A. General comments
Contents to be revised in line with the revisions
1 Done in revised MQP Rev 02
done
We have modified the witness points
TBEA to submit the test procedures for all the as per our experience and request to
2
witness tests along with the QAP approve the same. Test procedure has
been enclosed.
All reports which not for ECEPL/EICIPL witness Ok agreed. The same will be shown at
5
shall be submitted for ECEPL/EICIPL for review the time of final inspection/testing
1.4.8 Add "Check for edge burr after deburring" The same already included in Cl 1.5.4
2.2 Add " Oil duct arrangement" Included in revised MQP Rev 02
2.2 Add " Check for Air gap" Included in revised MQP Rev 02
2.2 Add" Core diameter" Included in revised MQP Rev 02
2.2
Add " Winding dimension Included in revised MQP Rev 02
2.2 Add " Distance of HV & LV Frames" Included in revised MQP Rev 02
Why Check of CRGO sheet selection during core The same is included in Cl 1.5.2 and
2.2.1
building deleted Cl1.5.3 hence deleted
2.2.11 Add customer witness for one transformer Included in revised MQP Rev 02
2.2.12 Add customer witness for one transformer Included in revised MQP Rev 02
2.2.13 Add customer witness for one transformer Included in revised MQP Rev 02
3.1 Test procedures are to be given Test procedures are given separately
3.1.9 "Full wave Lightning impulse on all line terminals" Included in revised MQP Rev 02
Note: All other changes as requested by Abir Infra is incorporated in the revised MQP Rev 02
02 of Abir Infra
Remarks
Covered in Cl No 2.2.3
Included in Cl 2.1.8
Not found in the MQP. Please mention the
clause no where it is being added or
where the same is covered.
Covered in Cl No 2.2.11
QP Rev 02