July 30, 2019

TPD# WMSC.00002

Camp Hill Chick-Fil-A


Transportation Impact Study
Camp Hill Borough, Cumberland County, PA

For Submission To:


Camp Hill Borough, Cumberland County, PA

www.TrafficPD.com
CAMP HILL CHICK-FIL-A
TRANSPORTATION IMPACT STUDY
FOR SUBMISSION TO:

Camp Hill Borough, Cumberland County, PA

Prepared For:
Consolidated Properties, LLC
400 North Front Street July 30, 2019
Wormleysburg, PA 17043 TPD # WMSC.00002

Prepared By:
Traffic Planning and Design, Inc.
4000 Crums Mill Road, Suite 102
Harrisburg, Pennsylvania 17112

Phone: (717) 234-1430


Fax: (717) 234-4490
E-mail: TPD@TrafficPD.com
Web Site: www.trafficpd.com

Jarred L. Neal, P.E.


Project Manager
Pennsylvania License Number PE083971
Table of Contents
EXECUTIVE SUMMARY ............................................................................................................................................................ i
INTRODUCTION ........................................................................................................................................................................1
EXISTING ROADWAY NETWORK .......................................................................................................................................1
EXISTING TRAFFIC CONDITIONS .......................................................................................................................................2
BASE (NO-BUILD) CONDITIONS ........................................................................................................................................3
PROPOSED SITE ACCESS .......................................................................................................................................................4
TRIP GENERATION ...................................................................................................................................................................5
TRIP DISTRIBUTION .................................................................................................................................................................6
PROJECTED (BUILD) CONDITION TRAFFIC VOLUMES ..............................................................................................7
LEVELS OF SERVICE FOR AN INTERSECTION ................................................................................................................7
CAPACITY ANALYSIS METHODOLOGY ...........................................................................................................................8
CHESTNUT STREET – TRAFFIC CALMING AND PEDESTRIAN SAFTEY EVALUATION ................................ 10
LEVELS OF SERVICE IN THE STUDY AREA ................................................................................................................... 11
95TH PERCENTILE QUEUE ANALYSIS ............................................................................................................................ 20
AUXILIARY TURN LANE ANALYSIS ................................................................................................................................. 22
FAST FOOD RESTAURANT QUEUING ANALYSIS ..................................................................................................... 22
RECOMMENDATIONS AND CONCLUSIONS ............................................................................................................. 24

FIGURES 1 – 23

TECHNICAL APPENDICES
Appendix A: Project Correspondence
Appendix B: Study Area Photographs
Appendix C: Traffic Count Data
Appendix D: Nearby Developments
Appendix E: Trip Generation Worksheets
Appendix F: Volume Development Worksheets
Appendix G: Capacity/Queue Analysis Printouts
Appendix H: Traffic Signal Permit Plans
Appendix I: Critical and Follow-up Headway Calculations
Appendix J: Turn Lane Warrant Analysis
Appendix K: Drive-Thru Count Data
Appendix L: Simtraffic Analysis Printouts
Appendix M: Conceptual Pedestrian Improvements Plan
EXECUTIVE SUMMARY
The purpose of this Transportation Impact Study (TIS) is to assess potential traffic impact associated with
the proposed Chick-fil-a development on the roadway network in Camp Hill Borough, Cumberland County,
PA. Based on this evaluation, the following conclusions were reached:

1. The project site is located on the southeast corner of the intersection of S. 32nd Street (S.R. 0015) &
Chestnut Street.
2. The study area intersections included in this TIS are as follows:
» Chestnut Street and N-S Alley/Select Medical PT parking lot;
» S. 32nd Street (S.R. 0015) and Chestnut Street;
» Chestnut Street and S. 31st Street;
» Chestnut Street and S. 30th Street;
» S. 31st Street & E-W Alley;
» Bramar Road and N-S Alley/Camp Hill Family Chiropractic;
» S. 32nd Street and Harvard Avenue/Shopping Center Driveway;
» Market Street and 30th Street;
» Market Street and 29th Street.
3. The proposed development will consist of a 5,031 s.f. Chick-fil-a with 106 seats to be constructed and
operational by 2020.
4. Access for the development is proposed via the existing N-S Alley to Chestnut Street. Left turning
movements will be prohibited to exit the N-S Alley during the weekday A.M., weekday midday,
weekday P.M. and Saturday midday peak periods (7-9 AM; 4-6 PM; 11AM-1PM) via signage. The N-
S Alley at Chestnut Street will exceed PennDOT’s Desirable and Safe Stopping Sight Distance (SSSD)
criteria.
5. Upon full build-out, the proposed development is expected to generate 46 new vehicle-trips during
the weekday A.M. peak hour, 261 new vehicle-trips during the weekday midday peak hour, 142 new
vehicle-trips during the weekday P.M. peak hour, and 253 new vehicle-trips during the Saturday
midday peak hour.
6. Under 2020 projected conditions with full build-out of the proposed Chick-fil-a implementation of
the recommended roadway improvements, all levels of service (LOS) at the study area intersections
will operate the same overall intersection level of service (ILOS) as under 2020 base conditions, during
the weekday A.M., weekday midday, weekday P.M., and Saturday midday peak hour.
7. All approaches and turning movements at the site driveway intersection will operate at LOS B or
better under 2020 Projected Conditions during the weekday A.M., weekday midday, weekday P.M.,
and Saturday midday peak hours.
8. An eastbound right-turn lane of minimum 150 feet is warranted at the site driveway on Chestnut
Street. Therefore, TPD recommends parking be restricted along the southern side of Chestnut Street
from 32nd Street to the N-S Alley and the installation of a right-turn lane of minimum 150 feet at this
location.
9. TPD has made the following recommendations in relation to the proposed Chick-fil-a development
in Camp Hill Borough:

Chestnut Street & N-S Alley (CFA driveway)

» Widen and improve the alley to a three-lane road which will operate as the site driveway;
» Construct a 150 foot northbound right turn lane;
» Construct a 150 foot northbound left turn lane;
» Construct a minimum 150 foot eastbound right turn lane;
» Prohibit exiting left turn movements at the driveway during the weekday A.M., weekday midday,
weekday P.M. and Saturday midday peak periods (7-9 AM; 4-6 PM; 11AM-1PM) via signage.

E-W Alley (from eastern site property line to 31st Street)

» Construct signage indicating “No Thru Traffic, Local Use Only” at the eastern site property line and at
the 31st Street intersection.

N-S Alley (from southern site property line to Bramar Road)

» Construct signage indicating “No Thru Traffic, Local Use Only” at the southern site property line and at
the Bramar Road intersection.

Chestnut Street

» In order to accommodate the minimum 150 foot eastbound right turn lane; parking is proposed to be
restricted along Chestnut Street from S. 32nd Street to the N-S Alley (CFA driveway).

Chestnut Street/E. Trindle Road & S. 32nd Street

» Restripe the eastbound through lane to a shared eastbound left/through lane.


» Optimize timings.

Chestnut Street & S. 31st Street

» Construct a raised crosswalk crossing S. 31st Street.


» Relocate stop sign and stop bar behind the proposed raised crosswalk.

Chestnut Street & S. 30th Street

» Construct a raised intersection including crosswalks on all approaches.


» Relocate all four stop signs and stop bars behind the proposed raised intersection crosswalks.

Chestnut Street & S. 28th Street

» Construct a raised crosswalk crossing the north and south approaches of S. 28th Street.
» Relocate stop sign and stop bar behind the proposed raised crosswalk.

Chestnut Street & S. 27th Street

» Construct a raised crosswalk crossing the north and south approaches of S. 27th Street.
» Relocate stop sign and stop bar behind the proposed raised crosswalk.

Page ii www.TrafficPD.com
10. Levels of Service (LOS) for the study area intersections have been summarized in matrix form. Table I
details the overall intersection LOS for each study area intersection.

TABLE I
OVERALL INTERSECTION LEVEL OF SERVICE SUMMARY
Time Opening Year 2020 Meets LOS
Intersection Existing
Period Base Projected Projected1 Requirements?
A.M. A (1.5) A (1.5) A (2.0) A (2.0) Yes
Chestnut Street &
MID A (1.7) A (1.7) A (3.5) A (3.5) Yes
N-S Alley (CFA driveway)/ Select
P.M. A (1.2) A (1.2) A (2.5) A (2.5) Yes
Medical PT Parking Lot
SAT A (0.4) A (0.4) A (2.9) A (2.9) Yes
A.M. D (51.5) E (55.3) E (68.6) E (60.4) Yes
Chestnut Street/
MID D (48.2) D (46.9) E (58.8) D (54.4) Yes
Trindle Road &
P.M. E (56.1) E (60.0) E (74.4) E (69.4) Yes
S 32nd Street
SAT D (45.5) D (52.3) E (65.1) D (54.6) Yes
A.M. A (0.9) A (0.9) A (0.9) A (0.9) Yes
Chestnut Street & MID A (0.6) A (0.5) A (0.6) A (0.6) Yes
31st Street P.M. A (1.0) A (1.0) A (1.0) A (1.0) Yes
SAT A (0.6) A (0.6) A (0.5) A (0.5) Yes
A.M. A (10.0) B (10.1) B (10.3) B (10.3) Yes
Chestnut Street & MID A (9.6) A (9.6) B (10.8) B (10.8) Yes
30th Street P.M. A (9.2) A (9.2) A (9.7) A (9.7) Yes
SAT A (8.4) A (8.4) A (9.2) A (9.2) Yes
A.M. A (0.2) A (0.2) A (0.2) A (0.2) Yes
31st Street & MID A (0.0) A (0.0) A (0.2) A (0.2) Yes
E-W Alley P.M. A (0.1) A (0.1) A (0.2) A (0.2) Yes
SAT A (0.2) A (0.2) A (0.2) A (0.2) Yes
A.M. A (1.5) A (1.5) A (0.7) A (0.7) Yes
Bramar Road &
MID A (2.7) A (2.7) A (0.7) A (0.7) Yes
N-S Alley/
P.M. A (6.0) A (6.0) A (3.7) A (3.7) Yes
Camp Hill Family Chiropractic
SAT A (1.6) A (1.6) A (0.2) A (0.2) Yes
A.M. C (21.4) C (21.8) C (22.7) C (22.7) Yes
S 32nd Street &
MID C (26.7) C (27.5) C (30.5) C (30.5) Yes
Harvard Avenue/
P.M. C (30.7) C (32.0) C (34.0) C (34.0) Yes
Shopping Center Driveway
SAT C (24.9) C (25.6) C (29.2) C (29.2) Yes
A.M. A (4.5) A (4.6) A (4.9) A (4.9) Yes
Market Street & MID A (2.1) A (2.1) A (3.9) A (3.9) Yes
30th Street P.M. A (2.1) A (2.1) A (3.1) A (3.1) Yes
SAT A (1.7) A (1.7) A (3.2) A (3.2) Yes
A.M. A (8.1) A (8.2) A (9.3) A (9.3) Yes
Market Street & MID A (7.7) A (7.7) B (11.2) B (11.2) Yes
29th Street P.M. A (8.5) A (8.6) B (10.0) B (10.0) Yes
SAT A (8.3) A (8.3) B (11.0) B (11.0) Yes

Base = No-Build scenario


Projected = Build scenario
Unsignalized ILOS calculated in accordance with Figure 5 of Policies and Procedures for Transportation Impact Studies.
1
Projected conditions with implementation of recommended improvements,

Page iii www.TrafficPD.com


INTRODUCTION
Traffic Planning and Design, Inc. (TPD) has completed a Transportation Impact Study (TIS) for the proposed
Chick-fil-a development in Camp Hill Borough, Cumberland County, Pennsylvania. As shown in Figure 1,
the project site is located on the southeast corner of the intersection of S. 32nd Street (S.R. 0015) & Chestnut
Street. As shown in Figure 2, the proposed development will consist of a 5,031 s.f. Chick-fil-a with 106 seats
to be constructed and operational by 2020.
This report has been prepared in accordance with PennDOT’s Policies and Procedures for Transportation
Impact Studies, found in PennDOT’s Publication 282, Appendix A, dated July 2017 and Camp Hill Borough’s
Zoning Ordinance, Part 7, Section 731. All relevant correspondence pertaining to this project has been
included in Appendix A.

Site Access Locations


Access for the development is proposed via the existing N-S Alley (CFA driveway) to Chestnut Street. Left
turning movements will be prohibited to exit the N-S Alley during the weekday A.M., weekday midday,
weekday P.M. and Saturday midday peak periods (7-9 AM; 4-6 PM; 11AM-1PM) via signage.

EXISTING ROADWAY NETWORK


A field review of the existing roadway system in the study area was conducted. The existing roadway
characteristics within the study area are summarized in Table 1. The existing lane configuration and
intersection controls for the study area intersections are shown in Figure 3. Photographs of the study area
intersections are included in Appendix B.

TABLE 1
ROADWAY CHARACTERISTICS WITHIN STUDY AREA
Functional Predominant
Average Daily Posted
Roadway Ownership Classification/ Directional
Traffic Speed Limit
Roadway Type Orientation
S. 32nd Street State (SR 0015) Principal Arterial North-South 34,524 35 mph
Chestnut Street Borough Local East-West 5,6501 25 mph
S. 31st Street Borough Local North-South 714 25 mph
S. 30th Street Borough Local North-South 1,7301 25 mph
Bramar Road Borough Local East-West 4701 Not posted
S. 29th Street Borough Local North-South 6401 Not posted
Market Street State (SR 1010) Principal Arterial East-West 9269 25 mph
Harvard Avenue Borough Local East-West 18001 Not posted
1
Based on TPD Counts

Land Use Context


In Chapter 4 of PennDOT & NJDOT’s Smart Transportation Guidebook, dated March 2008, there is guidance
pertaining to defining the land use context(s) for a given area. Based upon review of this information, the
land uses surrounding the proposed site best fits the Suburban Corridor, designation, as described below:
Suburban Corridor, “…characterized by big box stores, commercial strip centers, restaurants, auto
dealerships, office parks, and gas stations. These uses are sometimes interspersed with natural areas and
occasional clusters of homes. Buildings are usually set back from the roadway behind surface parking.”

Page 1 www.TrafficPD.com
Roadway Type
In Chapter 5 of PennDOT & NJDOT’s Smart Transportation Guidebook, there is guidance pertaining to defining
the transportation context(s) for a given area. Comparing the existing condition roadway characteristics to the
various options presented in Table 5.1 of the Smart Transportation Guidebook, the study area roadways best fit
the following categories, as described below:
Regional Arterial, traffic volumes of 10,000 to 40,000 vehicles per day, intersection spacing of 660 to 1,320
feet, a desired operating speed of 30-55 mph, and a description as follows: “Roadways in this category
would be considered “Principal Arterial” in traditional functional classification.”
» S. 32nd Street (S.R. 0015)
» Market Street (S.R. 1010)
Neighborhood Collector, traffic volumes of <6,000 vehicles per day, intersection spacing of 300 to 660
feet, a desired operating speed of 25-35 mph, and a description as follows: “similar in appearance to local
roadways. Typically classified as Minor Collector.”
» Chestnut Street
Local Road, traffic volumes of <3,000 vehicles per day, intersection spacing of 0 to 660 feet, a desired
operating speed of 20-30 mph.
» S. 31st Street
» S. 30th Street
» S. 29th Street
» Bramar Road
» Harvard Avenue

Bicycle and Pedestrian Facilities


Based on observations at the study area intersections, sidewalks are present on all study roadways in the
vicinity of the site.

Mass Transit Facilities


CAT bus stops are present on S. 32nd Street immediately adjacent to the site.

EXISTING TRAFFIC CONDITIONS

Manual Turning Movement Counts


Manual traffic counts were conducted in 15-minute intervals during the weekday morning (6:00 to 9:00
A.M.), weekday midday, (11:00 A.M. to 1:00 P.M.), weekday evening (3:00 to 6:00 P.M.) and Saturday Midday
(11:00 A.M. to 1:00 P.M.) peak periods. Data pertaining to heavy vehicles, pedestrians and transit vehicles
were observed during the manual counts. Peak hours and count dates for the study area intersections are
identified in Table 2.

Page 2 www.TrafficPD.com
TABLE 2
MANUAL TRAFFIC COUNT INFORMATION
Time Intersection
Intersection Date of Traffic Counts
Period Peak Hour1
Tuesday, December 4, 2018 Weekday A.M. 7:30 to 8:30 A.M.
Chestnut Street &
Tuesday, December 4, 2018 Weekday Midday 11:15 A.M. to 12:15 P.M.
N-S Alley/ Select Medical PT
Tuesday, December 4, 2018 Weekday P.M. 4:30 to 5:30 P.M.
Parking Lot
Saturday, December 1, 2018 Saturday Midday 11:30 A.M. to 12:30 P.M.
Tuesday, December 4, 2018 Weekday A.M. 7:30 to 8:30 A.M.
Chestnut Street/
Thursday, March 28, 2019 Weekday Midday 11:45 A.M. to 12:45 P.M.
Trindle Road &
Tuesday, December 4, 2018 Weekday P.M. 4:15 to 5:15 P.M.
S 32nd Street
Saturday, December 1, 2018 Saturday Midday 11:30 A.M. to 12:30 P.M.
Tuesday, December 4, 2018 Weekday A.M. 7:15 to 8:15 A.M.
Chestnut Street & Thursday, December 6, 2018 Weekday Midday 11:30 A.M. to 12:30 P.M.
31st Street Tuesday, December 4, 2018 Weekday P.M. 4:45 to 5:45 P.M.
Saturday, December 1, 2018 Saturday Midday 11:15 A.M. to 12:15 P.M.
Tuesday, December 4, 2018 Weekday A.M. 7:15 to 8:15 A.M.
Chestnut Street & Thursday, December 6, 2018 Weekday Midday 11:30 A.M. to 12:30 P.M.
30th Street Tuesday, December 4, 2018 Weekday P.M. 4:45 to 5:45 P.M.
Saturday, December 1, 2018 Saturday Midday 11:15 A.M. to 12:15 P.M.
Tuesday, December 4, 2018 Weekday A.M. 7:15 to 8:15 A.M.
31st Street & Thursday, December 6, 2018 Weekday Midday 11:00 A.M. to 12:00 P.M.
E-W Alley Tuesday, December 4, 2018 Weekday P.M. 4:45 to 5:45 P.M.
Saturday, December 1, 2018 Saturday Midday 11:45 A.M. to 12:45 P.M.
Tuesday, December 4, 2018 Weekday A.M. 7:00 to 8:00 A.M.
Bramar Road &
Thursday, December 6, 2018 Weekday Midday 11:00 A.M. to 12:00 P.M.
N-S Alley/
Tuesday, December 4, 2018 Weekday P.M. 4:45 to 5:45 P.M.
Camp Hill Family Chiropractic
Saturday, December 1, 2018 Saturday Midday 11:45 A.M. to 12:45 P.M.
Thursday, March 28, 2019 Weekday A.M. 7:15 to 8:15 A.M.
S 32nd Street &
Thursday, March 28, 2019 Weekday Midday 11:45 A.M. to 12:45 P.M.
Harvard Avenue/
Thursday, March 28, 2019 Weekday P.M. 4:30 to 5:30 P.M.
Shopping Center Driveway
Saturday, March 30, 2019 Saturday Midday 12:00 P.M. to 1:00 P.M.
Thursday, March 28, 2019 Weekday A.M. 7:15 to 8:15 A.M.
Market Street & Thursday, March 28, 2019 Weekday Midday 11:45 A.M. to 12:45 P.M.
30th Street Thursday, March 28, 2019 Weekday P.M. 4:45 to 5:45 P.M.
Saturday, March 30, 2019 Saturday Midday 10:30 to 11:30 A.M.
Thursday, March 28, 2019 Weekday A.M. 7:15 to 8:15 A.M.
Market Street & Thursday, March 28, 2019 Weekday Midday 11:45 A.M. to 12:45 P.M.
29th Street Thursday, March 28, 2019 Weekday P.M. 4:30 to 5:30 P.M.
Saturday, March 30, 2019 Saturday Midday 10:30 to 11:30 A.M.
1
Peak Hour consists of the four consecutive 15-minute intervals where the highest traffic volumes occur.

Existing condition traffic volumes for the weekday A.M., weekday P.M., and Saturday midday peak hours are
illustrated in Figures 4-7. Manual traffic count data sheets are provided in Appendix C.

BASE (NO-BUILD) CONDITIONS


In order to develop future base (no-build) traffic volumes, a background growth factor was developed based
on growth rates obtained from the PennDOT Bureau of Planning and Research (BPR). A background growth
rate of 0.80% per year is recommended for urban non-interstate roadways in Cumberland County. As such, the

Page 3 www.TrafficPD.com
background growth factor was applied annually to yield overall growth percentages of 1.61% (0.80% per year,
compounded over 2 years) for the 2020 opening year. Based on discussions with Borough staff, the following
nearby approved development (but not yet constructed) was specifically included in this study:
Quattro Redevelopment is a proposed mixed use redevelopment, which will raze the VA Clinic building and
be replaced with the construction of two one-story buildings, which will include a 4,002 s.f. furniture store,
3,544 s.f. fast casual restaurant, 3,000 s.f. fast casual restaurant, and 1,782 s.f. fast casual restaurant. Trip
generation and distribution for this development was based on the TIS prepared by Traffic Planning and
Design, Inc., dated July 13, 2018.

Base condition volumes for the weekday A.M., weekday midday, weekday P.M., and Saturday midday peak
hours are illustrated in Figures 8-11 for the 2020 opening year conditions Nearby trip generation and
distributions are included in Appendix D.

PROPOSED SITE ACCESS


Access for the development is proposed via the existing N-S Alley (CFA driveway) to Chestnut Street. Left
turning movements will be prohibited to exit the N-S Alley during the weekday A.M., weekday midday,
weekday P.M. and Saturday midday peak periods (7-9 AM; 4-6 PM; 11AM-1PM) via signage.

Sight Distance Analysis


A sight distance analysis was prepared for the proposed site driveway. In general, recommended safe sight
distances depend upon the posted speed limit and roadway grades. The existing sight distances at the
proposed driveway were measured in accordance with PennDOT Publication 282 Highway Occupancy Permit
Guidelines and compared to PennDOT’s desirable sight distance standard, which is identified in 67 PA Code
Chapter 441.8(h), “Access to and Occupancy of Highways by Driveways and Local Roads.” In addition, measured
sight distances at the proposed driveway were compared to PennDOT’s safe stopping sight distance standard,
which is calculated by the following equation:

SSSD = 1.47VT + V2/[30(f±g)]


SSSD = safe stopping sight distance (acceptable sight distance)
V = Vehicle Speed
T = Perception Reaction Time of Driver (2.5 seconds)
f = Coefficient of Friction for Wet Pavements
g = Percent of Roadway Grade Divided by 100

Table 3 shows the measured sight distances, desirable sight distances, and acceptable (SSSD) sight distances
at the site driveway for vehicles entering and exiting the site.

Page 4 www.TrafficPD.com
TABLE 3
SIGHT DISTANCE ANALYSIS
Chestnut Street & N-S Alley (CFA Driveway)
Posted Sight Distances (feet)
Direction Grade1
Speed DES SSSD EXIST
Exiting To the left 25 mph 0% 250’ 147’ 250’2,3
Movements To the right 25 mph 0% 195’ 147’ 300’3+
Entering Approaching same direction 25 mph 0% --- 147’ 300’+
Left Turns Approaching opposite direction 25 mph 0% 190’ 147’ 285’2
1
SSSD = PennDOT Acceptable Sight Distance Roadway Grade Approaching Driveway
2
DES = PennDOT Desirable Sight Distance Distance to S. 32nd Street Signalized Intersection
3
EXIST = Existing (Measured) Sight Distance Clear sight triangle requirements enforced

As shown in Table 3, the measured sight distances at the site driveway exceed the applicable PennDOT and
Borough sight distance requirements provided the landscaping and vegetation is properly maintained as
well as clear sight triangle requirements enforced.

TRIP GENERATION
TPD conducted traffic counts at three (3) existing Chick-fil-a restaurants of similar size and orientation in order
to develop trip generation rates for the proposed Chick-fil-a redevelopment. Based on the trip generation
methodology, Table 4 shows the trip generation rates for the proposed Chick-fil-a.

TABLE 4
LOCAL TRIP GENERATION DATA
Directional Splits Pass-by
Time Period Rate per 1000 sq. ft.
Enter % Exit % Percentage1
Weekday A.M. Peak Hour of Generator T = 17.91*(X) 51% 49% 49%
Weekday Midday Peak Hour of Generator T = 86.41*(X) 51%2 49%2 40%3
Weekday P.M. Peak Hour of Generator T = 56.50*(X) 52% 48% 50%
Saturday Midday Peak Hour of Generator T = 83.65*(X) 51% 49% 40%2
T = number of site-generated vehicular trips
X = independent variable
1
Pass-by percentages used from ITE Trip Generation Manual LUC #934
2
No weekday midday directional splits available; assumed consistent with Saturday midday peak hour
3
No weekday midday Pass-by Data available; assume 10% less than the PM Peak hour
4
No Saturday Pass-by Data available; assume 10% less than the PM Peak hour

Table 5 summarizes the number of trips that will be generated by the 5,031 s.f. Chick-fil-a development during
the weekday A.M. peak hour, weekday midday peak hour, weekday P.M. peak hour, and the Saturday Midday
peak hour.

Page 5 www.TrafficPD.com
TABLE 5
TRIP GENERATION SUMMARY
Total Pass-by Trips New Trips
Peak Hour
Total Enter Exit Total Enter Exit Total Enter Exit
Weekday A.M. Peak Hour of Generator 90 46 44 44 22 22 46 24 22
Weekday Midday Peak Hour of Generator 435 222 213 174 89 85 261 133 128
Weekday P.M. Peak Hour of Generator 284 148 136 142 74 68 142 74 68
Saturday Midday Peak Hour of Generator 421 215 206 168 86 82 253 129 124

Based on the trip generation analysis summarized in Table 5, the proposed Chick-fil-a will generate 46 new
vehicle-trips during the weekday A.M. peak hour of generator, 261 new vehicle-trips during the weekday
midday peak hour of generator, 142 new vehicle-trips during the weekday P.M. peak hour of generator, and
253 new vehicle-trips during the Saturday midday peak hour of generator. Details of the trip generation
calculations are included in Appendix E.

TRIP DISTRIBUTION
The distribution and assignment of new trips generated by the proposed development was based upon an
analysis of the following: (1) existing traffic patterns and distributions of the turning movements within the
study area; and (2) available routes for travel. The new trips for the proposed development were distributed
to the local roadway network based on the percentages shown in Table 6.

TABLE 6
TRIP DISTRIBUTION PERCENTAGES – NEW TRIPS
Direction - Assignment Distribution
To/From (To/From) Percentage
32nd Street 38%
North
30th Street 2%
32nd Street 38%
South 31st Street 1%
30th Street 1%
East Chestnut Street 5%
West Trindle Road 15%

Pass-by trips were established based on the existing traffic patterns in the vicinity of the site and the location
and configuration of the site driveway. The percentages used for the distribution of pass-by trips to the
project site are shown below in Table 7.

Page 6 www.TrafficPD.com
TABLE 7
TRIP DISTRIBUTION PERCENTAGES – PASS-BY TRIPS
Distribution Percentage
Direction From
Weekday A.M. Weekday Midday Weekday P.M. Saturday Midday
nd
North via 32 Street 36% 42% 42% 43%
South via 32nd Street 49% 41% 41% 39%
East via Chestnut Street 7% 8% 7% 7%
West via Chestnut Street 8% 9% 10% 11%

The assignment of site-generated trips for the proposed development during the weekday A.M., weekday
midday, weekday P.M., and Saturday midday peak hours are shown in Figures 12-15, respectively.

Exiting left turn movements at the N-S Alley (CFA driveway) will be prohibited during the weekday A.M.,
weekday midday, weekday P.M. and Saturday midday peak periods (7-9 AM; 4-6 PM; 11AM-1PM) via
signage. Therefore, existing traffic making a northbound left has been rerouted during the weekday A.M.,
weekday midday, weekday P.M., and Saturday midday peak hours, as shown in Figures 16-19, respectively.

PROJECTED (BUILD) CONDITION TRAFFIC VOLUMES


The site-generated trips for the proposed Chick-fil-a were added to the 2020 base (no-build) condition traffic
volumes to calculate 2020 projected (build) condition traffic volumes. Projected condition traffic volumes are
shown in Figures 20-23 for the 2020 opening year for the weekday A.M., weekday midday, weekday P.M., and
Saturday midday peak hours.

Traffic volume development worksheets for the study area intersections are contained in Appendix F.

LEVELS OF SERVICE FOR AN INTERSECTION


For analysis of intersections, level of service is defined in terms of delay, which is a measure of driver discomfort
and frustration, fuel consumption, and lost travel time. LOS criteria is stated in terms of control delay per vehicle
for a one-hour analysis period. Control delay includes initial deceleration delay, queue move-up time, stopped
delay, and final acceleration delay. The criteria are shown in Table 8. Delay, as it relates to level of service, is a
complex measure and is dependent upon a number of variables. For signalized intersections, these variables
include the quality of vehicle progression, the cycle length, the green time ratio, and the volume/capacity ratio
for the lane group in question. For unsignalized intersections, delay is related to the availability of gaps in the
flow of traffic on the major street and the driver’s discretion in selecting an appropriate gap for a particular
movement from the minor street (straight across, left or right turn).

Page 7 www.TrafficPD.com
TABLE 8
LEVEL OF SERVICE CRITERIA
UNSIGNALIZED AND SIGNALIZED INTERSECTIONS1
Control Delay Per Vehicle (Seconds)
Level of Service
Signalized Unsignalized
A < 10 < 10
B > 10 and < 20 > 10 and < 15
C > 20 and < 35 > 15 and < 25
D > 35 and < 55 > 25 and < 35
E > 55 and < 80 > 35 and < 50
F > 80 or v/c > 1.0 > 50 or v/c > 1.0
1
Obtained from Exhibits 18-4 and 19-1 of the Transportation Research Board’s Highway Capacity Manual 2010

CAPACITY ANALYSIS METHODOLOGY


Capacity analyses were conducted for the weekday A.M., weekday midday, weekday P.M. and Saturday
midday peak hours at the study area intersections. These analyses were conducted according to the
methodologies contained in the Highway Capacity Manual (HCM) 6th Edition using Synchro 10 software
(Version 10.3, Build 5, Revision 0), a Trafficware product.

The following conditions were analyzed, as applicable:


» Existing conditions;
» 2020 base conditions (Build-out year without development);
» 2020 projected conditions (Build-out year with development).
The following items should be noted with respect to the capacity analyses:

» The Pennsylvania default values for the suburban land use context contained in Chapter 10 of
PennDOT’s Publication 46 were utilized for the base saturation flow rate, start-up lost time, extension
of effective green time and number of left turn sneakers, at all signalized intersections.
» The Pennsylvania default values for the suburban land use context contained in Chapter 10 of
PennDOT’s Publication 46 were utilized for the base critical headway and base follow-up headways at
unsignalized intersections.
In addition, capacity analyses were conducted at the proposed site driveway intersection under the 2020
projected conditions. The capacity analysis worksheets are included in Appendix G. The PennDOT-
approved signal plans are included in Appendix H. Critical and follow-up headway calculations are
provided in Appendix I.

PennDOT’s Transportation Impact Study Guidelines outlined in PennDOT’s Policies and Procedures for
Transportation Impact Studies, found in PennDOT’s Publication 282, Appendix A, dated July 2017 contain
the following criteria regarding levels of service:
» Page 29 of the Guidelines state that if evaluation of the With Development Horizon Year Scenario to
the Without Development Horizon Year Scenario indicates that the overall intersection level of service
has dropped, the applicant will be required to mitigate the level of service if the increase in overall
intersection delay is greater than 10-seconds. If the overall intersection delay increase is less than or
equal to 10-seconds, mitigation of the intersection will not be required.

Page 8 www.TrafficPD.com
» Page 29 of the Guidelines state that for mitigation scenarios, applicants are expected to mitigate the
overall intersection LOS to the original Without Development LOS; the 10-second delay variance is not
applied to mitigation scenarios. Applicants may be required to address available storage and queue
lengths at critical movements or approaches even if the overall LOS requirements are met.
» Page 31 of the Guidelines state that if signalization is the preferred alternative for mitigation, overall
intersection LOS C in rural areas and LOS D in urban areas is acceptable.
» Page 31 of the Guidelines states new signalized or unsignalized intersection established to serve as
access to the development shall be designed to operate at minimum LOS C for rural areas, and
minimum LOS D for urban areas.

» Camp Hill Borough’s Zoning Ordinance, Part 7, Section 731 indicates the following requirements
relative to required levels of service:

» The recommendations of the traffic impact study shall provide safe and efficient movement of traffic
to and from and within and past the proposed development, while minimizing the impact to non-site
trips. The current levels-of-service must be maintained if they are levels “C” or “D”, not allowed to
deteriorate to worse than level “C” if they are currently levels “A” or “B”, and improved to level “D” if
they are levels “E” or “F”.

Initial Queues

Based on TPD’s initial queue observations, TPD made the following assumptions for the initial queue inputs for
the existing conditions at the S. 32nd Street (S.R. 0015) and Trindle Road (S.R. 0641)/Chestnut Street intersection.
As instructed by the township, TPD collected intersection queueing data by observing the approaches of
each signalized intersection as instructed in the PennDOT Publication 46. TPD utilized video recordings of
the peak hours used in the analysis. In order to determine the initial queue inputs for each movement, TPD
observed the queuing at the study intersection for the study time periods to determine if there were any
initial queues. TPD estimated the initial queues for each approach by documenting the number of queued
vehicles. As outlined in the HCM, the initial queue was determined by monitoring the queue count
continuously during each of the three consecutive cycles that occur just before the start of the analysis
period.

The initial queue observations for the S. 32nd Street (S.R. 0015) and Trindle Road (S.R. 0641)/Chestnut Street
intersection are included in Appendix G.

Due to limitations in HCM methodology, intersections with all-pedestrian phases cannot be modeled with
HCM 6. Therefore, Synchro percentile method was used for analysis results at the signalized intersections
with all-pedestrian phases. Initial queues can only be input via HCM methodology since Synchro percentile
methodology does not accept initial queue inputs. However, due to the low initial queue observation results
with the highest average of one vehicle in the eastbound left turn maneuver for weekday A.M., weekday
P.M., and Saturday midday time periods, the results will have a minimal impact.

Page 9 www.TrafficPD.com
CHESTNUT STREET – TRAFFIC CALMING AND PEDESTRIAN SAFTEY
EVALUATION
Based on feedback received at Borough Council and Planning Commission meetings, concerns were raised
regarding the increase of non-local traffic to Chestnut Street between 32nd Street and the Camp Hill High
School. The feedback received at Borough Council and Planning Commission meetings discussed the need
to calm traffic along this corridor due to walkable nature of the Borough, specifically for the school students
who walk to and from school as well as students who are released for lunch. In TPD’s opinion, the concerns
are not specifically related to capacity issues (i.e., Levels of Service, or amount of delay experience by
motorists). Rather, the concerns are related to the undesirable nature of having additional traffic utilizing
the roadway network adjacent to the school. Accordingly, TPD has investigated two relevant traffic calming
measures for slowing traffic in this area in accordance with PennDOT’s Publication 383, “Traffic Calming
Handbook”, as described below:

Raised Crosswalk

Raised crosswalks are marked and elevated pedestrian areas that are an extension of the sidewalk at
mid-block locations or intersections. Raised crosswalks are typically 3 to 6 inches above street level. In
many jurisdictions, raised crosswalks are level with the curb, about 6 inches above the street. A graphic
illustration of a curb extension from PennDOT’s Traffic Calming Handbook is provided below:

According to PennDOT’s Traffic Calming Handbook, raised crosswalks have the following advantages:

» Reduce speeds and improve visibility of the pedestrians by defining crossings


» Raised crosswalks reduce speeds an average of 6 mph.
» Traffic volumes are reduced an average of 12%.

Page 10 www.TrafficPD.com
Raised intersection

A Raised Intersection, including crosswalks, which are raised 3 to 6 inches above street level. Long ramps
are included on all approaches. Graphic illustrations of a raised intersection from PennDOT’s Traffic
Calming Handbook are provided below:

According to PennDOT’s Traffic Calming Handbook, a raised intersection can offer the following
advantages:

» Reduce vehicle speeds on all approaches.


» Decrease conflicts between vehicles and pedestrians by better demarcating crossing areas and
elevating pedestrians above the street.

A conceptual plan showing the type and location of the proposed traffic calming treatments is provided in
Appendix M of this report. Coordination efforts with the Borough and School District are currently ongoing
to ensure that location and type of treatments are preferred. The proposed treatments are listed in the
executive summary of this study.

LEVELS OF SERVICE IN THE STUDY AREA


Level of service (LOS) matrices for the study area intersections are shown in Tables 9-12 for the weekday
A.M., weekday midday, weekday P.M., and Saturday midday peak hours, respectively. Per PennDOT
standards, the signal timings at the signalized study area intersections have been optimized under base
conditions and projected conditions.

Page 11 www.TrafficPD.com
TABLE 9
LEVEL OF SERVICE DELAY (SECONDS) SUMMARY
Weekday A.M. Peak Hour
Existing 2020 Opening Year
Intersection Movement
Conditions Base Projected Proj1
EB LTR A A A A
WB LTR A A A A
1 Chestnut Street & NB LTR B A -- --
N-S Alley/ Select Medical NB L -- -- A A
PT Parking Lot NB TR -- -- A A
SB LTR B B B B
ILOS A (1.5) A (1.5) A (2.0) A (2.0)
EB L F (136.2) F (179.5) F (179.1) F (91.2)
EB T D E (57.9) E (57.9) F (88.8)
EB R C C C C (24.3)
WB L F (86.0) E (80.0) E (79.2) F (92.6)
2 Chestnut Street/ WB TR F (98.6) F (89.3) F (88.2) F (107.3)
Trindle Road & NB L F (166.9) F (182.1) F (195.5) F (112.9)
S 32nd Street NB TR D D E (70.5) E (67.8)
SB L E (59.1) E (59.7) E (63.7) E (63.9)
SB T C C C D
SB R A A A A
ILOS D (51.5) E (55.3) E (68.6) E (60.4)
EB TR A A A A
3 Chestnut Street & WB LT A A A A
31st Street NB LR B B B B
ILOS A (0.9) A (0.9) A (0.9) A (0.9)
EB LTR B B B B
WB LTR A A B B
4 Chestnut Street &
NB LTR A A A A
30th Street
SB LTR A B B B
ILOS A (10.0) B (10.1) B (10.3) B (10.3)
EB LTR A A A A
WB LTR A A A A
5 31st Street &
NB LTR A A A A
E-W Alley
SB LTR A A A A
ILOS A (0.2) A (0.2) A (0.2) A (0.2)
EB LTR A A A A
6 Bramar Road & WB LTR A A A A
N-S Alley/
NB LTR A A A A
Camp Hill Family
Chiropractic SB LTR A A A A
ILOS A (1.5) A (1.5) A (0.7) A (0.7)

Base = No-Build scenario


1
Projected conditions with implementation of recommended improvements
ILOS = Overall Intersection Level of Service
Unsignalized ILOS calculated in accordance with Figure 5 of Policies and Procedures for Transportation Impact Studies

Page 12 www.TrafficPD.com
TABLE 9 (CONTINUED)
LEVEL OF SERVICE DELAY (SECONDS) SUMMARY
Weekday A.M. Peak Hour
Existing 2020 Opening Year
Intersection Movement
Conditions Base Projected Proj1
EB L D D D D
EB T D D D D
EB R A A D D
7 S 32nd Street & WB LTR E (61.7) E (61.8) E (62.1) E (62.1)
Harvard Avenue/ NB L B B B B
Shopping Center Driveway NB TR B B B B
SB L B B B B
SB TR C C C C
ILOS C (21.4) C (21.8) C (22.7) C (22.7)
EB LTR A A A A
WB LTR A A A A
8 Market Street &
NB LTR B B C C
30th Street
SB LTR C C C C
ILOS A (4.5) A (4.6) A (4.9) A (4.9)
EB LTR A A A A
WB LTR A A A A
9 Market Street &
NB LTR B B B B
29th Street
SB LTR B B B B
ILOS A (8.1) A (8.2) A (9.3) A (9.3)

Base = No-Build scenario


1
Projected conditions with implementation of recommended improvements
ILOS = Overall Intersection Level of Service
Unsignalized ILOS calculated in accordance with Figure 5 of Policies and Procedures for Transportation Impact Studies

Page 13 www.TrafficPD.com
TABLE 10
LEVEL OF SERVICE DELAY (SECONDS) SUMMARY
Weekday Midday Peak Hour
Existing 2020 Opening Year
Intersection Movement
Conditions Base Projected Proj1
EB LTR A A A A
WB LTR A A A A
1 Chestnut Street & NB LTR B B -- --
N-S Alley/ Select Medical NB L -- -- A A
PT Parking Lot NB TR -- -- B B
SB LTR A A B B
ILOS A (1.7) A (1.7) A (3.5) A (3.5)
EB L F (82.5) F (99.3) F (99.3) E (78.2)
EB T D D D E (73.5)
EB R C C C C
WB L F (84.5) F (104.2) F (99.1) F (99.1)
2 Chestnut Street/ WB TR E (67.9) E (77.7) E (74.5) E (74.5)
Trindle Road & NB L F (213.6) E (79.8) F (102.5) F (102.5)
S 32nd Street NB TR C C E (57.9) D
SB L D D F (93.8) F (118.0)
SB T D D D D
SB R A A A A
ILOS D (48.2) D (46.9) E (58.8) D (54.4)
EB TR A A A A
3 Chestnut Street & WB LT A A A A
31st Street NB LR B B B B
ILOS A (0.6) A (0.5) A (0.6) A (0.6)
EB LTR A A B B
WB LTR A A B B
4 Chestnut Street &
NB LTR A A A A
30th Street
SB LTR A A B B
ILOS A (9.6) A (9.6) B (10.8) B (10.8)
EB LTR A A A A
WB LTR A A A A
5 31st Street &
NB LTR A A A A
E-W Alley
SB LTR A A A A
ILOS A (0.0) A (0.0) A (0.2) A (0.2)
EB LTR A A A A
6 Bramar Road & WB LTR A A A A
N-S Alley/
NB LTR A A A A
Camp Hill Family
Chiropractic SB LTR A A A A
ILOS A (2.7) A (2.7) A (0.7) A (0.7)

Base = No-Build scenario


1
Projected conditions with implementation of recommended improvements
ILOS = Overall Intersection Level of Service
Unsignalized ILOS calculated in accordance with Figure 5 of Policies and Procedures for Transportation Impact Studies

Page 14 www.TrafficPD.com
TABLE 10 (CONTINUED)
LEVEL OF SERVICE DELAY (SECONDS) SUMMARY
Weekday Midday Peak Hour
Existing 2020 Opening Year
Intersection Movement
Conditions Base Projected Proj1
EB L E (60.9) E (61.0) D D
EB T D D D D
EB R A A A A
7 S 32nd Street & WB LTR E (57.3) E (57.2) E (65.4) E (65.4)
Harvard Avenue/ NB L D D E (61.4) E (61.4)
Shopping Center Driveway NB TR B B B B
SB L B B B B
SB TR C C D D
ILOS C (26.7) C (27.5) C (30.5) C (30.5)
EB LTR A A A A
WB LTR A A A A
8 Market Street &
NB LTR C C D D
30th Street
SB LTR C C C C
ILOS A (2.1) A (2.1) A (3.9) A (3.9)
EB LTR A A B B
WB LTR A A A A
9 Market Street &
NB LTR C C C C
29th Street
SB LTR A A A A
ILOS A (7.7) A (7.7) B (11.2) B (11.2)

Base = No-Build scenario


1
Projected conditions with implementation of recommended improvements
ILOS = Overall Intersection Level of Service
Unsignalized ILOS calculated in accordance with Figure 5 of Policies and Procedures for Transportation Impact Studies

Page 15 www.TrafficPD.com
TABLE 11
LEVEL OF SERVICE DELAY (SECONDS) SUMMARY
Weekday P.M. Peak Hour
Existing 2020 Opening Year
Intersection Movement
Conditions Base Projected Proj1
EB LTR A A A A
WB LTR A A A A
1 Chestnut Street & NB LTR B B -- --
N-S Alley/ Select Medical NB L -- -- A A
PT Parking Lot NB TR -- -- B B
SB LTR B B B B
ILOS A (1.2) A (1.2) A (2.5) A (2.5)
EB L F (105.8) F (109.4) F (109.4) F (118.9)
EB T E (60.2) E (60.7) E (63.0) F (112.6)
EB R C C C C
WB L F (98.4) F (120.4) F (115.8) F (115.8)
2 Chestnut Street/ WB TR E (68.4) E (75.2) E (73.3) E (73.3)
Trindle Road & NB L F (234.4) F (106.1) F (122.2) F (102.9)
S 32nd Street NB TR C C E (73.8) E (60.5)
SB L E (59.4) E (59.4) F (87.5) F (87.5)
SB T D E (80.0) E (77.6) E (69.6)
SB R A A A A
ILOS E (56.1) E (60.0) E (74.4) E (69.4)
EB TR A A A A
3 Chestnut Street & WB LT A A A A
31st Street NB LR B B B B
ILOS A (1.0) A (1.0) A (1.0) A (1.0)
EB LTR A A A A
WB LTR A A A A
4 Chestnut Street &
NB LTR A A A A
30th Street
SB LTR A A A A
ILOS A (9.2) A (9.2) A (9.7) A (9.7)
EB LTR A A A A
WB LTR A A A A
5 31st Street &
NB LTR A A A A
E-W Alley
SB LTR A A A A
ILOS A (0.1) A (0.1) A (0.2) A (0.2)
EB LTR A A A A
6 Bramar Road & WB LTR A A A A
N-S Alley/
NB LTR A A A A
Camp Hill Family
Chiropractic SB LTR A A A A
ILOS A (6.0) A (6.0) A (3.7) A (3.7)

Base = No-Build scenario


1
Projected conditions with implementation of recommended improvements
ILOS = Overall Intersection Level of Service
Unsignalized ILOS calculated in accordance with Figure 5 of Policies and Procedures for Transportation Impact Studies

Page 16 www.TrafficPD.com
TABLE 11 (CONTINUED)
LEVEL OF SERVICE DELAY (SECONDS) SUMMARY
Weekday P.M. Peak Hour
Existing 2020 Opening Year
Intersection Movement
Conditions Base Projected Proj1
EB L D D D D
EB T D D D D
EB R A A A A
7 S 32nd Street & WB LTR E (68.6) E (68.8) F (82.1) F (82.1)
Harvard Avenue/ NB L E (75.9) E (79.6) F (83.1) F (83.1)
Shopping Center Driveway NB TR B B B B
SB L B B B B
SB TR D D D D
ILOS C (30.7) C (32.0) C (34.0) C (34.0)
EB LTR A A A A
WB LTR A A A A
8 Market Street &
NB LTR C C C C
30th Street
SB LTR C C C C
ILOS A (2.1) A (2.1) A (3.1) A (3.1)
EB LTR A A A A
WB LTR A A A A
9 Market Street &
NB LTR B B C C
29th Street
SB LTR C C C C
ILOS A (8.5) A (8.6) B (10.0) B (10.0)

Base = No-Build scenario


1
Projected conditions with implementation of recommended improvements
ILOS = Overall Intersection Level of Service
Unsignalized ILOS calculated in accordance with Figure 5 of Policies and Procedures for Transportation Impact Studies

Page 17 www.TrafficPD.com
TABLE 12
LEVEL OF SERVICE DELAY (SECONDS) SUMMARY
Saturday Midday Peak Hour
Existing 2020 Opening Year
Intersection Movement
Conditions Base Projected Proj1
EB LTR A A A A
WB LTR A A A A
1 Chestnut Street & NB LTR B B -- --
N-S Alley/ Select Medical NB L -- -- A A
PT Parking Lot NB TR -- -- B B
SB LTR A A A A
ILOS A (0.4) A (0.4) A (2.9) A (2.9)
EB L F (89.1) F (92.5) F (92.5) F (106.2)
EB T D D D F (102.2)
EB R C B B C
WB L F (86.2) F (89.2) F (83.5) F (83.5)
2 Chestnut Street/ WB TR D D D D
Trindle Road & NB L F (148.5) E (69.1) F (84.2) F (84.2)
S 32nd Street NB TR C C E (64.1) D
SB L D D E (79.5) E (79.5)
SB T D E (74.2) E (73.0) D
SB R A A A A
ILOS D (45.5) D (52.3) E (65.1) D (54.6)
EB TR A A A A
3 Chestnut Street & WB LT A A A A
31st Street NB LR A A B B
ILOS A (0.6) A (0.6) A (0.5) A (0.5)
EB LTR A A A A
WB LTR A A A A
4 Chestnut Street &
NB LTR A A A A
30th Street
SB LTR A A A A
ILOS A (8.4) A (8.4) A (9.2) A (9.2)
EB LTR A A A A
WB LTR A A A A
5 31st Street &
NB LTR A A A A
E-W Alley
SB LTR A A A A
ILOS A (0.2) A (0.2) A (0.2) A (0.2)
EB LTR A A A A
6 Bramar Road & WB LTR A A A A
N-S Alley/
NB LTR A A A A
Camp Hill Family
Chiropractic SB LTR A A A A
ILOS A (1.6) A (1.6) A (0.2) A (0.2)

Base = No-Build scenario


1
Projected conditions with implementation of recommended improvements
ILOS = Overall Intersection Level of Service
Unsignalized ILOS calculated in accordance with Figure 5 of Policies and Procedures for Transportation Impact Studies

Page 18 www.TrafficPD.com
TABLE 12 (CONTINUED)
LEVEL OF SERVICE DELAY (SECONDS) SUMMARY
Saturday Midday Peak Hour
Existing 2020 Opening Year
Intersection Movement
Conditions Base Projected Proj1
EB L D D D D
EB T D D D D
EB R A A A A
7 S 32nd Street & WB LTR D D E (55.8) E (55.8)
Harvard Avenue/ NB L D D E (57.3) E (57.3)
Shopping Center Driveway NB TR B B B B
SB L B B B B
SB TR C C D D
ILOS C (24.9) C (25.6) C (29.2) C (29.2)
EB LTR A A A A
WB LTR A A A A
8 Market Street &
NB LTR C C D D
30th Street
SB LTR C C C C
ILOS A (1.7) A (1.7) A (3.2) A (3.2)
EB LTR A A B B
WB LTR A A A A
9 Market Street &
NB LTR B B C C
29th Street
SB LTR C C C C
ILOS A (8.3) A (8.3) B (11.0) B (11.0)

Base = No-Build scenario


1
Projected conditions with implementation of recommended improvements
ILOS = Overall Intersection Level of Service
Unsignalized ILOS calculated in accordance with Figure 5 of Policies and Procedures for Transportation Impact Studies

Page 19 www.TrafficPD.com
As shown in Tables 9-12, under 2020 projected conditions with the development of the proposed site and
construction of the recommended roadway improvements, all overall levels of service at the study area
intersections comply with the requirements outlined in the Borough’s and PennDOT’s TIS Guidelines during
the weekday A.M., weekday midday, weekday P.M., and Saturday midday peak hours. Additionally, all
approaches and turning movements at the site driveway intersections will operate at LOS B or better under
2020 Projected Conditions during the weekday A.M., weekday midday, weekday P.M., and Saturday midday
peak hours.

95TH PERCENTILE QUEUE ANALYSIS

Page 20 www.TrafficPD.com
TABLE 13
95TH PERCENTILE QUEUE SUMMARY (FEET) SYNCHRO/HCM 6
2020 Base Conditions 2020 Projected Conditions1
Lane Existing 95th Percentile Queue Length (ft) Proposed 95th Percentile Queue Length (ft)
Intersection
Group Storage Storage
A.M. MID P.M. SAT A.M. MID P.M. SAT
Length Length
EB LTR -- 5/8 2/3 1/3 0/0 -- 5/8 2/3 1/3 0/0
WB LTR -- 0/0 0/0 0/0 0/0 -- 0/0 1/3 1/3 2/3
Chestnut Street &
NB LTR -- 0/0 1/0 1/0 0/0 -- -- -- -- --
N-S Alley/ Select Medical
NB L -- -- -- -- -- -- 0/0 0/0 0/0 0/0
PT Parking Lot
NB TR -- -- -- -- -- -- 5/5 27/25 17/15 30/28
SB LTR -- 1/3 6/5 6/5 1/0 -- 2/3 6/5 6/5 1/0
EB L 250’ 671/-- 536/-- 506/-- 474/-- 250’ 507/-- 447/-- 472/-- 412/--
EB T -- 301/-- 214/-- 303/-- 177/-- -- 524/-- 450/-- 482/-- 417/--
EB R 250’ 96/-- 125/-- 167/-- 117/-- 250’ 89/-- 125/-- 173/-- 117/--
WB L 150’ 242/-- 323/-- 417/-- 322/-- 150’ 251/-- 316/-- 407/-- 309/--
Chestnut Street/
WB TR -- 275/-- 264/-- 310/-- 163/-- -- 286/-- 251/-- 300/-- 155/--
Trindle Road &
NB L 640’ 318/-- 306/-- 380/-- 285/-- 640’ 303/-- 359/-- 400/-- 333/--
S 32nd Street2
NB TR -- 1301/-- 765/-- 1051/-- 747/-- -- 1320/-- 837/-- 1085/-- 791/--
SB L 110’ 33/-- 37/-- 24/-- 34/-- 110’ 64/-- 255/-- 167/-- 217/--
SB T -- 725/-- 744/-- 1028/-- 785/-- -- 752/-- 728/-- 1007/-- 746/--
SB R -- 59/-- 63/-- 115/-- 63/-- -- 63/-- 62/-- 117/-- 62/--
EB TR -- 0/0 0/0 0/0 0/0 -- 0/0 0/0 0/0 0/0
Chestnut Street &
WB LT -- 1/3 1/0 1/3 1/0 -- 1/3 1/3 1/3 1/0
31st Street
NB LR -- 4/3 3/3 5/5 2/3 -- 4/5 5/5 6/5 3/3
EB LTR -- --/38 --/33 --/28 --/20 -- --/43 --/63 --/40 --/38
Chestnut Street & WB LTR -- --/30 --/35 --/33 --/23 -- --/30 --/38 --/33 --/25
30th Street3 NB LTR -- --/5 --/5 --/3 --/3 -- --/5 --/5 --/3 --/3
SB LTR -- --/30 --/13 --/10 --/5 -- --/30 --/15 --/10 --/8
EB LTR -- 0/0 0/0 0/0 0/0 -- 0/0 0/0 0/0 0/0
31st Street & WB LTR -- 0/0 0/0 0/0 0/0 -- 0/0 0/0 0/0 0/0
E-W Alley NB LTR -- 0/0 0/0 0/0 0/0 -- 0/0 0/0 0/0 0/0
SB LTR -- 0/0 0/0 0/0 0/0 -- 0/0 0/0 0/0 0/0
Bramar Road & EB LTR -- 0/0 0/0 0/0 0/0 -- 0/0 0/0 0/0 0/0
N-S Alley/ WB LTR -- 0/0 0/0 1/0 0/0 -- 0/0 0/0 1/0 0/0
Camp Hill Family NB LTR -- 0/0 0/0 2/3 0/0 -- 0/0 0/0 2/3 0/0
Chiropractic SB LTR -- 0/0 0/0 0/0 0/0 -- 0/0 0/0 0/0 0/0
EB L 150’ 41/-- 200/-- 120/-- 165/-- 150’ 41/-- 192/-- 120/-- 164/--
EB T -- 26/-- 57/-- 42/-- 36/-- -- 26/-- 57/-- 42/-- 36/--
EB R -- 28/-- 40/-- 47/-- 37/-- -- 28/-- 40/-- 47/-- 37/--
7 S 32nd Street &
WB LTR -- 176/-- 177/-- 264/-- 159/-- -- 208/-- 321/-- 356/-- 284/--
Harvard Avenue/
NB L 400’ 138/-- 497/-- 431/-- 476/-- 400’ 142/-- 506/-- 431/-- 488/--
Shopping Center Driveway
NB TR -- 1144/-- 576/-- 883/-- 501/-- -- 1154/-- 616/-- 913/-- 535/--
SB L 160’ 25/-- 14/-- 11/-- 10/-- 160’ 25/-- 14/-- 11/-- 10/--
SB TR -- 779/-- 884/-- 1268/-- 806/-- -- 770/-- 873/-- 1258/-- 796/--
EB LTR -- 0/0 1/0 1/3 0/0 -- 0/0 1/0 1/3 0/0
8 Market Street & WB LTR -- 5/8 2/3 4/5 2/3 -- 5/8 3/3 4/5 3/3
30th Street NB LTR -- 20/20 11/10 11/13 8/8 -- 26/25 44/45 29/30 36/38
SB LTR -- 37/33 16/15 12/10 13/13 -- 37/33 17/15 13/10 14/13
EB LTR -- 340/-- 300/-- 308/-- 377/-- -- 340/-- 307/-- 309/-- 380/--
9 Market Street & WB LTR -- 200/-- 291/-- 392/-- 298/-- -- 200/-- 294/-- 394/-- 300/--
29th Street NB LTR -- 28/-- 27/-- 19/-- 22/-- -- 37/-- 88/-- 46/-- 72/--
SB LTR -- 30/-- 6/-- 30/-- 20/-- -- 30/-- 6/-- 30/-- 20/--
Projected1 = full build-out scenario of development with improvements recommended in this TIS
2 = Intersections with pedestrian phases do not produce HCM 6 results. Therefore, only synchro percentile method results are included
3 = All-way Stop-control synchro does not include queueing results. Therefore, only HCM 6 results are included

Page 21 www.TrafficPD.com
As shown in Table 13, all of the 2020 Projected Condition queues will largely be accommodated within the
projected storage length, or are comparable to the base (no-build) conditions. Queue analysis worksheets
are included with the capacity analysis worksheets provided in Appendix G.

AUXILIARY TURN LANE ANALYSIS


TPD evaluated auxiliary turn lane warrants at the Chestnut Street & N-S Alley (CFS driveway) based upon
the warrant analysis methodology contained within Chapter 11 of PennDOT’s Publication 46, Section 11.17.
The findings are summarized in Table 14. The auxiliary turn lane warrant analysis worksheets are contained
in Appendix J.

TABLE 14
AUXILIARY TURN LANE ANALYSIS SUMMARY
Warrant Satisfied? Required Proposed
Intersection Auxiliary Lane
AM MID PM SAT Lane Length Lane Length
Chestnut Street &
EB Right-Turn Lane No Yes-150’ Yes-100’ Yes-150’ 150’ Min 150’
N-S Alley (CFA driveway) /
Select Medical PT Parking
WB Left-Turn Lane No No No No -- --
Lot

Based on the aforementioned methodology, the right-turn lane warrant is satisfied for a 150 foot
eastbound right-turn lane during the weekday midday peak hour, 100 foot eastbound right-turn lane during
the weekday P.M. peak hour, and an eastbound 150 foot right-turn lane during weekday midday peak hour
and Saturday midday peak hour for the N-S Alley driveway. Therefore, TPD recommends the installation
of a right-turn lane of minimum 150 feet at this location.

FAST FOOD RESTAURANT QUEUING ANALYSIS

Methodology

TPD evaluated the projected drive-thru queues for the Chick-fil-a during the Saturday midday peak hour
(anticipated busiest hour). Typical Chick-fil-a restaurants deploy three types of vehicle/order processing;
(1) standard ordering with payments at the food pick-up window, (2) pay station in advance of the food
pick-up window, and (3) pay stations, tablet ordering and a three car, employee-assisted, pick-up window.
Counts were conducted by TPD to compare the three types of vehicle payment processing to determine
the resulting queues in the drive-thru. The results are included in Table 15. Drive-thru count data are
included in Appendix K.

TABLE 15
VEHICLE PAYMENT PROCESSING TIMES
Payment Processing Type Vehicle Dwell Time
(1) Standard Ordering/Payment 45 seconds
(2) Pay Station 39 seconds
(3) Pay Station , tablet orders, assisted pick-up 33 seconds

Page 22 www.TrafficPD.com
During the necessary peak hours, the CFA operator will implement the necessary measures (i.e. pay station,
tablet orders, assisted pick-up window to expedite the processing time and minimize the vehicle queue.

Based on counts at existing Chick-fil-a restaurants, TPD calculated the rate of vehicles utilizing the drive-
thru. The drive-thru rate and resulting drive thru trips for the proposed Chick-fil-a are shown in Table 16.

TABLE 16
DRIVE-THRU TRIPS
Drive Thru Rate Total Trips Drive-Thru Walk-In Trips
Time Period
per 1000 sq. ft. Total Enter Exit Trips Total Enter Exit
Saturday Midday Peak
T = 20.84*(X) 421 215 206 105 211 110 101
Hour of Generator
Weekday Midday Peak
T = 20.95*(X) 435 222 213 105 225 117 108
Hour of Generator
T = number of site-generated drive-thru vehicular trips as part of the total trips
X = independent variable

Based on the trip generation analysis summarized in Table 16, the proposed Chick-fil-a will generate 105 drive-
thru trips during the Saturday midday peak hour of generator and weekday midday peak hour of generator.

Simtraffic analyses were conducted at the Chick-fil-a driveway to calculate the proposed queue for Saturday
Midday peak hour. Using a vehicle payment processing time of 33 seconds, the average queue from the menu
board is 6 vehicles and 95th percentile queue is 13 vehicles. Simtraffic results are included in Appendix L.

Additionally, the anticipated storage required for the Chick-fil-a drive thru lane was calculated based on
the methodology outlined in Chapter 19 of the 2010 Highway Capacity Manual. TPD utilized equation 19-
68, as shown below:

  3600  V x 
   
 Vx 2  C  C   C 
 Vx 
Q95 ≈ 900T  −1+  − 1 +   m, x   m, x 
m , x
 
 Cm , x  Cm , x  150T  3600 
 
 
Q95 = 95th Percentile Queue (Vehicles)
Vx = Flow Rate for Movement (veh/hr)
Cm,x = Capacity of Movement (veh/hr)
T = Analysis Time Period (hr)

With a service time of 33 seconds per customer, the drive-thru can have a capacity (Cm,x) of 109 customers
per hour. It was determined that Saturday is the busiest period for this use, generating 105 trips per hour.
The drive-thru flow rate (Vx) for this highest peak hour (Saturday Midday) is 105 customers per hour during
the busiest part of the day. Utilizing equation 17-37, the anticipated 95th percentile queue length is
calculated to be 290 feet, or 12 vehicles. As depicted on the proposed site plan, there is approximately 160
feet (6 vehicles) of storage space between the pick-up window and order menu. Furthermore, there are
two 110 foot lanes (5 vehicles each) from the order menu boards to the first internal intersection.
Additionally, there is an additional 225 feet (9 vehicles) of storage outside of the designated storage area
where vehicle queuing can occur without impacts to the public street (Chestnut Street) traffic. As such, 11
vehicles can stack internally and 20 vehicles can stack without impacts to the public street traffic. Therefore,

Page 23 www.TrafficPD.com
it is our opinion that adequate storage length for the Chick-fil-a is available for typically normalized time
periods.

RECOMMENDATIONS AND CONCLUSIONS


The conclusions for this Transportation Impact Study are identified in the Executive Summary.

Page 24 www.TrafficPD.com
$FILE$
$DATE$ $TIME$ $USER$ $MODEL$

PROPOSED
SITE N

PITTSBURGH HARRISBURG
(412)765-3717 (717)234-1430
POTTSTOWN
(610)326-3100
LEHIGH VALLEY SOUTH JERSEY
(610)625-4242 (856)966-4242
WWW.TRAFFICPD.COM

FIGURE 1
(C) 2018 Google Earth

LOCATION MAP
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
2/16/2019 8:43:22 PM jshetler $MODEL$

N
CHESTNUT STREET

STOPSTOP

BYPASS
LANE
BYPASS
LANE
PROPOSED
RANT
RESTAUS.F. OUTDOOR
SEATING
5,031± AREA
11) . 00
T (S.R
TREE
32nd S

STOP

DRIVE DRIVE
THRU THRU

ALLEY

STOP

ALLEY
Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com

FIGURE 2

SITE PLAN
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:03 AM jshetler $MODEL$

CAL PT
MARKET
N STREET

29TH STREET
SELECT M EDI
PARKING LOT
TRINDLE CHESTNUT
ROAD STREET

S ALLEY

30TH STREET
32ND STREET

N-
E-W ALLEY

S ALLEY
N-

BRAMAR
ROAD

31ST STREET
HARVARD
AVENUE

Est. 1989

KEY: TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com
STOP CONTROLLED
FIGURE 3
SIGNALIZED INTERSECTION
LANE USE AND TRAFFIC CONTROL
SCHEMATIC DRAWING:NOT TO SCALE
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:05 AM jshetler $MODEL$

24
71

18
7

6
3
4 3
223 272
62 26

CAL PT
MARKET
N STREET

29TH STREET
1 5
344 401

SELECT M EDI
NG LOT
22 11

4
4
8
13
68

18
218
986

PARKI
10

10

57
75
36
0
2
15 2 10
99 224 191 137
101 0 17 25

TRINDLE CHESTNUT
ROAD STREET
301 73 203 52

S ALLEY
161 206 37 127

30TH STREET
116 2 21

1
112
1340

10

4
117

18

16
19
32ND STREET

N-

53
0

0
1
0
0

E-W ALLEY

S ALLEY
1
0
0
0
0
0

22
0

0
1
N-

3
1

BRAMAR
ROAD
0
5

31ST STREET
0
1
0
0
1230
12

21

2
8
87

HARVARD AVENUE

16
8
67
1562
10
133

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com

FIGURE 4
KEY: VOLUME FIGURES
EXISTING COUNTS
SCHEMATIC DRAWING:NOT TO SCALE
A.M. PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:06 AM jshetler $MODEL$

21
25

18
6

0
4
7 10
380 396
31 19

CAL PT
MARKET
N STREET

29TH STREET
7 5
391 408

SELECT M EDI
NG LOT
16 4

20
9
8

3
8
8
200
916

PARKI
14

49

44
29
0
3

2
18 3 5
98 203 239 179
141 0 10 18

TRINDLE CHESTNUT
ROAD STREET
265 26 189 31

S ALLEY
140 177 3 153

30TH STREET
161 0 7

12
140

4
0
0

10
896
46

9
7

5
32ND STREET

N-

15
1

0
0
0
0

E-W ALLEY

S ALLEY
0
0
0
1
0
0

0
25
0
N-

5
1

BRAMAR
ROAD
2
8

31ST STREET
1
0
0
3
1171
57

5
25
81

HARVARD AVENUE

115
29
284
301
1062
16

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com

FIGURE 5
KEY: VOLUME FIGURES
EXISTING COUNTS
SCHEMATIC DRAWING:NOT TO SCALE
MIDDAY PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:07 AM jshetler $MODEL$

13
16
8

9
6
9
13 11
415 452
49 38

CAL PT
MARKET
N STREET

29TH STREET
17 6
385 424

SELECT M EDI
NG LOT
9 7

2
14
30

0
4
9
1242
247

PARKI
42

53
31
7

0
1

7
5 1 10
145 304 251 191
191 0 17 23

TRINDLE CHESTNUT
ROAD STREET
246 21 175 53

S ALLEY
168 218 24 146

30TH STREET
223 0 4

2
174

4
1238
49

13
26

19
7
32ND STREET

N-

38
1

0
0
0
1

E-W ALLEY

S ALLEY
0
0
0
0
0
1

1
0
38
0
N-

2
15

BRAMAR
ROAD
1
7

31ST STREET
5
1

22
0
1696
34

10
13
117

HARVARD AVENUE

70
18
275
238
1448
15

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com

FIGURE 6
KEY: VOLUME FIGURES
EXISTING COUNTS
SCHEMATIC DRAWING:NOT TO SCALE
P.M. PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:08 AM jshetler $MODEL$

14
15
11

8
3
3
6 4
396 421
31 16

CAL PT
MARKET
N STREET

29TH STREET
7 9
430 457

SELECT M EDI
NG LOT
8 3

2
12
4
6

26

3
178
998

PARKI
14

10

36
17
0
0

0
8 3 4
84 243 203 167
159 0 9 8

TRINDLE CHESTNUT
ROAD STREET
257 4 150 21

S ALLEY
125 169 9 125

30TH STREET
156 0 11
911

2
0

4
147

37

6
9

8
5
32ND STREET

N-

18
0

0
0
0
1

E-W ALLEY

S ALLEY
0
0
0
0
0
0

0
19
1
N-

3
1

BRAMAR
ROAD
0
4

31ST STREET
0
1
0
0
1106
75

1
22
87

HARVARD AVENUE

113
16
329
310
997
8

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com

FIGURE 7
KEY: VOLUME FIGURES
EXISTING COUNTS
SCHEMATIC DRAWING:NOT TO SCALE
SATUIRDAY MIDDAY PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:09 AM jshetler $MODEL$

24
72

18
7

6
3
4 3
227 276
63 26

CAL PT
MARKET
N STREET

29TH STREET
1 5
350 407

SELECT M EDI
NG LOT
22 11

4
4
8
13
69

18
1004
222

PARKI
10

10

58
76
37
0
2
15 2 10
101 228 194 139
103 0 17 25

TRINDLE CHESTNUT
ROAD STREET
306 74 206 53

S ALLEY
164 209 38 129

30TH STREET
118 2 21

1
1372
114

10

4
119

18

16
19
32ND STREET

N-

54
0

0
1
0
0

E-W ALLEY

S ALLEY
1
0
0
0
0
0

22
0

0
1
N-

3
1

BRAMAR
ROAD
0
5

31ST STREET
0
1
0
0
1250
12

21

2
8
88

HARVARD AVENUE

16
8
68
10
1587
135

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com

FIGURE 8
KEY: VOLUME FIGURES
BASE 2020 CONDITIONS
SCHEMATIC DRAWING:NOT TO SCALE
A.M. PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:10 AM jshetler $MODEL$

21
25

18
6

0
4
7 10
386 402
31 19

CAL PT
MARKET
N STREET

29TH STREET
7 5
397 415

SELECT M EDI
NG LOT
16 4

20
9
8

3
8
8
203
942

PARKI
14

50

45
29
0
3

2
18 3 5
100 206 243 182
143 0 10 18

TRINDLE CHESTNUT
ROAD STREET
269 26 192 31

S ALLEY
142 180 3 155

30TH STREET
164 0 7
142

12
4
0
0

10
937
47

9
7

5
32ND STREET

N-

15
1

0
0
0
0

E-W ALLEY

S ALLEY
0
0
0
1
0
0

0
25
0
N-

5
1

BRAMAR
ROAD
2
8

31ST STREET
1
0
0
3
1190
58

5
25
82

HARVARD AVENUE

117
29
289
306
1079
16

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com

FIGURE 9
KEY: VOLUME FIGURES
BASE 2020 CONDITIONS
SCHEMATIC DRAWING:NOT TO SCALE
WEEKDAY MIDDAY PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:11 AM jshetler $MODEL$

13
16
8

9
6
9
13 11
422 459
50 39

CAL PT
MARKET
N STREET

29TH STREET
17 6
391 431

SELECT M EDI
NG LOT
9 7

2
14
30

0
4
9
1273
251

PARKI
43

54
31
7

0
1

7
5 1 10
147 309 255 194
194 0 17 23

TRINDLE CHESTNUT
ROAD STREET
250 21 178 54

S ALLEY
171 222 24 148

30TH STREET
227 0 4

2
50

4
177

13
26

19
7
1285
32ND STREET

N-

39
1

0
0
0
1

E-W ALLEY

S ALLEY
0
0
0
0
0
1

1
0
39
0
N-

2
15

BRAMAR
ROAD
1
7

31ST STREET
5
1

22
0
1723
35

10
13
119

HARVARD AVENUE

71
18
279
1471
242

15

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com

FIGURE 10
KEY: VOLUME FIGURES
BASE 2020 CONDITIONS
SCHEMATIC DRAWING:NOT TO SCALE
P.M. PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:12 AM jshetler $MODEL$

14
15
11

8
3
3
6 4
402 428
31 16

CAL PT
MARKET
N STREET

29TH STREET
7 9
437 464

SELECT M EDI
NG LOT
8 3

2
12
4
6

26

3
1046
181

PARKI
14

10

37
17
0
0

0
8 3 4
85 247 206 170
162 0 9 8

TRINDLE CHESTNUT
ROAD STREET
261 4 152 21

S ALLEY
127 172 9 127

30TH STREET
159 0 11
1001

2
0

4
149

38

6
9

8
5
32ND STREET

N-

18
0

0
0
0
1

E-W ALLEY

S ALLEY
0
0
0
0
0
0

0
19
1
N-

3
1

BRAMAR
ROAD
0
4

31ST STREET
0
1
0
0
1124
76

1
22
88

HARVARD AVENUE

115
16
334
1013
8
315

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com

FIGURE 11
KEY: VOLUME FIGURES
BASE 2020 CONDITIONS
SCHEMATIC DRAWING:NOT TO SCALE
SATURDAY MIDDAY PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:13 AM jshetler $MODEL$

(5)

CAL PT
MARKET
N STREET

29TH STREET
SELECT M EDI
NG LOT

5)

5)
4(

4(
5)
8)
-

PARKI
3(
9(
(-1) (-2) 2 1
(-1) 2 (2)

TRINDLE CHESTNUT
ROAD STREET
10 (10) 5 (5)

S ALLEY
4 (-2) 12 (11) 5 (5)

30TH STREET
22 (20)
1)
7)
11)

22)

1
3(
-
3(
9(

22 (

11)
32ND STREET

12 (
N-
Entering: 24 (22)
Exiting: 22 (22)
E-W ALLEY

S ALLEY

1
N-

7 (5)

BRAMAR
ROAD

31ST STREET
-
3(6)

5 (6)

HARVARD AVENUE
9

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com
KEY:
FIGURE 12
NEW(PASS-BY)TRIPS VOLUME FIGURES
SITE TRIPS
SCHEMATIC DRAWING:NOT TO SCALE
A.M. PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:14 AM jshetler $MODEL$

(18) 3
3

CAL PT
MARKET
N STREET

29TH STREET
3

SELECT M EDI
NG LOT

18)

18)
3
24 (

24 (
23)
37)
-
19 (
51 (

PARKI

3
(-4) (-8) 11 6
(-4) 12 (8)

TRINDLE CHESTNUT
ROAD STREET
59 (36) 27 (18)

S ALLEY
20 (-7) 69 (43) 31 (18)

30TH STREET
121 (81) 1
3)
22)
36)

85)

1
19 (
-
51 (

128 (
19 (

43)
32ND STREET

69 (
N-
Entering: 133 (89)
Exiting: 128 (85)
E-W ALLEY

S ALLEY

1
N-

38 (17)

BRAMAR
ROAD

31ST STREET
-
19 (28)

29 (26)

HARVARD AVENUE
51

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com
KEY:
FIGURE 13
NEW(PASS-BY)TRIPS VOLUME FIGURES
SITE TRIPS
SCHEMATIC DRAWING:NOT TO SCALE
WEEKDAY MIDDAY PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:15 AM jshetler $MODEL$

(14) 1
1

CAL PT
MARKET
N STREET

29TH STREET
1

SELECT M EDI
NG LOT

14)

14)
1
13 (

13 (
19)
31)
-
10 (
28 (

PARKI

1
(-4) (-7) 6 3
(-4) 7 (7)

TRINDLE CHESTNUT
ROAD STREET
31 (29) 14 (14)

S ALLEY
11 (-5) 37 (35) 16 (14)

30TH STREET
67 (67) 1
3)
19)
30)

68)

1
10 (
-
28 (

68 (
10 (

35)
32ND STREET

37 (
N-
Entering: 74 (74)
Exiting: 68 (68)
E-W ALLEY

S ALLEY

1
N-

20 (14)

BRAMAR
ROAD

31ST STREET
-
10 (19)

16 (20)

HARVARD AVENUE
28

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com
KEY:
FIGURE 14
NEW(PASS-BY)TRIPS VOLUME FIGURES
SITE TRIPS
SCHEMATIC DRAWING:NOT TO SCALE
P.M. PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:16 AM jshetler $MODEL$

(16) 3
3

CAL PT
MARKET
N STREET

29TH STREET
2

SELECT M EDI
NG LOT

16)

17)
2
24 (

24 (
23)
37)
-
19 (
50 (

PARKI

3
(-3) (-9) 10 6
(-6) 12 (9)

TRINDLE CHESTNUT
ROAD STREET
57 (33) 26 (16)

S ALLEY
19 (-6) 67 (43) 30 (16)

30TH STREET
117 (77) 1
3)
21)
34)

82)

1
19 (
-
49 (

124 (
19 (

43)
32ND STREET

67 (
N-
Entering: 129 (86)
Exiting: 124 (82)
E-W ALLEY

S ALLEY

1
N-

37 (16)

BRAMAR
ROAD

31ST STREET
-
19 (29)

29 (27)

HARVARD AVENUE
49

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com
KEY:
FIGURE 15
NEW(PASS-BY)TRIPS VOLUME FIGURES
SITE TRIPS
SCHEMATIC DRAWING:NOT TO SCALE
SATURDAY MIDDAY PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:17 AM jshetler $MODEL$

CAL PT
MARKET
N STREET

29TH STREET
SELECT M EDI
PARKING LOT
1

TRINDLE CHESTNUT
ROAD STREET

S ALLEY

30TH STREET
1

1
-
32ND STREET

N-
E-W ALLEY

S ALLEY
1

N-

BRAMAR
ROAD

31ST STREET
HARVARD AVENUE

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com

FIGURE 16
KEY: VOLUME FIGURES
REROUTED N-S ALLEY TRIPS
SCHEMATIC DRAWING:NOT TO SCALE
A.M. PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:18 AM jshetler $MODEL$

CAL PT
MARKET
N STREET

29TH STREET
SELECT M EDI
PARKING LOT
4

TRINDLE CHESTNUT
ROAD STREET

S ALLEY

30TH STREET
4

4
-
32ND STREET

N-
E-W ALLEY

S ALLEY
4

N-

BRAMAR
ROAD

31ST STREET
HARVARD AVENUE

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com

FIGURE 17
KEY: VOLUME FIGURES
REROUTED N-S ALLEY TRIPS
SCHEMATIC DRAWING:NOT TO SCALE
WEEKDAY MIDDAY PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:19 AM jshetler $MODEL$

CAL PT
MARKET
N STREET

29TH STREET
SELECT M EDI
PARKING LOT
3

TRINDLE CHESTNUT
ROAD STREET

S ALLEY

30TH STREET
3

3
-
32ND STREET

N-
E-W ALLEY

S ALLEY
3

N-

BRAMAR
ROAD

31ST STREET
HARVARD AVENUE

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com

FIGURE 18
KEY: VOLUME FIGURES
REROUTED N-S ALLEY TRIPS
SCHEMATIC DRAWING:NOT TO SCALE
P.M. PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:20 AM jshetler $MODEL$

CAL PT
MARKET
N STREET

29TH STREET
SELECT M EDI
PARKING LOT
2

TRINDLE CHESTNUT
ROAD STREET

S ALLEY

30TH STREET
2

2
-
32ND STREET

N-
E-W ALLEY

S ALLEY
2

N-

BRAMAR
ROAD

31ST STREET
HARVARD AVENUE

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com

FIGURE 19
KEY: VOLUME FIGURES
REROUTED N-S ALLEY TRIPS
SCHEMATIC DRAWING:NOT TO SCALE
SATURDAY MIDDAY PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:21 AM jshetler $MODEL$

24
72

18
7

6
3
4 3
232 276
63 26

CAL PT
MARKET
STREET
N

29TH STREET
1 5
350 407

SELECT M EDI
NG LOT
22 11

4
17
13
69

13

18
1002
222

PARKI
27

10

58
76
37
0
2
15 3 10
100 226 196 140
102 4 17 25

TRINDLE CHESTNUT
ROAD STREET
306 74 226 63

S ALLEY
168 207 61 139

30TH STREET
118 44 21

12
134

0
0
44

4
123
1368

18

16
19
32ND STREET

N-

77
0

0
1
0
0

E-W ALLEY

S ALLEY
2
0
0
0
0
0

0
23
1
N-

15
1

BRAMAR
ROAD
0
5

31ST STREET
0
1
0
0
1247
12

21

2
8
99

HARVARD AVENUE

16
8
68
10
1596
135

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com

FIGURE 20
KEY: VOLUME FIGURES
PROJECTED 2020 CONDITIONS
SCHEMATIC DRAWING:NOT TO SCALE
A.M. PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:22 AM jshetler $MODEL$

21
25

18
6

0
4
7 10
404 405
34 19

CAL PT
MARKET
N STREET

29TH STREET
7 5
397 418

SELECT M EDI
NG LOT
16 4

51
8
23

8
8
45
203
938
102

PARKI
50

48
29
0
3

2
18 3 5
96 202 254 188
139 20 10 18

TRINDLE CHESTNUT
ROAD STREET
269 26 287 76

S ALLEY
162 173 115 204

30TH STREET
164 202 8
164
934
134

0
0

14

10
213

13

5
32ND STREET

127
N-

0
0
0
0

E-W ALLEY

S ALLEY
4
0
0
1
0
0

0
26
0
N-

60
1

BRAMAR
ROAD
2
8

31ST STREET
1
0
0
3
1181
58

5
25
137

HARVARD AVENUE

117
29
289
1130
306

16

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com

FIGURE 21
KEY: VOLUME FIGURES
PROJECTED 2020 CONDITIONS
SCHEMATIC DRAWING:NOT TO SCALE
WEEKDAY MIDDAY PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:24 AM jshetler $MODEL$

13
16
8

9
6
9
13 11
436 460
51 39

CAL PT
MARKET
N STREET

29TH STREET
17 6
391 432

SELECT M EDI
NG LOT
9 7

31
14

4
29

27

9
1264
251

PARKI
66

43

55
31
0
1

7
5 1 10
143 305 261 197
190 14 17 23

TRINDLE CHESTNUT
ROAD STREET
250 21 238 82

S ALLEY
182 217 96 178

30TH STREET
227 134 5
190

0
0
1276
108

138

17
26

19
7
5
32ND STREET

111
N-

0
0
0
1

E-W ALLEY

S ALLEY
3
0
0
0
0
1

1
0
40
0
N-

36
15

BRAMAR
ROAD
1
7

31ST STREET
5
1

22
0
1714
35

10
13
155

HARVARD AVENUE

71
18
279
242
1499
15

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com

FIGURE 22
KEY: VOLUME FIGURES
PROJECTED 2020 CONDITIONS
SCHEMATIC DRAWING:NOT TO SCALE
P.M. PEAK HOUR
c:\pwworking\projectwise\jshetler\d0497892\TIS Figures 2019.01.08.dgn
4/23/2019 11:55:25 AM jshetler $MODEL$

14
15
11

8
3
3
6 4
402 428
31 16

CAL PT
MARKET
N STREET

29TH STREET
7 9
437 464

SELECT M EDI
NG LOT
8 3

2
12
4
6

26

3
1042
181

101

PARKI
10

40
17
0
0

0
8 3 4
82 240 216 176
156 21 9 8

TRINDLE CHESTNUT
ROAD STREET
261 4 242 104

S ALLEY
146 166 119 133

30TH STREET
159 194 12
171

121

0
0

4
999

208

9
9

6
8
32ND STREET

128
N-

0
0
0
1

E-W ALLEY

S ALLEY
2
0
0
0
0
0

0
20
0
1
N-

56
1

BRAMAR
ROAD
0
4

31ST STREET
0
1
0
0
1124
76

1
22
88

HARVARD AVENUE

115
16
334
1013
8
315

Est. 1989

TRAFFIC PLANNING AND DESIGN, INC.


www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com

FIGURE 23
KEY: VOLUME FIGURES
PROJECTED 2020 CONDITIONS
SCHEMATIC DRAWING:NOT TO SCALE
SATURDAY MIDDAY PEAK HOUR
APPENDIX A:
Project Correspondence
WWW.TRAFFICPD.COM

MEMORANDUM

To: Patrick Dennis, Borough Manager


From: Jarred L. Neal, P.E., Traffic Planning and Design, Inc. (TPD)

Cc: Mark Metil, Gannett Fleming

P. Eric Mains, Gannett Fleming

Date: November 14, 2018

Re: Traffic Impact Study (TIS) Scope Determination Request


Camp Hill Chick-Fil-A
Camp Hill Borough, Cumberland County, PA
TPD#: WMSC.00002

This memo regards the proposed Chick-Fil-A Development in Camp Hill Borough, Cumberland
County, PA. The proposed development will be located on the southeastern side of the intersection
of 32nd Street (SR 0011) and Chestnut Street (see attached location map). Upon full build-out, the
proposed development will consist of a 5,031 sq. ft. fast food restaurant with a drive-thru. Access will
be provided via one (1) full-movement driveway to Chestnut Street. TPD proposes the following
scope for the TIS, per Borough’s “Abbreviated Traffic Impact Study” requirements as identified in
Section 731.A.1 of the Borough’s Zoning Ordinance:

Study Area:
 Chestnut Street and Proposed Site Driveway.

