APPLICATION
PD- Installation of Three (3 RFSC/Other 8,100 5,400 2,700 2,700 5,400 24,300
PQ-01 ) units single phase Income
76.2 KVA, 7.62 kV
Automatic Voltage
Regulator will be
installed to different
system (DXS). to
correct the power
quality problem.
PD-Q- Conversion of 23 RFSC/Other 2,151 3,826 2,592 8,569
02 kilometers Single Income
Phase to Three Phase
Line from Barangay
San Rafael To
Barangay Langogan,
of San Jose Feeder
Puerto Princesa City
(at 3 periods)
SD-S- Encasement and RFSC/Other 535 565 1,064 565 565 3,292
02 protection of meters Income
into one (1) enclosure.
RI-Ol This projects involves RFSC/Other 8,174 8,174 8,174 8,174 8,174 40,872
the installation of Income
additional
sectionalizing
equipment and
devices to different
distribution systems.
SL-01 This project entails the RFSC/Other 8,700 8,700 8,700 8,700 8,700 43,500
replacement of ageing Income
kilowatt-hour meters,
routinely complaints
from customers and
meter readers such as
not-moving, creeping,
no display, broken
glass cover, burned
and inaccurate
meters.
SL-02 Installation of RFSCIOther 8,540 9,776 10.748 11,513 12,175 52,752
Amorphous Metal Income
Distribution
Transformers.
SL-03 Installation of RFSC/Other 1,021 1,021
photocell to existing Income
street lights in
replacement to
manual switch.
RE Extension of NEA 371,277 66,062
distribution lines to un- Subsidy
energize 23
barangays and 208
sitios.
distribution
transformers and other
line hardware for buffer
stocks for emergency
response in the
rehab i litation/restoration
of distribution lines.
to SM Mall.
PD-C-01 Uprating of Existing Primary Conductors of Capacity
Narra Feeder 2
PD-C-02 Uprating of Existing Primary Capacity
Conductors of El Nido Distibution Line
PD-PQ-01 Installation of Automatic Voltage Regulator Power Quality
PD-PQ-02 Single to Three Phase Line Conversion from Power Quality
Barangay San Rafael to Barangay Langogan,
Puerto Princesa City
PD-CR -02 Single to Three Phase Line Conversion from Capacity
Barangay Villa Libertad to Barangay Bucana,
El Nido and Sitio Logadia to Sitio Bobolungan,
Corong Corong, El Nido
PD-CR -03 Line Conversions to Three Phase from Rizal, Capacity
Taytay & Roxas Distribution Stand Alone
Systems
SD-S-01 Installation of Primary Lines to Overextended Safety
Secondary Lines and Service Drop Wires
SD-S-02 Meter Encasement and Protection Safety
RI-Ol Installation of Additional Sectionalizing Reliability
Equipment & Devices
SL-01 Replacement of Old and Defective Kilowatt- System Loss
hour Meters
SL-02 Installation of Amorphous Distribution System Loss
Transformers
SL-05 Installation of Photo switch for Street Lights System Loss
RE Extension of distribution lines to un-energize Rural
23 barangays and 208 sitios. Electrification
C. Power Quality;
Project Justification
Installation of 5 The project will primarily address and mitigate the voltage
MVA Substation at violations (under voltage and voltage unbalance) of San Jose
ERC Case No. 2016- RC
Application for Approval of the Five (5)-Year CAPEX Projects
Paqe9ofl9
Installation of 5 The project will primarily address and mitigate the voltage
MVA Substation at violations (under voltage and voltage variations/imbalance) of
Barangay Iwahig Feeder which has an existing total length of 35.84
Montible, Puerto kilometer 13.2 kV primary distribution line from the existing
Princesa City switchyard.
Barangay San The installation of additional two-phase line will correct the
Rafael to unbalance phase current and improve voltage imbalance. In
Barangay the future, this will also accommodate potential large load
Langogan, Puerto customers with three-phase connection requirement since
Princesa City the area is potential for resort hotels.
Single to Three The line conversion to Barangay Villa Libertad and portion of
Phase Line Barangay Pasadena are required to meet the connection
Conversion from requirement of Ayala Corporation. The expected demand of
Barangay Villa Ayala Corporation is initially 1.5 MW and will increase by 2.5
Libertad to
MW per year with an expected maximum demand of 15 MW.
Barangay Bucana,
El Nido and Sitio The expected additional sales per year is 10.950,000 kWh.
Logadia to Sitio
Bobolungan Aside from this, the long single phase line creates unbalance
Corong Corong, El in phase currents which usually results to tripping of feeder
Nido breaker when there is fault in one line.
