improvement of Kiat Water System 155,553.88 30,000.00 185,553.88 28-Apr-19 8-Jun-19 41 CD
TOTAL 2,350,330.88 63,600.00 2,413,930.88
TYPE OF SUB-PROJECT

SLOPE
ROAD/FOOT FOOT WATER PROTECTION IRRIGATION
CYCLE BUILDING TOTAL SP
H PATH BRIDGE SYSTEM / FLOOD
CONTROL
1 1 1 1 3
2 2 1 1 4
3/AF 1 1 2 1 5
4 1 1 2
TOTAL 5 1 1 4 2 1 14