Study Time Periods:


 Weekday A.M. Peak Hour (between 6:00-9:00 A.M.);
 Weekday P.M. Peak Hour (between 3:00-6:00 P.M.);
 Saturday Midday Peak Hour (between 11:00 A.M. - 1:00 P.M.).

Background Growth Factor & Nearby Developments:


 A background growth factor of 0.80% compounded annually will be applied to the existing traffic
volumes in accordance with the current PennDOT BPR statistics.
 TPD will include the Quattro Redevelopment at the intersection of N. 32nd Street and 31st Street
as a background development. Please advise of any other nearby planned developments that
the Borough is aware of in the vicinity of the proposed development.

4000 Crums Mill Road, Suite 102 717.234.1430


TPD@TrafficPD.com
Harrisburg, PA 17112
Trip Generation:
 The trip generation rates for the proposed development were obtained from the Trip Generation
Manual, Tenth Edition, 2017, an Institute of Transportation Engineers (ITE) Informational Report.
The statistics in Trip Generation Manual are empirical data based on more than 4,800 trip
generation studies. The data are categorized by Land Use Codes, with total vehicular trips for a
given land use estimated using an independent variable and statistically generated rates or
equations.

For the proposed development, Land Use Codes 934 (Fast-Food Restaurant with Drive-Thru) from
Trip Generation was used to calculate the number of vehicular trips the development will
generate during the following time periods: (1) average weekday; (2) weekday A.M. peak hour;
(3) weekday P.M. peak hour and (4) Saturday midday peak hour. Table 1 shows the trip generation
equations and directional split for the analyzed time periods.
TABLE 1
ITE TRIP GENERATION EQUATIONS
Land Use Time Directional Split
Units Rates
Component Period Enter Exit
Fast-Food Average Weekday T = 470.95*X 50% 50%
Restaurant A.M. Peak Hour T = 40.19*X 51% 49%
with Drive- 5,031 sq. ft.
Thru P.M. Peak Hour T = 32.67*X 52% 48%
(ITE #934) Saturday Peak Hour T = 54.86*X 51% 49%
T = number of site-generated vehicular trips;
X = independent variable (ksf gross floor area)

The calculated trip generation for the proposed development for the opening year is shown in Table 2.

TABLE 2
TRIP GENERATION SUMMARY
Total Trips Pass-by Trips New Trips
Time Period
Total Enter Exit Total Enter Exit Total Enter Exit
Weekday 2,370 1,185 1,185 --- --- --- --- --- ---
A.M. Peak Hour 202 103 99 99 50 49 103 53 50
P.M. Peak Hour 164 85 79 82 43 39 82 42 40
SAT Midday
276 141 135 110 56 54 166 85 81
Peak Hour

Trip Distribution:
 The distribution and assignment of new trips generated by the development will be based upon
an analysis of the following: (1) existing traffic patterns and distributions within the study area;
(2) available routes for travel; and (3) the proposed site driveway location.

4000 Crums Mill Road, Suite 102 717.234.1430 November 14, 2018 / Page 2
TPD@TrafficPD.com
Harrisburg, PA 17112
Capacity Analyses:
 Capacity analyses will be conducted according to the methodologies contained in the 2010
Highway Capacity Manual (HCM) using Synchro 10 software:
o Existing Conditions;
o 2020 Opening Year Conditions (without the proposed development);
o 2020 Opening Year Conditions (with the proposed development).

We would appreciate your review of the enclosed information. If there are any questions or comments,
please call any time.

ADDITIONAL INFORMATION:

Following submission of the Scoping memorandum a meeting was held to discuss the project with
Borough Staff. During the meeting it was determined the TIS should be completed using Chick-fil-A
transaction data.

Also the following study area intersections were requested to be included in the TIS:
--Chestnut Street & N-S Alley (CFA driveway)/ Select Medical PT Parking Lot;
--Chestnut Street/Trindle Road & S 32nd Street;
--Chestnut Street & 31st Street;
--Chestnut Street & 30th Street;
--31st Street & E-W Alley;
--Bramar Road & N-S Alley/Camp Hill Family Chiropractic.

4000 Crums Mill Road, Suite 102 717.234.1430 November 14, 2018 / Page 3
TPD@TrafficPD.com
Harrisburg, PA 17112
APPENDIX B:
Study Area Photographs
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: Chestnut Street & Alley

Direction / Road: EB Chestnut Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: EB Chestnut Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: Chestnut Street & Alley

Direction / Road: WB Chestnut Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: WB Chestnut Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: Chestnut Street & Alley

Direction / Road: NB Alley


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: NB Alley


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: Chestnut Street & Alley

Direction / Road: SB Alley


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: SB Alley


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: Chestnut St & Trindle Road/32nd St

Direction / Road: EB Trindle Road


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: EB Trindle Road


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: Chestnut St & Trindle Road/32nd St

Direction / Road: WB Chestnut Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: WB Chestnut Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: Chestnut St & Trindle Road/32nd St

Direction / Road: NB 32nd Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: NB 32nd Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: Chestnut St & Trindle Road/32nd St

Direction / Road: SB 32nd Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: SB 32nd Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: Chestnut & 30th Street

Direction / Road: NB 30th Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: NB 30th Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: Chestnut & 30th Street

Direction / Road: SB 30th Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: SB 30th Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: Chestnut & 30th Street

Direction / Road: WB Chestnut


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: WB Chestnut


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: Chestnut & 31st Street

Direction / Road: NB 31st Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: NB 31st Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: Chestnut & 31st Street

Direction / Road: EB Chestnut


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: EB Chestnut


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: Chestnut & 31st Street

Direction / Road: WB Chestnut


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: WB Chestnut


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: 31st Street & Alley

Direction / Road: EB E-W Alley


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: EB E-W Alley


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: 31st Street & Alley

Direction / Road: NB 31st Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: NB 31st Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: 31st Street & Alley

Direction / Road: SB 31st Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: SB 31st Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: Bramar Road & N-S Alley

Direction / Road: EB Bramar Road


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: EB E-W Alley


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: Bramar Road & N-S Alley

Direction / Road: WB Bramar Road


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: WB Bramar Road


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 12/10/2018 Intersection Of: Bramar Road & N-S Alley

Direction / Road: SB N-S Alley


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: SB N-S Alley


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 03/29/2019 Intersection Of: 29th Street & Market Street

Direction / Road: EB Market Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: EB Market Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 03/29/2019 Intersection Of: 29th Street & Market Street

Direction / Road: WB Market Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: WB Market Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 03/29/2019 Intersection Of: 29th Street & Market Street

Direction / Road: NB 29th Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: NB 29th Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 03/29/2019 Intersection Of: 29th Street & Market Street

Direction / Road: SB 29th Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: SB 29th Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 03/29/2019 Intersection Of: 30th Street & Market Street

Direction / Road: EB Market Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: EB Market Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 03/29/2019 Intersection Of: 30th Street & Market Street

Direction / Road: WB Market Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: WB Market Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 03/29/2019 Intersection Of: 30th Street & Market Street

Direction / Road: NB 30th Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: NB 30th Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 03/29/2019 Intersection Of: 30th Street & Market Street

Direction / Road: SB 30th Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: SB 30th Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 03/29/2019 Intersection Of: 32nd Street & Harvard Avenue

Direction / Road: EB Shopping Center


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: EB Shopping Center


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 03/29/2019 Intersection Of: 32nd Street & Harvard Avenue

Direction / Road: WB Harvard Avenue


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: WB Harvard Avenue


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 03/29/2019 Intersection Of: 32nd Street & Harvard Avenue

Direction / Road: NB 32nd Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: NB 32nd Street


Approach / Departure: Approach
Distance: 200 feet
Job #: WMSC.00002 Date Taken: 03/29/2019 Intersection Of: 32nd Street & Harvard Avenue

Direction / Road: SB 32nd Street


Approach / Departure: Approach
Distance: 50 feet

Direction / Road: SB 32nd Street


Approach / Departure: Approach
Distance: 200 feet
APPENDIX C:
Traffic Count Printouts
Count Name: AM_PM Alley &
Traffic Planning and Design, Inc Chestnut Street
2500 East High Street Site Code: AM_PM Alley &
Suite 650 Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/04/2018
610.326.3100 jwheeler@trafficpd.com Page No: 1

Turning Movement Data


Chestnut Street Chestnut Street Alley Office Park Driveway
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
6:00 AM 1 4 0 0 5 0 6 0 0 6 0 0 0 0 0 1 0 0 0 1 12
6:15 AM 4 8 1 0 13 0 13 0 0 13 0 0 0 0 0 0 0 1 0 1 27
6:30 AM 1 17 0 0 18 0 15 0 0 15 0 0 0 2 0 0 0 2 0 2 35
6:45 AM 8 20 0 0 28 0 26 0 0 26 0 0 0 0 0 0 0 2 0 2 56
Hourly Total 14 49 1 0 64 0 60 0 0 60 0 0 0 2 0 1 0 5 0 6 130
7:00 AM 6 33 0 0 39 0 23 0 0 23 0 0 0 2 0 0 0 3 0 3 65
7:15 AM 8 51 1 0 60 0 38 1 1 39 0 0 0 8 0 1 0 1 0 2 101
7:30 AM 16 55 2 0 73 0 59 2 0 61 0 0 0 1 0 1 0 4 2 5 139
7:45 AM 25 46 0 0 71 0 52 0 0 52 0 1 0 0 1 0 0 2 0 2 126
Hourly Total 55 185 3 0 243 0 172 3 1 175 0 1 0 11 1 2 0 10 2 12 431
8:00 AM 18 62 0 0 80 0 42 0 0 42 0 0 0 0 0 0 0 3 1 3 125
8:15 AM 14 43 0 0 57 0 71 0 0 71 0 0 0 0 0 1 0 1 0 2 130
8:30 AM 14 32 1 0 47 0 50 0 1 50 2 0 0 0 2 0 0 5 0 5 104
8:45 AM 6 42 0 0 48 2 54 0 0 56 1 0 0 0 1 2 0 2 0 4 109
Hourly Total 52 179 1 0 232 2 217 0 1 219 3 0 0 0 3 3 0 11 1 14 468
*** BREAK *** - - - - - - - - - - - - - - - - - - - - -
3:00 PM 5 41 0 0 46 0 79 2 0 81 1 0 2 7 3 0 0 8 0 8 138
3:15 PM 1 42 0 0 43 0 81 0 0 81 0 0 2 2 2 0 0 6 0 6 132
3:30 PM 4 49 0 0 53 0 60 1 0 61 0 1 0 0 1 1 0 12 0 13 128
3:45 PM 7 32 1 0 40 1 58 0 0 59 3 0 0 0 3 0 0 14 0 14 116
Hourly Total 17 164 1 0 182 1 278 3 0 282 4 1 4 9 9 1 0 40 0 41 514
4:00 PM 6 43 2 0 51 0 55 0 0 55 1 0 0 1 1 2 1 14 0 17 124
4:15 PM 2 40 0 0 42 0 62 0 0 62 1 0 0 0 1 1 0 15 0 16 121
4:30 PM 4 62 0 0 66 0 74 0 0 74 0 0 1 0 1 1 0 20 1 21 162
4:45 PM 4 58 0 0 62 0 71 1 0 72 0 0 1 0 1 0 0 7 0 7 142
Hourly Total 16 203 2 0 221 0 262 1 0 263 2 0 2 1 4 4 1 56 1 61 549
5:00 PM 9 41 0 0 50 0 88 0 0 88 2 0 0 0 2 0 0 8 0 8 148
5:15 PM 4 57 0 1 61 0 71 0 0 71 1 0 0 0 1 0 0 7 0 7 140
5:30 PM 4 63 0 0 67 1 58 0 0 59 1 0 0 0 1 0 0 6 0 6 133
5:45 PM 3 39 0 0 42 0 58 1 0 59 5 1 0 0 6 0 0 7 0 7 114
Hourly Total 20 200 0 1 220 1 275 1 0 277 9 1 0 0 10 0 0 28 0 28 535
Grand Total 174 980 8 1 1162 4 1264 8 2 1276 18 3 6 23 27 11 1 150 4 162 2627
Approach % 15.0 84.3 0.7 - - 0.3 99.1 0.6 - - 66.7 11.1 22.2 - - 6.8 0.6 92.6 - - -
Total % 6.6 37.3 0.3 - 44.2 0.2 48.1 0.3 - 48.6 0.7 0.1 0.2 - 1.0 0.4 0.0 5.7 - 6.2 -
Lights 173 972 8 - 1153 4 1251 7 - 1262 18 3 6 - 27 10 1 148 - 159 2601
% Lights 99.4 99.2 100.0 - 99.2 100.0 99.0 87.5 - 98.9 100.0 100.0 100.0 - 100.0 90.9 100.0 98.7 - 98.1 99.0
Other Vehicles 1 8 0 - 9 0 13 1 - 14 0 0 0 - 0 1 0 2 - 3 26
% Other 0.6 0.8 0.0 - 0.8 0.0 1.0 12.5 - 1.1 0.0 0.0 0.0 - 0.0 9.1 0.0 1.3 - 1.9 1.0
Vehicles
Pedestrians - - - 1 - - - - 2 - - - - 23 - - - - 4 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - 100.0 - - - - 100.0 - -
Count Name: AM_PM Alley &
Traffic Planning and Design, Inc Chestnut Street
2500 East High Street Site Code: AM_PM Alley &
Suite 650 Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/04/2018
610.326.3100 jwheeler@trafficpd.com Page No: 2

Office Park Driveway [N]


Out In Total
183 159 342
2 3 5
0 0 0
185 162 347

148 1 10 0
2 0 1 0
0 0 0 4
150 1 11 4
R T L P
173

174

R
1
0

8
0
1
7
Total
2570

2594

997

988
Out
24
0

0
9
Chestnut Street [W]

Chestnut Street [E]


1264

1251
972

980

13
T

T
8
0

0
12/04/2018 6:00 AM
1153

1162

1276

1262
14
In

In
9
0

0
Ending At
12/04/2018 6:00 PM
R
8
0
0
8

L
4
0
0
4
Lights
1417

1432

2273

2250
Total
Out

15

23
Other Vehicles
0

0
Pedestrians
P

P
0
0
1
1

2
2
0
0

L T R P
18 3 6 0
0 0 0 0
0 0 0 23
18 3 6 23

13 27 40
0 0 0
0 0 0
13 27 40
Out In Total
Alley [S]

Turning Movement Data Plot


Count Name: AM_PM Alley &
Traffic Planning and Design, Inc Chestnut Street
2500 East High Street Site Code: AM_PM Alley &
Suite 650 Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/04/2018
610.326.3100 jwheeler@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (7:30 AM)


Chestnut Street Chestnut Street Alley Office Park Driveway
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
7:30 AM 16 55 2 0 73 0 59 2 0 61 0 0 0 1 0 1 0 4 2 5 139
7:45 AM 25 46 0 0 71 0 52 0 0 52 0 1 0 0 1 0 0 2 0 2 126
8:00 AM 18 62 0 0 80 0 42 0 0 42 0 0 0 0 0 0 0 3 1 3 125
8:15 AM 14 43 0 0 57 0 71 0 0 71 0 0 0 0 0 1 0 1 0 2 130
Total 73 206 2 0 281 0 224 2 0 226 0 1 0 1 1 2 0 10 3 12 520
Approach % 26.0 73.3 0.7 - - 0.0 99.1 0.9 - - 0.0 100.0 0.0 - - 16.7 0.0 83.3 - - -
Total % 14.0 39.6 0.4 - 54.0 0.0 43.1 0.4 - 43.5 0.0 0.2 0.0 - 0.2 0.4 0.0 1.9 - 2.3 -
PHF 0.730 0.831 0.250 - 0.878 0.000 0.789 0.250 - 0.796 0.000 0.250 0.000 - 0.250 0.500 0.000 0.625 - 0.600 0.935
Lights 73 204 2 - 279 0 220 2 - 222 0 1 0 - 1 2 0 10 - 12 514
% Lights 100.0 99.0 100.0 - 99.3 - 98.2 100.0 - 98.2 - 100.0 - - 100.0 100.0 - 100.0 - 100.0 98.8
Other Vehicles 0 2 0 - 2 0 4 0 - 4 0 0 0 - 0 0 0 0 - 0 6
% Other 0.0 1.0 0.0 - 0.7 - 1.8 0.0 - 1.8 - 0.0 - - 0.0 0.0 - 0.0 - 0.0 1.2
Vehicles
Pedestrians - - - 0 - - - - 0 - - - - 1 - - - - 3 - -
% Pedestrians - - - - - - - - - - - - - 100.0 - - - - 100.0 - -
Count Name: AM_PM Alley &
Traffic Planning and Design, Inc Chestnut Street
2500 East High Street Site Code: AM_PM Alley &
Suite 650 Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/04/2018
610.326.3100 jwheeler@trafficpd.com Page No: 4

Office Park Driveway [N]


Out In Total
76 12 88
0 0 0
0 0 0
76 12 88

10 0 2 0
0 0 0 0
0 0 0 3
10 0 2 3
R T L P
73

73

R
0
0

2
0
0
2
Peak Hour Data
Total
509

515

208

206
Out
6
0

0
2
Chestnut Street [W]

Chestnut Street [E]


204

206

224

220
T

T
2
0

0
4
12/04/2018 7:30 AM
279

281

226

222
In

In
2
0

0
4
Ending At
12/04/2018 8:30 AM
R
2
0
0
2

L
0
0
0
0
Lights

Total
230

234

434

428
Out

Other Vehicles
4
0

0
6
Pedestrians
P

P
0
0
0
0

0
0
0
0

L T R P
0 1 0 0
0 0 0 0
0 0 0 1
0 1 0 1

2 1 3
0 0 0
0 0 0
2 1 3
Out In Total
Alley [S]

Turning Movement Peak Hour Data Plot (7:30 AM)


Count Name: AM_PM Alley &
Traffic Planning and Design, Inc Chestnut Street
2500 East High Street Site Code: AM_PM Alley &
Suite 650 Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/04/2018
610.326.3100 jwheeler@trafficpd.com Page No: 5

Turning Movement Peak Hour Data (4:30 PM)


Chestnut Street Chestnut Street Alley Office Park Driveway
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
4:30 PM 4 62 0 0 66 0 74 0 0 74 0 0 1 0 1 1 0 20 1 21 162
4:45 PM 4 58 0 0 62 0 71 1 0 72 0 0 1 0 1 0 0 7 0 7 142
5:00 PM 9 41 0 0 50 0 88 0 0 88 2 0 0 0 2 0 0 8 0 8 148
5:15 PM 4 57 0 1 61 0 71 0 0 71 1 0 0 0 1 0 0 7 0 7 140
Total 21 218 0 1 239 0 304 1 0 305 3 0 2 0 5 1 0 42 1 43 592
Approach % 8.8 91.2 0.0 - - 0.0 99.7 0.3 - - 60.0 0.0 40.0 - - 2.3 0.0 97.7 - - -
Total % 3.5 36.8 0.0 - 40.4 0.0 51.4 0.2 - 51.5 0.5 0.0 0.3 - 0.8 0.2 0.0 7.1 - 7.3 -
PHF 0.583 0.879 0.000 - 0.905 0.000 0.864 0.250 - 0.866 0.375 0.000 0.500 - 0.625 0.250 0.000 0.525 - 0.512 0.914
Lights 21 216 0 - 237 0 303 1 - 304 3 0 2 - 5 1 0 42 - 43 589
% Lights 100.0 99.1 - - 99.2 - 99.7 100.0 - 99.7 100.0 - 100.0 - 100.0 100.0 - 100.0 - 100.0 99.5
Other Vehicles 0 2 0 - 2 0 1 0 - 1 0 0 0 - 0 0 0 0 - 0 3
% Other 0.0 0.9 - - 0.8 - 0.3 0.0 - 0.3 0.0 - 0.0 - 0.0 0.0 - 0.0 - 0.0 0.5
Vehicles
Pedestrians - - - 1 - - - - 0 - - - - 0 - - - - 1 - -
% Pedestrians - - - 100.0 - - - - - - - - - - - - - - 100.0 - -
Count Name: AM_PM Alley &
Traffic Planning and Design, Inc Chestnut Street
2500 East High Street Site Code: AM_PM Alley &
Suite 650 Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/04/2018
610.326.3100 jwheeler@trafficpd.com Page No: 6

Office Park Driveway [N]


Out In Total
22 43 65
0 0 0
0 0 0
22 43 65

42 0 1 0
0 0 0 0
0 0 0 1
42 0 1 1
R T L P
21

21

R
0
0

1
0
0
1
Peak Hour Data
Total
585

588

221

219
Out
3
0

0
2
Chestnut Street [W]

Chestnut Street [E]


216

218

304

303
T

T
2
0

0
1
12/04/2018 4:30 PM
237

239

305

304
In

In
2
0

0
1
Ending At
12/04/2018 5:30 PM
R
0
0
0
0

L
0
0
0
0
Lights

Total
348

349

526

523
Out

Other Vehicles
1
0

0
3
Pedestrians
P

P
0
0
1
1

0
0
0
0

L T R P
3 0 2 0
0 0 0 0
0 0 0 0
3 0 2 0

0 5 5
0 0 0
0 0 0
0 5 5
Out In Total
Alley [S]

Turning Movement Peak Hour Data Plot (4:30 PM)


Count Name: SAT Alley &
Traffic Planning and Design, Inc Chestnut Street
2500 East High Street Site Code: SAT Alley & Chestnut
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/01/2018
610.326.3100 jwheeler@trafficpd.com Page No: 1

Turning Movement Data


Chestnut Street Chestnut Street Alley Office Park Dw
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
11:00 AM 2 46 0 0 48 0 55 0 0 55 0 0 0 0 0 0 0 4 0 4 107
11:15 AM 4 33 0 0 37 0 51 0 0 51 0 0 0 0 0 0 0 6 0 6 94
11:30 AM 0 37 0 0 37 0 53 1 0 54 0 0 1 0 1 0 0 3 1 3 95
11:45 AM 0 39 0 0 39 0 52 1 0 53 0 0 0 0 0 0 0 3 0 3 95
Hourly Total 6 155 0 0 161 0 211 2 0 213 0 0 1 0 1 0 0 16 1 16 391
12:00 PM 2 49 0 1 51 0 72 1 0 73 0 0 1 1 1 0 0 3 1 3 128
12:15 PM 2 44 0 0 46 0 66 0 0 66 2 0 0 0 2 0 0 1 0 1 115
12:30 PM 2 39 0 0 41 0 44 0 0 44 0 0 0 0 0 0 0 8 0 8 93
12:45 PM 4 28 0 0 32 0 49 0 0 49 0 0 0 0 0 0 0 6 0 6 87
Hourly Total 10 160 0 1 170 0 231 1 0 232 2 0 1 1 3 0 0 18 1 18 423
1:00 PM 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
Grand Total 17 315 0 1 332 0 442 3 0 445 2 0 2 1 4 0 0 34 2 34 815
Approach % 5.1 94.9 0.0 - - 0.0 99.3 0.7 - - 50.0 0.0 50.0 - - 0.0 0.0 100.0 - - -
Total % 2.1 38.7 0.0 - 40.7 0.0 54.2 0.4 - 54.6 0.2 0.0 0.2 - 0.5 0.0 0.0 4.2 - 4.2 -
Lights 16 315 0 - 331 0 442 2 - 444 2 0 2 - 4 0 0 33 - 33 812
% Lights 94.1 100.0 - - 99.7 - 100.0 66.7 - 99.8 100.0 - 100.0 - 100.0 - - 97.1 - 97.1 99.6
Other Vehicles 1 0 0 - 1 0 0 1 - 1 0 0 0 - 0 0 0 1 - 1 3
% Other 5.9 0.0 - - 0.3 - 0.0 33.3 - 0.2 0.0 - 0.0 - 0.0 - - 2.9 - 2.9 0.4
Vehicles
Pedestrians - - - 1 - - - - 0 - - - - 1 - - - - 2 - -
% Pedestrians - - - 100.0 - - - - - - - - - 100.0 - - - - 100.0 - -
Count Name: SAT Alley &
Traffic Planning and Design, Inc Chestnut Street
2500 East High Street Site Code: SAT Alley & Chestnut
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/01/2018
610.326.3100 jwheeler@trafficpd.com Page No: 2

Office Park Dw [N]


Out In Total
18 33 51
2 1 3
0 0 0
20 34 54

33 0 0 0
1 0 0 0
0 0 0 2
34 0 0 2
R T L P
16

17

R
1
0

3
0
1
2
Total
808

810

317

317
Out
2
0

0
0
Chestnut Street [W]

Chestnut Street [E]


315

315

442

442
T

T
0
0

0
0
12/01/2018 11:00 AM
331

332

445

444
In

In
1
0

0
1
Ending At
12/01/2018 1:15 PM
R
0
0
0
0

L
0
0
0
0
Lights

Total
477

478

762

761
Out

Other Vehicles
1
0

0
1
Pedestrians
P

P
0
0
1
1

0
0
0
0

L T R P
2 0 2 0
0 0 0 0
0 0 0 1
2 0 2 1

0 4 4
0 0 0
0 0 0
0 4 4
Out In Total
Alley [S]

Turning Movement Data Plot


Count Name: SAT Alley &
Traffic Planning and Design, Inc Chestnut Street
2500 East High Street Site Code: SAT Alley & Chestnut
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/01/2018
610.326.3100 jwheeler@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (11:30 AM)


Chestnut Street Chestnut Street Alley Office Park Dw
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
11:30 AM 0 37 0 0 37 0 53 1 0 54 0 0 1 0 1 0 0 3 1 3 95
11:45 AM 0 39 0 0 39 0 52 1 0 53 0 0 0 0 0 0 0 3 0 3 95
12:00 PM 2 49 0 1 51 0 72 1 0 73 0 0 1 1 1 0 0 3 1 3 128
12:15 PM 2 44 0 0 46 0 66 0 0 66 2 0 0 0 2 0 0 1 0 1 115
Total 4 169 0 1 173 0 243 3 0 246 2 0 2 1 4 0 0 10 2 10 433
Approach % 2.3 97.7 0.0 - - 0.0 98.8 1.2 - - 50.0 0.0 50.0 - - 0.0 0.0 100.0 - - -
Total % 0.9 39.0 0.0 - 40.0 0.0 56.1 0.7 - 56.8 0.5 0.0 0.5 - 0.9 0.0 0.0 2.3 - 2.3 -
PHF 0.500 0.862 0.000 - 0.848 0.000 0.844 0.750 - 0.842 0.250 0.000 0.500 - 0.500 0.000 0.000 0.833 - 0.833 0.846
Lights 4 169 0 - 173 0 243 2 - 245 2 0 2 - 4 0 0 10 - 10 432
% Lights 100.0 100.0 - - 100.0 - 100.0 66.7 - 99.6 100.0 - 100.0 - 100.0 - - 100.0 - 100.0 99.8
Other Vehicles 0 0 0 - 0 0 0 1 - 1 0 0 0 - 0 0 0 0 - 0 1
% Other 0.0 0.0 - - 0.0 - 0.0 33.3 - 0.4 0.0 - 0.0 - 0.0 - - 0.0 - 0.0 0.2
Vehicles
Pedestrians - - - 1 - - - - 0 - - - - 1 - - - - 2 - -
% Pedestrians - - - 100.0 - - - - - - - - - 100.0 - - - - 100.0 - -
Count Name: SAT Alley &
Traffic Planning and Design, Inc Chestnut Street
2500 East High Street Site Code: SAT Alley & Chestnut
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/01/2018
610.326.3100 jwheeler@trafficpd.com Page No: 4

Office Park Dw [N]


Out In Total
6 10 16
1 0 1
0 0 0
7 10 17

10 0 0 0
0 0 0 0
0 0 0 2
10 0 0 2
R T L P

R
4
0
0
4
L

3
0
1
2
Peak Hour Data
Total
428

428

171

171
Out
0
0

0
0
Chestnut Street [W]

Chestnut Street [E]


169

169

243

243
T

T
0
0

0
0
12/01/2018 11:30 AM
173

173

246

245
In

In
0
0

0
1
Ending At
12/01/2018 12:30 PM
R
0
0
0
0

L
0
0
0
0
Lights

Total
255

255

417

416
Out

Other Vehicles
0
0

0
1
Pedestrians
P

P
0
0
1
1

0
0
0
0

L T R P
2 0 2 0
0 0 0 0
0 0 0 1
2 0 2 1

0 4 4
0 0 0
0 0 0
0 4 4
Out In Total
Alley [S]

Turning Movement Peak Hour Data Plot (11:30 AM)


Count Name: 1100-1300
Chestnut Street & Existing
Traffic Planning and Design, Inc Alley/Select Medical PT
2500 East High Street Site Code: 1100-1300 Chestnut
Suite 650 Street & Existing Alley/Select
Pottstown, Pennsylvania, United States 19464 Start Date: 12/04/2018
610.326.3100 mosmulski@trafficpd.com Page No: 1

Turning Movement Data


Chestnut Street Chestnut Street Existing Alley Select Medical PT
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
11:00 AM 10 37 0 0 47 0 51 0 0 51 0 0 0 0 0 2 0 8 0 10 108
11:15 AM 13 54 0 0 67 0 36 0 0 36 2 0 0 0 2 0 0 12 0 12 117
11:30 AM 2 37 0 2 39 0 45 2 0 47 1 0 0 0 1 0 0 12 0 12 99
11:45 AM 6 40 0 0 46 0 69 0 0 69 1 0 0 0 1 0 0 9 4 9 125
Hourly Total 31 168 0 2 199 0 201 2 0 203 4 0 0 0 4 2 0 41 4 43 449
12:00 PM 5 46 0 0 51 0 53 1 0 54 0 0 0 0 0 3 0 16 1 19 124
12:15 PM 9 32 1 0 42 1 54 0 0 55 0 0 0 1 0 2 0 9 0 11 108
12:30 PM 8 28 0 0 36 0 43 2 0 45 0 0 0 2 0 1 0 11 0 12 93
12:45 PM 10 33 0 0 43 0 45 1 2 46 0 0 0 0 0 0 0 10 2 10 99
Hourly Total 32 139 1 0 172 1 195 4 2 200 0 0 0 3 0 6 0 46 3 52 424
Grand Total 63 307 1 2 371 1 396 6 2 403 4 0 0 3 4 8 0 87 7 95 873
Approach % 17.0 82.7 0.3 - - 0.2 98.3 1.5 - - 100.0 0.0 0.0 - - 8.4 0.0 91.6 - - -
Total % 7.2 35.2 0.1 - 42.5 0.1 45.4 0.7 - 46.2 0.5 0.0 0.0 - 0.5 0.9 0.0 10.0 - 10.9 -
Lights 63 297 1 - 361 1 390 5 - 396 4 0 0 - 4 7 0 87 - 94 855
% Lights 100.0 96.7 100.0 - 97.3 100.0 98.5 83.3 - 98.3 100.0 - - - 100.0 87.5 - 100.0 - 98.9 97.9
Other Vehicles 0 10 0 - 10 0 6 1 - 7 0 0 0 - 0 1 0 0 - 1 18
% Other 0.0 3.3 0.0 - 2.7 0.0 1.5 16.7 - 1.7 0.0 - - - 0.0 12.5 - 0.0 - 1.1 2.1
Vehicles
Pedestrians - - - 2 - - - - 2 - - - - 3 - - - - 7 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - 100.0 - - - - 100.0 - -
Count Name: 1100-1300
Chestnut Street & Existing
Traffic Planning and Design, Inc Alley/Select Medical PT
2500 East High Street Site Code: 1100-1300 Chestnut
Suite 650 Street & Existing Alley/Select
Pottstown, Pennsylvania, United States 19464 Start Date: 12/04/2018
610.326.3100 mosmulski@trafficpd.com Page No: 2

Select Medical PT [N]


Out In Total
68 94 162
1 1 2
0 0 0
69 95 164

87 0 7 0
0 0 1 0
0 0 0 7
87 0 8 7
R T L P
63

63

R
0
0

6
0
1
5
Total
842

858

315

304
Out
16

11
0

0
Chestnut Street [W]

Chestnut Street [E]


297

307

396

390
10

T
0

0
6
12/04/2018 11:00 AM
361

371

403

396
10
In

In
0

0
7
Ending At
12/04/2018 1:00 PM
R
1
0
0
1

L
1
0
0
1
Lights

Total
481

487

718

700
Out

18
Other Vehicles
6
0

0
Pedestrians
P

P
0
0
2
2

2
2
0
0

L T R P
4 0 0 0
0 0 0 0
0 0 0 3
4 0 0 3

2 4 6
0 0 0
0 0 0
2 4 6
Out In Total
Existing Alley [S]

Turning Movement Data Plot


Count Name: 1100-1300
Chestnut Street & Existing
Traffic Planning and Design, Inc Alley/Select Medical PT
2500 East High Street Site Code: 1100-1300 Chestnut
Suite 650 Street & Existing Alley/Select
Pottstown, Pennsylvania, United States 19464 Start Date: 12/04/2018
610.326.3100 mosmulski@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (11:15 AM)


Chestnut Street Chestnut Street Existing Alley Select Medical PT
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
11:15 AM 13 54 0 0 67 0 36 0 0 36 2 0 0 0 2 0 0 12 0 12 117
11:30 AM 2 37 0 2 39 0 45 2 0 47 1 0 0 0 1 0 0 12 0 12 99
11:45 AM 6 40 0 0 46 0 69 0 0 69 1 0 0 0 1 0 0 9 4 9 125
12:00 PM 5 46 0 0 51 0 53 1 0 54 0 0 0 0 0 3 0 16 1 19 124
Total 26 177 0 2 203 0 203 3 0 206 4 0 0 0 4 3 0 49 5 52 465
Approach % 12.8 87.2 0.0 - - 0.0 98.5 1.5 - - 100.0 0.0 0.0 - - 5.8 0.0 94.2 - - -
Total % 5.6 38.1 0.0 - 43.7 0.0 43.7 0.6 - 44.3 0.9 0.0 0.0 - 0.9 0.6 0.0 10.5 - 11.2 -
PHF 0.500 0.819 0.000 - 0.757 0.000 0.736 0.375 - 0.746 0.500 0.000 0.000 - 0.500 0.250 0.000 0.766 - 0.684 0.930
Lights 26 170 0 - 196 0 198 2 - 200 4 0 0 - 4 3 0 49 - 52 452
% Lights 100.0 96.0 - - 96.6 - 97.5 66.7 - 97.1 100.0 - - - 100.0 100.0 - 100.0 - 100.0 97.2
Other Vehicles 0 7 0 - 7 0 5 1 - 6 0 0 0 - 0 0 0 0 - 0 13
% Other 0.0 4.0 - - 3.4 - 2.5 33.3 - 2.9 0.0 - - - 0.0 0.0 - 0.0 - 0.0 2.8
Vehicles
Pedestrians - - - 2 - - - - 0 - - - - 0 - - - - 5 - -
% Pedestrians - - - 100.0 - - - - - - - - - - - - - - 100.0 - -
Count Name: 1100-1300
Chestnut Street & Existing
Traffic Planning and Design, Inc Alley/Select Medical PT
2500 East High Street Site Code: 1100-1300 Chestnut
Suite 650 Street & Existing Alley/Select
Pottstown, Pennsylvania, United States 19464 Start Date: 12/04/2018
610.326.3100 mosmulski@trafficpd.com Page No: 4

Select Medical PT [N]


Out In Total
28 52 80
1 0 1
0 0 0
29 52 81

49 0 3 0
0 0 0 0
0 0 0 5
49 0 3 5
R T L P
26

26

R
0
0

3
0
1
2
Peak Hour Data
Total
447

459

180

173
Out
12
0

0
7
Chestnut Street [W]

Chestnut Street [E]


170

177

203

198
T

T
7
0

0
5
12/04/2018 11:15 AM
196

203

206

200
In

In
7
0

0
6
Ending At
12/04/2018 12:15 PM
R
0
0
0
0

L
0
0
0
0
Lights

Total
251

256

386

373
Out

13
Other Vehicles
5
0

0
Pedestrians
P

P
0
0
2
2

0
0
0
0

L T R P
4 0 0 0
0 0 0 0
0 0 0 0
4 0 0 0

0 4 4
0 0 0
0 0 0
0 4 4
Out In Total
Existing Alley [S]

Turning Movement Peak Hour Data Plot (11:15 AM)


Count Name: AM_PM S.32nd
Street & Chestnut Street/E.
Trindle Road
Traffic Planning and Design, Inc Site Code: AM_PM S.32nd
2500 East High Street Street & Chestnut Street/E.
Suite 650 Trindle R
Pottstown, Pennsylvania, United States 19464 Start Date: 12/04/2018
610.326.3100 mosmulski@trafficpd.com Page No: 1

Turning Movement Data


E.Trindle Road Chestnut Street 32nd Street 32nd Street
Eastbound Westbound Northbound Southbound
Start Time Right Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Total
Red Red Red Red
6:00 AM 24 1 6 2 0 33 4 3 0 0 0 7 20 134 2 0 0 156 3 86 27 14 0 130 326
6:15 AM 39 6 9 3 0 57 8 3 1 0 0 12 15 156 5 0 0 176 2 135 21 4 0 162 407
6:30 AM 54 8 8 8 0 78 14 7 0 0 3 21 28 281 7 0 1 316 1 180 25 14 0 220 635
6:45 AM 65 14 8 12 0 99 18 10 1 0 0 29 24 338 12 0 2 374 5 164 35 14 0 218 720
Hourly Total 182 29 31 25 0 267 44 23 2 0 3 69 87 909 26 0 3 1022 11 565 108 46 0 730 2088
7:00 AM 66 17 11 12 0 106 9 16 2 0 0 27 27 354 18 0 2 399 3 175 31 12 0 221 753
7:15 AM 68 33 10 9 0 120 16 15 4 0 1 35 15 257 16 3 4 291 11 191 25 12 0 239 685
7:30 AM 47 38 15 9 0 109 36 22 4 0 0 62 27 343 23 2 1 395 2 236 32 26 2 296 862
7:45 AM 103 46 13 18 0 180 28 16 3 0 0 47 27 323 29 0 0 379 2 319 34 15 0 370 976
Hourly Total 284 134 49 48 0 515 89 69 13 0 1 171 96 1277 86 5 7 1464 18 921 122 65 2 1126 3276
8:00 AM 87 44 6 24 0 161 13 16 2 0 0 31 34 333 27 1 0 395 5 215 35 19 1 274 861
8:15 AM 64 33 12 19 0 128 24 45 6 0 0 75 29 341 29 1 0 400 1 216 45 12 0 274 877
8:30 AM 68 16 10 15 0 109 29 27 2 0 0 58 48 285 21 4 0 358 5 215 28 10 0 258 783
8:45 AM 64 20 8 20 0 112 23 40 2 0 0 65 49 308 22 2 1 381 3 206 34 19 0 262 820
Hourly Total 283 113 36 78 0 510 89 128 12 0 0 229 160 1267 99 8 1 1534 14 852 142 60 1 1068 3341
9:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - - -
Hourly Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:00 PM 51 29 18 19 0 117 39 32 4 0 2 75 36 209 13 0 6 258 3 252 24 12 2 291 741
3:15 PM 49 32 18 15 0 114 43 35 4 0 3 82 43 252 9 0 2 304 0 277 28 20 0 325 825
3:30 PM 57 37 13 18 0 125 45 38 7 0 0 90 36 263 15 0 0 314 3 342 37 18 0 400 929
3:45 PM 63 29 14 31 0 137 31 26 0 0 0 57 41 260 7 1 0 309 2 354 38 28 0 422 925
Hourly Total 220 127 63 83 0 493 158 131 15 0 5 304 156 984 44 1 8 1185 8 1225 127 78 2 1438 3420
4:00 PM 56 31 19 33 0 139 44 31 6 0 0 81 40 285 13 1 1 339 6 311 38 18 0 373 932
4:15 PM 62 33 13 32 0 140 47 23 2 0 0 72 50 297 8 0 0 355 2 374 44 17 0 437 1004
4:30 PM 63 54 15 37 0 169 48 41 1 0 1 90 50 302 10 0 0 362 4 314 41 15 0 374 995
4:45 PM 62 42 25 30 0 159 44 42 1 0 1 87 41 322 18 2 0 383 1 269 36 23 1 329 958
Hourly Total 243 160 72 132 0 607 183 137 10 0 2 330 181 1206 49 3 1 1439 13 1268 159 73 1 1513 3889
5:00 PM 59 39 25 46 0 169 52 39 1 0 0 92 33 317 11 0 1 361 0 285 53 18 0 356 978
5:15 PM 63 45 17 34 0 159 49 34 2 0 0 85 48 340 11 0 0 399 0 292 48 15 0 355 998
5:30 PM 70 51 11 26 0 158 35 28 2 0 0 65 51 289 11 0 0 351 0 281 59 23 0 363 937
5:45 PM 68 31 17 32 0 148 40 27 2 0 0 69 42 229 10 0 0 281 0 276 46 30 0 352 850
Hourly Total 260 166 70 138 0 634 176 128 7 0 0 311 174 1175 43 0 1 1392 0 1134 206 86 0 1426 3763
6:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 1
Grand Total 1472 729 321 504 0 3026 739 616 59 0 11 1414 854 6819 347 17 21 8037 64 5965 864 408 6 7301 19778
Approach % 48.6 24.1 10.6 16.7 - - 52.3 43.6 4.2 0.0 - - 10.6 84.8 4.3 0.2 - - 0.9 81.7 11.8 5.6 - - -
Total % 7.4 3.7 1.6 2.5 - 15.3 3.7 3.1 0.3 0.0 - 7.1 4.3 34.5 1.8 0.1 - 40.6 0.3 30.2 4.4 2.1 - 36.9 -
Lights 1451 727 309 489 - 2976 737 605 57 0 - 1399 825 6696 342 16 - 7879 62 5838 847 401 - 7148 19402
% Lights 98.6 99.7 96.3 97.0 - 98.3 99.7 98.2 96.6 - - 98.9 96.6 98.2 98.6 94.1 - 98.0 96.9 97.9 98.0 98.3 - 97.9 98.1
Other 21 2 12 15 - 50 2 11 2 0 - 15 29 123 5 1 - 158 2 127 17 7 - 153 376
Vehicles
% Other 1.4 0.3 3.7 3.0 - 1.7 0.3 1.8 3.4 - - 1.1 3.4 1.8 1.4 5.9 - 2.0 3.1 2.1 2.0 1.7 - 2.1 1.9
Vehicles
Pedestrians - - - - 0 - - - - - 11 - - - - - 21 - - - - - 6 - -
% - - - - - - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Pedestrians
Count Name: AM_PM S.32nd
Street & Chestnut Street/E.
Trindle Road
Traffic Planning and Design, Inc Site Code: AM_PM S.32nd
2500 East High Street Street & Chestnut Street/E.
Suite 650 Trindle R
Pottstown, Pennsylvania, United States 19464 Start Date: 12/04/2018
610.326.3100 mosmulski@trafficpd.com Page No: 2

32nd Street [N]


Out In Total
8204 7148 15352
146 153 299
0 0 0
8350 7301 15651

1248 5838 62 0
24 127 2 0
0 0 0 6
1272 5965 64 6
R T L P
1451

1472
21

59

57
R
0

0
2
Total
5654

5768

1157

1147
114

Out
10
0

0
E.Trindle Road [W]

Chestnut Street [E]


727

729

616

605
11
T

T
2
0

0
12/04/2018 6:00 AM
2976

3026

1414

1399
50

15
In

In
0

0
Ending At
12/04/2018 6:15 PM
798

825

739

737
27

R
0

0
2
Lights
2678

2742

2571

2546
Total
Out

64

25
Other Vehicles
0

0
Pedestrians 11
11
P

P
0
0
0
0

0
0

L T R P
825 6696 358 0
29 123 6 0
0 0 0 21
854 6819 364 21

7373 7879 15252


156 158 314
0 0 0
7529 8037 15566
Out In Total
32nd Street [S]

Turning Movement Data Plot


Count Name: AM_PM S.32nd
Street & Chestnut Street/E.
Trindle Road
Traffic Planning and Design, Inc Site Code: AM_PM S.32nd
2500 East High Street Street & Chestnut Street/E.
Suite 650 Trindle R
Pottstown, Pennsylvania, United States 19464 Start Date: 12/04/2018
610.326.3100 mosmulski@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (7:30 AM)


E.Trindle Road Chestnut Street 32nd Street 32nd Street
Eastbound Westbound Northbound Southbound
Start Time Right Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Total
Red Red Red Red
7:30 AM 47 38 15 9 0 109 36 22 4 0 0 62 27 343 23 2 1 395 2 236 32 26 2 296 862
7:45 AM 103 46 13 18 0 180 28 16 3 0 0 47 27 323 29 0 0 379 2 319 34 15 0 370 976
8:00 AM 87 44 6 24 0 161 13 16 2 0 0 31 34 333 27 1 0 395 5 215 35 19 1 274 861
8:15 AM 64 33 12 19 0 128 24 45 6 0 0 75 29 341 29 1 0 400 1 216 45 12 0 274 877
Total 301 161 46 70 0 578 101 99 15 0 0 215 117 1340 108 4 1 1569 10 986 146 72 3 1214 3576
Approach % 52.1 27.9 8.0 12.1 - - 47.0 46.0 7.0 0.0 - - 7.5 85.4 6.9 0.3 - - 0.8 81.2 12.0 5.9 - - -
Total % 8.4 4.5 1.3 2.0 - 16.2 2.8 2.8 0.4 0.0 - 6.0 3.3 37.5 3.0 0.1 - 43.9 0.3 27.6 4.1 2.0 - 33.9 -
PHF 0.731 0.875 0.767 0.729 - 0.803 0.701 0.550 0.625 0.000 - 0.717 0.860 0.977 0.931 0.500 - 0.981 0.500 0.773 0.811 0.692 - 0.820 0.916
Lights 294 161 43 67 - 565 100 97 14 0 - 211 111 1312 108 3 - 1534 9 963 143 72 - 1187 3497
% Lights 97.7 100.0 93.5 95.7 - 97.8 99.0 98.0 93.3 - - 98.1 94.9 97.9 100.0 75.0 - 97.8 90.0 97.7 97.9 100.0 - 97.8 97.8
Other 7 0 3 3 - 13 1 2 1 0 - 4 6 28 0 1 - 35 1 23 3 0 - 27 79
Vehicles
% Other 2.3 0.0 6.5 4.3 - 2.2 1.0 2.0 6.7 - - 1.9 5.1 2.1 0.0 25.0 - 2.2 10.0 2.3 2.1 0.0 - 2.2 2.2
Vehicles
Pedestrians - - - - 0 - - - - - 0 - - - - - 1 - - - - - 3 - -
% - - - - - - - - - - - - - - - - 100.0 - - - - - 100.0 - -
Pedestrians
Count Name: AM_PM S.32nd
Street & Chestnut Street/E.
Trindle Road
Traffic Planning and Design, Inc Site Code: AM_PM S.32nd
2500 East High Street Street & Chestnut Street/E.
Suite 650 Trindle R
Pottstown, Pennsylvania, United States 19464 Start Date: 12/04/2018
610.326.3100 mosmulski@trafficpd.com Page No: 4

32nd Street [N]


Out In Total
1620 1187 2807
36 27 63
0 0 0
1656 1214 2870

215 963 9 0
3 23 1 0
0 0 0 3
218 986 10 3
R T L P
294

301

15

14
R
7
0

0
1
Peak Hour Data
Total

1012
988

283

281
Out
24
0

0
2
E.Trindle Road [W]

Chestnut Street [E]


161

161

99

97
T

T
0
0

0
2
12/04/2018 7:30 AM
565

578

215

211
13
In

In
0

0
4
Ending At
12/04/2018 8:30 AM
110

116

101

100
R
6
0

0
1
Lights

Total
423

434

498

492
Out

11

Other Vehicles
0

0
6
Pedestrians
P

P
0
0
0
0

0
0
0
0

L T R P
111 1312 111 0
6 28 1 0
0 0 0 1
117 1340 112 1

1173 1534 2707


30 35 65
0 0 0
1203 1569 2772
Out In Total
32nd Street [S]

Turning Movement Peak Hour Data Plot (7:30 AM)


Count Name: AM_PM S.32nd
Street & Chestnut Street/E.
Trindle Road
Traffic Planning and Design, Inc Site Code: AM_PM S.32nd
2500 East High Street Street & Chestnut Street/E.
Suite 650 Trindle R
Pottstown, Pennsylvania, United States 19464 Start Date: 12/04/2018
610.326.3100 mosmulski@trafficpd.com Page No: 5

Turning Movement Peak Hour Data (4:15 PM)


E.Trindle Road Chestnut Street 32nd Street 32nd Street
Eastbound Westbound Northbound Southbound
Start Time Right Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Total
Red Red Red Red
4:15 PM 62 33 13 32 0 140 47 23 2 0 0 72 50 297 8 0 0 355 2 374 44 17 0 437 1004
4:30 PM 63 54 15 37 0 169 48 41 1 0 1 90 50 302 10 0 0 362 4 314 41 15 0 374 995
4:45 PM 62 42 25 30 0 159 44 42 1 0 1 87 41 322 18 2 0 383 1 269 36 23 1 329 958
5:00 PM 59 39 25 46 0 169 52 39 1 0 0 92 33 317 11 0 1 361 0 285 53 18 0 356 978
Total 246 168 78 145 0 637 191 145 5 0 2 341 174 1238 47 2 1 1461 7 1242 174 73 1 1496 3935
Approach % 38.6 26.4 12.2 22.8 - - 56.0 42.5 1.5 0.0 - - 11.9 84.7 3.2 0.1 - - 0.5 83.0 11.6 4.9 - - -
Total % 6.3 4.3 2.0 3.7 - 16.2 4.9 3.7 0.1 0.0 - 8.7 4.4 31.5 1.2 0.1 - 37.1 0.2 31.6 4.4 1.9 - 38.0 -
PHF 0.976 0.778 0.780 0.788 - 0.942 0.918 0.863 0.625 0.000 - 0.927 0.870 0.961 0.653 0.250 - 0.954 0.438 0.830 0.821 0.793 - 0.856 0.980
Lights 244 168 78 145 - 635 191 144 5 0 - 340 171 1219 46 2 - 1438 6 1233 170 72 - 1481 3894
% Lights 99.2 100.0 100.0 100.0 - 99.7 100.0 99.3 100.0 - - 99.7 98.3 98.5 97.9 100.0 - 98.4 85.7 99.3 97.7 98.6 - 99.0 99.0
Other 2 0 0 0 - 2 0 1 0 0 - 1 3 19 1 0 - 23 1 9 4 1 - 15 41
Vehicles
% Other 0.8 0.0 0.0 0.0 - 0.3 0.0 0.7 0.0 - - 0.3 1.7 1.5 2.1 0.0 - 1.6 14.3 0.7 2.3 1.4 - 1.0 1.0
Vehicles
Pedestrians - - - - 0 - - - - - 2 - - - - - 1 - - - - - 1 - -
% - - - - - - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Pedestrians
Count Name: AM_PM S.32nd
Street & Chestnut Street/E.
Trindle Road
Traffic Planning and Design, Inc Site Code: AM_PM S.32nd
2500 East High Street Street & Chestnut Street/E.
Suite 650 Trindle R
Pottstown, Pennsylvania, United States 19464 Start Date: 12/04/2018
610.326.3100 mosmulski@trafficpd.com Page No: 6

32nd Street [N]


Out In Total
1468 1481 2949
21 15 36
0 0 0
1489 1496 2985

242 1233 6 0
5 9 1 0
0 0 0 1
247 1242 7 1
R T L P
244

246

R
2
0

5
0
0
5
Peak Hour Data
Total
1192

1203

224

222
Out
11
0

0
2
E.Trindle Road [W]

Chestnut Street [E]


168

168

145

144
T

T
0
0

0
1
12/04/2018 4:15 PM
635

637

341

340
In

In
2
0

0
1
Ending At
12/04/2018 5:15 PM
223

223

191

191
R
0
0

0
0
Lights

Total
557

566

565

562
Out

Other Vehicles
9
0

0
3
Pedestrians
P

P
0
0
0
0

2
2
0
0

L T R P
171 1219 48 0
3 19 1 0
0 0 0 1
174 1238 49 1

1647 1438 3085


9 23 32
0 0 0
1656 1461 3117
Out In Total
32nd Street [S]

Turning Movement Peak Hour Data Plot (4:15 PM)


Count Name: SAT S.32nd Street
& Chestnut Street/E. Trindle
Traffic Planning and Design, Inc Road
2500 East High Street Site Code: SAT S.32nd Street &
Suite 650 Chestnut Street/E. Trindle Roa
Pottstown, Pennsylvania, United States 19464 Start Date: 12/01/2018
610.326.3100 jwheeler@trafficpd.com Page No: 1

Turning Movement Data


E. Trindle Road Chestnut Street 32nd Street 32nd Street
Eastbound Westbound Northbound Southbound
Start Time Right Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Total
Red Red Red Red
11:00 AM 73 34 21 20 0 148 36 23 2 0 0 61 38 204 15 1 1 258 0 222 18 19 0 259 726
11:15 AM 59 31 17 21 0 128 39 21 1 0 0 61 49 195 5 0 1 249 4 219 21 13 0 257 695
11:30 AM 63 26 20 23 0 132 27 28 1 1 0 57 41 209 8 1 0 259 1 277 25 12 1 315 763
11:45 AM 59 26 10 17 0 112 38 16 0 0 0 54 30 223 8 0 1 261 4 256 31 19 1 310 737
Hourly Total 254 117 68 81 0 520 140 88 4 1 0 233 158 831 36 2 3 1027 9 974 95 63 2 1141 2921
12:00 PM 62 32 21 21 0 136 47 24 2 0 0 73 33 242 8 0 1 283 5 228 26 30 0 289 781
12:15 PM 73 41 20 24 0 158 47 16 4 0 0 67 43 237 11 1 0 292 4 237 17 18 0 276 793
12:30 PM 70 25 23 31 0 149 30 25 2 0 0 57 48 202 8 2 1 260 3 218 26 8 0 255 721
12:45 PM 68 25 21 27 0 141 29 17 2 0 0 48 49 230 7 1 0 287 2 244 31 15 0 292 768
Hourly Total 273 123 85 103 0 584 153 82 10 0 0 245 173 911 34 4 2 1122 14 927 100 71 0 1112 3063
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 2 0 0 0 0 0 0 2
Grand Total 527 240 153 184 0 1104 293 170 14 1 0 478 332 1743 70 6 5 2151 23 1901 195 134 2 2253 5986
Approach % 47.7 21.7 13.9 16.7 - - 61.3 35.6 2.9 0.2 - - 15.4 81.0 3.3 0.3 - - 1.0 84.4 8.7 5.9 - - -
Total % 8.8 4.0 2.6 3.1 - 18.4 4.9 2.8 0.2 0.0 - 8.0 5.5 29.1 1.2 0.1 - 35.9 0.4 31.8 3.3 2.2 - 37.6 -
Lights 524 240 153 182 - 1099 292 170 14 1 - 477 328 1725 69 6 - 2128 23 1881 193 133 - 2230 5934
% Lights 99.4 100.0 100.0 98.9 - 99.5 99.7 100.0 100.0 100.0 - 99.8 98.8 99.0 98.6 100.0 - 98.9 100.0 98.9 99.0 99.3 - 99.0 99.1
Other 3 0 0 2 - 5 1 0 0 0 - 1 4 18 1 0 - 23 0 20 2 1 - 23 52
Vehicles
% Other 0.6 0.0 0.0 1.1 - 0.5 0.3 0.0 0.0 0.0 - 0.2 1.2 1.0 1.4 0.0 - 1.1 0.0 1.1 1.0 0.7 - 1.0 0.9
Vehicles
Pedestrians - - - - 0 - - - - - 0 - - - - - 5 - - - - - 2 - -
% - - - - - - - - - - - - - - - - 100.0 - - - - - 100.0 - -
Pedestrians
Count Name: SAT S.32nd Street
& Chestnut Street/E. Trindle
Traffic Planning and Design, Inc Road
2500 East High Street Site Code: SAT S.32nd Street &
Suite 650 Chestnut Street/E. Trindle Roa
Pottstown, Pennsylvania, United States 19464 Start Date: 12/01/2018
610.326.3100 jwheeler@trafficpd.com Page No: 2

32nd Street [N]


Out In Total
2264 2230 4494
21 23 44
0 0 0
2285 2253 4538

326 1881 23 0
3 20 0 0
0 0 0 2
329 1901 23 2
R T L P
524

527

15

15
R
3
0

0
0
Total
1923

1935

339

338
Out
12
E. Trindle Road [W]

0
1

Chestnut Street [E]


240

240

170

170
T

T
0
0

0
0
12/01/2018 11:00 AM
1099

1104

478

477
In

In
5
0

0
1
Ending At
12/01/2018 1:15 PM
335

337

293

292
R
2
0

0
1
Lights

Total
824

831

817

815
Out

Other Vehicles
7
0

0
2
Pedestrians
P

P
0
0
0
0

0
0
0
0

L T R P
328 1725 75 0
4 18 1 0
0 0 0 5
332 1743 76 5

2508 2128 4636


23 23 46
0 0 0
2531 2151 4682
Out In Total
32nd Street [S]

Turning Movement Data Plot


Count Name: SAT S.32nd Street
& Chestnut Street/E. Trindle
Traffic Planning and Design, Inc Road
2500 East High Street Site Code: SAT S.32nd Street &
Suite 650 Chestnut Street/E. Trindle Roa
Pottstown, Pennsylvania, United States 19464 Start Date: 12/01/2018
610.326.3100 jwheeler@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (11:30 AM)


E. Trindle Road Chestnut Street 32nd Street 32nd Street
Eastbound Westbound Northbound Southbound
Start Time Right Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Total
Red Red Red Red
11:30 AM 63 26 20 23 0 132 27 28 1 1 0 57 41 209 8 1 0 259 1 277 25 12 1 315 763
11:45 AM 59 26 10 17 0 112 38 16 0 0 0 54 30 223 8 0 1 261 4 256 31 19 1 310 737
12:00 PM 62 32 21 21 0 136 47 24 2 0 0 73 33 242 8 0 1 283 5 228 26 30 0 289 781
12:15 PM 73 41 20 24 0 158 47 16 4 0 0 67 43 237 11 1 0 292 4 237 17 18 0 276 793
Total 257 125 71 85 0 538 159 84 7 1 0 251 147 911 35 2 2 1095 14 998 99 79 2 1190 3074
Approach % 47.8 23.2 13.2 15.8 - - 63.3 33.5 2.8 0.4 - - 13.4 83.2 3.2 0.2 - - 1.2 83.9 8.3 6.6 - - -
Total % 8.4 4.1 2.3 2.8 - 17.5 5.2 2.7 0.2 0.0 - 8.2 4.8 29.6 1.1 0.1 - 35.6 0.5 32.5 3.2 2.6 - 38.7 -
PHF 0.880 0.762 0.845 0.885 - 0.851 0.846 0.750 0.438 0.250 - 0.860 0.855 0.941 0.795 0.500 - 0.938 0.700 0.901 0.798 0.658 - 0.944 0.969
Lights 256 125 71 85 - 537 159 84 7 1 - 251 145 904 35 2 - 1086 14 985 97 78 - 1174 3048
% Lights 99.6 100.0 100.0 100.0 - 99.8 100.0 100.0 100.0 100.0 - 100.0 98.6 99.2 100.0 100.0 - 99.2 100.0 98.7 98.0 98.7 - 98.7 99.2
Other 1 0 0 0 - 1 0 0 0 0 - 0 2 7 0 0 - 9 0 13 2 1 - 16 26
Vehicles
% Other 0.4 0.0 0.0 0.0 - 0.2 0.0 0.0 0.0 0.0 - 0.0 1.4 0.8 0.0 0.0 - 0.8 0.0 1.3 2.0 1.3 - 1.3 0.8
Vehicles
Pedestrians - - - - 0 - - - - - 0 - - - - - 2 - - - - - 2 - -
% - - - - - - - - - - - - - - - - 100.0 - - - - - 100.0 - -
Pedestrians
Count Name: SAT S.32nd Street
& Chestnut Street/E. Trindle
Traffic Planning and Design, Inc Road
2500 East High Street Site Code: SAT S.32nd Street &
Suite 650 Chestnut Street/E. Trindle Roa
Pottstown, Pennsylvania, United States 19464 Start Date: 12/01/2018
610.326.3100 jwheeler@trafficpd.com Page No: 4

32nd Street [N]


Out In Total
1168 1174 2342
8 16 24
0 0 0
1176 1190 2366

175 985 14 0
3 13 0 0
0 0 0 2
178 998 14 2
R T L P
256

257

R
1
0

8
0
0
8
Peak Hour Data
Total
941

947

176

176
Out
E. Trindle Road [W]

6
0

0
0

Chestnut Street [E]


125

125

84

84
T

T
0
0

0
0
12/01/2018 11:30 AM
537

538

251

251
In

In
1
0

0
0
Ending At
12/01/2018 12:30 PM
156

156

159

159
R
0
0

0
0
Lights

Total
404

409

427

427
Out

Other Vehicles
5
0

0
0
Pedestrians
P

P
0
0
0
0

0
0
0
0

L T R P
145 904 37 0
2 7 0 0
0 0 0 2
147 911 37 2

1300 1086 2386


13 9 22
0 0 0
1313 1095 2408
Out In Total
32nd Street [S]

Turning Movement Peak Hour Data Plot (11:30 AM)


Traffic Planning and Design, Inc Count Name: WD 32nd &
2500 East High Street Chestnut
Suite 650 Site Code: WD 32nd & Chestnut
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 jfunk@trafficpd.com Page No: 1

Turning Movement Data


Chestnut Street E.Trindle 32nd Street 32nd Street
Westbound Eastbound Southbound Northbound
Start Time Right Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Total
Red Red Red Red
6:00 AM 4 3 1 0 0 8 22 5 3 5 0 35 1 89 25 4 0 119 19 138 2 0 0 159 321
6:15 AM 8 5 0 0 0 13 43 2 10 2 0 57 3 138 23 9 0 173 20 174 3 0 0 197 440
6:30 AM 5 9 1 0 0 15 48 8 6 11 0 73 0 188 30 12 0 230 22 250 4 0 0 276 594
6:45 AM 21 5 2 0 0 28 46 10 6 6 0 68 4 191 46 10 0 251 15 355 9 0 0 379 726
Hourly Total 38 22 4 0 0 64 159 25 25 24 0 233 8 606 124 35 0 773 76 917 18 0 0 1011 2081
7:00 AM 13 15 1 0 1 29 62 19 10 8 0 99 5 156 25 26 0 212 22 289 13 1 5 325 665
7:15 AM 21 18 4 0 0 43 72 44 11 14 0 141 10 239 40 15 0 304 24 340 18 0 1 382 870
7:30 AM 30 31 5 0 0 66 88 43 18 20 0 169 8 277 42 10 0 337 15 398 23 1 0 437 1009
7:45 AM 11 16 1 0 0 28 95 40 18 19 0 172 7 321 30 12 0 370 46 280 30 1 0 357 927
Hourly Total 75 80 11 0 1 166 317 146 57 61 0 581 30 993 137 63 0 1223 107 1307 84 3 6 1501 3471
8:00 AM 21 23 2 0 0 46 76 55 9 14 0 154 2 244 47 14 0 307 41 329 32 1 0 403 910
8:15 AM 25 32 2 0 0 59 62 28 6 19 1 115 1 179 29 10 0 219 38 318 20 3 0 379 772
8:30 AM 16 38 5 0 0 59 58 14 11 13 0 96 8 238 37 16 0 299 52 272 17 0 0 341 795
8:45 AM 30 16 3 0 0 49 66 35 13 10 0 124 6 185 54 14 0 259 45 322 36 1 0 404 836
Hourly Total 92 109 12 0 0 213 262 132 39 56 1 489 17 846 167 54 0 1084 176 1241 105 5 0 1527 3313
*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - - -
11:00 AM 33 27 2 0 0 62 62 38 22 19 1 141 2 223 40 11 0 276 23 153 9 0 0 185 664
11:15 AM 26 27 3 0 0 56 59 25 17 27 0 128 4 221 27 21 0 273 41 208 15 0 1 264 721
11:30 AM 38 36 11 0 0 85 56 33 22 23 0 134 4 220 35 14 0 273 35 210 11 0 0 256 748
11:45 AM 41 25 3 0 0 69 79 36 19 21 0 155 2 251 35 16 0 304 36 217 9 2 1 264 792
Hourly Total 138 115 19 0 0 272 256 132 80 90 1 558 12 915 137 62 0 1126 135 788 44 2 2 969 2925
12:00 PM 22 29 2 1 0 54 55 39 14 23 0 131 6 202 25 14 1 247 34 212 3 0 0 249 681
12:15 PM 29 24 7 0 0 60 65 28 15 22 0 130 2 231 29 21 1 283 33 220 12 0 0 265 738
12:30 PM 49 20 5 0 3 74 66 37 17 30 0 150 4 232 35 25 1 296 37 247 20 0 2 304 824
12:45 PM 22 19 3 0 1 44 71 26 12 28 0 137 3 233 19 22 2 277 39 246 8 1 4 294 752
Hourly Total 122 92 17 1 4 232 257 130 58 103 0 548 15 898 108 82 5 1103 143 925 43 1 6 1112 2995
*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - - -
3:00 PM 27 26 9 0 0 62 60 27 15 31 0 133 5 253 33 10 0 301 37 231 19 0 3 287 783
3:15 PM 49 38 5 0 1 92 55 38 17 28 0 138 4 296 28 15 0 343 40 275 13 4 0 332 905
3:30 PM 44 31 4 0 0 79 55 22 24 33 0 134 2 325 41 29 0 397 38 246 15 0 0 299 909
3:45 PM 40 23 3 0 0 66 65 29 24 26 2 144 5 300 33 25 0 363 44 275 7 3 2 329 902
Hourly Total 160 118 21 0 1 299 235 116 80 118 2 549 16 1174 135 79 0 1404 159 1027 54 7 5 1247 3499
4:00 PM 35 26 6 0 0 67 62 27 13 24 0 126 2 343 47 21 0 413 30 287 11 0 0 328 934
4:15 PM 28 33 2 0 1 63 58 23 7 27 0 115 2 373 41 12 1 428 37 246 12 1 0 296 902
4:30 PM 56 31 5 0 0 92 63 37 28 46 0 174 6 309 40 16 0 371 37 317 9 1 0 364 1001
4:45 PM 46 32 7 0 0 85 58 35 22 28 0 143 4 325 41 23 1 393 47 316 8 3 1 374 995
Hourly Total 165 122 20 0 1 307 241 122 70 125 0 558 14 1350 169 72 2 1605 151 1166 40 5 1 1362 3832
5:00 PM 45 37 5 0 0 87 58 36 32 35 0 161 4 351 27 21 1 403 42 304 9 0 0 355 1006
5:15 PM 44 31 0 0 0 75 62 35 15 26 0 138 2 341 51 23 1 417 44 287 7 1 0 339 969
5:30 PM 44 33 3 0 0 80 60 30 20 26 0 136 4 284 36 19 1 343 49 261 12 0 0 322 881
5:45 PM 33 25 3 0 0 61 58 39 12 27 0 136 4 282 45 20 0 351 42 257 13 0 1 312 860
Hourly Total 166 126 11 0 0 303 238 140 79 114 0 571 14 1258 159 83 3 1514 177 1109 41 1 1 1328 3716
Grand Total 956 784 115 1 7 1856 1965 943 488 691 4 4087 126 8040 1136 530 10 9832 1124 8480 429 24 21 10057 25832

Approach % 51.5 42.2 6.2 0.1 - - 48.1 23.1 11.9 16.9 - - 1.3 81.8 11.6 5.4 - - 11.2 84.3 4.3 0.2 - - -
Total % 3.7 3.0 0.4 0.0 - 7.2 7.6 3.7 1.9 2.7 - 15.8 0.5 31.1 4.4 2.1 - 38.1 4.4 32.8 1.7 0.1 - 38.9 -
Lights 946 777 113 1 - 1837 1938 938 479 662 - 4017 124 7866 1114 518 - 9622 1087 8283 414 24 - 9808 25284
% Lights 99.0 99.1 98.3 100.0 - 99.0 98.6 99.5 98.2 95.8 - 98.3 98.4 97.8 98.1 97.7 - 97.9 96.7 97.7 96.5 100.0 - 97.5 97.9
Other 10 7 2 0 - 19 27 5 9 29 - 70 2 174 22 12 - 210 37 197 15 0 - 249 548
Vehicles
% Other 1.0 0.9 1.7 0.0 - 1.0 1.4 0.5 1.8 4.2 - 1.7 1.6 2.2 1.9 2.3 - 2.1 3.3 2.3 3.5 0.0 - 2.5 2.1
Vehicles
Pedestrians - - - - 7 - - - - - 4 - - - - - 10 - - - - - 21 - -
% - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Pedestrians
Traffic Planning and Design, Inc Count Name: WD 32nd &
2500 East High Street Chestnut
Suite 650 Site Code: WD 32nd & Chestnut
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 jfunk@trafficpd.com Page No: 2

32nd Street [SB]


Out In Total
10335 9622 19957
226 210 436
0 0 0
10561 9832 20393

1632 7866 124 0


34 174 2 0
0 0 0 10
1666 8040 126 10
R T L P
1938

1965

116

114
27

R
0

0
2
Total
7513

7661

1522

1500
148

Out
22

Chestnut Street [WB]


0

0
E.Trindle [EB]

938

943

784

777
T

T
5
0

0
7
03/28/2019 6:00 AM
4017

4087

1856

1837
70

19
In

In
0

0
Ending At
03/28/2019 6:00 PM
1141

1179

956

946
38

10
R
0

0
Lights
3496

3574

3378

3337
Total
Out

78

41
Other Vehicles
0

0
Pedestrians
P

P
0
0
4
4

7
7
0
0

L T R P
1087 8283 438 0
37 197 15 0
0 0 0 21
1124 8480 453 21

9953 9808 19761


222 249 471
0 0 0
10175 10057 20232
Out In Total
32nd Street [NB]

Turning Movement Data Plot


Traffic Planning and Design, Inc Count Name: WD 32nd &
2500 East High Street Chestnut
Suite 650 Site Code: WD 32nd & Chestnut
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 jfunk@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (11:45 AM)


Chestnut Street E.Trindle 32nd Street 32nd Street
Westbound Eastbound Southbound Northbound
Start Time Right Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Total
Red Red Red Red
11:45 AM 41 25 3 0 0 69 79 36 19 21 0 155 2 251 35 16 0 304 36 217 9 2 1 264 792
12:00 PM 22 29 2 1 0 54 55 39 14 23 0 131 6 202 25 14 1 247 34 212 3 0 0 249 681
12:15 PM 29 24 7 0 0 60 65 28 15 22 0 130 2 231 29 21 1 283 33 220 12 0 0 265 738
12:30 PM 49 20 5 0 3 74 66 37 17 30 0 150 4 232 35 25 1 296 37 247 20 0 2 304 824
Total 141 98 17 1 3 257 265 140 65 96 0 566 14 916 124 76 3 1130 140 896 44 2 3 1082 3035
Approach % 54.9 38.1 6.6 0.4 - - 46.8 24.7 11.5 17.0 - - 1.2 81.1 11.0 6.7 - - 12.9 82.8 4.1 0.2 - - -
Total % 4.6 3.2 0.6 0.0 - 8.5 8.7 4.6 2.1 3.2 - 18.6 0.5 30.2 4.1 2.5 - 37.2 4.6 29.5 1.4 0.1 - 35.7 -
PHF 0.719 0.845 0.607 0.250 - 0.868 0.839 0.897 0.855 0.800 - 0.913 0.583 0.912 0.886 0.760 - 0.929 0.946 0.907 0.550 0.250 - 0.890 0.921
Lights 138 98 17 1 - 254 261 138 63 94 - 556 14 897 120 74 - 1105 130 867 41 2 - 1040 2955
% Lights 97.9 100.0 100.0 100.0 - 98.8 98.5 98.6 96.9 97.9 - 98.2 100.0 97.9 96.8 97.4 - 97.8 92.9 96.8 93.2 100.0 - 96.1 97.4
Other 3 0 0 0 - 3 4 2 2 2 - 10 0 19 4 2 - 25 10 29 3 0 - 42 80
Vehicles
% Other 2.1 0.0 0.0 0.0 - 1.2 1.5 1.4 3.1 2.1 - 1.8 0.0 2.1 3.2 2.6 - 2.2 7.1 3.2 6.8 0.0 - 3.9 2.6
Vehicles
Pedestrians - - - - 3 - - - - - 0 - - - - - 3 - - - - - 3 - -
% - - - - 100.0 - - - - - - - - - - - 100.0 - - - - - 100.0 - -
Pedestrians
Traffic Planning and Design, Inc Count Name: WD 32nd &
2500 East High Street Chestnut
Suite 650 Site Code: WD 32nd & Chestnut
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 jfunk@trafficpd.com Page No: 4

32nd Street [SB]


Out In Total
1146 1105 2251
33 25 58
0 0 0
1179 1130 2309

194 897 14 0
6 19 0 0
0 0 0 3
200 916 14 3
R T L P
261

265

18

18
R
4
0

0
0
Peak Hour Data
Total

1004
978

200

195
Out
26

Chestnut Street [WB]


0

0
5
E.Trindle [EB]

138

140

98

98
T

T
2
0

0
0
03/28/2019 11:45 AM
556

566

257

254
10
In

In
0

0
3
Ending At
03/28/2019 12:45 PM
157

161

141

138
R
4
0

0
3
Lights

Total
422

438

457

449
Out

16

Other Vehicles
0

0
8
Pedestrians
P

P
0
0
0
0

3
3
0
0

L T R P
130 867 43 0
10 29 3 0
0 0 0 3
140 896 46 3

1192 1040 2232


26 42 68
0 0 0
1218 1082 2300
Out In Total
32nd Street [NB]

Turning Movement Peak Hour Data Plot (11:45 AM)


Count Name: AM_PM S. 31
Traffic Planning and Design, Inc Street & Chestnut Street
2500 East High Street Site Code: AM_PM S. 31 Street
Suite 650 & Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 1

