Vous êtes sur la page 1sur 4

Republic of the Philippines

Province of Bulacan
Malolos City

Project: Solar Street Light/Post


Libreng Pailaw ni Gobernor Daniel R. Fernando
SOP
Actual Withholding SOP Actual Actual
Items Market SOP VICE GOV SOP SOP SOP Contractor’s
Price Bidding Tax and Accountin Project Project Cost
Qty.

And Price BAC BOARD GOV Treasurer COA Profit


FOB/Lande Price VAT g Cost After Tax
Units Manila MEMBER
d
12% 3% 5% 10% 1% 1% 1% 12% 7%
G.I. Pipe
Galvanize
Powder 200 14,350.00 22,100.00 20,090.00 482,160.00 106,075.02 176,792.00 353,584.00 35,358.04 35,358.04 35,358.04 4,018,000 3,535,840 247,508.08
Coating
8 meters
G.I. Pipe
Galvanize
Powder
200 12,745.00 19,853.00 17,843.00 428,232.00 94,211.04 157,018.04 314,036.08 31.403.68 31.403.68 31.403.68 3,568,600 3,140,368 219.825.76
Coating
7 meters

Submitted to:

HON. DANIEL R. FERNANDO


Governor, Province of Bulacan Submitted by:

ART CABRAL CAPITO


President – JHICASSCO – POWER K
Specification:
Solar Color
Led Light Lumen Charging Discharging Water Angle Installation Actual
Units Battery Panel Tempera Lighting Mode Height Market Price
Lifespan Time Time Proof Distance Price
Lifespan ture

All-in-One 8 Hours High


Bridge
Integrated Lithium-ion 90W+18 6000K 11,000 8 Hours by Bright + 25%,
Lux U.S. 3 to 5 Days
SOLAR STREET A Grade V To Bright Bright IP 165 with PIR 120º 8 Meters 30 Meters 35,000.00 21,500.00
60,000 Rainy Days
LIGHT 100 50AH 25 years 6500K White Sunlight Motion Sensor
Hours
watts till Dawn
All-in-One 8 Hours High
Bridge
Integrated Lithium-ion 40W+18 6000K 2,200 8 Hours by Bright + 25%,
Lux U.S. 3 to 5 Days
SOLAR STREET A Grade V To Bright Bright IP 165 with PIR 120º 8 Meters 20 Meters 25,844.00 15,040.00
50,000 Rainy Days
LIGHT 20 18AH 25 years 6500K White Sunlight Motion Sensor
Hours
watts till Dawn
Specification:
Items Bottom Top Status of Pipe Distance of
Size/Height Thickness Color Quantity Market Price Actual Price
Diameter Diameter Installation Pipe

G.I. Pipe
Galvanize Hot Dipped and
8 Meters 166 cm 70 cm 3.0 Any 200 30mm 22, 100 20,090
Powder Powder Coat
Coating

G.I. Pipe
Galvanize
Hot Dipped and
Powder 7 Meters 154 cm 70 cm 3.0 Any 200 29mm 19,853 17,843
Powder Coat
Coating
1. Gov. Daniel Fernando
2. Tennie Bautista
3. Leinona Maya
4. Donna
5. Angelica Jones Alarva
6. Ador Punzalan
7 Jose Acelajado
8. Mayor Rainier Leopando
9. Coun. Hommer
10. Boyet Espejo
11. Vice Mayor Gerald Aritao
12. Mayor Jovit Reyes
13. Coun. Joselito Pajarillo
14. Engr. Michael Cruz
15. Sen Bong Revilla
16. Jay Lucena
17. Sen. Sherwin Gatchalian
18. Sen. Grace Poe
19. Sen Lito Lapid
20. Sen. Sonny Angara
21. Benjamin Navea
22. Sen. Joel Villanueva
23. Engr. Joshua
24. Shanica Bautista
25. Mayor Severniro Lajara
26. Arvin Vitales
27. Joey Maya
28. Niño Garcia
29. Jerome Oliveros
30. USEC. Robert Bernardo

Vous aimerez peut-être aussi