: Learning Area: Grade Level: Quarter: Duration: Date:


15 Science 8 First 60 minutes June 23, 2017

Bibliography:

 Science 8 Learner's Material pages 25-26, Science 8 Teacher's Guide pages 19-20.
 Exploring Life Through Science 8 By Josefina Ma. Ferriols-Pavico, Anna Cherylle Morales-Ramos, Aristea
V. Bayquen, Angelina A. Silverio, John Donnie A. Ramos (Author-Coordinator) pages 308-310.
 DepEd Curriculum Guide in Science 8.

Appendices:
1. Expected answer to question (Analysis):
When is work done in relation to the context of force and displacement?
 Work is done when the force (F) applied to the object causes the object to have a displacement (d) in the
same direction as the force applied.

2. Answers to problems with solutions:


Application (Reflected to real-life situation):
How much work is done by a shopper in pushing her grocery cart by a force of 32 N through a distance of 4.5
m?
Solution:
We are given the applied force F= 32 N and d= 4.5 m.
Work done by applied force = Fd
W= (32 N) (4.5 m)
W= 144 J = 140 J
Assessment:
Suppose a woman is pushing a grocery cart with a 500 Newton force along the 7 meters aisle, how much work is
done in pushing the cart from one end of the aisle to the other?
Solution:
𝑊=𝐹𝑑
𝑊=500 𝑁 (7 𝑚)
𝑊=3500 𝑁𝑚
𝑊=3500 𝐽
Assignment (Reinforcing/Strengthening the day’s lesson):
Try solving this:
A book of mass 1 kg is on the floor. If the book is lifted from the floor to the top shelf which is 2 meters from the floor,
how much work is done on the book?
Solution:
W= Fd
W= mgh
W= 1 kg (9.8 m/s2) (2m)
W= 19.6 N m or J
UNDERTAKING

The undersigned members of the LRMDS LESSON PLAN HARVESTING PROGRAM Team hereby attest to
the authenticity and veracity of the harvested plan as the true and original work of PORO SECONDARY SCIENCE 8
TEACHERS, from PORO, CEBU and that the Team thoroughly ascertained that no law, particularly the Intellectual
Property Law and other related legislations, orders and regulations have been breached and/or violated by the writer.

Further, that the TEAM take full responsibility of any breach/violation that will hereinafter maybe discovered
and shall take immediate corrective measures upon its discovery.

Signed in the Municipality of Poro Cebu, Philippines, this 21st day of July, in the year of our Lord Two Thousand
Seventeen.

MELNA M. TALABOC MELINA A. BORLASA


Member/MT 1-Science Subject Coordinator Member/MT 1-TLE Subject Coordinator

MARIETA A. GORGONIO
Member/Coordinating Principal

RAUL A. JUMAO-AS
Chairman/PSDS Poro District

Vous aimerez peut-être aussi