Vous êtes sur la page 1sur 32

Report No:

MATERIAL TRACEABILITY INSPECTION REPORT


Date:

Project: FQP No:


Customer: Tank Name:
Consultant: Tank No:
Sub Contractor: Area/Location/Zone/Grid:
WO No. Sub Location:
TPL JOB Code No: Drawing Number & Rev No:
Quantity Ordered: RFI NO:
Quantity inspected: Cumulative Qty Cleared till date:

Item Number/ Dimensions Material Heat Number/ Manufacturer's


Sl.No Description Part Number Specification Plate Number Test Certificate No. Quantity Remarks
Length Width Thickness

Sub-Contractor TPL Client / TPIA


Signature

Name

Date
Format No. 08.03.03/FQ-132/R0 Date 25-03-2019
Report No:
TANK FOUNDATION LEVEL INSPECTION REPORT
Date:

Project: FQP No:


Customer: Tank Name:
Consultant: Tank No:
Sub Contractor: Area/Location/Zone/Grid:
WO No. Sub Location:
TPL JOB Code No: Drawing Number & Rev No:
Stage/Final: Reference Code/Spec:
Quantity Ordered: RFI NO:
Quantity inspected: Cumulative Qty Cleared till date:

Type of Foundation : Horizontal Plane Foundation / Sloping Foundation Concrete Ringwall : Provided / Not Provided / Concrete Slab

TANK BOTTOM VERFICATION


Parameter to be 45⁰ 90⁰ 135⁰ 180⁰ 225⁰ 270⁰ 315⁰ Remarks
0⁰ / 360⁰
checked
Diameter

Slope

Level Reading

CONCRETE SLAB VERIFICATION

Required Level
Level at the mid of the slab in Annular Ring area, measured radially
as per Drawing
1 2 3 4 5 6 7 8 Remarks

Level of the slab at other areas ( to ensure slope towards centre)

NOTE-1: THE ABOVE FOUNDATION IS CLREARED FOR FURTHER CONSTRUCTION ACTIVITY.


NOTE-2: ENCLOSE RELEVANT SKETCH - AS APPLICABLE.

Sub-Contractor TPL - Civil FQE TPL - Mechanical FQE Client / TPIA

Signature

Name

Date
Format No. 08.03.03/FQ-133/R0 Date 25-03-2019
Report No:
FITUP & WELD VISUAL INSPECTION REPORT FOR TANK ROOF & BOTTOM PLATE
Date:

Project: FQP No:


Customer: Tank Name:
Consultant: Tank No:
Sub Contractor: Area/Location/Zone/Grid:
WO No. Sub Location:
TPL JOB Code No: Drawing Number & Rev No:
Stage/Final: Design Code:
Quantity Ordered: RFI NO:
Quantity inspected: Cumulative Qty Cleared till date:

Type of Root gap / Fitup Inspeciton Weld Visual Inspection


Sl.No Item Number Joint Number WPS No. Welder No. Remarks
Joint Overlap TPL Client TPL Client
NOTE : THE LAYOUT OF THE PLATES SHALL BE MARKED IN THE DRAWING AND ATTACHED TO THIS REPORT.
Sub-Contractor TPL Client / TPIA

Signature

Name

Date
Format No. 08.03.03/FQ-134/R0 Date 25-03-2019
Report No:

Date:

Remarks
D ATTACHED TO THIS REPORT.
Client / TPIA
Report No:
FITUP INSPECTION REPORT FOR TANK SHELL
Date:

Project: FQP No:


Customer: Tank Name:
Consultant: Tank No:
Sub Contractor: Area/Location/Zone/Grid:
WO No. Sub Location:
TPL JOB Code No: Drawing Number & Rev No:
Stage/Final: Design Code:
Quantity Ordered: RFI NO:
Quantity inspected: Cumulative Qty Cleared till date:
Shell Course Number: Level/Elevation:

Item number for the specified Shell Courses shall be taken from the "Shell Layout Drawing".
Joint Number SC - VJ -01 SC - VJ -02 SC - VJ -03 SC - VJ -04 SC - VJ -05 SC - VJ -06 SC - VJ -07 SC - VJ -08 Remarks
Item - 01
Item - 02

