Hasil Simulasi Epanet di Node Alternatif 2

Elevation Demand Head Pressure


Node ID
m LPS m m
Junc 1 15 27.85 72.11 57.11
Junc 2 12 43.67 67.20 55.20
Junc 3 6 32.28 53.93 47.93
Junc 4 5 18.80 52.78 47.78
Junc 5 6 34.57 50.96 44.96
Junc 6 3 33.15 49.41 46.41
Junc 7 2 0.00 46.43 44.43
Junc 8 4 50.93 43.72 39.72
Junc 9 4 30.73 47.09 43.09
Junc 10 6 40.61 49.58 43.58
Junc 11 7 45.68 56.34 49.34
Junc 12 7 24.23 59.96 52.96
Junc 13 11 14.26 60.94 49.94
Junc 14 9 25.56 66.04 57.04
Junc 15 8 53.55 65.01 57.01
Junc 16 10 56.91 58.94 48.94
Junc 17 15 41.78 80.16 65.16
Junc 18 21 78.68 90.18 69.18
Junc 19 18 45.92 65.49 47.49
Junc 20 18 42.69 68.20 50.20
Junc 21 21 88.43 70.95 49.95
Junc 22 17 48.33 85.58 68.58
Junc 23 18 74.20 74.31 56.31
Junc 27 22 84.47 92.56 70.56
Junc 28 32 95.36 96.68 64.68
Junc 29 30 119.50 94.68 64.68
Junc 30 96 11.18 120.01 24.01
Junc 31 65 12.50 124.10 59.10
Junc 32 64 29.28 128.41 64.41
Junc 33 62 13.39 128.95 66.95
Junc 34 63 13.63 129.35 66.35
Junc 35 66 39.25 129.66 63.66
Junc 36 68 20.55 130.83 62.83
Junc 37 79 3.83 131.34 52.34
Junc 38 89 28.78 131.90 42.90
Junc 39 112 29.75 132.15 20.15
Junc 40 105 47.80 130.60 25.60
Junc 41 78 58.88 124.81 46.81
Junc 42 60 13.63 119.79 59.79
Junc 43 51 27.50 114.82 63.82
Junc 44 43 46.76 110.21 67.21
Junc 45 34 52.07 104.96 70.96
Junc 46 32 55.02 101.52 69.52
Junc 47 60 60.89 115.00 55.00
Junc 48 53 61.36 104.69 51.69
Junc 49 31 82.99 99.44 68.44
Elevation Demand Head Pressure
Node ID
m LPS m m
Junc 50 35 131.10 94.09 59.09
Junc 51 5 80.84 68.84 63.84
Junc 52 5 21.07 76.69 71.69
Junc 53 7 32.07 77.49 70.49
Junc 54 9 43.96 79.35 70.35
Junc 55 29 32.35 91.57 62.57
Junc 56 23 50.66 88.46 65.46
Junc 58 35 59.06 91.82 56.82
Junc 59 40 77.94 92.44 52.44
Junc 60 43 57.91 93.17 50.17
Junc 61 36 39.79 91.18 55.18
Junc 62 32 40.21 89.59 57.59
Junc 63 35 68.55 88.65 53.65
Junc 64 38 82.54 87.64 49.64
Junc 66 32 88.10 84.47 52.47
Junc 67 40 49.04 84.93 44.93
Junc 68 44 78.74 85.37 41.37
Junc 69 40 73.52 85.75 45.75
Junc 70 33 40.95 86.40 53.40
Junc 71 40 65.17 86.82 46.82
Junc 72 37 89.25 87.42 50.42
Junc 73 21 80.80 84.00 63.00
Junc 74 19 86.60 83.57 64.57
Junc 75 16 75.58 82.94 66.94
Junc 76 22 79.33 87.65 65.65