Turning Movement Data


Chestnut Street Chestnut Street 31st Street
Eastbound Westbound Northbound
Start Time
Thru Right Peds App. Total Left Thru Peds App. Total Left Right Peds App. Total Int. Total
6:00 AM 3 1 0 4 1 11 0 12 0 0 0 0 16
6:15 AM 8 1 0 9 0 11 0 11 0 0 1 0 20
6:30 AM 10 0 0 10 0 10 0 10 1 1 0 2 22
6:45 AM 19 2 0 21 0 19 0 19 1 0 0 1 41
Hourly Total 40 4 0 44 1 51 0 52 2 1 1 3 99
7:00 AM 31 1 0 32 1 27 0 28 2 1 6 3 63
7:15 AM 60 5 0 65 3 40 0 43 4 5 6 9 117
7:30 AM 51 8 0 59 7 61 0 68 2 5 1 7 134
7:45 AM 42 12 0 54 4 47 0 51 4 4 0 8 113
Hourly Total 184 26 0 210 15 175 0 190 12 15 13 27 427
8:00 AM 50 12 0 62 3 43 0 46 0 4 0 4 112
8:15 AM 19 6 0 25 2 59 0 61 2 1 0 3 89
8:30 AM 28 6 0 34 0 44 0 44 1 0 1 1 79
8:45 AM 34 2 0 36 2 45 0 47 1 2 0 3 86
Hourly Total 131 26 0 157 7 191 0 198 4 7 1 11 366
*** BREAK *** - - - - - - - - - - - - -
3:00 PM 41 5 0 46 3 58 0 61 3 11 9 14 121
3:15 PM 49 7 0 56 4 60 0 64 0 14 1 14 134
3:30 PM 38 4 0 42 1 53 0 54 2 14 0 16 112
3:45 PM 53 3 0 56 0 51 0 51 5 1 1 6 113
Hourly Total 181 19 0 200 8 222 0 230 10 40 11 50 480
4:00 PM 30 3 0 33 6 58 0 64 1 1 0 2 99
4:15 PM 40 3 0 43 3 63 0 66 1 7 0 8 117
4:30 PM 36 3 0 39 7 75 0 82 3 4 3 7 128
4:45 PM 38 3 0 41 6 56 0 62 4 10 0 14 117
Hourly Total 144 12 0 156 22 252 0 274 9 22 3 31 461
5:00 PM 46 5 0 51 2 64 0 66 3 9 0 12 129
5:15 PM 50 9 0 59 5 54 0 59 2 3 0 5 123
5:30 PM 41 7 0 48 4 77 2 81 4 4 1 8 137
5:45 PM 38 4 0 42 4 46 0 50 2 4 1 6 98
Hourly Total 175 25 0 200 15 241 2 256 11 20 2 31 487
Grand Total 855 112 0 967 68 1132 2 1200 48 105 31 153 2320
Approach % 88.4 11.6 - - 5.7 94.3 - - 31.4 68.6 - - -
Total % 36.9 4.8 - 41.7 2.9 48.8 - 51.7 2.1 4.5 - 6.6 -
Lights 850 110 - 960 67 1128 - 1195 48 104 - 152 2307
% Lights 99.4 98.2 - 99.3 98.5 99.6 - 99.6 100.0 99.0 - 99.3 99.4
Other Vehicles 5 2 - 7 1 4 - 5 0 1 - 1 13
% Other Vehicles 0.6 1.8 - 0.7 1.5 0.4 - 0.4 0.0 1.0 - 0.7 0.6
Pedestrians - - 0 - - - 2 - - - 31 - -
% Pedestrians - - - - - - 100.0 - - - 100.0 - -
Count Name: AM_PM S. 31
Traffic Planning and Design, Inc Street & Chestnut Street
2500 East High Street Site Code: AM_PM S. 31 Street
Suite 650 & Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 2

Fake Approach [N]


Out In Total
0 0 0
0 0 0
0 0 0
0 0 0
Total
2136

2147

1132

1128
850

855

960

954
Out
11
Chestnut Street [W]

T
0

5
0

0
4

0
6

Chestnut Street [E]


12/06/2018 6:00 AM

1200

1195
960

967

110

112

68

67
In

In
R
7
0

2
0

0
1

0
5
Ending At
12/06/2018 6:00 PM

Lights
1176

1180

2160

2149
Total
Out

11
Other Vehicles
P

P
4
0

0
0
0
0

2
2
0
0

0
Pedestrians

L R P
48 104 0
0 1 0
0 0 31
48 105 31

177 152 329


3 1 4
0 0 0
180 153 333
Out In Total
31st Street [S]

Turning Movement Data Plot


Count Name: AM_PM S. 31
Traffic Planning and Design, Inc Street & Chestnut Street
2500 East High Street Site Code: AM_PM S. 31 Street
Suite 650 & Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (7:15 AM)


Chestnut Street Chestnut Street 31st Street
Eastbound Westbound Northbound
Start Time
Thru Right Peds App. Total Left Thru Peds App. Total Left Right Peds App. Total Int. Total
7:15 AM 60 5 0 65 3 40 0 43 4 5 6 9 117
7:30 AM 51 8 0 59 7 61 0 68 2 5 1 7 134
7:45 AM 42 12 0 54 4 47 0 51 4 4 0 8 113
8:00 AM 50 12 0 62 3 43 0 46 0 4 0 4 112
Total 203 37 0 240 17 191 0 208 10 18 7 28 476
Approach % 84.6 15.4 - - 8.2 91.8 - - 35.7 64.3 - - -
Total % 42.6 7.8 - 50.4 3.6 40.1 - 43.7 2.1 3.8 - 5.9 -
PHF 0.846 0.771 - 0.923 0.607 0.783 - 0.765 0.625 0.900 - 0.778 0.888
Lights 201 36 - 237 17 190 - 207 10 18 - 28 472
% Lights 99.0 97.3 - 98.8 100.0 99.5 - 99.5 100.0 100.0 - 100.0 99.2
Other Vehicles 2 1 - 3 0 1 - 1 0 0 - 0 4
% Other Vehicles 1.0 2.7 - 1.3 0.0 0.5 - 0.5 0.0 0.0 - 0.0 0.8
Pedestrians - - 0 - - - 0 - - - 7 - -
% Pedestrians - - - - - - - - - - 100.0 - -
Count Name: AM_PM S. 31
Traffic Planning and Design, Inc Street & Chestnut Street
2500 East High Street Site Code: AM_PM S. 31 Street
Suite 650 & Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 4

Fake Approach [N]


Out In Total
0 0 0
0 0 0
0 0 0
0 0 0

Peak Hour Data


Total
437

441

201

203

191

190

221

219
Out
Chestnut Street [W]

T
4
0

2
0

0
1

0
2

Chestnut Street [E]


12/06/2018 7:15 AM
237

240

208

207
36

37

17

17
In

In
R
3
0

1
0

0
0

0
1
Ending At
12/06/2018 8:15 AM

Lights

Total
200

201

429

426
Out

Other Vehicles
P

P
1
0

0
0
0
0

0
0
0
0

0
3
Pedestrians

L R P
10 18 0
0 0 0
0 0 7
10 18 7

53 28 81
1 0 1
0 0 0
54 28 82
Out In Total
31st Street [S]

Turning Movement Peak Hour Data Plot (7:15 AM)


Count Name: AM_PM S. 31
Traffic Planning and Design, Inc Street & Chestnut Street
2500 East High Street Site Code: AM_PM S. 31 Street
Suite 650 & Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 5

Turning Movement Peak Hour Data (4:45 PM)


Chestnut Street Chestnut Street 31st Street
Eastbound Westbound Northbound
Start Time
Thru Right Peds App. Total Left Thru Peds App. Total Left Right Peds App. Total Int. Total
4:45 PM 38 3 0 41 6 56 0 62 4 10 0 14 117
5:00 PM 46 5 0 51 2 64 0 66 3 9 0 12 129
5:15 PM 50 9 0 59 5 54 0 59 2 3 0 5 123
5:30 PM 41 7 0 48 4 77 2 81 4 4 1 8 137
Total 175 24 0 199 17 251 2 268 13 26 1 39 506
Approach % 87.9 12.1 - - 6.3 93.7 - - 33.3 66.7 - - -
Total % 34.6 4.7 - 39.3 3.4 49.6 - 53.0 2.6 5.1 - 7.7 -
PHF 0.875 0.667 - 0.843 0.708 0.815 - 0.827 0.813 0.650 - 0.696 0.923
Lights 175 24 - 199 17 250 - 267 13 25 - 38 504
% Lights 100.0 100.0 - 100.0 100.0 99.6 - 99.6 100.0 96.2 - 97.4 99.6
Other Vehicles 0 0 - 0 0 1 - 1 0 1 - 1 2
% Other Vehicles 0.0 0.0 - 0.0 0.0 0.4 - 0.4 0.0 3.8 - 2.6 0.4
Pedestrians - - 0 - - - 2 - - - 1 - -
% Pedestrians - - - - - - 100.0 - - - 100.0 - -
Count Name: AM_PM S. 31
Traffic Planning and Design, Inc Street & Chestnut Street
2500 East High Street Site Code: AM_PM S. 31 Street
Suite 650 & Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 6

Fake Approach [N]


Out In Total
0 0 0
0 0 0
0 0 0
0 0 0

Peak Hour Data


Total
462

463

175

175

251

250

201

200
Out
Chestnut Street [W]

T
1
0

0
0

0
1

0
1

Chestnut Street [E]


12/06/2018 4:45 PM
199

199

268

267
24

24

17

17
In

In
R
0
0

0
0

0
0

0
1
Ending At
12/06/2018 5:45 PM

Lights

Total
263

264

469

467
Out

Other Vehicles
P

P
1
0

0
0
0
0

2
2
0
0

0
2
Pedestrians

L R P
13 25 0
0 1 0
0 0 1
13 26 1

41 38 79
0 1 1
0 0 0
41 39 80
Out In Total
31st Street [S]

Turning Movement Peak Hour Data Plot (4:45 PM)


Count Name: SAT S. 31st Street
Traffic Planning and Design, Inc & Chestnut Street
2500 East High Street Site Code: SAT S. 31st Street &
Suite 650 Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/08/2018
610.326.3100 jwheeler@trafficpd.com Page No: 1

Turning Movement Data


Chestnut Street Chestnut Street 31st Street
Eastbound Westbound Northbound
Start Time
Thru Right Peds App. Total Left Thru Peds App. Total Left Right Peds App. Total Int. Total
11:00 AM 32 3 0 35 3 54 0 57 2 3 0 5 97
11:15 AM 38 1 0 39 1 55 0 56 1 4 1 5 100
11:30 AM 39 3 0 42 3 48 0 51 1 1 2 2 95
11:45 AM 36 3 0 39 1 37 0 38 1 1 3 2 79
Hourly Total 145 10 0 155 8 194 0 202 5 9 6 14 371
12:00 PM 37 2 0 39 4 63 0 67 3 3 0 6 112
12:15 PM 45 2 0 47 1 46 0 47 1 5 2 6 100
12:30 PM 39 1 0 40 4 30 0 34 3 4 0 7 81
12:45 PM 35 2 0 37 0 40 0 40 2 0 0 2 79
Hourly Total 156 7 0 163 9 179 0 188 9 12 2 21 372
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand Total 301 17 0 318 17 373 0 390 14 21 8 35 743
Approach % 94.7 5.3 - - 4.4 95.6 - - 40.0 60.0 - - -
Total % 40.5 2.3 - 42.8 2.3 50.2 - 52.5 1.9 2.8 - 4.7 -
Lights 300 17 - 317 17 372 - 389 14 21 - 35 741
% Lights 99.7 100.0 - 99.7 100.0 99.7 - 99.7 100.0 100.0 - 100.0 99.7
Other Vehicles 1 0 - 1 0 1 - 1 0 0 - 0 2
% Other Vehicles 0.3 0.0 - 0.3 0.0 0.3 - 0.3 0.0 0.0 - 0.0 0.3
Pedestrians - - 0 - - - 0 - - - 8 - -
% Pedestrians - - - - - - - - - - 100.0 - -
Count Name: SAT S. 31st Street
Traffic Planning and Design, Inc & Chestnut Street
2500 East High Street Site Code: SAT S. 31st Street &
Suite 650 Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/08/2018
610.326.3100 jwheeler@trafficpd.com Page No: 2

Fake Approach [N]


Out In Total
0 0 0
0 0 0
0 0 0
0 0 0
Total
703

705

300

301

373

372

322

321
Out
T

T
2
0

1
0

0
1

0
1
Chestnut Street [W]

Chestnut Street [E]


12/08/2018 11:00 AM
317

318

390

389
17

17

17

17
In

In
R
1
0

0
0

0
0

0
1
Ending At
12/08/2018 1:15 PM

Lights

Total
386

387

712

710
Out

Other Vehicles
P

P
1
0

0
0
0
0

0
0
0
0

0
2
Pedestrians

L R P
14 21 0
0 0 0
0 0 8
14 21 8

34 35 69
0 0 0
0 0 0
34 35 69
Out In Total
31st Street [S]

Turning Movement Data Plot


Count Name: SAT S. 31st Street
Traffic Planning and Design, Inc & Chestnut Street
2500 East High Street Site Code: SAT S. 31st Street &
Suite 650 Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/08/2018
610.326.3100 jwheeler@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (11:15 AM)


Chestnut Street Chestnut Street 31st Street
Eastbound Westbound Northbound
Start Time
Thru Right Peds App. Total Left Thru Peds App. Total Left Right Peds App. Total Int. Total
11:15 AM 38 1 0 39 1 55 0 56 1 4 1 5 100
11:30 AM 39 3 0 42 3 48 0 51 1 1 2 2 95
11:45 AM 36 3 0 39 1 37 0 38 1 1 3 2 79
12:00 PM 37 2 0 39 4 63 0 67 3 3 0 6 112
Total 150 9 0 159 9 203 0 212 6 9 6 15 386
Approach % 94.3 5.7 - - 4.2 95.8 - - 40.0 60.0 - - -
Total % 38.9 2.3 - 41.2 2.3 52.6 - 54.9 1.6 2.3 - 3.9 -
PHF 0.962 0.750 - 0.946 0.563 0.806 - 0.791 0.500 0.563 - 0.625 0.862
Lights 150 9 - 159 9 202 - 211 6 9 - 15 385
% Lights 100.0 100.0 - 100.0 100.0 99.5 - 99.5 100.0 100.0 - 100.0 99.7
Other Vehicles 0 0 - 0 0 1 - 1 0 0 - 0 1
% Other Vehicles 0.0 0.0 - 0.0 0.0 0.5 - 0.5 0.0 0.0 - 0.0 0.3
Pedestrians - - 0 - - - 0 - - - 6 - -
% Pedestrians - - - - - - - - - - 100.0 - -
Count Name: SAT S. 31st Street
Traffic Planning and Design, Inc & Chestnut Street
2500 East High Street Site Code: SAT S. 31st Street &
Suite 650 Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/08/2018
610.326.3100 jwheeler@trafficpd.com Page No: 4

Fake Approach [N]


Out In Total
0 0 0
0 0 0
0 0 0
0 0 0

Peak Hour Data


Total
367

368

150

150

203

202

159

159
Out
T

T
1
0

0
0

0
1

0
0
Chestnut Street [W]

Chestnut Street [E]


12/08/2018 11:15 AM
159

159

212

211
In

In
R
0
0

9
0
0
9

L
9
0
0
9

0
1
Ending At
12/08/2018 12:15 PM

Lights

Total
208

209

371

370
Out

Other Vehicles
P

P
1
0

0
0
0
0

0
0
0
0

0
1
Pedestrians

L R P
6 9 0
0 0 0
0 0 6
6 9 6

18 15 33
0 0 0
0 0 0
18 15 33
Out In Total
31st Street [S]

Turning Movement Peak Hour Data Plot (11:15 AM)


Count Name: 1100-1300 S.31st
Traffic Planning and Design, Inc Street & Chestnut Street
2500 East High Street Site Code: 1100-1300 S.31st
Suite 650 Street & Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 1

Turning Movement Data


Chestnut Street Chestnut Street S.31st Street
Eastbound Westbound Northbound
Start Time
Thru Right Peds App. Total Left Thru Peds App. Total Left Right Peds App. Total Int. Total
11:00 AM 36 4 0 40 0 44 0 44 1 6 1 7 91
11:15 AM 38 2 0 40 1 46 0 47 2 3 0 5 92
11:30 AM 45 0 0 45 2 55 0 57 4 5 0 9 111
11:45 AM 57 1 0 58 4 79 0 83 4 0 0 4 145
Hourly Total 176 7 0 183 7 224 0 231 11 14 1 25 439
12:00 PM 40 2 0 42 2 46 0 48 1 1 0 2 92
12:15 PM 47 0 1 47 2 59 0 61 0 1 0 1 109
12:30 PM 36 0 0 36 4 39 0 43 2 3 0 5 84
12:45 PM 26 4 0 30 3 36 0 39 1 4 0 5 74
Hourly Total 149 6 1 155 11 180 0 191 4 9 0 13 359
Grand Total 325 13 1 338 18 404 0 422 15 23 1 38 798
Approach % 96.2 3.8 - - 4.3 95.7 - - 39.5 60.5 - - -
Total % 40.7 1.6 - 42.4 2.3 50.6 - 52.9 1.9 2.9 - 4.8 -
Lights 318 13 - 331 17 398 - 415 15 23 - 38 784
% Lights 97.8 100.0 - 97.9 94.4 98.5 - 98.3 100.0 100.0 - 100.0 98.2
Other Vehicles 7 0 - 7 1 6 - 7 0 0 - 0 14
% Other Vehicles 2.2 0.0 - 2.1 5.6 1.5 - 1.7 0.0 0.0 - 0.0 1.8
Pedestrians - - 1 - - - 0 - - - 1 - -
% Pedestrians - - 100.0 - - - - - - - 100.0 - -
Count Name: 1100-1300 S.31st
Traffic Planning and Design, Inc Street & Chestnut Street
2500 East High Street Site Code: 1100-1300 S.31st
Suite 650 Street & Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 2

Fake Approach [N]


Out In Total
0 0 0
0 0 0
0 0 0
0 0 0
Total
744

757

318

325

404

398

348

341
Out
13

T
0

7
0

0
6

0
7
Chestnut Street [W]

Chestnut Street [E]


12/06/2018 11:00 AM
331

338

422

415
13

13

18

17
In

In
R
7
0

0
0

0
1

0
7
Ending At
12/06/2018 1:00 PM

Lights

Total
413

419

770

756
Out

14
Other Vehicles
P

P
6
0

0
0
1
1

0
0
0
0

0
Pedestrians

L R P
15 23 0
0 0 0
0 0 1
15 23 1

30 38 68
1 0 1
0 0 0
31 38 69
Out In Total
S.31st Street [S]

Turning Movement Data Plot


Count Name: 1100-1300 S.31st
Traffic Planning and Design, Inc Street & Chestnut Street
2500 East High Street Site Code: 1100-1300 S.31st
Suite 650 Street & Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (11:30 AM)


Chestnut Street Chestnut Street S.31st Street
Eastbound Westbound Northbound
Start Time
Thru Right Peds App. Total Left Thru Peds App. Total Left Right Peds App. Total Int. Total
11:30 AM 45 0 0 45 2 55 0 57 4 5 0 9 111
11:45 AM 57 1 0 58 4 79 0 83 4 0 0 4 145
12:00 PM 40 2 0 42 2 46 0 48 1 1 0 2 92
12:15 PM 47 0 1 47 2 59 0 61 0 1 0 1 109
Total 189 3 1 192 10 239 0 249 9 7 0 16 457
Approach % 98.4 1.6 - - 4.0 96.0 - - 56.3 43.8 - - -
Total % 41.4 0.7 - 42.0 2.2 52.3 - 54.5 2.0 1.5 - 3.5 -
PHF 0.829 0.375 - 0.828 0.625 0.756 - 0.750 0.563 0.350 - 0.444 0.788
Lights 185 3 - 188 9 235 - 244 9 7 - 16 448
% Lights 97.9 100.0 - 97.9 90.0 98.3 - 98.0 100.0 100.0 - 100.0 98.0
Other Vehicles 4 0 - 4 1 4 - 5 0 0 - 0 9
% Other Vehicles 2.1 0.0 - 2.1 10.0 1.7 - 2.0 0.0 0.0 - 0.0 2.0
Pedestrians - - 1 - - - 0 - - - 0 - -
% Pedestrians - - 100.0 - - - - - - - - - -
Count Name: 1100-1300 S.31st
Traffic Planning and Design, Inc Street & Chestnut Street
2500 East High Street Site Code: 1100-1300 S.31st
Suite 650 Street & Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 4

Fake Approach [N]


Out In Total
0 0 0
0 0 0
0 0 0
0 0 0

Peak Hour Data


Total
432

440

185

189

239

235

196

192
Out
T

T
8
0

4
0

0
4

0
4
Chestnut Street [W]

Chestnut Street [E]


12/06/2018 11:30 AM
188

192

249

244
10
In

In
R
4
0

3
0
0
3

0
1
9

0
5
Ending At
12/06/2018 12:30 PM

Lights

Total
244

248

445

436
Out

Other Vehicles
P

P
4
0

0
0
1
1

0
0
0
0

0
9
Pedestrians

L R P
9 7 0
0 0 0
0 0 0
9 7 0

12 16 28
1 0 1
0 0 0
13 16 29
Out In Total
S.31st Street [S]

Turning Movement Peak Hour Data Plot (11:30 AM)


Count Name: AM_PM S. 30th
Traffic Planning and Design, Inc Street & Chestnut Street
2500 East High Street Site Code: AM_PM S. 30th
Suite 650 Street & Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 1

Turning Movement Data


Chestnut Street Chestnut Street 30th Street 30th Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
6:00 AM 0 3 0 0 3 0 6 0 0 6 1 0 0 0 1 0 0 5 0 5 15
6:15 AM 2 6 0 1 8 0 8 1 0 9 1 0 0 1 1 0 0 2 0 2 20
6:30 AM 2 7 1 0 10 2 5 0 1 7 2 0 0 0 2 1 1 3 0 5 24
6:45 AM 3 14 2 1 19 0 9 0 3 9 2 1 0 1 3 2 9 7 0 18 49
Hourly Total 7 30 3 2 40 2 28 1 4 31 6 1 0 2 7 3 10 17 0 30 108
7:00 AM 6 19 4 1 29 0 17 1 1 18 1 4 2 5 7 3 2 11 1 16 70
7:15 AM 16 38 4 0 58 1 31 4 0 36 1 4 2 11 7 18 15 13 1 46 147
7:30 AM 12 38 3 0 53 7 53 6 0 66 8 7 1 5 16 15 18 12 0 45 180
7:45 AM 12 24 4 2 40 2 31 0 0 33 3 3 0 0 6 2 7 17 0 26 105
Hourly Total 46 119 15 3 180 10 132 11 1 153 13 18 5 21 36 38 42 53 2 133 502
8:00 AM 12 27 10 1 49 15 22 0 0 37 4 5 1 0 10 1 35 15 0 51 147
8:15 AM 0 15 2 0 17 9 39 1 0 49 4 6 0 0 10 3 29 19 1 51 127
8:30 AM 5 18 0 1 23 2 32 0 0 34 1 2 0 0 3 1 4 15 0 20 80
8:45 AM 10 24 2 0 36 2 31 0 0 33 1 1 1 0 3 0 3 16 0 19 91
Hourly Total 27 84 14 2 125 28 124 1 0 153 10 14 2 0 26 5 71 65 1 141 445
*** BREAK *** - - - - - - - - - - - - - - - - - - - - -
3:00 PM 19 32 1 1 52 6 37 2 1 45 9 12 5 6 26 2 16 13 1 31 154
3:15 PM 24 33 2 2 59 4 47 0 0 51 6 11 5 1 22 4 5 11 0 20 152
3:30 PM 20 29 1 2 50 2 37 0 1 39 1 4 6 3 11 1 8 14 0 23 123
3:45 PM 10 35 2 0 47 7 40 0 3 47 1 3 0 1 4 0 8 10 1 18 116
Hourly Total 73 129 6 5 208 19 161 2 5 182 17 30 16 11 63 7 37 48 2 92 545
4:00 PM 11 19 1 2 31 8 47 3 0 58 1 2 5 1 8 1 3 10 1 14 111
4:15 PM 9 36 0 1 45 5 45 1 0 51 3 1 3 0 7 0 12 18 0 30 133
4:30 PM 8 29 4 1 41 2 55 2 0 59 1 1 1 4 3 0 7 9 0 16 119
4:45 PM 16 32 2 0 50 4 40 2 0 46 1 7 3 0 11 2 5 11 0 18 125
Hourly Total 44 116 7 4 167 19 187 8 0 214 6 11 12 5 29 3 27 48 1 78 488
5:00 PM 11 41 1 1 53 6 52 3 1 61 0 5 1 1 6 1 7 10 0 18 138
5:15 PM 14 39 1 2 54 4 43 1 5 48 2 3 3 2 8 2 12 16 5 30 140
5:30 PM 12 34 0 0 46 9 56 4 1 69 1 4 0 1 5 2 7 16 2 25 145
5:45 PM 8 35 1 0 44 2 35 4 3 41 3 3 0 3 6 4 8 8 0 20 111
Hourly Total 45 149 3 3 197 21 186 12 10 219 6 15 4 7 25 9 34 50 7 93 534
Grand Total 242 627 48 19 917 99 818 35 20 952 58 89 39 46 186 65 221 281 13 567 2622
Approach % 26.4 68.4 5.2 - - 10.4 85.9 3.7 - - 31.2 47.8 21.0 - - 11.5 39.0 49.6 - - -
Total % 9.2 23.9 1.8 - 35.0 3.8 31.2 1.3 - 36.3 2.2 3.4 1.5 - 7.1 2.5 8.4 10.7 - 21.6 -
Lights 242 623 46 - 911 97 814 35 - 946 57 88 39 - 184 65 215 279 - 559 2600
% Lights 100.0 99.4 95.8 - 99.3 98.0 99.5 100.0 - 99.4 98.3 98.9 100.0 - 98.9 100.0 97.3 99.3 - 98.6 99.2
Other Vehicles 0 4 2 - 6 2 4 0 - 6 1 1 0 - 2 0 6 2 - 8 22
% Other 0.0 0.6 4.2 - 0.7 2.0 0.5 0.0 - 0.6 1.7 1.1 0.0 - 1.1 0.0 2.7 0.7 - 1.4 0.8
Vehicles
Pedestrians - - - 19 - - - - 20 - - - - 46 - - - - 13 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - 100.0 - - - - 100.0 - -
Count Name: AM_PM S. 30th
Traffic Planning and Design, Inc Street & Chestnut Street
2500 East High Street Site Code: AM_PM S. 30th
Suite 650 Street & Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 2

30th Street [N]


Out In Total
365 559 924
1 8 9
0 0 0
366 567 933

279 215 65 0
2 6 0 0
0 0 0 13
281 221 65 13
R T L P
242

242

35

35
R
0
0

0
0
Total
2061

2074

731

727
Out
13
0

0
4
Chestnut Street [W]

Chestnut Street [E]


623

627

818

814
T

T
4
0

0
4
12/06/2018 6:00 AM
911

917

952

946
In

In
6
0

0
6
Ending At
12/06/2018 6:00 PM
46

48

99

97
R
2
0

0
2
Lights
1150

1157

1683

1673
Total
Out

10
Other Vehicles
7
0

0
Pedestrians
19
19

20
20
P

P
0
0

0
0

L T R P
57 88 39 0
1 1 0 0
0 0 0 46
58 89 39 46

358 184 542


10 2 12
0 0 0
368 186 554
Out In Total
30th Street [S]

Turning Movement Data Plot


Count Name: AM_PM S. 30th
Traffic Planning and Design, Inc Street & Chestnut Street
2500 East High Street Site Code: AM_PM S. 30th
Suite 650 Street & Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (7:15 AM)


Chestnut Street Chestnut Street 30th Street 30th Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
7:15 AM 16 38 4 0 58 1 31 4 0 36 1 4 2 11 7 18 15 13 1 46 147
7:30 AM 12 38 3 0 53 7 53 6 0 66 8 7 1 5 16 15 18 12 0 45 180
7:45 AM 12 24 4 2 40 2 31 0 0 33 3 3 0 0 6 2 7 17 0 26 105
8:00 AM 12 27 10 1 49 15 22 0 0 37 4 5 1 0 10 1 35 15 0 51 147
Total 52 127 21 3 200 25 137 10 0 172 16 19 4 16 39 36 75 57 1 168 579
Approach % 26.0 63.5 10.5 - - 14.5 79.7 5.8 - - 41.0 48.7 10.3 - - 21.4 44.6 33.9 - - -
Total % 9.0 21.9 3.6 - 34.5 4.3 23.7 1.7 - 29.7 2.8 3.3 0.7 - 6.7 6.2 13.0 9.8 - 29.0 -
PHF 0.813 0.836 0.525 - 0.862 0.417 0.646 0.417 - 0.652 0.500 0.679 0.500 - 0.609 0.500 0.536 0.838 - 0.824 0.804
Lights 52 125 20 - 197 25 137 10 - 172 15 19 4 - 38 36 73 56 - 165 572
% Lights 100.0 98.4 95.2 - 98.5 100.0 100.0 100.0 - 100.0 93.8 100.0 100.0 - 97.4 100.0 97.3 98.2 - 98.2 98.8
Other Vehicles 0 2 1 - 3 0 0 0 - 0 1 0 0 - 1 0 2 1 - 3 7
% Other 0.0 1.6 4.8 - 1.5 0.0 0.0 0.0 - 0.0 6.3 0.0 0.0 - 2.6 0.0 2.7 1.8 - 1.8 1.2
Vehicles
Pedestrians - - - 3 - - - - 0 - - - - 16 - - - - 1 - -
% Pedestrians - - - 100.0 - - - - - - - - - 100.0 - - - - 100.0 - -
Count Name: AM_PM S. 30th
Traffic Planning and Design, Inc Street & Chestnut Street
2500 East High Street Site Code: AM_PM S. 30th
Suite 650 Street & Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 4

30th Street [N]


Out In Total
81 165 246
0 3 3
0 0 0
81 168 249

56 73 36 0
1 2 0 0
0 0 0 1
57 75 36 1
R T L P
52

52

10

10
R
0
0

0
0
Peak Hour Data
Total
405

410

167

165
Out
5
0

0
2
Chestnut Street [W]

Chestnut Street [E]


125

127

137

137
T

T
2
0

0
0
12/06/2018 7:15 AM
197

200

172

172
In

In
3
0

0
0
Ending At
12/06/2018 8:15 AM
20

21

25

25
R
1
0

0
0
Lights

Total
208

210

339

337
Out

Other Vehicles
2
0

0
2
Pedestrians
P

P
0
0
3
3

0
0
0
0

L T R P
15 19 4 0
1 0 0 0
0 0 0 16
16 19 4 16

118 38 156
3 1 4
0 0 0
121 39 160
Out In Total
30th Street [S]

Turning Movement Peak Hour Data Plot (7:15 AM)


Count Name: AM_PM S. 30th
Traffic Planning and Design, Inc Street & Chestnut Street
2500 East High Street Site Code: AM_PM S. 30th
Suite 650 Street & Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 5

Turning Movement Peak Hour Data (4:45 PM)


Chestnut Street Chestnut Street 30th Street 30th Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
4:45 PM 16 32 2 0 50 4 40 2 0 46 1 7 3 0 11 2 5 11 0 18 125
5:00 PM 11 41 1 1 53 6 52 3 1 61 0 5 1 1 6 1 7 10 0 18 138
5:15 PM 14 39 1 2 54 4 43 1 5 48 2 3 3 2 8 2 12 16 5 30 140
5:30 PM 12 34 0 0 46 9 56 4 1 69 1 4 0 1 5 2 7 16 2 25 145
Total 53 146 4 3 203 23 191 10 7 224 4 19 7 4 30 7 31 53 7 91 548
Approach % 26.1 71.9 2.0 - - 10.3 85.3 4.5 - - 13.3 63.3 23.3 - - 7.7 34.1 58.2 - - -
Total % 9.7 26.6 0.7 - 37.0 4.2 34.9 1.8 - 40.9 0.7 3.5 1.3 - 5.5 1.3 5.7 9.7 - 16.6 -
PHF 0.828 0.890 0.500 - 0.940 0.639 0.853 0.625 - 0.812 0.500 0.679 0.583 - 0.682 0.875 0.646 0.828 - 0.758 0.945
Lights 53 145 4 - 202 21 190 10 - 221 4 18 7 - 29 7 31 53 - 91 543
% Lights 100.0 99.3 100.0 - 99.5 91.3 99.5 100.0 - 98.7 100.0 94.7 100.0 - 96.7 100.0 100.0 100.0 - 100.0 99.1
Other Vehicles 0 1 0 - 1 2 1 0 - 3 0 1 0 - 1 0 0 0 - 0 5
% Other 0.0 0.7 0.0 - 0.5 8.7 0.5 0.0 - 1.3 0.0 5.3 0.0 - 3.3 0.0 0.0 0.0 - 0.0 0.9
Vehicles
Pedestrians - - - 3 - - - - 7 - - - - 4 - - - - 7 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - 100.0 - - - - 100.0 - -
Count Name: AM_PM S. 30th
Traffic Planning and Design, Inc Street & Chestnut Street
2500 East High Street Site Code: AM_PM S. 30th
Suite 650 Street & Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 6

30th Street [N]


Out In Total
81 91 172
1 0 1
0 0 0
82 91 173

53 31 7 0
0 0 0 0
0 0 0 7
53 31 7 7
R T L P
53

53

10

10
R
0
0

0
0
Peak Hour Data
Total
449

451

160

159
Out
2
0

0
1
Chestnut Street [W]

Chestnut Street [E]


145

146

191

190
T

T
1
0

0
1
12/06/2018 4:45 PM
202

203

224

221
In

In
1
0

0
3
Ending At
12/06/2018 5:45 PM

23

21
R
4
0
0
4

0
2
Lights

Total
247

248

384

380
Out

Other Vehicles
1
0

0
4
Pedestrians
P

P
0
0
3
3

7
7
0
0

L T R P
4 18 7 0
0 1 0 0
0 0 0 4
4 19 7 4

56 29 85
2 1 3
0 0 0
58 30 88
Out In Total
30th Street [S]

Turning Movement Peak Hour Data Plot (4:45 PM)


Count Name: SAT S.30th Street
Traffic Planning and Design, Inc & Chestnut Street
2500 East High Street Site Code: SAT S.30th Street &
Suite 650 Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/08/2018
610.326.3100 jwheeler@trafficpd.com Page No: 1

Turning Movement Data


Chestnut Street Chestnut Street 30th Street 30th Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
11:00 AM 8 24 2 1 34 3 44 1 1 48 0 1 3 0 4 0 1 13 0 14 100
11:15 AM 8 30 4 0 42 2 44 1 0 47 4 2 1 1 7 0 3 9 0 12 108
11:30 AM 4 34 2 0 40 4 37 0 1 41 1 4 1 3 6 0 8 10 0 18 105
11:45 AM 4 29 2 0 35 0 32 1 0 33 0 1 0 4 1 0 5 4 0 9 78
Hourly Total 24 117 10 1 151 9 157 3 2 169 5 8 5 8 18 0 17 36 0 53 391
12:00 PM 5 32 3 0 40 2 54 2 1 58 0 1 2 0 3 0 1 13 1 14 115
12:15 PM 5 43 1 1 49 2 32 0 0 34 1 4 3 2 8 1 3 13 1 17 108
12:30 PM 7 36 0 4 43 2 29 0 0 31 0 0 0 1 0 0 5 3 0 8 82
12:45 PM 5 30 1 0 36 2 30 2 0 34 2 3 3 0 8 1 5 7 0 13 91
Hourly Total 22 141 5 5 168 8 145 4 1 157 3 8 8 3 19 2 14 36 2 52 396
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand Total 46 258 15 6 319 17 302 7 3 326 8 16 13 11 37 2 31 72 2 105 787
Approach % 14.4 80.9 4.7 - - 5.2 92.6 2.1 - - 21.6 43.2 35.1 - - 1.9 29.5 68.6 - - -
Total % 5.8 32.8 1.9 - 40.5 2.2 38.4 0.9 - 41.4 1.0 2.0 1.7 - 4.7 0.3 3.9 9.1 - 13.3 -
Lights 46 256 15 - 317 17 302 7 - 326 8 16 13 - 37 2 31 71 - 104 784
% Lights 100.0 99.2 100.0 - 99.4 100.0 100.0 100.0 - 100.0 100.0 100.0 100.0 - 100.0 100.0 100.0 98.6 - 99.0 99.6
Other Vehicles 0 2 0 - 2 0 0 0 - 0 0 0 0 - 0 0 0 1 - 1 3
% Other 0.0 0.8 0.0 - 0.6 0.0 0.0 0.0 - 0.0 0.0 0.0 0.0 - 0.0 0.0 0.0 1.4 - 1.0 0.4
Vehicles
Pedestrians - - - 6 - - - - 3 - - - - 11 - - - - 2 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - 100.0 - - - - 100.0 - -
Count Name: SAT S.30th Street
Traffic Planning and Design, Inc & Chestnut Street
2500 East High Street Site Code: SAT S.30th Street &
Suite 650 Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/08/2018
610.326.3100 jwheeler@trafficpd.com Page No: 2

30th Street [N]


Out In Total
69 104 173
0 1 1
0 0 0
69 105 174

71 31 2 0
1 0 0 0
0 0 0 2
72 31 2 2
R T L P
46

46

R
0
0

7
0
0
7
Total
698

701

273

271
Out
Chestnut Street [W]

3
0

0
2

Chestnut Street [E]


256

258

302

302
T

T
2
0

0
0
12/08/2018 11:00 AM
317

319

326

326
In

In
2
0

0
0
Ending At
12/08/2018 1:15 PM
15

15

17

17
R
0
0

0
0
Lights

Total
381

382

599

597
Out

Other Vehicles
1
0

0
2
Pedestrians
P

P
0
0
6
6

3
3
0
0

L T R P
8 16 13 0
0 0 0 0
0 0 0 11
8 16 13 11

63 37 100
0 0 0
0 0 0
63 37 100
Out In Total
30th Street [S]

Turning Movement Data Plot


Count Name: SAT S.30th Street
Traffic Planning and Design, Inc & Chestnut Street
2500 East High Street Site Code: SAT S.30th Street &
Suite 650 Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/08/2018
610.326.3100 jwheeler@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (11:15 AM)


Chestnut Street Chestnut Street 30th Street 30th Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
11:15 AM 8 30 4 0 42 2 44 1 0 47 4 2 1 1 7 0 3 9 0 12 108
11:30 AM 4 34 2 0 40 4 37 0 1 41 1 4 1 3 6 0 8 10 0 18 105
11:45 AM 4 29 2 0 35 0 32 1 0 33 0 1 0 4 1 0 5 4 0 9 78
12:00 PM 5 32 3 0 40 2 54 2 1 58 0 1 2 0 3 0 1 13 1 14 115
Total 21 125 11 0 157 8 167 4 2 179 5 8 4 8 17 0 17 36 1 53 406
Approach % 13.4 79.6 7.0 - - 4.5 93.3 2.2 - - 29.4 47.1 23.5 - - 0.0 32.1 67.9 - - -
Total % 5.2 30.8 2.7 - 38.7 2.0 41.1 1.0 - 44.1 1.2 2.0 1.0 - 4.2 0.0 4.2 8.9 - 13.1 -
PHF 0.656 0.919 0.688 - 0.935 0.500 0.773 0.500 - 0.772 0.313 0.500 0.500 - 0.607 0.000 0.531 0.692 - 0.736 0.883
Lights 21 124 11 - 156 8 167 4 - 179 5 8 4 - 17 0 17 35 - 52 404
% Lights 100.0 99.2 100.0 - 99.4 100.0 100.0 100.0 - 100.0 100.0 100.0 100.0 - 100.0 - 100.0 97.2 - 98.1 99.5
Other Vehicles 0 1 0 - 1 0 0 0 - 0 0 0 0 - 0 0 0 1 - 1 2
% Other 0.0 0.8 0.0 - 0.6 0.0 0.0 0.0 - 0.0 0.0 0.0 0.0 - 0.0 - 0.0 2.8 - 1.9 0.5
Vehicles
Pedestrians - - - 0 - - - - 2 - - - - 8 - - - - 1 - -
% Pedestrians - - - - - - - - 100.0 - - - - 100.0 - - - - 100.0 - -
Count Name: SAT S.30th Street
Traffic Planning and Design, Inc & Chestnut Street
2500 East High Street Site Code: SAT S.30th Street &
Suite 650 Chestnut Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/08/2018
610.326.3100 jwheeler@trafficpd.com Page No: 4

30th Street [N]


Out In Total
33 52 85
0 1 1
0 0 0
33 53 86

35 17 0 0
1 0 0 0
0 0 0 1
36 17 0 1
R T L P
21

21

R
0
0

4
0
0
4
Peak Hour Data
Total
363

365

129

128
Out
Chestnut Street [W]

2
0

0
1

Chestnut Street [E]


124

125

167

167
T

T
1
0

0
0
12/08/2018 11:15 AM
156

157

179

179
In

In
1
0

0
0
Ending At
12/08/2018 12:15 PM
11

11
R
0
0

L
8
0
0
8
Lights

Total
207

208

308

307
Out

Other Vehicles
1
0

0
1
Pedestrians
P

P
0
0
0
0

2
2
0
0

L T R P
5 8 4 0
0 0 0 0
0 0 0 8
5 8 4 8

36 17 53
0 0 0
0 0 0
36 17 53
Out In Total
30th Street [S]

Turning Movement Peak Hour Data Plot (11:15 AM)


Count Name: 1100-1300
Traffic Planning and Design, Inc Chestnut & S.30th Street
2500 East High Street Site Code: 1100-1300 Chestnut
Suite 650 & S.30th Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 jwheeler@trafficpd.com Page No: 1

Turning Movement Data


Chestnut Street Chestnut Street S.30th Street S.30th Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
11:00 AM 7 26 5 1 38 4 31 1 0 36 2 3 1 3 6 0 8 6 0 14 94
11:15 AM 6 38 1 0 45 5 31 1 0 37 3 4 2 1 9 2 8 10 0 20 111
11:30 AM 6 40 4 0 50 4 47 0 0 51 2 2 2 2 6 0 4 8 0 12 119
11:45 AM 9 47 2 0 58 4 59 2 0 65 1 3 0 3 4 1 6 20 0 27 154
Hourly Total 28 151 12 1 191 17 168 4 0 189 8 12 5 9 25 3 26 44 0 73 478
12:00 PM 5 32 1 0 38 5 32 0 0 37 1 4 2 0 7 0 6 12 0 18 100
12:15 PM 11 34 0 0 45 5 41 3 0 49 8 1 1 3 10 1 13 4 1 18 122
12:30 PM 7 30 0 1 37 1 32 1 0 34 1 6 0 0 7 1 0 7 0 8 86
12:45 PM 8 19 0 0 27 6 31 0 0 37 0 4 0 0 4 0 2 7 0 9 77
Hourly Total 31 115 1 1 147 17 136 4 0 157 10 15 3 3 28 2 21 30 1 53 385
Grand Total 59 266 13 2 338 34 304 8 0 346 18 27 8 12 53 5 47 74 1 126 863
Approach % 17.5 78.7 3.8 - - 9.8 87.9 2.3 - - 34.0 50.9 15.1 - - 4.0 37.3 58.7 - - -
Total % 6.8 30.8 1.5 - 39.2 3.9 35.2 0.9 - 40.1 2.1 3.1 0.9 - 6.1 0.6 5.4 8.6 - 14.6 -
Lights 57 263 13 - 333 34 301 8 - 343 16 24 8 - 48 4 41 74 - 119 843
% Lights 96.6 98.9 100.0 - 98.5 100.0 99.0 100.0 - 99.1 88.9 88.9 100.0 - 90.6 80.0 87.2 100.0 - 94.4 97.7
Other Vehicles 2 3 0 - 5 0 3 0 - 3 2 3 0 - 5 1 6 0 - 7 20
% Other 3.4 1.1 0.0 - 1.5 0.0 1.0 0.0 - 0.9 11.1 11.1 0.0 - 9.4 20.0 12.8 0.0 - 5.6 2.3
Vehicles
Pedestrians - - - 2 - - - - 0 - - - - 12 - - - - 1 - -
% Pedestrians - - - 100.0 - - - - - - - - - 100.0 - - - - 100.0 - -
Count Name: 1100-1300
Traffic Planning and Design, Inc Chestnut & S.30th Street
2500 East High Street Site Code: 1100-1300 Chestnut
Suite 650 & S.30th Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 jwheeler@trafficpd.com Page No: 2

S.30th Street [N]


Out In Total
89 119 208
5 7 12
0 0 0
94 126 220

74 41 4 0
0 6 1 0
0 0 0 1
74 47 5 1
R T L P
57

59

R
2
0

8
0
0
8
Total
724

734

279

275
Out
10
0

0
4
Chestnut Street [W]

Chestnut Street [E]


263

266

304

301
T

T
3
0

0
3
12/06/2018 11:00 AM
333

338

346

343
In

In
5
0

0
3
Ending At
12/06/2018 1:00 PM
13

13

34

34
R
0
0

0
0
Lights

Total
391

396

625

618
Out

Other Vehicles
5
0

0
7
Pedestrians
P

P
0
0
2
2

0
0
0
0

L T R P
16 24 8 0
2 3 0 0
0 0 0 12
18 27 8 12

88 48 136
6 5 11
0 0 0
94 53 147
Out In Total
S.30th Street [S]

Turning Movement Data Plot


Count Name: 1100-1300
Traffic Planning and Design, Inc Chestnut & S.30th Street
2500 East High Street Site Code: 1100-1300 Chestnut
Suite 650 & S.30th Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 jwheeler@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (11:30 AM)


Chestnut Street Chestnut Street S.30th Street S.30th Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
11:30 AM 6 40 4 0 50 4 47 0 0 51 2 2 2 2 6 0 4 8 0 12 119
11:45 AM 9 47 2 0 58 4 59 2 0 65 1 3 0 3 4 1 6 20 0 27 154
12:00 PM 5 32 1 0 38 5 32 0 0 37 1 4 2 0 7 0 6 12 0 18 100
12:15 PM 11 34 0 0 45 5 41 3 0 49 8 1 1 3 10 1 13 4 1 18 122
Total 31 153 7 0 191 18 179 5 0 202 12 10 5 8 27 2 29 44 1 75 495
Approach % 16.2 80.1 3.7 - - 8.9 88.6 2.5 - - 44.4 37.0 18.5 - - 2.7 38.7 58.7 - - -
Total % 6.3 30.9 1.4 - 38.6 3.6 36.2 1.0 - 40.8 2.4 2.0 1.0 - 5.5 0.4 5.9 8.9 - 15.2 -
PHF 0.705 0.814 0.438 - 0.823 0.900 0.758 0.417 - 0.777 0.375 0.625 0.625 - 0.675 0.500 0.558 0.550 - 0.694 0.804
Lights 31 151 7 - 189 18 177 5 - 200 10 10 5 - 25 1 27 44 - 72 486
% Lights 100.0 98.7 100.0 - 99.0 100.0 98.9 100.0 - 99.0 83.3 100.0 100.0 - 92.6 50.0 93.1 100.0 - 96.0 98.2
Other Vehicles 0 2 0 - 2 0 2 0 - 2 2 0 0 - 2 1 2 0 - 3 9
% Other 0.0 1.3 0.0 - 1.0 0.0 1.1 0.0 - 1.0 16.7 0.0 0.0 - 7.4 50.0 6.9 0.0 - 4.0 1.8
Vehicles
Pedestrians - - - 0 - - - - 0 - - - - 8 - - - - 1 - -
% Pedestrians - - - - - - - - - - - - - 100.0 - - - - 100.0 - -
Count Name: 1100-1300
Traffic Planning and Design, Inc Chestnut & S.30th Street
2500 East High Street Site Code: 1100-1300 Chestnut
Suite 650 & S.30th Street
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 jwheeler@trafficpd.com Page No: 4

S.30th Street [N]


Out In Total
46 72 118
0 3 3
0 0 0
46 75 121

44 27 1 0
0 2 1 0
0 0 0 1
44 29 2 1
R T L P
31

31

R
0
0

5
0
0
5
Peak Hour Data
Total
420

426

160

157
Out
6
0

0
3
Chestnut Street [W]

Chestnut Street [E]


151

153

179

177
T

T
2
0

0
2
12/06/2018 11:30 AM
189

191

202

200
In

In
2
0

0
2
Ending At
12/06/2018 12:30 PM

18

18
R
7
0
0
7

0
0
Lights

Total
231

235

362

357
Out

Other Vehicles
4
0

0
5
Pedestrians
P

P
0
0
0
0

0
0
0
0

L T R P
10 10 5 0
2 0 0 0
0 0 0 8
12 10 5 8

52 25 77
2 2 4
0 0 0
54 27 81
Out In Total
S.30th Street [S]

Turning Movement Peak Hour Data Plot (11:30 AM)


Count Name: AM_PM S. 31st
Traffic Planning and Design, Inc Street & Alley
2500 East High Street Site Code: AM_PM S. 31st
Suite 650 Street & Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 jwheeler@trafficpd.com Page No: 1

Turning Movement Data


Alley Alley 31st Street 31st Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
6:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 2
6:15 AM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 0 0 0 1 2
6:30 AM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 1
6:45 AM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 2 0 0 2 3
Hourly Total 0 0 0 0 0 0 0 0 0 0 0 3 0 0 3 1 4 0 0 5 8
7:00 AM 0 0 0 1 0 0 0 0 0 0 0 4 0 0 4 0 2 0 0 2 6
7:15 AM 0 0 0 1 0 0 0 1 2 1 0 7 0 0 7 0 10 0 0 10 18
7:30 AM 0 0 0 0 0 0 0 0 1 0 0 6 0 0 6 0 18 0 0 18 24
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 9 0 0 9 0 14 0 0 14 23
Hourly Total 0 0 0 2 0 0 0 1 3 1 0 26 0 0 26 0 44 0 0 44 71
8:00 AM 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 11 0 0 11 12
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 3 0 1 3 0 9 0 0 9 12
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 5 0 0 6 7
8:45 AM 0 0 0 0 0 0 0 1 0 1 0 4 0 0 4 0 4 0 0 4 9
Hourly Total 1 0 0 1 1 0 0 1 0 1 0 8 0 1 8 1 29 0 0 30 40
*** BREAK *** - - - - - - - - - - - - - - - - - - - - -
3:00 PM 0 0 0 0 0 0 0 0 0 0 0 15 0 0 15 0 9 0 0 9 24
3:15 PM 1 0 0 0 1 0 0 0 0 0 0 17 0 0 17 0 6 0 0 6 24
3:30 PM 0 0 0 0 0 0 0 0 0 0 0 11 0 0 11 0 5 1 0 6 17
3:45 PM 0 0 0 0 0 0 0 0 0 0 0 6 0 0 6 0 4 0 0 4 10
Hourly Total 1 0 0 0 1 0 0 0 0 0 0 49 0 0 49 0 24 1 0 25 75
4:00 PM 0 0 0 0 0 0 0 0 1 0 0 4 0 0 4 0 9 0 0 9 13
4:15 PM 0 0 0 0 0 0 0 0 0 0 1 7 1 0 9 0 8 0 0 8 17
4:30 PM 0 0 0 2 0 0 0 0 0 0 0 7 0 0 7 0 8 0 0 8 15
4:45 PM 0 0 0 1 0 0 0 0 0 0 0 15 1 0 16 0 8 0 0 8 24
Hourly Total 0 0 0 3 0 0 0 0 1 0 1 33 2 0 36 0 33 0 0 33 69
5:00 PM 0 0 0 0 0 1 0 0 0 1 0 11 0 0 11 0 9 0 0 9 21
5:15 PM 0 0 0 1 0 0 0 0 0 0 0 3 0 0 3 0 12 1 0 13 16
5:30 PM 0 0 0 1 0 0 0 0 0 0 0 9 0 0 9 0 9 0 0 9 18
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 5 0 0 5 0 7 0 0 7 12
Hourly Total 0 0 0 2 0 1 0 0 0 1 0 28 0 0 28 0 37 1 0 38 67
Grand Total 2 0 0 8 2 1 0 2 4 3 1 147 2 1 150 2 171 2 0 175 330
Approach % 100.0 0.0 0.0 - - 33.3 0.0 66.7 - - 0.7 98.0 1.3 - - 1.1 97.7 1.1 - - -
Total % 0.6 0.0 0.0 - 0.6 0.3 0.0 0.6 - 0.9 0.3 44.5 0.6 - 45.5 0.6 51.8 0.6 - 53.0 -
Lights 2 0 0 - 2 1 0 2 - 3 1 145 2 - 148 2 168 2 - 172 325
% Lights 100.0 - - - 100.0 100.0 - 100.0 - 100.0 100.0 98.6 100.0 - 98.7 100.0 98.2 100.0 - 98.3 98.5
Other Vehicles 0 0 0 - 0 0 0 0 - 0 0 2 0 - 2 0 3 0 - 3 5
% Other 0.0 - - - 0.0 0.0 - 0.0 - 0.0 0.0 1.4 0.0 - 1.3 0.0 1.8 0.0 - 1.7 1.5
Vehicles
Pedestrians - - - 8 - - - - 4 - - - - 1 - - - - 0 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - 100.0 - - - - - - -
Count Name: AM_PM S. 31st
Traffic Planning and Design, Inc Street & Alley
2500 East High Street Site Code: AM_PM S. 31st
Suite 650 Street & Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 jwheeler@trafficpd.com Page No: 2

31st Street [N]


Out In Total
149 172 321
2 3 5
0 0 0
151 175 326

2 168 2 0
0 3 0 0
0 0 0 0
2 171 2 0
R T L P

R
2
0
0
2
L

2
0
0
2
Total

Out
5
0
0
5

4
0
0
4
T

T
0
0
0
0

0
0
0
0
Alley [W]

Alley [E]
12/06/2018 6:00 AM
In

In
2
0
0
2

3
0
0
3
Ending At
12/06/2018 6:00 PM
R
0
0
0
0

L
1
0
0
1
Lights

Total
Out

Other Vehicles
3
0
0
3

7
0
0
7
Pedestrians
P

P
0
0
8
8

4
4
0
0

L T R P
1 145 2 0
0 2 0 0
0 0 0 1
1 147 2 1

169 148 317


3 2 5
0 0 0
172 150 322
Out In Total
31st Street [S]

Turning Movement Data Plot


Count Name: AM_PM S. 31st
Traffic Planning and Design, Inc Street & Alley
2500 East High Street Site Code: AM_PM S. 31st
Suite 650 Street & Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 jwheeler@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (7:15 AM)


Alley Alley 31st Street 31st Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
7:15 AM 0 0 0 1 0 0 0 1 2 1 0 7 0 0 7 0 10 0 0 10 18
7:30 AM 0 0 0 0 0 0 0 0 1 0 0 6 0 0 6 0 18 0 0 18 24
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 9 0 0 9 0 14 0 0 14 23
8:00 AM 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 11 0 0 11 12
Total 1 0 0 2 1 0 0 1 3 1 0 22 0 0 22 0 53 0 0 53 77
Approach % 100.0 0.0 0.0 - - 0.0 0.0 100.0 - - 0.0 100.0 0.0 - - 0.0 100.0 0.0 - - -
Total % 1.3 0.0 0.0 - 1.3 0.0 0.0 1.3 - 1.3 0.0 28.6 0.0 - 28.6 0.0 68.8 0.0 - 68.8 -
PHF 0.250 0.000 0.000 - 0.250 0.000 0.000 0.250 - 0.250 0.000 0.611 0.000 - 0.611 0.000 0.736 0.000 - 0.736 0.802
Lights 1 0 0 - 1 0 0 1 - 1 0 22 0 - 22 0 52 0 - 52 76
% Lights 100.0 - - - 100.0 - - 100.0 - 100.0 - 100.0 - - 100.0 - 98.1 - - 98.1 98.7
Other Vehicles 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0 1 0 - 1 1
% Other 0.0 - - - 0.0 - - 0.0 - 0.0 - 0.0 - - 0.0 - 1.9 - - 1.9 1.3
Vehicles
Pedestrians - - - 2 - - - - 3 - - - - 0 - - - - 0 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - - - - - - - - -
Count Name: AM_PM S. 31st
Traffic Planning and Design, Inc Street & Alley
2500 East High Street Site Code: AM_PM S. 31st
Suite 650 Street & Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 jwheeler@trafficpd.com Page No: 4

31st Street [N]


Out In Total
24 52 76
0 1 1
0 0 0
24 53 77

0 52 0 0
0 1 0 0
0 0 0 0
0 53 0 0
R T L P

R
1
0
0
1
L

1
0
0
1
Peak Hour Data
Total

Out
1
0
0
1

0
0
0
0
T

T
0
0
0
0

0
0
0
0
Alley [W]

Alley [E]
12/06/2018 7:15 AM
In

In
1
0
0
1

1
0
0
1
Ending At
12/06/2018 8:15 AM
R
0
0
0
0

L
0
0
0
0
Lights

Total
Out

Other Vehicles
0
0
0
0

1
0
0
1
Pedestrians
P

P
0
0
2
2

3
3
0
0

L T R P
0 22 0 0
0 0 0 0
0 0 0 0
0 22 0 0

52 22 74
1 0 1
0 0 0
53 22 75
Out In Total
31st Street [S]

Turning Movement Peak Hour Data Plot (7:15 AM)


Count Name: AM_PM S. 31st
Traffic Planning and Design, Inc Street & Alley
2500 East High Street Site Code: AM_PM S. 31st
Suite 650 Street & Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 jwheeler@trafficpd.com Page No: 5

Turning Movement Peak Hour Data (4:45 PM)


Alley Alley 31st Street 31st Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
4:45 PM 0 0 0 1 0 0 0 0 0 0 0 15 1 0 16 0 8 0 0 8 24
5:00 PM 0 0 0 0 0 1 0 0 0 1 0 11 0 0 11 0 9 0 0 9 21
5:15 PM 0 0 0 1 0 0 0 0 0 0 0 3 0 0 3 0 12 1 0 13 16
5:30 PM 0 0 0 1 0 0 0 0 0 0 0 9 0 0 9 0 9 0 0 9 18
Total 0 0 0 3 0 1 0 0 0 1 0 38 1 0 39 0 38 1 0 39 79
Approach % 0.0 0.0 0.0 - - 100.0 0.0 0.0 - - 0.0 97.4 2.6 - - 0.0 97.4 2.6 - - -
Total % 0.0 0.0 0.0 - 0.0 1.3 0.0 0.0 - 1.3 0.0 48.1 1.3 - 49.4 0.0 48.1 1.3 - 49.4 -
PHF 0.000 0.000 0.000 - 0.000 0.250 0.000 0.000 - 0.250 0.000 0.633 0.250 - 0.609 0.000 0.792 0.250 - 0.750 0.823
Lights 0 0 0 - 0 1 0 0 - 1 0 37 1 - 38 0 38 1 - 39 78
% Lights - - - - - 100.0 - - - 100.0 - 97.4 100.0 - 97.4 - 100.0 100.0 - 100.0 98.7
Other Vehicles 0 0 0 - 0 0 0 0 - 0 0 1 0 - 1 0 0 0 - 0 1
% Other - - - - - 0.0 - - - 0.0 - 2.6 0.0 - 2.6 - 0.0 0.0 - 0.0 1.3
Vehicles
Pedestrians - - - 3 - - - - 0 - - - - 0 - - - - 0 - -
% Pedestrians - - - 100.0 - - - - - - - - - - - - - - - - -
Count Name: AM_PM S. 31st
Traffic Planning and Design, Inc Street & Alley
2500 East High Street Site Code: AM_PM S. 31st
Suite 650 Street & Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 jwheeler@trafficpd.com Page No: 6

31st Street [N]


Out In Total
37 39 76
1 0 1
0 0 0
38 39 77

1 38 0 0
0 0 0 0
0 0 0 0
1 38 0 0
R T L P

R
0
0
0
0
L

0
0
0
0
Peak Hour Data
Total

Out
1
0
0
1

1
0
0
1
T

T
0
0
0
0

0
0
0
0
Alley [W]

Alley [E]
12/06/2018 4:45 PM
In

In
0
0
0
0

1
0
0
1
Ending At
12/06/2018 5:45 PM
R
0
0
0
0

L
1
0
0
1
Lights

Total
Out

Other Vehicles
1
0
0
1

2
0
0
2
Pedestrians
P

P
0
0
3
3

0
0
0
0

L T R P
0 37 1 0
0 1 0 0
0 0 0 0
0 38 1 0

39 38 77
0 1 1
0 0 0
39 39 78
Out In Total
31st Street [S]

Turning Movement Peak Hour Data Plot (4:45 PM)


Count Name: SAT S. 31st Street
Traffic Planning and Design, Inc & Alley
2500 East High Street Site Code: SAT S. 31st Street &
Suite 650 Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/08/2018
610.326.3100 jwheeler@trafficpd.com Page No: 1

Turning Movement Data


Alley Alley 31st Street 31st Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 5 1 0 6 0 6 0 0 6 12
11:15 AM 0 0 0 0 0 0 0 0 2 0 0 4 0 0 4 0 3 0 0 3 7
11:30 AM 0 0 0 0 0 0 0 0 1 0 0 2 0 0 2 0 6 0 0 6 8
11:45 AM 0 0 0 4 0 1 0 0 1 1 0 3 0 0 3 0 3 0 1 3 7
Hourly Total 0 0 0 4 0 1 0 0 4 1 0 14 1 0 15 0 18 0 1 18 34
12:00 PM 0 0 0 0 0 0 0 0 1 0 0 5 0 0 5 0 7 0 0 7 12
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 5 0 0 5 0 4 0 1 4 9
12:30 PM 0 0 0 3 0 0 0 0 1 0 0 6 0 2 6 0 4 0 0 4 10
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 2 0 2 2 0 1 0 0 1 3
Hourly Total 0 0 0 3 0 0 0 0 2 0 0 18 0 4 18 0 16 0 1 16 34
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand Total 0 0 0 7 0 1 0 0 6 1 0 32 1 4 33 0 34 0 2 34 68
Approach % 0.0 0.0 0.0 - - 100.0 0.0 0.0 - - 0.0 97.0 3.0 - - 0.0 100.0 0.0 - - -
Total % 0.0 0.0 0.0 - 0.0 1.5 0.0 0.0 - 1.5 0.0 47.1 1.5 - 48.5 0.0 50.0 0.0 - 50.0 -
Lights 0 0 0 - 0 1 0 0 - 1 0 32 1 - 33 0 34 0 - 34 68
% Lights - - - - - 100.0 - - - 100.0 - 100.0 100.0 - 100.0 - 100.0 - - 100.0 100.0
Other Vehicles 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0
% Other - - - - - 0.0 - - - 0.0 - 0.0 0.0 - 0.0 - 0.0 - - 0.0 0.0
Vehicles
Pedestrians - - - 7 - - - - 6 - - - - 4 - - - - 2 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - 100.0 - - - - 100.0 - -
Count Name: SAT S. 31st Street
Traffic Planning and Design, Inc & Alley
2500 East High Street Site Code: SAT S. 31st Street &
Suite 650 Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/08/2018
610.326.3100 jwheeler@trafficpd.com Page No: 2

31st Street [N]


Out In Total
32 34 66
0 0 0
0 0 0
32 34 66

0 34 0 0
0 0 0 0
0 0 0 2
0 34 0 2
R T L P

R
0
0
0
0
L

0
0
0
0
Total

Out
0
0
0
0

1
0
0
1
T

T
0
0
0
0

0
0
0
0
Alley [W]

Alley [E]
12/08/2018 11:00 AM
In

In
0
0
0
0

1
0
0
1
Ending At
12/08/2018 1:15 PM
R
0
0
0
0

L
1
0
0
1
Lights

Total
Out

Other Vehicles
0
0
0
0

2
0
0
2
Pedestrians
P

P
0
0
7
7

6
6
0
0

L T R P
0 32 1 0
0 0 0 0
0 0 0 4
0 32 1 4

35 33 68
0 0 0
0 0 0
35 33 68
Out In Total
31st Street [S]

Turning Movement Data Plot


Count Name: SAT S. 31st Street
Traffic Planning and Design, Inc & Alley
2500 East High Street Site Code: SAT S. 31st Street &
Suite 650 Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/08/2018
610.326.3100 jwheeler@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (11:45 AM)


Alley Alley 31st Street 31st Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
11:45 AM 0 0 0 4 0 1 0 0 1 1 0 3 0 0 3 0 3 0 1 3 7
12:00 PM 0 0 0 0 0 0 0 0 1 0 0 5 0 0 5 0 7 0 0 7 12
12:15 PM 0 0 0 0 0 0 0 0 0 0 0 5 0 0 5 0 4 0 1 4 9
12:30 PM 0 0 0 3 0 0 0 0 1 0 0 6 0 2 6 0 4 0 0 4 10
Total 0 0 0 7 0 1 0 0 3 1 0 19 0 2 19 0 18 0 2 18 38
Approach % 0.0 0.0 0.0 - - 100.0 0.0 0.0 - - 0.0 100.0 0.0 - - 0.0 100.0 0.0 - - -
Total % 0.0 0.0 0.0 - 0.0 2.6 0.0 0.0 - 2.6 0.0 50.0 0.0 - 50.0 0.0 47.4 0.0 - 47.4 -
PHF 0.000 0.000 0.000 - 0.000 0.250 0.000 0.000 - 0.250 0.000 0.792 0.000 - 0.792 0.000 0.643 0.000 - 0.643 0.792
Lights 0 0 0 - 0 1 0 0 - 1 0 19 0 - 19 0 18 0 - 18 38
% Lights - - - - - 100.0 - - - 100.0 - 100.0 - - 100.0 - 100.0 - - 100.0 100.0
Other Vehicles 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0
% Other - - - - - 0.0 - - - 0.0 - 0.0 - - 0.0 - 0.0 - - 0.0 0.0
Vehicles
Pedestrians - - - 7 - - - - 3 - - - - 2 - - - - 2 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - 100.0 - - - - 100.0 - -
Count Name: SAT S. 31st Street
Traffic Planning and Design, Inc & Alley
2500 East High Street Site Code: SAT S. 31st Street &
Suite 650 Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/08/2018
610.326.3100 jwheeler@trafficpd.com Page No: 4

31st Street [N]


Out In Total
19 18 37
0 0 0
0 0 0
19 18 37

0 18 0 0
0 0 0 0
0 0 0 2
0 18 0 2
R T L P

R
0
0
0
0
L

0
0
0
0
Peak Hour Data
Total

Out
0
0
0
0

0
0
0
0
T

T
0
0
0
0

0
0
0
0
Alley [W]

Alley [E]
12/08/2018 11:45 AM
In

In
0
0
0
0

1
0
0
1
Ending At
12/08/2018 12:45 PM
R
0
0
0
0

L
1
0
0
1
Lights

Total
Out

Other Vehicles
0
0
0
0

1
0
0
1
Pedestrians
P

P
0
0
7
7

3
3
0
0

L T R P
0 19 0 0
0 0 0 0
0 0 0 2
0 19 0 2

19 19 38
0 0 0
0 0 0
19 19 38
Out In Total
31st Street [S]

Turning Movement Peak Hour Data Plot (11:45 AM)


Count Name: 1100-1300 S.31st
Traffic Planning and Design, Inc & Existing Alley
2500 East High Street Site Code: 1100-1300 S.31st &
Suite 650 Existing Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 1

Turning Movement Data


Existing Alley Existing Alley S.31st Street S.31st Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 7 0 0 7 0 4 0 0 4 11
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 5 0 0 5 0 2 1 0 3 8
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 8 0 0 8 0 3 0 0 3 11
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 5 0 0 5 0 6 0 0 6 11
Hourly Total 0 0 0 0 0 0 0 0 0 0 0 25 0 0 25 0 15 1 0 16 41
12:00 PM 1 0 0 0 1 0 0 0 2 0 0 1 0 0 1 0 3 0 0 3 5
12:15 PM 0 0 0 0 0 1 0 0 1 1 0 1 0 0 1 0 2 0 0 2 4
12:30 PM 0 0 0 0 0 0 0 0 0 0 0 5 0 0 5 0 4 0 0 4 9
12:45 PM 0 0 0 0 0 0 0 0 0 0 0 5 0 0 5 0 9 0 0 9 14
Hourly Total 1 0 0 0 1 1 0 0 3 1 0 12 0 0 12 0 18 0 0 18 32
Grand Total 1 0 0 0 1 1 0 0 3 1 0 37 0 0 37 0 33 1 0 34 73
Approach % 100.0 0.0 0.0 - - 100.0 0.0 0.0 - - 0.0 100.0 0.0 - - 0.0 97.1 2.9 - - -
Total % 1.4 0.0 0.0 - 1.4 1.4 0.0 0.0 - 1.4 0.0 50.7 0.0 - 50.7 0.0 45.2 1.4 - 46.6 -
Lights 1 0 0 - 1 1 0 0 - 1 0 37 0 - 37 0 31 1 - 32 71
% Lights 100.0 - - - 100.0 100.0 - - - 100.0 - 100.0 - - 100.0 - 93.9 100.0 - 94.1 97.3
Other Vehicles 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0 2 0 - 2 2
% Other 0.0 - - - 0.0 0.0 - - - 0.0 - 0.0 - - 0.0 - 6.1 0.0 - 5.9 2.7
Vehicles
Pedestrians - - - 0 - - - - 3 - - - - 0 - - - - 0 - -
% Pedestrians - - - - - - - - 100.0 - - - - - - - - - - - -
Count Name: 1100-1300 S.31st
Traffic Planning and Design, Inc & Existing Alley
2500 East High Street Site Code: 1100-1300 S.31st &
Suite 650 Existing Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 2

S.31st Street [N]


Out In Total
38 32 70
0 2 2
0 0 0
38 34 72

1 31 0 0
0 2 0 0
0 0 0 0
1 33 0 0
R T L P

R
1
0
0
1
L

0
0
0
0
Total

Out
2
0
0
2

0
0
0
0
Existing Alley [W]

Existing Alley [E]


T

T
0
0
0
0

0
0
0
0
12/06/2018 11:00 AM
In

In
1
0
0
1

1
0
0
1
Ending At
12/06/2018 1:00 PM
R
0
0
0
0

L
1
0
0
1
Lights

Total
Out

Other Vehicles
1
0
0
1

1
0
0
1
Pedestrians
P

P
0
0
0
0

3
3
0
0

L T R P
0 37 0 0
0 0 0 0
0 0 0 0
0 37 0 0

32 37 69
2 0 2
0 0 0
34 37 71
Out In Total
S.31st Street [S]

Turning Movement Data Plot


Count Name: 1100-1300 S.31st
Traffic Planning and Design, Inc & Existing Alley
2500 East High Street Site Code: 1100-1300 S.31st &
Suite 650 Existing Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (11:00 AM)


Existing Alley Existing Alley S.31st Street S.31st Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 7 0 0 7 0 4 0 0 4 11
11:15 AM 0 0 0 0 0 0 0 0 0 0 0 5 0 0 5 0 2 1 0 3 8
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 8 0 0 8 0 3 0 0 3 11
11:45 AM 0 0 0 0 0 0 0 0 0 0 0 5 0 0 5 0 6 0 0 6 11
Total 0 0 0 0 0 0 0 0 0 0 0 25 0 0 25 0 15 1 0 16 41
Approach % 0.0 0.0 0.0 - - 0.0 0.0 0.0 - - 0.0 100.0 0.0 - - 0.0 93.8 6.3 - - -
Total % 0.0 0.0 0.0 - 0.0 0.0 0.0 0.0 - 0.0 0.0 61.0 0.0 - 61.0 0.0 36.6 2.4 - 39.0 -
PHF 0.000 0.000 0.000 - 0.000 0.000 0.000 0.000 - 0.000 0.000 0.781 0.000 - 0.781 0.000 0.625 0.250 - 0.667 0.932
Lights 0 0 0 - 0 0 0 0 - 0 0 25 0 - 25 0 15 1 - 16 41
% Lights - - - - - - - - - - - 100.0 - - 100.0 - 100.0 100.0 - 100.0 100.0
Other Vehicles 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0
% Other - - - - - - - - - - - 0.0 - - 0.0 - 0.0 0.0 - 0.0 0.0
Vehicles
Pedestrians - - - 0 - - - - 0 - - - - 0 - - - - 0 - -
% Pedestrians - - - - - - - - - - - - - - - - - - - - -
Count Name: 1100-1300 S.31st
Traffic Planning and Design, Inc & Existing Alley
2500 East High Street Site Code: 1100-1300 S.31st &
Suite 650 Existing Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 4

S.31st Street [N]


Out In Total
25 16 41
0 0 0
0 0 0
25 16 41

1 15 0 0
0 0 0 0
0 0 0 0
1 15 0 0
R T L P

R
0
0
0
0
L

0
0
0
0
Peak Hour Data
Total

Out
1
0
0
1

0
0
0
0
Existing Alley [W]

Existing Alley [E]


T

T
0
0
0
0

0
0
0
0
12/06/2018 11:00 AM
In

In
0
0
0
0

0
0
0
0
Ending At
12/06/2018 12:00 PM
R
0
0
0
0

L
0
0
0
0
Lights

Total
Out

Other Vehicles
1
0
0
1

0
0
0
0
Pedestrians
P

P
0
0
0
0

0
0
0
0

L T R P
0 25 0 0
0 0 0 0
0 0 0 0
0 25 0 0

15 25 40
0 0 0
0 0 0
15 25 40
Out In Total
S.31st Street [S]

Turning Movement Peak Hour Data Plot (11:00 AM)


Count Name: AM_PM Bramar
Traffic Planning and Design, Inc Road & Alley
2500 East High Street Site Code: AM_PM Bramar
Suite 650 Road & Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 jwheeler@trafficpd.com Page No: 1

Turning Movement Data


Bramar Road Bramar Road Camp Hill Chiropractic Alley
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
6:00 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1
6:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6:30 AM 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1
6:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Hourly Total 0 0 0 0 0 1 1 0 0 2 0 0 0 0 0 0 0 0 0 0 2
7:00 AM 0 2 0 0 2 1 1 1 0 3 0 0 1 0 1 0 0 0 0 0 6
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 2 0 0 2 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 3
7:45 AM 0 1 0 0 1 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 2
Hourly Total 0 5 0 0 5 1 3 1 0 5 0 0 1 0 1 0 0 0 0 0 11
8:00 AM 0 1 0 0 1 3 0 0 0 3 0 0 0 1 0 0 0 0 2 0 4
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 2 2
8:30 AM 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1
Hourly Total 0 1 0 0 1 3 1 0 0 4 0 0 1 1 1 1 0 1 2 2 8
*** BREAK *** - - - - - - - - - - - - - - - - - - - - -
3:00 PM 1 1 1 0 3 1 2 0 0 3 0 0 0 0 0 0 0 0 0 0 6
3:15 PM 0 5 0 0 5 4 1 0 0 5 0 0 0 0 0 0 0 2 0 2 12
3:30 PM 0 3 0 0 3 1 1 0 0 2 1 0 2 0 3 0 0 0 0 0 8
3:45 PM 0 2 1 0 3 1 1 0 0 2 0 0 1 0 1 0 0 0 0 0 6
Hourly Total 1 11 2 0 14 7 5 0 0 12 1 0 3 0 4 0 0 2 0 2 32
4:00 PM 0 1 1 0 2 1 0 0 0 1 0 0 1 0 1 0 0 0 0 0 4
4:15 PM 0 5 1 0 6 2 0 0 0 2 0 0 1 0 1 0 0 0 0 0 9
4:30 PM 0 4 2 0 6 1 1 0 0 2 1 0 3 1 4 0 0 0 3 0 12
4:45 PM 0 2 0 1 2 2 0 0 0 2 1 0 4 1 5 0 0 0 1 0 9
Hourly Total 0 12 4 1 16 6 1 0 0 7 2 0 9 2 11 0 0 0 4 0 34
5:00 PM 0 3 2 0 5 3 1 0 0 4 0 0 6 0 6 0 0 0 0 0 15
5:15 PM 1 0 1 0 2 6 1 0 0 7 0 0 7 0 7 1 0 0 0 1 17
5:30 PM 0 2 2 0 4 4 0 0 0 4 0 0 5 0 5 0 0 0 0 0 13
5:45 PM 0 1 1 0 2 3 0 0 0 3 1 0 2 0 3 0 0 0 0 0 8
Hourly Total 1 6 6 0 13 16 2 0 0 18 1 0 20 0 21 1 0 0 0 1 53
Grand Total 2 35 12 1 49 34 13 1 0 48 4 0 34 3 38 2 0 3 6 5 140
Approach % 4.1 71.4 24.5 - - 70.8 27.1 2.1 - - 10.5 0.0 89.5 - - 40.0 0.0 60.0 - - -
Total % 1.4 25.0 8.6 - 35.0 24.3 9.3 0.7 - 34.3 2.9 0.0 24.3 - 27.1 1.4 0.0 2.1 - 3.6 -
Lights 2 34 12 - 48 34 13 1 - 48 4 0 34 - 38 2 0 3 - 5 139
% Lights 100.0 97.1 100.0 - 98.0 100.0 100.0 100.0 - 100.0 100.0 - 100.0 - 100.0 100.0 - 100.0 - 100.0 99.3
Other Vehicles 0 1 0 - 1 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 1
% Other 0.0 2.9 0.0 - 2.0 0.0 0.0 0.0 - 0.0 0.0 - 0.0 - 0.0 0.0 - 0.0 - 0.0 0.7
Vehicles
Pedestrians - - - 1 - - - - 0 - - - - 3 - - - - 6 - -
% Pedestrians - - - 100.0 - - - - - - - - - 100.0 - - - - 100.0 - -
Count Name: AM_PM Bramar
Traffic Planning and Design, Inc Road & Alley
2500 East High Street Site Code: AM_PM Bramar
Suite 650 Road & Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 jwheeler@trafficpd.com Page No: 2

Alley [N]
Out In Total
3 5 8
0 0 0
0 0 0
3 5 8

3 0 2 0
0 0 0 0
0 0 0 6
3 0 2 6
R T L P

R
2
0
0
2
L

1
0
0
1
Total

Out
68

69

71

70
1
0

0
1
Bramar Road [W]

Bramar Road [E]


34

35

13

13
T

T
1
0

0
0
12/06/2018 6:00 AM
48

49

48

48
In

In
1
0

0
0
Ending At
12/06/2018 6:00 PM
12

12

34

34
R
0
0

0
0
Lights

Total
119

118
Out
20

20

Other Vehicles
0
0

0
1
Pedestrians
P

P
0
0
1
1

0
0
0
0

L T R P
4 0 34 0
0 0 0 0
0 0 0 3
4 0 34 3

46 38 84
0 0 0
0 0 0
46 38 84
Out In Total
Camp Hill Chiropractic [S]

Turning Movement Data Plot


Count Name: AM_PM Bramar
Traffic Planning and Design, Inc Road & Alley
2500 East High Street Site Code: AM_PM Bramar
Suite 650 Road & Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 jwheeler@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (7:00 AM)


Bramar Road Bramar Road Camp Hill Chiropractic Alley
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
7:00 AM 0 2 0 0 2 1 1 1 0 3 0 0 1 0 1 0 0 0 0 0 6
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 2 0 0 2 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 3
7:45 AM 0 1 0 0 1 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 2
Total 0 5 0 0 5 1 3 1 0 5 0 0 1 0 1 0 0 0 0 0 11
Approach % 0.0 100.0 0.0 - - 20.0 60.0 20.0 - - 0.0 0.0 100.0 - - 0.0 0.0 0.0 - - -
Total % 0.0 45.5 0.0 - 45.5 9.1 27.3 9.1 - 45.5 0.0 0.0 9.1 - 9.1 0.0 0.0 0.0 - 0.0 -
PHF 0.000 0.625 0.000 - 0.625 0.250 0.750 0.250 - 0.417 0.000 0.000 0.250 - 0.250 0.000 0.000 0.000 - 0.000 0.458
Lights 0 5 0 - 5 1 3 1 - 5 0 0 1 - 1 0 0 0 - 0 11
% Lights - 100.0 - - 100.0 100.0 100.0 100.0 - 100.0 - - 100.0 - 100.0 - - - - - 100.0
Other Vehicles 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0
% Other - 0.0 - - 0.0 0.0 0.0 0.0 - 0.0 - - 0.0 - 0.0 - - - - - 0.0
Vehicles
Pedestrians - - - 0 - - - - 0 - - - - 0 - - - - 0 - -
% Pedestrians - - - - - - - - - - - - - - - - - - - - -
Count Name: AM_PM Bramar
Traffic Planning and Design, Inc Road & Alley
2500 East High Street Site Code: AM_PM Bramar
Suite 650 Road & Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 jwheeler@trafficpd.com Page No: 4

Alley [N]
Out In Total
1 0 1
0 0 0
0 0 0
1 0 1

0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
R T L P

R
0
0
0
0
L

1
0
0
1
Peak Hour Data
Total

Out
8
0
0
8

6
0
0
6
Bramar Road [W]

Bramar Road [E]


T

T
5
0
0
5

3
0
0
3
12/06/2018 7:00 AM
In

In
5
0
0
5

5
0
0
5
Ending At
12/06/2018 8:00 AM
R
0
0
0
0

L
1
0
0
1
Lights

Total
Out

11

11
Other Vehicles
3
0
0
3

0
0
Pedestrians
P

P
0
0
0
0

0
0
0
0

L T R P
0 0 1 0
0 0 0 0
0 0 0 0
0 0 1 0

1 1 2
0 0 0
0 0 0
1 1 2
Out In Total
Camp Hill Chiropractic [S]

Turning Movement Peak Hour Data Plot (7:00 AM)