VERTICAL JOINT ROOT GAP AND MIS-ALIGNMENT READING


Joint Number SC - VJ -01 SC - VJ -02 SC - VJ -03 SC - VJ -04 SC - VJ -05 SC - VJ -06 SC - VJ -07 SC - VJ -08 Remarks

Top
Middle
Bottom

Mis-alignment

HORIZONTAL JOINT BETWEEN SC - + SC - (HJ - ) ROOT GAP AND MIS-ALIGNMENT READING


Radial Area 0⁰ / 360⁰ 45⁰ 90⁰ 135⁰ 180⁰ 225⁰ 270⁰ 315⁰ Remarks
Root Gap
Mis-alignment

Sub-Contractor TPL Client / TPIA

Signature

Name

Date

Format No. 08.03.03/FQ-135-1/R0 Date 25-03-2019 Page: 1 of 2


Report No:

Date:

ses shall be taken from the "Shell Layout Drawing".


Remarks

AP AND MIS-ALIGNMENT READING


Remarks

(HJ - ) ROOT GAP AND MIS-ALIGNMENT READING


Remarks
Client / TPIA

Page: 1 of 2
Report No:
FITUP INSPECTION REPORT FOR TANK SHELL
Date:

Project: FQP No:


Customer: Tank Name:
Consultant: Tank No:
Sub Contractor: Area/Location/Zone/Grid:
WO No. Sub Location:
TPL JOB Code No: Drawing Number & Rev No:
Inspection Stage: Stage / Final Design Code:
Quantity Ordered: RFI NO:
Quantity inspected: Cumulative Qty Cleared till date:
Shell Course Number: Level/Elevation:

PLUMBNESS
Plumb Area 0⁰ / 360⁰ 45⁰ 90⁰ 135⁰ 180⁰ 225⁰ 270⁰ 315⁰ Remarks
Top
Middle
Bottom
DIAMETER
Diameter at 0⁰ - 180⁰ 45⁰ - 225⁰ 90⁰ - 270⁰ 135⁰ - 315⁰ Remarks
Bottom
CIRCUMFERENCE
Top Middle Bottom Remarks
Circumference reading of shell

PEAKING AT VERTICAL JOINTS OF SHELL COURSE SC - .


Joint Number SC - VJ -01 SC - VJ -02 SC - VJ -03 SC - VJ -04 SC - VJ -05 SC - VJ -06 SC - VJ -07 SC - VJ -08 Remarks
Top
Middle
Bottom
BANDING AT HORIZONTAL JOINT BETWEEN SC - + SC - (HJ - )
0⁰ - 90⁰ 90⁰ - 180⁰ 180⁰ - 270⁰ 270⁰ - 0⁰ Remarks
Reading 1
Reading 2
NOTE-1: ENCLOSE RELEVANT SKETCH - AS APPLICABLE.
NOTE-2: THE DETAILS OF MEASUREMENTS OF PLUMBNESS, DIAMETER, CIRCUMFERENCE, PEAKING AND BANDING ARE INDICATED IN FORM NO.: 135-2. AFTER SATISFACTORY COMPLETION
OF ALL MEASUREMENTS, THE JOINTS ARE RELEASED FOR WELDING.

Sub-Contractor TPL Client / TPIA


Signature
Name
Date
Format No. 08.03.03/FQ-135-2/R0 Date 25-03-2019 Page: 2 of 2
Report No:
WELD VISUAL INSPECTION REPORT FOR TANK SHELL
Date:

Project: FQP No:


Customer: Tank Name:
Consultant: Tank No:
Sub Contractor: Area/Location/Zone/Grid:
WO No. Sub Location:
TPL JOB Code No: Drawing Number & Rev No:
Inspection Stage: Stage / Final Design Code:
Quantity Ordered: RFI NO:
Quantity inspected: Cumulative Qty Cleared till date:
Shell Course Number: Level/Elevation:

