CERTIFICATE OF COMPLETION AND ACCEPTANCE

PROJECT : CONSULTANCY SERVICES FOR THE PRELIMINARY AND DETAILED


ENGINEERING (PDE) FOR SCHOOL BUILDING SUBSURFACE SOIL
EXPLORATION WORKS FOR REGION I

LOCATION : BATAC CITY

CONTRACTOR : RS JARDIN & ASSOCIATES

LOT NO. :2

CONTRACT AMOUNT: Php1,337,500.00


= = = = = = = = = == = = = = = = = = = = = = = = = = = = = = = = = = = = = = =

I. SCOPE OF WORK: The whole project is identified as:


Geotechnical Conditions for the Services for the Preliminary Detailed
Engineering (PDE) of the following schools:

ITEM
SCH. ID NAME OF SCHOOL REMARKS
NO.
1 100080 Maipalig-Quiom Elementary School Completed

2 100083 Parangopong Elementary School Completed

3 100088 Benigno Macadaeg Memorial School Completed

4 100091 Baoa Elementary School Completed

5 320803 City of Batac National High School Payao Completed

6 100081 Naguirangan Capacuan Elementary School Completed

7 100084 Payao Elementary School Completed

8 100094 Camandingan Elementary School Completed

9 100098 Rayuray Elementary School Completed

II. CONTRACTOR’S CERTIFICATION


a. The Service Provider has fully completed the scope of work in accordance
with the plans specifications and other related contract documents by
furnishing all the necessary labor, materials, equipment, tools, supplies and
supervision (see attached individual Certificate of Completion)
b. The Service Provider has fully completed all the works as indicated in the
Program of Works within the agreed completion period.
c. The Service Provider certified the correctness of the data result submitted and

(072) 607-8137
depedregion1
(072) 607-8136
region1@deped.gov.ph
d. willing to extend his services if necessary without any additional cost to be
collected in this Office after the acceptance of the project and within the
guaranty period.

III. ACCEPTANCE

We certify that the above mention project is 100% complete based on the
required PDE result stipulated in the contracts, plans and specification. We hereby
recommend for the acceptance of the project as described in Item I above conditions
provided under Item II.

RECOMMENDING APPROVAL:

ENGR. REDENTOR S. JARDIN DARWIN M. RIVER


Manager STA-II
R.S. Jardin & Associates

ENGR. CELSO C. MANANGAN EDILBERTO R. ABALOS


Engineer III-Regional Office I Chief ESSD

In view of the foregoing, the project is hereby declared 100% completed.

By:

MALCOLM S. GARMA
Regional Director