• Political unrest
Notice to
Time to beginning of Commercial Operation Month
proceed
• Renewable additions
3 6 9 12 15 18 21 24 27 30
• Market liberalization
Centralized Combined Cycle
• Retirement of old plants
• Extended outage of other power plants
Centralized Simple Cycle
• Seasonal grid support
Distributed • Ability to relocate (mobility)
Simple Cycle
• Remote sites (e.g. mining, fracking)
Mobile “Bridge power” Relocation / • Fuel availability (e.g. flare gas)
GT1 Supply stabilization while permanent generation is brought online 1.6 GW change
Duty
• …and more
1 Gas Turbine
Typical durations, subject to individual project conditions.
SGT-A45
Mobile Unit
44 MWe
SGT-A45
Siemens
Gas Turbine
Aero-
derivative
45 MW class
SGT-A45 pedigree
Siemens SGT-A65
(Industrial Trent 60)
66 MW 44 MW
1.5M service hours
Common core modules
1 LP = Low Pressure
© Siemens AG 2017 All rights reserved.
Page 5 AL: N ECCN: N C. Balestrino; S. Lewis Siemens Power & Gas
SGT-A45 Core
Built on Trusted Gas Turbine Pedigree
SGT-A65 SGT-A35
(Industrial Trent 60) (Industrial RB211-GT30)
66 MW 34 MW / 38 MW
LP booster removed
SGT-A45
Two-shaft architecture
High power density
Proven components
44 MW
Industrial Trent 60 Free Power Turbine
Engine Core Derived from Industrial/Aero/Marine Trent
SGT-A45 Gas
Turbine
First unit validated
and tested
Trailer # 1 Trailer # 2
A/C generator Gas Turbine
& auxiliaries & auxiliaries
Trailer # 3
Power Control Module Non-trailerized
(ship separately)
‒ Air filter
‒ Exhaust stack
‒ GT bleed air silencer
Fast Power
2-weeks installation
Mobile by road, air or sea
Minimal site interfaces and preparation
Cost-effective power solution
44 MWe (ISO) with outstanding power density
CAPEX savings with fewer units ($/kW)
Performance optimized for hot climates
Superior value in operation
OPEX savings with high fuel efficiency
Liquid and gas fuel with same service interval
Proven turbomachinery in industrial package
Flexible, dependable technology
50 Hz or 60 Hz
Emissions as low as 25 vppm NOx
Fast start (< 8 mins) and no “hot lock-out”
© Siemens AG 2017 All rights reserved.
Page 14 AL: N ECCN: N C. Balestrino; S. Lewis Siemens Power & Gas
SGT-A45 Performance Ratings – 50 Hz
Significantly more mobile power
MWe
150 MW power plant
200 5
20 Annual fuel savings *
6
+2
16 5 4
1,000,000 $ gas fuel
150
4,500,000 litres Diesel
12 4
3 Due to higher efficiency
100
3
8 +1 * Compared to other mobile gas turbine
2 Based on 150 MW plant output.
50 2 Gas fuel price 6 $/MMBTU
4 8,000 hrs operation per year
1 1
0
Reciprocating engine Other mobile GT Siemens SGT-A45
10 MW ISO-rating 34 MW ISO-rating 44 MW ISO-rating
128 m
SGT-A45
Mobile Unit
Fast Power
2-weeks installation
Superior value
More power. Less $/kW. Less fuel.
Trusted technology
Proven, flexible turbomachinery.
https://www.youtube.com/watch?v=r4H_j-DoSaY
Cristiano Balestrino
Product Family Owner 9545 Cote-de-Liesse
Siemens Canada, Ltd. Dorval, QC
Phone: +1 514 290 5369 H9P 1A5, Canada
E-mail: cristiano.balestrino@siemens.com
Steven Lewis
Development Program Manager Rheinstraße 100,
Siemens Canada, Ltd. 45478 Mülheim an der Ruhr
Phone: +1 514 518 7363 Germany
E-mail: steven.j.lewis@siemens.com
siemens.com/gasturbine
This document contains forward-looking statements and information – that is, statements related to future, not past, events. These statements may be identified
either orally or in writing by words as “expects”, “anticipates”, “intends”, “plans”, “believes”, “seeks”, “estimates”, “will” or words of similar meaning. Such
statements are based on our current expectations and certain assumptions, and are, therefore, subject to certain risks and uncertainties. A variety of factors,
many of which are beyond Siemens’ control, affect its operations, performance, business strategy and results and could cause the actual results, performance or
achievements of Siemens worldwide to be materially different from any future results, performance or achievements that may be expressed or implied by such
forward-looking statements. For us, particular uncertainties arise, among others, from changes in general economic and business conditions, changes in
currency exchange rates and interest rates, introduction of competing products or technologies by other companies, lack of acceptance of new products or
services by customers targeted by Siemens worldwide, changes in business strategy and various other factors. More detailed information about certain of these
factors is contained in Siemens’ filings with the SEC, which are available on the Siemens website, www.siemens.com and on the SEC’s website, www.sec.gov.
Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those
described in the relevant forward-looking statement as anticipated, believed, estimated, expected, intended, planned or projected. Siemens does not intend or
assume any obligation to update or revise these forward-looking statements in light of developments which differ from those anticipated.
Trademarks mentioned in this document are the property of Siemens AG, its affiliates or their respective owners.
TRENT® and RB211® are registered trade marks of and used under license from Rolls-Royce plc. Trent, RB211, 501 and Avon are trade marks of and used
under license of Rolls-Royce plc.