For Vertical Joints : Electrode / Filler Wire Specification : Batch No. :


WPS Number
For Horizontal Joints : Electrode / Filler Wire Specification : Batch No. :
Weld Visual Inspection of Vertical Joints of SC -
Joint Number SC - VJ -01 SC - VJ -02 SC - VJ -03 SC - VJ -04 SC - VJ -05 SC - VJ -06 SC - VJ -07 SC - VJ -08 Remarks
Welder No.
Outside

Back Groving

Welder No. Inside

Weld Visual of Horizontal Joint between SC - + SC - (HJ - )


0⁰ - 90⁰ 90⁰ - 180⁰ 180⁰ - 270⁰ 270⁰ - 0⁰ Remarks
Welder No.
Outside

Back Groving

Welder No. Inside

PEAKING AT VERTICAL JOINTS OF SHELL COURSE SC - .


Joint Number SC - VJ -01 SC - VJ -02 SC - VJ -03 SC - VJ -04 SC - VJ -05 SC - VJ -06 SC - VJ -07 SC - VJ -08 Remarks
Top
Middle
Bottom
BANDING AT HORIZONTAL JOINT BETWEEN SC - + SC - (HJ - )
0⁰ - 90⁰ 90⁰ - 180⁰ 180⁰ - 270⁰ 270⁰ - 0⁰ Remarks
Reading 1
Reading 2
NOTE ENCLOSE RELEVANT SKETCH - AS APPLICABLE.
Sub-Contractor TPL Client / TPIA
Signature
Name
Date
Format No. 08.03.03/FQ-136/R0 Date 25-03-2019
Report No:
TANK SETTLEMENT REPORT DURING HYDROSTATIC TEST
Date:

Project: FQP No:


Customer: Tank Name:
Consultant: Tank No:
Sub Contractor: Area/Location/Zone/Grid:
WO No. Sub Location:
TPL JOB Code No: Drawing Number & Rev No:
Inspection Stage: Stage / Final Design Code:
Quantity. RFI NO:
Cumulative Qty Cleared till date: Level/Elevation:

Holding Time Water 0º 30º 60º 90º 120º 150º 180º 210º 240º 270º 300º 330º
Remarks
Holding
Date Level Period Start End Ht. (m) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
During Filling
Initial Reading

25% Level after Holding


Period

50% Level after Holding


Period

75% Level after Holding


Period

Final Settlement @
100% level after Holding
Period

During Draining
75% Level after Holding
Period

50% Level after Holding


Period
25% Level after Holding
Period

NOTE: ENCLOSE RELEVANT SKETCH - AS APPLICABLE.


Sub-Contractor TPL Client / TPIA
Signature
Name
Date
Format No. 08.03.03/FQ-137/R0 Date 25-03-2019
Report No:
REPORT FOR
TANK NOZZLES - FIT UP INSPECTION
Date

Project: FQP No:

Customer: Tank Name:

Consultant: Tank No:

Sub Contractor: Area/Location/Zone/Grid:

WO No. Sub Location:

TPL JOB Code No: Drawing Number & Rev No:

Inspection Stage: Stage / Final Design Code:

Quantity. RFI NO:

Cumulative Qty Cleared till date: Level/Elevation:

Marking Inspection of Nozzle Openings : --

Location Orientation Elevation Projection Inspection by


Sl.No Nozzle No. Size RF Pad
(Shell/Roof) Required As found Required As found Required As found (as applicable) TPL
NOTE-1: ENCLOSE RELEVANT SKETCH - AS APPLICABLE.
Format No. 08.03.03/FQ-138/R0 Date 25-03-2019
Report No:

Date

Inspection by
Client/TPIA
Report No:
REPORT FOR
TANK NOZZLES - WELD VISUAL INSPECTION
Date:

Project: Design Code:


Customer: Area/Location/Zone/Grid:
Consultant: FQP NO:
Sub Contractor: Drawing Number & Rev No
TPL JOB Code No: Tank Name/Tank No:
RFI NO: Level/Elevation:

Inspection Stage: Stage / Final Quantity:

RF Pad Inspection by
Sl.No Nozzle No. WPS No. Welder No.
Weld Visual Pneumatic Test TPL Client/TPIA Remarks

NOTE: ENCLOSE RELEVANT SKETCH - AS APPLICABLE.


