Vous êtes sur la page 1sur 8

UNIVERSITI KEBANGSAAN MALAYSIA

CADANGAN REKA DAN BINA SISTEM RANGKAIAN PAIP AGIHAN UNTUK BEKALAN AIR TELAGA TIUB
BAGI KOLEJ UNGKU OMAR (KUO), UNIVERSITI KEBANGSAAN MALAYSIA, BANGI, SELANGOR DARUL
. EHSAN (PANGGILAN SEMULA)
RINGKASAN SEBUTHARGA

SECTION DESCRIPTION FROM PAGE NO AMOUNT

A PRELIMANARIES 2 111,634.00

B KERJA REKABENTUK 3 30,000.00

C KERJA-KERJA AWAM 6 357,250.00

D PROVISIONAL SUM 7 50,000.00

548,884.00
SECTION `A' - KERJA-KERJA AWALAN
BIL BUTIRAN KERJA HARGA PUKAL
(RM)
BAHAGIAN A
Kerja-Kerja Awalan
CAR Insurance 5,000.00

Workman's Compensation 5,000.00

Insurance for works 5,000.00

Design Guarantee 5,000.00

Performance Bond 5,000.00

CIDB Requipment 1,375.00

Contract Document 500.00

Progress Report 500.00

Sample 500.00

Signboard 2,000.00

Security and safety 1,000.00

Clearing of Rubbish 2,000.00

Duty Stamp 6,000.00

Temporary access 3,000.00

Plant and equipment 20,000.00

Keeping site dairy 1,000.00

Protection of the works 1,000.00

Protection of Existing Services 1,000.00

Hoarding 6,600.00

Kerja-Kerja Ukur 20,159.00

Kerja-Kerja Penyiasatan Tanah 20,000.00

DIBAWA KE RINGKASAN SEBUTHARGA 111,634.00

Section A/1/2
HARGA SEMASA TUNTUTAN JUMLAH
ITEM DESCRIPTION UNIT QTY. RATE AMOUNT Kuantiti Kadar Jumlah Terdahulu Sekarang TUNTUTAN
NO. (RM) (RM) (RM) % % (RM)

Kerja-Kerja Reka Bentuk

1 Melantik Perunding bagi kerja-kerja LS 24,000.00 24,000.00 - 100 24,000.00


reka dan bina

2 Lukisan Terbina LS 6,000.00 6,000.00 - - -

To Collection: 30,000.00 24,000.00


ITEM DESCRIPTION UNIT QTY. RATE AMOUNT
NO. (RM)

Rangkaian Paip Agihan

Reka, Bekal dan Pasang Sistem Rangkaian


Paip Agihan

1 100mm Dia HDPE Pipe LS 102,000.00

2 50mm Dia HDPE Pipe LS 19,250.00

3 50mm Dia, Injap Apung LS 20,000.00

4 Sistem meter LS 10,500.00

To Collection: 151,750.00
ITEM DESCRIPTION UNIT QTY. RATE AMOUNT
NO. (RM)
151,750.00
Tangki Agihan

1 Reka, Bekal dan Pasang struktur tapak dari konk LS 125,000.00

2 Bekal dan pasang 3 nos Tangki HDPE 5000 Gal LS 42,000.00

3 Mengangkut dan pasang tangki sedia ada LS 6,000.00

4 Reka bina rumah pam LS 24,500.00

To Collection: 349,250.00
ITEM DESCRIPTION UNIT QTY. RATE AMOUNT
NO. (RM)
349,250.00

Sisa Binaan

7 Buang Segala sampah sedia ada LS 4,000.00

8 Membaik pulih kerosakan LS 4,000.00

TO SUMMARY: 357,250.00
HARGA SEMASA TUNTUTAN
ITEM DESCRIPTION UNIT QTY. RATE AMOUNT Kuantiti Kadar Jumlah Terdahulu Sekarang
NO. (RM) (RM) (RM) % %

PERUNTUKAN SEMENTARA

A Sediakan Wang Peruntukan Sementara LS 50,000.00


sejumlah RM 50,000.00

TO SUMMARY: 50,000.00
JUMLAH
TUNTUTAN
(RM)

Vous aimerez peut-être aussi