Junc 77 14 41.38 86.71 72.71
Junc 78 16 38.01 81.69 65.69
Junc 79 12 32.54 80.51 68.51
Junc 84 15 0.00 54.04 39.04
Junc 24 26 0.00 88.69 62.69
Junc 25 110 0.00 132.37 22.37
Resvr 82 15 -93.04 15.00 0.00
Resvr 81 54 -3605.20 54.00 0.00
Hasil Simulasi Epanet di Pipa Alternatif 2
Length Diameter Velocity Unit Headloss
Link ID
m mm m/s m/km
Pipe 1 900 400 1.67 5.46
Pipe 2 1170 200 1.60 11.34
Pipe 3 1215 450 0.70 0.95
Pipe 4 1530 400 0.73 1.19
Pipe 5 1620 350 0.60 0.96
Pipe 6 990 200 0.78 3.01
Pipe 7 900 200 0.78 3.01
Pipe 8 990 200 0.84 3.40
Pipe 9 1260 300 0.81 1.98
Pipe 10 1260 300 1.38 5.36
Pipe 11 1350 400 1.14 2.69
Pipe 12 810 500 0.85 1.21
Pipe 13 1125 450 0.73 1.03
Pipe 14 900 400 0.72 1.15
Pipe 15 945 200 1.18 6.42
Pipe 16 990 200 0.63 2.02
Pipe 17 1170 400 1.89 6.88
Pipe 18 1080 400 2.23 9.28
Pipe 22 1080 700 1.46 2.21
Pipe 23 1440 700 1.68 2.86
Pipe 24 1350 400 1.29 3.37
Pipe 25 900 450 1.31 3.01
Pipe 26 1080 500 1.28 2.55
Pipe 27 900 400 1.61 5.11
Pipe 28 900 300 2.18 12.53
Pipe 29 900 300 1.14 3.73
Pipe 32 1000 600 1.90 4.32
Pipe 33 810 900 0.89 0.66
Pipe 34 585 900 0.91 0.69
Pipe 35 720 1000 0.76 0.43
Pipe 36 810 800 1.26 1.44
Pipe 37 990 1000 0.83 0.51
Pipe 38 1080 1000 0.84 0.52
Pipe 39 1080 1200 0.61 0.23
Pipe 40 990 1400 1.88 1.57
Pipe 41 1800 1200 2.51 3.22
Pipe 42 1620 1200 2.46 3.10
Pipe 43 1620 1200 2.45 3.07
Pipe 48 1800 800 1.47 1.91
Pipe 54 450 800 2.31 4.44
Pipe 55 1290 800 1.66 2.41
Pipe 58 810 600 0.73 0.74
Pipe 31 990 600 1.86 4.13
Pipe 49 1260 600 1.82 3.97
Length Diameter Velocity Unit Headloss
Link ID
m mm m/s m/km
Pipe 59 1350 500 2.31 7.64
Pipe 60 900 500 2.00 5.84
Pipe 61 1260 800 1.36 1.66
Pipe 62 1620 800 1.97 3.30
Pipe 63 720 1000 1.36 1.28
Pipe 64 630 1000 1.29 1.15
Pipe 65 630 1000 1.19 0.99
Pipe 66 720 1000 1.11 0.88
Pipe 67 1980 1000 1.06 0.81
Pipe 68 1270 1000 1.01 0.74
Pipe 72 1440 1200 0.69 0.30
Pipe 73 810 600 0.73 0.73
Pipe 75 1170 600 0.71 0.69
Pipe 76 1260 1000 0.69 0.36
Pipe 77 1035 1000 0.75 0.43
Pipe 78 720 1000 0.85 0.54
Pipe 79 990 1000 0.94 0.65
Pipe 80 1080 900 0.71 0.43
Pipe 81 810 800 0.74 0.54
Pipe 82 990 700 0.74 0.63
Pipe 83 1665 600 0.74 0.75
Pipe 84 1440 500 0.61 0.65
Pipe 85 1395 300 1.11 3.60
Pipe 87 1080 200 1.27 7.31