Count Name: AM_PM Bramar
Traffic Planning and Design, Inc Road & Alley
2500 East High Street Site Code: AM_PM Bramar
Suite 650 Road & Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 jwheeler@trafficpd.com Page No: 5

Turning Movement Peak Hour Data (4:45 PM)


Bramar Road Bramar Road Camp Hill Chiropractic Alley
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
4:45 PM 0 2 0 1 2 2 0 0 0 2 1 0 4 1 5 0 0 0 1 0 9
5:00 PM 0 3 2 0 5 3 1 0 0 4 0 0 6 0 6 0 0 0 0 0 15
5:15 PM 1 0 1 0 2 6 1 0 0 7 0 0 7 0 7 1 0 0 0 1 17
5:30 PM 0 2 2 0 4 4 0 0 0 4 0 0 5 0 5 0 0 0 0 0 13
Total 1 7 5 1 13 15 2 0 0 17 1 0 22 1 23 1 0 0 1 1 54
Approach % 7.7 53.8 38.5 - - 88.2 11.8 0.0 - - 4.3 0.0 95.7 - - 100.0 0.0 0.0 - - -
Total % 1.9 13.0 9.3 - 24.1 27.8 3.7 0.0 - 31.5 1.9 0.0 40.7 - 42.6 1.9 0.0 0.0 - 1.9 -
PHF 0.250 0.583 0.625 - 0.650 0.625 0.500 0.000 - 0.607 0.250 0.000 0.786 - 0.821 0.250 0.000 0.000 - 0.250 0.794
Lights 1 6 5 - 12 15 2 0 - 17 1 0 22 - 23 1 0 0 - 1 53
% Lights 100.0 85.7 100.0 - 92.3 100.0 100.0 - - 100.0 100.0 - 100.0 - 100.0 100.0 - - - 100.0 98.1
Other Vehicles 0 1 0 - 1 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 1
% Other 0.0 14.3 0.0 - 7.7 0.0 0.0 - - 0.0 0.0 - 0.0 - 0.0 0.0 - - - 0.0 1.9
Vehicles
Pedestrians - - - 1 - - - - 0 - - - - 1 - - - - 1 - -
% Pedestrians - - - 100.0 - - - - - - - - - 100.0 - - - - 100.0 - -
Count Name: AM_PM Bramar
Traffic Planning and Design, Inc Road & Alley
2500 East High Street Site Code: AM_PM Bramar
Suite 650 Road & Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 jwheeler@trafficpd.com Page No: 6

Alley [N]
Out In Total
1 1 2
0 0 0
0 0 0
1 1 2

0 0 1 0
0 0 0 0
0 0 0 1
0 0 1 1
R T L P

R
1
0
0
1
L

0
0
0
0
Peak Hour Data
Total

Out
15

16

30

29
1
0

0
1
Bramar Road [W]

Bramar Road [E]


T

T
6
1
0
7

2
0
0
2
12/06/2018 4:45 PM
12

13

17

17
In

In
1
0

0
0
Ending At
12/06/2018 5:45 PM

15

15
R
5
0
0
5

0
0
Lights

Total
Out

47

46
Other Vehicles
3
0
0
3

0
1
Pedestrians
P

P
0
0
1
1

0
0
0
0

L T R P
1 0 22 0
0 0 0 0
0 0 0 1
1 0 22 1

20 23 43
0 0 0
0 0 0
20 23 43
Out In Total
Camp Hill Chiropractic [S]

Turning Movement Peak Hour Data Plot (4:45 PM)


Count Name: SAT Bramar Road
Traffic Planning and Design, Inc & Alley
2500 East High Street Site Code: SAT Bramar Road &
Suite 650 Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/08/2018
610.326.3100 jwheeler@trafficpd.com Page No: 1

Turning Movement Data


Bramar Road Bramar Road Camp Hill Chiropractic Alley
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:15 AM 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11:45 AM 0 0 0 0 0 1 1 0 0 2 0 0 0 0 0 0 0 0 0 0 2
Hourly Total 0 2 0 0 2 1 1 0 0 2 0 0 0 0 0 0 0 0 0 0 4
12:00 PM 0 2 0 0 2 0 2 1 0 3 0 0 0 0 0 0 0 0 0 0 5
12:15 PM 0 1 0 0 1 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 2
12:30 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
12:45 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
Hourly Total 0 5 0 0 5 0 2 1 0 3 0 0 1 0 1 0 0 0 0 0 9
1:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand Total 0 7 0 0 7 1 3 1 0 5 0 0 1 0 1 0 0 0 0 0 13
Approach % 0.0 100.0 0.0 - - 20.0 60.0 20.0 - - 0.0 0.0 100.0 - - 0.0 0.0 0.0 - - -
Total % 0.0 53.8 0.0 - 53.8 7.7 23.1 7.7 - 38.5 0.0 0.0 7.7 - 7.7 0.0 0.0 0.0 - 0.0 -
Lights 0 7 0 - 7 1 3 1 - 5 0 0 1 - 1 0 0 0 - 0 13
% Lights - 100.0 - - 100.0 100.0 100.0 100.0 - 100.0 - - 100.0 - 100.0 - - - - - 100.0
Other Vehicles 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0
% Other - 0.0 - - 0.0 0.0 0.0 0.0 - 0.0 - - 0.0 - 0.0 - - - - - 0.0
Vehicles
Pedestrians - - - 0 - - - - 0 - - - - 0 - - - - 0 - -
% Pedestrians - - - - - - - - - - - - - - - - - - - - -
Count Name: SAT Bramar Road
Traffic Planning and Design, Inc & Alley
2500 East High Street Site Code: SAT Bramar Road &
Suite 650 Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/08/2018
610.326.3100 jwheeler@trafficpd.com Page No: 2

Alley [N]
Out In Total
1 0 1
0 0 0
0 0 0
1 0 1

0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
R T L P

R
0
0
0
0
L

1
0
0
1
Total

Out
10

10
0
0

8
0
0
8
Bramar Road [W]

Bramar Road [E]


T

T
7
0
0
7

3
0
0
3
12/08/2018 11:00 AM
In

In
7
0
0
7

5
0
0
5
Ending At
12/08/2018 1:15 PM
R
0
0
0
0

L
1
0
0
1
Lights

Total
Out

13

13
Other Vehicles
3
0
0
3

0
0
Pedestrians
P

P
0
0
0
0

0
0
0
0

L T R P
0 0 1 0
0 0 0 0
0 0 0 0
0 0 1 0

1 1 2
0 0 0
0 0 0
1 1 2
Out In Total
Camp Hill Chiropractic [S]

Turning Movement Data Plot


Count Name: SAT Bramar Road
Traffic Planning and Design, Inc & Alley
2500 East High Street Site Code: SAT Bramar Road &
Suite 650 Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/08/2018
610.326.3100 jwheeler@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (11:45 AM)


Bramar Road Bramar Road Camp Hill Chiropractic Alley
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
11:45 AM 0 0 0 0 0 1 1 0 0 2 0 0 0 0 0 0 0 0 0 0 2
12:00 PM 0 2 0 0 2 0 2 1 0 3 0 0 0 0 0 0 0 0 0 0 5
12:15 PM 0 1 0 0 1 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 2
12:30 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
Total 0 4 0 0 4 1 3 1 0 5 0 0 1 0 1 0 0 0 0 0 10
Approach % 0.0 100.0 0.0 - - 20.0 60.0 20.0 - - 0.0 0.0 100.0 - - 0.0 0.0 0.0 - - -
Total % 0.0 40.0 0.0 - 40.0 10.0 30.0 10.0 - 50.0 0.0 0.0 10.0 - 10.0 0.0 0.0 0.0 - 0.0 -
PHF 0.000 0.500 0.000 - 0.500 0.250 0.375 0.250 - 0.417 0.000 0.000 0.250 - 0.250 0.000 0.000 0.000 - 0.000 0.500
Lights 0 4 0 - 4 1 3 1 - 5 0 0 1 - 1 0 0 0 - 0 10
% Lights - 100.0 - - 100.0 100.0 100.0 100.0 - 100.0 - - 100.0 - 100.0 - - - - - 100.0
Other Vehicles 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0
% Other - 0.0 - - 0.0 0.0 0.0 0.0 - 0.0 - - 0.0 - 0.0 - - - - - 0.0
Vehicles
Pedestrians - - - 0 - - - - 0 - - - - 0 - - - - 0 - -
% Pedestrians - - - - - - - - - - - - - - - - - - - - -
Count Name: SAT Bramar Road
Traffic Planning and Design, Inc & Alley
2500 East High Street Site Code: SAT Bramar Road &
Suite 650 Alley
Pottstown, Pennsylvania, United States 19464 Start Date: 12/08/2018
610.326.3100 jwheeler@trafficpd.com Page No: 4

Alley [N]
Out In Total
1 0 1
0 0 0
0 0 0
1 0 1

0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
R T L P

R
0
0
0
0
L

1
0
0
1
Peak Hour Data
Total

Out
7
0
0
7

5
0
0
5
Bramar Road [W]

Bramar Road [E]


T

T
4
0
0
4

3
0
0
3
12/08/2018 11:45 AM
In

In
4
0
0
4

5
0
0
5
Ending At
12/08/2018 12:45 PM
R
0
0
0
0

L
1
0
0
1
Lights

Total
Out

10

10
Other Vehicles
3
0
0
3

0
0
Pedestrians
P

P
0
0
0
0

0
0
0
0

L T R P
0 0 1 0
0 0 0 0
0 0 0 0
0 0 1 0

1 1 2
0 0 0
0 0 0
1 1 2
Out In Total
Camp Hill Chiropractic [S]

Turning Movement Peak Hour Data Plot (11:45 AM)


Count Name: 1100-1300 Bramar
Road & Existing Alley & Camp
Hill Chiropractiv
Traffic Planning and Design, Inc Site Code: 1100-1300 Bramar
2500 East High Street Road & Existing Alley & Camp
Suite 650 Hill
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 1

Turning Movement Data


Bramar Road Bramar Road Camp Hill Chiropractic Dw Alley
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
11:00 AM 0 1 1 0 2 0 3 0 0 3 0 0 0 0 0 0 0 1 0 1 6
11:15 AM 1 3 0 0 4 1 2 0 0 3 0 0 2 2 2 0 0 0 0 0 9
11:30 AM 0 2 0 1 2 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 3
11:45 AM 1 2 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
Hourly Total 2 8 1 1 11 1 5 0 0 6 0 0 3 2 3 0 0 1 0 1 21
12:00 PM 0 2 0 0 2 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 2
12:15 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 1
12:30 PM 0 1 0 0 1 0 0 0 0 0 1 0 1 0 2 0 0 0 0 0 3
12:45 PM 0 1 0 0 1 0 2 0 0 2 0 0 1 0 1 0 0 0 0 0 4
Hourly Total 0 5 0 0 5 0 2 0 0 2 1 0 2 4 3 0 0 0 0 0 10
Grand Total 2 13 1 1 16 1 7 0 0 8 1 0 5 6 6 0 0 1 0 1 31
Approach % 12.5 81.3 6.3 - - 12.5 87.5 0.0 - - 16.7 0.0 83.3 - - 0.0 0.0 100.0 - - -
Total % 6.5 41.9 3.2 - 51.6 3.2 22.6 0.0 - 25.8 3.2 0.0 16.1 - 19.4 0.0 0.0 3.2 - 3.2 -
Lights 2 13 1 - 16 1 6 0 - 7 1 0 5 - 6 0 0 1 - 1 30
% Lights 100.0 100.0 100.0 - 100.0 100.0 85.7 - - 87.5 100.0 - 100.0 - 100.0 - - 100.0 - 100.0 96.8
Other Vehicles 0 0 0 - 0 0 1 0 - 1 0 0 0 - 0 0 0 0 - 0 1
% Other 0.0 0.0 0.0 - 0.0 0.0 14.3 - - 12.5 0.0 - 0.0 - 0.0 - - 0.0 - 0.0 3.2
Vehicles
Pedestrians - - - 1 - - - - 0 - - - - 6 - - - - 0 - -
% Pedestrians - - - 100.0 - - - - - - - - - 100.0 - - - - - - -
Count Name: 1100-1300 Bramar
Road & Existing Alley & Camp
Hill Chiropractiv
Traffic Planning and Design, Inc Site Code: 1100-1300 Bramar
2500 East High Street Road & Existing Alley & Camp
Suite 650 Hill
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 2

Alley [N]
Out In Total
2 1 3
0 0 0
0 0 0
2 1 3

1 0 0 0
0 0 0 0
0 0 0 0
1 0 0 0
R T L P

R
2
0
0
2
L

0
0
0
0
Total

Out
24

25

18

18
1
0

0
0
Bramar Road [W]

Bramar Road [E]


13

13
T

T
0
0

7
0
1
6
12/06/2018 11:00 AM
16

16
In

In
0
0

8
0
1
7
Ending At
12/06/2018 1:00 PM
R
1
0
0
1

L
1
0
0
1
Lights

Total
Out

26

25
Other Vehicles
8
1
0
9

0
1
Pedestrians
P

P
0
0
1
1

0
0
0
0

L T R P
1 0 5 0
0 0 0 0
0 0 0 6
1 0 5 6

2 6 8
0 0 0
0 0 0
2 6 8
Out In Total
Camp Hill Chiropractic Dw

Turning Movement Data Plot


Count Name: 1100-1300 Bramar
Road & Existing Alley & Camp
Hill Chiropractiv
Traffic Planning and Design, Inc Site Code: 1100-1300 Bramar
2500 East High Street Road & Existing Alley & Camp
Suite 650 Hill
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (11:00 AM)


Bramar Road Bramar Road Camp Hill Chiropractic Dw Alley
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
11:00 AM 0 1 1 0 2 0 3 0 0 3 0 0 0 0 0 0 0 1 0 1 6
11:15 AM 1 3 0 0 4 1 2 0 0 3 0 0 2 2 2 0 0 0 0 0 9
11:30 AM 0 2 0 1 2 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 3
11:45 AM 1 2 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
Total 2 8 1 1 11 1 5 0 0 6 0 0 3 2 3 0 0 1 0 1 21
Approach % 18.2 72.7 9.1 - - 16.7 83.3 0.0 - - 0.0 0.0 100.0 - - 0.0 0.0 100.0 - - -
Total % 9.5 38.1 4.8 - 52.4 4.8 23.8 0.0 - 28.6 0.0 0.0 14.3 - 14.3 0.0 0.0 4.8 - 4.8 -
PHF 0.500 0.667 0.250 - 0.688 0.250 0.417 0.000 - 0.500 0.000 0.000 0.375 - 0.375 0.000 0.000 0.250 - 0.250 0.583
Lights 2 8 1 - 11 1 4 0 - 5 0 0 3 - 3 0 0 1 - 1 20
% Lights 100.0 100.0 100.0 - 100.0 100.0 80.0 - - 83.3 - - 100.0 - 100.0 - - 100.0 - 100.0 95.2
Other Vehicles 0 0 0 - 0 0 1 0 - 1 0 0 0 - 0 0 0 0 - 0 1
% Other 0.0 0.0 0.0 - 0.0 0.0 20.0 - - 16.7 - - 0.0 - 0.0 - - 0.0 - 0.0 4.8
Vehicles
Pedestrians - - - 1 - - - - 0 - - - - 2 - - - - 0 - -
% Pedestrians - - - 100.0 - - - - - - - - - 100.0 - - - - - - -
Count Name: 1100-1300 Bramar
Road & Existing Alley & Camp
Hill Chiropractiv
Traffic Planning and Design, Inc Site Code: 1100-1300 Bramar
2500 East High Street Road & Existing Alley & Camp
Suite 650 Hill
Pottstown, Pennsylvania, United States 19464 Start Date: 12/06/2018
610.326.3100 mosmulski@trafficpd.com Page No: 4

Alley [N]
Out In Total
2 1 3
0 0 0
0 0 0
2 1 3

1 0 0 0
0 0 0 0
0 0 0 0
1 0 0 0
R T L P

R
2
0
0
2
L

0
0
0
0
Peak Hour Data
Total

Out
16

17

11

11
1
0

0
0
Bramar Road [W]

Bramar Road [E]


T

T
8
0
0
8

5
0
1
4
12/06/2018 11:00 AM
11

11
In

In
0
0

6
0
1
5
Ending At
12/06/2018 12:00 PM
R
1
0
0
1

L
1
0
0
1
Lights

Total
Out

17

16
Other Vehicles
5
1
0
6

0
1
Pedestrians
P

P
0
0
1
1

0
0
0
0

L T R P
0 0 3 0
0 0 0 0
0 0 0 2
0 0 3 2

2 3 5
0 0 0
0 0 0
2 3 5
Out In Total
Camp Hill Chiropractic Dw

Turning Movement Peak Hour Data Plot (11:00 AM)


Count Name: WD 32nd &
Traffic Planning and Design, Inc Harvard Ave
2500 East High Street Site Code: WD 32nd & Harvard
Suite 650 Ave
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 1

Turning Movement Data


Camp Hill Mall Harvard Ave 32nd Street 32nd Street
Eastbound Westbound Northbound Southbound
Start Time Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Left Thru Right Peds Left Thru Right on Peds Left Thru Right on Peds
Total Total Total Total Total
Red Red Red
6:00 AM 2 0 1 3 0 6 1 0 1 0 2 2 175 0 0 0 177 1 104 0 0 0 105 290
6:15 AM 2 0 1 5 0 8 5 0 0 0 5 3 203 1 0 0 207 0 158 1 0 0 159 379
6:30 AM 2 0 1 9 0 12 9 0 0 0 9 15 330 0 0 0 345 0 214 1 0 0 215 581
6:45 AM 7 1 3 14 0 25 18 0 1 0 19 21 364 1 0 0 386 0 211 6 0 0 217 647
Hourly Total 13 1 6 31 0 51 33 0 2 0 35 41 1072 2 0 0 1115 1 687 8 0 0 696 1897
7:00 AM 6 2 0 17 0 25 13 1 0 0 14 34 390 0 0 0 424 1 201 1 0 0 203 666
7:15 AM 5 1 0 17 0 23 20 1 2 0 23 30 395 1 0 0 426 2 260 3 0 0 265 737
7:30 AM 1 2 1 20 0 24 22 3 0 1 25 32 385 1 1 0 419 4 383 3 0 0 390 858
7:45 AM 3 2 1 11 0 17 23 2 0 0 25 30 405 3 0 0 438 6 327 4 0 0 337 817
Hourly Total 15 7 2 65 0 89 78 7 2 1 87 126 1575 5 1 0 1707 13 1171 11 0 0 1195 3078
8:00 AM 7 3 2 15 0 27 22 2 0 0 24 41 377 4 0 0 422 9 260 2 0 0 271 744
8:15 AM 7 0 2 8 0 17 21 0 2 0 23 26 385 1 0 0 412 4 252 1 0 0 257 709
8:30 AM 4 1 3 5 0 13 20 2 2 0 24 43 404 3 0 0 450 1 247 4 0 1 252 739
8:45 AM 6 0 4 15 0 25 10 3 2 0 15 58 401 2 0 0 461 4 232 4 0 0 240 741
Hourly Total 24 4 11 43 0 82 73 7 6 0 86 168 1567 10 0 0 1745 18 991 11 0 1 1020 2933
*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - -
11:00 AM 17 3 34 24 0 78 21 2 2 0 25 66 202 3 0 0 271 4 242 13 0 0 259 633
11:15 AM 25 5 31 34 0 95 14 6 2 0 22 59 227 6 0 0 292 1 281 14 2 0 298 707
11:30 AM 23 6 31 30 0 90 16 9 2 1 27 65 253 5 0 0 323 3 251 19 0 1 273 713
11:45 AM 23 7 34 33 0 97 14 5 0 0 19 89 256 5 0 0 350 2 314 16 0 0 332 798
Hourly Total 88 21 130 121 0 360 65 22 6 1 93 279 938 19 0 0 1236 10 1088 62 2 1 1162 2851
12:00 PM 23 8 36 32 0 99 30 10 3 0 43 68 247 5 0 0 320 2 257 13 0 1 272 734
12:15 PM 40 5 44 33 0 122 22 6 2 0 30 89 266 1 0 0 356 4 256 13 0 0 273 781
12:30 PM 29 9 36 36 0 110 15 4 0 0 19 55 293 5 0 0 353 1 344 15 0 0 360 842
12:45 PM 36 6 27 38 0 107 19 9 2 0 30 66 274 5 0 0 345 2 235 11 0 0 248 730
Hourly Total 128 28 143 139 0 438 86 29 7 0 122 278 1080 16 0 0 1374 9 1092 52 0 1 1153 3087
*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - -
3:00 PM 20 2 36 27 0 85 34 9 6 0 49 57 307 2 0 0 366 2 329 6 1 0 338 838
3:15 PM 20 6 40 24 0 90 35 12 0 0 47 53 305 5 0 0 363 1 390 6 0 2 397 897
3:30 PM 26 5 42 33 0 106 27 7 0 0 34 50 331 7 0 0 388 4 393 18 1 0 416 944
3:45 PM 25 5 31 24 0 85 31 2 0 0 33 66 302 4 0 0 372 2 397 8 0 0 407 897
Hourly Total 91 18 149 108 0 366 127 30 6 0 163 226 1245 18 0 0 1489 9 1509 38 2 2 1558 3576
4:00 PM 19 10 41 34 0 104 27 5 1 0 33 54 338 5 0 0 397 4 402 10 0 0 416 950
4:15 PM 20 5 46 20 0 91 21 4 2 0 27 58 326 3 0 0 387 1 413 13 2 0 429 934
4:30 PM 20 3 34 29 0 86 27 2 2 0 31 71 366 3 1 0 441 2 426 5 0 0 433 991
4:45 PM 16 4 42 27 0 89 26 0 3 0 29 67 372 5 0 0 444 1 388 12 0 2 401 963
Hourly Total 75 22 163 110 0 370 101 11 8 0 120 250 1402 16 1 0 1669 8 1629 40 2 2 1679 3838
5:00 PM 17 5 48 27 0 97 36 8 3 0 47 34 345 4 0 0 383 1 464 8 0 0 473 1000
5:15 PM 17 6 43 25 0 91 28 3 2 1 33 66 365 2 0 0 433 3 418 9 0 1 430 987
5:30 PM 11 3 28 26 0 68 32 4 0 0 36 59 349 2 0 0 410 4 356 11 0 0 371 885
5:45 PM 25 10 23 24 0 82 27 8 2 0 37 54 306 3 0 0 363 3 333 12 0 0 348 830
Hourly Total 70 24 142 102 0 338 123 23 7 1 153 213 1365 11 0 0 1589 11 1571 40 0 1 1622 3702
Grand Total 504 125 746 719 0 2094 686 129 44 3 859 1581 10244 97 2 0 11924 79 9738 262 6 8 10085 24962

Approach % 24.1 6.0 35.6 34.3 - - 79.9 15.0 5.1 - - 13.3 85.9 0.8 0.0 - - 0.8 96.6 2.6 0.1 - - -
Total % 2.0 0.5 3.0 2.9 - 8.4 2.7 0.5 0.2 - 3.4 6.3 41.0 0.4 0.0 - 47.8 0.3 39.0 1.0 0.0 - 40.4 -
Lights 465 124 735 713 - 2037 679 129 44 - 852 1571 10019 94 2 - 11686 78 9550 260 6 - 9894 24469

% Lights 92.3 99.2 98.5 99.2 - 97.3 99.0 100.0 100.0 - 99.2 99.4 97.8 96.9 100.0 - 98.0 98.7 98.1 99.2 100.0 - 98.1 98.0
Other 39 1 11 6 - 57 7 0 0 - 7 10 225 3 0 - 238 1 188 2 0 - 191 493
Vehicles
% Other 7.7 0.8 1.5 0.8 - 2.7 1.0 0.0 0.0 - 0.8 0.6 2.2 3.1 0.0 - 2.0 1.3 1.9 0.8 0.0 - 1.9 2.0
Vehicles
Pedestrians - - - - 0 - - - - 3 - - - - - 0 - - - - - 8 - -
% - - - - - - - - - 100.0 - - - - - - - - - - - 100.0 - -
Pedestrians
Count Name: WD 32nd &
Traffic Planning and Design, Inc Harvard Ave
2500 East High Street Site Code: WD 32nd & Harvard
Suite 650 Ave
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 2

32nd Street [N]


Out In Total
10528 9894 20422
264 191 455
0 0 0
10792 10085 20877

266 9550 78 0
2 188 1 0
0 0 0 8
268 9738 79 8
R T L P
465

504
39

44

44
R
0

0
0
Total
4003

4072

303

298
Out
69
0

0
5
Camp Hill Mall [W]

Harvard Ave [E]


124

125

129

129
T

T
1
0

0
0
03/28/2019 6:00 AM
2037

2094

859

852
57
In

In
0

0
7
Ending At
03/28/2019 6:00 PM
1448

1465

686

679
17

R
0

0
7
Lights
1966

1978

1162

1150
Total
Out

12

12
Other Vehicles
0

0
Pedestrians
P

P
0
0
0
0

3
3
0
0

L T R P
1571 10019 96 0
10 225 3 0
0 0 0 0
1581 10244 99 0

11677 11686 23363


212 238 450
0 0 0
11889 11924 23813
Out In Total
32nd Street [S]

Turning Movement Data Plot


Count Name: WD 32nd &
Traffic Planning and Design, Inc Harvard Ave
2500 East High Street Site Code: WD 32nd & Harvard
Suite 650 Ave
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (7:15 AM)


Camp Hill Mall Harvard Ave 32nd Street 32nd Street
Eastbound Westbound Northbound Southbound
Start Time Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Left Thru Right Peds Left Thru Right on Peds Left Thru Right on Peds
Total Total Total Total Total
Red Red Red
7:15 AM 5 1 0 17 0 23 20 1 2 0 23 30 395 1 0 0 426 2 260 3 0 0 265 737
7:30 AM 1 2 1 20 0 24 22 3 0 1 25 32 385 1 1 0 419 4 383 3 0 0 390 858
7:45 AM 3 2 1 11 0 17 23 2 0 0 25 30 405 3 0 0 438 6 327 4 0 0 337 817
8:00 AM 7 3 2 15 0 27 22 2 0 0 24 41 377 4 0 0 422 9 260 2 0 0 271 744
Total 16 8 4 63 0 91 87 8 2 1 97 133 1562 9 1 0 1705 21 1230 12 0 0 1263 3156
Approach % 17.6 8.8 4.4 69.2 - - 89.7 8.2 2.1 - - 7.8 91.6 0.5 0.1 - - 1.7 97.4 1.0 0.0 - - -
Total % 0.5 0.3 0.1 2.0 - 2.9 2.8 0.3 0.1 - 3.1 4.2 49.5 0.3 0.0 - 54.0 0.7 39.0 0.4 0.0 - 40.0 -
PHF 0.571 0.667 0.500 0.788 - 0.843 0.946 0.667 0.250 - 0.970 0.811 0.964 0.563 0.250 - 0.973 0.583 0.803 0.750 0.000 - 0.810 0.920
Lights 11 8 3 62 - 84 86 8 2 - 96 133 1530 9 1 - 1673 21 1210 12 0 - 1243 3096
% Lights 68.8 100.0 75.0 98.4 - 92.3 98.9 100.0 100.0 - 99.0 100.0 98.0 100.0 100.0 - 98.1 100.0 98.4 100.0 - - 98.4 98.1
Other 5 0 1 1 - 7 1 0 0 - 1 0 32 0 0 - 32 0 20 0 0 - 20 60
Vehicles
% Other 31.3 0.0 25.0 1.6 - 7.7 1.1 0.0 0.0 - 1.0 0.0 2.0 0.0 0.0 - 1.9 0.0 1.6 0.0 - - 1.6 1.9
Vehicles
Pedestrians - - - - 0 - - - - 1 - - - - - 0 - - - - - 0 - -
% - - - - - - - - - 100.0 - - - - - - - - - - - - - -
Pedestrians
Count Name: WD 32nd &
Traffic Planning and Design, Inc Harvard Ave
2500 East High Street Site Code: WD 32nd & Harvard
Suite 650 Ave
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 4

32nd Street [N]


Out In Total
1543 1243 2786
37 20 57
0 0 0
1580 1263 2843

12 1210 21 0
0 20 0 0
0 0 0 0
12 1230 21 0
R T L P
11

16

R
5
0

2
0
0
2
Peak Hour Data
Total
237

244

Out
39

39
7
0

0
0
Camp Hill Mall [W]

Harvard Ave [E]


T

T
8
0
0
8

8
0
0
8
03/28/2019 7:15 AM
84

91

97

96
In

In
7
0

0
1
Ending At
03/28/2019 8:15 AM
65

67

87

86
R
2
0

0
1
Lights

Total
153

153

136

135
Out

Other Vehicles
0
0

0
1
Pedestrians
P

P
0
0
0
0

1
1
0
0

L T R P
133 1530 10 0
0 32 0 0
0 0 0 0
133 1562 10 0

1361 1673 3034


23 32 55
0 0 0
1384 1705 3089
Out In Total
32nd Street [S]

Turning Movement Peak Hour Data Plot (7:15 AM)


Count Name: WD 32nd &
Traffic Planning and Design, Inc Harvard Ave
2500 East High Street Site Code: WD 32nd & Harvard
Suite 650 Ave
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 5

Turning Movement Peak Hour Data (11:45 AM)


Camp Hill Mall Harvard Ave 32nd Street 32nd Street
Eastbound Westbound Northbound Southbound
Start Time Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Left Thru Right Peds Left Thru Right on Peds Left Thru Right on Peds
Total Total Total Total Total
Red Red Red
11:45 AM 23 7 34 33 0 97 14 5 0 0 19 89 256 5 0 0 350 2 314 16 0 0 332 798
12:00 PM 23 8 36 32 0 99 30 10 3 0 43 68 247 5 0 0 320 2 257 13 0 1 272 734
12:15 PM 40 5 44 33 0 122 22 6 2 0 30 89 266 1 0 0 356 4 256 13 0 0 273 781
12:30 PM 29 9 36 36 0 110 15 4 0 0 19 55 293 5 0 0 353 1 344 15 0 0 360 842
Total 115 29 150 134 0 428 81 25 5 0 111 301 1062 16 0 0 1379 9 1171 57 0 1 1237 3155
Approach % 26.9 6.8 35.0 31.3 - - 73.0 22.5 4.5 - - 21.8 77.0 1.2 0.0 - - 0.7 94.7 4.6 0.0 - - -
Total % 3.6 0.9 4.8 4.2 - 13.6 2.6 0.8 0.2 - 3.5 9.5 33.7 0.5 0.0 - 43.7 0.3 37.1 1.8 0.0 - 39.2 -
PHF 0.719 0.806 0.852 0.931 - 0.877 0.675 0.625 0.417 - 0.645 0.846 0.906 0.800 0.000 - 0.968 0.563 0.851 0.891 0.000 - 0.859 0.937
Lights 110 29 149 134 - 422 81 25 5 - 111 297 1022 15 0 - 1334 9 1143 57 0 - 1209 3076
% Lights 95.7 100.0 99.3 100.0 - 98.6 100.0 100.0 100.0 - 100.0 98.7 96.2 93.8 - - 96.7 100.0 97.6 100.0 - - 97.7 97.5
Other 5 0 1 0 - 6 0 0 0 - 0 4 40 1 0 - 45 0 28 0 0 - 28 79
Vehicles
% Other 4.3 0.0 0.7 0.0 - 1.4 0.0 0.0 0.0 - 0.0 1.3 3.8 6.3 - - 3.3 0.0 2.4 0.0 - - 2.3 2.5
Vehicles
Pedestrians - - - - 0 - - - - 0 - - - - - 0 - - - - - 1 - -
% - - - - - - - - - - - - - - - - - - - - - 100.0 - -
Pedestrians
Count Name: WD 32nd &
Traffic Planning and Design, Inc Harvard Ave
2500 East High Street Site Code: WD 32nd & Harvard
Suite 650 Ave
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 6

32nd Street [N]


Out In Total
1137 1209 2346
45 28 73
0 0 0
1182 1237 2419

57 1143 9 0
0 28 0 0
0 0 0 1
57 1171 9 1
R T L P
110

115

R
5
0

5
0
0
5
Peak Hour Data
Total
801

811

Out
10

54

53
0

0
1
Camp Hill Mall [W]

Harvard Ave [E]


29

29

25

25
T

T
0
0

0
0
03/28/2019 11:45 AM
422

428

111

111
In

In
6
0

0
0
Ending At
03/28/2019 12:45 PM
283

284

81

81
R
1
0

0
0
Lights

Total
379

383

165

164
Out

Other Vehicles
4
0

0
1
Pedestrians
P

P
0
0
0
0

0
0
0
0

L T R P
297 1022 15 0
4 40 1 0
0 0 0 0
301 1062 16 0

1507 1334 2841


29 45 74
0 0 0
1536 1379 2915
Out In Total
32nd Street [S]

Turning Movement Peak Hour Data Plot (11:45 AM)


Count Name: WD 32nd &
Traffic Planning and Design, Inc Harvard Ave
2500 East High Street Site Code: WD 32nd & Harvard
Suite 650 Ave
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 7

Turning Movement Peak Hour Data (4:30 PM)


Camp Hill Mall Harvard Ave 32nd Street 32nd Street
Eastbound Westbound Northbound Southbound
Start Time Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Left Thru Right Peds Left Thru Right on Peds Left Thru Right on Peds
Total Total Total Total Total
Red Red Red
4:30 PM 20 3 34 29 0 86 27 2 2 0 31 71 366 3 1 0 441 2 426 5 0 0 433 991
4:45 PM 16 4 42 27 0 89 26 0 3 0 29 67 372 5 0 0 444 1 388 12 0 2 401 963
5:00 PM 17 5 48 27 0 97 36 8 3 0 47 34 345 4 0 0 383 1 464 8 0 0 473 1000
5:15 PM 17 6 43 25 0 91 28 3 2 1 33 66 365 2 0 0 433 3 418 9 0 1 430 987
Total 70 18 167 108 0 363 117 13 10 1 140 238 1448 14 1 0 1701 7 1696 34 0 3 1737 3941
Approach % 19.3 5.0 46.0 29.8 - - 83.6 9.3 7.1 - - 14.0 85.1 0.8 0.1 - - 0.4 97.6 2.0 0.0 - - -
Total % 1.8 0.5 4.2 2.7 - 9.2 3.0 0.3 0.3 - 3.6 6.0 36.7 0.4 0.0 - 43.2 0.2 43.0 0.9 0.0 - 44.1 -
PHF 0.875 0.750 0.870 0.931 - 0.936 0.813 0.406 0.833 - 0.745 0.838 0.973 0.700 0.250 - 0.958 0.583 0.914 0.708 0.000 - 0.918 0.985
Lights 66 18 166 108 - 358 116 13 10 - 139 238 1439 14 1 - 1692 7 1685 34 0 - 1726 3915
% Lights 94.3 100.0 99.4 100.0 - 98.6 99.1 100.0 100.0 - 99.3 100.0 99.4 100.0 100.0 - 99.5 100.0 99.4 100.0 - - 99.4 99.3
Other 4 0 1 0 - 5 1 0 0 - 1 0 9 0 0 - 9 0 11 0 0 - 11 26
Vehicles
% Other 5.7 0.0 0.6 0.0 - 1.4 0.9 0.0 0.0 - 0.7 0.0 0.6 0.0 0.0 - 0.5 0.0 0.6 0.0 - - 0.6 0.7
Vehicles
Pedestrians - - - - 0 - - - - 1 - - - - - 0 - - - - - 3 - -
% - - - - - - - - - 100.0 - - - - - - - - - - - 100.0 - -
Pedestrians
Count Name: WD 32nd &
Traffic Planning and Design, Inc Harvard Ave
2500 East High Street Site Code: WD 32nd & Harvard
Suite 650 Ave
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 8

32nd Street [N]


Out In Total
1515 1726 3241
13 11 24
0 0 0
1528 1737 3265

34 1685 7 0
0 11 0 0
0 0 0 3
34 1696 7 3
R T L P
66

70

10

10
R
4
0

0
0
Peak Hour Data
Total
643

648

Out
40

40
5
0

0
0
Camp Hill Mall [W]

Harvard Ave [E]


18

18

13

13
T

T
0
0

0
0
03/28/2019 4:30 PM
358

363

140

139
In

In
5
0

0
1
Ending At
03/28/2019 5:30 PM
274

275

117

116
R
1
0

0
1
Lights

Total
285

285

180

179
Out

Other Vehicles
0
0

0
1
Pedestrians
P

P
0
0
0
0

1
1
0
0

L T R P
238 1439 15 0
0 9 0 0
0 0 0 0
238 1448 15 0

2075 1692 3767


13 9 22
0 0 0
2088 1701 3789
Out In Total
32nd Street [S]

Turning Movement Peak Hour Data Plot (4:30 PM)


Count Name: SAT 32nd &
Traffic Planning and Design, Inc Harvard Ave
2500 East High Street Site Code: SAT 32nd & Harvard
Suite 650 Ave
Pottstown, Pennsylvania, United States 19464 Start Date: 03/30/2019
610.326.3100 mosmulski@trafficpd.com Page No: 1

Turning Movement Data


Camp Hill Mall Harvard Ave 32nd Street 32nd Street
Eastbound Westbound Northbound Southbound
Start Time Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Left Thru Right Peds Left Thru Right on Peds Left Thru Right on Peds
Total Total Total Total Total
Red Red Red
10:00 AM 16 2 26 6 0 50 12 9 0 0 21 71 215 2 1 0 289 3 249 20 0 2 272 632
10:15 AM 18 4 49 16 0 87 8 4 1 0 13 78 247 4 0 0 329 1 227 17 1 1 246 675
10:30 AM 23 8 48 15 0 94 18 2 2 0 22 58 204 1 1 0 264 2 243 19 0 0 264 644
10:45 AM 21 2 51 6 0 80 11 8 1 0 20 87 241 3 0 0 331 1 274 18 0 0 293 724
Hourly Total 78 16 174 43 0 311 49 23 4 0 76 294 907 10 2 0 1213 7 993 74 1 3 1075 2675
11:00 AM 21 3 31 35 0 90 16 5 1 0 22 85 203 2 1 0 291 3 270 17 1 3 291 694
11:15 AM 27 2 41 35 0 105 20 2 0 0 22 64 241 4 0 0 309 2 272 24 0 7 298 734
11:30 AM 20 5 38 36 0 99 17 7 1 0 25 88 226 11 0 0 325 1 304 22 3 1 330 779
11:45 AM 32 6 46 40 0 124 16 9 1 0 26 82 236 1 1 0 320 1 278 22 1 1 302 772
Hourly Total 100 16 156 146 0 418 69 23 3 0 95 319 906 18 2 0 1245 7 1124 85 5 12 1221 2979
12:00 PM 23 6 79 10 0 118 21 6 1 1 28 86 237 0 0 0 323 4 261 21 0 0 286 755
12:15 PM 29 3 75 7 0 114 20 5 0 0 25 75 244 1 0 0 320 0 281 22 1 3 304 763
12:30 PM 29 5 74 7 0 115 21 5 0 0 26 71 240 4 0 0 315 0 283 13 2 1 298 754
12:45 PM 32 2 75 2 0 111 25 6 0 0 31 78 276 2 1 0 357 2 281 14 2 0 299 798
Hourly Total 113 16 303 26 0 458 87 22 1 1 110 310 997 7 1 0 1315 6 1106 70 5 4 1187 3070
1:00 PM 26 3 45 40 0 114 13 0 2 0 15 67 242 4 0 0 313 1 247 16 0 1 264 706
1:15 PM 26 1 45 32 0 104 11 1 0 0 12 87 243 0 1 0 331 2 261 18 0 5 281 728
1:30 PM 25 1 66 33 0 125 13 7 0 0 20 66 241 1 0 0 308 2 280 14 1 5 297 750
1:45 PM 24 6 55 18 0 103 12 5 1 2 18 65 237 2 0 0 304 2 253 14 0 6 269 694
Hourly Total 101 11 211 123 0 446 49 13 3 2 65 285 963 7 1 0 1256 7 1041 62 1 17 1111 2878
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand Total 392 59 844 338 0 1633 254 81 11 3 346 1208 3773 42 6 0 5029 27 4264 291 12 36 4594 11602

Approach % 24.0 3.6 51.7 20.7 - - 73.4 23.4 3.2 - - 24.0 75.0 0.8 0.1 - - 0.6 92.8 6.3 0.3 - - -
Total % 3.4 0.5 7.3 2.9 - 14.1 2.2 0.7 0.1 - 3.0 10.4 32.5 0.4 0.1 - 43.3 0.2 36.8 2.5 0.1 - 39.6 -
Lights 385 59 837 338 - 1619 252 81 11 - 344 1204 3729 41 6 - 4980 27 4221 291 11 - 4550 11493

% Lights 98.2 100.0 99.2 100.0 - 99.1 99.2 100.0 100.0 - 99.4 99.7 98.8 97.6 100.0 - 99.0 100.0 99.0 100.0 91.7 - 99.0 99.1
Other 7 0 7 0 - 14 2 0 0 - 2 4 44 1 0 - 49 0 43 0 1 - 44 109
Vehicles
% Other 1.8 0.0 0.8 0.0 - 0.9 0.8 0.0 0.0 - 0.6 0.3 1.2 2.4 0.0 - 1.0 0.0 1.0 0.0 8.3 - 1.0 0.9
Vehicles
Pedestrians - - - - 0 - - - - 3 - - - - - 0 - - - - - 36 - -
% - - - - - - - - - 100.0 - - - - - - - - - - - 100.0 - -
Pedestrians
Count Name: SAT 32nd &
Traffic Planning and Design, Inc Harvard Ave
2500 East High Street Site Code: SAT 32nd & Harvard
Suite 650 Ave
Pottstown, Pennsylvania, United States 19464 Start Date: 03/30/2019
610.326.3100 mosmulski@trafficpd.com Page No: 2

32nd Street [N]


Out In Total
4125 4550 8675
51 44 95
0 0 0
4176 4594 8770

302 4221 27 0
1 43 0 0
0 0 0 36
303 4264 27 36
R T L P
385

392

11

11
R
7
0

0
0
Total
3206

3225

134

133
Out
19
0

0
1
Camp Hill Mall [W]

Harvard Ave [E]


59

59

81

81
T

T
0
0

0
0
03/30/2019 10:00 AM
1619

1633

346

344
14
In

In
0

0
2
Ending At
03/30/2019 2:15 PM
1175

1182

254

252
R
7
0

0
2
Lights
1587

1592

Total
480

477
Out

Other Vehicles
5
0

0
3
Pedestrians
P

P
0
0
0
0

3
3
0
0

L T R P
1204 3729 47 0
4 44 1 0
0 0 0 0
1208 3773 48 0

5648 4980 10628


52 49 101
0 0 0
5700 5029 10729
Out In Total
32nd Street [S]

Turning Movement Data Plot


Count Name: SAT 32nd &
Traffic Planning and Design, Inc Harvard Ave
2500 East High Street Site Code: SAT 32nd & Harvard
Suite 650 Ave
Pottstown, Pennsylvania, United States 19464 Start Date: 03/30/2019
610.326.3100 mosmulski@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (12:00 PM)


Camp Hill Mall Harvard Ave 32nd Street 32nd Street
Eastbound Westbound Northbound Southbound
Start Time Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Left Thru Right Peds Left Thru Right on Peds Left Thru Right on Peds
Total Total Total Total Total
Red Red Red
12:00 PM 23 6 79 10 0 118 21 6 1 1 28 86 237 0 0 0 323 4 261 21 0 0 286 755
12:15 PM 29 3 75 7 0 114 20 5 0 0 25 75 244 1 0 0 320 0 281 22 1 3 304 763
12:30 PM 29 5 74 7 0 115 21 5 0 0 26 71 240 4 0 0 315 0 283 13 2 1 298 754
12:45 PM 32 2 75 2 0 111 25 6 0 0 31 78 276 2 1 0 357 2 281 14 2 0 299 798
Total 113 16 303 26 0 458 87 22 1 1 110 310 997 7 1 0 1315 6 1106 70 5 4 1187 3070
Approach % 24.7 3.5 66.2 5.7 - - 79.1 20.0 0.9 - - 23.6 75.8 0.5 0.1 - - 0.5 93.2 5.9 0.4 - - -
Total % 3.7 0.5 9.9 0.8 - 14.9 2.8 0.7 0.0 - 3.6 10.1 32.5 0.2 0.0 - 42.8 0.2 36.0 2.3 0.2 - 38.7 -
PHF 0.883 0.667 0.959 0.650 - 0.970 0.870 0.917 0.250 - 0.887 0.901 0.903 0.438 0.250 - 0.921 0.375 0.977 0.795 0.625 - 0.976 0.962
Lights 111 16 301 26 - 454 86 22 1 - 109 309 986 7 1 - 1303 6 1095 70 5 - 1176 3042
% Lights 98.2 100.0 99.3 100.0 - 99.1 98.9 100.0 100.0 - 99.1 99.7 98.9 100.0 100.0 - 99.1 100.0 99.0 100.0 100.0 - 99.1 99.1
Other 2 0 2 0 - 4 1 0 0 - 1 1 11 0 0 - 12 0 11 0 0 - 11 28
Vehicles
% Other 1.8 0.0 0.7 0.0 - 0.9 1.1 0.0 0.0 - 0.9 0.3 1.1 0.0 0.0 - 0.9 0.0 1.0 0.0 0.0 - 0.9 0.9
Vehicles
Pedestrians - - - - 0 - - - - 1 - - - - - 0 - - - - - 4 - -
% - - - - - - - - - 100.0 - - - - - - - - - - - 100.0 - -
Pedestrians
Count Name: SAT 32nd &
Traffic Planning and Design, Inc Harvard Ave
2500 East High Street Site Code: SAT 32nd & Harvard
Suite 650 Ave
Pottstown, Pennsylvania, United States 19464 Start Date: 03/30/2019
610.326.3100 mosmulski@trafficpd.com Page No: 4

32nd Street [N]


Out In Total
1098 1176 2274
13 11 24
0 0 0
1111 1187 2298

75 1095 6 0
0 11 0 0
0 0 0 4
75 1106 6 4
R T L P
111

113

R
2
0

1
0
0
1
Peak Hour Data
Total
860

865

Out
30

30
5
0

0
0
Camp Hill Mall [W]

Harvard Ave [E]


16

16

22

22
T

T
0
0

0
0
03/30/2019 12:00 PM
454

458

110

109
In

In
4
0

0
1
Ending At
03/30/2019 1:00 PM
327

329

87

86
R
2
0

0
1
Lights

Total
406

407

140

139
Out

Other Vehicles
1
0

0
1
Pedestrians
P

P
0
0
0
0

1
1
0
0

L T R P
309 986 8 0
1 11 0 0
0 0 0 0
310 997 8 0

1508 1303 2811


14 12 26
0 0 0
1522 1315 2837
Out In Total
32nd Street [S]

Turning Movement Peak Hour Data Plot (12:00 PM)


Count Name: WD 30th & Market
Traffic Planning and Design, Inc Street
2500 East High Street Site Code: WD 30th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 1

Turning Movement Data


Market Street Market Street 30th Street 30th Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
6:00 AM 0 15 0 2 15 2 28 0 0 30 0 0 3 0 3 0 0 1 2 1 49
6:15 AM 2 27 0 0 29 2 19 0 1 21 1 0 1 1 2 1 3 1 0 5 57
6:30 AM 0 42 2 0 44 4 31 0 1 35 0 1 4 0 5 2 1 2 0 5 89
6:45 AM 0 45 0 0 45 5 37 1 0 43 1 0 6 0 7 2 14 1 1 17 112
Hourly Total 2 129 2 2 133 13 115 1 2 129 2 1 14 1 17 5 18 5 3 28 307
7:00 AM 1 59 4 0 64 10 37 2 0 49 0 3 7 0 10 2 5 4 2 11 134
7:15 AM 0 78 7 1 85 11 54 0 0 65 2 6 18 0 26 1 28 4 0 33 209
7:30 AM 1 97 2 0 100 16 60 3 0 79 2 5 20 0 27 1 19 10 0 30 236
7:45 AM 0 89 3 2 92 7 56 1 0 64 3 0 18 0 21 3 6 2 0 11 188
Hourly Total 2 323 16 3 341 44 207 6 0 257 7 14 63 0 84 7 58 20 2 85 767
8:00 AM 0 80 10 0 90 28 53 0 1 81 1 2 12 1 15 2 18 8 0 28 214
8:15 AM 3 85 4 0 92 19 58 0 0 77 2 2 6 0 10 3 4 2 0 9 188
8:30 AM 0 72 4 0 76 12 59 1 0 72 2 1 5 0 8 1 4 5 0 10 166
8:45 AM 2 111 1 1 114 12 64 1 0 77 0 2 8 0 10 1 2 4 0 7 208
Hourly Total 5 348 19 1 372 71 234 2 1 307 5 7 31 1 43 7 28 19 0 54 776
*** BREAK *** - - - - - - - - - - - - - - - - - - - - -
11:00 AM 1 79 4 0 84 4 98 1 3 103 0 1 8 2 9 1 5 3 1 9 205
11:15 AM 4 91 5 0 100 5 103 3 0 111 1 2 5 0 8 3 3 3 2 9 228
11:30 AM 0 77 5 0 82 10 102 2 0 114 2 0 3 1 5 3 1 1 0 5 206
11:45 AM 2 103 3 0 108 9 102 1 0 112 4 5 2 0 11 2 5 4 0 11 242
Hourly Total 7 350 17 0 374 28 405 7 3 440 7 8 18 3 33 9 14 11 3 34 881
12:00 PM 2 89 7 0 98 5 80 3 0 88 0 2 6 0 8 1 7 5 0 13 207
12:15 PM 1 101 1 1 103 7 91 2 3 100 2 0 2 0 4 2 7 6 1 15 222
12:30 PM 2 98 5 0 105 10 107 1 0 118 3 1 10 1 14 1 6 6 0 13 250
12:45 PM 2 94 1 2 97 11 81 2 0 94 3 4 8 3 15 2 2 2 0 6 212
Hourly Total 7 382 14 3 403 33 359 8 3 400 8 7 26 4 41 6 22 19 1 47 891
*** BREAK *** - - - - - - - - - - - - - - - - - - - - -
3:00 PM 3 67 3 0 73 13 79 0 0 92 1 7 11 0 19 2 4 1 1 7 191
3:15 PM 2 95 1 0 98 7 84 1 0 92 0 3 5 2 8 0 3 1 0 4 202
3:30 PM 2 102 4 0 108 9 86 3 3 98 2 3 8 0 13 1 6 2 1 9 228
3:45 PM 2 83 7 1 92 6 109 1 0 116 1 3 7 0 11 3 1 4 1 8 227
Hourly Total 9 347 15 1 371 35 358 5 3 398 4 16 31 2 51 6 14 8 3 28 848
4:00 PM 2 96 3 0 101 13 87 1 0 101 0 2 7 0 9 0 5 2 0 7 218
4:15 PM 5 94 3 0 102 10 95 3 0 108 0 6 7 0 13 1 2 3 0 6 229
4:30 PM 4 96 2 0 102 10 84 1 0 95 1 1 14 0 16 1 4 1 0 6 219
4:45 PM 3 104 2 0 109 6 102 0 0 108 0 3 10 1 13 2 5 4 1 11 241
Hourly Total 14 390 10 0 414 39 368 5 0 412 1 12 38 1 51 4 16 10 1 30 907
5:00 PM 7 92 2 0 101 20 107 3 0 130 0 7 6 0 13 2 5 3 2 10 254
5:15 PM 2 98 3 0 103 11 115 4 0 130 0 1 6 0 7 3 5 1 1 9 249
5:30 PM 5 91 2 0 98 12 91 6 0 109 2 3 8 0 13 1 1 5 0 7 227
5:45 PM 2 91 3 0 96 13 82 2 1 97 0 5 9 0 14 1 8 9 0 18 225
Hourly Total 16 372 10 0 398 56 395 15 1 466 2 16 29 0 47 7 19 18 3 44 955
Grand Total 62 2641 103 10 2806 319 2441 49 13 2809 36 81 250 12 367 51 189 110 16 350 6332
Approach % 2.2 94.1 3.7 - - 11.4 86.9 1.7 - - 9.8 22.1 68.1 - - 14.6 54.0 31.4 - - -
Total % 1.0 41.7 1.6 - 44.3 5.0 38.6 0.8 - 44.4 0.6 1.3 3.9 - 5.8 0.8 3.0 1.7 - 5.5 -
Lights 62 2582 100 - 2744 317 2387 49 - 2753 35 81 248 - 364 49 188 109 - 346 6207
% Lights 100.0 97.8 97.1 - 97.8 99.4 97.8 100.0 - 98.0 97.2 100.0 99.2 - 99.2 96.1 99.5 99.1 - 98.9 98.0
Other Vehicles 0 59 3 - 62 2 54 0 - 56 1 0 2 - 3 2 1 1 - 4 125
% Other 0.0 2.2 2.9 - 2.2 0.6 2.2 0.0 - 2.0 2.8 0.0 0.8 - 0.8 3.9 0.5 0.9 - 1.1 2.0
Vehicles
Pedestrians - - - 10 - - - - 13 - - - - 12 - - - - 16 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - 100.0 - - - - 100.0 - -
Count Name: WD 30th & Market
Traffic Planning and Design, Inc Street
2500 East High Street Site Code: WD 30th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 2

30th Street [N]


Out In Total
192 346 538
0 4 4
0 0 0
192 350 542

109 188 49 0
1 1 2 0
0 0 0 16
110 189 51 16
R T L P
62

62

49

49
R
0
0

0
0
Total
5275

5393

2942

2879
118

Out
63
0

0
Market Street [W]

Market Street [E]


2582

2641

2441

2387
59

54
T

T
0

0
03/28/2019 6:00 AM
2744

2806

2809

2753
62

56
In

In
0

0
Ending At
03/28/2019 6:00 PM
100

103

319

317
R
3
0

0
2
Lights
2531

2587

5751

5632
Total
119
Out

56

Other Vehicles
0

0
Pedestrians
10
10

13
13
P

P
0
0

0
0

L T R P
35 81 248 0
1 0 2 0
0 0 0 12
36 81 250 12

605 364 969


6 3 9
0 0 0
611 367 978
Out In Total
30th Street [S]

Turning Movement Data Plot


Count Name: WD 30th & Market
Traffic Planning and Design, Inc Street
2500 East High Street Site Code: WD 30th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (7:15 AM)


Market Street Market Street 30th Street 30th Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
7:15 AM 0 78 7 1 85 11 54 0 0 65 2 6 18 0 26 1 28 4 0 33 209
7:30 AM 1 97 2 0 100 16 60 3 0 79 2 5 20 0 27 1 19 10 0 30 236
7:45 AM 0 89 3 2 92 7 56 1 0 64 3 0 18 0 21 3 6 2 0 11 188
8:00 AM 0 80 10 0 90 28 53 0 1 81 1 2 12 1 15 2 18 8 0 28 214
Total 1 344 22 3 367 62 223 4 1 289 8 13 68 1 89 7 71 24 0 102 847
Approach % 0.3 93.7 6.0 - - 21.5 77.2 1.4 - - 9.0 14.6 76.4 - - 6.9 69.6 23.5 - - -
Total % 0.1 40.6 2.6 - 43.3 7.3 26.3 0.5 - 34.1 0.9 1.5 8.0 - 10.5 0.8 8.4 2.8 - 12.0 -
PHF 0.250 0.887 0.550 - 0.918 0.554 0.929 0.333 - 0.892 0.667 0.542 0.850 - 0.824 0.583 0.634 0.600 - 0.773 0.897
Lights 1 333 20 - 354 61 216 4 - 281 8 13 68 - 89 7 71 24 - 102 826
% Lights 100.0 96.8 90.9 - 96.5 98.4 96.9 100.0 - 97.2 100.0 100.0 100.0 - 100.0 100.0 100.0 100.0 - 100.0 97.5
Other Vehicles 0 11 2 - 13 1 7 0 - 8 0 0 0 - 0 0 0 0 - 0 21
% Other 0.0 3.2 9.1 - 3.5 1.6 3.1 0.0 - 2.8 0.0 0.0 0.0 - 0.0 0.0 0.0 0.0 - 0.0 2.5
Vehicles
Pedestrians - - - 3 - - - - 1 - - - - 1 - - - - 0 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - 100.0 - - - - - - -
Count Name: WD 30th & Market
Traffic Planning and Design, Inc Street
2500 East High Street Site Code: WD 30th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 4

30th Street [N]


Out In Total
18 102 120
0 0 0
0 0 0
18 102 120

24 71 7 0
0 0 0 0
0 0 0 0
24 71 7 0
R T L P

R
1
0
0
1
L

4
0
0
4
Peak Hour Data
Total
602

622

419

408
Out
20

11
0

0
Market Street [W]

Market Street [E]


333

344

223

216
11

T
0

0
7
03/28/2019 7:15 AM
354

367

289

281
13
In

In
0

0
8
Ending At
03/28/2019 8:15 AM
20

22

62

61
R
2
0

0
1
Lights

Total
248

255

708

689
Out

19
Other Vehicles
7
0

0
Pedestrians
P

P
0
0
3
3

1
1
0
0

L T R P
8 13 68 0
0 0 0 0
0 0 0 1
8 13 68 1

152 89 241
3 0 3
0 0 0
155 89 244
Out In Total
30th Street [S]

Turning Movement Peak Hour Data Plot (7:15 AM)


Count Name: WD 30th & Market
Traffic Planning and Design, Inc Street
2500 East High Street Site Code: WD 30th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 5

Turning Movement Peak Hour Data (11:45 AM)


Market Street Market Street 30th Street 30th Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
11:45 AM 2 103 3 0 108 9 102 1 0 112 4 5 2 0 11 2 5 4 0 11 242
12:00 PM 2 89 7 0 98 5 80 3 0 88 0 2 6 0 8 1 7 5 0 13 207
12:15 PM 1 101 1 1 103 7 91 2 3 100 2 0 2 0 4 2 7 6 1 15 222
12:30 PM 2 98 5 0 105 10 107 1 0 118 3 1 10 1 14 1 6 6 0 13 250
Total 7 391 16 1 414 31 380 7 3 418 9 8 20 1 37 6 25 21 1 52 921
Approach % 1.7 94.4 3.9 - - 7.4 90.9 1.7 - - 24.3 21.6 54.1 - - 11.5 48.1 40.4 - - -
Total % 0.8 42.5 1.7 - 45.0 3.4 41.3 0.8 - 45.4 1.0 0.9 2.2 - 4.0 0.7 2.7 2.3 - 5.6 -
PHF 0.875 0.949 0.571 - 0.958 0.775 0.888 0.583 - 0.886 0.563 0.400 0.500 - 0.661 0.750 0.893 0.875 - 0.867 0.921
Lights 7 385 16 - 408 31 376 7 - 414 8 8 20 - 36 6 24 21 - 51 909
% Lights 100.0 98.5 100.0 - 98.6 100.0 98.9 100.0 - 99.0 88.9 100.0 100.0 - 97.3 100.0 96.0 100.0 - 98.1 98.7
Other Vehicles 0 6 0 - 6 0 4 0 - 4 1 0 0 - 1 0 1 0 - 1 12
% Other 0.0 1.5 0.0 - 1.4 0.0 1.1 0.0 - 1.0 11.1 0.0 0.0 - 2.7 0.0 4.0 0.0 - 1.9 1.3
Vehicles
Pedestrians - - - 1 - - - - 3 - - - - 1 - - - - 1 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - 100.0 - - - - 100.0 - -
Count Name: WD 30th & Market
Traffic Planning and Design, Inc Street
2500 East High Street Site Code: WD 30th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 6

30th Street [N]


Out In Total
22 51 73
0 1 1
0 0 0
22 52 74

21 24 6 0
0 1 0 0
0 0 0 1
21 25 6 1
R T L P

R
7
0
0
7
L

7
0
0
7
Peak Hour Data
Total
813

824

417

411
Out
11
0

0
6
Market Street [W]

Market Street [E]


385

391

380

376
T

T
6
0

0
4
03/28/2019 11:45 AM
408

414

418

414
In

In
6
0

0
4
Ending At
03/28/2019 12:45 PM
16

16

31

31
R
0
0

0
0
Lights

Total
405

410

835

825
Out

10
Other Vehicles
5
0

0
Pedestrians
P

P
0
0
1
1

3
3
0
0

L T R P
8 8 20 0
1 0 0 0
0 0 0 1
9 8 20 1

71 36 107
1 1 2
0 0 0
72 37 109
Out In Total
30th Street [S]

Turning Movement Peak Hour Data Plot (11:45 AM)


Count Name: WD 30th & Market
Traffic Planning and Design, Inc Street
2500 East High Street Site Code: WD 30th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 7

Turning Movement Peak Hour Data (4:45 PM)


Market Street Market Street 30th Street 30th Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
4:45 PM 3 104 2 0 109 6 102 0 0 108 0 3 10 1 13 2 5 4 1 11 241
5:00 PM 7 92 2 0 101 20 107 3 0 130 0 7 6 0 13 2 5 3 2 10 254
5:15 PM 2 98 3 0 103 11 115 4 0 130 0 1 6 0 7 3 5 1 1 9 249
5:30 PM 5 91 2 0 98 12 91 6 0 109 2 3 8 0 13 1 1 5 0 7 227
Total 17 385 9 0 411 49 415 13 0 477 2 14 30 1 46 8 16 13 4 37 971
Approach % 4.1 93.7 2.2 - - 10.3 87.0 2.7 - - 4.3 30.4 65.2 - - 21.6 43.2 35.1 - - -
Total % 1.8 39.6 0.9 - 42.3 5.0 42.7 1.3 - 49.1 0.2 1.4 3.1 - 4.7 0.8 1.6 1.3 - 3.8 -
PHF 0.607 0.925 0.750 - 0.943 0.613 0.902 0.542 - 0.917 0.250 0.500 0.750 - 0.885 0.667 0.800 0.650 - 0.841 0.956
Lights 17 382 9 - 408 49 410 13 - 472 2 14 30 - 46 8 16 13 - 37 963
% Lights 100.0 99.2 100.0 - 99.3 100.0 98.8 100.0 - 99.0 100.0 100.0 100.0 - 100.0 100.0 100.0 100.0 - 100.0 99.2
Other Vehicles 0 3 0 - 3 0 5 0 - 5 0 0 0 - 0 0 0 0 - 0 8
% Other 0.0 0.8 0.0 - 0.7 0.0 1.2 0.0 - 1.0 0.0 0.0 0.0 - 0.0 0.0 0.0 0.0 - 0.0 0.8
Vehicles
Pedestrians - - - 0 - - - - 0 - - - - 1 - - - - 4 - -
% Pedestrians - - - - - - - - - - - - - 100.0 - - - - 100.0 - -
Count Name: WD 30th & Market
Traffic Planning and Design, Inc Street
2500 East High Street Site Code: WD 30th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 8

30th Street [N]


Out In Total
44 37 81
0 0 0
0 0 0
44 37 81

13 16 8 0
0 0 0 0
0 0 0 4
13 16 8 4
R T L P
17

17

13

13
R
0
0

0
0
Peak Hour Data
Total
833

841

423

420
Out
8
0

0
3
Market Street [W]

Market Street [E]


382

385

415

410
T

T
3
0

0
5
03/28/2019 4:45 PM
408

411

477

472
In

In
3
0

0
5
Ending At
03/28/2019 5:45 PM

49

49
R
9
0
0
9

0
0
Lights

Total
425

430

900

892
Out

Other Vehicles
5
0

0
8
Pedestrians
P

P
0
0
0
0

0
0
0
0

L T R P
2 14 30 0
0 0 0 0
0 0 0 1
2 14 30 1

74 46 120
0 0 0
0 0 0
74 46 120
Out In Total
30th Street [S]

Turning Movement Peak Hour Data Plot (4:45 PM)


Count Name: SAT 30th &
Traffic Planning and Design, Inc Market Street
2500 East High Street Site Code: SAT 30th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/30/2019
610.326.3100 mosmulski@trafficpd.com Page No: 1

Turning Movement Data


Market Street Market Street 30th Street 30th Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
10:00 AM 4 107 1 0 112 7 87 1 0 95 1 2 3 0 6 2 5 2 0 9 222
10:15 AM 1 113 0 4 114 7 103 0 0 110 1 6 6 1 13 2 2 3 0 7 244
10:30 AM 1 106 1 0 108 9 88 1 0 98 4 1 9 0 14 4 4 4 0 12 232
10:45 AM 2 113 1 0 116 9 105 2 2 116 1 1 5 1 7 1 3 5 1 9 248
Hourly Total 8 439 3 4 450 32 383 4 2 419 7 10 23 2 40 9 14 14 1 37 946
11:00 AM 3 101 1 4 105 7 95 2 0 104 0 0 4 1 4 4 2 2 2 8 221
11:15 AM 1 110 5 0 116 6 108 1 0 115 1 2 8 2 11 2 6 3 0 11 253
11:30 AM 2 101 4 0 107 5 100 0 2 105 2 2 5 0 9 2 3 5 0 10 231
11:45 AM 3 104 1 1 108 4 113 2 0 119 2 0 2 0 4 3 6 3 0 12 243
Hourly Total 9 416 11 5 436 22 416 5 2 443 5 4 19 3 28 11 17 13 2 41 948
12:00 PM 1 73 4 1 78 6 103 1 0 110 1 2 3 0 6 0 4 5 1 9 203
12:15 PM 1 88 3 7 92 6 107 0 0 113 0 3 9 3 12 4 5 1 0 10 227
12:30 PM 6 97 3 0 106 13 97 2 0 112 1 1 8 4 10 4 1 2 0 7 235
12:45 PM 2 99 2 3 103 4 81 0 0 85 0 0 7 0 7 2 4 5 3 11 206
Hourly Total 10 357 12 11 379 29 388 3 0 420 2 6 27 7 35 10 14 13 4 37 871
1:00 PM 2 94 0 1 96 7 88 2 0 97 2 1 8 0 11 1 6 0 0 7 211
1:15 PM 6 104 1 0 111 3 112 5 1 120 2 2 4 0 8 1 4 5 3 10 249
1:30 PM 3 107 2 1 112 3 89 0 0 92 1 2 5 0 8 2 2 0 0 4 216
1:45 PM 4 104 2 0 110 6 86 2 0 94 2 3 5 0 10 2 3 5 0 10 224
Hourly Total 15 409 5 2 429 19 375 9 1 403 7 8 22 0 37 6 15 10 3 31 900
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand Total 42 1621 31 22 1694 102 1562 21 5 1685 21 28 91 12 140 36 60 50 10 146 3665
Approach % 2.5 95.7 1.8 - - 6.1 92.7 1.2 - - 15.0 20.0 65.0 - - 24.7 41.1 34.2 - - -
Total % 1.1 44.2 0.8 - 46.2 2.8 42.6 0.6 - 46.0 0.6 0.8 2.5 - 3.8 1.0 1.6 1.4 - 4.0 -
Lights 42 1612 31 - 1685 101 1547 21 - 1669 21 28 90 - 139 36 60 50 - 146 3639
% Lights 100.0 99.4 100.0 - 99.5 99.0 99.0 100.0 - 99.1 100.0 100.0 98.9 - 99.3 100.0 100.0 100.0 - 100.0 99.3
Other Vehicles 0 9 0 - 9 1 15 0 - 16 0 0 1 - 1 0 0 0 - 0 26
% Other 0.0 0.6 0.0 - 0.5 1.0 1.0 0.0 - 0.9 0.0 0.0 1.1 - 0.7 0.0 0.0 0.0 - 0.0 0.7
Vehicles
Pedestrians - - - 22 - - - - 5 - - - - 12 - - - - 10 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - 100.0 - - - - 100.0 - -
Count Name: SAT 30th &
Traffic Planning and Design, Inc Market Street
2500 East High Street Site Code: SAT 30th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/30/2019
610.326.3100 mosmulski@trafficpd.com Page No: 2

30th Street [N]


Out In Total
91 146 237
0 0 0
0 0 0
91 146 237

50 60 36 0
0 0 0 0
0 0 0 10
50 60 36 10
R T L P
42

42

21

21
R
0
0

0
0
Total
3303

3327

1748

1738
Out
24

10
0

0
Market Street [W]

Market Street [E]


1612

1621

1562

1547
15
T

T
9
0

0
03/30/2019 10:00 AM
1685

1694

1685

1669
16
In

In
9
0

0
Ending At
03/30/2019 2:15 PM

102

101
31

31
R
0
0

0
1
Lights
1618

1633

3433

3407
Total
Out

15

26
Other Vehicles
0

0
Pedestrians
22
22
P

P
0
0

5
5
0
0

L T R P
21 28 90 0
0 0 1 0
0 0 0 12
21 28 91 12

192 139 331


1 1 2
0 0 0
193 140 333
Out In Total
30th Street [S]

Turning Movement Data Plot


Count Name: SAT 30th &
Traffic Planning and Design, Inc Market Street
2500 East High Street Site Code: SAT 30th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/30/2019
610.326.3100 mosmulski@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (10:30 AM)


Market Street Market Street 30th Street 30th Street
Eastbound Westbound Northbound Southbound
Start Time App. App. App. App. Int.
Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds
Total Total Total Total Total
10:30 AM 1 106 1 0 108 9 88 1 0 98 4 1 9 0 14 4 4 4 0 12 232
10:45 AM 2 113 1 0 116 9 105 2 2 116 1 1 5 1 7 1 3 5 1 9 248
11:00 AM 3 101 1 4 105 7 95 2 0 104 0 0 4 1 4 4 2 2 2 8 221
11:15 AM 1 110 5 0 116 6 108 1 0 115 1 2 8 2 11 2 6 3 0 11 253
Total 7 430 8 4 445 31 396 6 2 433 6 4 26 4 36 11 15 14 3 40 954
Approach % 1.6 96.6 1.8 - - 7.2 91.5 1.4 - - 16.7 11.1 72.2 - - 27.5 37.5 35.0 - - -
Total % 0.7 45.1 0.8 - 46.6 3.2 41.5 0.6 - 45.4 0.6 0.4 2.7 - 3.8 1.2 1.6 1.5 - 4.2 -
PHF 0.583 0.951 0.400 - 0.959 0.861 0.917 0.750 - 0.933 0.375 0.500 0.722 - 0.643 0.688 0.625 0.700 - 0.833 0.943
Lights 7 428 8 - 443 31 392 6 - 429 6 4 25 - 35 11 15 14 - 40 947
% Lights 100.0 99.5 100.0 - 99.6 100.0 99.0 100.0 - 99.1 100.0 100.0 96.2 - 97.2 100.0 100.0 100.0 - 100.0 99.3
Other Vehicles 0 2 0 - 2 0 4 0 - 4 0 0 1 - 1 0 0 0 - 0 7
% Other 0.0 0.5 0.0 - 0.4 0.0 1.0 0.0 - 0.9 0.0 0.0 3.8 - 2.8 0.0 0.0 0.0 - 0.0 0.7
Vehicles
Pedestrians - - - 4 - - - - 2 - - - - 4 - - - - 3 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - 100.0 - - - - 100.0 - -
Count Name: SAT 30th &
Traffic Planning and Design, Inc Market Street
2500 East High Street Site Code: SAT 30th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/30/2019
610.326.3100 mosmulski@trafficpd.com Page No: 4

30th Street [N]


Out In Total
17 40 57
0 0 0
0 0 0
17 40 57

14 15 11 0
0 0 0 0
0 0 0 3
14 15 11 3
R T L P

R
7
0
0
7
L

6
0
0
6
Peak Hour Data
Total
855

861

467

464
Out
6
0

0
3
Market Street [W]

Market Street [E]


428

430

396

392
T

T
2
0

0
4
03/30/2019 10:30 AM
443

445

433

429
In

In
2
0

0
4
Ending At
03/30/2019 11:30 AM

31

31
R
8
0
0
8

0
0
Lights

Total
412

416

900

893
Out

Other Vehicles
4
0

0
7
Pedestrians
P

P
0
0
4
4

2
2
0
0

L T R P
6 4 25 0
0 0 1 0
0 0 0 4
6 4 26 4

54 35 89
0 1 1
0 0 0
54 36 90
Out In Total
30th Street [S]

Turning Movement Peak Hour Data Plot (10:30 AM)


Count Name: WD 29th & Market
Traffic Planning and Design, Inc Street
2500 East High Street Site Code: WD 29th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 1

Turning Movement Data


Market Street Market Street 29th Street 29th Street
Eastbound Westbound Northbound Southbound
Start Time Right Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Total
Red Red Red Red
6:00 AM 0 17 0 0 0 17 0 27 0 0 1 27 0 0 0 0 0 0 0 0 0 2 2 2 46
6:15 AM 0 30 0 0 0 30 1 20 0 0 0 21 0 0 0 0 1 0 0 0 0 1 0 1 52
6:30 AM 1 48 1 0 2 50 0 35 0 0 0 35 0 0 0 2 0 2 0 0 0 0 3 0 87
6:45 AM 1 50 1 0 1 52 1 41 0 0 0 42 0 0 0 1 1 1 0 0 0 1 1 1 96
Hourly Total 2 145 2 0 3 149 2 123 0 0 1 125 0 0 0 3 2 3 0 0 0 4 6 4 281
7:00 AM 0 65 3 0 0 68 1 45 0 1 1 47 0 0 1 1 0 2 1 2 1 2 1 6 123
7:15 AM 1 92 4 1 0 98 14 60 1 0 1 75 1 2 0 5 0 8 3 4 2 2 2 11 192
7:30 AM 3 109 3 0 1 115 8 73 2 0 1 83 1 0 1 3 0 5 0 1 1 5 1 7 210
7:45 AM 1 109 0 0 0 110 2 61 0 0 0 63 1 0 0 2 0 3 0 0 0 3 0 3 179
Hourly Total 5 375 10 1 1 391 25 239 3 1 3 268 3 2 2 11 0 18 4 7 4 12 4 27 704
8:00 AM 0 91 3 0 0 94 2 78 0 0 0 80 1 2 4 3 1 10 0 1 0 5 1 6 190
8:15 AM 0 92 0 0 0 92 3 70 0 0 0 73 0 1 0 2 0 3 1 0 2 4 0 7 175
8:30 AM 0 75 0 0 0 75 0 70 0 0 0 70 1 1 0 2 0 4 1 1 0 1 0 3 152
8:45 AM 0 121 1 0 0 122 3 72 0 0 0 75 1 0 0 5 0 6 2 0 0 1 0 3 206
Hourly Total 0 379 4 0 0 383 8 290 0 0 0 298 3 4 4 12 1 23 4 2 2 11 1 19 723
*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - - -
11:00 AM 0 89 1 0 1 90 6 101 0 0 3 107 1 0 0 5 0 6 3 0 1 1 4 5 208
11:15 AM 2 95 0 0 0 97 1 107 0 0 1 108 1 0 0 1 0 2 1 0 0 1 1 2 209
11:30 AM 2 79 2 0 0 83 3 115 2 0 1 120 0 0 0 2 1 2 3 1 0 1 0 5 210
11:45 AM 0 105 0 0 0 105 6 104 6 0 0 116 0 3 1 3 0 7 0 0 2 4 0 6 234
Hourly Total 4 368 3 0 1 375 16 427 8 0 5 451 2 3 1 11 1 17 7 1 3 7 5 18 861
12:00 PM 1 95 0 0 0 96 4 85 3 0 0 92 1 0 1 1 0 3 3 0 0 3 1 6 197
12:15 PM 3 102 2 0 0 107 7 95 1 0 0 103 1 4 0 0 1 5 0 0 0 5 0 5 220
12:30 PM 1 106 2 0 0 109 2 112 0 0 0 114 1 1 1 1 1 4 1 0 1 3 0 5 232
12:45 PM 4 100 0 0 0 104 1 94 0 0 0 95 0 0 0 1 3 1 1 0 0 0 0 1 201
Hourly Total 9 403 4 0 0 416 14 386 4 0 0 404 3 5 2 3 5 13 5 0 1 11 1 17 850
*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - - -
3:00 PM 1 77 1 0 1 79 13 95 3 0 2 111 3 6 0 0 0 9 0 4 0 3 1 7 206
3:15 PM 1 100 1 0 2 102 24 83 5 0 0 112 1 2 1 2 4 6 2 4 0 0 0 6 226
3:30 PM 1 106 0 0 1 107 8 97 1 0 0 106 1 0 3 0 0 4 3 0 0 1 0 4 221
3:45 PM 1 94 1 0 0 96 6 117 1 0 0 124 0 3 1 1 0 5 1 2 0 0 1 3 228
Hourly Total 4 377 3 0 4 384 51 392 10 0 2 453 5 11 5 3 4 24 6 10 0 4 2 20 881
4:00 PM 2 97 1 0 0 100 7 101 1 0 0 109 0 0 0 2 0 2 1 0 0 0 0 1 212
4:15 PM 3 98 0 0 0 101 7 101 1 0 0 109 1 0 1 2 0 4 1 0 1 2 0 4 218
4:30 PM 1 105 2 0 0 108 18 93 1 0 2 112 0 0 0 1 0 1 2 1 1 0 1 4 225
4:45 PM 0 118 0 0 0 118 10 108 6 0 0 124 0 1 1 3 1 5 1 1 0 0 1 2 249
Hourly Total 6 418 3 0 0 427 42 403 9 0 2 454 1 1 2 8 1 12 5 2 2 2 2 11 904
5:00 PM 4 97 0 0 0 101 6 126 1 1 0 134 0 3 2 0 1 5 4 2 3 1 2 10 250
5:15 PM 1 104 5 0 1 110 4 125 2 0 0 131 0 0 2 0 0 2 2 2 0 4 0 8 251
5:30 PM 3 97 1 0 2 101 2 105 2 0 0 109 1 0 0 3 0 4 0 3 2 1 0 6 220
5:45 PM 5 95 2 0 0 102 10 92 4 0 0 106 0 0 0 2 0 2 0 1 2 1 1 4 214
Hourly Total 13 393 8 0 3 414 22 448 9 1 0 480 1 3 4 5 1 13 6 8 7 7 3 28 935
Grand Total 43 2858 37 1 12 2939 180 2708 43 2 13 2933 18 29 20 56 15 123 37 30 19 58 24 144 6139
Approach % 1.5 97.2 1.3 0.0 - - 6.1 92.3 1.5 0.1 - - 14.6 23.6 16.3 45.5 - - 25.7 20.8 13.2 40.3 - - -
Total % 0.7 46.6 0.6 0.0 - 47.9 2.9 44.1 0.7 0.0 - 47.8 0.3 0.5 0.3 0.9 - 2.0 0.6 0.5 0.3 0.9 - 2.3 -
Lights 40 2798 36 1 - 2875 179 2655 42 2 - 2878 17 29 20 56 - 122 37 30 19 57 - 143 6018
% Lights 93.0 97.9 97.3 100.0 - 97.8 99.4 98.0 97.7 100.0 - 98.1 94.4 100.0 100.0 100.0 - 99.2 100.0 100.0 100.0 98.3 - 99.3 98.0
Other 3 60 1 0 - 64 1 53 1 0 - 55 1 0 0 0 - 1 0 0 0 1 - 1 121
Vehicles
% Other 7.0 2.1 2.7 0.0 - 2.2 0.6 2.0 2.3 0.0 - 1.9 5.6 0.0 0.0 0.0 - 0.8 0.0 0.0 0.0 1.7 - 0.7 2.0
Vehicles
Pedestrians - - - - 12 - - - - - 13 - - - - - 15 - - - - - 24 - -
% - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Pedestrians
Count Name: WD 29th & Market
Traffic Planning and Design, Inc Street
2500 East High Street Site Code: WD 29th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 2

29th Street [N]


Out In Total
113 143 256
4 1 5
0 0 0
117 144 261

76 30 37 0
1 0 0 0
0 0 0 24
77 30 37 24
R T L P
40

43

45

44
R
3
0

0
1
Total
5623

5742

2971

2911
119

Out
60
0

0
Market Street [W]

Market Street [E]


2798

2858

2708

2655
60

53
T

T
0

0
03/28/2019 6:00 AM
2875

2939

2933

2878
64

55
In

In
0

0
Ending At
03/28/2019 6:00 PM

180

179
37

38
R
1
0

0
1
Lights
2748

2803

5904

5789
Total
115
Out

55

Other Vehicles
0

0
Pedestrians
12
12

13
13
P

P
0
0

0
0

L T R P
17 29 76 0
1 0 0 0
0 0 0 15
18 29 76 15

246 122 368


2 1 3
0 0 0
248 123 371
Out In Total
29th Street [S]

