Vous êtes sur la page 1sur 8

Date of last update: 4/8/2019

Updated by: REHAN MONIS

# Activity list

Tank Roof
1
Roof plate fitup
Roof plate long seam weld
Roof nozzle fabrication
Roof nozzle weld
Test/inspection to be done (if any)

2 Shell course
Shell course erection
Shell course long seam weld
Shell course circ. seam weld
Shell nozzles/cutouts (if any)
Test/inspection to be done (Peeking & banding, RT, PT,
Plumbness, Weld visual)

3 Bottom plate
Bottom plate fit up
Bottom plate long seam weld
Bottom plate sump cut out and fit up
Other attachments to BP
Test/inspection to be done (Vacuum box, RT)

Pipes and pipe supports


4
Fabrication of supports
Pipe fit up and weld
Test/inspection (if any)

5 Staircase & handrails


Fabrication of stairs
Fabrication of supports
Fabrication of handrails
Fit up of staircase and handrails
Welding of staircase and handrails
Test/inspection (if any)

6 Other attachments
Floating suction
Foam chamber
Vortex breaker (if any)
Gauge hatch

7 Hydrotest
Filling of tank
Test/inspection (if any)
Emptying of tank
Drying and cleaning of tank
Repair activity (if any)

8 Painting
Painting of external pipes and nozzles
Internal painting of pipes, supports, nozzles
Painting of external acccessories (spiral staircase, handrails,
etc.)
Internal weld repair painting
External weld repair painting
Bottom plate painting (internal) w/ sump
Bottom plate painting (external)
Internal painting of shells up to 1m from bottom
Internal painting of roof structure
External painting of shell and roof

Fire fighting
9

Note: Tank overall progress does not include hydrotest


28B 28C
Tank overall progress (%): 53 Tank overall progress (%):

Finished % Overall % Finished %


100 100
100 80
100 60 100
0 0
0 0

Finished % Overall % Finished %


100 100
100 100
100 90
100
100 50

100 70

Finished % Overall % Finished %


100 100
100 100
100 100 100
100 80
100 90

Finished % Overall % Finished %


100 50
60 53 0
0 0

Finished % Overall % Finished %


100 100
100 100
100 100
50
0 0
0 0
0 0

Finished % Overall % Finished %


0 0
0
0 0
0
0 0
0 0

Finished % Overall % Finished %


0 0
0 0
0 0 0
0 0
0 0

Finished % Overall % Finished %


0 0
0 0

0 0
0 0
0 7 0
0 0
50 50
0 0
20 20
0 0

drotest
28C 28D
Tank overall progress (%): 44 Tank overall progress (%): 20

Overall % Finished % Overall %


0
0
56 0 0
0
0

Overall % Finished % Overall %


25
25
0
82 12
0

10

Overall % Finished % Overall %


100
100
94 100 94
80
90

Overall % Finished % Overall %


0
17 0 0
0

Overall % Finished % Overall %


0
0
0
50 0
0
0
0

Overall % Finished % Overall %


0
0 0
0
0 0
0
0

Overall % Finished % Overall %


0
0
0 0 0
0
0

Overall % Finished % Overall %


0
0

0
0
7 0 31
35
100
50
90
35
28E
Tank overall progress (%): 19

Finished % Overall %
0
0
0 0
0
0

Finished % Overall %
25
0
0
6
0

Finished % Overall %
100
100
100 94
80
90

Finished % Overall %
0
0 0
0

Finished % Overall %
0
0
0
0
0
0
0

Finished % Overall %
0
0
0
0
0
0

Finished % Overall %
0
0
0 0
0
0

Finished % Overall %
0
0

0
0
0 31
35
100
50
90
35