Pipe 88 990 300 1.71 7.92
Pipe 89 900 500 0.72 0.89
Pipe 90 1440 500 0.88 1.29
Pipe 91 1440 600 0.77 0.81
Pipe 92 1530 1200 2.42 3.01
Pipe 93 1800 1200 2.38 2.92
Pipe 94 1620 1000 0.92 0.62
Pipe 53 1125 600 0.89 1.05
Pipe 20 1650 1000 0.82 0.50
Pipe 21 1550 700 0.77 0.67
Pipe 30 2210 400 2.06 8.02
Pipe 44 1290 800 1.60 2.24
Pipe 45 210 800 1.09 1.09
Pipe 19 1330 900 2.99 6.23
Pipe 47 95 1400 2.34 2.36
Pipe 50 90 400 0.74 1.21
Pump1 #N/A #N/A 0.00 -39.04
Pump 46 #N/A #N/A 0.00 -78.37
Alternatif 2
Kapasitas R1 = 93,04 L/detik
Kapasitas R2 = 3.605,20
Kelurahan Qhm Qjp
Curug
Kemanisan 34.71 61.03
Pancalaksana 14.69 25.83
Tinggar 4.57 8.03
Cipete 12.04 21.18
Curugmanis 12.17 21.39
Sukalaksana 12.35 21.71
Sukawana 3.36 5.92
Curug 18.37 32.30
Sukajaya 15.88 27.93
Cilaku 30.68 53.95
Jumlah 158.82 279.26
Walantaka
Nyapah 10.29 18.09
Lebakwangi 3.97 6.98
Cigoong 9.67 17.00
Tegalsari 7.07 12.43
Pasuluhan 9.98 17.55
Pabuaran 3.83 6.73
Walantaka 14.37 25.27
Pengampelan 39.38 69.24
Pipitan 53.17 93.50
Kiara 21.77 38.28
Pegaragung 40.25 70.78
Kalodran 30.91 54.35
Kapuren 23.26 40.90
Teritih 38.70 68.05
Jumlah 306.62 539.15
Cipocok Jaya
Gelam 25.36 44.59
Dalung 34.76 61.13
Tembong 24.43 42.96
Karundang 27.77 48.83
Cipocok Jaya 58.65 103.13
Banjarsari 85.01 149.47
Banjaragung 61.81 108.68
Panancangan 59.91 105.35
Jumlah 377.70 664.14
Serang 0.00 0.00
Serang 94.40 165.99
Cipere 91.19 160.35
Sumur Pecung 72.02 126.64
Cimuncang 89.59 157.53
Kotabaru 23.17 40.73
Lontarbaru 32.14 56.51
Kagungan 47.06 82.75
Lopang 51.16 89.96
Unyur 121.40 213.47
Kaligandu 60.92 107.11
Terondol 23.42 41.18
Kelurahan Qhm Qjp
Sukawana 2.26 3.98
Jumlah 708.72 1246.19
Taktakan
Cilowong 2.90 5.09
Sayar 14.22 25.01
Sepang 31.80 55.91
Pancur 2.53 4.44
Kalang Anyar 12.69 22.32
Kuranji 13.12 23.07
Panggung Jati 26.07 45.84
Drangong 68.87 121.10
Taktakan 24.46 43.01
Umbul Tengah 15.63 27.49
Lialang 21.74 38.22
Taman Baru 25.64 45.09
Cibendung 2.18 3.83
Jumlah 261.85 460.43
Kasemen
Kasemen 48.46 85.20
Warung Jaud 31.83 55.98
Mesjid Priyayi 22.01 38.70
Bendung 20.67 36.35
Terumbu 27.03 47.52
Sawah Luhur 19.82 34.85
Kilasah 23.93 42.07
Margaluyu 19.16 33.68
Kasunyatan 30.28 53.25
Banten 46.37 81.54
Jumlah 289.56 509.15