Turning Movement Data Plot


Count Name: WD 29th & Market
Traffic Planning and Design, Inc Street
2500 East High Street Site Code: WD 29th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (7:15 AM)


Market Street Market Street 29th Street 29th Street
Eastbound Westbound Northbound Southbound
Start Time Right Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Total
Red Red Red Red
7:15 AM 1 92 4 1 0 98 14 60 1 0 1 75 1 2 0 5 0 8 3 4 2 2 2 11 192
7:30 AM 3 109 3 0 1 115 8 73 2 0 1 83 1 0 1 3 0 5 0 1 1 5 1 7 210
7:45 AM 1 109 0 0 0 110 2 61 0 0 0 63 1 0 0 2 0 3 0 0 0 3 0 3 179
8:00 AM 0 91 3 0 0 94 2 78 0 0 0 80 1 2 4 3 1 10 0 1 0 5 1 6 190
Total 5 401 10 1 1 417 26 272 3 0 2 301 4 4 5 13 1 26 3 6 3 15 4 27 771
Approach % 1.2 96.2 2.4 0.2 - - 8.6 90.4 1.0 0.0 - - 15.4 15.4 19.2 50.0 - - 11.1 22.2 11.1 55.6 - - -
Total % 0.6 52.0 1.3 0.1 - 54.1 3.4 35.3 0.4 0.0 - 39.0 0.5 0.5 0.6 1.7 - 3.4 0.4 0.8 0.4 1.9 - 3.5 -
PHF 0.417 0.920 0.625 0.250 - 0.907 0.464 0.872 0.375 0.000 - 0.907 1.000 0.500 0.313 0.650 - 0.650 0.250 0.375 0.375 0.750 - 0.614 0.918
Lights 4 391 9 1 - 405 26 265 3 0 - 294 4 4 5 13 - 26 3 6 3 14 - 26 751
% Lights 80.0 97.5 90.0 100.0 - 97.1 100.0 97.4 100.0 - - 97.7 100.0 100.0 100.0 100.0 - 100.0 100.0 100.0 100.0 93.3 - 96.3 97.4
Other 1 10 1 0 - 12 0 7 0 0 - 7 0 0 0 0 - 0 0 0 0 1 - 1 20
Vehicles
% Other 20.0 2.5 10.0 0.0 - 2.9 0.0 2.6 0.0 - - 2.3 0.0 0.0 0.0 0.0 - 0.0 0.0 0.0 0.0 6.7 - 3.7 2.6
Vehicles
Pedestrians - - - - 1 - - - - - 2 - - - - - 1 - - - - - 4 - -
% - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Pedestrians
Count Name: WD 29th & Market
Traffic Planning and Design, Inc Street
2500 East High Street Site Code: WD 29th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 4

29th Street [N]


Out In Total
11 26 37
1 1 2
0 0 0
12 27 39

17 6 3 0
1 0 0 0
0 0 0 4
18 6 3 4
R T L P

R
4
1
0
5
L

3
0
0
3
Peak Hour Data
Total
691

711

422

412
Out
20

10
0

0
Market Street [W]

Market Street [E]


391

401

272

265
10

T
0

0
7
03/28/2019 7:15 AM
405

417

301

294
12
In

In
0

0
7
Ending At
03/28/2019 8:15 AM
10

11

26

26
R
1
0

0
0
Lights

Total
286

294

723

706
Out

17
Other Vehicles
8
0

0
Pedestrians
P

P
0
0
1
1

2
2
0
0

L T R P
4 4 18 0
0 0 0 0
0 0 0 1
4 4 18 1

42 26 68
1 0 1
0 0 0
43 26 69
Out In Total
29th Street [S]

Turning Movement Peak Hour Data Plot (7:15 AM)


Count Name: WD 29th & Market
Traffic Planning and Design, Inc Street
2500 East High Street Site Code: WD 29th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 5

Turning Movement Peak Hour Data (11:45 AM)


Market Street Market Street 29th Street 29th Street
Eastbound Westbound Northbound Southbound
Start Time Right Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Total
Red Red Red Red
11:45 AM 0 105 0 0 0 105 6 104 6 0 0 116 0 3 1 3 0 7 0 0 2 4 0 6 234
12:00 PM 1 95 0 0 0 96 4 85 3 0 0 92 1 0 1 1 0 3 3 0 0 3 1 6 197
12:15 PM 3 102 2 0 0 107 7 95 1 0 0 103 1 4 0 0 1 5 0 0 0 5 0 5 220
12:30 PM 1 106 2 0 0 109 2 112 0 0 0 114 1 1 1 1 1 4 1 0 1 3 0 5 232
Total 5 408 4 0 0 417 19 396 10 0 0 425 3 8 3 5 2 19 4 0 3 15 1 22 883
Approach % 1.2 97.8 1.0 0.0 - - 4.5 93.2 2.4 0.0 - - 15.8 42.1 15.8 26.3 - - 18.2 0.0 13.6 68.2 - - -
Total % 0.6 46.2 0.5 0.0 - 47.2 2.2 44.8 1.1 0.0 - 48.1 0.3 0.9 0.3 0.6 - 2.2 0.5 0.0 0.3 1.7 - 2.5 -
PHF 0.417 0.962 0.500 0.000 - 0.956 0.679 0.884 0.417 0.000 - 0.916 0.750 0.500 0.750 0.417 - 0.679 0.333 0.000 0.375 0.750 - 0.917 0.943
Lights 5 402 4 0 - 411 19 392 10 0 - 421 3 8 3 5 - 19 4 0 3 15 - 22 873
% Lights 100.0 98.5 100.0 - - 98.6 100.0 99.0 100.0 - - 99.1 100.0 100.0 100.0 100.0 - 100.0 100.0 - 100.0 100.0 - 100.0 98.9
Other 0 6 0 0 - 6 0 4 0 0 - 4 0 0 0 0 - 0 0 0 0 0 - 0 10
Vehicles
% Other 0.0 1.5 0.0 - - 1.4 0.0 1.0 0.0 - - 0.9 0.0 0.0 0.0 0.0 - 0.0 0.0 - 0.0 0.0 - 0.0 1.1
Vehicles
Pedestrians - - - - 0 - - - - - 0 - - - - - 2 - - - - - 1 - -
% - - - - - - - - - - - - - - - - 100.0 - - - - - 100.0 - -
Pedestrians
Count Name: WD 29th & Market
Traffic Planning and Design, Inc Street
2500 East High Street Site Code: WD 29th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 6

29th Street [N]


Out In Total
23 22 45
0 0 0
0 0 0
23 22 45

18 0 4 0
0 0 0 0
0 0 0 1
18 0 4 1
R T L P

10

10
R
5
0
0
5
L

0
0
Peak Hour Data
Total
824

834

420

414
Out
10
0

0
6
Market Street [W]

Market Street [E]


402

408

396

392
T

T
6
0

0
4
03/28/2019 11:45 AM
411

417

425

421
In

In
6
0

0
4
Ending At
03/28/2019 12:45 PM

19

19
R
4
0
0
4

0
0
Lights

Total
413

417

845

835
Out

10
Other Vehicles
4
0

0
Pedestrians
P

P
0
0
0
0

0
0
0
0

L T R P
3 8 8 0
0 0 0 0
0 0 0 2
3 8 8 2

23 19 42
0 0 0
0 0 0
23 19 42
Out In Total
29th Street [S]

Turning Movement Peak Hour Data Plot (11:45 AM)


Count Name: WD 29th & Market
Traffic Planning and Design, Inc Street
2500 East High Street Site Code: WD 29th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 7

Turning Movement Peak Hour Data (4:30 PM)


Market Street Market Street 29th Street 29th Street
Eastbound Westbound Northbound Southbound
Start Time Right Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Total
Red Red Red Red
4:30 PM 1 105 2 0 0 108 18 93 1 0 2 112 0 0 0 1 0 1 2 1 1 0 1 4 225
4:45 PM 0 118 0 0 0 118 10 108 6 0 0 124 0 1 1 3 1 5 1 1 0 0 1 2 249
5:00 PM 4 97 0 0 0 101 6 126 1 1 0 134 0 3 2 0 1 5 4 2 3 1 2 10 250
5:15 PM 1 104 5 0 1 110 4 125 2 0 0 131 0 0 2 0 0 2 2 2 0 4 0 8 251
Total 6 424 7 0 1 437 38 452 10 1 2 501 0 4 5 4 2 13 9 6 4 5 4 24 975
Approach % 1.4 97.0 1.6 0.0 - - 7.6 90.2 2.0 0.2 - - 0.0 30.8 38.5 30.8 - - 37.5 25.0 16.7 20.8 - - -
Total % 0.6 43.5 0.7 0.0 - 44.8 3.9 46.4 1.0 0.1 - 51.4 0.0 0.4 0.5 0.4 - 1.3 0.9 0.6 0.4 0.5 - 2.5 -
PHF 0.375 0.898 0.350 0.000 - 0.926 0.528 0.897 0.417 0.250 - 0.935 0.000 0.333 0.625 0.333 - 0.650 0.563 0.750 0.333 0.313 - 0.600 0.971
Lights 6 419 7 0 - 432 38 448 10 1 - 497 0 4 5 4 - 13 9 6 4 5 - 24 966
% Lights 100.0 98.8 100.0 - - 98.9 100.0 99.1 100.0 100.0 - 99.2 - 100.0 100.0 100.0 - 100.0 100.0 100.0 100.0 100.0 - 100.0 99.1
Other 0 5 0 0 - 5 0 4 0 0 - 4 0 0 0 0 - 0 0 0 0 0 - 0 9
Vehicles
% Other 0.0 1.2 0.0 - - 1.1 0.0 0.9 0.0 0.0 - 0.8 - 0.0 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0 - 0.0 0.9
Vehicles
Pedestrians - - - - 1 - - - - - 2 - - - - - 2 - - - - - 4 - -
% - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Pedestrians
Count Name: WD 29th & Market
Traffic Planning and Design, Inc Street
2500 East High Street Site Code: WD 29th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/28/2019
610.326.3100 mosmulski@trafficpd.com Page No: 8

29th Street [N]


Out In Total
21 24 45
0 0 0
0 0 0
21 24 45

9 6 9 0
0 0 0 0
0 0 0 4
9 6 9 4
R T L P

11

11
R
6
0
0
6
L

0
0
Peak Hour Data
Total
889

898

442

437
Out
9
0

0
5
Market Street [W]

Market Street [E]


419

424

452

448
T

T
5
0

0
4
03/28/2019 4:30 PM
432

437

501

497
In

In
5
0

0
4
Ending At
03/28/2019 5:30 PM

38

38
R
7
0
0
7

0
0
Lights

Total
457

461

943

934
Out

Other Vehicles
4
0

0
9
Pedestrians
P

P
0
0
1
1

2
2
0
0

L T R P
0 4 9 0
0 0 0 0
0 0 0 2
0 4 9 2

51 13 64
0 0 0
0 0 0
51 13 64
Out In Total
29th Street [S]

Turning Movement Peak Hour Data Plot (4:30 PM)


Count Name: SAT 29th &
Traffic Planning and Design, Inc Market Street
2500 East High Street Site Code: SAT 29th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/30/2019
610.326.3100 mosmulski@trafficpd.com Page No: 1

Turning Movement Data


Market Street Market Street 29th Street 29th Street
Eastbound Westbound Northbound Southbound
Start Time Right Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Total
Red Red Red Red
10:00 AM 0 111 1 0 0 112 1 94 2 0 1 97 0 1 1 1 0 3 1 2 0 1 0 4 216
10:15 AM 1 116 0 0 0 117 4 103 0 0 0 107 2 1 0 1 1 4 2 2 3 2 0 9 237
10:30 AM 2 120 0 0 0 122 4 97 1 0 0 102 1 0 0 2 0 3 1 0 0 0 1 1 228
10:45 AM 1 115 0 0 0 116 4 113 3 0 0 120 0 0 0 4 0 4 1 1 1 2 0 5 245
Hourly Total 4 462 1 0 0 467 13 407 6 0 1 426 3 2 1 8 1 14 5 5 4 5 1 19 926
11:00 AM 1 105 1 0 0 107 5 100 0 0 0 105 0 1 1 4 1 6 0 1 1 2 1 4 222
11:15 AM 5 117 2 0 0 124 3 111 0 0 0 114 2 1 0 1 2 4 1 1 0 2 0 4 246
11:30 AM 0 109 0 0 1 109 5 101 1 0 1 107 1 0 0 2 0 3 1 0 0 3 0 4 223
11:45 AM 0 105 0 0 1 105 1 121 0 0 3 122 0 1 0 3 1 4 1 3 0 0 0 4 235
Hourly Total 6 436 3 0 2 445 14 433 1 0 4 448 3 3 1 10 4 17 3 5 1 7 1 16 926
12:00 PM 0 77 0 0 0 77 10 106 2 0 0 118 3 1 1 1 0 6 0 1 0 3 0 4 205
12:15 PM 1 97 4 0 0 102 4 114 3 0 8 121 0 1 0 5 3 6 0 0 0 0 0 0 229
12:30 PM 0 108 1 0 0 109 6 106 4 0 0 116 1 0 0 1 4 2 1 0 0 2 2 3 230
12:45 PM 1 107 0 0 0 108 3 86 1 0 0 90 0 0 0 2 0 2 1 0 0 0 0 1 201
Hourly Total 2 389 5 0 0 396 23 412 10 0 8 445 4 2 1 9 7 16 2 1 0 5 2 8 865
1:00 PM 0 100 1 0 0 101 3 91 1 0 0 95 3 1 0 1 0 5 2 0 1 1 3 4 205
1:15 PM 3 106 0 0 0 109 2 119 3 0 2 124 1 0 2 1 0 4 2 1 0 0 0 3 240
1:30 PM 1 112 0 0 0 113 2 90 3 0 0 95 0 0 0 2 0 2 1 0 0 2 2 3 213
1:45 PM 5 109 0 0 0 114 3 92 1 0 0 96 2 2 1 2 0 7 1 1 1 0 2 3 220
Hourly Total 9 427 1 0 0 437 10 392 8 0 2 410 6 3 3 6 0 18 6 2 2 3 7 13 878
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand Total 21 1714 10 0 2 1745 60 1644 25 0 15 1729 16 10 6 33 12 65 16 13 7 20 11 56 3595
Approach % 1.2 98.2 0.6 0.0 - - 3.5 95.1 1.4 0.0 - - 24.6 15.4 9.2 50.8 - - 28.6 23.2 12.5 35.7 - - -
Total % 0.6 47.7 0.3 0.0 - 48.5 1.7 45.7 0.7 0.0 - 48.1 0.4 0.3 0.2 0.9 - 1.8 0.4 0.4 0.2 0.6 - 1.6 -
Lights 21 1705 10 0 - 1736 59 1628 25 0 - 1712 16 9 6 33 - 64 16 13 7 20 - 56 3568
% Lights 100.0 99.5 100.0 - - 99.5 98.3 99.0 100.0 - - 99.0 100.0 90.0 100.0 100.0 - 98.5 100.0 100.0 100.0 100.0 - 100.0 99.2
Other 0 9 0 0 - 9 1 16 0 0 - 17 0 1 0 0 - 1 0 0 0 0 - 0 27
Vehicles
% Other 0.0 0.5 0.0 - - 0.5 1.7 1.0 0.0 - - 1.0 0.0 10.0 0.0 0.0 - 1.5 0.0 0.0 0.0 0.0 - 0.0 0.8
Vehicles
Pedestrians - - - - 2 - - - - - 15 - - - - - 12 - - - - - 11 - -
% - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Pedestrians
Count Name: SAT 29th &
Traffic Planning and Design, Inc Market Street
2500 East High Street Site Code: SAT 29th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/30/2019
610.326.3100 mosmulski@trafficpd.com Page No: 2

29th Street [N]


Out In Total
55 56 111
1 0 1
0 0 0
56 56 112

27 13 16 0
0 0 0 0
0 0 0 11
27 13 16 11
R T L P
21

21

25

25
R
0
0

0
0
Total
3407

3432

1769

1760
Out
25
0

0
9
Market Street [W]

Market Street [E]


1705

1714

1644

1628
16
T

T
9
0

0
03/30/2019 10:00 AM
1736

1745

1729

1712
17
In

In
9
0

0
Ending At
03/30/2019 2:15 PM
10

10

60

59
R
0
0

0
1
Lights
1671

1687

3498

3472
Total
Out

16

26
Other Vehicles
0

0
Pedestrians 15
15
P

P
0
0
2
2

0
0

L T R P
16 9 39 0
0 1 0 0
0 0 0 12
16 10 39 12

82 64 146
1 1 2
0 0 0
83 65 148
Out In Total
29th Street [S]

Turning Movement Data Plot


Count Name: SAT 29th &
Traffic Planning and Design, Inc Market Street
2500 East High Street Site Code: SAT 29th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/30/2019
610.326.3100 mosmulski@trafficpd.com Page No: 3

Turning Movement Peak Hour Data (10:30 AM)


Market Street Market Street 29th Street 29th Street
Eastbound Westbound Northbound Southbound
Start Time Right Right Right Right
App. App. App. App. Int.
Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Left Thru Right on Peds Total Total
Red Red Red Red
10:30 AM 2 120 0 0 0 122 4 97 1 0 0 102 1 0 0 2 0 3 1 0 0 0 1 1 228
10:45 AM 1 115 0 0 0 116 4 113 3 0 0 120 0 0 0 4 0 4 1 1 1 2 0 5 245
11:00 AM 1 105 1 0 0 107 5 100 0 0 0 105 0 1 1 4 1 6 0 1 1 2 1 4 222
11:15 AM 5 117 2 0 0 124 3 111 0 0 0 114 2 1 0 1 2 4 1 1 0 2 0 4 246
Total 9 457 3 0 0 469 16 421 4 0 0 441 3 2 1 11 3 17 3 3 2 6 2 14 941
Approach % 1.9 97.4 0.6 0.0 - - 3.6 95.5 0.9 0.0 - - 17.6 11.8 5.9 64.7 - - 21.4 21.4 14.3 42.9 - - -
Total % 1.0 48.6 0.3 0.0 - 49.8 1.7 44.7 0.4 0.0 - 46.9 0.3 0.2 0.1 1.2 - 1.8 0.3 0.3 0.2 0.6 - 1.5 -
PHF 0.450 0.952 0.375 0.000 - 0.946 0.800 0.931 0.333 0.000 - 0.919 0.375 0.500 0.250 0.688 - 0.708 0.750 0.750 0.500 0.750 - 0.700 0.956
Lights 9 454 3 0 - 466 15 417 4 0 - 436 3 2 1 11 - 17 3 3 2 6 - 14 933
% Lights 100.0 99.3 100.0 - - 99.4 93.8 99.0 100.0 - - 98.9 100.0 100.0 100.0 100.0 - 100.0 100.0 100.0 100.0 100.0 - 100.0 99.1
Other 0 3 0 0 - 3 1 4 0 0 - 5 0 0 0 0 - 0 0 0 0 0 - 0 8
Vehicles
% Other 0.0 0.7 0.0 - - 0.6 6.3 1.0 0.0 - - 1.1 0.0 0.0 0.0 0.0 - 0.0 0.0 0.0 0.0 0.0 - 0.0 0.9
Vehicles
Pedestrians - - - - 0 - - - - - 0 - - - - - 3 - - - - - 2 - -
% - - - - - - - - - - - - - - - - 100.0 - - - - - 100.0 - -
Pedestrians
Count Name: SAT 29th &
Traffic Planning and Design, Inc Market Street
2500 East High Street Site Code: SAT 29th & Market
Suite 650 Street
Pottstown, Pennsylvania, United States 19464 Start Date: 03/30/2019
610.326.3100 mosmulski@trafficpd.com Page No: 4

29th Street [N]


Out In Total
15 14 29
0 0 0
0 0 0
15 14 29

8 3 3 0
0 0 0 0
0 0 0 2
8 3 3 2
R T L P

R
9
0
0
9
L

4
0
0
4
Peak Hour Data
Total
894

901

472

469
Out
7
0

0
3
Market Street [W]

Market Street [E]


454

457

421

417
T

T
3
0

0
4
03/30/2019 10:30 AM
466

469

441

436
In

In
3
0

0
5
Ending At
03/30/2019 11:30 AM

16

15
R
3
0
0
3

0
1
Lights

Total
428

432

913

905
Out

Other Vehicles
4
0

0
8
Pedestrians
P

P
0
0
0
0

0
0
0
0

L T R P
3 2 12 0
0 0 0 0
0 0 0 3
3 2 12 3

21 17 38
1 0 1
0 0 0
22 17 39
Out In Total
29th Street [S]

Turning Movement Peak Hour Data Plot (10:30 AM)


APPENDIX D:
Nearby Development Information
EXCERPT OF FULL TIS
N

NORTH DRIVEWAY
1
10

N.31ST STREET
Enter = 13
Exit = 5

1
REAR DRIVEWAY

SOUTH DRIVEWAY
SR 0011)

2
10

3
N.32ND STREET (

MARKET STREET
$MODEL$
$USER$

PITTSBURGH HARRISBURG
(412)765-3717 (717)234-1430
KEY: POTTSTOWN
$TIME$

(610)326-3100
LEHIGH VALLEY SOUTH JERSEY
STOP CONTROLLED (610)625-4242 (856)966-4242
WWW.TRAFFICPD.COM
SIGNALIZED INTERSECTION
FIGURE 6
NEW(PASS-BY)TRIPS QUATTRO REDEVELOPMENT
$FILE$
$DATE$

WEEKDAY A.M. PEAK HOUR


SCHEMATIC DRAWING:NOT TO SCALE
TRIP DISTRIBUTION AND ASSIGNMENT
N

10 (18)

NORTH DRIVEWAY
23)
28)
-
27 (
3(

N.31ST STREET
Enter = 38(28)
Exit = 30(23)

2
3 (5)
REAR DRIVEWAY

SOUTH DRIVEWAY

2
SR 0011)

15
27

9
N.32ND STREET (

MARKET STREET
$MODEL$
$USER$

PITTSBURGH HARRISBURG
(412)765-3717 (717)234-1430
KEY: POTTSTOWN
$TIME$

(610)326-3100
LEHIGH VALLEY SOUTH JERSEY
STOP CONTROLLED (610)625-4242 (856)966-4242
WWW.TRAFFICPD.COM
SIGNALIZED INTERSECTION
FIGURE 7
NEW(PASS-BY)TRIPS QUATTRO REDEVELOPMENT
$FILE$
$DATE$

WEEKDAY P.M. PEAK HOUR


SCHEMATIC DRAWING:NOT TO SCALE
TRIP DISTRIBUTION AND ASSIGNMENT
N

30 (34)

NORTH DRIVEWAY
44)
52)
-
75 (
10 (

N.31ST STREET
Enter = 106(52)
Exit = 87(42)

5
10 (8)
REAR DRIVEWAY

SOUTH DRIVEWAY

4
SR 0011)

43

26
75
N.32ND STREET (

MARKET STREET
$MODEL$
$USER$

PITTSBURGH HARRISBURG
(412)765-3717 (717)234-1430
KEY: POTTSTOWN
$TIME$

(610)326-3100
LEHIGH VALLEY SOUTH JERSEY
STOP CONTROLLED (610)625-4242 (856)966-4242
WWW.TRAFFICPD.COM
SIGNALIZED INTERSECTION
FIGURE 8
NEW(PASS-BY)TRIPS QUATTRO REDEVELOPMENT
$FILE$
$DATE$

SATURDAY MIDDAY PEAK HOUR


SCHEMATIC DRAWING:NOT TO SCALE
TRIP DISTRIBUTION AND ASSIGNMENT
APPENDIX E:
Trip Generation Worksheets
Lansdale FSU
4943 SF
132 Seats
Saturday Tuesday
Parking Total Transactions/ Parking Total Transactio
Time Hour
Drive Thru Drive Thru
Trips Transactio 1000 SF Trips Transactio ns/1000
12:00 AM 0 0 2 2 0.4 0 2 2 0.4
1:00 AM 1 0 2 2 0.4 0 2 2 0.4
2:00 AM 2 0 1 1 0.2 0 0 0 0.0
3:00 AM 3 0 1 1 0.2 0 1 1 0.2
4:00 AM 4 0 1 1 0.2 0 0 0 0.0
5:00 AM 5 0 1 1 0.2 1 1 2 0.4
6:00 AM 6 5 7 12 2.4 9 9 18 3.6
7:00 AM 7 17 13 30 6.1 30 16 46 9.3
8:00 AM 8 27 23 50 10.1 31 17 48 9.7
9:00 AM 9 36 29 65 13.1 26 22 48 9.7
10:00 AM 10 37 34 71 14.4 26 21 47 9.5
11:00 AM 11 67 61 128 25.9 71 64 135 27.3
12:00 PM 12 91 98 189 38.2 107 110 217 43.9
1:00 PM 13 85 89 174 35.2 81 66 147 29.7
2:00 PM 14 72 68 140 28.3 61 44 105 21.2
3:00 PM 15 60 49 109 22.1 55 38 93 18.8
4:00 PM 16 55 50 105 21.2 60 41 101 20.4
5:00 PM 17 64 66 130 26.3 74 65 139 28.1
6:00 PM 18 63 69 132 26.7 74 68 142 28.7
7:00 PM 19 54 52 106 21.4 64 49 113 22.9
8:00 PM 20 43 36 79 16.0 51 35 86 17.4
9:00 PM 21 30 23 53 10.7 30 20 50 10.1
10:00 PM 22 1 11 12 2.4 1 11 12 2.4
11:00 PM 23 0 5 5 1.0 0 14 14 2.8
Lindle Road FSU
4739 SF
126 Seats
Saturday Tuesday
Parking Total Transactio Parking Total Transactio
Drive Thru Drive Thru
Trips Transactio ns/1000 Trips Transactio ns/1000
12:00 AM 0 3 3 0.6 0 2 2 0.4
1:00 AM 0 1 1 0.2 0 1 1 0.2
2:00 AM 0 1 1 0.2 0 0 0 0.0
3:00 AM 0 1 1 0.2 0 0 0 0.0
4:00 AM 0 1 1 0.2 0 0 0 0.0
5:00 AM 2 3 5 1.1 0 2 2 0.4
6:00 AM 8 8 16 3.4 11 9 20 4.2
7:00 AM 21 17 38 8.0 29 13 42 8.9
8:00 AM 34 28 62 13.1 30 19 49 10.3
9:00 AM 45 39 84 17.7 30 20 50 10.6
10:00 AM 47 48 95 20.0 34 29 63 13.3
11:00 AM 75 89 164 34.6 81 85 166 35.0
12:00 PM 97 121 218 46.0 116 122 238 50.2
1:00 PM 95 115 210 44.3 91 79 170 35.9
2:00 PM 85 94 179 37.8 65 52 117 24.7
3:00 PM 74 76 150 31.7 56 46 102 21.5
4:00 PM 70 76 146 30.8 60 48 108 22.8
5:00 PM 74 89 163 34.4 72 69 141 29.8
6:00 PM 74 91 165 34.8 75 75 150 31.7
7:00 PM 70 79 149 31.4 69 63 132 27.9
8:00 PM 63 63 126 26.6 60 46 106 22.4
9:00 PM 50 47 97 20.5 44 34 78 16.5
10:00 PM 2 17 19 4.0 2 14 16 3.4
11:00 PM 0 10 10 2.1 0 5 5 1.1
Lincoln Highway East
4831 SF
138 Seats
Saturday Tuesday
Parking Total Transactio Parking Total Transactio
Drive Thru Drive Thru
Trips Transactio ns/1000 Trips Transactio ns/1000
12:00 AM 0 7 7 1.4 0 4 4 0.8
1:00 AM 0 2 2 0.4 0 1 1 0.2
2:00 AM 0 1 1 0.2 0 0 0 0.0
3:00 AM 0 0 0 0.0 0 0 0 0.0
4:00 AM 0 1 1 0.2 2 12 14 2.9
5:00 AM 1 1 2 0.4 1 2 3 0.6
6:00 AM 4 8 12 2.5 5 6 11 2.3
7:00 AM 13 13 26 5.4 16 12 28 5.8
8:00 AM 21 23 44 9.1 17 16 33 6.8
9:00 AM 28 32 60 12.4 18 19 37 7.7
10:00 AM 31 39 70 14.5 22 24 46 9.5
11:00 AM 61 81 142 29.4 56 64 120 24.8
12:00 PM 84 116 200 41.4 81 91 172 35.6
1:00 PM 85 116 201 41.6 66 74 140 29.0
2:00 PM 76 102 178 36.8 47 55 102 21.1
3:00 PM 63 83 146 30.2 40 42 82 17.0
4:00 PM 60 81 141 29.2 44 48 92 19.0
5:00 PM 67 100 167 34.6 57 73 130 26.9
6:00 PM 68 102 170 35.2 59 78 137 28.4
7:00 PM 59 85 144 29.8 46 58 104 21.5
8:00 PM 49 65 114 23.6 36 41 77 15.9
9:00 PM 39 52 91 18.8 24 35 59 12.2
10:00 PM 2 18 20 4.1 1 15 16 3.3
11:00 PM 0 19 19 3.9 0 12 12 2.5
Existing Average Chick-fil-a Sites
4837.7 SF
132.0 Seats
Saturday Tuesday
Time rate Avg Transactions
Avg Trips rate Avg Transactions
Avg Trips
12:00 AM 4.0 8.0 2.7 5.3
1:00 AM 1.7 3.3 1.3 2.7
2:00 AM 1.0 2.0 0.0 0.0
3:00 AM 0.7 1.3 0.3 0.7
4:00 AM 1.0 2.0 4.7 9.3
5:00 AM 2.7 5.3 2.3 4.7
6:00 AM 13.3 26.7 16.3 32.7
7:00 AM 31.3 62.7 15.99 38.7 77.3
8:00 AM 52.0 104.0 17.91 43.3 86.7
9:00 AM 69.7 139.3 45.0 90.0
10:00 AM 78.7 157.3 52.0 104.0
11:00 AM 59.81 144.7 289.3 58.02 140.3 280.7
12:00 PM 83.65 202.3 404.7 86.41 209.0 418.0
1:00 PM 195.0 390.0 152.3 304.7
2:00 PM 165.7 331.3 108.0 216.0
3:00 PM 135.0 270.0 92.3 184.7
4:00 PM 130.7 261.3 41.48 100.3 200.7
5:00 PM 153.3 306.7 56.50 136.7 273.3
6:00 PM 155.7 311.3 143.0 286.0
7:00 PM 133.0 266.0 116.3 232.7
8:00 PM 106.3 212.7 89.7 179.3
9:00 PM 80.3 160.7 62.3 124.7
10:00 PM 17.0 34.0 14.7 29.3
11:00 PM 11.3 22.7 10.3 20.7
APPENDIX F:
Volume Development Spreadsheets
WMSC.00002
7/26/2019
Traffic Volumes Worksheet
Intersection: Chestnut Street & N-S Alley/Select Medical PT Parking Lot
Synchro Node: 1 Adjacent intersections: West 0 East 0 North 0 South 0

Time Period: Weekday A.M. Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 73 206 2 0 224 2 0 1 0 2 0 10 520
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing
Existing Volumes (Balanced) 73 206 2 0 224 2 0 1 0 2 0 10 520
2020 Background Growth 1 3 0 0 4 0 0 0 0 0 0 0 8
Nearby 1 0
2020 Base Volumes 74 209 2 0 228 2 0 1 0 2 0 10 528

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 24 22 46
EXIT = 22 22 44
90

Retail Trip Assignment % - Enter 91% 9%


Retail Trip Assignment % - Exit 100%
Total New Trips 0 0 22 2 0 0 0 0 22 0 0 0 46
Retail Pass-By Trips % - Enter -7% 92% 8% -8%
Retail Pass-By Trips % - Exit 100%
Total Pass-By Trips 0 -2 20 2 -2 0 0 0 22 0 0 0 40
2020 Rerouted Trips 1 -1 0
2020 Projected Volumes 74 207 44 4 226 3 0 0 44 2 0 10 614

Time Period: Midday Weekday Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 26 177 0 0 203 3 4 0 0 3 0 49 465
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 26 177 0 0 203 3 4 0 0 3 0 49 465

2020 Background Growth 0 3 0 0 3 0 0 0 0 0 0 1 7


Nearby 1 0

2020 Base Volumes 26 180 0 0 206 3 4 0 0 3 0 50 472

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 133 89 222
EXIT = 128 85 213
435

Retail Trip Assignment % - Enter 91% 9%


Retail Trip Assignment % - Exit 100%
Total New Trips 0 0 121 12 0 0 0 0 128 0 0 0 261
Retail Pass-By Trips % - Enter -8% 91% 9% -9%
Retail Pass-By Trips % - Exit 100%
Total Pass-By Trips 0 -7 81 8 -8 0 0 0 85 0 0 0 159

2020 Rerouted Trips 4 -4 0

2020 Projected Volumes 26 173 202 20 202 3 0 0 213 3 0 50 892

Time Period: Weekday P.M. Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 21 218 0 0 304 1 3 0 2 1 0 42 592
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 21 218 0 0 304 1 3 0 2 1 0 42 592

2020 Background Growth 0 4 0 0 5 0 0 0 0 0 0 1 10


Nearby 1 0

2020 Base Volumes 21 222 0 0 309 1 3 0 2 1 0 43 602

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 74 74 148
EXIT = 68 68 136
284

Retail Trip Assignment % - Enter 91% 9%


Retail Trip Assignment % - Exit 100%
Total New Trips 0 0 67 7 0 0 0 0 68 0 0 0 142
Retail Pass-By Trips % - Enter -7% 90% 10% -10%
Retail Pass-By Trips % - Exit 100%
Total Pass-By Trips 0 -5 67 7 -7 0 0 0 68 0 0 0 130

2020 Rerouted Trips 3 -3 0

2020 Projected Volumes 21 217 134 14 305 1 0 0 138 1 0 43 874

Time Period: Saturday Midday Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 4 169 0 0 243 3 2 0 2 0 0 10 433
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 4 169 0 0 243 3 2 0 2 0 0 10 433
2020 Background Growth 0 3 0 0 4 0 0 0 0 0 0 0 7
Nearby 1 0
2020 Base Volumes 4 172 0 0 247 3 2 0 2 0 0 10 440

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 129 86 215
EXIT = 124 82 206
421
Retail Trip Assignment % - Enter 91% 9%
Retail Trip Assignment % - Exit 100%
Total New Trips 0 0 117 12 0 0 0 0 124 0 0 0 253
Retail Pass-By Trips % - Enter -7% 89% 11% -11%
Retail Pass-By Trips % - Exit 100%
Total Pass-By Trips 0 -6 77 9 -9 0 0 0 82 0 0 0 153
2020 Rerouted Trips 2 -2 0
2020 Projected Volumes 4 166 194 21 240 3 0 0 208 0 0 10 846

7/26/2019 11:46 AM
WMSC.00002
7/26/2019
Traffic Volumes Worksheet
Intersection: Chestnut Street & 32nd Street
Synchro Node: 2 Adjacent intersections: West 0 East 0 North 0 South 0

Time Period: Weekday A.M. Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 301 161 116 101 99 15 117 1340 112 10 986 218 3576
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing
Existing Volumes (Balanced) 301 161 116 101 99 15 117 1340 112 10 986 218 3576
2020 Background Growth 5 3 2 2 2 0 2 22 2 0 16 4 60
Nearby 1 10 2 12
2020 Base Volumes 306 164 118 103 101 15 119 1372 114 10 1004 222 3648

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 24 22 46
EXIT = 22 22 44
90

Retail Trip Assignment % - Enter 15% 38% 38%


Retail Trip Assignment % - Exit 15% 15% 15%
Total New Trips 0 4 0 0 0 0 3 3 9 9 3 0 31
Retail Pass-By Trips % - Enter -4% -3% -1% -49% 49% 36% -36%
Retail Pass-By Trips % - Exit 3% 20% 14%
Total Pass-By Trips 0 0 0 -1 -1 0 1 -7 11 8 -5 0 6
2020 Rerouted Trips 0
2020 Projected Volumes 306 168 118 102 100 15 123 1368 134 27 1002 222 3685

Time Period: Midday Weekday Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 265 140 161 141 98 18 140 896 46 14 916 200 3035
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 265 140 161 141 98 18 140 896 46 14 916 200 3035

2020 Background Growth 4 2 3 2 2 0 2 14 1 0 15 3 48


Nearby 1 27 11 38

2020 Base Volumes 269 142 164 143 100 18 142 937 47 14 942 203 3121

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 133 89 222
EXIT = 128 85 213
435

Retail Trip Assignment % - Enter 15% 38% 38%


Retail Trip Assignment % - Exit 15% 15% 15%
Total New Trips 0 20 0 0 0 0 19 19 51 51 19 0 179
Retail Pass-By Trips % - Enter -5% -4% -41% 41% 42% -42%
Retail Pass-By Trips % - Exit 4% 16% 17%
Total Pass-By Trips 0 0 0 -4 -4 0 3 -22 36 37 -23 0 23

2020 Rerouted Trips 0

2020 Projected Volumes 269 162 164 139 96 18 164 934 134 102 938 203 3323

Time Period: Weekday P.M. Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 246 168 223 191 145 5 174 1238 49 7 1242 247 3935
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 246 168 223 191 145 5 174 1238 49 7 1242 247 3935

2020 Background Growth 4 3 4 3 2 0 3 20 1 0 20 4 64


Nearby 1 27 11 38

2020 Base Volumes 250 171 227 194 147 5 177 1285 50 7 1273 251 4037

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 74 74 148
EXIT = 68 68 136
284

Retail Trip Assignment % - Enter 15% 38% 38%


Retail Trip Assignment % - Exit 15% 15% 15%
Total New Trips 0 11 0 0 0 0 10 10 28 28 10 0 97
Retail Pass-By Trips % - Enter -5% -5% -41% 41% 42% -42%
Retail Pass-By Trips % - Exit 5% 16% 17%
Total Pass-By Trips 0 0 0 -4 -4 0 3 -19 30 31 -19 0 18

2020 Rerouted Trips 0

2020 Projected Volumes 250 182 227 190 143 5 190 1276 108 66 1264 251 4152

Time Period: Saturday Midday Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 257 125 156 159 84 8 147 911 37 14 998 178 3074
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 257 125 156 159 84 8 147 911 37 14 998 178 3074
2020 Background Growth 4 2 3 3 1 0 2 15 1 0 16 3 50
Nearby 1 75 32 107
2020 Base Volumes 261 127 159 162 85 8 149 1001 38 14 1046 181 3231

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 129 86 215
EXIT = 124 82 206
421
Retail Trip Assignment % - Enter 15% 38% 38%
Retail Trip Assignment % - Exit 15% 15% 15%
Total New Trips 0 19 0 0 0 0 19 19 49 50 19 0 175
Retail Pass-By Trips % - Enter -7% -4% -39% 39% 43% -43%
Retail Pass-By Trips % - Exit 4% 16% 17%
Total Pass-By Trips 0 0 0 -6 -3 0 3 -21 34 37 -23 0 21
2020 Rerouted Trips 0
2020 Projected Volumes 261 146 159 156 82 8 171 999 121 101 1042 181 3427

7/26/2019 11:46 AM
WMSC.00002
7/26/2019
Traffic Volumes Worksheet
Intersection: Chestnut Street & 31st Street
Synchro Node: 3 Adjacent intersections: West 0 East 0 North 0 South 0

Time Period: Weekday A.M. Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 203 37 17 191 10 18 476
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing
Existing Volumes (Balanced) 0 203 37 17 191 0 10 0 18 0 0 0 476
2020 Background Growth 0 3 1 0 3 0 0 0 0 0 0 0 7
Nearby 1 0
2020 Base Volumes 0 206 38 17 194 0 10 0 18 0 0 0 483

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 24 22 46
EXIT = 22 22 44
90

Retail Trip Assignment % - Enter 8% 1%


Retail Trip Assignment % - Exit 46% 54%
Total New Trips 0 10 12 0 2 0 1 0 0 0 0 0 25
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 44% 49%
Total Pass-By Trips 0 10 11 0 0 0 0 0 0 0 0 0 21
2020 Rerouted Trips 1 1
2020 Projected Volumes 0 226 61 17 196 0 12 0 18 0 0 0 530

Time Period: Midday Weekday Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 189 3 10 239 9 7 457
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 0 189 3 10 239 0 9 0 7 0 0 0 457

2020 Background Growth 0 3 0 0 4 0 0 0 0 0 0 0 7


Nearby 1 0

2020 Base Volumes 0 192 3 10 243 0 9 0 7 0 0 0 464

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 133 89 222
EXIT = 128 85 213
435

Retail Trip Assignment % - Enter 8% 1%


Retail Trip Assignment % - Exit 46% 54%
Total New Trips 0 59 69 0 11 0 1 0 0 0 0 0 140
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 42% 50%
Total Pass-By Trips 0 36 43 0 0 0 0 0 0 0 0 0 79

2020 Rerouted Trips 4 4

2020 Projected Volumes 0 287 115 10 254 0 14 0 7 0 0 0 687

Time Period: Weekday P.M. Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 175 24 17 251 13 26 506
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 0 175 24 17 251 0 13 0 26 0 0 0 506

2020 Background Growth 0 3 0 0 4 0 0 0 0 0 0 0 7


Nearby 1 0

2020 Base Volumes 0 178 24 17 255 0 13 0 26 0 0 0 513

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 74 74 148
EXIT = 68 68 136
284

Retail Trip Assignment % - Enter 8% 1%


Retail Trip Assignment % - Exit 46% 54%
Total New Trips 0 31 37 0 6 0 1 0 0 0 0 0 75
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 42% 51%
Total Pass-By Trips 0 29 35 0 0 0 0 0 0 0 0 0 64

2020 Rerouted Trips 3 3

2020 Projected Volumes 0 238 96 17 261 0 17 0 26 0 0 0 655

Time Period: Saturday Midday Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 150 9 9 203 6 9 386
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 0 150 9 9 203 0 6 0 9 0 0 0 386
2020 Background Growth 0 2 0 0 3 0 0 0 0 0 0 0 5
Nearby 1 0
2020 Base Volumes 0 152 9 9 206 0 6 0 9 0 0 0 391

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 129 86 215
EXIT = 124 82 206
421
Retail Trip Assignment % - Enter 8% 1%
Retail Trip Assignment % - Exit 46% 54%
Total New Trips 0 57 67 0 10 0 1 0 0 0 0 0 135
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 40% 53%
Total Pass-By Trips 0 33 43 0 0 0 0 0 0 0 0 0 76
2020 Rerouted Trips 2 2
2020 Projected Volumes 0 242 119 9 216 0 9 0 9 0 0 0 604

7/26/2019 11:46 AM
WMSC.00002
7/26/2019
Traffic Volumes Worksheet
Intersection: Chestnut Street & 30th Street
Synchro Node: 4 Adjacent intersections: West 0 East 0 North 0 South 0

Time Period: Weekday A.M. Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 52 127 21 25 137 10 16 19 4 36 75 57 579
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing
Existing Volumes (Balanced) 52 127 21 25 137 10 16 19 4 36 75 57 579
2020 Background Growth 1 2 0 0 2 0 0 0 0 1 1 1 8
Nearby 1 0
2020 Base Volumes 53 129 21 25 139 10 16 19 4 37 76 58 587

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 24 22 46
EXIT = 22 22 44
90

Retail Trip Assignment % - Enter 5% 1% 2%


Retail Trip Assignment % - Exit 21% 24% 1%
Total New Trips 5 5 0 0 1 0 0 0 0 0 0 0 11
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 22% 22%
Total Pass-By Trips 5 5 0 0 0 0 0 0 0 0 0 0 10
2020 Rerouted Trips 0
2020 Projected Volumes 63 139 21 25 140 10 16 19 4 37 76 58 608

Time Period: Midday Weekday Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 31 153 7 18 179 5 12 10 5 2 29 44 495
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 31 153 7 18 179 5 12 10 5 2 29 44 495

2020 Background Growth 0 2 0 0 3 0 0 0 0 0 0 1 6


Nearby 1 0

2020 Base Volumes 31 155 7 18 182 5 12 10 5 2 29 45 501

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 133 89 222
EXIT = 128 85 213
435

Retail Trip Assignment % - Enter 5% 1% 2%


Retail Trip Assignment % - Exit 21% 24% 1%
Total New Trips 27 31 1 0 6 0 1 0 0 0 0 3 69
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 21% 21%
Total Pass-By Trips 18 18 0 0 0 0 0 0 0 0 0 0 36

2020 Rerouted Trips 0

2020 Projected Volumes 76 204 8 18 188 5 13 10 5 2 29 48 606

Time Period: Weekday P.M. Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 53 146 4 23 191 10 4 19 7 7 31 53 548
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 53 146 4 23 191 10 4 19 7 7 31 53 548

2020 Background Growth 1 2 0 0 3 0 0 0 0 0 0 1 7


Nearby 1 0

2020 Base Volumes 54 148 4 23 194 10 4 19 7 7 31 54 555

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 74 74 148
EXIT = 68 68 136
284

Retail Trip Assignment % - Enter 5% 1% 2%


Retail Trip Assignment % - Exit 21% 24% 1%
Total New Trips 14 16 1 0 3 0 1 0 0 0 0 1 36
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 21% 21%
Total Pass-By Trips 14 14 0 0 0 0 0 0 0 0 0 0 28

2020 Rerouted Trips 0

2020 Projected Volumes 82 178 5 23 197 10 5 19 7 7 31 55 619

Time Period: Saturday Midday Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 21 125 11 8 167 4 5 8 4 0 17 36 406
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 21 125 11 8 167 4 5 8 4 0 17 36 406
2020 Background Growth 0 2 0 0 3 0 0 0 0 0 0 1 6
Nearby 1 0
2020 Base Volumes 21 127 11 8 170 4 5 8 4 0 17 37 412

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 129 86 215
EXIT = 124 82 206
421
Retail Trip Assignment % - Enter 5% 1% 2%
Retail Trip Assignment % - Exit 21% 24% 1%
Total New Trips 26 30 1 0 6 0 1 0 0 0 0 3 67
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 20% 20%
Total Pass-By Trips 16 16 0 0 0 0 0 0 0 0 0 0 32
2020 Rerouted Trips 0
2020 Projected Volumes 63 173 12 8 176 4 6 8 4 0 17 40 511

7/26/2019 11:46 AM
WMSC.00002
7/26/2019
Traffic Volumes Worksheet
Intersection: 31st Street & E-W Alley
Synchro Node: 5 Adjacent intersections: West 0 East 0 North 0 South 0

Time Period: Weekday A.M. Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 1 0 0 0 0 1 0 22 0 0 53 0 77
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing
Existing Volumes (Balanced) 1 0 0 0 0 1 0 22 0 0 53 0 77
2020 Background Growth 0 0 0 0 0 0 0 0 0 0 1 0 1
Nearby 1 0
2020 Base Volumes 1 0 0 0 0 1 0 22 0 0 54 0 78

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 24 22 46
EXIT = 22 22 44
90

Retail Trip Assignment % - Enter 1%


Retail Trip Assignment % - Exit 54%
Total New Trips 0 0 0 0 0 0 0 1 0 0 12 0 13
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 49%
Total Pass-By Trips 0 0 0 0 0 0 0 0 0 0 11 0 11
2020 Rerouted Trips 1 1
2020 Projected Volumes 2 0 0 0 0 1 0 23 0 0 77 0 103

Time Period: Midday Weekday Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 0 0 0 0 0 0 0 25 0 0 15 1 41
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 0 0 0 0 0 0 0 25 0 0 15 1 41

2020 Background Growth 0 0 0 0 0 0 0 0 0 0 0 0 0


Nearby 1 0

2020 Base Volumes 0 0 0 0 0 0 0 25 0 0 15 1 41

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 133 89 222
EXIT = 128 85 213
435

Retail Trip Assignment % - Enter 1%


Retail Trip Assignment % - Exit 54%
Total New Trips 0 0 0 0 0 0 0 1 0 0 69 0 70
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 50%
Total Pass-By Trips 0 0 0 0 0 0 0 0 0 0 43 0 43

2020 Rerouted Trips 4 4

2020 Projected Volumes 4 0 0 0 0 0 0 26 0 0 127 1 158

Time Period: Weekday P.M. Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 0 0 0 1 0 0 0 38 1 0 38 1 79
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 0 0 0 1 0 0 0 38 1 0 38 1 79

2020 Background Growth 0 0 0 0 0 0 0 1 0 0 1 0 2


Nearby 1 0

2020 Base Volumes 0 0 0 1 0 0 0 39 1 0 39 1 81

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 74 74 148
EXIT = 68 68 136
284

Retail Trip Assignment % - Enter 1%


Retail Trip Assignment % - Exit 54%
Total New Trips 0 0 0 0 0 0 0 1 0 0 37 0 38
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 51%
Total Pass-By Trips 0 0 0 0 0 0 0 0 0 0 35 0 35

2020 Rerouted Trips 3 3

2020 Projected Volumes 3 0 0 1 0 0 0 40 1 0 111 1 157

Time Period: Saturday Midday Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 0 0 0 1 0 0 0 19 0 0 18 0 38
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 0 0 0 1 0 0 0 19 0 0 18 0 38
2020 Background Growth 0 0 0 0 0 0 0 0 0 0 0 0 0
Nearby 1 0
2020 Base Volumes 0 0 0 1 0 0 0 19 0 0 18 0 38

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 129 86 215
EXIT = 124 82 206
421
Retail Trip Assignment % - Enter 1%
Retail Trip Assignment % - Exit 54%
Total New Trips 0 0 0 0 0 0 0 1 0 0 67 0 68
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 53%
Total Pass-By Trips 0 0 0 0 0 0 0 0 0 0 43 0 43
2020 Rerouted Trips 2 2
2020 Projected Volumes 2 0 0 1 0 0 0 20 0 0 128 0 151

7/26/2019 11:46 AM
WMSC.00002
7/26/2019
Traffic Volumes Worksheet
Intersection: Bramar Road & N-S Alley/Camp Hill Chiropractic
Synchro Node: 6 Adjacent intersections: West 0 East 0 North 0 South 0

Time Period: Weekday A.M. Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 0 5 0 1 3 1 0 0 1 0 0 0 11
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing
Existing Volumes (Balanced) 0 5 0 1 3 1 0 0 1 0 0 0 11
2020 Background Growth 0 0 0 0 0 0 0 0 0 0 0 0 0
Nearby 1 0
2020 Base Volumes 0 5 0 1 3 1 0 0 1 0 0 0 11

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 24 22 46
EXIT = 22 22 44
90

Retail Trip Assignment % - Enter


Retail Trip Assignment % - Exit 30%
Total New Trips 0 0 0 0 7 0 0 0 0 0 0 0 7
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 23%
Total Pass-By Trips 0 0 0 0 5 0 0 0 0 0 0 0 5
2020 Rerouted Trips 0
2020 Projected Volumes 0 5 0 1 15 1 0 0 1 0 0 0 23

Time Period: Midday Weekday Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 2 8 1 1 5 0 0 0 3 0 0 1 21
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 2 8 1 1 5 0 0 0 3 0 0 1 21

2020 Background Growth 0 0 0 0 0 0 0 0 0 0 0 0 0


Nearby 1 0

2020 Base Volumes 2 8 1 1 5 0 0 0 3 0 0 1 21

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 133 89 222
EXIT = 128 85 213
435

Retail Trip Assignment % - Enter


Retail Trip Assignment % - Exit 30%
Total New Trips 0 0 0 0 38 0 0 0 0 0 0 0 38
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 20%
Total Pass-By Trips 0 0 0 0 17 0 0 0 0 0 0 0 17

2020 Rerouted Trips 0

2020 Projected Volumes 2 8 1 1 60 0 0 0 3 0 0 1 76

Time Period: Weekday P.M. Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 1 7 5 15 2 0 1 0 22 1 0 0 54
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 1 7 5 15 2 0 1 0 22 1 0 0 54

2020 Background Growth 0 0 0 0 0 0 0 0 0 0 0 0 0


Nearby 1 0

2020 Base Volumes 1 7 5 15 2 0 1 0 22 1 0 0 54

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 74 74 148
EXIT = 68 68 136
284

Retail Trip Assignment % - Enter


Retail Trip Assignment % - Exit 30%
Total New Trips 0 0 0 0 20 0 0 0 0 0 0 0 20
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 21%
Total Pass-By Trips 0 0 0 0 14 0 0 0 0 0 0 0 14

2020 Rerouted Trips 0

2020 Projected Volumes 1 7 5 15 36 0 1 0 22 1 0 0 88

Time Period: Saturday Midday Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 0 4 0 1 3 1 0 0 1 0 0 0 10
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 0 4 0 1 3 1 0 0 1 0 0 0 10
2020 Background Growth 0 0 0 0 0 0 0 0 0 0 0 0 0
Nearby 1 0
2020 Base Volumes 0 4 0 1 3 1 0 0 1 0 0 0 10

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 129 86 215
EXIT = 124 82 206
421
Retail Trip Assignment % - Enter
Retail Trip Assignment % - Exit 30%
Total New Trips 0 0 0 0 37 0 0 0 0 0 0 0 37
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 20%
Total Pass-By Trips 0 0 0 0 16 0 0 0 0 0 0 0 16
2020 Rerouted Trips 0
2020 Projected Volumes 0 4 0 1 56 1 0 0 1 0 0 0 63

7/26/2019 11:46 AM
WMSC.00002
7/26/2019
Traffic Volumes Worksheet
Intersection: Harvard Avenue & 32nd Street
Synchro Node: 7 Adjacent intersections: West 0 East 0 North 0 South 0

Time Period: Weekday A.M. Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 16 8 67 87 8 2 133 1562 10 21 1230 12 3156
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing
Existing Volumes (Balanced) 16 8 67 87 8 2 133 1562 10 21 1230 12 3156
2020 Background Growth 0 0 1 1 0 0 2 25 0 0 20 0 49
Nearby 1 0
2020 Base Volumes 16 8 68 88 8 2 135 1587 10 21 1250 12 3205

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 24 22 46
EXIT = 22 22 44
90

Retail Trip Assignment % - Enter 38%


Retail Trip Assignment % - Exit 23% 15%
Total New Trips 0 0 0 5 0 0 0 9 0 0 3 0 17
Retail Pass-By Trips % - Enter -40%
Retail Pass-By Trips % - Exit 26% 14%
Total Pass-By Trips 0 0 0 6 0 0 0 0 0 0 -6 0 0
2020 Rerouted Trips 0
2020 Projected Volumes 16 8 68 99 8 2 135 1596 10 21 1247 12 3222

Time Period: Midday Weekday Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 115 29 284 81 25 5 301 1062 16 9 1171 57 3155
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 115 29 284 81 25 5 301 1062 16 9 1171 57 3155

2020 Background Growth 2 0 5 1 0 0 5 17 0 0 19 1 50


Nearby 1 0

2020 Base Volumes 117 29 289 82 25 5 306 1079 16 9 1190 58 3205

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 133 89 222
EXIT = 128 85 213
435

Retail Trip Assignment % - Enter 38%


Retail Trip Assignment % - Exit 23% 15%
Total New Trips 0 0 0 29 0 0 0 51 0 0 19 0 99
Retail Pass-By Trips % - Enter -47%
Retail Pass-By Trips % - Exit 30% 17%
Total Pass-By Trips 0 0 0 26 0 0 0 0 0 0 -28 0 -2

2020 Rerouted Trips 0

2020 Projected Volumes 117 29 289 137 25 5 306 1130 16 9 1181 58 3302

Time Period: Weekday P.M. Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 70 18 275 117 13 10 238 1448 15 7 1696 34 3941
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 70 18 275 117 13 10 238 1448 15 7 1696 34 3941

2020 Background Growth 1 0 4 2 0 0 4 23 0 0 27 1 62


Nearby 1 0

2020 Base Volumes 71 18 279 119 13 10 242 1471 15 7 1723 35 4003

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 74 74 148
EXIT = 68 68 136
284

Retail Trip Assignment % - Enter 38%


Retail Trip Assignment % - Exit 23% 15%
Total New Trips 0 0 0 16 0 0 0 28 0 0 10 0 54
Retail Pass-By Trips % - Enter 17%
Retail Pass-By Trips % - Exit 30% -47%
Total Pass-By Trips 0 0 0 20 0 0 0 0 0 0 -19 0 1

2020 Rerouted Trips 0

2020 Projected Volumes 71 18 279 155 13 10 242 1499 15 7 1714 35 4058

Time Period: Saturday Midday Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 113 16 329 87 22 1 310 997 8 6 1106 75 3070
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 113 16 329 87 22 1 310 997 8 6 1106 75 3070
2020 Background Growth 2 0 5 1 0 0 5 16 0 0 18 1 48
Nearby 1 0
2020 Base Volumes 115 16 334 88 22 1 315 1013 8 6 1124 76 3118

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 129 86 215
EXIT = 124 82 206
421
Retail Trip Assignment % - Enter 38%
Retail Trip Assignment % - Exit 23% 15%
Total New Trips 0 0 0 29 0 0 0 49 0 0 19 0 97
Retail Pass-By Trips % - Enter -50%
Retail Pass-By Trips % - Exit 33% 17%
Total Pass-By Trips 0 0 0 27 0 0 0 0 0 0 -29 0 -2
2020 Rerouted Trips 0
2020 Projected Volumes 115 16 334 144 22 1 315 1062 8 6 1114 76 3213

7/26/2019 11:46 AM
WMSC.00002
7/26/2019
Traffic Volumes Worksheet
Intersection: 30th Street & Market Street
Synchro Node: 8 Adjacent intersections: West 0 East 0 North 0 South 0

Time Period: Weekday A.M. Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 1 344 22 62 223 4 8 13 68 7 71 24 847
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing
Existing Volumes (Balanced) 1 344 22 62 223 4 8 13 68 7 71 24 847
2020 Background Growth 0 6 0 1 4 0 0 0 1 0 1 0 13
Nearby 1 0
2020 Base Volumes 1 350 22 63 227 4 8 13 69 7 72 24 860

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 24 22 46
EXIT = 22 22 44
90

Retail Trip Assignment % - Enter 2%


Retail Trip Assignment % - Exit 19% 2%
Total New Trips 0 0 0 0 0 0 4 0 0 0 0 0 4
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 22% 22%
Total Pass-By Trips 0 0 0 0 5 0 5 0 0 0 0 0 10
2020 Rerouted Trips 0
2020 Projected Volumes 1 350 22 63 232 4 17 13 69 7 72 24 874

Time Period: Midday Weekday Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 7 391 16 31 380 7 9 8 20 6 25 21 921
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 7 391 16 31 380 7 9 8 20 6 25 21 921

2020 Background Growth 0 6 0 0 6 0 0 0 0 0 0 0 12


Nearby 1 0

2020 Base Volumes 7 397 16 31 386 7 9 8 20 6 25 21 933

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 133 89 222
EXIT = 128 85 213
435

Retail Trip Assignment % - Enter 2%


Retail Trip Assignment % - Exit 19% 2%
Total New Trips 0 0 0 3 0 0 24 0 3 0 0 0 30
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 21% 21%
Total Pass-By Trips 0 0 0 0 18 0 18 0 0 0 0 0 36

2020 Rerouted Trips 0

2020 Projected Volumes 7 397 16 34 404 7 51 8 23 6 25 21 999

Time Period: Weekday P.M. Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 17 385 9 49 415 13 2 14 30 8 16 13 971
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 17 385 9 49 415 13 2 14 30 8 16 13 971

2020 Background Growth 0 6 0 1 7 0 0 0 0 0 0 0 14


Nearby 1 0

2020 Base Volumes 17 391 9 50 422 13 2 14 30 8 16 13 985

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 74 74 148
EXIT = 68 68 136
284

Retail Trip Assignment % - Enter 2%


Retail Trip Assignment % - Exit 19% 2%
Total New Trips 0 0 0 1 0 0 13 0 1 0 0 0 15
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 21% 21%
Total Pass-By Trips 0 0 0 0 14 0 14 0 0 0 0 0 28

2020 Rerouted Trips 0

2020 Projected Volumes 17 391 9 51 436 13 29 14 31 8 16 13 1028

Time Period: Saturday Midday Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 7 430 8 31 396 6 6 4 26 11 15 14 954
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 7 430 8 31 396 6 6 4 26 11 15 14 954
2020 Background Growth 0 7 0 0 6 0 0 0 0 0 0 0 13
Nearby 1 0
2020 Base Volumes 7 437 8 31 402 6 6 4 26 11 15 14 967

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 129 86 215
EXIT = 124 82 206
421
Retail Trip Assignment % - Enter 2%
Retail Trip Assignment % - Exit 19% 2%
Total New Trips 0 0 0 3 0 0 24 0 2 0 0 0 29
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 20% 20%
Total Pass-By Trips 0 0 0 0 16 0 16 0 0 0 0 0 32
2020 Rerouted Trips 0
2020 Projected Volumes 7 437 8 34 418 6 46 4 28 11 15 14 1028

7/26/2019 11:46 AM
WMSC.00002
7/26/2019
Traffic Volumes Worksheet
Intersection: 29th Street & Market Street
Synchro Node: 9 Adjacent intersections: West 0 East 0 North 0 South 0

Time Period: Weekday A.M. Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 5 401 11 26 272 3 4 4 18 3 6 18 771
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing
Existing Volumes (Balanced) 5 401 11 26 272 3 4 4 18 3 6 18 771
2020 Background Growth 0 6 0 0 4 0 0 0 0 0 0 0 10
Nearby 1 0
2020 Base Volumes 5 407 11 26 276 3 4 4 18 3 6 18 781

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 24 22 46
EXIT = 22 22 44
90

Retail Trip Assignment % - Enter 2%


Retail Trip Assignment % - Exit 2% 19%
Total New Trips 0 0 0 0 0 0 4 0 0 0 0 0 4
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 22%
Total Pass-By Trips 0 0 0 0 0 0 5 0 0 0 0 0 5
2020 Rerouted Trips 0
2020 Projected Volumes 5 407 11 26 276 3 13 4 18 3 6 18 790

Time Period: Midday Weekday Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 5 408 4 19 396 10 3 8 8 4 0 18 883
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 5 408 4 19 396 10 3 8 8 4 0 18 883

2020 Background Growth 0 7 0 0 6 0 0 0 0 0 0 0 13


Nearby 1 0

2020 Base Volumes 5 415 4 19 402 10 3 8 8 4 0 18 896

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 133 89 222
EXIT = 128 85 213
435

Retail Trip Assignment % - Enter 2%


Retail Trip Assignment % - Exit 2% 19%
Total New Trips 0 3 0 0 3 0 24 0 0 0 0 0 30
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 21%
Total Pass-By Trips 0 0 0 0 0 0 18 0 0 0 0 0 18

2020 Rerouted Trips 0

2020 Projected Volumes 5 418 4 19 405 10 45 8 8 4 0 18 944

Time Period: Weekday P.M. Peak Hour

Eastbound Westbound Northbound Southbound Intersection


left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 6 424 7 38 452 11 0 4 9 9 6 9 975
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 6 424 7 38 452 11 0 4 9 9 6 9 975

2020 Background Growth 0 7 0 1 7 0 0 0 0 0 0 0 15


Nearby 1 0

2020 Base Volumes 6 431 7 39 459 11 0 4 9 9 6 9 990

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 74 74 148
EXIT = 68 68 136
284

Retail Trip Assignment % - Enter 2%


Retail Trip Assignment % - Exit 2% 19%
Total New Trips 0 1 0 0 1 0 13 0 0 0 0 0 15
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 21%
Total Pass-By Trips 0 0 0 0 0 0 14 0 0 0 0 0 14

2020 Rerouted Trips 0

2020 Projected Volumes 6 432 7 39 460 11 27 4 9 9 6 9 1019

Time Period: Saturday Midday Peak Hour


Eastbound Westbound Northbound Southbound Intersection
left thru right left thru right left thru right left thru right Volume
2018 Existing Counts 9 457 3 16 421 4 3 2 12 3 3 8 941
Seasonal Adjustment Factor 0 0 0 0 0 0 0 0 0 0 0 0 0
Balancing 0
Existing Volumes (Balanced) 9 457 3 16 421 4 3 2 12 3 3 8 941
2020 Background Growth 0 7 0 0 7 0 0 0 0 0 0 0 14
Nearby 1 0
2020 Base Volumes 9 464 3 16 428 4 3 2 12 3 3 8 955

Retail Use #2 Use #3 Use #4


New P-By New P-By New P-By New P-By
ENTER = 129 86 215
EXIT = 124 82 206
421
Retail Trip Assignment % - Enter 2%
Retail Trip Assignment % - Exit 2% 19%
Total New Trips 0 2 0 0 3 0 24 0 0 0 0 0 29
Retail Pass-By Trips % - Enter
Retail Pass-By Trips % - Exit 21%
Total Pass-By Trips 0 0 0 0 0 0 17 0 0 0 0 0 17
2020 Rerouted Trips 0
2020 Projected Volumes 9 466 3 16 431 4 44 2 12 3 3 8 1001

7/26/2019 11:46 AM
APPENDIX G:
Capacity and Queue Analysis Worksheets
TABLE 1
INITIAL QUEUE OBSERVATIONS
S. 32nd Street (SR 0015) & Trindle Road (SR 0641)/Chestnut Street
Signal Cycle1 Initial
Time Period Movement
Cycle 1 Cycle 2 Cycle 3 Queue2
EB L 1 2 0 1
EB T 0 0 0 0
EB R 0 0 0 0
WB L 0 0 0 0
Weekday A.M. Peak Hour WB TR 0 0 0 0
7:30 – 8:30 A.M. NB L 0 0 0 0
NB TR 0 0 0 0
SB L 0 0 0 0
SB T 0 0 0 0
SB R 0 0 0 0
EB L 0 0 0 0
EB T 0 0 0 0
EB R 0 0 0 0
WB L 0 0 0 0
Weekday Midday Peak Hour WB TR 0 0 0 0
11:45 A.M. – 12:45 P.M. NB L 0 0 0 0
NB TR 0 0 0 0
SB L 0 0 0 0
SB T 0 0 0 0
SB R 0 0 0 0
EB L 1 1 0 1
EB T 0 0 0 0
EB R 0 0 0 0
WB L 0 0 0 0
Weekday P.M. Peak Hour WB TR 0 0 0 0
4:15 – 5:15 P.M. NB L 1 0 0 0
NB TR 0 0 0 0
SB L 0 0 0 0
SB T 0 0 0 0
SB R 0 0 0 0
EB L 1 3 0 1
EB T 0 0 0 0
EB R 0 0 0 0
WB L 0 0 0 0
Saturday Midday Peak Hour WB TR 0 0 0 0
11:30 A.M. – 12:30 P.M. NB L 1 0 0 0
NB TR 0 0 0 0
SB L 0 0 0 0
SB T 0 0 0 0
SB R 0 0 0 0
1
Signal cycles immediately prior to the beginning of the peak period
2
Initial Queue = Average of the three (3) signal cycles
Existing Conditions
1: N-S Alley & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 73 206 2 0 224 2 0 1 0 2 0 10
Future Volume (vph) 73 206 2 0 224 2 0 1 0 2 0 10
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 11 11 11 12 12 12
Grade (%) 0% 0% -2% 0%
Satd. Flow (prot) 0 1860 0 0 1861 0 0 1855 0 0 1670 0
Flt Permitted 0.987 0.992
Satd. Flow (perm) 0 1860 0 0 1861 0 0 1855 0 0 1670 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 325 227 190 155
Travel Time (s) 8.9 6.2 5.2 4.2
Confl. Peds. (#/hr) 3 1 1 3
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 0% 1% 0% 0% 2% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 299 0 0 240 0 0 1 0 0 13 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 40.4% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 1
1: N-S Alley & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 1.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 73 206 2 0 224 2 0 1 0 2 0 10
Future Vol, veh/h 73 206 2 0 224 2 0 1 0 2 0 10
Conflicting Peds, #/hr 3 0 1 1 0 3 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - -2 - - 0 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94
Heavy Vehicles, % 0 1 0 0 2 0 0 0 0 0 0 0
Mvmt Flow 78 219 2 0 238 2 0 1 0 2 0 11

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 243 0 0 222 0 0 622 620 221 619 620 242
Stage 1 - - - - - - 377 377 - 242 242 -
Stage 2 - - - - - - 245 243 - 377 378 -
Critical Hdwy 4.3 - - 4.3 - - 6.7 6.1 6 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 5.7 5.1 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 5.7 5.1 - 6.1 5.5 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 992 - - 1008 - - 483 436 882 453 407 848
Stage 1 - - - - - - 770 646 - 879 709 -
Stage 2 - - - - - - 900 728 - 738 619 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 989 - - 1007 - - 444 395 881 420 369 846
Mov Cap-2 Maneuver - - - - - - 444 395 - 420 369 -
Stage 1 - - - - - - 700 587 - 797 707 -
Stage 2 - - - - - - 889 726 - 670 563 -

Approach EB WB NB SB
HCM Control Delay, s 2.3 0 14.1 10.1
HCM LOS B B

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 395 989 - - 1007 - - 724
HCM Lane V/C Ratio 0.003 0.079 - - - - - 0.018
HCM Control Delay (s) 14.1 8.9 0 - 0 - - 10.1
HCM Lane LOS B A A - A - - B
HCM 95th %tile Q(veh) 0 0.3 - - 0 - - 0.1

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 2
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 301 161 116 101 99 15 117 1340 112 10 986 218
Future Volume (vph) 301 161 116 101 99 15 117 1340 112 10 986 218
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 12 12 14 10 10 10 11 11 11 10 11 11
Grade (%) -1% -1% 1% -1%
Storage Length (ft) 250 250 150 0 640 0 110 0
Storage Lanes 1 1 1 0 1 0 1 1
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1685 1809 1562 1588 1608 0 1566 3189 0 1458 3257 1472
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1675 1809 1541 1582 1608 0 1566 3189 0 1458 3257 1472
Right Turn on Red No No Yes Yes
Satd. Flow (RTOR) 6 220
Link Speed (mph) 35 25 35 35
Link Distance (ft) 525 325 1233 312
Travel Time (s) 10.2 8.9 24.0 6.1
Confl. Peds. (#/hr) 3 1 1 3
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 2% 0% 5% 1% 2% 7% 5% 2% 1% 10% 2% 1%
Shared Lane Traffic (%)
Lane Group Flow (vph) 327 175 126 110 124 0 127 1579 0 11 1072 237
Turn Type Split NA pm+ov Split NA Prot NA Prot NA pm+ov
Protected Phases 4 4 5 8 8 5 2 1 6 4
Permitted Phases 4 6
Detector Phase 4 4 5 8 8 5 2 1 6 4
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 10.0 7.0 10.0 7.0
Minimum Split (s) 13.0 13.0 13.5 13.1 13.1 13.5 16.5 13.5 16.5 13.0
Total Split (s) 24.0 24.0 13.6 15.0 15.0 13.6 55.5 13.5 55.4 24.0
Total Split (%) 16.0% 16.0% 9.1% 10.0% 10.0% 9.1% 37.0% 9.0% 36.9% 16.0%
Yellow Time (s) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
All-Red Time (s) 2.3 2.3 2.8 2.4 2.4 2.8 2.8 2.8 2.8 2.3
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.0 5.0 5.5 5.1 5.1 5.5 5.5 5.5 5.5 5.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None None
Act Effct Green (s) 19.4 19.4 27.2 10.1 10.1 8.3 59.3 8.2 47.4 72.4
Actuated g/C Ratio 0.17 0.17 0.24 0.09 0.09 0.07 0.52 0.07 0.42 0.64
v/c Ratio 1.13 0.56 0.34 0.77 0.87 1.11 0.94 0.10 0.79 0.23
Control Delay 136.2 53.9 25.9 86.0 98.6 166.9 38.7 59.1 35.0 3.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 136.2 53.9 25.9 86.0 98.6 166.9 38.7 59.1 35.0 3.0
LOS F D C F F F D E C A
Approach Delay 91.1 92.7 48.3 29.4
Approach LOS F F D C
Queue Length 50th (ft) ~245 108 49 73 83 ~93 438 7 304 3
Queue Length 95th (ft) #648 #283 92 #251 #284 #312 #1262 33 #704 55

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 3
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 7.0
Minimum Split (s) 42.0
Total Split (s) 42.0
Total Split (%) 28%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 4
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 445 245 1153 232
Turn Bay Length (ft) 250 250 150 640 110
Base Capacity (vph) 289 310 372 142 143 114 1673 105 1468 1021
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 1.13 0.56 0.34 0.77 0.87 1.11 0.94 0.10 0.73 0.23
Intersection Summary
Area Type: Other
Cycle Length: 150
Actuated Cycle Length: 113.1
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 1.13
Intersection Signal Delay: 51.5 Intersection LOS: D
Intersection Capacity Utilization 90.4% ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 2: S 32nd Street & Trindle Road/Chestnut Street

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 5
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 6
3: 31st Street & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (vph) 203 37 17 191 10 18
Future Volume (vph) 203 37 17 191 10 18
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 0% 0% -1%
Satd. Flow (prot) 1836 0 0 1875 1714 0
Flt Permitted 0.996 0.983
Satd. Flow (perm) 1836 0 0 1875 1714 0
Link Speed (mph) 25 25 25
Link Distance (ft) 227 445 204
Travel Time (s) 6.2 12.1 5.6
Confl. Peds. (#/hr) 7 7
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89
Heavy Vehicles (%) 1% 3% 0% 1% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 270 0 0 234 31 0
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 34.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 7
3: 31st Street & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 0.9
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 203 37 17 191 10 18
Future Vol, veh/h 203 37 17 191 10 18
Conflicting Peds, #/hr 0 7 7 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 -1 -
Peak Hour Factor 89 89 89 89 89 89
Heavy Vehicles, % 1 3 0 1 0 0
Mvmt Flow 228 42 19 215 11 20

Major/Minor Major1 Major2 Minor1


Conflicting Flow All 0 0 277 0 509 256
Stage 1 - - - - 256 -
Stage 2 - - - - 253 -
Critical Hdwy - - 4.3 - 6.2 6.1
Critical Hdwy Stg 1 - - - - 5.2 -
Critical Hdwy Stg 2 - - - - 5.2 -
Follow-up Hdwy - - 3 - 3 3.1
Pot Cap-1 Maneuver - - 965 - 613 839
Stage 1 - - - - 921 -
Stage 2 - - - - 924 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 959 - 595 833
Mov Cap-2 Maneuver - - - - 595 -
Stage 1 - - - - 915 -
Stage 2 - - - - 904 -

Approach EB WB NB
HCM Control Delay, s 0 0.7 10.2
HCM LOS B

Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT


Capacity (veh/h) 729 - - 959 -
HCM Lane V/C Ratio 0.043 - - 0.02 -
HCM Control Delay (s) 10.2 - - 8.8 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.1 - - 0.1 -

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 8
4: 30th Street & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 52 127 21 25 137 10 16 19 4 36 75 57
Future Volume (vph) 52 127 21 25 137 10 16 19 4 36 75 57
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 0% 1% -1% -1%
Satd. Flow (prot) 0 1816 0 0 1862 0 0 1801 0 0 1766 0
Flt Permitted 0.987 0.993 0.980 0.989
Satd. Flow (perm) 0 1816 0 0 1862 0 0 1801 0 0 1766 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 445 215 319 515
Travel Time (s) 12.1 5.9 8.7 14.0
Confl. Peds. (#/hr) 16 1 1 16 3 3
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles (%) 0% 2% 5% 0% 0% 0% 6% 0% 0% 0% 3% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 250 0 0 215 0 0 49 0 0 210 0
Sign Control Stop Stop Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 35.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 9
4: 30th Street & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Intersection
Intersection Delay, s/veh 10
Intersection LOS A

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 52 127 21 25 137 10 16 19 4 36 75 57
Future Vol, veh/h 52 127 21 25 137 10 16 19 4 36 75 57
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles, % 0 2 5 0 0 0 6 0 0 0 3 2
Mvmt Flow 65 159 26 31 171 13 20 24 5 45 94 71
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 10.3 9.9 9 10
HCM LOS B A A A

Lane NBLn1 EBLn1 WBLn1 SBLn1


Vol Left, % 41% 26% 15% 21%
Vol Thru, % 49% 64% 80% 45%
Vol Right, % 10% 10% 6% 34%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 39 200 172 168
LT Vol 16 52 25 36
Through Vol 19 127 137 75
RT Vol 4 21 10 57
Lane Flow Rate 49 250 215 210
Geometry Grp 1 1 1 1
Degree of Util (X) 0.073 0.333 0.29 0.286
Departure Headway (Hd) 5.423 4.802 4.848 4.905
Convergence, Y/N Yes Yes Yes Yes
Cap 653 743 735 727
Service Time 3.521 2.871 2.919 2.979
HCM Lane V/C Ratio 0.075 0.336 0.293 0.289
HCM Control Delay 9 10.3 9.9 10
HCM Lane LOS A B A A
HCM 95th-tile Q 0.2 1.5 1.2 1.2

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 10
5: 31st Street & E-W Alley WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 1 0 0 0 0 1 0 22 0 0 53 0
Future Volume (vph) 1 0 0 0 0 1 0 22 0 0 53 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 12 12 12 12 12 12 12 12 12
Grade (%) -5% 0% 1% 0%
Satd. Flow (prot) 0 1727 0 0 1644 0 0 1890 0 0 1863 0
Flt Permitted 0.950
Satd. Flow (perm) 0 1727 0 0 1644 0 0 1890 0 0 1863 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 151 181 206 204
Travel Time (s) 4.1 4.9 5.6 5.6
Confl. Peds. (#/hr) 2 3 3 2
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 2% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 1 0 0 1 0 0 28 0 0 66 0
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 14.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 11
5: 31st Street & E-W Alley WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 0 0 0 0 1 0 22 0 0 53 0
Future Vol, veh/h 1 0 0 0 0 1 0 22 0 0 53 0
Conflicting Peds, #/hr 0 0 0 0 0 0 2 0 3 3 0 2
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - -5 - - 0 - - 1 - - 0 -
Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 2 0
Mvmt Flow 1 0 0 0 0 1 0 28 0 0 66 0

Major/Minor Minor2 Minor1 Major1 Major2


Conflicting Flow All 97 99 68 97 99 31 68 0 0 31 0 0
Stage 1 68 68 - 31 31 - - - - - - -
Stage 2 29 31 - 66 68 - - - - - - -
Critical Hdwy 6.1 5.5 5.7 7.1 6.5 6.2 4.3 - - 4.3 - -
Critical Hdwy Stg 1 5.1 4.5 - 6.1 5.5 - - - - - - -
Critical Hdwy Stg 2 5.1 4.5 - 6.1 5.5 - - - - - - -
Follow-up Hdwy 3 4 3.1 3 4 3.1 3 - - 3 - -
Pot Cap-1 Maneuver 1060 817 1074 1032 795 1116 1138 - - 1171 - -
Stage 1 1121 858 - 1153 873 - - - - - - -
Stage 2 1166 881 - 1103 842 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1057 813 1072 1029 791 1113 1136 - - 1168 - -
Mov Cap-2 Maneuver 1057 813 - 1029 791 - - - - - - -
Stage 1 1119 856 - 1150 870 - - - - - - -
Stage 2 1165 878 - 1103 840 - - - - - - -

Approach EB WB NB SB
HCM Control Delay, s 8.4 8.2 0 0
HCM LOS A A

Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1136 - - 1057 1113 1168 - -
HCM Lane V/C Ratio - - - 0.001 0.001 - - -
HCM Control Delay (s) 0 - - 8.4 8.2 0 - -
HCM Lane LOS A - - A A A - -
HCM 95th %tile Q(veh) 0 - - 0 0 0 - -

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 12
6: Bramar Road & N-S Alley WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 5 0 1 3 1 0 0 1 0 0 0
Future Volume (vph) 0 5 0 1 3 1 0 0 1 0 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 11 11
Grade (%) 3% -4% 0% -3%
Satd. Flow (prot) 0 1872 0 0 1873 0 0 1644 0 0 1864 0
Flt Permitted 0.991
Satd. Flow (perm) 0 1872 0 0 1873 0 0 1644 0 0 1864 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 131 186 162 179
Travel Time (s) 3.6 5.1 4.4 4.9
Peak Hour Factor 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 11 0 0 11 0 0 2 0 0 0 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 13
6: Bramar Road & N-S Alley WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 1.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 5 0 1 3 1 0 0 1 0 0 0
Future Vol, veh/h 0 5 0 1 3 1 0 0 1 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 3 - - -4 - - 0 - - -3 -
Peak Hour Factor 46 46 46 46 46 46 46 46 46 46 46 46
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 0 11 0 2 7 2 0 0 2 0 0 0

