CONVERSION OF THE EXISTING 4-LANE KARACHI-HYDERABAD SUPERHIGHWAY

INTO 6-LANE MOTORWAY (M-9)

ORGANIZATION CHART FOR DESIGN REVIEW TEAM

PROJECT MANAGER

PROJECT
COORDINATOR

DESIGN REVIEW TEAM FIELD MONITORING TEAM

Topographic Survey Team

Geology / Geotechnical Invest.


HIGHWAY STRUCTURE GEOTECHNICAL ELECTRICAL HYDRAULICS

Pavement Evaluation

Pavement Design Eng.


Bridge / Structure Condition Survey
Geometric Design Eng. Geotechnical Eng. Electrical
Interchanges Hydraulics
Surveyor Geologists Design Eng.
Eng. Design Eng.
Quantity Surveyor Seismologists Lighting Eng.
Buildings Eng.
Material Specialist
Borrow Area / Materials

Hydraulics
CONVERSION OF THE EXISTING 4-LANE KARACHI-HYDERABAD SUPERHIGHWAY
INTO 6-LANE MOTORWAY (M-9)

ORGANIZATION CHART FOR QUALITY CONTROL CONSULTANT

PROJECT MANAGER

DESIGN ENGINEERS
PROJECT
QUALITY EXPERTS
COORDINATOR CONTRACT ENGINEER

OFFICE ENGINEER
DESIGN ENGINEERS CHIEF RESIDENT ENGINEER
QUANTITY SURVEYORS (CRE)
CADMAN

RESIDENT ENGINEER HIGHWAY - I RESIDENT ENGINEER STRUCTURES RESIDENT ENGINEER HIGHWAY - II

ARE MATERIAL ARE MATERIAL ARE MATERIAL


ARE - I ARE - II
HIGHWAY ENGINEER ELECTRICAL ENGINEER HIGHWAY ENGINEER

PILING ENG. PILING ENG.


SITE SITE
(1 Nos.) (1 Nos.)
ENGINEER ENGINEER
LAB TECH. PILING INS. PILING INS. MATERIAL LAB TECH.
INSPECTOR INSPECTOR
(2 Nos.) INSPECTOR (1 Nos.) (1 Nos.) INS. (4 Nos.) (2 Nos.)
(3 Nos.) (3 Nos.)
MATERIAL (2 Nos.) INSPECTOR INSPECTOR LAB TECH MATERIAL
SURVEYOR SURVEYOR
INS. (2 Nos.) (2 Nos.) (2 Nos.) (2 Nos.) INS. (2 Nos.)
(2 Nos.) (2 Nos.)
SURVEYOR SURVEYOR
CADMAN CADMAN
(1 Nos.) (1 Nos.)