Line Conversions The main purpose of this project is to accommodate the
to Three Phase at three-phase connection requirement of government facilities
Rizal, Taytay & and other commercial customers. The conversion of this
Roxas Stand lines will also refurbish the existing lines which is
Alone Distribution deteriorated. This will also serve as tapping of the future line
Systems extension of unenergized barangays of the respective
distribution system.
This will eliminate many service drop wires in the pole which
is prone to short circuit
Installation of This project will help improve system reliability by shortening
Additional the lines to be affected in case of line faults, therefore
Sectionalizing decrease number customers affected. Generally, these
ERC Case No. 2016- RC
Application for Approval of the Five (5)-Year CAPEX Projects
Paqe 12 of 19
14. The total estimated cost of PALECO 's CAPEX Projects for
CYs 2017-2021 is PhP1,161,818,240.00;
Cash Outflows:
CAPEX Requirement:
Funded by Loans: -
If sales will increase at 10% higher than forecast, rate impact will
be PhPO.05931kWh
Overall Indicative Rate Impact of the 2017-2021 Capex Projects
bales atltr'. IlignerInen 1- ortoast, Ste Interest
Cash Outflows:
CAPEXRequirement:
Funded by Loans: -
Assumptions:
If sales will decrease at 10% lower than forecast, rate impact will
be PhPO.1351/kWh
Overall Indicative Rate Impact of the 2017-2021 Capex Projects
aaies at lute Lower man Forecast, 05 IntereSt
Cash Outftows:
CAPEX_Requirement:
Funded by Loans:
NewCapex 56,430,476 45,671,815 50,891,833 69,086,019 32,619,825 263,708,769
Fundedby RFSC:
NewCapex 91.056,868 110.846,999 91,554.475 95,990,895 71,321,074 460,770,310
CAPEX Debt Service
NewCapex 6,484,516 11,846,888 16,613.283 26,551,034 63.495,722
Old Loans 1 16,500,000 21,000,000 20,000,000 25,000.000 24,000,000 108.500,000
ERC PerniliFee, Php(0.75%) 1 1,106,215.08 1.181,391.10 1,128,341.31 1,238,082.86 779,55(.74 5,433,593
Total Cash Outflows, Php 1 167,101,559 186,184,721 183,421,543 209,929,080 155.271,490 901,906,394
RFSC Balance Ending, FThp Excess (Shortfall) 13,872,765 (49.031,728) (91,752.166) (145,494,884) (176.015.857) (176.015,857)
IExcess(Shortfall) on RFSC, PhpMwh 0.0619 (0.2025) (0.3525) (0.5219) (0.5915) (0.1351)
ERC Case No. 2016- RC
Application for Approval of the Five (5)-Year CAPEX Projects
Page 15 of 19
Cash Outflows:
CAPEX Requirement:
Funded by Loans: -
Cash Outflows:
CAPEX Requirement:
Funded by Loans:
New Capes 56,438,476 46,671,815 58.891,833 69,088,819 32,619.825 263,708,789
Funds by RFSC: -
J JN *I
Other reliefs just and equitable under the premises are, likewise,
prayed for.
Respectfully Submitted.
Ilcoblaw...
ERC Case No. 2016- RC
Application for Approval of the Five (5)-Year CAPEX Projects
Page 19 of 19
go
LUMEN P. BALBOA
Roll of Attorneys No. 60550
PTR No. 5942018/01-20-2017/ Makati City
IBP No. 1069272; 01/20/2017/ Quezon City
MCLE Compliance No. V-0022277; 06/14/2016
Email: lumen.balboa@coblaw.ph
LUMEN P. BALBOA
MARIA C4ftHAUTEA 2
Roll of Aft rneys No. 66585
PTR No. 5727946/07-22-2016/Makati City
IBP No. 1042173/06-09-2016/RSM
Email: carmela.hautea@coblaw.ph
'In compliance with Supreme Court Resolution dated February 17, 2015, undersigned counsel respecthilly manifest
the MCLE Compliance details of their Firm's Name Partners, as follows:
2 MCLE Compliance in the process of completion as counsel was admitted to the Bar only last year 2016.
REPUBLIC OF THE PHILIPPINES)
)S.S
PUERTO PH:NLhS4 CIT
ANNEX "B"
VERIFICATION AND CERTIFICATION
That -
2. The allegations set forth in said Application are true and correct
based on my own personal knowledge and/or the authentic
records of the Cooperative.
N
OUN
L?R T
SUBSCRIBED AND SWORN to before me this day of
2017 at PUERTO PRINCESA UI e , affiant
- u-'HLbD NL 'J-t-i JcF6- I
exhibiting to me - issued ojj— at
fLTL! flm(?c4 cii-'/ ,-(]J
Doc. No. [1
Page No.
Book No. q7b UWTL DEC. 312017
Series of 2017.
W0, 110fl4I 0 TIO 5 /W4pg
liw
ji 4fl73 pJ954Q
ML