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 9 0 0 11 0 0 23 24 11 24 23 8
Stage 1 - - - - - - 11 11 - 12 12 -
Stage 2 - - - - - - 12 13 - 12 11 -
Critical Hdwy 4.3 - - 4.3 - - 7.1 6.5 6.2 6.5 5.9 5.9
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 5.5 4.9 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 5.5 4.9 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1192 - - 1190 - - 1158 873 1145 1161 878 1150
Stage 1 - - - - - - 1183 890 - 1184 891 -
Stage 2 - - - - - - 1182 889 - 1184 892 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1192 - - 1190 - - 1156 871 1145 1158 876 1150
Mov Cap-2 Maneuver - - - - - - 1156 871 - 1158 876 -
Stage 1 - - - - - - 1183 890 - 1184 889 -
Stage 2 - - - - - - 1180 887 - 1182 892 -

Approach EB WB NB SB
HCM Control Delay, s 0 1.6 8.2 0
HCM LOS A A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1145 1192 - - 1190 - - -
HCM Lane V/C Ratio 0.002 - - - 0.002 - - -
HCM Control Delay (s) 8.2 0 - - 8 0 - 0
HCM Lane LOS A A - - A A - A
HCM 95th %tile Q(veh) 0 0 - - 0 - - -

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 14
7: S 32nd Street & Harvard Avenue WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 16 8 67 87 8 2 133 1562 10 21 1230 12
Future Volume (vph) 16 8 67 87 8 2 133 1562 10 21 1230 12
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 14 14 14 12 12 12 12 12 12 12 12 12
Grade (%) -2% 0% -1% -2%
Storage Length (ft) 150 0 0 0 400 0 160 0
Storage Lanes 1 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1406 1939 1600 0 1702 0 1719 3366 0 1727 3384 0
Flt Permitted 0.769 0.742 0.110 0.080
Satd. Flow (perm) 1138 1939 1600 0 1320 0 199 3366 0 145 3384 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 73 1 1 1
Link Speed (mph) 25 25 35 35
Link Distance (ft) 357 317 547 1233
Travel Time (s) 9.7 8.6 10.7 24.0
Confl. Peds. (#/hr) 1 1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 31% 0% 3% 1% 0% 0% 0% 2% 0% 0% 2% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 17 9 73 0 106 0 145 1709 0 23 1350 0
Turn Type Perm NA pm+ov Perm NA pm+pt NA pm+pt NA
Protected Phases 4 5 8 5 2 1 6
Permitted Phases 4 4 8 2 6
Detector Phase 4 4 5 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0
Minimum Split (s) 24.2 24.2 11.4 24.2 24.2 11.4 24.4 11.4 24.4
Total Split (s) 24.4 24.4 16.2 24.4 24.4 16.2 76.1 11.5 71.4
Total Split (%) 16.3% 16.3% 10.8% 16.3% 16.3% 10.8% 50.7% 7.7% 47.6%
Yellow Time (s) 3.0 3.0 3.8 3.0 3.0 3.8 3.8 3.8 3.8
All-Red Time (s) 3.2 3.2 2.6 3.2 3.2 2.6 2.6 2.6 2.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.2 5.2 5.4 5.2 5.4 5.4 5.4 5.4
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None
Act Effct Green (s) 14.6 14.6 29.9 14.6 76.9 73.2 67.1 60.8
Actuated g/C Ratio 0.14 0.14 0.28 0.14 0.71 0.68 0.62 0.56
v/c Ratio 0.11 0.03 0.15 0.60 0.50 0.75 0.13 0.71
Control Delay 49.3 48.2 6.8 61.7 15.7 18.7 10.9 22.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 49.3 48.2 6.8 61.7 15.7 18.7 10.9 22.7
LOS D D A E B B B C
Approach Delay 17.9 61.7 18.5 22.5
Approach LOS B E B C
Queue Length 50th (ft) 9 5 0 60 21 246 3 291
Queue Length 95th (ft) 41 26 28 #168 #120 #1118 25 750

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 15
7: S 32nd Street & Harvard Avenue WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 38.0
Total Split (s) 38.0
Total Split (%) 25%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 16
7: S 32nd Street & Harvard Avenue WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 277 237 467 1153
Turn Bay Length (ft) 150 400 160
Base Capacity (vph) 209 356 501 243 298 2278 182 2138
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.08 0.03 0.15 0.44 0.49 0.75 0.13 0.63
Intersection Summary
Area Type: Other
Cycle Length: 150
Actuated Cycle Length: 108.1
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.75
Intersection Signal Delay: 21.4 Intersection LOS: C
Intersection Capacity Utilization 75.7% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 7: S 32nd Street & Harvard Avenue

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 17
7: S 32nd Street & Harvard Avenue WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 18
8: 30th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 1 344 22 62 223 4 8 13 68 7 71 24
Future Volume (vph) 1 344 22 62 223 4 8 13 68 7 71 24
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 1% 1% 2% -2%
Satd. Flow (prot) 0 1633 0 0 1634 0 0 1677 0 0 1667 0
Flt Permitted 0.989 0.995 0.997
Satd. Flow (perm) 0 1633 0 0 1634 0 0 1677 0 0 1667 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 426 373 515 207
Travel Time (s) 11.6 10.2 14.0 5.6
Confl. Peds. (#/hr) 1 1 3 1 1 3
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Heavy Vehicles (%) 0% 3% 9% 2% 3% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 407 0 0 321 0 0 99 0 0 114 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 52.6% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 19
8: 30th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 4.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 344 22 62 223 4 8 13 68 7 71 24
Future Vol, veh/h 1 344 22 62 223 4 8 13 68 7 71 24
Conflicting Peds, #/hr 0 0 1 1 0 0 3 0 1 1 0 3
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 1 - - 1 - - 2 - - -2 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 0 3 9 2 3 0 0 0 0 0 0 0
Mvmt Flow 1 382 24 69 248 4 9 14 76 8 79 27

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 252 0 0 407 0 0 841 787 396 830 797 253
Stage 1 - - - - - - 397 397 - 388 388 -
Stage 2 - - - - - - 444 390 - 442 409 -
Critical Hdwy 4.3 - - 4.3 - - 7.5 6.9 6.4 6.7 6.1 6
Critical Hdwy Stg 1 - - - - - - 6.5 5.9 - 5.7 5.1 -
Critical Hdwy Stg 2 - - - - - - 6.5 5.9 - 5.7 5.1 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 985 - - 870 - - 289 299 678 355 352 848
Stage 1 - - - - - - 688 581 - 760 639 -
Stage 2 - - - - - - 644 585 - 712 627 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 985 - - 869 - - 210 271 677 281 319 846
Mov Cap-2 Maneuver - - - - - - 210 271 - 281 319 -
Stage 1 - - - - - - 687 580 - 759 580 -
Stage 2 - - - - - - 488 531 - 616 626 -

Approach EB WB NB SB
HCM Control Delay, s 0 2 14.5 19
HCM LOS B C

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 477 985 - - 869 - - 370
HCM Lane V/C Ratio 0.207 0.001 - - 0.079 - - 0.306
HCM Control Delay (s) 14.5 8.7 0 - 9.5 0 - 19
HCM Lane LOS B A A - A A - C
HCM 95th %tile Q(veh) 0.8 0 - - 0.3 - - 1.3

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 20
9: 29th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 5 401 11 26 272 3 4 4 18 3 6 18
Future Volume (vph) 5 401 11 26 272 3 4 4 18 3 6 18
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Grade (%) -1% 0% -2% -1%
Satd. Flow (prot) 0 1567 0 0 1743 0 0 1435 0 0 1384 0
Flt Permitted 0.997 0.952
Satd. Flow (perm) 0 1563 0 0 1666 0 0 1444 0 0 1389 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 2 1 20 20
Link Speed (mph) 25 25 25 25
Link Distance (ft) 373 270 277 210
Travel Time (s) 10.2 7.4 7.6 5.7
Confl. Peds. (#/hr) 4 1 1 4 1 2 2 1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 20% 3% 9% 0% 3% 0% 0% 0% 0% 0% 0% 7%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 453 0 0 327 0 0 28 0 0 30 0
Turn Type Perm NA Perm NA Perm NA Perm NA
Protected Phases 2 6 8 4
Permitted Phases 2 6 8 4
Detector Phase 2 2 6 6 8 8 4 4
Switch Phase
Minimum Initial (s) 30.0 30.0 30.0 30.0 3.0 3.0 3.0 3.0
Minimum Split (s) 35.0 35.0 35.0 35.0 7.6 7.6 7.6 7.6
Total Split (s) 35.0 35.0 35.0 35.0 10.0 10.0 10.0 10.0
Total Split (%) 43.8% 43.8% 43.8% 43.8% 12.5% 12.5% 12.5% 12.5%
Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
All-Red Time (s) 2.0 2.0 2.0 2.0 1.6 1.6 1.6 1.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 4.0 4.0 3.6 3.6
Lead/Lag
Lead-Lag Optimize?
Recall Mode Min Min Min Min None None None None
Act Effct Green (s) 45.6 45.6 6.9 6.9
Actuated g/C Ratio 0.88 0.88 0.13 0.13
v/c Ratio 0.33 0.22 0.13 0.15
Control Delay 8.1 6.7 16.6 17.0
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 8.1 6.7 16.6 17.0
LOS A A B B
Approach Delay 8.1 6.7 16.6 17.0
Approach LOS A A B B
Queue Length 50th (ft) 0 0 2 2
Queue Length 95th (ft) #317 197 28 30
Internal Link Dist (ft) 293 190 197 130
Turn Bay Length (ft)
Base Capacity (vph) 1372 1462 208 201

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 21
9: 29th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 9.0
Minimum Split (s) 35.0
Total Split (s) 35.0
Total Split (%) 44%
Yellow Time (s) 2.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 22
9: 29th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.33 0.22 0.13 0.15
Intersection Summary
Area Type: Other
Cycle Length: 80
Actuated Cycle Length: 52
Natural Cycle: 80
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.33
Intersection Signal Delay: 8.1 Intersection LOS: A
Intersection Capacity Utilization 42.5% ICU Level of Service A
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 9: 29th Street & Market Street

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 23
9: 29th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 24
1: N-S Alley & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 26 177 0 0 203 3 4 0 0 3 0 49
Future Volume (vph) 26 177 0 0 203 3 4 0 0 3 0 49
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 11 11 11 12 12 12
Grade (%) 0% 0% -2% 0%
Satd. Flow (prot) 0 1825 0 0 1834 0 0 1762 0 0 1652 0
Flt Permitted 0.994 0.950 0.997
Satd. Flow (perm) 0 1825 0 0 1834 0 0 1762 0 0 1652 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 325 227 190 155
Travel Time (s) 8.9 6.2 5.2 4.2
Confl. Peds. (#/hr) 2 2 1 1
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Heavy Vehicles (%) 0% 4% 0% 0% 3% 33% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 218 0 0 221 0 0 4 0 0 56 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 35.4% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 1
1: N-S Alley & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 1.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 26 177 0 0 203 3 4 0 0 3 0 49
Future Vol, veh/h 26 177 0 0 203 3 4 0 0 3 0 49
Conflicting Peds, #/hr 0 0 2 2 0 0 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - -2 - - 0 -
Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93
Heavy Vehicles, % 0 4 0 0 3 33 0 0 0 0 0 0
Mvmt Flow 28 190 0 0 218 3 4 0 0 3 0 53

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 221 0 0 192 0 0 495 469 192 466 468 221
Stage 1 - - - - - - 248 248 - 220 220 -
Stage 2 - - - - - - 247 221 - 246 248 -
Critical Hdwy 4.3 - - 4.3 - - 6.7 6.1 6 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 5.7 5.1 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 5.7 5.1 - 6.1 5.5 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1009 - - 1032 - - 583 522 915 578 496 872
Stage 1 - - - - - - 897 725 - 905 725 -
Stage 2 - - - - - - 898 742 - 875 705 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1009 - - 1030 - - 533 505 913 564 480 871
Mov Cap-2 Maneuver - - - - - - 533 505 - 564 480 -
Stage 1 - - - - - - 867 701 - 877 725 -
Stage 2 - - - - - - 843 742 - 848 682 -

Approach EB WB NB SB
HCM Control Delay, s 1.1 0 11.8 9.6
HCM LOS B A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 533 1009 - - 1030 - - 844
HCM Lane V/C Ratio 0.008 0.028 - - - - - 0.066
HCM Control Delay (s) 11.8 8.7 0 - 0 - - 9.6
HCM Lane LOS B A A - A - - A
HCM 95th %tile Q(veh) 0 0.1 - - 0 - - 0.2

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 2
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 265 140 161 141 98 18 140 896 46 14 916 200
Future Volume (vph) 265 140 161 141 98 18 140 896 46 14 916 200
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 12 12 14 10 10 10 11 11 11 10 11 11
Grade (%) -1% -1% 1% -1%
Storage Length (ft) 250 250 150 0 640 0 110 0
Storage Lanes 1 1 1 0 1 0 1 1
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1685 1809 1562 1588 1598 0 1566 3200 0 1458 3257 1472
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1675 1809 1536 1574 1598 0 1566 3200 0 1449 3257 1472
Right Turn on Red No No Yes Yes
Satd. Flow (RTOR) 4 212
Link Speed (mph) 35 25 35 35
Link Distance (ft) 525 325 1233 312
Travel Time (s) 10.2 8.9 24.0 6.1
Confl. Peds. (#/hr) 3 3 3 3 3 3
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 2% 0% 5% 1% 2% 7% 5% 2% 1% 10% 2% 1%
Shared Lane Traffic (%)
Lane Group Flow (vph) 288 152 175 153 127 0 152 1024 0 15 996 217
Turn Type Split NA pm+ov Split NA Prot NA Prot NA pm+ov
Protected Phases 4 4 5 8 8 5 2 1 6 4
Permitted Phases 4 6
Detector Phase 4 4 5 8 8 5 2 1 6 4
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 10.0 7.0 10.0 7.0
Minimum Split (s) 13.0 13.0 13.5 13.1 13.1 13.5 16.5 13.5 16.5 13.0
Total Split (s) 24.0 24.0 13.5 17.0 17.0 13.5 43.5 13.5 43.5 24.0
Total Split (%) 17.1% 17.1% 9.6% 12.1% 12.1% 9.6% 31.1% 9.6% 31.1% 17.1%
Yellow Time (s) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
All-Red Time (s) 2.3 2.3 2.8 2.4 2.4 2.8 2.8 2.8 2.8 2.3
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.0 5.0 5.5 5.1 5.1 5.5 5.5 5.5 5.5 5.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None None
Act Effct Green (s) 19.4 19.4 27.0 12.1 12.1 8.2 50.5 8.2 38.8 63.8
Actuated g/C Ratio 0.18 0.18 0.25 0.11 0.11 0.08 0.47 0.08 0.36 0.60
v/c Ratio 0.94 0.46 0.45 0.85 0.70 1.28 0.67 0.13 0.84 0.22
Control Delay 82.5 47.2 27.0 84.5 67.9 213.6 27.4 54.8 39.9 3.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 82.5 47.2 27.0 84.5 67.9 213.6 27.4 54.8 39.9 3.1
LOS F D C F E F C D D A
Approach Delay 58.0 77.0 51.4 33.6
Approach LOS E E D C
Queue Length 50th (ft) 176 84 59 94 77 ~115 222 9 283 1
Queue Length 95th (ft) #515 210 137 #307 #248 #350 #725 38 #687 50

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 3
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 7.0
Minimum Split (s) 42.0
Total Split (s) 42.0
Total Split (%) 30%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 4
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 445 245 1153 232
Turn Bay Length (ft) 250 250 150 640 110
Base Capacity (vph) 306 329 392 180 182 119 1521 112 1186 967
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.94 0.46 0.45 0.85 0.70 1.28 0.67 0.13 0.84 0.22
Intersection Summary
Area Type: Other
Cycle Length: 140
Actuated Cycle Length: 106.4
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 1.28
Intersection Signal Delay: 48.2 Intersection LOS: D
Intersection Capacity Utilization 74.6% ICU Level of Service D
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 2: S 32nd Street & Trindle Road/Chestnut Street

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 5
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 6
3: 31st Street & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (vph) 189 3 10 239 9 7
Future Volume (vph) 189 3 10 239 9 7
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 0% 0% -1%
Satd. Flow (prot) 1860 0 0 1853 1745 0
Flt Permitted 0.998 0.973
Satd. Flow (perm) 1860 0 0 1853 1745 0
Link Speed (mph) 25 25 25
Link Distance (ft) 227 445 204
Travel Time (s) 6.2 12.1 5.6
Confl. Peds. (#/hr) 1
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79
Heavy Vehicles (%) 2% 0% 10% 2% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 243 0 0 316 20 0
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 30.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 7
3: 31st Street & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 0.6
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 189 3 10 239 9 7
Future Vol, veh/h 189 3 10 239 9 7
Conflicting Peds, #/hr 0 0 0 0 1 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 -1 -
Peak Hour Factor 79 79 79 79 79 79
Heavy Vehicles, % 2 0 10 2 0 0
Mvmt Flow 239 4 13 303 11 9

Major/Minor Major1 Major2 Minor1


Conflicting Flow All 0 0 243 0 571 241
Stage 1 - - - - 241 -
Stage 2 - - - - 330 -
Critical Hdwy - - 4.4 - 6.2 6.1
Critical Hdwy Stg 1 - - - - 5.2 -
Critical Hdwy Stg 2 - - - - 5.2 -
Follow-up Hdwy - - 3.1 - 3 3.1
Pot Cap-1 Maneuver - - 956 - 564 855
Stage 1 - - - - 935 -
Stage 2 - - - - 852 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 956 - 554 855
Mov Cap-2 Maneuver - - - - 554 -
Stage 1 - - - - 935 -
Stage 2 - - - - 838 -

Approach EB WB NB
HCM Control Delay, s 0 0.4 10.7
HCM LOS B

Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT


Capacity (veh/h) 655 - - 956 -
HCM Lane V/C Ratio 0.031 - - 0.013 -
HCM Control Delay (s) 10.7 - - 8.8 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.1 - - 0 -

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 8
4: 30th Street & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 31 153 7 18 179 5 12 10 5 2 29 44
Future Volume (vph) 31 153 7 18 179 5 12 10 5 2 29 44
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 0% 1% -1% -1%
Satd. Flow (prot) 0 1861 0 0 1859 0 0 1696 0 0 1683 0
Flt Permitted 0.992 0.995 0.978 0.998
Satd. Flow (perm) 0 1861 0 0 1859 0 0 1696 0 0 1683 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 445 215 319 515
Travel Time (s) 12.1 5.9 8.7 14.0
Confl. Peds. (#/hr) 1 8 8 1
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 17% 0% 0% 50% 7% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 239 0 0 253 0 0 34 0 0 94 0
Sign Control Stop Stop Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 31.2% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 9
4: 30th Street & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Intersection
Intersection Delay, s/veh 9.6
Intersection LOS A

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 31 153 7 18 179 5 12 10 5 2 29 44
Future Vol, veh/h 31 153 7 18 179 5 12 10 5 2 29 44
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles, % 0 1 0 0 1 0 17 0 0 50 7 0
Mvmt Flow 39 191 9 23 224 6 15 13 6 3 36 55
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 9.5 9.7 8.8 9.6
HCM LOS A A A A

Lane NBLn1 EBLn1 WBLn1 SBLn1


Vol Left, % 44% 16% 9% 3%
Vol Thru, % 37% 80% 89% 39%
Vol Right, % 19% 4% 2% 59%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 27 191 202 75
LT Vol 12 31 18 2
Through Vol 10 153 179 29
RT Vol 5 7 5 44
Lane Flow Rate 34 239 252 94
Geometry Grp 1 1 1 1
Degree of Util (X) 0.051 0.301 0.317 0.145
Departure Headway (Hd) 5.425 4.546 4.525 5.56
Convergence, Y/N Yes Yes Yes Yes
Cap 656 790 793 642
Service Time 3.489 2.583 2.561 3.615
HCM Lane V/C Ratio 0.052 0.303 0.318 0.146
HCM Control Delay 8.8 9.5 9.7 9.6
HCM Lane LOS A A A A
HCM 95th-tile Q 0.2 1.3 1.4 0.5

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 10
5: 31st Street & E-W Alley WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 0 0 0 0 25 0 0 15 1
Future Volume (vph) 0 0 0 0 0 0 0 25 0 0 15 1
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 12 12 12 12 12 12 12 12 12
Grade (%) -5% 0% 1% 0%
Satd. Flow (prot) 0 1818 0 0 1900 0 0 1890 0 0 1885 0
Flt Permitted
Satd. Flow (perm) 0 1818 0 0 1900 0 0 1890 0 0 1885 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 151 181 206 204
Travel Time (s) 4.1 4.9 5.6 5.6
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 0 0 0 27 0 0 17 0
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 6.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 11
5: 31st Street & E-W Alley WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 0
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 0 0 0 0 25 0 0 15 1
Future Vol, veh/h 0 0 0 0 0 0 0 25 0 0 15 1
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - -5 - - 0 - - 1 - - 0 -
Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 0 0 0 0 0 0 0 27 0 0 16 1

Major/Minor Minor2 Minor1 Major1 Major2


Conflicting Flow All 44 44 17 44 44 27 17 0 0 27 0 0
Stage 1 17 17 - 27 27 - - - - - - -
Stage 2 27 27 - 17 17 - - - - - - -
Critical Hdwy 6.1 5.5 5.7 7.1 6.5 6.2 4.3 - - 4.3 - -
Critical Hdwy Stg 1 5.1 4.5 - 6.1 5.5 - - - - - - -
Critical Hdwy Stg 2 5.1 4.5 - 6.1 5.5 - - - - - - -
Follow-up Hdwy 3 4 3.1 3 4 3.1 3 - - 3 - -
Pot Cap-1 Maneuver 1134 862 1139 1121 852 1121 1184 - - 1175 - -
Stage 1 1180 889 - 1159 877 - - - - - - -
Stage 2 1168 883 - 1174 885 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1134 862 1139 1121 852 1121 1184 - - 1175 - -
Mov Cap-2 Maneuver 1134 862 - 1121 852 - - - - - - -
Stage 1 1180 889 - 1159 877 - - - - - - -
Stage 2 1168 883 - 1174 885 - - - - - - -

Approach EB WB NB SB
HCM Control Delay, s 0 0 0 0
HCM LOS A A

Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1184 - - - - 1175 - -
HCM Lane V/C Ratio - - - - - - - -
HCM Control Delay (s) 0 - - 0 0 0 - -
HCM Lane LOS A - - A A A - -
HCM 95th %tile Q(veh) 0 - - - - 0 - -

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 12
6: Bramar Road & N-S Alley WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 2 8 1 1 5 0 0 0 3 0 0 1
Future Volume (vph) 2 8 1 1 5 0 0 0 3 0 0 1
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 11 11
Grade (%) 3% -4% 0% -3%
Satd. Flow (prot) 0 1831 0 0 1650 0 0 1644 0 0 1613 0
Flt Permitted 0.992 0.991
Satd. Flow (perm) 0 1831 0 0 1650 0 0 1644 0 0 1613 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 131 186 162 179
Travel Time (s) 3.6 5.1 4.4 4.9
Confl. Peds. (#/hr) 2 2 1 1
Peak Hour Factor 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58
Heavy Vehicles (%) 0% 0% 0% 0% 20% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 19 0 0 11 0 0 5 0 0 2 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 14.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 13
6: Bramar Road & N-S Alley WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 2.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 2 8 1 1 5 0 0 0 3 0 0 1
Future Vol, veh/h 2 8 1 1 5 0 0 0 3 0 0 1
Conflicting Peds, #/hr 0 0 2 2 0 0 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 3 - - -4 - - 0 - - -3 -
Peak Hour Factor 58 58 58 58 58 58 58 58 58 58 58 58
Heavy Vehicles, % 0 0 0 0 20 0 0 0 0 0 0 0
Mvmt Flow 3 14 2 2 9 0 0 0 5 0 0 2

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 9 0 0 18 0 0 38 36 17 37 37 10
Stage 1 - - - - - - 23 23 - 13 13 -
Stage 2 - - - - - - 15 13 - 24 24 -
Critical Hdwy 4.3 - - 4.3 - - 7.1 6.5 6.2 6.5 5.9 5.9
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 5.5 4.9 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 5.5 4.9 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1192 - - 1183 - - 1131 860 1136 1140 865 1147
Stage 1 - - - - - - 1165 880 - 1183 891 -
Stage 2 - - - - - - 1177 889 - 1168 883 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1192 - - 1181 - - 1122 854 1134 1131 859 1146
Mov Cap-2 Maneuver - - - - - - 1122 854 - 1131 859 -
Stage 1 - - - - - - 1159 876 - 1179 889 -
Stage 2 - - - - - - 1172 887 - 1159 879 -

Approach EB WB NB SB
HCM Control Delay, s 1.5 1.3 8.2 8.1
HCM LOS A A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1134 1192 - - 1181 - - 1146
HCM Lane V/C Ratio 0.005 0.003 - - 0.001 - - 0.002
HCM Control Delay (s) 8.2 8 0 - 8.1 0 - 8.1
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0 0 - - 0 - - 0

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 14
7: S 32nd Street & Harvard Avenue WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 115 29 284 81 25 5 301 1062 16 9 1171 57
Future Volume (vph) 115 29 284 81 25 5 301 1062 16 9 1171 57
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 14 14 14 12 12 12 12 12 12 12 12 12
Grade (%) -2% 0% -1% -2%
Storage Length (ft) 150 0 0 0 400 0 160 0
Storage Lanes 1 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1771 1939 1632 0 1726 0 1702 3297 0 1727 3366 0
Flt Permitted 0.706 0.765 0.084 0.248
Satd. Flow (perm) 1314 1939 1632 0 1368 0 150 3297 0 451 3366 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 302 1 1 4
Link Speed (mph) 25 25 35 35
Link Distance (ft) 357 317 547 1233
Travel Time (s) 9.7 8.6 10.7 24.0
Confl. Peds. (#/hr) 1 1
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 4% 0% 1% 0% 0% 0% 1% 4% 6% 0% 2% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 122 31 302 0 118 0 320 1147 0 10 1307 0
Turn Type Perm NA pm+ov Perm NA pm+pt NA pm+pt NA
Protected Phases 4 5 8 5 2 1 6
Permitted Phases 4 4 8 2 6
Detector Phase 4 4 5 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0
Minimum Split (s) 24.2 24.2 11.4 24.2 24.2 11.4 24.4 11.4 24.4
Total Split (s) 24.2 24.2 24.0 24.2 24.2 24.0 66.4 11.4 53.8
Total Split (%) 17.3% 17.3% 17.1% 17.3% 17.3% 17.1% 47.4% 8.1% 38.4%
Yellow Time (s) 3.0 3.0 3.8 3.0 3.0 3.8 3.8 3.8 3.8
All-Red Time (s) 3.2 3.2 2.6 3.2 3.2 2.6 2.6 2.6 2.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.2 5.2 5.4 5.2 5.4 5.4 5.4 5.4
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None
Act Effct Green (s) 15.4 15.4 38.9 15.4 74.0 72.3 55.6 49.5
Actuated g/C Ratio 0.15 0.15 0.37 0.15 0.70 0.68 0.52 0.47
v/c Ratio 0.64 0.11 0.38 0.59 0.84 0.51 0.03 0.83
Control Delay 60.9 44.0 3.7 57.3 46.8 13.8 12.0 32.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 60.9 44.0 3.7 57.3 46.8 13.8 12.0 32.2
LOS E D A E D B B C
Approach Delay 21.7 57.3 21.0 32.1
Approach LOS C E C C
Queue Length 50th (ft) 72 17 0 68 134 131 1 345
Queue Length 95th (ft) #196 57 39 #175 #477 563 14 #862

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 15
7: S 32nd Street & Harvard Avenue WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 38.0
Total Split (s) 38.0
Total Split (%) 27%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 16
7: S 32nd Street & Harvard Avenue WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 277 237 467 1153
Turn Bay Length (ft) 150 400 160
Base Capacity (vph) 240 355 790 251 383 2248 310 1572
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.51 0.09 0.38 0.47 0.84 0.51 0.03 0.83
Intersection Summary
Area Type: Other
Cycle Length: 140
Actuated Cycle Length: 106
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.84
Intersection Signal Delay: 26.7 Intersection LOS: C
Intersection Capacity Utilization 80.1% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 7: S 32nd Street & Harvard Avenue

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 17
7: S 32nd Street & Harvard Avenue WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 18
8: 30th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 7 391 16 31 380 7 9 8 20 6 25 21
Future Volume (vph) 7 391 16 31 380 7 9 8 20 6 25 21
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 1% 1% 2% -2%
Satd. Flow (prot) 0 1660 0 0 1676 0 0 1680 0 0 1594 0
Flt Permitted 0.999 0.996 0.988 0.994
Satd. Flow (perm) 0 1660 0 0 1676 0 0 1680 0 0 1594 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 426 373 515 207
Travel Time (s) 11.6 10.2 14.0 5.6
Confl. Peds. (#/hr) 1 1 1 1 1 3 3 1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 0% 2% 0% 0% 1% 0% 11% 0% 0% 0% 4% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 450 0 0 455 0 0 41 0 0 57 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 49.5% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 19
8: 30th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 2.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 391 16 31 380 7 9 8 20 6 25 21
Future Vol, veh/h 7 391 16 31 380 7 9 8 20 6 25 21
Conflicting Peds, #/hr 1 0 1 1 0 1 1 0 3 3 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 1 - - 1 - - 2 - - -2 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 0 2 0 0 1 0 11 0 0 0 4 0
Mvmt Flow 8 425 17 34 413 8 10 9 22 7 27 23

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 422 0 0 443 0 0 962 941 438 954 945 419
Stage 1 - - - - - - 451 451 - 486 486 -
Stage 2 - - - - - - 511 490 - 468 459 -
Critical Hdwy 4.3 - - 4.3 - - 7.61 6.9 6.4 6.7 6.14 6
Critical Hdwy Stg 1 - - - - - - 6.61 5.9 - 5.7 5.14 -
Critical Hdwy Stg 2 - - - - - - 6.61 5.9 - 5.7 5.14 -
Follow-up Hdwy 3 - - 3 - - 3.1 4 3.1 3 4.036 3.1
Pot Cap-1 Maneuver 860 - - 845 - - 224 239 640 295 289 688
Stage 1 - - - - - - 612 546 - 676 578 -
Stage 2 - - - - - - 562 523 - 691 593 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 859 - - 844 - - 190 223 638 262 270 687
Mov Cap-2 Maneuver - - - - - - 190 223 - 262 270 -
Stage 1 - - - - - - 604 539 - 667 547 -
Stage 2 - - - - - - 489 495 - 647 585 -

Approach EB WB NB SB
HCM Control Delay, s 0.2 0.7 17.7 17
HCM LOS C C

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 323 859 - - 844 - - 356
HCM Lane V/C Ratio 0.125 0.009 - - 0.04 - - 0.159
HCM Control Delay (s) 17.7 9.2 0 - 9.4 0 - 17
HCM Lane LOS C A A - A A - C
HCM 95th %tile Q(veh) 0.4 0 - - 0.1 - - 0.6

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 20
9: 29th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 5 408 4 19 396 10 3 8 8 4 0 18
Future Volume (vph) 5 408 4 19 396 10 3 8 8 4 0 18
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Grade (%) -1% 0% -2% -1%
Satd. Flow (prot) 0 1593 0 0 1774 0 0 1531 0 0 1433 0
Flt Permitted 0.996 0.978
Satd. Flow (perm) 0 1589 0 0 1738 0 0 1541 0 0 1446 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 1 2 9 55
Link Speed (mph) 25 25 25 25
Link Distance (ft) 373 270 277 210
Travel Time (s) 10.2 7.4 7.6 5.7
Confl. Peds. (#/hr) 1 2 2 1
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 0% 2% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 443 0 0 452 0 0 21 0 0 23 0
Turn Type Perm NA Perm NA Perm NA Perm NA
Protected Phases 2 6 8 4
Permitted Phases 2 6 8 4
Detector Phase 2 2 6 6 8 8 4 4
Switch Phase
Minimum Initial (s) 30.0 30.0 30.0 30.0 3.0 3.0 3.0 3.0
Minimum Split (s) 35.0 35.0 35.0 35.0 7.6 7.6 7.6 7.6
Total Split (s) 35.0 35.0 35.0 35.0 10.0 10.0 10.0 10.0
Total Split (%) 43.8% 43.8% 43.8% 43.8% 12.5% 12.5% 12.5% 12.5%
Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
All-Red Time (s) 2.0 2.0 2.0 2.0 1.6 1.6 1.6 1.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 4.0 4.0 3.6 3.6
Lead/Lag
Lead-Lag Optimize?
Recall Mode Min Min Min Min None None None None
Act Effct Green (s) 46.5 46.5 6.9 6.9
Actuated g/C Ratio 0.88 0.88 0.13 0.13
v/c Ratio 0.32 0.30 0.10 0.10
Control Delay 7.7 7.2 20.3 3.1
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 7.7 7.2 20.3 3.1
LOS A A C A
Approach Delay 7.7 7.2 20.3 3.1
Approach LOS A A C A
Queue Length 50th (ft) 0 0 3 0
Queue Length 95th (ft) 294 285 27 6
Internal Link Dist (ft) 293 190 197 130
Turn Bay Length (ft)
Base Capacity (vph) 1394 1525 207 235

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 21
9: 29th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 9.0
Minimum Split (s) 35.0
Total Split (s) 35.0
Total Split (%) 44%
Yellow Time (s) 2.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 22
9: 29th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.32 0.30 0.10 0.10
Intersection Summary
Area Type: Other
Cycle Length: 80
Actuated Cycle Length: 53
Natural Cycle: 80
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.32
Intersection Signal Delay: 7.7 Intersection LOS: A
Intersection Capacity Utilization 44.8% ICU Level of Service A
Analysis Period (min) 15

Splits and Phases: 9: 29th Street & Market Street

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 23
9: 29th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 24
1: N-S Alley & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 21 218 0 0 304 1 3 0 2 1 0 42
Future Volume (vph) 21 218 0 0 304 1 3 0 2 1 0 42
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 11 11 11 12 12 12
Grade (%) 0% 0% -2% 0%
Satd. Flow (prot) 0 1875 0 0 1900 0 0 1704 0 0 1648 0
Flt Permitted 0.996 0.971 0.999
Satd. Flow (perm) 0 1875 0 0 1900 0 0 1704 0 0 1648 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 325 227 190 155
Travel Time (s) 8.9 6.2 5.2 4.2
Confl. Peds. (#/hr) 1 1 1 1
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Heavy Vehicles (%) 0% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 263 0 0 335 0 0 5 0 0 47 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 39.2% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 1
1: N-S Alley & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 1.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 218 0 0 304 1 3 0 2 1 0 42
Future Vol, veh/h 21 218 0 0 304 1 3 0 2 1 0 42
Conflicting Peds, #/hr 1 0 0 0 0 1 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - -2 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 0 1 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 23 240 0 0 334 1 3 0 2 1 0 46

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 336 0 0 240 0 0 645 622 240 623 622 337
Stage 1 - - - - - - 286 286 - 336 336 -
Stage 2 - - - - - - 359 336 - 287 286 -
Critical Hdwy 4.3 - - 4.3 - - 6.7 6.1 6 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 5.7 5.1 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 5.7 5.1 - 6.1 5.5 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 921 - - 994 - - 467 434 862 450 405 749
Stage 1 - - - - - - 858 701 - 779 645 -
Stage 2 - - - - - - 786 670 - 830 679 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 920 - - 994 - - 428 421 862 438 393 748
Mov Cap-2 Maneuver - - - - - - 428 421 - 438 393 -
Stage 1 - - - - - - 833 681 - 756 644 -
Stage 2 - - - - - - 737 669 - 804 659 -

Approach EB WB NB SB
HCM Control Delay, s 0.8 0 11.8 10.2
HCM LOS B B

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 536 920 - - 994 - - 736
HCM Lane V/C Ratio 0.01 0.025 - - - - - 0.064
HCM Control Delay (s) 11.8 9 0 - 0 - - 10.2
HCM Lane LOS B A A - A - - B
HCM 95th %tile Q(veh) 0 0.1 - - 0 - - 0.2

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 2
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 246 168 223 191 145 5 174 1238 49 7 1242 247
Future Volume (vph) 246 168 223 191 145 5 174 1238 49 7 1242 247
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 12 12 14 10 10 10 11 11 11 10 11 11
Grade (%) -1% -1% 1% -1%
Storage Length (ft) 250 250 150 0 640 0 110 0
Storage Lanes 1 1 1 0 1 0 1 1
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1702 1809 1640 1604 1663 0 1612 3203 0 1407 3290 1457
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1698 1809 1618 1600 1663 0 1612 3203 0 1403 3290 1457
Right Turn on Red No No Yes Yes
Satd. Flow (RTOR) 3 182
Link Speed (mph) 35 25 35 35
Link Distance (ft) 525 325 1233 312
Travel Time (s) 10.2 8.9 24.0 6.1
Confl. Peds. (#/hr) 1 1 1 1 2 2
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Heavy Vehicles (%) 1% 0% 0% 0% 1% 0% 2% 2% 2% 14% 1% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 251 171 228 195 153 0 178 1313 0 7 1267 252
Turn Type Split NA pm+ov Split NA Prot NA Prot NA pm+ov
Protected Phases 4 4 5 8 8 5 2 1 6 4
Permitted Phases 4 6
Detector Phase 4 4 5 8 8 5 2 1 6 4
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 10.0 7.0 10.0 7.0
Minimum Split (s) 13.0 13.0 13.5 13.1 13.1 13.5 16.5 13.5 16.5 13.0
Total Split (s) 22.0 22.0 15.0 20.0 20.0 15.0 52.5 13.5 51.0 22.0
Total Split (%) 14.7% 14.7% 10.0% 13.3% 13.3% 10.0% 35.0% 9.0% 34.0% 14.7%
Yellow Time (s) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
All-Red Time (s) 2.3 2.3 2.8 2.4 2.4 2.8 2.8 2.8 2.8 2.3
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.0 5.0 5.5 5.1 5.1 5.5 5.5 5.5 5.5 5.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None None
Act Effct Green (s) 17.3 17.3 26.5 15.2 15.2 9.7 59.5 8.1 46.3 69.2
Actuated g/C Ratio 0.15 0.15 0.23 0.13 0.13 0.08 0.51 0.07 0.40 0.59
v/c Ratio 1.00 0.64 0.62 0.93 0.71 1.34 0.80 0.07 0.97 0.27
Control Delay 105.8 60.2 34.7 98.4 68.4 234.4 30.3 59.4 53.4 5.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 105.8 60.2 34.7 98.4 68.4 234.4 30.3 59.4 53.4 5.6
LOS F E C F E F C E D A
Approach Delay 68.9 85.2 54.6 45.5
Approach LOS E F D D
Queue Length 50th (ft) 174 112 93 134 102 ~155 336 5 425 17
Queue Length 95th (ft) #496 #295 #241 #400 #295 #418 #1011 24 #961 100

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 3
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 7.0
Minimum Split (s) 42.0
Total Split (s) 42.0
Total Split (%) 28%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 4
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 445 245 1153 232
Turn Bay Length (ft) 250 250 150 640 110
Base Capacity (vph) 252 268 369 209 216 133 1637 98 1308 939
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 1.00 0.64 0.62 0.93 0.71 1.34 0.80 0.07 0.97 0.27
Intersection Summary
Area Type: Other
Cycle Length: 150
Actuated Cycle Length: 116.4
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 1.34
Intersection Signal Delay: 56.1 Intersection LOS: E
Intersection Capacity Utilization 86.8% ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 2: S 32nd Street & Trindle Road/Chestnut Street

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 5
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 6
3: 31st Street & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (vph) 175 24 17 251 13 26
Future Volume (vph) 175 24 17 251 13 26
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 0% 0% -1%
Satd. Flow (prot) 1870 0 0 1894 1665 0
Flt Permitted 0.997 0.984
Satd. Flow (perm) 1870 0 0 1894 1665 0
Link Speed (mph) 25 25 25
Link Distance (ft) 227 445 204
Travel Time (s) 6.2 12.1 5.6
Confl. Peds. (#/hr) 1 1 2
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 0% 0% 0% 0% 0% 4%
Shared Lane Traffic (%)
Lane Group Flow (vph) 216 0 0 291 42 0
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 37.2% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 7
3: 31st Street & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 175 24 17 251 13 26
Future Vol, veh/h 175 24 17 251 13 26
Conflicting Peds, #/hr 0 1 1 0 2 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 -1 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 0 0 0 0 0 4
Mvmt Flow 190 26 18 273 14 28

Major/Minor Major1 Major2 Minor1


Conflicting Flow All 0 0 217 0 515 204
Stage 1 - - - - 204 -
Stage 2 - - - - 311 -
Critical Hdwy - - 4.3 - 6.2 6.14
Critical Hdwy Stg 1 - - - - 5.2 -
Critical Hdwy Stg 2 - - - - 5.2 -
Follow-up Hdwy - - 3 - 3 3.1
Pot Cap-1 Maneuver - - 1012 - 608 894
Stage 1 - - - - 972 -
Stage 2 - - - - 869 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1011 - 593 893
Mov Cap-2 Maneuver - - - - 593 -
Stage 1 - - - - 971 -
Stage 2 - - - - 849 -

Approach EB WB NB
HCM Control Delay, s 0 0.5 10
HCM LOS B

Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT


Capacity (veh/h) 764 - - 1011 -
HCM Lane V/C Ratio 0.055 - - 0.018 -
HCM Control Delay (s) 10 - - 8.6 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.2 - - 0.1 -

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 8
4: 30th Street & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 53 146 4 23 191 10 4 19 7 7 31 53
Future Volume (vph) 53 146 4 23 191 10 4 19 7 7 31 53
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 0% 1% -1% -1%
Satd. Flow (prot) 0 1856 0 0 1837 0 0 1784 0 0 1752 0
Flt Permitted 0.987 0.995 0.994 0.996
Satd. Flow (perm) 0 1856 0 0 1837 0 0 1784 0 0 1752 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 445 215 319 515
Travel Time (s) 12.1 5.9 8.7 14.0
Confl. Peds. (#/hr) 4 7 7 4 3 7 7 3
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Heavy Vehicles (%) 0% 1% 0% 9% 1% 0% 0% 5% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 214 0 0 236 0 0 31 0 0 96 0
Sign Control Stop Stop Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 35.2% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 9
4: 30th Street & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Intersection
Intersection Delay, s/veh 9.2
Intersection LOS A

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 53 146 4 23 191 10 4 19 7 7 31 53
Future Vol, veh/h 53 146 4 23 191 10 4 19 7 7 31 53
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Heavy Vehicles, % 0 1 0 9 1 0 0 5 0 0 0 0
Mvmt Flow 56 154 4 24 201 11 4 20 7 7 33 56
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 9.2 9.6 8.2 8.3
HCM LOS A A A A

Lane NBLn1 EBLn1 WBLn1 SBLn1


Vol Left, % 13% 26% 10% 8%
Vol Thru, % 63% 72% 85% 34%
Vol Right, % 23% 2% 4% 58%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 30 203 224 91
LT Vol 4 53 23 7
Through Vol 19 146 191 31
RT Vol 7 4 10 53
Lane Flow Rate 32 214 236 96
Geometry Grp 1 1 1 1
Degree of Util (X) 0.043 0.268 0.3 0.123
Departure Headway (Hd) 4.941 4.508 4.586 4.632
Convergence, Y/N Yes Yes Yes Yes
Cap 723 797 783 772
Service Time 2.986 2.535 2.613 2.67
HCM Lane V/C Ratio 0.044 0.269 0.301 0.124
HCM Control Delay 8.2 9.2 9.6 8.3
HCM Lane LOS A A A A
HCM 95th-tile Q 0.1 1.1 1.3 0.4

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 10
5: 31st Street & E-W Alley WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 1 0 0 0 38 1 0 38 1
Future Volume (vph) 0 0 0 1 0 0 0 38 1 0 38 1
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 12 12 12 12 12 12 12 12 12
Grade (%) -5% 0% 1% 0%
Satd. Flow (prot) 0 1818 0 0 1805 0 0 1831 0 0 1894 0
Flt Permitted 0.950
Satd. Flow (perm) 0 1818 0 0 1805 0 0 1831 0 0 1894 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 151 181 206 204
Travel Time (s) 4.1 4.9 5.6 5.6
Confl. Peds. (#/hr) 3 3
Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 3% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 1 0 0 47 0 0 47 0
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 14.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 11
5: 31st Street & E-W Alley WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 0.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 1 0 0 0 38 1 0 38 1
Future Vol, veh/h 0 0 0 1 0 0 0 38 1 0 38 1
Conflicting Peds, #/hr 0 0 0 0 0 0 3 0 0 0 0 3
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - -5 - - 0 - - 1 - - 0 -
Peak Hour Factor 82 82 82 82 82 82 82 82 82 82 82 82
Heavy Vehicles, % 0 0 0 0 0 0 0 3 0 0 0 0
Mvmt Flow 0 0 0 1 0 0 0 46 1 0 46 1

Major/Minor Minor2 Minor1 Major1 Major2


Conflicting Flow All 97 97 50 94 97 47 50 0 0 47 0 0
Stage 1 50 50 - 47 47 - - - - - - -
Stage 2 47 47 - 47 50 - - - - - - -
Critical Hdwy 6.1 5.5 5.7 7.1 6.5 6.2 4.3 - - 4.3 - -
Critical Hdwy Stg 1 5.1 4.5 - 6.1 5.5 - - - - - - -
Critical Hdwy Stg 2 5.1 4.5 - 6.1 5.5 - - - - - - -
Follow-up Hdwy 3 4 3.1 3 4 3.1 3 - - 3 - -
Pot Cap-1 Maneuver 1060 819 1096 1036 797 1093 1154 - - 1157 - -
Stage 1 1141 869 - 1130 860 - - - - - - -
Stage 2 1145 871 - 1130 857 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1058 817 1093 1036 795 1093 1151 - - 1157 - -
Mov Cap-2 Maneuver 1058 817 - 1036 795 - - - - - - -
Stage 1 1139 867 - 1130 860 - - - - - - -
Stage 2 1145 871 - 1130 855 - - - - - - -

Approach EB WB NB SB
HCM Control Delay, s 0 8.5 0 0
HCM LOS A A

Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1151 - - - 1036 1157 - -
HCM Lane V/C Ratio - - - - 0.001 - - -
HCM Control Delay (s) 0 - - 0 8.5 0 - -
HCM Lane LOS A - - A A A - -
HCM 95th %tile Q(veh) 0 - - - 0 0 - -

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 12
6: Bramar Road & N-S Alley WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 1 7 5 15 2 0 1 0 22 1 0 0
Future Volume (vph) 1 7 5 15 2 0 1 0 22 1 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 11 11
Grade (%) 3% -4% 0% -3%
Satd. Flow (prot) 0 1641 0 0 1859 0 0 1650 0 0 1771 0
Flt Permitted 0.997 0.959 0.998 0.950
Satd. Flow (perm) 0 1641 0 0 1859 0 0 1650 0 0 1771 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 131 186 162 179
Travel Time (s) 3.6 5.1 4.4 4.9
Confl. Peds. (#/hr) 1 1 1 1
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Heavy Vehicles (%) 0% 14% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 16 0 0 22 0 0 29 0 0 1 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 16.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 13
6: Bramar Road & N-S Alley WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 7 5 15 2 0 1 0 22 1 0 0
Future Vol, veh/h 1 7 5 15 2 0 1 0 22 1 0 0
Conflicting Peds, #/hr 1 0 1 1 0 1 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 3 - - -4 - - 0 - - -3 -
Peak Hour Factor 79 79 79 79 79 79 79 79 79 79 79 79
Heavy Vehicles, % 0 14 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 1 9 6 19 3 0 1 0 28 1 0 0

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 4 0 0 16 0 0 56 57 13 70 60 4
Stage 1 - - - - - - 15 15 - 42 42 -
Stage 2 - - - - - - 41 42 - 28 18 -
Critical Hdwy 4.3 - - 4.3 - - 7.1 6.5 6.2 6.5 5.9 5.9
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 5.5 4.9 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 5.5 4.9 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1196 - - 1185 - - 1100 838 1142 1089 843 1156
Stage 1 - - - - - - 1177 887 - 1145 870 -
Stage 2 - - - - - - 1139 864 - 1163 887 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1195 - - 1184 - - 1085 822 1141 1048 827 1155
Mov Cap-2 Maneuver - - - - - - 1085 822 - 1048 827 -
Stage 1 - - - - - - 1175 885 - 1143 855 -
Stage 2 - - - - - - 1121 849 - 1133 885 -

Approach EB WB NB SB
HCM Control Delay, s 0.6 7.1 8.2 8.4
HCM LOS A A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1138 1195 - - 1184 - - 1048
HCM Lane V/C Ratio 0.026 0.001 - - 0.016 - - 0.001
HCM Control Delay (s) 8.2 8 0 - 8.1 0 - 8.4
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 14
7: S 32nd Street & Harvard Avenue WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 70 18 275 117 13 10 238 1448 15 7 1696 34
Future Volume (vph) 70 18 275 117 13 10 238 1448 15 7 1696 34
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 14 14 14 12 12 12 12 12 12 12 12 12
Grade (%) -2% 0% -1% -2%
Storage Length (ft) 150 0 0 0 400 0 160 0
Storage Lanes 1 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1738 1939 1540 0 1694 0 1719 3396 0 1727 3410 0
Flt Permitted 0.753 0.748 0.053 0.136
Satd. Flow (perm) 1372 1939 1540 0 1320 0 96 3396 0 247 3410 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 278 2 1 2
Link Speed (mph) 25 25 35 35
Link Distance (ft) 357 317 547 1233
Travel Time (s) 9.7 8.6 10.7 24.0
Confl. Peds. (#/hr) 3 3 1 1
Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99
Heavy Vehicles (%) 6% 0% 7% 1% 0% 0% 0% 1% 0% 0% 1% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 71 18 278 0 141 0 240 1478 0 7 1747 0
Turn Type Perm NA pm+ov Perm NA pm+pt NA pm+pt NA
Protected Phases 4 5 8 5 2 1 6
Permitted Phases 4 4 8 2 6
Detector Phase 4 4 5 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0
Minimum Split (s) 24.2 24.2 11.4 24.2 24.2 11.4 24.4 11.4 24.4
Total Split (s) 24.2 24.2 19.0 24.2 24.2 19.0 76.4 11.4 68.8
Total Split (%) 16.1% 16.1% 12.7% 16.1% 16.1% 12.7% 50.9% 7.6% 45.9%
Yellow Time (s) 3.0 3.0 3.8 3.0 3.0 3.8 3.8 3.8 3.8
All-Red Time (s) 3.2 3.2 2.6 3.2 3.2 2.6 2.6 2.6 2.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.2 5.2 5.4 5.2 5.4 5.4 5.4 5.4
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None
Act Effct Green (s) 17.7 17.7 35.9 17.7 83.7 81.9 70.5 64.4
Actuated g/C Ratio 0.15 0.15 0.30 0.15 0.71 0.69 0.60 0.55
v/c Ratio 0.35 0.06 0.42 0.71 0.93 0.63 0.03 0.94
Control Delay 53.5 48.4 4.9 68.6 75.9 15.6 10.9 37.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 53.5 48.4 4.9 68.6 75.9 15.6 10.9 37.2
LOS D D A E E B B D
Approach Delay 16.5 68.6 24.0 37.1
Approach LOS B E C D
Queue Length 50th (ft) 45 11 0 94 126 225 1 556
Queue Length 95th (ft) 119 42 47 #260 #422 #816 11 #1238

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 15
7: S 32nd Street & Harvard Avenue WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 38.0
Total Split (s) 38.0
Total Split (%) 25%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 16
7: S 32nd Street & Harvard Avenue WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 277 237 467 1153
Turn Bay Length (ft) 150 400 160
Base Capacity (vph) 224 316 661 217 257 2354 223 1860
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.32 0.06 0.42 0.65 0.93 0.63 0.03 0.94
Intersection Summary
Area Type: Other
Cycle Length: 150
Actuated Cycle Length: 118.1
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.94
Intersection Signal Delay: 30.7 Intersection LOS: C
Intersection Capacity Utilization 92.8% ICU Level of Service F
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 7: S 32nd Street & Harvard Avenue

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 17
7: S 32nd Street & Harvard Avenue WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 18
8: 30th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 17 385 9 49 415 13 2 14 30 8 16 13
Future Volume (vph) 17 385 9 49 415 13 2 14 30 8 16 13
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 1% 1% 2% -2%
Satd. Flow (prot) 0 1677 0 0 1672 0 0 1714 0 0 1628 0
Flt Permitted 0.998 0.995 0.998 0.990
Satd. Flow (perm) 0 1677 0 0 1672 0 0 1714 0 0 1628 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 426 373 515 207
Travel Time (s) 11.6 10.2 14.0 5.6
Confl. Peds. (#/hr) 4 1 1 4
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 428 0 0 497 0 0 48 0 0 39 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 53.9% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 19
8: 30th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 2.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 17 385 9 49 415 13 2 14 30 8 16 13
Future Vol, veh/h 17 385 9 49 415 13 2 14 30 8 16 13
Conflicting Peds, #/hr 4 0 1 1 0 4 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 1 - - 1 - - 2 - - -2 -
Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96
Heavy Vehicles, % 0 1 0 0 1 0 0 0 0 0 0 0
Mvmt Flow 18 401 9 51 432 14 2 15 31 8 17 14

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 450 0 0 411 0 0 1000 995 407 1010 992 443
Stage 1 - - - - - - 443 443 - 545 545 -
Stage 2 - - - - - - 557 552 - 465 447 -
Critical Hdwy 4.3 - - 4.3 - - 7.5 6.9 6.4 6.7 6.1 6
Critical Hdwy Stg 1 - - - - - - 6.5 5.9 - 5.7 5.1 -
Critical Hdwy Stg 2 - - - - - - 6.5 5.9 - 5.7 5.1 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 841 - - 867 - - 220 221 668 271 277 668
Stage 1 - - - - - - 645 551 - 630 554 -
Stage 2 - - - - - - 549 487 - 693 606 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 838 - - 866 - - 188 197 667 224 247 665
Mov Cap-2 Maneuver - - - - - - 188 197 - 224 247 -
Stage 1 - - - - - - 626 535 - 610 509 -
Stage 2 - - - - - - 480 447 - 625 588 -

Approach EB WB NB SB
HCM Control Delay, s 0.4 1 16.4 18.4
HCM LOS C C

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 363 838 - - 866 - - 308
HCM Lane V/C Ratio 0.132 0.021 - - 0.059 - - 0.125
HCM Control Delay (s) 16.4 9.4 0 - 9.4 0 - 18.4
HCM Lane LOS C A A - A A - C
HCM 95th %tile Q(veh) 0.5 0.1 - - 0.2 - - 0.4

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 20
9: 29th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 6 424 7 38 452 11 0 4 9 9 6 9
Future Volume (vph) 6 424 7 38 452 11 0 4 9 9 6 9
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Grade (%) -1% 0% -2% -1%
Satd. Flow (prot) 0 1607 0 0 1770 0 0 1451 0 0 1502 0
Flt Permitted 0.995 0.952
Satd. Flow (perm) 0 1601 0 0 1692 0 0 1451 0 0 1523 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 1 2 9 9
Link Speed (mph) 25 25 25 25
Link Distance (ft) 373 270 277 210
Travel Time (s) 10.2 7.4 7.6 5.7
Confl. Peds. (#/hr) 4 2 2 4 1 2 2 1
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 450 0 0 516 0 0 13 0 0 24 0
Turn Type Perm NA Perm NA NA Perm NA
Protected Phases 2 6 8 4
Permitted Phases 2 6 8 4
Detector Phase 2 2 6 6 8 8 4 4
Switch Phase
Minimum Initial (s) 30.0 30.0 30.0 30.0 3.0 3.0 3.0 3.0
Minimum Split (s) 35.0 35.0 35.0 35.0 7.6 7.6 7.6 7.6
Total Split (s) 35.0 35.0 35.0 35.0 10.0 10.0 10.0 10.0
Total Split (%) 43.8% 43.8% 43.8% 43.8% 12.5% 12.5% 12.5% 12.5%
Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
All-Red Time (s) 2.0 2.0 2.0 2.0 1.6 1.6 1.6 1.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 4.0 4.0 3.6 3.6
Lead/Lag
Lead-Lag Optimize?
Recall Mode Min Min Min Min None None None None
Act Effct Green (s) 47.3 47.3 6.8 6.8
Actuated g/C Ratio 0.88 0.88 0.13 0.13
v/c Ratio 0.32 0.35 0.07 0.12
Control Delay 7.8 8.2 18.8 21.5
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 7.8 8.2 18.8 21.5
LOS A A B C
Approach Delay 7.8 8.2 18.8 21.5
Approach LOS A A B C
Queue Length 50th (ft) 0 0 1 4
Queue Length 95th (ft) 298 #382 19 30
Internal Link Dist (ft) 293 190 197 130
Turn Bay Length (ft)
Base Capacity (vph) 1405 1485 189 198

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 21
9: 29th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 9.0
Minimum Split (s) 35.0
Total Split (s) 35.0
Total Split (%) 44%
Yellow Time (s) 2.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 22
9: 29th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.32 0.35 0.07 0.12
Intersection Summary
Area Type: Other
Cycle Length: 80
Actuated Cycle Length: 53.9
Natural Cycle: 80
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.35
Intersection Signal Delay: 8.5 Intersection LOS: A
Intersection Capacity Utilization 64.7% ICU Level of Service C
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 9: 29th Street & Market Street

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 23
9: 29th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 24
1: N-S Alley & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 4 169 0 0 243 3 2 0 2 0 0 10
Future Volume (vph) 4 169 0 0 243 3 2 0 2 0 0 10
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 11 11 11 12 12 12
Grade (%) 0% 0% -2% 0%
Satd. Flow (prot) 0 1898 0 0 1888 0 0 1687 0 0 1644 0
Flt Permitted 0.999 0.976
Satd. Flow (perm) 0 1898 0 0 1888 0 0 1687 0 0 1644 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 325 227 190 155
Travel Time (s) 8.9 6.2 5.2 4.2
Confl. Peds. (#/hr) 2 1 1 2 1 1
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Heavy Vehicles (%) 0% 0% 0% 0% 0% 33% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 204 0 0 290 0 0 4 0 0 12 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 23.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 1
1: N-S Alley & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 0.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 169 0 0 243 3 2 0 2 0 0 10
Future Vol, veh/h 4 169 0 0 243 3 2 0 2 0 0 10
Conflicting Peds, #/hr 2 0 1 1 0 2 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - -2 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 0 0 0 0 0 33 0 0 0 0 0 0
Mvmt Flow 5 199 0 0 286 4 2 0 2 0 0 12

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 292 0 0 200 0 0 505 502 200 500 500 291
Stage 1 - - - - - - 210 210 - 290 290 -
Stage 2 - - - - - - 295 292 - 210 210 -
Critical Hdwy 4.3 - - 4.3 - - 6.7 6.1 6 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 5.7 5.1 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 5.7 5.1 - 6.1 5.5 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 954 - - 1026 - - 574 502 906 547 476 795
Stage 1 - - - - - - 938 749 - 826 676 -
Stage 2 - - - - - - 848 697 - 916 732 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 952 - - 1025 - - 562 497 905 542 472 793
Mov Cap-2 Maneuver - - - - - - 562 497 - 542 472 -
Stage 1 - - - - - - 931 744 - 819 675 -
Stage 2 - - - - - - 835 696 - 908 727 -

Approach EB WB NB SB
HCM Control Delay, s 0.2 0 10.2 9.6
HCM LOS B A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 693 952 - - 1025 - - 793
HCM Lane V/C Ratio 0.007 0.005 - - - - - 0.015
HCM Control Delay (s) 10.2 8.8 0 - 0 - - 9.6
HCM Lane LOS B A A - A - - A
HCM 95th %tile Q(veh) 0 0 - - 0 - - 0

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 2
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 257 125 156 159 84 8 147 911 37 14 998 178
Future Volume (vph) 257 125 156 159 84 8 147 911 37 14 998 178
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 12 12 14 10 10 10 11 11 11 10 11 11
Grade (%) -1% -1% 1% -1%
Storage Length (ft) 250 250 150 0 640 0 110 0
Storage Lanes 1 1 1 0 1 0 1 1
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1719 1809 1640 1604 1664 0 1628 3239 0 1604 3290 1457
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1711 1809 1615 1594 1664 0 1628 3239 0 1604 3290 1457
Right Turn on Red No No Yes Yes
Satd. Flow (RTOR) 3 176
Link Speed (mph) 35 25 35 35
Link Distance (ft) 525 325 1233 312
Travel Time (s) 10.2 8.9 24.0 6.1
Confl. Peds. (#/hr) 2 2 2 2
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 1% 1% 0% 0% 1% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 265 129 161 164 95 0 152 977 0 14 1029 184
Turn Type Split NA pm+ov Split NA Prot NA Prot NA pm+ov
Protected Phases 4 4 5 8 8 5 2 1 6 4
Permitted Phases 4 6
Detector Phase 4 4 5 8 8 5 2 1 6 4
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 10.0 7.0 10.0 7.0
Minimum Split (s) 13.0 13.0 13.5 13.1 13.1 13.5 16.5 13.5 16.5 13.0
Total Split (s) 20.0 20.0 13.5 16.0 16.0 13.5 38.5 13.5 38.5 20.0
Total Split (%) 15.4% 15.4% 10.4% 12.3% 12.3% 10.4% 29.6% 10.4% 29.6% 15.4%
Yellow Time (s) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
All-Red Time (s) 2.3 2.3 2.8 2.4 2.4 2.8 2.8 2.8 2.8 2.3
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.0 5.0 5.5 5.1 5.1 5.5 5.5 5.5 5.5 5.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None None
Act Effct Green (s) 15.4 15.4 23.1 11.2 11.2 8.2 45.6 8.2 33.8 54.8
Actuated g/C Ratio 0.16 0.16 0.24 0.12 0.12 0.09 0.47 0.09 0.35 0.57
v/c Ratio 0.97 0.45 0.41 0.89 0.49 1.10 0.64 0.10 0.89 0.20
Control Delay 89.1 45.7 24.4 86.2 52.9 148.5 25.1 48.9 41.9 3.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 89.1 45.7 24.4 86.2 52.9 148.5 25.1 48.9 41.9 3.7
LOS F D C F D F C D D A
Approach Delay 60.2 74.0 41.7 36.3
Approach LOS E E D D
Queue Length 50th (ft) 146 65 47 90 50 ~89 180 7 268 2
Queue Length 95th (ft) #465 174 114 #316 #160 #320 #658 34 #698 50

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 3
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 7.0
Minimum Split (s) 42.0
Total Split (s) 42.0
Total Split (%) 32%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 4
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 445 245 1153 232
Turn Bay Length (ft) 250 250 150 640 110
Base Capacity (vph) 274 288 388 185 193 138 1534 136 1153 904
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.97 0.45 0.41 0.89 0.49 1.10 0.64 0.10 0.89 0.20
Intersection Summary
Area Type: Other
Cycle Length: 130
Actuated Cycle Length: 96.4
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 1.10
Intersection Signal Delay: 45.5 Intersection LOS: D
Intersection Capacity Utilization 76.2% ICU Level of Service D
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 2: S 32nd Street & Trindle Road/Chestnut Street

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 5
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 6
3: 31st Street & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (vph) 150 9 9 203 6 9
Future Volume (vph) 150 9 9 203 6 9
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 0% 0% -1%
Satd. Flow (prot) 1887 0 0 1878 1723 0
Flt Permitted 0.998 0.980
Satd. Flow (perm) 1887 0 0 1878 1723 0
Link Speed (mph) 25 25 25
Link Distance (ft) 227 445 204
Travel Time (s) 6.2 12.1 5.6
Confl. Peds. (#/hr) 6 6
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86
Heavy Vehicles (%) 0% 0% 0% 1% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 184 0 0 246 17 0
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 28.0% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 7
3: 31st Street & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 0.6
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 150 9 9 203 6 9
Future Vol, veh/h 150 9 9 203 6 9
Conflicting Peds, #/hr 0 6 6 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 -1 -
Peak Hour Factor 86 86 86 86 86 86
Heavy Vehicles, % 0 0 0 1 0 0
Mvmt Flow 174 10 10 236 7 10

Major/Minor Major1 Major2 Minor1


Conflicting Flow All 0 0 190 0 441 185
Stage 1 - - - - 185 -
Stage 2 - - - - 256 -
Critical Hdwy - - 4.3 - 6.2 6.1
Critical Hdwy Stg 1 - - - - 5.2 -
Critical Hdwy Stg 2 - - - - 5.2 -
Follow-up Hdwy - - 3 - 3 3.1
Pot Cap-1 Maneuver - - 1034 - 671 918
Stage 1 - - - - 991 -
Stage 2 - - - - 921 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1028 - 660 913
Mov Cap-2 Maneuver - - - - 660 -
Stage 1 - - - - 985 -
Stage 2 - - - - 911 -

Approach EB WB NB
HCM Control Delay, s 0 0.4 9.6
HCM LOS A

Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT


Capacity (veh/h) 792 - - 1028 -
HCM Lane V/C Ratio 0.022 - - 0.01 -
HCM Control Delay (s) 9.6 - - 8.5 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh) 0.1 - - 0 -

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 8
4: 30th Street & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 21 125 11 8 167 4 5 8 4 0 17 36
Future Volume (vph) 21 125 11 8 167 4 5 8 4 0 17 36
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 0% 1% -1% -1%
Satd. Flow (prot) 0 1853 0 0 1881 0 0 1817 0 0 1699 0
Flt Permitted 0.993 0.998 0.985
Satd. Flow (perm) 0 1853 0 0 1881 0 0 1817 0 0 1699 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 445 215 319 515
Travel Time (s) 12.1 5.9 8.7 14.0
Confl. Peds. (#/hr) 1 8 8 1 2 2
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Heavy Vehicles (%) 0% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 3%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 179 0 0 204 0 0 20 0 0 60 0
Sign Control Stop Stop Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 28.0% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 9
4: 30th Street & Chestnut Street WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Intersection
Intersection Delay, s/veh 8.4
Intersection LOS A

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 125 11 8 167 4 5 8 4 0 17 36
Future Vol, veh/h 21 125 11 8 167 4 5 8 4 0 17 36
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Heavy Vehicles, % 0 1 0 0 0 0 0 0 0 0 0 3
Mvmt Flow 24 142 13 9 190 5 6 9 5 0 19 41
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 8.4 8.6 7.9 7.7
HCM LOS A A A A

Lane NBLn1 EBLn1 WBLn1 SBLn1


Vol Left, % 29% 13% 4% 0%
Vol Thru, % 47% 80% 93% 32%
Vol Right, % 24% 7% 2% 68%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 17 157 179 53
LT Vol 5 21 8 0
Through Vol 8 125 167 17
RT Vol 4 11 4 36
Lane Flow Rate 19 178 203 60
Geometry Grp 1 1 1 1
Degree of Util (X) 0.025 0.212 0.236 0.073
Departure Headway (Hd) 4.726 4.282 4.272 4.35
Convergence, Y/N Yes Yes Yes Yes
Cap 760 844 846 826
Service Time 2.739 2.282 2.272 2.36
HCM Lane V/C Ratio 0.025 0.211 0.24 0.073
HCM Control Delay 7.9 8.4 8.6 7.7
HCM Lane LOS A A A A
HCM 95th-tile Q 0.1 0.8 0.9 0.2

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 10
5: 31st Street & E-W Alley WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 1 0 0 0 19 0 0 18 0
Future Volume (vph) 0 0 0 1 0 0 0 19 0 0 18 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 12 12 12 12 12 12 12 12 12
Grade (%) -5% 0% 1% 0%
Satd. Flow (prot) 0 1818 0 0 1805 0 0 1890 0 0 1900 0
Flt Permitted 0.950
Satd. Flow (perm) 0 1818 0 0 1805 0 0 1890 0 0 1900 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 151 181 206 204
Travel Time (s) 4.1 4.9 5.6 5.6
Confl. Peds. (#/hr) 2 2 2 2 7 3 3 7
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 1 0 0 24 0 0 23 0
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 16.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 11
5: 31st Street & E-W Alley WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 1 0 0 0 19 0 0 18 0
Future Vol, veh/h 0 0 0 1 0 0 0 19 0 0 18 0
Conflicting Peds, #/hr 2 0 2 2 0 2 7 0 3 3 0 7
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - -5 - - 0 - - 1 - - 0 -
Peak Hour Factor 79 79 79 79 79 79 79 79 79 79 79 79
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 0 0 0 1 0 0 0 24 0 0 23 0

Major/Minor Minor2 Minor1 Major1 Major2


Conflicting Flow All 56 57 32 52 57 29 30 0 0 27 0 0
Stage 1 30 30 - 27 27 - - - - - - -
Stage 2 26 27 - 25 30 - - - - - - -
Critical Hdwy 6.1 5.5 5.7 7.1 6.5 6.2 4.3 - - 4.3 - -
Critical Hdwy Stg 1 5.1 4.5 - 6.1 5.5 - - - - - - -
Critical Hdwy Stg 2 5.1 4.5 - 6.1 5.5 - - - - - - -
Follow-up Hdwy 3 4 3.1 3 4 3.1 3 - - 3 - -
Pot Cap-1 Maneuver 1117 851 1119 1107 838 1119 1172 - - 1175 - -
Stage 1 1165 881 - 1159 877 - - - - - - -
Stage 2 1169 883 - 1162 874 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1109 843 1111 1101 830 1114 1165 - - 1172 - -
Mov Cap-2 Maneuver 1109 843 - 1101 830 - - - - - - -
Stage 1 1158 876 - 1156 874 - - - - - - -
Stage 2 1167 880 - 1160 869 - - - - - - -

Approach EB WB NB SB
HCM Control Delay, s 0 8.3 0 0
HCM LOS A A

Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1165 - - - 1101 1172 - -
HCM Lane V/C Ratio - - - - 0.001 - - -
HCM Control Delay (s) 0 - - 0 8.3 0 - -
HCM Lane LOS A - - A A A - -
HCM 95th %tile Q(veh) 0 - - - 0 0 - -

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 12
6: Bramar Road & N-S Alley WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 4 0 1 3 1 0 0 1 0 0 0
Future Volume (vph) 0 4 0 1 3 1 0 0 1 0 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 11 11
Grade (%) 3% -4% 0% -3%
Satd. Flow (prot) 0 1872 0 0 1867 0 0 1644 0 0 1864 0
Flt Permitted 0.990
Satd. Flow (perm) 0 1872 0 0 1867 0 0 1644 0 0 1864 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 131 186 162 179
Travel Time (s) 3.6 5.1 4.4 4.9
Peak Hour Factor 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 8 0 0 10 0 0 2 0 0 0 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 13
6: Bramar Road & N-S Alley WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 1.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 4 0 1 3 1 0 0 1 0 0 0
Future Vol, veh/h 0 4 0 1 3 1 0 0 1 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 3 - - -4 - - 0 - - -3 -
Peak Hour Factor 50 50 50 50 50 50 50 50 50 50 50 50
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 0 8 0 2 6 2 0 0 2 0 0 0

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 8 0 0 8 0 0 19 20 8 20 19 7
Stage 1 - - - - - - 8 8 - 11 11 -
Stage 2 - - - - - - 11 12 - 9 8 -
Critical Hdwy 4.3 - - 4.3 - - 7.1 6.5 6.2 6.5 5.9 5.9
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 5.5 4.9 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 5.5 4.9 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1193 - - 1193 - - 1165 878 1149 1167 882 1152
Stage 1 - - - - - - 1188 893 - 1185 892 -
Stage 2 - - - - - - 1183 890 - 1188 894 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1193 - - 1193 - - 1163 876 1149 1163 880 1152
Mov Cap-2 Maneuver - - - - - - 1163 876 - 1163 880 -
Stage 1 - - - - - - 1188 893 - 1185 890 -
Stage 2 - - - - - - 1181 888 - 1186 894 -

Approach EB WB NB SB
HCM Control Delay, s 0 1.6 8.1 0
HCM LOS A A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1149 1193 - - 1193 - - -
HCM Lane V/C Ratio 0.002 - - - 0.002 - - -
HCM Control Delay (s) 8.1 0 - - 8 0 - 0
HCM Lane LOS A A - - A A - A
HCM 95th %tile Q(veh) 0 0 - - 0 - - -

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 14
7: S 32nd Street & Harvard Avenue WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 113 16 329 87 22 1 310 997 8 6 1106 75
Future Volume (vph) 113 16 329 87 22 1 310 997 8 6 1106 75
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 14 14 14 12 12 12 12 12 12 12 12 12
Grade (%) -2% 0% -1% -2%
Storage Length (ft) 150 0 0 0 400 0 160 0
Storage Lanes 1 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1806 1939 1632 0 1716 0 1719 3399 0 1727 3388 0
Flt Permitted 0.729 0.759 0.094 0.273
Satd. Flow (perm) 1378 1939 1632 0 1354 0 170 3399 0 496 3388 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 343 1 6
Link Speed (mph) 25 25 35 35
Link Distance (ft) 357 317 547 1233
Travel Time (s) 9.7 8.6 10.7 24.0
Confl. Peds. (#/hr) 4 4 1 1
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 2% 0% 1% 1% 0% 0% 0% 1% 0% 0% 1% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 118 17 343 0 115 0 323 1047 0 6 1230 0
Turn Type Perm NA pm+ov Perm NA pm+pt NA pm+pt NA
Protected Phases 4 5 8 5 2 1 6
Permitted Phases 4 4 8 2 6
Detector Phase 4 4 5 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0
Minimum Split (s) 24.2 24.2 11.4 24.2 24.2 11.4 24.4 11.4 24.4
Total Split (s) 24.2 24.2 22.0 24.2 24.2 22.0 56.4 11.4 45.8
Total Split (%) 18.6% 18.6% 16.9% 18.6% 18.6% 16.9% 43.4% 8.8% 35.2%
Yellow Time (s) 3.0 3.0 3.8 3.0 3.0 3.8 3.8 3.8 3.8
All-Red Time (s) 3.2 3.2 2.6 3.2 3.2 2.6 2.6 2.6 2.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.2 5.2 5.4 5.2 5.4 5.4 5.4 5.4
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None
Act Effct Green (s) 13.8 13.8 35.4 13.8 64.2 62.6 47.7 41.6
Actuated g/C Ratio 0.15 0.15 0.38 0.15 0.68 0.66 0.51 0.44
v/c Ratio 0.59 0.06 0.42 0.58 0.82 0.46 0.02 0.82
Control Delay 52.8 39.4 3.5 52.9 40.9 13.5 12.7 31.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 52.8 39.4 3.5 52.9 40.9 13.5 12.7 31.0
LOS D D A D D B B C
Approach Delay 17.0 52.9 20.0 30.9
Approach LOS B D B C
Queue Length 50th (ft) 60 8 0 59 110 101 1 282
Queue Length 95th (ft) 162 36 37 158 #460 491 10 #788

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 15
7: S 32nd Street & Harvard Avenue WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 38.0
Total Split (s) 38.0
Total Split (%) 29%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 16
7: S 32nd Street & Harvard Avenue WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 277 237 467 1153
Turn Bay Length (ft) 150 400 160
Base Capacity (vph) 285 401 826 280 395 2252 331 1495
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.41 0.04 0.42 0.41 0.82 0.46 0.02 0.82
Intersection Summary
Area Type: Other
Cycle Length: 130
Actuated Cycle Length: 94.4
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.82
Intersection Signal Delay: 24.9 Intersection LOS: C
Intersection Capacity Utilization 79.3% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 7: S 32nd Street & Harvard Avenue

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 17
7: S 32nd Street & Harvard Avenue WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 18
8: 30th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 7 430 8 31 396 6 6 4 26 11 15 14
Future Volume (vph) 7 430 8 31 396 6 6 4 26 11 15 14
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 1% 1% 2% -2%
Satd. Flow (prot) 0 1678 0 0 1676 0 0 1633 0 0 1623 0
Flt Permitted 0.999 0.996 0.992 0.986
Satd. Flow (perm) 0 1678 0 0 1676 0 0 1633 0 0 1623 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 426 373 515 207
Travel Time (s) 11.6 10.2 14.0 5.6
Confl. Peds. (#/hr) 3 4 4 3 4 2 2 4
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 4% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 473 0 0 460 0 0 38 0 0 43 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 50.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 19
8: 30th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 1.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 430 8 31 396 6 6 4 26 11 15 14
Future Vol, veh/h 7 430 8 31 396 6 6 4 26 11 15 14
Conflicting Peds, #/hr 3 0 4 4 0 3 4 0 2 2 0 4
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 1 - - 1 - - 2 - - -2 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94
Heavy Vehicles, % 0 1 0 0 1 0 0 0 4 0 0 0
Mvmt Flow 7 457 9 33 421 6 6 4 28 12 16 15

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 430 0 0 470 0 0 990 976 468 987 977 431
Stage 1 - - - - - - 480 480 - 493 493 -
Stage 2 - - - - - - 510 496 - 494 484 -
Critical Hdwy 4.3 - - 4.3 - - 7.5 6.9 6.44 6.7 6.1 6
Critical Hdwy Stg 1 - - - - - - 6.5 5.9 - 5.7 5.1 -
Critical Hdwy Stg 2 - - - - - - 6.5 5.9 - 5.7 5.1 -
Follow-up Hdwy 3 - - 3 - - 3.1 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 854 - - 827 - - 219 227 611 280 282 678
Stage 1 - - - - - - 596 529 - 670 581 -
Stage 2 - - - - - - 571 519 - 670 586 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 852 - - 824 - - 193 211 608 249 262 673
Mov Cap-2 Maneuver - - - - - - 193 211 - 249 262 -
Stage 1 - - - - - - 587 521 - 661 548 -
Stage 2 - - - - - - 511 490 - 626 577 -

Approach EB WB NB SB
HCM Control Delay, s 0.1 0.7 15.3 17.6
HCM LOS C C

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 388 852 - - 824 - - 327
HCM Lane V/C Ratio 0.099 0.009 - - 0.04 - - 0.13
HCM Control Delay (s) 15.3 9.3 0 - 9.6 0 - 17.6
HCM Lane LOS C A A - A A - C
HCM 95th %tile Q(veh) 0.3 0 - - 0.1 - - 0.4

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 20
9: 29th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 9 457 3 16 421 4 3 2 12 3 3 8
Future Volume (vph) 9 457 3 16 421 4 3 2 12 3 3 8
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Grade (%) -1% 0% -2% -1%
Satd. Flow (prot) 0 1609 0 0 1773 0 0 1464 0 0 1486 0
Flt Permitted 0.993 0.981
Satd. Flow (perm) 0 1599 0 0 1743 0 0 1476 0 0 1503 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 1 13 8
Link Speed (mph) 25 25 25 25
Link Distance (ft) 373 270 277 210
Travel Time (s) 10.2 7.4 7.6 5.7
Confl. Peds. (#/hr) 2 3 3 2
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 0% 1% 0% 6% 1% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 488 0 0 460 0 0 18 0 0 14 0
Turn Type Perm NA Perm NA Perm NA Perm NA
Protected Phases 2 6 8 4
Permitted Phases 2 6 8 4
Detector Phase 2 2 6 6 8 8 4 4
Switch Phase
Minimum Initial (s) 30.0 30.0 30.0 30.0 3.0 3.0 3.0 3.0
Minimum Split (s) 35.0 35.0 35.0 35.0 7.6 7.6 7.6 7.6
Total Split (s) 35.0 35.0 35.0 35.0 10.0 10.0 10.0 10.0
Total Split (%) 43.8% 43.8% 43.8% 43.8% 12.5% 12.5% 12.5% 12.5%
Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
All-Red Time (s) 2.0 2.0 2.0 2.0 1.6 1.6 1.6 1.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 4.0 4.0 3.6 3.6
Lead/Lag
Lead-Lag Optimize?
Recall Mode Min Min Min Min None None None None
Act Effct Green (s) 48.0 48.0 6.7 6.7
Actuated g/C Ratio 0.88 0.88 0.12 0.12
v/c Ratio 0.35 0.30 0.09 0.07
Control Delay 8.5 7.3 18.5 20.5
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 8.5 7.3 18.5 20.5
LOS A A B C
Approach Delay 8.5 7.3 18.5 20.5
Approach LOS A A B C
Queue Length 50th (ft) 0 0 1 2
Queue Length 95th (ft) #369 292 22 20
Internal Link Dist (ft) 293 190 197 130
Turn Bay Length (ft)
Base Capacity (vph) 1403 1530 191 190