Format No. 08.03.03/FQ-139/R0 Date 25-03-2019
TANK FINAL INSPECTION REPORT

Project: Design Code:

Customer: Area/Location/Zone/Grid:

Consultant: FQP NO:

Sub Contractor: Drawing Number & Rev No

TPL JOB Code No: Tank Name


RFI NO: Tank No:

Quantity: Inspection Stage: Stage / Final

01 . All QC and Tesing documents were reviewed and found satisfactory.


02 . Orientation, Elevation and Projection of Sheel and Roof Appurtenances.
Orientation Elevation Projection
Sl.No Description Size Required Achieved Required Achieved Required

3 Total Tank Visual Inspection :


4 Plumbness :

5 Peacking :

6 Banding :

8 Circumference Bottom : Top:

9 Radigraphy of Tank Joints :

10 Vacuum Test of Tank Bottom :

11 Initial Tank Foudation Levels :


NOTE: ENCLOSE RELEVANT SKETCH - AS APPLICABLE.

Sub-Contractor TPL - FQE

Signature

Name

Date
Format No. 08.03.03/FQ-140/R0 Date 25-03-2019
Report No:

TANK FINAL INSPECTION REPORT


Date:

Design Code:

Area/Location/Zone/Grid:

FQP NO:

Drawing Number & Rev No

Tank Name
Tank No:

Inspection Stage: Stage / Final

und satisfactory.
Roof Appurtenances.
Projection
Achieved Remarks
Client / TPIA
TANK ROOF PNEUMATIC TEST REPORT

Project: Design Code:

Customer: Area/Location/Zone/Grid:

Consultant: FQP NO:

Sub Contractor: Drawing Number & Rev No

TPL JOB Code No: Tank Name

RFI NO: Tank No:

Quantity: Inspection Stage: Stage / Final

Test Starting Time :

Test Ending Time :

Test Pressure :

Manometer Reading during Hold :


Calibration Status :

Roof Test Results :

NOTE: ENCLOSE RELEVANT SKETCH - AS APPLICABLE.

Sub-Contractor TPL - FQE Client

Signature

Name

Date
Format No. 08.03.03/FQ-141/R0 Date 25-03-2019
Report No.

PNEUMATIC TEST REPORT


Date

Design Code:

Area/Location/Zone/Grid:

FQP NO:

Drawing Number & Rev No

Tank Name

Tank No:

Inspection Stage: Stage / Final

Client / TPIA
TANK PAINTING INSPECTION REPORT

Project: FQP No:


Customer: Tank Name:
Consultant: Tank No:
Sub Contractor: Area/Location/Zone/Grid:
TPL JOB Code No: RFI NO:
Paint Trade Name: SurfaceTemprature:
Humidity: Paint Specification:
Inspection Stage: Stage / Final Elcometer Details
Paint IMIR No: Drg No & Rev.
MRR No. Quantity:
Location
Required
Item Description Level 0 90 180
(µm) (µm) (µm) (µm)

SHELL COURSE - Bottom

Mid

Top

SHELL COURSE - Bottom

Mid

Top

SHELL COURSE - Bottom

Mid

Top

SHELL COURSE - Bottom

Mid

Top

SHELL COURSE - Bottom

Mid

Top

SHELL COURSE - Bottom

Mid

Top

ROOF Bottom
Mid

Top
Results :

Sub-Contractor TPL - FQE Client / T

Signature
Name
Date
Format No. 08.03.03/FQ-142/R0 Date 25-03-2019
Report No:

Date:

FQP No:
Tank Name:
Tank No:
Area/Location/Zone/Grid:
RFI NO:
SurfaceTemprature:
Paint Specification:
Elcometer Details
Drg No & Rev.
Quantity:
Location
270 Remarks
(µm)
Client / TPIA