BINDUSARA BRIDGE

1 GENERAL
1.1 DISTRICT BEED
1.2 DIVISION SPECIAL PROJECT DIVISION NO. 1BEED
1.3 CIRCLE SPECIAL PROJECT CIRCLE AURANGABAD
1.4 NAME OF RIVER BIDUSARA RIVER
1.5 NEAREST VILLAGE OR TOWN BEED
1.6 NAME OF ROAD SOLAPUR - BEED - DHULE N.H.-211
1.7 LOCATION OF BRIDGE KM 175/900

2 HYDRAULIC DATA
2.1 CATCHMENT AREA 3230.90 SQ. KM
2.2 DESIGN DISCHARGE 7157.00 CUMECS
2.3 DESIGN VELOCITY 1.45 M/SEC
2.4 H.F.L. R.L.108.50 M
2.5 LOW WATER LEVEL R.L.103.90 M
2.6 LOWEST BED LEVEL R.L. 102.50 M
2.7 SUB SOIL DATA SANDY SOIL

3 STRUCTURAL DATA
3.1 TYPE OF BRIDGE SUBMERSIBLE BRIDGE
3.2 LENGTH (BETWEEN END FACES OF DECKING ) 162.50 M
3.3 AVERAGE HEIGHT ( FROM FOUNDATION TO FORMATION ) 8.20 M
3.4 SPAN ARRANEGEMENT 23 SPANS OF 7.0 M C/C
3.5 ROAD WIDTH (CLEAR / OVERALL) 7.50 M / 11.0 M
3.6 FORMATION LEVEL R.L. 110.00 M
3.7 FOUNDATION LEVEL ( LOWEST ) R.L. 103.30 M
3.8 FOUNDATION LEVEL ( HIGHEST ) R.L. 103.80 M
3.9 TYPE OF FOUNDATION OPEN FOUNDATION
3.10 TYPE OF SUBSTRUCTURE (PIERS ) COMPOSITE C.R.+ P.C.C.
3.11 TYPE OF END BLOCK --
3.12 TYPE OF BEARINGS NOT POSSIBLE TO SEE
3.13 TYPE OF SUPERSTRUCTURE T-BEAM. GIRDER AND SLAB
3.14 TYPE OF WEARING COAT BITUMINOUS
3.15 TYPE OF RAILING SANCHI TYPE R.C.C.

4 OTHER DATA
4.1 DATE OF STARTING WIDENING - 1997
4.2 DATE OF COMPLETION WIDENING - 1998
4.3 TOTAL COST OF BRIDGE PROPER --
4.4 CONSTRUCTION AGENCY WIDENING - Y.G.PATWARDHAN - PUNE
4.5 TOTAL LENGTH OF APPROACHES 340.00 M
4.6 TOTAL COST OF APPROACHES --
4.7 SPECIAL FEATURES IF ANY --