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 21
9: 29th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 9.0
Minimum Split (s) 35.0
Total Split (s) 35.0
Total Split (%) 44%
Yellow Time (s) 2.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 22
9: 29th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.35 0.30 0.09 0.07
Intersection Summary
Area Type: Other
Cycle Length: 80
Actuated Cycle Length: 54.7
Natural Cycle: 80
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.35
Intersection Signal Delay: 8.3 Intersection LOS: A
Intersection Capacity Utilization 42.5% ICU Level of Service A
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 9: 29th Street & Market Street

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 23
9: 29th Street & Market Street WMSC.00002
Existing Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Existing Conditions Synchro 10 Report


TPD Page 24
2020 Base (No-Build) Conditions
1: N-S Alley & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 74 209 2 0 228 2 0 1 0 2 0 10
Future Volume (vph) 74 209 2 0 228 2 0 1 0 2 0 10
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 11 11 11 12 12 12
Grade (%) 0% 0% -2% 0%
Storage Length (ft) 0 150 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 0 1860 0 0 1861 0 0 1855 0 0 1670 0
Flt Permitted 0.987 0.992
Satd. Flow (perm) 0 1860 0 0 1861 0 0 1855 0 0 1670 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 325 227 190 155
Travel Time (s) 8.9 6.2 5.2 4.2
Confl. Peds. (#/hr) 3 1 1 3
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 0% 1% 0% 0% 2% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 303 0 0 245 0 0 1 0 0 13 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 40.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 1
1: N-S Alley & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 74 209 2 0 228 2 0 1 0 2 0 10
Future Volume (Veh/h) 74 209 2 0 228 2 0 1 0 2 0 10
Sign Control Free Free Stop Stop
Grade 0% 0% -2% 0%
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Hourly flow rate (vph) 79 222 2 0 243 2 0 1 0 2 0 11
Pedestrians 1 3
Lane Width (ft) 11.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 325
pX, platoon unblocked 0.91 0.91 0.91 0.91 0.91 0.91
vC, conflicting volume 248 225 637 630 224 628 630 247
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 248 103 554 547 102 545 547 247
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 94 100 100 100 100 99 100 99
cM capacity (veh/h) 1326 1369 382 383 874 391 383 794
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 303 245 1 13
Volume Left 79 0 0 2
Volume Right 2 2 0 11
cSH 1326 1369 383 686
Volume to Capacity 0.06 0.00 0.00 0.02
Queue Length 95th (ft) 5 0 0 1
Control Delay (s) 2.5 0.0 14.4 10.4
Lane LOS A B B
Approach Delay (s) 2.5 0.0 14.4 10.4
Approach LOS B B
Intersection Summary
Average Delay 1.6
Intersection Capacity Utilization 40.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 2
1: N-S Alley & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 1.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 74 209 2 0 228 2 0 1 0 2 0 10
Future Vol, veh/h 74 209 2 0 228 2 0 1 0 2 0 10
Conflicting Peds, #/hr 3 0 1 1 0 3 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - -2 - - 0 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94
Heavy Vehicles, % 0 1 0 0 2 0 0 0 0 0 0 0
Mvmt Flow 79 222 2 0 243 2 0 1 0 2 0 11

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 248 0 0 225 0 0 632 630 224 629 630 247
Stage 1 - - - - - - 382 382 - 247 247 -
Stage 2 - - - - - - 250 248 - 382 383 -
Critical Hdwy 4.3 - - 4.3 - - 6.7 6.1 6 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 5.7 5.1 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 5.7 5.1 - 6.1 5.5 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 988 - - 1006 - - 476 430 879 446 401 842
Stage 1 - - - - - - 765 643 - 874 706 -
Stage 2 - - - - - - 895 725 - 733 616 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 985 - - 1005 - - 436 389 878 413 363 840
Mov Cap-2 Maneuver - - - - - - 436 389 - 413 363 -
Stage 1 - - - - - - 694 583 - 791 704 -
Stage 2 - - - - - - 884 723 - 664 559 -

Approach EB WB NB SB
HCM Control Delay, s 2.3 0 14.3 10.1
HCM LOS B B

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 389 985 - - 1005 - - 717
HCM Lane V/C Ratio 0.003 0.08 - - - - - 0.018
HCM Control Delay (s) 14.3 9 0 - 0 - - 10.1
HCM Lane LOS B A A - A - - B
HCM 95th %tile Q(veh) 0 0.3 - - 0 - - 0.1

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 3
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 306 164 118 103 101 15 119 1372 114 10 1004 222
Future Volume (vph) 306 164 118 103 101 15 119 1372 114 10 1004 222
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 12 12 14 10 10 10 11 11 11 10 11 11
Grade (%) -1% -1% 1% -1%
Storage Length (ft) 250 250 150 0 640 0 110 0
Storage Lanes 1 1 1 0 1 0 1 1
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1685 1809 1562 1588 1609 0 1566 3189 0 1458 3257 1472
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1674 1809 1541 1583 1609 0 1566 3189 0 1458 3257 1472
Right Turn on Red No No Yes Yes
Satd. Flow (RTOR) 6 217
Link Speed (mph) 35 25 35 35
Link Distance (ft) 525 325 1233 312
Travel Time (s) 10.2 8.9 24.0 6.1
Confl. Peds. (#/hr) 3 1 1 3
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 2% 0% 5% 1% 2% 7% 5% 2% 1% 10% 2% 1%
Shared Lane Traffic (%)
Lane Group Flow (vph) 333 178 128 112 126 0 129 1615 0 11 1091 241
Turn Type Split NA pm+ov Split NA Prot NA Prot NA pm+ov
Protected Phases 4 4 5 8 8 5 2 1 6 4
Permitted Phases 4 6
Detector Phase 4 4 5 8 8 5 2 1 6 4
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 10.0 7.0 10.0 7.0
Minimum Split (s) 13.0 13.0 13.5 13.1 13.1 13.5 16.5 13.5 16.5 13.0
Total Split (s) 23.0 23.0 13.6 16.0 16.0 13.6 55.5 13.5 55.4 23.0
Total Split (%) 15.3% 15.3% 9.1% 10.7% 10.7% 9.1% 37.0% 9.0% 36.9% 15.3%
Yellow Time (s) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
All-Red Time (s) 2.3 2.3 2.8 2.4 2.4 2.8 2.8 2.8 2.8 2.3
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.0 5.0 5.5 5.1 5.1 5.5 5.5 5.5 5.5 5.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None None
Act Effct Green (s) 18.3 18.3 26.1 11.1 11.1 8.3 61.7 8.1 49.9 73.9
Actuated g/C Ratio 0.16 0.16 0.23 0.10 0.10 0.07 0.53 0.07 0.43 0.64
v/c Ratio 1.25 0.62 0.37 0.74 0.82 1.16 0.95 0.11 0.78 0.24
Control Delay 179.5 57.9 27.7 80.0 89.3 182.1 38.9 59.7 34.3 3.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 179.5 57.9 27.7 80.0 89.3 182.1 38.9 59.7 34.3 3.2
LOS F E C E F F D E C A
Approach Delay 115.2 84.9 49.5 28.9
Approach LOS F F D C
Queue Length 50th (ft) ~277 115 53 76 86 ~101 458 7 312 5
Queue Length 95th (ft) #671 #301 96 #242 #275 #318 #1301 33 #725 59

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 4
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 7.0
Minimum Split (s) 42.0
Total Split (s) 42.0
Total Split (%) 28%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 5
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 445 245 1153 232
Turn Bay Length (ft) 250 250 150 640 110
Base Capacity (vph) 267 287 349 152 154 111 1705 102 1432 1018
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 1.25 0.62 0.37 0.74 0.82 1.16 0.95 0.11 0.76 0.24
Intersection Summary
Area Type: Other
Cycle Length: 150
Actuated Cycle Length: 115.6
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 1.25
Intersection Signal Delay: 55.3 Intersection LOS: E
Intersection Capacity Utilization 91.8% ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 2: S 32nd Street & Trindle Road/Chestnut Street

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 6
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 7
3: 31st Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (vph) 206 38 17 194 10 18
Future Volume (vph) 206 38 17 194 10 18
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 0% 0% -1%
Satd. Flow (prot) 1836 0 0 1875 1714 0
Flt Permitted 0.996 0.983
Satd. Flow (perm) 1836 0 0 1875 1714 0
Link Speed (mph) 25 25 25
Link Distance (ft) 227 445 204
Travel Time (s) 6.2 12.1 5.6
Confl. Peds. (#/hr) 7 7
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89
Heavy Vehicles (%) 1% 3% 0% 1% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 274 0 0 237 31 0
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 34.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 8
3: 31st Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Movement EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (veh/h) 206 38 17 194 10 18
Future Volume (Veh/h) 206 38 17 194 10 18
Sign Control Free Free Stop
Grade 0% 0% -1%
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89
Hourly flow rate (vph) 231 43 19 218 11 20
Pedestrians 7
Lane Width (ft) 12.0
Walking Speed (ft/s) 3.5
Percent Blockage 1
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 552
pX, platoon unblocked 0.96 0.96 0.96
vC, conflicting volume 281 516 260
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 229 474 207
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 99 98 97
cM capacity (veh/h) 1287 519 799
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 274 237 31
Volume Left 0 19 11
Volume Right 43 0 20
cSH 1700 1287 671
Volume to Capacity 0.16 0.01 0.05
Queue Length 95th (ft) 0 1 4
Control Delay (s) 0.0 0.8 10.6
Lane LOS A B
Approach Delay (s) 0.0 0.8 10.6
Approach LOS B
Intersection Summary
Average Delay 0.9
Intersection Capacity Utilization 34.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 9
3: 31st Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 0.9
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 206 38 17 194 10 18
Future Vol, veh/h 206 38 17 194 10 18
Conflicting Peds, #/hr 0 7 7 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 -1 -
Peak Hour Factor 89 89 89 89 89 89
Heavy Vehicles, % 1 3 0 1 0 0
Mvmt Flow 231 43 19 218 11 20

Major/Minor Major1 Major2 Minor1


Conflicting Flow All 0 0 281 0 516 260
Stage 1 - - - - 260 -
Stage 2 - - - - 256 -
Critical Hdwy - - 4.3 - 6.2 6.1
Critical Hdwy Stg 1 - - - - 5.2 -
Critical Hdwy Stg 2 - - - - 5.2 -
Follow-up Hdwy - - 3 - 3 3.1
Pot Cap-1 Maneuver - - 962 - 607 834
Stage 1 - - - - 917 -
Stage 2 - - - - 921 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 956 - 589 828
Mov Cap-2 Maneuver - - - - 589 -
Stage 1 - - - - 911 -
Stage 2 - - - - 900 -

Approach EB WB NB
HCM Control Delay, s 0 0.7 10.2
HCM LOS B

Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT


Capacity (veh/h) 723 - - 956 -
HCM Lane V/C Ratio 0.044 - - 0.02 -
HCM Control Delay (s) 10.2 - - 8.8 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.1 - - 0.1 -

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 10
4: 30th Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 53 129 21 25 139 10 16 19 4 37 76 58
Future Volume (vph) 53 129 21 25 139 10 16 19 4 37 76 58
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 0% 1% -1% -1%
Satd. Flow (prot) 0 1817 0 0 1862 0 0 1801 0 0 1766 0
Flt Permitted 0.987 0.993 0.980 0.989
Satd. Flow (perm) 0 1817 0 0 1862 0 0 1801 0 0 1766 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 445 215 319 515
Travel Time (s) 12.1 5.9 8.7 14.0
Confl. Peds. (#/hr) 16 1 1 16 3 3
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles (%) 0% 2% 5% 0% 0% 0% 6% 0% 0% 0% 3% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 253 0 0 218 0 0 49 0 0 214 0
Sign Control Stop Stop Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 36.4% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 11
4: 30th Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Stop Stop
Traffic Volume (vph) 53 129 21 25 139 10 16 19 4 37 76 58
Future Volume (vph) 53 129 21 25 139 10 16 19 4 37 76 58
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Hourly flow rate (vph) 66 161 26 31 174 13 20 24 5 46 95 73
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total (vph) 253 218 49 214
Volume Left (vph) 66 31 20 46
Volume Right (vph) 26 13 5 73
Hadj (s) 0.02 -0.01 0.06 -0.13
Departure Headway (s) 4.9 5.0 5.5 5.0
Degree Utilization, x 0.35 0.30 0.07 0.30
Capacity (veh/h) 688 682 569 657
Control Delay (s) 10.5 10.1 9.0 10.2
Approach Delay (s) 10.5 10.1 9.0 10.2
Approach LOS B B A B
Intersection Summary
Delay 10.2
Level of Service B
Intersection Capacity Utilization 36.4% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 12
4: 30th Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Intersection
Intersection Delay, s/veh 10.1
Intersection LOS B

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 53 129 21 25 139 10 16 19 4 37 76 58
Future Vol, veh/h 53 129 21 25 139 10 16 19 4 37 76 58
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles, % 0 2 5 0 0 0 6 0 0 0 3 2
Mvmt Flow 66 161 26 31 174 13 20 24 5 46 95 73
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 10.4 10 9 10.1
HCM LOS B A A B

Lane NBLn1 EBLn1 WBLn1 SBLn1


Vol Left, % 41% 26% 14% 22%
Vol Thru, % 49% 64% 80% 44%
Vol Right, % 10% 10% 6% 34%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 39 203 174 171
LT Vol 16 53 25 37
Through Vol 19 129 139 76
RT Vol 4 21 10 58
Lane Flow Rate 49 254 218 214
Geometry Grp 1 1 1 1
Degree of Util (X) 0.075 0.34 0.294 0.292
Departure Headway (Hd) 5.55 4.818 4.866 4.922
Convergence, Y/N Yes Yes Yes Yes
Cap 649 741 731 722
Service Time 3.55 2.892 2.943 3.002
HCM Lane V/C Ratio 0.076 0.343 0.298 0.296
HCM Control Delay 9 10.4 10 10.1
HCM Lane LOS A B A B
HCM 95th-tile Q 0.2 1.5 1.2 1.2

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 13
5: 31st Street & E-W Alley WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 1 0 0 0 0 1 0 22 0 0 54 0
Future Volume (vph) 1 0 0 0 0 1 0 22 0 0 54 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 12 12 12 12 12 12 12 12 12
Grade (%) -5% 0% 1% 0%
Satd. Flow (prot) 0 1727 0 0 1644 0 0 1890 0 0 1863 0
Flt Permitted 0.950
Satd. Flow (perm) 0 1727 0 0 1644 0 0 1890 0 0 1863 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 151 181 206 204
Travel Time (s) 4.1 4.9 5.6 5.6
Confl. Peds. (#/hr) 2 3 3 2
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 2% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 1 0 0 1 0 0 28 0 0 68 0
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 14.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 14
5: 31st Street & E-W Alley WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 1 0 0 0 0 1 0 22 0 0 54 0
Future Volume (Veh/h) 1 0 0 0 0 1 0 22 0 0 54 0
Sign Control Stop Stop Free Free
Grade -5% 0% 1% 0%
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Hourly flow rate (vph) 1 0 0 0 0 1 0 28 0 0 68 0
Pedestrians 2 3
Lane Width (ft) 10.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 99 101 70 99 101 31 70 31
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 99 101 70 99 101 31 70 31
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1
tC, 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 882 790 997 882 789 1046 1541 1590
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 1 1 28 68
Volume Left 1 0 0 0
Volume Right 0 1 0 0
cSH 882 1046 1541 1590
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 9.1 8.4 0.0 0.0
Lane LOS A A
Approach Delay (s) 9.1 8.4 0.0 0.0
Approach LOS A A
Intersection Summary
Average Delay 0.2
Intersection Capacity Utilization 14.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 15
5: 31st Street & E-W Alley WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 0 0 0 0 1 0 22 0 0 54 0
Future Vol, veh/h 1 0 0 0 0 1 0 22 0 0 54 0
Conflicting Peds, #/hr 0 0 0 0 0 0 2 0 3 3 0 2
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - -5 - - 0 - - 1 - - 0 -
Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 2 0
Mvmt Flow 1 0 0 0 0 1 0 28 0 0 68 0

Major/Minor Minor2 Minor1 Major1 Major2


Conflicting Flow All 99 101 70 99 101 31 70 0 0 31 0 0
Stage 1 70 70 - 31 31 - - - - - - -
Stage 2 29 31 - 68 70 - - - - - - -
Critical Hdwy 6.1 5.5 5.7 7.1 6.5 6.2 4.3 - - 4.3 - -
Critical Hdwy Stg 1 5.1 4.5 - 6.1 5.5 - - - - - - -
Critical Hdwy Stg 2 5.1 4.5 - 6.1 5.5 - - - - - - -
Follow-up Hdwy 3 4 3.1 3 4 3.1 3 - - 3 - -
Pot Cap-1 Maneuver 1057 815 1071 1028 793 1116 1136 - - 1171 - -
Stage 1 1119 857 - 1153 873 - - - - - - -
Stage 2 1166 881 - 1100 841 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1054 811 1069 1025 789 1113 1134 - - 1168 - -
Mov Cap-2 Maneuver 1054 811 - 1025 789 - - - - - - -
Stage 1 1117 855 - 1150 870 - - - - - - -
Stage 2 1165 878 - 1100 839 - - - - - - -

Approach EB WB NB SB
HCM Control Delay, s 8.4 8.2 0 0
HCM LOS A A

Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1134 - - 1054 1113 1168 - -
HCM Lane V/C Ratio - - - 0.001 0.001 - - -
HCM Control Delay (s) 0 - - 8.4 8.2 0 - -
HCM Lane LOS A - - A A A - -
HCM 95th %tile Q(veh) 0 - - 0 0 0 - -

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 16
6: Bramar Road & N-S Alley WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 5 0 1 3 1 0 0 1 0 0 0
Future Volume (vph) 0 5 0 1 3 1 0 0 1 0 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 11 11
Grade (%) 3% -4% 0% -3%
Satd. Flow (prot) 0 1872 0 0 1873 0 0 1644 0 0 1864 0
Flt Permitted 0.991
Satd. Flow (perm) 0 1872 0 0 1873 0 0 1644 0 0 1864 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 131 186 162 179
Travel Time (s) 3.6 5.1 4.4 4.9
Peak Hour Factor 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 11 0 0 11 0 0 2 0 0 0 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 17
6: Bramar Road & N-S Alley WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 0 5 0 1 3 1 0 0 1 0 0 0
Future Volume (Veh/h) 0 5 0 1 3 1 0 0 1 0 0 0
Sign Control Free Free Stop Stop
Grade 3% -4% 0% -3%
Peak Hour Factor 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46
Hourly flow rate (vph) 0 11 0 2 7 2 0 0 2 0 0 0
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 9 11 23 24 11 25 23 8
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 9 11 23 24 11 25 23 8
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 1624 1621 993 872 1076 988 873 1080
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 11 11 2 0
Volume Left 0 2 0 0
Volume Right 0 2 2 0
cSH 1624 1621 1076 1700
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 0.0 1.3 8.4 0.0
Lane LOS A A A
Approach Delay (s) 0.0 1.3 8.4 0.0
Approach LOS A A
Intersection Summary
Average Delay 1.3
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 18
6: Bramar Road & N-S Alley WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 1.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 5 0 1 3 1 0 0 1 0 0 0
Future Vol, veh/h 0 5 0 1 3 1 0 0 1 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 3 - - -4 - - 0 - - -3 -
Peak Hour Factor 46 46 46 46 46 46 46 46 46 46 46 46
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 0 11 0 2 7 2 0 0 2 0 0 0

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 9 0 0 11 0 0 23 24 11 24 23 8
Stage 1 - - - - - - 11 11 - 12 12 -
Stage 2 - - - - - - 12 13 - 12 11 -
Critical Hdwy 4.3 - - 4.3 - - 7.1 6.5 6.2 6.5 5.9 5.9
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 5.5 4.9 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 5.5 4.9 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1192 - - 1190 - - 1158 873 1145 1161 878 1150
Stage 1 - - - - - - 1183 890 - 1184 891 -
Stage 2 - - - - - - 1182 889 - 1184 892 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1192 - - 1190 - - 1156 871 1145 1158 876 1150
Mov Cap-2 Maneuver - - - - - - 1156 871 - 1158 876 -
Stage 1 - - - - - - 1183 890 - 1184 889 -
Stage 2 - - - - - - 1180 887 - 1182 892 -

Approach EB WB NB SB
HCM Control Delay, s 0 1.6 8.2 0
HCM LOS A A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1145 1192 - - 1190 - - -
HCM Lane V/C Ratio 0.002 - - - 0.002 - - -
HCM Control Delay (s) 8.2 0 - - 8 0 - 0
HCM Lane LOS A A - - A A - A
HCM 95th %tile Q(veh) 0 0 - - 0 - - -

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 19
7: S 32nd Street & Harvard Avenue WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 16 8 68 88 8 2 135 1587 10 21 1250 12
Future Volume (vph) 16 8 68 88 8 2 135 1587 10 21 1250 12
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 14 14 14 12 12 12 12 12 12 12 12 12
Grade (%) -2% 0% -1% -2%
Storage Length (ft) 150 0 0 0 400 0 160 0
Storage Lanes 1 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1406 1939 1600 0 1702 0 1719 3366 0 1727 3384 0
Flt Permitted 0.770 0.742 0.105 0.075
Satd. Flow (perm) 1140 1939 1600 0 1320 0 190 3366 0 136 3384 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 74 1 1 1
Link Speed (mph) 25 25 35 35
Link Distance (ft) 357 317 547 1233
Travel Time (s) 9.7 8.6 10.7 24.0
Confl. Peds. (#/hr) 1 1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 31% 0% 3% 1% 0% 0% 0% 2% 0% 0% 2% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 17 9 74 0 107 0 147 1736 0 23 1372 0
Turn Type Perm NA pm+ov Perm NA pm+pt NA pm+pt NA
Protected Phases 4 5 8 5 2 1 6
Permitted Phases 4 4 8 2 6
Detector Phase 4 4 5 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0
Minimum Split (s) 24.2 24.2 11.4 24.2 24.2 11.4 24.4 11.4 24.4
Total Split (s) 24.2 24.2 16.2 24.2 24.2 16.2 76.4 11.4 71.6
Total Split (%) 16.1% 16.1% 10.8% 16.1% 16.1% 10.8% 50.9% 7.6% 47.7%
Yellow Time (s) 3.0 3.0 3.8 3.0 3.0 3.8 3.8 3.8 3.8
All-Red Time (s) 3.2 3.2 2.6 3.2 3.2 2.6 2.6 2.6 2.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.2 5.2 5.4 5.2 5.4 5.4 5.4 5.4
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None
Act Effct Green (s) 14.7 14.7 30.1 14.7 77.1 73.4 67.1 60.9
Actuated g/C Ratio 0.14 0.14 0.28 0.14 0.71 0.68 0.62 0.56
v/c Ratio 0.11 0.03 0.15 0.60 0.51 0.76 0.13 0.72
Control Delay 49.4 48.4 6.8 61.8 16.8 19.1 11.0 23.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 49.4 48.4 6.8 61.8 16.8 19.1 11.0 23.1
LOS D D A E B B B C
Approach Delay 17.8 61.8 18.9 22.9
Approach LOS B E B C
Queue Length 50th (ft) 9 5 0 61 22 256 3 302
Queue Length 95th (ft) 41 26 28 #176 #138 #1144 25 #779

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 20
7: S 32nd Street & Harvard Avenue WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 38.0
Total Split (s) 38.0
Total Split (%) 25%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 21
7: S 32nd Street & Harvard Avenue WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 277 237 467 1153
Turn Bay Length (ft) 150 400 160
Base Capacity (vph) 206 351 502 240 292 2278 175 2136
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.08 0.03 0.15 0.45 0.50 0.76 0.13 0.64
Intersection Summary
Area Type: Other
Cycle Length: 150
Actuated Cycle Length: 108.5
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.76
Intersection Signal Delay: 21.8 Intersection LOS: C
Intersection Capacity Utilization 76.5% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 7: S 32nd Street & Harvard Avenue

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 22
7: S 32nd Street & Harvard Avenue WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 23
8: 30th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 1 350 22 63 227 4 8 13 69 7 72 24
Future Volume (vph) 1 350 22 63 227 4 8 13 69 7 72 24
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 1% 1% 2% -2%
Satd. Flow (prot) 0 1633 0 0 1634 0 0 1679 0 0 1667 0
Flt Permitted 0.989 0.996 0.997
Satd. Flow (perm) 0 1633 0 0 1634 0 0 1679 0 0 1667 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 426 373 515 207
Travel Time (s) 11.6 10.2 14.0 5.6
Confl. Peds. (#/hr) 1 1 3 1 1 3
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Heavy Vehicles (%) 0% 3% 9% 2% 3% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 414 0 0 326 0 0 100 0 0 115 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 53.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 24
8: 30th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 1 350 22 63 227 4 8 13 69 7 72 24
Future Volume (Veh/h) 1 350 22 63 227 4 8 13 69 7 72 24
Sign Control Free Free Stop Stop
Grade 1% 1% 2% -2%
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Hourly flow rate (vph) 1 389 24 70 252 4 9 14 77 8 80 27
Pedestrians 3 1 1
Lane Width (ft) 12.0 12.0 12.0
Walking Speed (ft/s) 3.5 3.5 3.5
Percent Blockage 0 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 373
pX, platoon unblocked 0.99 0.99 0.99 0.99 0.99 0.99
vC, conflicting volume 256 414 868 800 403 882 810 257
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 246 414 863 794 403 877 804 247
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 94 95 95 88 96 73 97
cM capacity (veh/h) 1321 1144 200 300 650 218 296 788
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 414 326 100 115
Volume Left 1 70 9 8
Volume Right 24 4 77 27
cSH 1321 1144 476 337
Volume to Capacity 0.00 0.06 0.21 0.34
Queue Length 95th (ft) 0 5 20 37
Control Delay (s) 0.0 2.3 14.6 21.1
Lane LOS A A B C
Approach Delay (s) 0.0 2.3 14.6 21.1
Approach LOS B C
Intersection Summary
Average Delay 4.9
Intersection Capacity Utilization 53.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 25
8: 30th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 4.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 350 22 63 227 4 8 13 69 7 72 24
Future Vol, veh/h 1 350 22 63 227 4 8 13 69 7 72 24
Conflicting Peds, #/hr 0 0 1 1 0 0 3 0 1 1 0 3
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 1 - - 1 - - 2 - - -2 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 0 3 9 2 3 0 0 0 0 0 0 0
Mvmt Flow 1 389 24 70 252 4 9 14 77 8 80 27

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 256 0 0 414 0 0 855 800 403 844 810 257
Stage 1 - - - - - - 404 404 - 394 394 -
Stage 2 - - - - - - 451 396 - 450 416 -
Critical Hdwy 4.3 - - 4.3 - - 7.5 6.9 6.4 6.7 6.1 6
Critical Hdwy Stg 1 - - - - - - 6.5 5.9 - 5.7 5.1 -
Critical Hdwy Stg 2 - - - - - - 6.5 5.9 - 5.7 5.1 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 981 - - 865 - - 283 293 671 347 346 844
Stage 1 - - - - - - 681 576 - 754 636 -
Stage 2 - - - - - - 638 581 - 706 623 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 981 - - 864 - - 203 265 670 273 312 842
Mov Cap-2 Maneuver - - - - - - 203 265 - 273 312 -
Stage 1 - - - - - - 680 575 - 753 576 -
Stage 2 - - - - - - 480 526 - 608 622 -

Approach EB WB NB SB
HCM Control Delay, s 0 2 14.7 19.5
HCM LOS B C

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 470 981 - - 864 - - 362
HCM Lane V/C Ratio 0.213 0.001 - - 0.081 - - 0.316
HCM Control Delay (s) 14.7 8.7 0 - 9.5 0 - 19.5
HCM Lane LOS B A A - A A - C
HCM 95th %tile Q(veh) 0.8 0 - - 0.3 - - 1.3

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 26
9: 29th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 5 407 11 26 276 3 4 4 18 3 6 18
Future Volume (vph) 5 407 11 26 276 3 4 4 18 3 6 18
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Grade (%) -1% 0% -2% -1%
Satd. Flow (prot) 0 1567 0 0 1743 0 0 1435 0 0 1384 0
Flt Permitted 0.997 0.952
Satd. Flow (perm) 0 1564 0 0 1666 0 0 1444 0 0 1389 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 2 1 20 20
Link Speed (mph) 25 25 25 25
Link Distance (ft) 373 270 277 210
Travel Time (s) 10.2 7.4 7.6 5.7
Confl. Peds. (#/hr) 4 1 1 4 1 2 2 1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 20% 3% 9% 0% 3% 0% 0% 0% 0% 0% 0% 7%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 459 0 0 331 0 0 28 0 0 30 0
Turn Type Perm NA Perm NA Perm NA Perm NA
Protected Phases 2 6 8 4
Permitted Phases 2 6 8 4
Detector Phase 2 2 6 6 8 8 4 4
Switch Phase
Minimum Initial (s) 30.0 30.0 30.0 30.0 3.0 3.0 3.0 3.0
Minimum Split (s) 35.0 35.0 35.0 35.0 7.6 7.6 7.6 7.6
Total Split (s) 35.0 35.0 35.0 35.0 10.0 10.0 10.0 10.0
Total Split (%) 43.8% 43.8% 43.8% 43.8% 12.5% 12.5% 12.5% 12.5%
Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
All-Red Time (s) 2.0 2.0 2.0 2.0 1.6 1.6 1.6 1.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 4.0 4.0 3.6 3.6
Lead/Lag
Lead-Lag Optimize?
Recall Mode Min Min Min Min None None None None
Act Effct Green (s) 45.6 45.6 6.9 6.9
Actuated g/C Ratio 0.88 0.88 0.13 0.13
v/c Ratio 0.33 0.23 0.13 0.15
Control Delay 8.2 6.7 16.6 17.0
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 8.2 6.7 16.6 17.0
LOS A A B B
Approach Delay 8.2 6.7 16.6 17.0
Approach LOS A A B B
Queue Length 50th (ft) 0 0 2 2
Queue Length 95th (ft) #340 200 28 30
Internal Link Dist (ft) 293 190 197 130
Turn Bay Length (ft)
Base Capacity (vph) 1373 1462 208 201

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 27
9: 29th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 9.0
Minimum Split (s) 35.0
Total Split (s) 35.0
Total Split (%) 44%
Yellow Time (s) 2.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 28
9: 29th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.33 0.23 0.13 0.15
Intersection Summary
Area Type: Other
Cycle Length: 80
Actuated Cycle Length: 52
Natural Cycle: 80
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.33
Intersection Signal Delay: 8.2 Intersection LOS: A
Intersection Capacity Utilization 42.7% ICU Level of Service A
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 9: 29th Street & Market Street

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 29
9: 29th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 30
1: N-S Alley & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 26 180 0 0 206 3 4 0 0 3 0 50
Future Volume (vph) 26 180 0 0 206 3 4 0 0 3 0 50
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 11 11 11 12 12 12
Grade (%) 0% 0% -2% 0%
Storage Length (ft) 0 150 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 0 1825 0 0 1834 0 0 1762 0 0 1652 0
Flt Permitted 0.994 0.950 0.997
Satd. Flow (perm) 0 1825 0 0 1834 0 0 1762 0 0 1652 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 325 227 190 155
Travel Time (s) 8.9 6.2 5.2 4.2
Confl. Peds. (#/hr) 2 2 1 1
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Heavy Vehicles (%) 0% 4% 0% 0% 3% 33% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 222 0 0 225 0 0 4 0 0 57 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 35.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 1
1: N-S Alley & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 26 180 0 0 206 3 4 0 0 3 0 50
Future Volume (Veh/h) 26 180 0 0 206 3 4 0 0 3 0 50
Sign Control Free Free Stop Stop
Grade 0% 0% -2% 0%
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Hourly flow rate (vph) 28 194 0 0 222 3 4 0 0 3 0 54
Pedestrians 1 2
Lane Width (ft) 12.0 11.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 325
pX, platoon unblocked 0.93 0.93 0.93 0.93 0.93 0.93
vC, conflicting volume 225 196 530 477 196 474 476 224
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 225 93 454 396 93 393 395 224
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 98 100 99 100 100 99 100 93
cM capacity (veh/h) 1356 1401 441 493 897 520 494 819
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 222 225 4 57
Volume Left 28 0 4 3
Volume Right 0 3 0 54
cSH 1356 1401 441 795
Volume to Capacity 0.02 0.00 0.01 0.07
Queue Length 95th (ft) 2 0 1 6
Control Delay (s) 1.1 0.0 13.2 9.9
Lane LOS A B A
Approach Delay (s) 1.1 0.0 13.2 9.9
Approach LOS B A
Intersection Summary
Average Delay 1.7
Intersection Capacity Utilization 35.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 2
1: N-S Alley & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 1.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 26 180 0 0 206 3 4 0 0 3 0 50
Future Vol, veh/h 26 180 0 0 206 3 4 0 0 3 0 50
Conflicting Peds, #/hr 0 0 2 2 0 0 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - -2 - - 0 -
Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93
Heavy Vehicles, % 0 4 0 0 3 33 0 0 0 0 0 0
Mvmt Flow 28 194 0 0 222 3 4 0 0 3 0 54

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 225 0 0 196 0 0 504 477 196 474 476 225
Stage 1 - - - - - - 252 252 - 224 224 -
Stage 2 - - - - - - 252 225 - 250 252 -
Critical Hdwy 4.3 - - 4.3 - - 6.7 6.1 6 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 5.7 5.1 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 5.7 5.1 - 6.1 5.5 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1006 - - 1029 - - 575 517 910 570 491 867
Stage 1 - - - - - - 893 722 - 900 722 -
Stage 2 - - - - - - 893 740 - 870 702 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1006 - - 1027 - - 525 500 908 556 475 866
Mov Cap-2 Maneuver - - - - - - 525 500 - 556 475 -
Stage 1 - - - - - - 864 698 - 872 722 -
Stage 2 - - - - - - 837 740 - 843 679 -

Approach EB WB NB SB
HCM Control Delay, s 1.1 0 11.9 9.6
HCM LOS B A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 525 1006 - - 1027 - - 840
HCM Lane V/C Ratio 0.008 0.028 - - - - - 0.068
HCM Control Delay (s) 11.9 8.7 0 - 0 - - 9.6
HCM Lane LOS B A A - A - - A
HCM 95th %tile Q(veh) 0 0.1 - - 0 - - 0.2

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 3
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 269 142 164 143 100 18 142 937 47 14 942 203
Future Volume (vph) 269 142 164 143 100 18 142 937 47 14 942 203
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 12 12 14 10 10 10 11 11 11 10 11 11
Grade (%) -1% -1% 1% -1%
Storage Length (ft) 250 250 150 0 640 0 110 0
Storage Lanes 1 1 1 0 1 0 1 1
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1685 1809 1562 1588 1599 0 1566 3200 0 1458 3257 1472
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1675 1809 1537 1573 1599 0 1566 3200 0 1451 3257 1472
Right Turn on Red No No Yes Yes
Satd. Flow (RTOR) 4 200
Link Speed (mph) 35 25 35 35
Link Distance (ft) 525 325 1233 312
Travel Time (s) 10.2 8.9 24.0 6.1
Confl. Peds. (#/hr) 3 3 3 3 3 3
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 2% 0% 5% 1% 2% 7% 5% 2% 1% 10% 2% 1%
Shared Lane Traffic (%)
Lane Group Flow (vph) 292 154 178 155 129 0 154 1069 0 15 1024 221
Turn Type Split NA pm+ov Split NA Prot NA Prot NA pm+ov
Protected Phases 4 4 5 8 8 5 2 1 6 4
Permitted Phases 4 6
Detector Phase 4 4 5 8 8 5 2 1 6 4
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 10.0 7.0 10.0 7.0
Minimum Split (s) 13.0 13.0 13.5 13.1 13.1 13.5 16.5 13.5 16.5 13.0
Total Split (s) 23.0 23.0 18.0 16.0 16.0 18.0 44.0 15.0 41.0 23.0
Total Split (%) 16.4% 16.4% 12.9% 11.4% 11.4% 12.9% 31.4% 10.7% 29.3% 16.4%
Yellow Time (s) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
All-Red Time (s) 2.3 2.3 2.8 2.4 2.4 2.8 2.8 2.8 2.8 2.3
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.0 5.0 5.5 5.1 5.1 5.5 5.5 5.5 5.5 5.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None None
Act Effct Green (s) 18.4 18.4 30.6 11.1 11.1 12.8 52.3 8.4 36.2 60.2
Actuated g/C Ratio 0.17 0.17 0.29 0.10 0.10 0.12 0.49 0.08 0.34 0.57
v/c Ratio 1.01 0.49 0.40 0.94 0.78 0.82 0.68 0.13 0.92 0.24
Control Delay 99.3 49.0 21.5 104.2 77.7 79.8 26.5 53.9 48.9 4.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 99.3 49.0 21.5 104.2 77.7 79.8 26.5 53.9 48.9 4.1
LOS F D C F E E C D D A
Approach Delay 64.7 92.2 33.2 41.1
Approach LOS E F C D
Queue Length 50th (ft) 182 87 56 97 79 94 225 9 308 5
Queue Length 95th (ft) #536 214 125 #323 #264 #306 #765 37 #744 63

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 4
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 7.0
Minimum Split (s) 42.0
Total Split (s) 42.0
Total Split (%) 30%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 5
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 445 245 1153 232
Turn Bay Length (ft) 250 250 150 640 110
Base Capacity (vph) 290 312 445 165 166 187 1575 132 1108 919
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 1.01 0.49 0.40 0.94 0.78 0.82 0.68 0.11 0.92 0.24
Intersection Summary
Area Type: Other
Cycle Length: 140
Actuated Cycle Length: 106.4
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 1.01
Intersection Signal Delay: 46.9 Intersection LOS: D
Intersection Capacity Utilization 75.9% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 2: S 32nd Street & Trindle Road/Chestnut Street

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 6
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 7
3: 31st Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (vph) 192 3 10 243 9 7
Future Volume (vph) 192 3 10 243 9 7
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 0% 0% -1%
Satd. Flow (prot) 1860 0 0 1853 1745 0
Flt Permitted 0.998 0.973
Satd. Flow (perm) 1860 0 0 1853 1745 0
Link Speed (mph) 25 25 25
Link Distance (ft) 227 445 204
Travel Time (s) 6.2 12.1 5.6
Confl. Peds. (#/hr) 1
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79
Heavy Vehicles (%) 2% 0% 10% 2% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 247 0 0 321 20 0
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 30.9% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 8
3: 31st Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Movement EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (veh/h) 192 3 10 243 9 7
Future Volume (Veh/h) 192 3 10 243 9 7
Sign Control Free Free Stop
Grade 0% 0% -1%
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79
Hourly flow rate (vph) 243 4 13 308 11 9
Pedestrians 1
Lane Width (ft) 12.0
Walking Speed (ft/s) 3.5
Percent Blockage 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 552
pX, platoon unblocked 0.95 0.95 0.95
vC, conflicting volume 247 580 245
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 181 532 179
tC, single (s) 4.2 6.4 6.2
tC, 2 stage (s)
tF (s) 2.3 3.5 3.3
p0 queue free % 99 98 99
cM capacity (veh/h) 1280 481 826
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 247 321 20
Volume Left 0 13 11
Volume Right 4 0 9
cSH 1700 1280 592
Volume to Capacity 0.15 0.01 0.03
Queue Length 95th (ft) 0 1 3
Control Delay (s) 0.0 0.4 11.3
Lane LOS A B
Approach Delay (s) 0.0 0.4 11.3
Approach LOS B
Intersection Summary
Average Delay 0.6
Intersection Capacity Utilization 30.9% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 9
3: 31st Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 0.5
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 192 3 10 243 9 7
Future Vol, veh/h 192 3 10 243 9 7
Conflicting Peds, #/hr 0 0 0 0 1 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 -1 -
Peak Hour Factor 79 79 79 79 79 79
Heavy Vehicles, % 2 0 10 2 0 0
Mvmt Flow 243 4 13 308 11 9

Major/Minor Major1 Major2 Minor1


Conflicting Flow All 0 0 247 0 580 245
Stage 1 - - - - 245 -
Stage 2 - - - - 335 -
Critical Hdwy - - 4.4 - 6.2 6.1
Critical Hdwy Stg 1 - - - - 5.2 -
Critical Hdwy Stg 2 - - - - 5.2 -
Follow-up Hdwy - - 3.1 - 3 3.1
Pot Cap-1 Maneuver - - 953 - 557 850
Stage 1 - - - - 931 -
Stage 2 - - - - 848 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 953 - 548 850
Mov Cap-2 Maneuver - - - - 548 -
Stage 1 - - - - 931 -
Stage 2 - - - - 834 -

Approach EB WB NB
HCM Control Delay, s 0 0.3 10.7
HCM LOS B

Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT


Capacity (veh/h) 649 - - 953 -
HCM Lane V/C Ratio 0.031 - - 0.013 -
HCM Control Delay (s) 10.7 - - 8.8 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.1 - - 0 -

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 10
4: 30th Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 31 155 7 18 182 5 12 10 5 2 29 45
Future Volume (vph) 31 155 7 18 182 5 12 10 5 2 29 45
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 0% 1% -1% -1%
Satd. Flow (prot) 0 1860 0 0 1861 0 0 1696 0 0 1682 0
Flt Permitted 0.992 0.996 0.978 0.998
Satd. Flow (perm) 0 1860 0 0 1861 0 0 1696 0 0 1682 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 445 215 319 515
Travel Time (s) 12.1 5.9 8.7 14.0
Confl. Peds. (#/hr) 1 8 8 1
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 17% 0% 0% 50% 7% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 242 0 0 257 0 0 34 0 0 95 0
Sign Control Stop Stop Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 31.4% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 11
4: 30th Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Stop Stop
Traffic Volume (vph) 31 155 7 18 182 5 12 10 5 2 29 45
Future Volume (vph) 31 155 7 18 182 5 12 10 5 2 29 45
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Hourly flow rate (vph) 39 194 9 23 228 6 15 13 6 3 36 56
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total (vph) 242 257 34 95
Volume Left (vph) 39 23 15 3
Volume Right (vph) 9 6 6 56
Hadj (s) 0.02 0.02 0.11 -0.28
Departure Headway (s) 4.6 4.5 5.3 4.8
Degree Utilization, x 0.31 0.32 0.05 0.13
Capacity (veh/h) 763 761 605 669
Control Delay (s) 9.5 9.7 8.6 8.5
Approach Delay (s) 9.5 9.7 8.6 8.5
Approach LOS A A A A
Intersection Summary
Delay 9.4
Level of Service A
Intersection Capacity Utilization 31.4% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 12
4: 30th Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Intersection
Intersection Delay, s/veh 9.6
Intersection LOS A

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 31 155 7 18 182 5 12 10 5 2 29 45
Future Vol, veh/h 31 155 7 18 182 5 12 10 5 2 29 45
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles, % 0 1 0 0 1 0 17 0 0 50 7 0
Mvmt Flow 39 194 9 23 228 6 15 13 6 3 36 56
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 9.6 9.7 8.8 9.6
HCM LOS A A A A

Lane NBLn1 EBLn1 WBLn1 SBLn1


Vol Left, % 44% 16% 9% 3%
Vol Thru, % 37% 80% 89% 38%
Vol Right, % 19% 4% 2% 59%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 27 193 205 76
LT Vol 12 31 18 2
Through Vol 10 155 182 29
RT Vol 5 7 5 45
Lane Flow Rate 34 241 256 95
Geometry Grp 1 1 1 1
Degree of Util (X) 0.051 0.305 0.323 0.147
Departure Headway (Hd) 5.442 4.555 4.532 5.571
Convergence, Y/N Yes Yes Yes Yes
Cap 654 786 792 641
Service Time 3.51 2.592 2.568 3.63
HCM Lane V/C Ratio 0.052 0.307 0.323 0.148
HCM Control Delay 8.8 9.6 9.7 9.6
HCM Lane LOS A A A A
HCM 95th-tile Q 0.2 1.3 1.4 0.5

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 13
5: 31st Street & E-W Alley WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 0 0 0 0 25 0 0 15 1
Future Volume (vph) 0 0 0 0 0 0 0 25 0 0 15 1
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 12 12 12 12 12 12 12 12 12
Grade (%) -5% 0% 1% 0%
Satd. Flow (prot) 0 1818 0 0 1900 0 0 1890 0 0 1885 0
Flt Permitted
Satd. Flow (perm) 0 1818 0 0 1900 0 0 1890 0 0 1885 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 151 181 206 204
Travel Time (s) 4.1 4.9 5.6 5.6
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 0 0 0 27 0 0 17 0
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 6.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 14
5: 31st Street & E-W Alley WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 0 0 0 0 0 0 0 25 0 0 15 1
Future Volume (Veh/h) 0 0 0 0 0 0 0 25 0 0 15 1
Sign Control Stop Stop Free Free
Grade -5% 0% 1% 0%
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Hourly flow rate (vph) 0 0 0 0 0 0 0 27 0 0 16 1
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 44 44 16 44 44 27 17 27
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 44 44 16 44 44 27 17 27
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1
tC, 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 964 852 1068 964 852 1054 1613 1600
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 0 0 27 17
Volume Left 0 0 0 0
Volume Right 0 0 0 1
cSH 1700 1700 1613 1600
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 0.0 0.0 0.0 0.0
Lane LOS A A
Approach Delay (s) 0.0 0.0 0.0 0.0
Approach LOS A A
Intersection Summary
Average Delay 0.0
Intersection Capacity Utilization 6.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 15
5: 31st Street & E-W Alley WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 0
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 0 0 0 0 25 0 0 15 1
Future Vol, veh/h 0 0 0 0 0 0 0 25 0 0 15 1
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - -5 - - 0 - - 1 - - 0 -
Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 0 0 0 0 0 0 0 27 0 0 16 1

Major/Minor Minor2 Minor1 Major1 Major2


Conflicting Flow All 44 44 17 44 44 27 17 0 0 27 0 0
Stage 1 17 17 - 27 27 - - - - - - -
Stage 2 27 27 - 17 17 - - - - - - -
Critical Hdwy 6.1 5.5 5.7 7.1 6.5 6.2 4.3 - - 4.3 - -
Critical Hdwy Stg 1 5.1 4.5 - 6.1 5.5 - - - - - - -
Critical Hdwy Stg 2 5.1 4.5 - 6.1 5.5 - - - - - - -
Follow-up Hdwy 3 4 3.1 3 4 3.1 3 - - 3 - -
Pot Cap-1 Maneuver 1134 862 1139 1121 852 1121 1184 - - 1175 - -
Stage 1 1180 889 - 1159 877 - - - - - - -
Stage 2 1168 883 - 1174 885 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1134 862 1139 1121 852 1121 1184 - - 1175 - -
Mov Cap-2 Maneuver 1134 862 - 1121 852 - - - - - - -
Stage 1 1180 889 - 1159 877 - - - - - - -
Stage 2 1168 883 - 1174 885 - - - - - - -

Approach EB WB NB SB
HCM Control Delay, s 0 0 0 0
HCM LOS A A

Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1184 - - - - 1175 - -
HCM Lane V/C Ratio - - - - - - - -
HCM Control Delay (s) 0 - - 0 0 0 - -
HCM Lane LOS A - - A A A - -
HCM 95th %tile Q(veh) 0 - - - - 0 - -

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 16
6: Bramar Road & N-S Alley WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 2 8 1 1 5 0 0 0 3 0 0 1
Future Volume (vph) 2 8 1 1 5 0 0 0 3 0 0 1
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 11 11
Grade (%) 3% -4% 0% -3%
Satd. Flow (prot) 0 1831 0 0 1650 0 0 1644 0 0 1613 0
Flt Permitted 0.992 0.991
Satd. Flow (perm) 0 1831 0 0 1650 0 0 1644 0 0 1613 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 131 186 162 179
Travel Time (s) 3.6 5.1 4.4 4.9
Confl. Peds. (#/hr) 2 2 1 1
Peak Hour Factor 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58
Heavy Vehicles (%) 0% 0% 0% 0% 20% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 19 0 0 11 0 0 5 0 0 2 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 14.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 17
6: Bramar Road & N-S Alley WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 2 8 1 1 5 0 0 0 3 0 0 1
Future Volume (Veh/h) 2 8 1 1 5 0 0 0 3 0 0 1
Sign Control Free Free Stop Stop
Grade 3% -4% 0% -3%
Peak Hour Factor 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58
Hourly flow rate (vph) 3 14 2 2 9 0 0 0 5 0 0 2
Pedestrians 1 2
Lane Width (ft) 12.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 9 18 39 36 17 39 37 10
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 9 18 39 36 17 39 37 10
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 1624 1609 962 856 1066 962 855 1076
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 19 11 5 2
Volume Left 3 2 0 0
Volume Right 2 0 5 2
cSH 1624 1609 1066 1076
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 1.2 1.3 8.4 8.4
Lane LOS A A A A
Approach Delay (s) 1.2 1.3 8.4 8.4
Approach LOS A A
Intersection Summary
Average Delay 2.6
Intersection Capacity Utilization 14.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 18
6: Bramar Road & N-S Alley WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 2.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 2 8 1 1 5 0 0 0 3 0 0 1
Future Vol, veh/h 2 8 1 1 5 0 0 0 3 0 0 1
Conflicting Peds, #/hr 0 0 2 2 0 0 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 3 - - -4 - - 0 - - -3 -
Peak Hour Factor 58 58 58 58 58 58 58 58 58 58 58 58
Heavy Vehicles, % 0 0 0 0 20 0 0 0 0 0 0 0
Mvmt Flow 3 14 2 2 9 0 0 0 5 0 0 2

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 9 0 0 18 0 0 38 36 17 37 37 10
Stage 1 - - - - - - 23 23 - 13 13 -
Stage 2 - - - - - - 15 13 - 24 24 -
Critical Hdwy 4.3 - - 4.3 - - 7.1 6.5 6.2 6.5 5.9 5.9
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 5.5 4.9 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 5.5 4.9 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1192 - - 1183 - - 1131 860 1136 1140 865 1147
Stage 1 - - - - - - 1165 880 - 1183 891 -
Stage 2 - - - - - - 1177 889 - 1168 883 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1192 - - 1181 - - 1122 854 1134 1131 859 1146
Mov Cap-2 Maneuver - - - - - - 1122 854 - 1131 859 -
Stage 1 - - - - - - 1159 876 - 1179 889 -
Stage 2 - - - - - - 1172 887 - 1159 879 -

Approach EB WB NB SB
HCM Control Delay, s 1.5 1.3 8.2 8.1
HCM LOS A A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1134 1192 - - 1181 - - 1146
HCM Lane V/C Ratio 0.005 0.003 - - 0.001 - - 0.002
HCM Control Delay (s) 8.2 8 0 - 8.1 0 - 8.1
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0 0 - - 0 - - 0

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 19
7: S 32nd Street & Harvard Avenue WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 117 29 289 82 25 5 306 1079 16 9 1190 58
Future Volume (vph) 117 29 289 82 25 5 306 1079 16 9 1190 58
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 14 14 14 12 12 12 12 12 12 12 12 12
Grade (%) -2% 0% -1% -2%
Storage Length (ft) 150 0 0 0 400 0 160 0
Storage Lanes 1 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1771 1939 1632 0 1726 0 1702 3297 0 1727 3366 0
Flt Permitted 0.706 0.764 0.079 0.243
Satd. Flow (perm) 1314 1939 1632 0 1366 0 141 3297 0 442 3366 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 307 1 1 4
Link Speed (mph) 25 25 35 35
Link Distance (ft) 357 317 547 1233
Travel Time (s) 9.7 8.6 10.7 24.0
Confl. Peds. (#/hr) 1 1
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 4% 0% 1% 0% 0% 0% 1% 4% 6% 0% 2% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 124 31 307 0 119 0 326 1165 0 10 1328 0
Turn Type Perm NA pm+ov Perm NA pm+pt NA pm+pt NA
Protected Phases 4 5 8 5 2 1 6
Permitted Phases 4 4 8 2 6
Detector Phase 4 4 5 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0
Minimum Split (s) 24.2 24.2 11.4 24.2 24.2 11.4 24.4 11.4 24.4
Total Split (s) 24.2 24.2 24.0 24.2 24.2 24.0 66.4 11.4 53.8
Total Split (%) 17.3% 17.3% 17.1% 17.3% 17.3% 17.1% 47.4% 8.1% 38.4%
Yellow Time (s) 3.0 3.0 3.8 3.0 3.0 3.8 3.8 3.8 3.8
All-Red Time (s) 3.2 3.2 2.6 3.2 3.2 2.6 2.6 2.6 2.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.2 5.2 5.4 5.2 5.4 5.4 5.4 5.4
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None
Act Effct Green (s) 15.6 15.6 39.1 15.6 74.0 72.3 55.6 49.5
Actuated g/C Ratio 0.15 0.15 0.37 0.15 0.70 0.68 0.52 0.47
v/c Ratio 0.64 0.11 0.39 0.59 0.86 0.52 0.03 0.85
Control Delay 61.0 43.9 3.7 57.2 51.4 14.0 12.1 33.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 61.0 43.9 3.7 57.2 51.4 14.0 12.1 33.0
LOS E D A E D B B C
Approach Delay 21.7 57.2 22.2 32.9
Approach LOS C E C C
Queue Length 50th (ft) 73 17 0 69 143 135 2 356
Queue Length 95th (ft) #200 57 40 #177 #497 576 14 #884

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 20
7: S 32nd Street & Harvard Avenue WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 38.0
Total Split (s) 38.0
Total Split (%) 27%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 21
7: S 32nd Street & Harvard Avenue WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 277 237 467 1153
Turn Bay Length (ft) 150 400 160
Base Capacity (vph) 240 354 794 250 377 2244 305 1570
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.52 0.09 0.39 0.48 0.86 0.52 0.03 0.85
Intersection Summary
Area Type: Other
Cycle Length: 140
Actuated Cycle Length: 106.2
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.86
Intersection Signal Delay: 27.5 Intersection LOS: C
Intersection Capacity Utilization 81.1% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 7: S 32nd Street & Harvard Avenue

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 22
7: S 32nd Street & Harvard Avenue WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 23
8: 30th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 7 397 16 31 386 7 9 8 20 6 25 21
Future Volume (vph) 7 397 16 31 386 7 9 8 20 6 25 21
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 1% 1% 2% -2%
Satd. Flow (prot) 0 1660 0 0 1676 0 0 1680 0 0 1594 0
Flt Permitted 0.999 0.996 0.988 0.994
Satd. Flow (perm) 0 1660 0 0 1676 0 0 1680 0 0 1594 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 426 373 515 207
Travel Time (s) 11.6 10.2 14.0 5.6
Confl. Peds. (#/hr) 1 1 1 1 1 3 3 1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 0% 2% 0% 0% 1% 0% 11% 0% 0% 0% 4% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 457 0 0 462 0 0 41 0 0 57 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 49.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 24
8: 30th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 7 397 16 31 386 7 9 8 20 6 25 21
Future Volume (Veh/h) 7 397 16 31 386 7 9 8 20 6 25 21
Sign Control Free Free Stop Stop
Grade 1% 1% 2% -2%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 8 432 17 34 420 8 10 9 22 7 27 23
Pedestrians 1 3 1 1
Lane Width (ft) 12.0 12.0 12.0 12.0
Walking Speed (ft/s) 3.5 3.5 3.5 3.5
Percent Blockage 0 0 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 373
pX, platoon unblocked 0.93 0.93 0.93 0.93 0.93 0.93
vC, conflicting volume 429 450 987 954 444 979 959 426
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 353 450 951 916 444 942 921 350
tC, single (s) 4.1 4.1 7.2 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.6 4.0 3.3 3.5 4.0 3.3
p0 queue free % 99 97 95 96 96 97 89 96
cM capacity (veh/h) 1135 1120 184 246 615 208 241 651
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 457 462 41 57
Volume Left 8 34 10 7
Volume Right 17 8 22 23
cSH 1135 1120 324 315
Volume to Capacity 0.01 0.03 0.13 0.18
Queue Length 95th (ft) 1 2 11 16
Control Delay (s) 0.2 0.9 17.7 18.9
Lane LOS A A C C
Approach Delay (s) 0.2 0.9 17.7 18.9
Approach LOS C C
Intersection Summary
Average Delay 2.3
Intersection Capacity Utilization 49.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 25
8: 30th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 2.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 397 16 31 386 7 9 8 20 6 25 21
Future Vol, veh/h 7 397 16 31 386 7 9 8 20 6 25 21
Conflicting Peds, #/hr 1 0 1 1 0 1 1 0 3 3 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 1 - - 1 - - 2 - - -2 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 0 2 0 0 1 0 11 0 0 0 4 0
Mvmt Flow 8 432 17 34 420 8 10 9 22 7 27 23

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 429 0 0 450 0 0 976 955 445 968 959 426
Stage 1 - - - - - - 458 458 - 493 493 -
Stage 2 - - - - - - 518 497 - 475 466 -
Critical Hdwy 4.3 - - 4.3 - - 7.61 6.9 6.4 6.7 6.14 6
Critical Hdwy Stg 1 - - - - - - 6.61 5.9 - 5.7 5.14 -
Critical Hdwy Stg 2 - - - - - - 6.61 5.9 - 5.7 5.14 -
Follow-up Hdwy 3 - - 3 - - 3.1 4 3.1 3 4.036 3.1
Pot Cap-1 Maneuver 855 - - 841 - - 218 234 634 289 284 682
Stage 1 - - - - - - 606 542 - 670 574 -
Stage 2 - - - - - - 556 519 - 685 589 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 854 - - 840 - - 184 218 632 256 265 681
Mov Cap-2 Maneuver - - - - - - 184 218 - 256 265 -
Stage 1 - - - - - - 598 534 - 661 543 -
Stage 2 - - - - - - 483 491 - 640 581 -

Approach EB WB NB SB
HCM Control Delay, s 0.2 0.7 18 17.3
HCM LOS C C

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 316 854 - - 840 - - 350
HCM Lane V/C Ratio 0.127 0.009 - - 0.04 - - 0.161
HCM Control Delay (s) 18 9.3 0 - 9.5 0 - 17.3
HCM Lane LOS C A A - A A - C
HCM 95th %tile Q(veh) 0.4 0 - - 0.1 - - 0.6

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 26
9: 29th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 5 415 4 19 402 10 3 8 8 4 0 18
Future Volume (vph) 5 415 4 19 402 10 3 8 8 4 0 18
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Grade (%) -1% 0% -2% -1%
Satd. Flow (prot) 0 1593 0 0 1774 0 0 1531 0 0 1433 0
Flt Permitted 0.996 0.978
Satd. Flow (perm) 0 1588 0 0 1738 0 0 1541 0 0 1446 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 1 2 9 55
Link Speed (mph) 25 25 25 25
Link Distance (ft) 373 270 277 210
Travel Time (s) 10.2 7.4 7.6 5.7
Confl. Peds. (#/hr) 1 2 2 1
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 0% 2% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 450 0 0 459 0 0 21 0 0 23 0
Turn Type Perm NA Perm NA Perm NA Perm NA
Protected Phases 2 6 8 4
Permitted Phases 2 6 8 4
Detector Phase 2 2 6 6 8 8 4 4
Switch Phase
Minimum Initial (s) 30.0 30.0 30.0 30.0 3.0 3.0 3.0 3.0
Minimum Split (s) 35.0 35.0 35.0 35.0 7.6 7.6 7.6 7.6
Total Split (s) 35.0 35.0 35.0 35.0 10.0 10.0 10.0 10.0
Total Split (%) 43.8% 43.8% 43.8% 43.8% 12.5% 12.5% 12.5% 12.5%
Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
All-Red Time (s) 2.0 2.0 2.0 2.0 1.6 1.6 1.6 1.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 4.0 4.0 3.6 3.6
Lead/Lag
Lead-Lag Optimize?
Recall Mode Min Min Min Min None None None None
Act Effct Green (s) 46.5 46.5 6.9 6.9
Actuated g/C Ratio 0.88 0.88 0.13 0.13
v/c Ratio 0.32 0.30 0.10 0.10
Control Delay 7.9 7.3 20.3 3.1
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 7.9 7.3 20.3 3.1
LOS A A C A
Approach Delay 7.9 7.3 20.3 3.1
Approach LOS A A C A
Queue Length 50th (ft) 0 0 3 0
Queue Length 95th (ft) #300 291 27 6
Internal Link Dist (ft) 293 190 197 130
Turn Bay Length (ft)
Base Capacity (vph) 1393 1525 207 235

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 27
9: 29th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 9.0
Minimum Split (s) 35.0
Total Split (s) 35.0
Total Split (%) 44%
Yellow Time (s) 2.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 28
9: 29th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.32 0.30 0.10 0.10
Intersection Summary
Area Type: Other
Cycle Length: 80
Actuated Cycle Length: 53
Natural Cycle: 80
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.32
Intersection Signal Delay: 7.7 Intersection LOS: A
Intersection Capacity Utilization 45.2% ICU Level of Service A
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 9: 29th Street & Market Street

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 29
9: 29th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 30
1: N-S Alley & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 21 222 0 0 309 1 3 0 2 1 0 43
Future Volume (vph) 21 222 0 0 309 1 3 0 2 1 0 43
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 11 11 11 12 12 12
Grade (%) 0% 0% -2% 0%
Storage Length (ft) 0 150 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 0 1875 0 0 1900 0 0 1704 0 0 1648 0
Flt Permitted 0.996 0.971 0.999
Satd. Flow (perm) 0 1875 0 0 1900 0 0 1704 0 0 1648 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 325 227 190 155
Travel Time (s) 8.9 6.2 5.2 4.2
Confl. Peds. (#/hr) 1 1 1 1
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Heavy Vehicles (%) 0% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 267 0 0 341 0 0 5 0 0 48 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 39.4% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 1
1: N-S Alley & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 21 222 0 0 309 1 3 0 2 1 0 43
Future Volume (Veh/h) 21 222 0 0 309 1 3 0 2 1 0 43
Sign Control Free Free Stop Stop
Grade 0% 0% -2% 0%
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Hourly flow rate (vph) 23 244 0 0 340 1 3 0 2 1 0 47
Pedestrians 1 1
Lane Width (ft) 12.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 325
pX, platoon unblocked 0.91 0.91 0.91 0.91 0.91 0.91
vC, conflicting volume 342 244 678 632 244 634 632 342
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 342 123 599 548 123 550 548 342
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 98 100 99 100 100 100 100 93
cM capacity (veh/h) 1227 1347 349 400 851 402 400 703
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 267 341 5 48
Volume Left 23 0 3 1
Volume Right 0 1 2 47
cSH 1227 1347 457 693
Volume to Capacity 0.02 0.00 0.01 0.07
Queue Length 95th (ft) 1 0 1 6
Control Delay (s) 0.8 0.0 13.0 10.6
Lane LOS A B B
Approach Delay (s) 0.8 0.0 13.0 10.6
Approach LOS B B
Intersection Summary
Average Delay 1.2
Intersection Capacity Utilization 39.4% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 2
1: N-S Alley & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 1.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 222 0 0 309 1 3 0 2 1 0 43
Future Vol, veh/h 21 222 0 0 309 1 3 0 2 1 0 43
Conflicting Peds, #/hr 1 0 0 0 0 1 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - -2 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 0 1 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 23 244 0 0 340 1 3 0 2 1 0 47

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 342 0 0 244 0 0 655 632 244 633 632 343
Stage 1 - - - - - - 290 290 - 342 342 -
Stage 2 - - - - - - 365 342 - 291 290 -
Critical Hdwy 4.3 - - 4.3 - - 6.7 6.1 6 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 5.7 5.1 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 5.7 5.1 - 6.1 5.5 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 917 - - 991 - - 460 429 857 443 400 743
Stage 1 - - - - - - 853 698 - 773 642 -
Stage 2 - - - - - - 781 666 - 825 676 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 916 - - 991 - - 421 416 857 431 388 742
Mov Cap-2 Maneuver - - - - - - 421 416 - 431 388 -
Stage 1 - - - - - - 828 678 - 750 641 -
Stage 2 - - - - - - 731 665 - 799 656 -

Approach EB WB NB SB
HCM Control Delay, s 0.8 0 11.9 10.3
HCM LOS B B

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 529 916 - - 991 - - 730
HCM Lane V/C Ratio 0.01 0.025 - - - - - 0.066
HCM Control Delay (s) 11.9 9 0 - 0 - - 10.3
HCM Lane LOS B A A - A - - B
HCM 95th %tile Q(veh) 0 0.1 - - 0 - - 0.2

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 3
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 250 171 227 194 147 5 177 1285 50 7 1273 251
Future Volume (vph) 250 171 227 194 147 5 177 1285 50 7 1273 251
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 12 12 14 10 10 10 11 11 11 10 11 11
Grade (%) -1% -1% 1% -1%
Storage Length (ft) 250 250 150 0 640 0 110 0
Storage Lanes 1 1 1 0 1 0 1 1
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1702 1809 1640 1604 1663 0 1612 3203 0 1407 3290 1457
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1698 1809 1618 1600 1663 0 1612 3203 0 1403 3290 1457
Right Turn on Red No No Yes Yes
Satd. Flow (RTOR) 3 174
Link Speed (mph) 35 25 35 35
Link Distance (ft) 525 325 1233 312
Travel Time (s) 10.2 8.9 24.0 6.1
Confl. Peds. (#/hr) 1 1 1 1 2 2
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Heavy Vehicles (%) 1% 0% 0% 0% 1% 0% 2% 2% 2% 14% 1% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 255 174 232 198 155 0 181 1362 0 7 1299 256
Turn Type Split NA pm+ov Split NA Prot NA Prot NA pm+ov
Protected Phases 4 4 5 8 8 5 2 1 6 4
Permitted Phases 4 6
Detector Phase 4 4 5 8 8 5 2 1 6 4
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 10.0 7.0 10.0 7.0
Minimum Split (s) 13.0 13.0 13.5 13.1 13.1 13.5 16.5 13.5 16.5 13.0
Total Split (s) 22.0 22.0 19.0 19.0 19.0 19.0 53.5 13.5 48.0 22.0
Total Split (%) 14.7% 14.7% 12.7% 12.7% 12.7% 12.7% 35.7% 9.0% 32.0% 14.7%
Yellow Time (s) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
All-Red Time (s) 2.3 2.3 2.8 2.4 2.4 2.8 2.8 2.8 2.8 2.3
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.0 5.0 5.5 5.1 5.1 5.5 5.5 5.5 5.5 5.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None None
Act Effct Green (s) 17.3 17.3 30.5 14.1 14.1 13.7 60.5 8.1 43.2 66.1
Actuated g/C Ratio 0.15 0.15 0.26 0.12 0.12 0.12 0.52 0.07 0.37 0.57
v/c Ratio 1.01 0.65 0.54 1.02 0.77 0.95 0.82 0.07 1.06 0.28
Control Delay 109.4 60.7 28.4 120.4 75.2 106.1 30.3 59.4 80.0 6.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 109.4 60.7 28.4 120.4 75.2 106.1 30.3 59.4 80.0 6.6
LOS F E C F E F C E E A
Approach Delay 68.1 100.5 39.2 67.9
Approach LOS E F D E
Queue Length 50th (ft) 177 114 89 138 105 125 350 5 ~470 22
Queue Length 95th (ft) #506 #303 167 #417 #310 #380 #1051 24 #1028 115

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 4
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 7.0
Minimum Split (s) 42.0
Total Split (s) 42.0
Total Split (%) 28%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 5
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 445 245 1153 232
Turn Bay Length (ft) 250 250 150 640 110
Base Capacity (vph) 252 268 427 194 202 190 1665 98 1222 903
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 1.01 0.65 0.54 1.02 0.77 0.95 0.82 0.07 1.06 0.28
Intersection Summary
Area Type: Other
Cycle Length: 150
Actuated Cycle Length: 116.4
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 1.06
Intersection Signal Delay: 60.0 Intersection LOS: E
Intersection Capacity Utilization 88.2% ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 2: S 32nd Street & Trindle Road/Chestnut Street

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 6
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 7
3: 31st Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (vph) 178 24 17 255 13 26
Future Volume (vph) 178 24 17 255 13 26
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 0% 0% -1%
Satd. Flow (prot) 1870 0 0 1894 1665 0
Flt Permitted 0.997 0.984
Satd. Flow (perm) 1870 0 0 1894 1665 0
Link Speed (mph) 25 25 25
Link Distance (ft) 227 445 204
Travel Time (s) 6.2 12.1 5.6
Confl. Peds. (#/hr) 1 1 2
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 0% 0% 0% 0% 0% 4%
Shared Lane Traffic (%)
Lane Group Flow (vph) 219 0 0 295 42 0
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 37.4% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 8
3: 31st Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Movement EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (veh/h) 178 24 17 255 13 26
Future Volume (Veh/h) 178 24 17 255 13 26
Sign Control Free Free Stop
Grade 0% 0% -1%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 193 26 18 277 14 28
Pedestrians 2 1
Lane Width (ft) 12.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 552
pX, platoon unblocked 0.94 0.94 0.94
vC, conflicting volume 220 522 207
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 139 460 125
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 99 97 97
cM capacity (veh/h) 1369 521 865
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 219 295 42
Volume Left 0 18 14
Volume Right 26 0 28
cSH 1700 1369 709
Volume to Capacity 0.13 0.01 0.06
Queue Length 95th (ft) 0 1 5
Control Delay (s) 0.0 0.6 10.4
Lane LOS A B
Approach Delay (s) 0.0 0.6 10.4
Approach LOS B
Intersection Summary
Average Delay 1.1
Intersection Capacity Utilization 37.4% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 9
3: 31st Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 178 24 17 255 13 26
Future Vol, veh/h 178 24 17 255 13 26
Conflicting Peds, #/hr 0 1 1 0 2 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 -1 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 0 0 0 0 0 4
Mvmt Flow 193 26 18 277 14 28

Major/Minor Major1 Major2 Minor1


Conflicting Flow All 0 0 220 0 522 207
Stage 1 - - - - 207 -
Stage 2 - - - - 315 -
Critical Hdwy - - 4.3 - 6.2 6.14
Critical Hdwy Stg 1 - - - - 5.2 -
Critical Hdwy Stg 2 - - - - 5.2 -
Follow-up Hdwy - - 3 - 3 3.1
Pot Cap-1 Maneuver - - 1010 - 602 891
Stage 1 - - - - 969 -
Stage 2 - - - - 866 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1009 - 588 890
Mov Cap-2 Maneuver - - - - 588 -
Stage 1 - - - - 968 -
Stage 2 - - - - 846 -

Approach EB WB NB
HCM Control Delay, s 0 0.5 10
HCM LOS B

Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT


Capacity (veh/h) 760 - - 1009 -
HCM Lane V/C Ratio 0.056 - - 0.018 -
HCM Control Delay (s) 10 - - 8.6 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.2 - - 0.1 -

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 10
4: 30th Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 54 148 4 23 194 10 4 19 7 7 31 54
Future Volume (vph) 54 148 4 23 194 10 4 19 7 7 31 54
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 0% 1% -1% -1%
Satd. Flow (prot) 0 1858 0 0 1837 0 0 1784 0 0 1752 0
Flt Permitted 0.987 0.995 0.994 0.996
Satd. Flow (perm) 0 1858 0 0 1837 0 0 1784 0 0 1752 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 445 215 319 515
Travel Time (s) 12.1 5.9 8.7 14.0
Confl. Peds. (#/hr) 4 7 7 4 3 7 7 3
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Heavy Vehicles (%) 0% 1% 0% 9% 1% 0% 0% 5% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 217 0 0 239 0 0 31 0 0 97 0
Sign Control Stop Stop Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 35.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 11
4: 30th Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Stop Stop
Traffic Volume (vph) 54 148 4 23 194 10 4 19 7 7 31 54
Future Volume (vph) 54 148 4 23 194 10 4 19 7 7 31 54
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 57 156 4 24 204 11 4 20 7 7 33 57
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total (vph) 217 239 31 97
Volume Left (vph) 57 24 4 7
Volume Right (vph) 4 11 7 57
Hadj (s) 0.05 0.02 -0.05 -0.34
Departure Headway (s) 4.5 4.5 5.0 4.7
Degree Utilization, x 0.27 0.30 0.04 0.13
Capacity (veh/h) 764 768 640 697
Control Delay (s) 9.2 9.4 8.3 8.3
Approach Delay (s) 9.2 9.4 8.3 8.3
Approach LOS A A A A
Intersection Summary
Delay 9.1
Level of Service A
Intersection Capacity Utilization 35.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 12
4: 30th Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Intersection
Intersection Delay, s/veh 9.2
Intersection LOS A

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 54 148 4 23 194 10 4 19 7 7 31 54
Future Vol, veh/h 54 148 4 23 194 10 4 19 7 7 31 54
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Heavy Vehicles, % 0 1 0 9 1 0 0 5 0 0 0 0
Mvmt Flow 57 156 4 24 204 11 4 20 7 7 33 57
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 9.2 9.6 8.2 8.4
HCM LOS A A A A

Lane NBLn1 EBLn1 WBLn1 SBLn1


Vol Left, % 13% 26% 10% 8%
Vol Thru, % 63% 72% 85% 34%
Vol Right, % 23% 2% 4% 59%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 30 206 227 92
LT Vol 4 54 23 7
Through Vol 19 148 194 31
RT Vol 7 4 10 54
Lane Flow Rate 32 217 239 97
Geometry Grp 1 1 1 1
Degree of Util (X) 0.043 0.272 0.305 0.125
Departure Headway (Hd) 4.958 4.515 4.591 4.645
Convergence, Y/N Yes Yes Yes Yes
Cap 720 796 784 770
Service Time 3.005 2.544 2.621 2.683
HCM Lane V/C Ratio 0.044 0.273 0.305 0.126
HCM Control Delay 8.2 9.2 9.6 8.4
HCM Lane LOS A A A A
HCM 95th-tile Q 0.1 1.1 1.3 0.4

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 13
5: 31st Street & E-W Alley WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 1 0 0 0 39 1 0 39 1
Future Volume (vph) 0 0 0 1 0 0 0 39 1 0 39 1
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 12 12 12 12 12 12 12 12 12
Grade (%) -5% 0% 1% 0%
Satd. Flow (prot) 0 1818 0 0 1805 0 0 1831 0 0 1894 0
Flt Permitted 0.950
Satd. Flow (perm) 0 1818 0 0 1805 0 0 1831 0 0 1894 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 151 181 206 204
Travel Time (s) 4.1 4.9 5.6 5.6
Confl. Peds. (#/hr) 3 3
Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 3% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 1 0 0 49 0 0 49 0
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 14.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 14
5: 31st Street & E-W Alley WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 0 0 0 1 0 0 0 39 1 0 39 1
Future Volume (Veh/h) 0 0 0 1 0 0 0 39 1 0 39 1
Sign Control Stop Stop Free Free
Grade -5% 0% 1% 0%
Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82
Hourly flow rate (vph) 0 0 0 1 0 0 0 48 1 0 48 1
Pedestrians 3
Lane Width (ft) 10.0
Walking Speed (ft/s) 3.5
Percent Blockage 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 100 100 52 97 100 48 52 49
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 100 100 52 97 100 48 52 49
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1
tC, 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 883 792 1020 889 791 1026 1563 1571
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 0 1 49 49
Volume Left 0 1 0 0
Volume Right 0 0 1 1
cSH 1700 889 1563 1571
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 0.0 9.1 0.0 0.0
Lane LOS A A
Approach Delay (s) 0.0 9.1 0.0 0.0
Approach LOS A A
Intersection Summary
Average Delay 0.1
Intersection Capacity Utilization 14.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 15
5: 31st Street & E-W Alley WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 0.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 1 0 0 0 39 1 0 39 1
Future Vol, veh/h 0 0 0 1 0 0 0 39 1 0 39 1
Conflicting Peds, #/hr 0 0 0 0 0 0 3 0 0 0 0 3
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - -5 - - 0 - - 1 - - 0 -
Peak Hour Factor 82 82 82 82 82 82 82 82 82 82 82 82
Heavy Vehicles, % 0 0 0 0 0 0 0 3 0 0 0 0
Mvmt Flow 0 0 0 1 0 0 0 48 1 0 48 1

Major/Minor Minor2 Minor1 Major1 Major2


Conflicting Flow All 101 101 52 98 101 49 52 0 0 49 0 0
Stage 1 52 52 - 49 49 - - - - - - -
Stage 2 49 49 - 49 52 - - - - - - -
Critical Hdwy 6.1 5.5 5.7 7.1 6.5 6.2 4.3 - - 4.3 - -
Critical Hdwy Stg 1 5.1 4.5 - 6.1 5.5 - - - - - - -
Critical Hdwy Stg 2 5.1 4.5 - 6.1 5.5 - - - - - - -
Follow-up Hdwy 3 4 3.1 3 4 3.1 3 - - 3 - -
Pot Cap-1 Maneuver 1054 815 1094 1030 793 1090 1152 - - 1155 - -
Stage 1 1139 868 - 1127 858 - - - - - - -
Stage 2 1143 870 - 1127 856 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1052 813 1091 1030 791 1090 1149 - - 1155 - -
Mov Cap-2 Maneuver 1052 813 - 1030 791 - - - - - - -
Stage 1 1137 866 - 1127 858 - - - - - - -
Stage 2 1143 870 - 1127 854 - - - - - - -

Approach EB WB NB SB
HCM Control Delay, s 0 8.5 0 0
HCM LOS A A

Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1149 - - - 1030 1155 - -
HCM Lane V/C Ratio - - - - 0.001 - - -
HCM Control Delay (s) 0 - - 0 8.5 0 - -
HCM Lane LOS A - - A A A - -
HCM 95th %tile Q(veh) 0 - - - 0 0 - -

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 16
6: Bramar Road & N-S Alley WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 1 7 5 15 2 0 1 0 22 1 0 0
Future Volume (vph) 1 7 5 15 2 0 1 0 22 1 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 11 11
Grade (%) 3% -4% 0% -3%
Satd. Flow (prot) 0 1641 0 0 1859 0 0 1650 0 0 1771 0
Flt Permitted 0.997 0.959 0.998 0.950
Satd. Flow (perm) 0 1641 0 0 1859 0 0 1650 0 0 1771 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 131 186 162 179
Travel Time (s) 3.6 5.1 4.4 4.9
Confl. Peds. (#/hr) 1 1 1 1
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Heavy Vehicles (%) 0% 14% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 16 0 0 22 0 0 29 0 0 1 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 16.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 17
6: Bramar Road & N-S Alley WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 1 7 5 15 2 0 1 0 22 1 0 0
Future Volume (Veh/h) 1 7 5 15 2 0 1 0 22 1 0 0
Sign Control Free Free Stop Stop
Grade 3% -4% 0% -3%
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Hourly flow rate (vph) 1 9 6 19 3 0 1 0 28 1 0 0
Pedestrians 1 1
Lane Width (ft) 12.0 11.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 4 16 56 57 13 84 60 4
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 4 16 56 57 13 84 60 4
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 99 100 100 97 100 100 100
cM capacity (veh/h) 1629 1613 935 826 1072 874 823 1084
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 16 22 29 1
Volume Left 1 19 1 1
Volume Right 6 0 28 0
cSH 1629 1613 1067 874
Volume to Capacity 0.00 0.01 0.03 0.00
Queue Length 95th (ft) 0 1 2 0
Control Delay (s) 0.5 6.3 8.5 9.1
Lane LOS A A A A
Approach Delay (s) 0.5 6.3 8.5 9.1
Approach LOS A A
Intersection Summary
Average Delay 5.9
Intersection Capacity Utilization 16.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 18
6: Bramar Road & N-S Alley WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 7 5 15 2 0 1 0 22 1 0 0
Future Vol, veh/h 1 7 5 15 2 0 1 0 22 1 0 0
Conflicting Peds, #/hr 1 0 1 1 0 1 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 3 - - -4 - - 0 - - -3 -
Peak Hour Factor 79 79 79 79 79 79 79 79 79 79 79 79
Heavy Vehicles, % 0 14 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 1 9 6 19 3 0 1 0 28 1 0 0

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 4 0 0 16 0 0 56 57 13 70 60 4
Stage 1 - - - - - - 15 15 - 42 42 -
Stage 2 - - - - - - 41 42 - 28 18 -
Critical Hdwy 4.3 - - 4.3 - - 7.1 6.5 6.2 6.5 5.9 5.9
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 5.5 4.9 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 5.5 4.9 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1196 - - 1185 - - 1100 838 1142 1089 843 1156
Stage 1 - - - - - - 1177 887 - 1145 870 -
Stage 2 - - - - - - 1139 864 - 1163 887 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1195 - - 1184 - - 1085 822 1141 1048 827 1155
Mov Cap-2 Maneuver - - - - - - 1085 822 - 1048 827 -
Stage 1 - - - - - - 1175 885 - 1143 855 -
Stage 2 - - - - - - 1121 849 - 1133 885 -

Approach EB WB NB SB
HCM Control Delay, s 0.6 7.1 8.2 8.4
HCM LOS A A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1138 1195 - - 1184 - - 1048
HCM Lane V/C Ratio 0.026 0.001 - - 0.016 - - 0.001
HCM Control Delay (s) 8.2 8 0 - 8.1 0 - 8.4
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 19
7: S 32nd Street & Harvard Avenue WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 71 18 279 119 13 10 242 1471 15 7 1723 35
Future Volume (vph) 71 18 279 119 13 10 242 1471 15 7 1723 35
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 14 14 14 12 12 12 12 12 12 12 12 12
Grade (%) -2% 0% -1% -2%
Storage Length (ft) 150 0 0 0 400 0 160 0
Storage Lanes 1 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1738 1939 1540 0 1696 0 1719 3399 0 1727 3410 0
Flt Permitted 0.755 0.748 0.053 0.131
Satd. Flow (perm) 1376 1939 1540 0 1321 0 96 3399 0 238 3410 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 282 2 1 2
Link Speed (mph) 25 25 35 35
Link Distance (ft) 357 317 547 1233
Travel Time (s) 9.7 8.6 10.7 24.0
Confl. Peds. (#/hr) 3 3 1 1
Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99
Heavy Vehicles (%) 6% 0% 7% 1% 0% 0% 0% 1% 0% 0% 1% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 72 18 282 0 143 0 244 1501 0 7 1775 0
Turn Type Perm NA pm+ov Perm NA pm+pt NA pm+pt NA
Protected Phases 4 5 8 5 2 1 6
Permitted Phases 4 4 8 2 6
Detector Phase 4 4 5 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0
Minimum Split (s) 24.2 24.2 11.4 24.2 24.2 11.4 24.4 11.4 24.4
Total Split (s) 24.2 24.2 19.0 24.2 24.2 19.0 76.4 11.4 68.8
Total Split (%) 16.1% 16.1% 12.7% 16.1% 16.1% 12.7% 50.9% 7.6% 45.9%
Yellow Time (s) 3.0 3.0 3.8 3.0 3.0 3.8 3.8 3.8 3.8
All-Red Time (s) 3.2 3.2 2.6 3.2 3.2 2.6 2.6 2.6 2.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.2 5.2 5.4 5.2 5.4 5.4 5.4 5.4
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None
Act Effct Green (s) 17.8 17.8 36.0 17.8 83.7 81.9 70.5 64.4
Actuated g/C Ratio 0.15 0.15 0.30 0.15 0.71 0.69 0.60 0.54
v/c Ratio 0.35 0.06 0.42 0.71 0.95 0.64 0.03 0.96
Control Delay 53.4 48.4 4.9 68.8 79.6 15.8 10.9 39.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 53.4 48.4 4.9 68.8 79.6 15.8 10.9 39.6
LOS D D A E E B B D
Approach Delay 16.4 68.8 24.7 39.4
Approach LOS B E C D
Queue Length 50th (ft) 46 11 0 95 129 231 1 576
Queue Length 95th (ft) 120 42 47 #264 #431 #883 11 #1268

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 20
7: S 32nd Street & Harvard Avenue WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 38.0
Total Split (s) 38.0
Total Split (%) 25%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 21
7: S 32nd Street & Harvard Avenue WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 277 237 467 1153
Turn Bay Length (ft) 150 400 160
Base Capacity (vph) 224 316 665 217 257 2354 218 1857
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.32 0.06 0.42 0.66 0.95 0.64 0.03 0.96
Intersection Summary
Area Type: Other
Cycle Length: 150
Actuated Cycle Length: 118.2
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.96
Intersection Signal Delay: 32.0 Intersection LOS: C
Intersection Capacity Utilization 93.9% ICU Level of Service F
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 7: S 32nd Street & Harvard Avenue

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 22
7: S 32nd Street & Harvard Avenue WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 23
8: 30th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 17 391 9 50 422 13 2 14 30 8 16 13
Future Volume (vph) 17 391 9 50 422 13 2 14 30 8 16 13
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 1% 1% 2% -2%
Satd. Flow (prot) 0 1677 0 0 1672 0 0 1714 0 0 1628 0
Flt Permitted 0.998 0.995 0.998 0.990
Satd. Flow (perm) 0 1677 0 0 1672 0 0 1714 0 0 1628 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 426 373 515 207
Travel Time (s) 11.6 10.2 14.0 5.6
Confl. Peds. (#/hr) 4 1 1 4
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 434 0 0 506 0 0 48 0 0 39 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 54.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 24
8: 30th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 17 391 9 50 422 13 2 14 30 8 16 13
Future Volume (Veh/h) 17 391 9 50 422 13 2 14 30 8 16 13
Sign Control Free Free Stop Stop
Grade 1% 1% 2% -2%
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Hourly flow rate (vph) 18 407 9 52 440 14 2 15 31 8 17 14
Pedestrians 1 4
Lane Width (ft) 12.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 373
pX, platoon unblocked 0.91 0.91 0.91 0.91 0.91 0.91
vC, conflicting volume 458 417 1022 1010 412 1041 1008 451
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 360 417 977 965 412 998 962 353
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 98 95 99 93 95 95 92 98
cM capacity (veh/h) 1102 1152 185 219 643 176 221 634
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 434 506 48 39
Volume Left 18 52 2 8
Volume Right 9 14 31 14
cSH 1102 1152 377 270
Volume to Capacity 0.02 0.05 0.13 0.14
Queue Length 95th (ft) 1 4 11 12
Control Delay (s) 0.5 1.3 15.9 20.6
Lane LOS A A C C
Approach Delay (s) 0.5 1.3 15.9 20.6
Approach LOS C C
Intersection Summary
Average Delay 2.4
Intersection Capacity Utilization 54.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 25
8: 30th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 2.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 17 391 9 50 422 13 2 14 30 8 16 13
Future Vol, veh/h 17 391 9 50 422 13 2 14 30 8 16 13
Conflicting Peds, #/hr 4 0 1 1 0 4 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 1 - - 1 - - 2 - - -2 -
Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96
Heavy Vehicles, % 0 1 0 0 1 0 0 0 0 0 0 0
Mvmt Flow 18 407 9 52 440 14 2 15 31 8 17 14

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 458 0 0 417 0 0 1016 1011 413 1026 1008 451
Stage 1 - - - - - - 449 449 - 555 555 -
Stage 2 - - - - - - 567 562 - 471 453 -
Critical Hdwy 4.3 - - 4.3 - - 7.5 6.9 6.4 6.7 6.1 6
Critical Hdwy Stg 1 - - - - - - 6.5 5.9 - 5.7 5.1 -
Critical Hdwy Stg 2 - - - - - - 6.5 5.9 - 5.7 5.1 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 835 - - 863 - - 214 216 662 264 271 661
Stage 1 - - - - - - 639 548 - 622 549 -
Stage 2 - - - - - - 541 482 - 688 603 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 832 - - 862 - - 182 192 661 217 241 658
Mov Cap-2 Maneuver - - - - - - 182 192 - 217 241 -
Stage 1 - - - - - - 620 532 - 602 502 -
Stage 2 - - - - - - 471 441 - 620 586 -

Approach EB WB NB SB
HCM Control Delay, s 0.4 1 16.7 18.7
HCM LOS C C

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 356 832 - - 862 - - 301
HCM Lane V/C Ratio 0.135 0.021 - - 0.06 - - 0.128
HCM Control Delay (s) 16.7 9.4 0 - 9.4 0 - 18.7
HCM Lane LOS C A A - A A - C
HCM 95th %tile Q(veh) 0.5 0.1 - - 0.2 - - 0.4

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 26
9: 29th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 6 431 7 39 459 11 0 4 9 9 6 9
Future Volume (vph) 6 431 7 39 459 11 0 4 9 9 6 9
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Grade (%) -1% 0% -2% -1%
Satd. Flow (prot) 0 1607 0 0 1770 0 0 1451 0 0 1502 0
Flt Permitted 0.995 0.951
Satd. Flow (perm) 0 1601 0 0 1690 0 0 1451 0 0 1523 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 1 2 9 9
Link Speed (mph) 25 25 25 25
Link Distance (ft) 373 270 277 210
Travel Time (s) 10.2 7.4 7.6 5.7
Confl. Peds. (#/hr) 4 2 2 4 1 2 2 1
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 457 0 0 524 0 0 13 0 0 24 0
Turn Type Perm NA Perm NA NA Perm NA
Protected Phases 2 6 8 4
Permitted Phases 2 6 8 4
Detector Phase 2 2 6 6 8 8 4 4
Switch Phase
Minimum Initial (s) 30.0 30.0 30.0 30.0 3.0 3.0 3.0 3.0
Minimum Split (s) 35.0 35.0 35.0 35.0 7.6 7.6 7.6 7.6
Total Split (s) 35.0 35.0 35.0 35.0 10.0 10.0 10.0 10.0
Total Split (%) 43.8% 43.8% 43.8% 43.8% 12.5% 12.5% 12.5% 12.5%
Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
All-Red Time (s) 2.0 2.0 2.0 2.0 1.6 1.6 1.6 1.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 4.0 4.0 3.6 3.6
Lead/Lag
Lead-Lag Optimize?
Recall Mode Min Min Min Min None None None None
Act Effct Green (s) 47.3 47.3 6.8 6.8
Actuated g/C Ratio 0.88 0.88 0.13 0.13
v/c Ratio 0.33 0.35 0.07 0.12
Control Delay 7.9 8.4 18.8 21.5
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 7.9 8.4 18.8 21.5
LOS A A B C
Approach Delay 7.9 8.4 18.8 21.5
Approach LOS A A B C
Queue Length 50th (ft) 0 0 1 4
Queue Length 95th (ft) #308 #392 19 30
Internal Link Dist (ft) 293 190 197 130
Turn Bay Length (ft)
Base Capacity (vph) 1405 1483 189 198

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 27
9: 29th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 9.0
Minimum Split (s) 35.0
Total Split (s) 35.0
Total Split (%) 44%
Yellow Time (s) 2.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 28
9: 29th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.33 0.35 0.07 0.12
Intersection Summary
Area Type: Other
Cycle Length: 80
Actuated Cycle Length: 53.9
Natural Cycle: 80
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.35
Intersection Signal Delay: 8.6 Intersection LOS: A
Intersection Capacity Utilization 65.8% ICU Level of Service C
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 9: 29th Street & Market Street

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 29
9: 29th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 30
1: N-S Alley & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 4 172 0 0 247 3 2 0 2 0 0 10
Future Volume (vph) 4 172 0 0 247 3 2 0 2 0 0 10
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 11 11 11 12 12 12
Grade (%) 0% 0% -2% 0%
Storage Length (ft) 0 150 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 0 1898 0 0 1888 0 0 1687 0 0 1644 0
Flt Permitted 0.999 0.976
Satd. Flow (perm) 0 1898 0 0 1888 0 0 1687 0 0 1644 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 325 227 190 155
Travel Time (s) 8.9 6.2 5.2 4.2
Confl. Peds. (#/hr) 2 1 1 2 1 1
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Heavy Vehicles (%) 0% 0% 0% 0% 0% 33% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 207 0 0 295 0 0 4 0 0 12 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 23.5% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 1
1: N-S Alley & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 4 172 0 0 247 3 2 0 2 0 0 10
Future Volume (Veh/h) 4 172 0 0 247 3 2 0 2 0 0 10
Sign Control Free Free Stop Stop
Grade 0% 0% -2% 0%
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Hourly flow rate (vph) 5 202 0 0 291 4 2 0 2 0 0 12
Pedestrians 1 1 2
Lane Width (ft) 12.0 11.0 12.0
Walking Speed (ft/s) 3.5 3.5 3.5
Percent Blockage 0 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 325
pX, platoon unblocked 0.94 0.94 0.94 0.94 0.94 0.94
vC, conflicting volume 297 203 519 510 203 509 508 296
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 297 122 458 448 122 447 446 296
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 100 100 100 100 100 100 98
cM capacity (veh/h) 1273 1390 475 476 879 490 477 746
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 207 295 4 12
Volume Left 5 0 2 0
Volume Right 0 4 2 12
cSH 1273 1390 617 746
Volume to Capacity 0.00 0.00 0.01 0.02
Queue Length 95th (ft) 0 0 0 1
Control Delay (s) 0.2 0.0 10.9 9.9
Lane LOS A B A
Approach Delay (s) 0.2 0.0 10.9 9.9
Approach LOS B A
Intersection Summary
Average Delay 0.4
Intersection Capacity Utilization 23.5% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 2
1: N-S Alley & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 0.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 172 0 0 247 3 2 0 2 0 0 10
Future Vol, veh/h 4 172 0 0 247 3 2 0 2 0 0 10
Conflicting Peds, #/hr 2 0 1 1 0 2 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - -2 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 0 0 0 0 0 33 0 0 0 0 0 0
Mvmt Flow 5 202 0 0 291 4 2 0 2 0 0 12

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 297 0 0 203 0 0 513 510 203 508 508 296
Stage 1 - - - - - - 213 213 - 295 295 -
Stage 2 - - - - - - 300 297 - 213 213 -
Critical Hdwy 4.3 - - 4.3 - - 6.7 6.1 6 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 5.7 5.1 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 5.7 5.1 - 6.1 5.5 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 950 - - 1024 - - 568 497 902 540 471 790
Stage 1 - - - - - - 935 747 - 821 673 -
Stage 2 - - - - - - 843 694 - 913 730 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 948 - - 1023 - - 556 493 901 535 467 788
Mov Cap-2 Maneuver - - - - - - 556 493 - 535 467 -
Stage 1 - - - - - - 928 742 - 814 672 -
Stage 2 - - - - - - 830 693 - 905 725 -

Approach EB WB NB SB
HCM Control Delay, s 0.2 0 10.3 9.6
HCM LOS B A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 688 948 - - 1023 - - 788
HCM Lane V/C Ratio 0.007 0.005 - - - - - 0.015
HCM Control Delay (s) 10.3 8.8 0 - 0 - - 9.6
HCM Lane LOS B A A - A - - A
HCM 95th %tile Q(veh) 0 0 - - 0 - - 0

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 3
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 261 127 159 162 85 8 149 1001 38 14 1046 181
Future Volume (vph) 261 127 159 162 85 8 149 1001 38 14 1046 181
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 12 12 14 10 10 10 11 11 11 10 11 11
Grade (%) -1% -1% 1% -1%
Storage Length (ft) 250 250 150 0 640 0 110 0
Storage Lanes 1 1 1 0 1 0 1 1
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1719 1809 1640 1604 1664 0 1628 3242 0 1604 3290 1457
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1711 1809 1616 1594 1664 0 1628 3242 0 1604 3290 1457
Right Turn on Red No No Yes Yes
Satd. Flow (RTOR) 3 163
Link Speed (mph) 35 25 35 35
Link Distance (ft) 525 325 1233 312
Travel Time (s) 10.2 8.9 24.0 6.1
Confl. Peds. (#/hr) 2 2 2 2
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 1% 1% 0% 0% 1% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 269 131 164 167 96 0 154 1071 0 14 1078 187
Turn Type Split NA pm+ov Split NA Prot NA Prot NA pm+ov
Protected Phases 4 4 5 8 8 5 2 1 6 4
Permitted Phases 4 6
Detector Phase 4 4 5 8 8 5 2 1 6 4
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 10.0 7.0 10.0 7.0
Minimum Split (s) 13.0 13.0 13.5 13.1 13.1 13.5 16.5 13.5 16.5 13.0
Total Split (s) 20.0 20.0 17.0 16.0 16.0 17.0 38.5 13.5 35.0 20.0
Total Split (%) 15.4% 15.4% 13.1% 12.3% 12.3% 13.1% 29.6% 10.4% 26.9% 15.4%
Yellow Time (s) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
All-Red Time (s) 2.3 2.3 2.8 2.4 2.4 2.8 2.8 2.8 2.8 2.3
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.0 5.0 5.5 5.1 5.1 5.5 5.5 5.5 5.5 5.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None None
Act Effct Green (s) 15.4 15.4 26.6 11.2 11.2 11.8 45.6 8.2 30.2 51.2
Actuated g/C Ratio 0.16 0.16 0.28 0.12 0.12 0.12 0.47 0.09 0.31 0.53
v/c Ratio 0.98 0.45 0.37 0.90 0.50 0.78 0.70 0.10 1.05 0.22
Control Delay 92.5 45.8 19.4 89.2 53.1 69.1 26.2 48.9 74.2 4.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 92.5 45.8 19.4 89.2 53.1 69.1 26.2 48.9 74.2 4.9
LOS F D B F D E C D E A
Approach Delay 60.4 76.0 31.6 63.8
Approach LOS E E C E
Queue Length 50th (ft) 148 66 44 92 50 83 207 7 307 5
Queue Length 95th (ft) #474 177 117 #322 #163 #285 #747 34 #785 63

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 4
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 7.0
Minimum Split (s) 42.0
Total Split (s) 42.0
Total Split (%) 32%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 5
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 445 245 1153 232
Turn Bay Length (ft) 250 250 150 640 110
Base Capacity (vph) 274 288 449 185 193 198 1536 136 1031 850
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.98 0.45 0.37 0.90 0.50 0.78 0.70 0.10 1.05 0.22
Intersection Summary
Area Type: Other
Cycle Length: 130
Actuated Cycle Length: 96.4
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 1.05
Intersection Signal Delay: 52.3 Intersection LOS: D
Intersection Capacity Utilization 77.9% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 2: S 32nd Street & Trindle Road/Chestnut Street

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 6
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 7
3: 31st Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (vph) 152 9 9 206 6 9
Future Volume (vph) 152 9 9 206 6 9
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 0% 0% -1%
Satd. Flow (prot) 1887 0 0 1878 1723 0
Flt Permitted 0.998 0.980
Satd. Flow (perm) 1887 0 0 1878 1723 0
Link Speed (mph) 25 25 25
Link Distance (ft) 227 445 204
Travel Time (s) 6.2 12.1 5.6
Confl. Peds. (#/hr) 6 6
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86
Heavy Vehicles (%) 0% 0% 0% 1% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 187 0 0 250 17 0
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 28.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 8
3: 31st Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Movement EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (veh/h) 152 9 9 206 6 9
Future Volume (Veh/h) 152 9 9 206 6 9
Sign Control Free Free Stop
Grade 0% 0% -1%
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86
Hourly flow rate (vph) 177 10 10 240 7 10
Pedestrians 6
Lane Width (ft) 12.0
Walking Speed (ft/s) 3.5
Percent Blockage 1
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 552
pX, platoon unblocked 0.97 0.97 0.97
vC, conflicting volume 193 448 188
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 148 412 143
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 99 99 99
cM capacity (veh/h) 1390 573 875
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 187 250 17
Volume Left 0 10 7
Volume Right 10 0 10
cSH 1700 1390 719
Volume to Capacity 0.11 0.01 0.02
Queue Length 95th (ft) 0 1 2
Control Delay (s) 0.0 0.4 10.1
Lane LOS A B
Approach Delay (s) 0.0 0.4 10.1
Approach LOS B
Intersection Summary
Average Delay 0.6
Intersection Capacity Utilization 28.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 9
3: 31st Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 0.6
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 152 9 9 206 6 9
Future Vol, veh/h 152 9 9 206 6 9
Conflicting Peds, #/hr 0 6 6 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 -1 -
Peak Hour Factor 86 86 86 86 86 86
Heavy Vehicles, % 0 0 0 1 0 0
Mvmt Flow 177 10 10 240 7 10

Major/Minor Major1 Major2 Minor1


Conflicting Flow All 0 0 193 0 448 188
Stage 1 - - - - 188 -
Stage 2 - - - - 260 -
Critical Hdwy - - 4.3 - 6.2 6.1
Critical Hdwy Stg 1 - - - - 5.2 -
Critical Hdwy Stg 2 - - - - 5.2 -
Follow-up Hdwy - - 3 - 3 3.1
Pot Cap-1 Maneuver - - 1032 - 665 915
Stage 1 - - - - 988 -
Stage 2 - - - - 917 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1026 - 654 910
Mov Cap-2 Maneuver - - - - 654 -
Stage 1 - - - - 982 -
Stage 2 - - - - 907 -

Approach EB WB NB
HCM Control Delay, s 0 0.4 9.7
HCM LOS A

Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT


Capacity (veh/h) 787 - - 1026 -
HCM Lane V/C Ratio 0.022 - - 0.01 -
HCM Control Delay (s) 9.7 - - 8.5 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh) 0.1 - - 0 -

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 10
4: 30th Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 21 127 11 8 170 4 5 8 4 0 17 37
Future Volume (vph) 21 127 11 8 170 4 5 8 4 0 17 37
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 0% 1% -1% -1%
Satd. Flow (prot) 0 1853 0 0 1881 0 0 1817 0 0 1697 0
Flt Permitted 0.993 0.998 0.985
Satd. Flow (perm) 0 1853 0 0 1881 0 0 1817 0 0 1697 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 445 215 319 515
Travel Time (s) 12.1 5.9 8.7 14.0
Confl. Peds. (#/hr) 1 8 8 1 2 2
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Heavy Vehicles (%) 0% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 3%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 181 0 0 207 0 0 20 0 0 61 0
Sign Control Stop Stop Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 28.2% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 11
4: 30th Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Stop Stop
Traffic Volume (vph) 21 127 11 8 170 4 5 8 4 0 17 37
Future Volume (vph) 21 127 11 8 170 4 5 8 4 0 17 37
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Hourly flow rate (vph) 24 144 13 9 193 5 6 9 5 0 19 42
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total (vph) 181 207 20 61
Volume Left (vph) 24 9 6 0
Volume Right (vph) 13 5 5 42
Hadj (s) 0.00 -0.01 -0.09 -0.38
Departure Headway (s) 4.3 4.3 4.7 4.4
Degree Utilization, x 0.22 0.25 0.03 0.07
Capacity (veh/h) 812 812 691 742
Control Delay (s) 8.5 8.7 7.9 7.8
Approach Delay (s) 8.5 8.7 7.9 7.8
Approach LOS A A A A
Intersection Summary
Delay 8.4
Level of Service A
Intersection Capacity Utilization 28.2% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 12
4: 30th Street & Chestnut Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Intersection
Intersection Delay, s/veh 8.4
Intersection LOS A

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 127 11 8 170 4 5 8 4 0 17 37
Future Vol, veh/h 21 127 11 8 170 4 5 8 4 0 17 37
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Heavy Vehicles, % 0 1 0 0 0 0 0 0 0 0 0 3
Mvmt Flow 24 144 13 9 193 5 6 9 5 0 19 42
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 8.5 8.6 7.9 7.7
HCM LOS A A A A

Lane NBLn1 EBLn1 WBLn1 SBLn1


Vol Left, % 29% 13% 4% 0%
Vol Thru, % 47% 80% 93% 31%
Vol Right, % 24% 7% 2% 69%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 17 159 182 54
LT Vol 5 21 8 0
Through Vol 8 127 170 17
RT Vol 4 11 4 37
Lane Flow Rate 19 181 207 61
Geometry Grp 1 1 1 1
Degree of Util (X) 0.025 0.215 0.24 0.074
Departure Headway (Hd) 4.741 4.288 4.277 4.359
Convergence, Y/N Yes Yes Yes Yes
Cap 758 842 844 825
Service Time 2.753 2.288 2.277 2.369
HCM Lane V/C Ratio 0.025 0.215 0.245 0.074
HCM Control Delay 7.9 8.5 8.6 7.7
HCM Lane LOS A A A A
HCM 95th-tile Q 0.1 0.8 0.9 0.2

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 13
5: 31st Street & E-W Alley WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 1 0 0 0 19 0 0 18 0
Future Volume (vph) 0 0 0 1 0 0 0 19 0 0 18 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 12 12 12 12 12 12 12 12 12
Grade (%) -5% 0% 1% 0%
Satd. Flow (prot) 0 1818 0 0 1805 0 0 1890 0 0 1900 0
Flt Permitted 0.950
Satd. Flow (perm) 0 1818 0 0 1805 0 0 1890 0 0 1900 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 151 181 206 204
Travel Time (s) 4.1 4.9 5.6 5.6
Confl. Peds. (#/hr) 2 2 2 2 7 3 3 7
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 1 0 0 24 0 0 23 0
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 16.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 14
5: 31st Street & E-W Alley WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 0 0 0 1 0 0 0 19 0 0 18 0
Future Volume (Veh/h) 0 0 0 1 0 0 0 19 0 0 18 0
Sign Control Stop Stop Free Free
Grade -5% 0% 1% 0%
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Hourly flow rate (vph) 0 0 0 1 0 0 0 24 0 0 23 0
Pedestrians 7 3 2 2
Lane Width (ft) 10.0 12.0 12.0 12.0
Walking Speed (ft/s) 3.5 3.5 3.5 3.5
Percent Blockage 1 0 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 56 57 32 52 57 29 30 27
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 56 57 32 52 57 29 30 27
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1
tC, 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 933 831 1040 941 831 1047 1587 1595
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 0 1 24 23
Volume Left 0 1 0 0
Volume Right 0 0 0 0
cSH 1700 941 1587 1595
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 0.0 8.8 0.0 0.0
Lane LOS A A
Approach Delay (s) 0.0 8.8 0.0 0.0
Approach LOS A A
Intersection Summary
Average Delay 0.2
Intersection Capacity Utilization 16.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 15
5: 31st Street & E-W Alley WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 1 0 0 0 19 0 0 18 0
Future Vol, veh/h 0 0 0 1 0 0 0 19 0 0 18 0
Conflicting Peds, #/hr 2 0 2 2 0 2 7 0 3 3 0 7
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - -5 - - 0 - - 1 - - 0 -
Peak Hour Factor 79 79 79 79 79 79 79 79 79 79 79 79
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 0 0 0 1 0 0 0 24 0 0 23 0

Major/Minor Minor2 Minor1 Major1 Major2


Conflicting Flow All 56 57 32 52 57 29 30 0 0 27 0 0
Stage 1 30 30 - 27 27 - - - - - - -
Stage 2 26 27 - 25 30 - - - - - - -
Critical Hdwy 6.1 5.5 5.7 7.1 6.5 6.2 4.3 - - 4.3 - -
Critical Hdwy Stg 1 5.1 4.5 - 6.1 5.5 - - - - - - -
Critical Hdwy Stg 2 5.1 4.5 - 6.1 5.5 - - - - - - -
Follow-up Hdwy 3 4 3.1 3 4 3.1 3 - - 3 - -
Pot Cap-1 Maneuver 1117 851 1119 1107 838 1119 1172 - - 1175 - -
Stage 1 1165 881 - 1159 877 - - - - - - -
Stage 2 1169 883 - 1162 874 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1109 843 1111 1101 830 1114 1165 - - 1172 - -
Mov Cap-2 Maneuver 1109 843 - 1101 830 - - - - - - -
Stage 1 1158 876 - 1156 874 - - - - - - -
Stage 2 1167 880 - 1160 869 - - - - - - -

Approach EB WB NB SB
HCM Control Delay, s 0 8.3 0 0
HCM LOS A A

Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1165 - - - 1101 1172 - -
HCM Lane V/C Ratio - - - - 0.001 - - -
HCM Control Delay (s) 0 - - 0 8.3 0 - -
HCM Lane LOS A - - A A A - -
HCM 95th %tile Q(veh) 0 - - - 0 0 - -

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 16
6: Bramar Road & N-S Alley WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 4 0 1 3 1 0 0 1 0 0 0
Future Volume (vph) 0 4 0 1 3 1 0 0 1 0 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 11 11
Grade (%) 3% -4% 0% -3%
Satd. Flow (prot) 0 1872 0 0 1867 0 0 1644 0 0 1864 0
Flt Permitted 0.990
Satd. Flow (perm) 0 1872 0 0 1867 0 0 1644 0 0 1864 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 131 186 162 179
Travel Time (s) 3.6 5.1 4.4 4.9
Peak Hour Factor 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 8 0 0 10 0 0 2 0 0 0 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 17
6: Bramar Road & N-S Alley WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 0 4 0 1 3 1 0 0 1 0 0 0
Future Volume (Veh/h) 0 4 0 1 3 1 0 0 1 0 0 0
Sign Control Free Free Stop Stop
Grade 3% -4% 0% -3%
Peak Hour Factor 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Hourly flow rate (vph) 0 8 0 2 6 2 0 0 2 0 0 0
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 8 8 19 20 8 21 19 7
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 8 8 19 20 8 21 19 7
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 1625 1625 999 877 1080 994 878 1081
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 8 10 2 0
Volume Left 0 2 0 0
Volume Right 0 2 2 0
cSH 1625 1625 1080 1700
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 0.0 1.5 8.3 0.0
Lane LOS A A A
Approach Delay (s) 0.0 1.5 8.3 0.0
Approach LOS A A
Intersection Summary
Average Delay 1.6
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 18
6: Bramar Road & N-S Alley WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 1.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 4 0 1 3 1 0 0 1 0 0 0
Future Vol, veh/h 0 4 0 1 3 1 0 0 1 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 3 - - -4 - - 0 - - -3 -
Peak Hour Factor 50 50 50 50 50 50 50 50 50 50 50 50
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 0 8 0 2 6 2 0 0 2 0 0 0

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 8 0 0 8 0 0 19 20 8 20 19 7
Stage 1 - - - - - - 8 8 - 11 11 -
Stage 2 - - - - - - 11 12 - 9 8 -
Critical Hdwy 4.3 - - 4.3 - - 7.1 6.5 6.2 6.5 5.9 5.9
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 5.5 4.9 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 5.5 4.9 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1193 - - 1193 - - 1165 878 1149 1167 882 1152
Stage 1 - - - - - - 1188 893 - 1185 892 -
Stage 2 - - - - - - 1183 890 - 1188 894 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1193 - - 1193 - - 1163 876 1149 1163 880 1152
Mov Cap-2 Maneuver - - - - - - 1163 876 - 1163 880 -
Stage 1 - - - - - - 1188 893 - 1185 890 -
Stage 2 - - - - - - 1181 888 - 1186 894 -

Approach EB WB NB SB
HCM Control Delay, s 0 1.6 8.1 0
HCM LOS A A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1149 1193 - - 1193 - - -
HCM Lane V/C Ratio 0.002 - - - 0.002 - - -
HCM Control Delay (s) 8.1 0 - - 8 0 - 0
HCM Lane LOS A A - - A A - A
HCM 95th %tile Q(veh) 0 0 - - 0 - - -

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 19
7: S 32nd Street & Harvard Avenue WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 115 16 334 88 22 1 315 1013 8 6 1124 76
Future Volume (vph) 115 16 334 88 22 1 315 1013 8 6 1124 76
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 14 14 14 12 12 12 12 12 12 12 12 12
Grade (%) -2% 0% -1% -2%
Storage Length (ft) 150 0 0 0 400 0 160 0
Storage Lanes 1 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1806 1939 1632 0 1716 0 1719 3399 0 1727 3391 0
Flt Permitted 0.730 0.759 0.089 0.269
Satd. Flow (perm) 1380 1939 1632 0 1354 0 161 3399 0 489 3391 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 348 1 5
Link Speed (mph) 25 25 35 35
Link Distance (ft) 357 317 547 1233
Travel Time (s) 9.7 8.6 10.7 24.0
Confl. Peds. (#/hr) 4 4 1 1
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 2% 0% 1% 1% 0% 0% 0% 1% 0% 0% 1% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 120 17 348 0 116 0 328 1063 0 6 1250 0
Turn Type Perm NA pm+ov Perm NA pm+pt NA pm+pt NA
Protected Phases 4 5 8 5 2 1 6
Permitted Phases 4 4 8 2 6
Detector Phase 4 4 5 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0
Minimum Split (s) 24.2 24.2 11.4 24.2 24.2 11.4 24.4 11.4 24.4
Total Split (s) 24.2 24.2 22.0 24.2 24.2 22.0 56.4 11.4 45.8
Total Split (%) 18.6% 18.6% 16.9% 18.6% 18.6% 16.9% 43.4% 8.8% 35.2%
Yellow Time (s) 3.0 3.0 3.8 3.0 3.0 3.8 3.8 3.8 3.8
All-Red Time (s) 3.2 3.2 2.6 3.2 3.2 2.6 2.6 2.6 2.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.2 5.2 5.4 5.2 5.4 5.4 5.4 5.4
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None
Act Effct Green (s) 13.9 13.9 35.5 13.9 64.2 62.6 47.7 41.6
Actuated g/C Ratio 0.15 0.15 0.38 0.15 0.68 0.66 0.50 0.44
v/c Ratio 0.59 0.06 0.42 0.59 0.84 0.47 0.02 0.84
Control Delay 53.1 39.4 3.5 52.9 44.3 13.7 12.7 31.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 53.1 39.4 3.5 52.9 44.3 13.7 12.7 31.7
LOS D D A D D B B C
Approach Delay 17.0 52.9 20.9 31.6
Approach LOS B D C C
Queue Length 50th (ft) 61 8 0 59 117 103 1 291
Queue Length 95th (ft) 165 36 37 159 #476 501 10 #806

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 20
7: S 32nd Street & Harvard Avenue WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 38.0
Total Split (s) 38.0
Total Split (%) 29%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 21
7: S 32nd Street & Harvard Avenue WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 277 237 467 1153
Turn Bay Length (ft) 150 400 160
Base Capacity (vph) 285 401 830 280 391 2250 327 1494
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.42 0.04 0.42 0.41 0.84 0.47 0.02 0.84
Intersection Summary
Area Type: Other
Cycle Length: 130
Actuated Cycle Length: 94.5
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.84
Intersection Signal Delay: 25.6 Intersection LOS: C
Intersection Capacity Utilization 80.2% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 7: S 32nd Street & Harvard Avenue

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 22
7: S 32nd Street & Harvard Avenue WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 23
8: 30th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 7 437 8 31 402 6 6 4 26 11 15 14
Future Volume (vph) 7 437 8 31 402 6 6 4 26 11 15 14
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 1% 1% 2% -2%
Satd. Flow (prot) 0 1678 0 0 1676 0 0 1633 0 0 1623 0
Flt Permitted 0.999 0.996 0.992 0.986
Satd. Flow (perm) 0 1678 0 0 1676 0 0 1633 0 0 1623 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 426 373 515 207
Travel Time (s) 11.6 10.2 14.0 5.6
Confl. Peds. (#/hr) 3 4 4 3 4 2 2 4
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 4% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 481 0 0 467 0 0 38 0 0 43 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 51.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 24
8: 30th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 7 437 8 31 402 6 6 4 26 11 15 14
Future Volume (Veh/h) 7 437 8 31 402 6 6 4 26 11 15 14
Sign Control Free Free Stop Stop
Grade 1% 1% 2% -2%
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Hourly flow rate (vph) 7 465 9 33 428 6 6 4 28 12 16 15
Pedestrians 4 2 4 3
Lane Width (ft) 12.0 12.0 12.0 12.0
Walking Speed (ft/s) 3.5 3.5 3.5 3.5
Percent Blockage 0 0 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 373
pX, platoon unblocked 0.93 0.93 0.93 0.93 0.93 0.93
vC, conflicting volume 437 478 1012 990 476 1016 992 438
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 354 478 973 951 476 978 952 355
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 99 97 97 98 95 94 93 98
cM capacity (veh/h) 1125 1091 192 232 582 195 232 639
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 481 467 38 43
Volume Left 7 33 6 12
Volume Right 9 6 28 15
cSH 1125 1091 393 279
Volume to Capacity 0.01 0.03 0.10 0.15
Queue Length 95th (ft) 0 2 8 13
Control Delay (s) 0.2 0.9 15.1 20.2
Lane LOS A A C C
Approach Delay (s) 0.2 0.9 15.1 20.2
Approach LOS C C
Intersection Summary
Average Delay 1.9
Intersection Capacity Utilization 51.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 25
8: 30th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 1.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 437 8 31 402 6 6 4 26 11 15 14
Future Vol, veh/h 7 437 8 31 402 6 6 4 26 11 15 14
Conflicting Peds, #/hr 3 0 4 4 0 3 4 0 2 2 0 4
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 1 - - 1 - - 2 - - -2 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94
Heavy Vehicles, % 0 1 0 0 1 0 0 0 4 0 0 0
Mvmt Flow 7 465 9 33 428 6 6 4 28 12 16 15

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 437 0 0 478 0 0 1005 991 476 1002 992 438
Stage 1 - - - - - - 488 488 - 500 500 -
Stage 2 - - - - - - 517 503 - 502 492 -
Critical Hdwy 4.3 - - 4.3 - - 7.5 6.9 6.44 6.7 6.1 6
Critical Hdwy Stg 1 - - - - - - 6.5 5.9 - 5.7 5.1 -
Critical Hdwy Stg 2 - - - - - - 6.5 5.9 - 5.7 5.1 -
Follow-up Hdwy 3 - - 3 - - 3.1 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 850 - - 822 - - 214 222 604 274 277 672
Stage 1 - - - - - - 589 524 - 665 578 -
Stage 2 - - - - - - 566 515 - 663 582 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 848 - - 819 - - 188 206 601 244 258 668
Mov Cap-2 Maneuver - - - - - - 188 206 - 244 258 -
Stage 1 - - - - - - 580 516 - 656 546 -
Stage 2 - - - - - - 507 486 - 619 573 -

Approach EB WB NB SB
HCM Control Delay, s 0.1 0.7 15.5 17.9
HCM LOS C C

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 381 848 - - 819 - - 322
HCM Lane V/C Ratio 0.101 0.009 - - 0.04 - - 0.132
HCM Control Delay (s) 15.5 9.3 0 - 9.6 0 - 17.9
HCM Lane LOS C A A - A A - C
HCM 95th %tile Q(veh) 0.3 0 - - 0.1 - - 0.5

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 26
9: 29th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 9 464 3 16 428 4 3 2 12 3 3 8
Future Volume (vph) 9 464 3 16 428 4 3 2 12 3 3 8
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Grade (%) -1% 0% -2% -1%
Satd. Flow (prot) 0 1609 0 0 1773 0 0 1464 0 0 1486 0
Flt Permitted 0.993 0.981
Satd. Flow (perm) 0 1599 0 0 1743 0 0 1476 0 0 1503 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 1 13 8
Link Speed (mph) 25 25 25 25
Link Distance (ft) 373 270 277 210
Travel Time (s) 10.2 7.4 7.6 5.7
Confl. Peds. (#/hr) 2 3 3 2
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 0% 1% 0% 6% 1% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 495 0 0 467 0 0 18 0 0 14 0
Turn Type Perm NA Perm NA Perm NA Perm NA
Protected Phases 2 6 8 4
Permitted Phases 2 6 8 4
Detector Phase 2 2 6 6 8 8 4 4
Switch Phase
Minimum Initial (s) 30.0 30.0 30.0 30.0 3.0 3.0 3.0 3.0
Minimum Split (s) 35.0 35.0 35.0 35.0 7.6 7.6 7.6 7.6
Total Split (s) 35.0 35.0 35.0 35.0 10.0 10.0 10.0 10.0
Total Split (%) 43.8% 43.8% 43.8% 43.8% 12.5% 12.5% 12.5% 12.5%
Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
All-Red Time (s) 2.0 2.0 2.0 2.0 1.6 1.6 1.6 1.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 4.0 4.0 3.6 3.6
Lead/Lag
Lead-Lag Optimize?
Recall Mode Min Min Min Min None None None None
Act Effct Green (s) 48.0 48.0 6.7 6.7
Actuated g/C Ratio 0.88 0.88 0.12 0.12
v/c Ratio 0.35 0.31 0.09 0.07
Control Delay 8.6 7.3 18.5 20.5
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 8.6 7.3 18.5 20.5
LOS A A B C
Approach Delay 8.6 7.3 18.5 20.5
Approach LOS A A B C
Queue Length 50th (ft) 0 0 1 2
Queue Length 95th (ft) #377 298 22 20
Internal Link Dist (ft) 293 190 197 130
Turn Bay Length (ft)
Base Capacity (vph) 1403 1530 191 190

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 27
9: 29th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 9.0
Minimum Split (s) 35.0
Total Split (s) 35.0
Total Split (%) 44%
Yellow Time (s) 2.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 28
9: 29th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.35 0.31 0.09 0.07
Intersection Summary
Area Type: Other
Cycle Length: 80
Actuated Cycle Length: 54.7
Natural Cycle: 80
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.35
Intersection Signal Delay: 8.3 Intersection LOS: A
Intersection Capacity Utilization 42.9% ICU Level of Service A
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 9: 29th Street & Market Street

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 29
9: 29th Street & Market Street WMSC.00002
Base 2020 Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Base 2020 Conditions Synchro 10 Report


TPD Page 30
2020 Projected (Build) Conditions
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 74 207 44 4 226 3 0 0 44 2 0 10
Future Volume (vph) 74 207 44 4 226 3 0 0 44 2 0 10
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 11 11 11 12 12 12
Grade (%) 0% 0% -2% 0%
Storage Length (ft) 0 150 0 0 0 0 0 0
Storage Lanes 0 1 0 0 1 0 0 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 0 1862 1615 0 1858 0 1855 1577 0 0 1670 0
Flt Permitted 0.987 0.999 0.992
Satd. Flow (perm) 0 1862 1615 0 1858 0 1855 1577 0 0 1670 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 325 227 190 155
Travel Time (s) 8.9 6.2 5.2 4.2
Confl. Peds. (#/hr) 3 1 1 3
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 0% 1% 0% 0% 2% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 299 47 0 247 0 0 47 0 0 13 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 40.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 1
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 74 207 44 4 226 3 0 0 44 2 0 10
Future Volume (Veh/h) 74 207 44 4 226 3 0 0 44 2 0 10
Sign Control Free Free Stop Stop
Grade 0% 0% -2% 0%
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Hourly flow rate (vph) 79 220 47 4 240 3 0 0 47 2 0 11
Pedestrians 1 3
Lane Width (ft) 11.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 325
pX, platoon unblocked 0.92 0.92 0.92 0.92 0.92 0.92
vC, conflicting volume 246 268 640 633 221 678 678 244
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 246 164 567 560 113 608 609 244
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 94 100 100 100 95 99 100 99
cM capacity (veh/h) 1328 1314 378 379 871 339 355 797
Direction, Lane # EB 1 EB 2 WB 1 NB 1 NB 2 SB 1
Volume Total 299 47 247 0 47 13
Volume Left 79 0 4 0 0 2
Volume Right 0 47 3 0 47 11
cSH 1328 1700 1314 1700 871 660
Volume to Capacity 0.06 0.03 0.00 0.00 0.05 0.02
Queue Length 95th (ft) 5 0 0 0 4 2
Control Delay (s) 2.5 0.0 0.2 0.0 9.4 10.6
Lane LOS A A A A B
Approach Delay (s) 2.1 0.2 9.4 10.6
Approach LOS A B
Intersection Summary
Average Delay 2.1
Intersection Capacity Utilization 40.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 2
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 74 207 44 4 226 3 0 0 44 2 0 10
Future Vol, veh/h 74 207 44 4 226 3 0 0 44 2 0 10
Conflicting Peds, #/hr 3 0 1 1 0 3 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 150 - - - 0 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - -2 - - 0 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94
Heavy Vehicles, % 0 1 0 0 2 0 0 0 0 0 0 0
Mvmt Flow 79 220 47 4 240 3 0 0 47 2 0 11

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 246 0 0 268 0 0 634 633 221 678 679 245
Stage 1 - - - - - - 379 379 - 253 253 -
Stage 2 - - - - - - 255 254 - 425 426 -
Critical Hdwy 4.3 - - 4.3 - - 6.7 6.1 6 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 5.7 5.1 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 5.7 5.1 - 6.1 5.5 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 989 - - 972 - - 475 429 882 412 376 845
Stage 1 - - - - - - 768 645 - 867 701 -
Stage 2 - - - - - - 890 721 - 694 589 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 986 - - 971 - - 433 385 881 359 337 843
Mov Cap-2 Maneuver - - - - - - 433 385 - 359 337 -
Stage 1 - - - - - - 694 583 - 782 695 -
Stage 2 - - - - - - 874 715 - 595 532 -

Approach EB WB NB SB
HCM Control Delay, s 2 0.1 9.3 10.3
HCM LOS A B

Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 881 986 - - 971 - - 688
HCM Lane V/C Ratio - 0.053 0.08 - - 0.004 - - 0.019
HCM Control Delay (s) 0 9.3 9 0 - 8.7 0 - 10.3
HCM Lane LOS A A A A - A A - B
HCM 95th %tile Q(veh) - 0.2 0.3 - - 0 - - 0.1

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 3
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 306 164 118 102 100 15 123 1368 134 27 1002 222
Future Volume (vph) 306 164 118 102 100 15 123 1368 134 27 1002 222
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 12 12 14 10 10 10 11 11 11 10 11 11
Grade (%) -1% -1% 1% -1%
Storage Length (ft) 250 250 150 0 640 0 110 0
Storage Lanes 1 1 1 0 1 0 1 1
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1685 1809 1562 1588 1609 0 1566 3186 0 1458 3257 1472
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1674 1809 1541 1583 1609 0 1566 3186 0 1458 3257 1472
Right Turn on Red No No Yes Yes
Satd. Flow (RTOR) 7 217
Link Speed (mph) 35 25 35 35
Link Distance (ft) 525 325 1233 312
Travel Time (s) 10.2 8.9 24.0 6.1
Confl. Peds. (#/hr) 3 1 1 3
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 2% 0% 5% 1% 2% 7% 5% 2% 1% 10% 2% 1%
Shared Lane Traffic (%)
Lane Group Flow (vph) 333 178 128 111 125 0 134 1633 0 29 1089 241
Turn Type Split NA pm+ov Split NA Prot NA Prot NA pm+ov
Protected Phases 4 4 5 8 8 5 2 1 6 4
Permitted Phases 4 6
Detector Phase 4 4 5 8 8 5 2 1 6 4
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 10.0 7.0 10.0 7.0
Minimum Split (s) 13.0 13.0 13.5 13.1 13.1 13.5 16.5 13.5 16.5 13.0
Total Split (s) 23.0 23.0 13.6 16.0 16.0 13.6 55.5 13.5 55.4 23.0
Total Split (%) 15.3% 15.3% 9.1% 10.7% 10.7% 9.1% 37.0% 9.0% 36.9% 15.3%
Yellow Time (s) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
All-Red Time (s) 2.3 2.3 2.8 2.4 2.4 2.8 2.8 2.8 2.8 2.3
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.0 5.0 5.5 5.1 5.1 5.5 5.5 5.5 5.5 5.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None None
Act Effct Green (s) 18.3 18.3 26.1 11.1 11.1 8.3 55.8 8.2 49.8 73.8
Actuated g/C Ratio 0.16 0.16 0.23 0.10 0.10 0.07 0.48 0.07 0.43 0.64
v/c Ratio 1.25 0.62 0.37 0.73 0.81 1.21 1.06 0.28 0.78 0.24
Control Delay 179.1 57.9 27.7 79.2 88.2 195.5 70.5 63.7 34.3 3.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 179.1 57.9 27.7 79.2 88.2 195.5 70.5 63.7 34.3 3.2
LOS F E C E F F E E C A
Approach Delay 115.0 84.0 80.0 29.4
Approach LOS F F E C
Queue Length 50th (ft) ~278 115 53 76 86 ~109 ~680 19 311 5
Queue Length 95th (ft) #671 #301 96 #240 #275 #328 #1320 64 #724 59

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 4
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 7.0
Minimum Split (s) 42.0
Total Split (s) 42.0
Total Split (%) 28%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 5
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 445 245 1153 232
Turn Bay Length (ft) 250 250 150 640 110
Base Capacity (vph) 267 287 349 152 154 111 1543 103 1433 1018
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 1.25 0.62 0.37 0.73 0.81 1.21 1.06 0.28 0.76 0.24
Intersection Summary
Area Type: Other
Cycle Length: 150
Actuated Cycle Length: 115.5
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 1.25
Intersection Signal Delay: 68.6 Intersection LOS: E
Intersection Capacity Utilization 92.3% ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 2: S 32nd Street & Trindle Road/Chestnut Street

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 6
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 7
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (vph) 226 61 17 196 12 18
Future Volume (vph) 226 61 17 196 12 18
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 0% 0% -1%
Satd. Flow (prot) 1819 0 0 1875 1720 0
Flt Permitted 0.996 0.981
Satd. Flow (perm) 1819 0 0 1875 1720 0
Link Speed (mph) 25 25 25
Link Distance (ft) 227 445 204
Travel Time (s) 6.2 12.1 5.6
Confl. Peds. (#/hr) 7 7
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89
Heavy Vehicles (%) 1% 3% 0% 1% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 323 0 0 239 33 0
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 34.4% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 8
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Movement EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (veh/h) 226 61 17 196 12 18
Future Volume (Veh/h) 226 61 17 196 12 18
Sign Control Free Free Stop
Grade 0% 0% -1%
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89
Hourly flow rate (vph) 254 69 19 220 13 20
Pedestrians 7
Lane Width (ft) 12.0
Walking Speed (ft/s) 3.5
Percent Blockage 1
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 552
pX, platoon unblocked 0.99 0.99 0.99
vC, conflicting volume 330 554 296
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 322 547 288
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 98 97 97
cM capacity (veh/h) 1232 487 746
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 323 239 33
Volume Left 0 19 13
Volume Right 69 0 20
cSH 1700 1232 617
Volume to Capacity 0.19 0.02 0.05
Queue Length 95th (ft) 0 1 4
Control Delay (s) 0.0 0.8 11.2
Lane LOS A B
Approach Delay (s) 0.0 0.8 11.2
Approach LOS B
Intersection Summary
Average Delay 0.9
Intersection Capacity Utilization 34.4% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 9
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 0.9
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 226 61 17 196 12 18
Future Vol, veh/h 226 61 17 196 12 18
Conflicting Peds, #/hr 0 7 7 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 -1 -
Peak Hour Factor 89 89 89 89 89 89
Heavy Vehicles, % 1 3 0 1 0 0
Mvmt Flow 254 69 19 220 13 20

Major/Minor Major1 Major2 Minor1


Conflicting Flow All 0 0 330 0 554 296
Stage 1 - - - - 296 -
Stage 2 - - - - 258 -
Critical Hdwy - - 4.3 - 6.2 6.1
Critical Hdwy Stg 1 - - - - 5.2 -
Critical Hdwy Stg 2 - - - - 5.2 -
Follow-up Hdwy - - 3 - 3 3.1
Pot Cap-1 Maneuver - - 925 - 577 797
Stage 1 - - - - 883 -
Stage 2 - - - - 919 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 919 - 559 792
Mov Cap-2 Maneuver - - - - 559 -
Stage 1 - - - - 877 -
Stage 2 - - - - 897 -

Approach EB WB NB
HCM Control Delay, s 0 0.7 10.6
HCM LOS B

Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT


Capacity (veh/h) 679 - - 919 -
HCM Lane V/C Ratio 0.05 - - 0.021 -
HCM Control Delay (s) 10.6 - - 9 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.2 - - 0.1 -

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 10
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 63 139 21 25 140 10 16 19 4 37 76 58
Future Volume (vph) 63 139 21 25 140 10 16 19 4 37 76 58
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 0% 1% -1% -1%
Satd. Flow (prot) 0 1818 0 0 1862 0 0 1801 0 0 1766 0
Flt Permitted 0.986 0.993 0.980 0.989
Satd. Flow (perm) 0 1818 0 0 1862 0 0 1801 0 0 1766 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 445 215 319 515
Travel Time (s) 12.1 5.9 8.7 14.0
Confl. Peds. (#/hr) 16 1 1 16 3 3
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles (%) 0% 2% 5% 0% 0% 0% 6% 0% 0% 0% 3% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 279 0 0 219 0 0 49 0 0 214 0
Sign Control Stop Stop Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 39.2% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 11
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Stop Stop
Traffic Volume (vph) 63 139 21 25 140 10 16 19 4 37 76 58
Future Volume (vph) 63 139 21 25 140 10 16 19 4 37 76 58
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Hourly flow rate (vph) 79 174 26 31 175 13 20 24 5 46 95 73
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total (vph) 279 219 49 214
Volume Left (vph) 79 31 20 46
Volume Right (vph) 26 13 5 73
Hadj (s) 0.03 -0.01 0.06 -0.13
Departure Headway (s) 5.0 5.0 5.6 5.1
Degree Utilization, x 0.38 0.30 0.08 0.30
Capacity (veh/h) 687 675 558 646
Control Delay (s) 11.0 10.2 9.1 10.3
Approach Delay (s) 11.0 10.2 9.1 10.3
Approach LOS B B A B
Intersection Summary
Delay 10.5
Level of Service B
Intersection Capacity Utilization 39.2% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 12
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Intersection
Intersection Delay, s/veh 10.3
Intersection LOS B

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 63 139 21 25 140 10 16 19 4 37 76 58
Future Vol, veh/h 63 139 21 25 140 10 16 19 4 37 76 58
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles, % 0 2 5 0 0 0 6 0 0 0 3 2
Mvmt Flow 79 174 26 31 175 13 20 24 5 46 95 73
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 10.8 10.1 9.1 10.2
HCM LOS B B A B

Lane NBLn1 EBLn1 WBLn1 SBLn1


Vol Left, % 41% 28% 14% 22%
Vol Thru, % 49% 62% 80% 44%
Vol Right, % 10% 9% 6% 34%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 39 223 175 171
LT Vol 16 63 25 37
Through Vol 19 139 140 76
RT Vol 4 21 10 58
Lane Flow Rate 49 279 219 214
Geometry Grp 1 1 1 1
Degree of Util (X) 0.076 0.375 0.298 0.296
Departure Headway (Hd) 5.631 4.837 4.905 4.986
Convergence, Y/N Yes Yes Yes Yes
Cap 640 736 724 712
Service Time 3.631 2.917 2.989 3.073
HCM Lane V/C Ratio 0.077 0.379 0.302 0.301
HCM Control Delay 9.1 10.8 10.1 10.2
HCM Lane LOS A B B B
HCM 95th-tile Q 0.2 1.7 1.2 1.2

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 13
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 2 0 0 0 0 1 0 23 0 0 77 0
Future Volume (vph) 2 0 0 0 0 1 0 23 0 0 77 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 12 12 12 12 12 12 12 12 12
Grade (%) -5% 0% 1% 0%
Satd. Flow (prot) 0 1727 0 0 1644 0 0 1890 0 0 1863 0
Flt Permitted 0.950
Satd. Flow (perm) 0 1727 0 0 1644 0 0 1890 0 0 1863 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 151 181 206 204
Travel Time (s) 4.1 4.9 5.6 5.6
Confl. Peds. (#/hr) 2 3 3 2
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 2% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 3 0 0 1 0 0 29 0 0 96 0
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 14.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 14
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 2 0 0 0 0 1 0 23 0 0 77 0
Future Volume (Veh/h) 2 0 0 0 0 1 0 23 0 0 77 0
Sign Control Stop Stop Free Free
Grade -5% 0% 1% 0%
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Hourly flow rate (vph) 3 0 0 0 0 1 0 29 0 0 96 0
Pedestrians 2 3
Lane Width (ft) 10.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 128 130 98 128 130 32 98 32
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 128 130 98 128 130 32 98 32
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1
tC, 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 845 761 962 845 761 1045 1505 1589
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 3 1 29 96
Volume Left 3 0 0 0
Volume Right 0 1 0 0
cSH 845 1045 1505 1589
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 9.3 8.4 0.0 0.0
Lane LOS A A
Approach Delay (s) 9.3 8.4 0.0 0.0
Approach LOS A A
Intersection Summary
Average Delay 0.3
Intersection Capacity Utilization 14.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 15
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 2 0 0 0 0 1 0 23 0 0 77 0
Future Vol, veh/h 2 0 0 0 0 1 0 23 0 0 77 0
Conflicting Peds, #/hr 0 0 0 0 0 0 2 0 3 3 0 2
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - -5 - - 0 - - 1 - - 0 -
Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 2 0
Mvmt Flow 3 0 0 0 0 1 0 29 0 0 96 0

Major/Minor Minor2 Minor1 Major1 Major2


Conflicting Flow All 128 130 98 128 130 32 98 0 0 32 0 0
Stage 1 98 98 - 32 32 - - - - - - -
Stage 2 30 32 - 96 98 - - - - - - -
Critical Hdwy 6.1 5.5 5.7 7.1 6.5 6.2 4.3 - - 4.3 - -
Critical Hdwy Stg 1 5.1 4.5 - 6.1 5.5 - - - - - - -
Critical Hdwy Stg 2 5.1 4.5 - 6.1 5.5 - - - - - - -
Follow-up Hdwy 3 4 3.1 3 4 3.1 3 - - 3 - -
Pot Cap-1 Maneuver 1018 792 1037 983 764 1114 1112 - - 1170 - -
Stage 1 1088 840 - 1152 872 - - - - - - -
Stage 2 1165 880 - 1061 818 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1015 788 1035 980 760 1111 1110 - - 1167 - -
Mov Cap-2 Maneuver 1015 788 - 980 760 - - - - - - -
Stage 1 1086 838 - 1149 869 - - - - - - -
Stage 2 1164 877 - 1061 816 - - - - - - -

Approach EB WB NB SB
HCM Control Delay, s 8.6 8.2 0 0
HCM LOS A A

Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1110 - - 1015 1111 1167 - -
HCM Lane V/C Ratio - - - 0.002 0.001 - - -
HCM Control Delay (s) 0 - - 8.6 8.2 0 - -
HCM Lane LOS A - - A A A - -
HCM 95th %tile Q(veh) 0 - - 0 0 0 - -

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 16
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 5 0 1 15 1 0 0 1 0 0 0
Future Volume (vph) 0 5 0 1 15 1 0 0 1 0 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 11 11
Grade (%) 3% -4% 0% -3%
Satd. Flow (prot) 0 1872 0 0 1919 0 0 1644 0 0 1864 0
Flt Permitted 0.997
Satd. Flow (perm) 0 1872 0 0 1919 0 0 1644 0 0 1864 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 131 186 162 179
Travel Time (s) 3.6 5.1 4.4 4.9
Peak Hour Factor 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 11 0 0 37 0 0 2 0 0 0 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 17
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 0 5 0 1 15 1 0 0 1 0 0 0
Future Volume (Veh/h) 0 5 0 1 15 1 0 0 1 0 0 0
Sign Control Free Free Stop Stop
Grade 3% -4% 0% -3%
Peak Hour Factor 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46
Hourly flow rate (vph) 0 11 0 2 33 2 0 0 2 0 0 0
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 35 11 49 50 11 51 49 34
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 35 11 49 50 11 51 49 34
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 1589 1621 955 844 1076 951 845 1045
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 11 37 2 0
Volume Left 0 2 0 0
Volume Right 0 2 2 0
cSH 1589 1621 1076 1700
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 0.0 0.4 8.4 0.0
Lane LOS A A A
Approach Delay (s) 0.0 0.4 8.4 0.0
Approach LOS A A
Intersection Summary
Average Delay 0.6
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 18
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 0.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 5 0 1 15 1 0 0 1 0 0 0
Future Vol, veh/h 0 5 0 1 15 1 0 0 1 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 3 - - -4 - - 0 - - -3 -
Peak Hour Factor 46 46 46 46 46 46 46 46 46 46 46 46
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 0 11 0 2 33 2 0 0 2 0 0 0

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 35 0 0 11 0 0 49 50 11 50 49 34
Stage 1 - - - - - - 11 11 - 38 38 -
Stage 2 - - - - - - 38 39 - 12 11 -
Critical Hdwy 4.3 - - 4.3 - - 7.1 6.5 6.2 6.5 5.9 5.9
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 5.5 4.9 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 5.5 4.9 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1168 - - 1190 - - 1112 845 1145 1119 853 1115
Stage 1 - - - - - - 1183 890 - 1150 873 -
Stage 2 - - - - - - 1143 866 - 1184 892 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1168 - - 1190 - - 1110 843 1145 1116 851 1115
Mov Cap-2 Maneuver - - - - - - 1110 843 - 1116 851 -
Stage 1 - - - - - - 1183 890 - 1150 871 -
Stage 2 - - - - - - 1141 864 - 1182 892 -

Approach EB WB NB SB
HCM Control Delay, s 0 0.5 8.2 0
HCM LOS A A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1145 1168 - - 1190 - - -
HCM Lane V/C Ratio 0.002 - - - 0.002 - - -
HCM Control Delay (s) 8.2 0 - - 8 0 - 0
HCM Lane LOS A A - - A A - A
HCM 95th %tile Q(veh) 0 0 - - 0 - - -

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 19
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 16 8 68 99 8 2 135 1596 10 21 1247 12
Future Volume (vph) 16 8 68 99 8 2 135 1596 10 21 1247 12
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 14 14 14 12 12 12 12 12 12 12 12 12
Grade (%) -2% 0% -1% -2%
Storage Length (ft) 150 0 0 0 400 0 160 0
Storage Lanes 1 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1406 1939 1600 0 1704 0 1719 3366 0 1727 3384 0
Flt Permitted 0.774 0.739 0.103 0.070
Satd. Flow (perm) 1146 1939 1600 0 1316 0 186 3366 0 127 3384 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 74 1 1
Link Speed (mph) 25 25 35 35
Link Distance (ft) 357 317 547 1233
Travel Time (s) 9.7 8.6 10.7 24.0
Confl. Peds. (#/hr) 1 1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 31% 0% 3% 1% 0% 0% 0% 2% 0% 0% 2% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 17 9 74 0 119 0 147 1746 0 23 1368 0
Turn Type Perm NA pm+ov Perm NA pm+pt NA pm+pt NA
Protected Phases 4 5 8 5 2 1 6
Permitted Phases 4 4 8 2 6
Detector Phase 4 4 5 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0
Minimum Split (s) 24.2 24.2 11.4 24.2 24.2 11.4 24.4 11.4 24.4
Total Split (s) 24.2 24.2 16.2 24.2 24.2 16.2 76.4 11.4 71.6
Total Split (%) 16.1% 16.1% 10.8% 16.1% 16.1% 10.8% 50.9% 7.6% 47.7%
Yellow Time (s) 3.0 3.0 3.8 3.0 3.0 3.8 3.8 3.8 3.8
All-Red Time (s) 3.2 3.2 2.6 3.2 3.2 2.6 2.6 2.6 2.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.2 5.2 5.4 5.2 5.4 5.4 5.4 5.4
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None
Act Effct Green (s) 16.0 16.0 31.4 16.0 77.0 73.3 67.0 60.8
Actuated g/C Ratio 0.15 0.15 0.29 0.15 0.70 0.67 0.61 0.55
v/c Ratio 0.10 0.03 0.15 0.62 0.52 0.78 0.14 0.73
Control Delay 48.8 48.1 6.7 62.1 17.8 19.9 11.4 23.8
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 48.8 48.1 6.7 62.1 17.8 19.9 11.4 23.8
LOS D D A E B B B C
Approach Delay 17.6 62.1 19.8 23.6
Approach LOS B E B C
Queue Length 50th (ft) 9 5 0 69 24 283 3 314
Queue Length 95th (ft) 41 26 28 #208 #142 #1154 25 #770

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 20
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 38.0
Total Split (s) 38.0
Total Split (%) 25%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 21
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 277 237 467 1153
Turn Bay Length (ft) 150 400 160
Base Capacity (vph) 205 346 515 235 286 2248 167 2108
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.08 0.03 0.14 0.51 0.51 0.78 0.14 0.65
Intersection Summary
Area Type: Other
Cycle Length: 150
Actuated Cycle Length: 109.7
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.78
Intersection Signal Delay: 22.7 Intersection LOS: C
Intersection Capacity Utilization 77.4% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 7: S 32nd Street & Harvard Avenue

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 22
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 23
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 1 350 22 63 232 4 17 13 69 7 72 24
Future Volume (vph) 1 350 22 63 232 4 17 13 69 7 72 24
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 1% 1% 2% -2%
Satd. Flow (prot) 0 1633 0 0 1636 0 0 1687 0 0 1667 0
Flt Permitted 0.990 0.991 0.997
Satd. Flow (perm) 0 1633 0 0 1636 0 0 1687 0 0 1667 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 426 373 515 207
Travel Time (s) 11.6 10.2 14.0 5.6
Confl. Peds. (#/hr) 1 1 3 1 1 3
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Heavy Vehicles (%) 0% 3% 9% 2% 3% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 414 0 0 332 0 0 110 0 0 115 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 56.7% ICU Level of Service B
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 24
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 1 350 22 63 232 4 17 13 69 7 72 24
Future Volume (Veh/h) 1 350 22 63 232 4 17 13 69 7 72 24
Sign Control Free Free Stop Stop
Grade 1% 1% 2% -2%
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Hourly flow rate (vph) 1 389 24 70 258 4 19 14 77 8 80 27
Pedestrians 3 1 1
Lane Width (ft) 12.0 12.0 12.0
Walking Speed (ft/s) 3.5 3.5 3.5
Percent Blockage 0 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 373
pX, platoon unblocked 0.98 0.98 0.98 0.98 0.98 0.98
vC, conflicting volume 262 414 874 806 403 888 816 263
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 241 414 864 794 403 878 805 242
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 94 90 95 88 96 73 97
cM capacity (veh/h) 1315 1144 197 297 650 216 294 786
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 414 332 110 115
Volume Left 1 70 19 8
Volume Right 24 4 77 27
cSH 1315 1144 420 335
Volume to Capacity 0.00 0.06 0.26 0.34
Queue Length 95th (ft) 0 5 26 37
Control Delay (s) 0.0 2.2 16.6 21.3
Lane LOS A A C C
Approach Delay (s) 0.0 2.2 16.6 21.3
Approach LOS C C
Intersection Summary
Average Delay 5.2
Intersection Capacity Utilization 56.7% ICU Level of Service B
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 25
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 4.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 350 22 63 232 4 17 13 69 7 72 24
Future Vol, veh/h 1 350 22 63 232 4 17 13 69 7 72 24
Conflicting Peds, #/hr 0 0 1 1 0 0 3 0 1 1 0 3
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 1 - - 1 - - 2 - - -2 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 0 3 9 2 3 0 0 0 0 0 0 0
Mvmt Flow 1 389 24 70 258 4 19 14 77 8 80 27

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 262 0 0 414 0 0 861 806 403 850 816 263
Stage 1 - - - - - - 404 404 - 400 400 -
Stage 2 - - - - - - 457 402 - 450 416 -
Critical Hdwy 4.3 - - 4.3 - - 7.5 6.9 6.4 6.7 6.1 6
Critical Hdwy Stg 1 - - - - - - 6.5 5.9 - 5.7 5.1 -
Critical Hdwy Stg 2 - - - - - - 6.5 5.9 - 5.7 5.1 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 977 - - 865 - - 280 291 671 344 343 837
Stage 1 - - - - - - 681 576 - 749 633 -
Stage 2 - - - - - - 632 577 - 706 623 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 977 - - 864 - - 201 263 670 270 310 835
Mov Cap-2 Maneuver - - - - - - 201 263 - 270 310 -
Stage 1 - - - - - - 680 575 - 748 573 -
Stage 2 - - - - - - 475 522 - 608 622 -

Approach EB WB NB SB
HCM Control Delay, s 0 2 16.7 19.7
HCM LOS C C

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 418 977 - - 864 - - 359
HCM Lane V/C Ratio 0.263 0.001 - - 0.081 - - 0.319
HCM Control Delay (s) 16.7 8.7 0 - 9.5 0 - 19.7
HCM Lane LOS C A A - A A - C
HCM 95th %tile Q(veh) 1 0 - - 0.3 - - 1.3

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 26
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 5 407 11 26 276 3 13 4 18 3 6 18
Future Volume (vph) 5 407 11 26 276 3 13 4 18 3 6 18
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Grade (%) -1% 0% -2% -1%
Satd. Flow (prot) 0 1567 0 0 1743 0 0 1467 0 0 1384 0
Flt Permitted 0.997 0.952 0.912 0.959
Satd. Flow (perm) 0 1564 0 0 1666 0 0 1360 0 0 1332 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 2 1 20 20
Link Speed (mph) 25 25 25 25
Link Distance (ft) 373 270 277 210
Travel Time (s) 10.2 7.4 7.6 5.7
Confl. Peds. (#/hr) 4 1 1 4 1 2 2 1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 20% 3% 9% 0% 3% 0% 0% 0% 0% 0% 0% 7%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 459 0 0 331 0 0 38 0 0 30 0
Turn Type Perm NA Perm NA Perm NA Perm NA
Protected Phases 2 6 8 4
Permitted Phases 2 6 8 4
Detector Phase 2 2 6 6 8 8 4 4
Switch Phase
Minimum Initial (s) 30.0 30.0 30.0 30.0 3.0 3.0 3.0 3.0
Minimum Split (s) 35.0 35.0 35.0 35.0 7.6 7.6 7.6 7.6
Total Split (s) 35.0 35.0 35.0 35.0 10.0 10.0 10.0 10.0
Total Split (%) 43.8% 43.8% 43.8% 43.8% 12.5% 12.5% 12.5% 12.5%
Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
All-Red Time (s) 2.0 2.0 2.0 2.0 1.6 1.6 1.6 1.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 4.0 4.0 3.6 3.6
Lead/Lag
Lead-Lag Optimize?
Recall Mode Min Min Min Min None None None None
Act Effct Green (s) 43.0 43.0 6.8 6.8
Actuated g/C Ratio 0.81 0.81 0.13 0.13
v/c Ratio 0.36 0.24 0.20 0.16
Control Delay 9.2 7.5 19.7 18.1
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 9.2 7.5 19.7 18.1
LOS A A B B
Approach Delay 9.2 7.5 19.7 18.1
Approach LOS A A B B
Queue Length 50th (ft) 0 0 3 2
Queue Length 95th (ft) #340 200 37 30
Internal Link Dist (ft) 293 190 197 130
Turn Bay Length (ft)
Base Capacity (vph) 1275 1358 192 188

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 27
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 9.0
Minimum Split (s) 35.0
Total Split (s) 35.0
Total Split (%) 44%
Yellow Time (s) 2.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 28
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.36 0.24 0.20 0.16
Intersection Summary
Area Type: Other
Cycle Length: 80
Actuated Cycle Length: 52.8
Natural Cycle: 80
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.36
Intersection Signal Delay: 9.3 Intersection LOS: A
Intersection Capacity Utilization 44.7% ICU Level of Service A
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 9: 29th Street & Market Street

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 29
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: A.M. Peak Hour

Lane Group Ø9
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 30
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 26 173 202 20 202 3 0 0 213 3 0 50
Future Volume (vph) 26 173 202 20 202 3 0 0 213 3 0 50
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 11 11 11 12 12 12
Grade (%) 0% 0% -2% 0%
Storage Length (ft) 0 150 0 0 0 0 0 0
Storage Lanes 0 1 0 0 1 0 0 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 0 1825 1615 0 1830 0 1855 1577 0 0 1652 0
Flt Permitted 0.994 0.995 0.997
Satd. Flow (perm) 0 1825 1615 0 1830 0 1855 1577 0 0 1652 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 325 227 190 155
Travel Time (s) 8.9 6.2 5.2 4.2
Confl. Peds. (#/hr) 2 2 1 1
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Heavy Vehicles (%) 0% 4% 0% 0% 3% 33% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 214 217 0 242 0 0 229 0 0 57 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 45.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 1
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 26 173 202 20 202 3 0 0 213 3 0 50
Future Volume (Veh/h) 26 173 202 20 202 3 0 0 213 3 0 50
Sign Control Free Free Stop Stop
Grade 0% 0% -2% 0%
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Hourly flow rate (vph) 28 186 217 22 217 3 0 0 229 3 0 54
Pedestrians 1 2
Lane Width (ft) 12.0 11.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 325
pX, platoon unblocked
vC, conflicting volume 220 405 562 508 188 734 724 220
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 220 405 562 508 188 734 724 220
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 98 98 100 100 73 99 100 93
cM capacity (veh/h) 1361 1163 398 452 858 240 340 824
Direction, Lane # EB 1 EB 2 WB 1 NB 1 NB 2 SB 1
Volume Total 214 217 242 0 229 57
Volume Left 28 0 22 0 0 3
Volume Right 0 217 3 0 229 54
cSH 1361 1700 1163 1700 858 731
Volume to Capacity 0.02 0.13 0.02 0.00 0.27 0.08
Queue Length 95th (ft) 2 0 1 0 27 6
Control Delay (s) 1.2 0.0 0.9 0.0 10.7 10.3
Lane LOS A A A B B
Approach Delay (s) 0.6 0.9 10.7 10.3
Approach LOS B B
Intersection Summary
Average Delay 3.7
Intersection Capacity Utilization 45.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 2
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 3.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 26 173 202 20 202 3 0 0 213 3 0 50
Future Vol, veh/h 26 173 202 20 202 3 0 0 213 3 0 50
Conflicting Peds, #/hr 0 0 2 2 0 0 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 150 - - - 0 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - -2 - - 0 -
Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93
Heavy Vehicles, % 0 4 0 0 3 33 0 0 0 0 0 0
Mvmt Flow 28 186 217 22 217 3 0 0 229 3 0 54

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 220 0 0 405 0 0 535 508 188 728 724 220
Stage 1 - - - - - - 244 244 - 263 263 -
Stage 2 - - - - - - 291 264 - 465 461 -
Critical Hdwy 4.3 - - 4.3 - - 6.7 6.1 6 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 5.7 5.1 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 5.7 5.1 - 6.1 5.5 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1010 - - 872 - - 550 498 919 381 354 873
Stage 1 - - - - - - 901 727 - 856 694 -
Stage 2 - - - - - - 852 714 - 658 569 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1010 - - 870 - - 489 465 917 272 330 872
Mov Cap-2 Maneuver - - - - - - 489 465 - 272 330 -
Stage 1 - - - - - - 866 699 - 824 674 -
Stage 2 - - - - - - 776 693 - 475 547 -

Approach EB WB NB SB
HCM Control Delay, s 0.6 0.8 10.2 10
HCM LOS B B

Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 917 1010 - - 870 - - 775
HCM Lane V/C Ratio - 0.25 0.028 - - 0.025 - - 0.074
HCM Control Delay (s) 0 10.2 8.7 0 - 9.2 0 - 10
HCM Lane LOS A B A A - A A - B
HCM 95th %tile Q(veh) - 1 0.1 - - 0.1 - - 0.2

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 3
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 269 162 164 139 96 18 164 934 134 102 938 203
Future Volume (vph) 269 162 164 139 96 18 164 934 134 102 938 203
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 12 12 14 10 10 10 11 11 11 10 11 11
Grade (%) -1% -1% 1% -1%
Storage Length (ft) 250 250 150 0 640 0 110 0
Storage Lanes 1 1 1 0 1 0 1 1
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1685 1809 1562 1588 1597 0 1566 3158 0 1458 3257 1472
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1675 1809 1537 1574 1597 0 1566 3158 0 1452 3257 1472
Right Turn on Red No No Yes Yes
Satd. Flow (RTOR) 11 201
Link Speed (mph) 35 25 35 35
Link Distance (ft) 525 325 1233 312
Travel Time (s) 10.2 8.9 24.0 6.1
Confl. Peds. (#/hr) 3 3 3 3 3 3
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 2% 0% 5% 1% 2% 7% 5% 2% 1% 10% 2% 1%
Shared Lane Traffic (%)
Lane Group Flow (vph) 292 176 178 151 124 0 178 1161 0 111 1020 221
Turn Type Split NA pm+ov Split NA Prot NA Prot NA pm+ov
Protected Phases 4 4 5 8 8 5 2 1 6 4
Permitted Phases 4 6
Detector Phase 4 4 5 8 8 5 2 1 6 4
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 10.0 7.0 10.0 7.0
Minimum Split (s) 13.0 13.0 13.5 13.1 13.1 13.5 16.5 13.5 16.5 13.0
Total Split (s) 23.0 23.0 18.0 16.0 16.0 18.0 44.0 15.0 41.0 23.0
Total Split (%) 16.4% 16.4% 12.9% 11.4% 11.4% 12.9% 31.4% 10.7% 29.3% 16.4%
Yellow Time (s) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
All-Red Time (s) 2.3 2.3 2.8 2.4 2.4 2.8 2.8 2.8 2.8 2.3
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.0 5.0 5.5 5.1 5.1 5.5 5.5 5.5 5.5 5.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None None
Act Effct Green (s) 18.4 18.4 30.6 11.1 11.1 12.8 39.3 9.7 36.2 60.2
Actuated g/C Ratio 0.17 0.17 0.29 0.10 0.10 0.12 0.37 0.09 0.34 0.57
v/c Ratio 1.01 0.56 0.40 0.92 0.75 0.95 0.99 0.84 0.92 0.24
Control Delay 99.3 50.8 21.5 99.1 74.5 102.5 57.9 93.8 48.5 4.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 99.3 50.8 21.5 99.1 74.5 102.5 57.9 93.8 48.5 4.0
LOS F D C F E F E F D A
Approach Delay 64.7 88.0 63.8 45.0
Approach LOS E F E D
Queue Length 50th (ft) 182 100 56 94 76 111 355 69 306 5
Queue Length 95th (ft) #536 #268 125 #316 #251 #359 #860 #245 #740 62

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 4
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 7.0
Minimum Split (s) 42.0
Total Split (s) 42.0
Total Split (%) 30%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 5
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 445 245 1153 232
Turn Bay Length (ft) 250 250 150 640 110
Base Capacity (vph) 290 312 445 165 166 187 1173 132 1108 920
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 1.01 0.56 0.40 0.92 0.75 0.95 0.99 0.84 0.92 0.24
Intersection Summary
Area Type: Other
Cycle Length: 140
Actuated Cycle Length: 106.4
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 1.01
Intersection Signal Delay: 58.8 Intersection LOS: E
Intersection Capacity Utilization 77.6% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 2: S 32nd Street & Trindle Road/Chestnut Street

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 6
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 7
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (vph) 287 115 10 254 14 7
Future Volume (vph) 287 115 10 254 14 7
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 0% 0% -1%
Satd. Flow (prot) 1800 0 0 1853 1765 0
Flt Permitted 0.998 0.968
Satd. Flow (perm) 1800 0 0 1853 1765 0
Link Speed (mph) 25 25 25
Link Distance (ft) 227 445 204
Travel Time (s) 6.2 12.1 5.6
Confl. Peds. (#/hr) 1
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79
Heavy Vehicles (%) 2% 0% 10% 2% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 509 0 0 335 27 0
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 32.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 8
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Movement EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (veh/h) 287 115 10 254 14 7
Future Volume (Veh/h) 287 115 10 254 14 7
Sign Control Free Free Stop
Grade 0% 0% -1%
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79
Hourly flow rate (vph) 363 146 13 322 18 9
Pedestrians 1
Lane Width (ft) 12.0
Walking Speed (ft/s) 3.5
Percent Blockage 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 552
pX, platoon unblocked
vC, conflicting volume 509 785 436
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 509 785 436
tC, single (s) 4.2 6.4 6.2
tC, 2 stage (s)
tF (s) 2.3 3.5 3.3
p0 queue free % 99 95 99
cM capacity (veh/h) 1016 359 625
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 509 335 27
Volume Left 0 13 18
Volume Right 146 0 9
cSH 1700 1016 419
Volume to Capacity 0.30 0.01 0.06
Queue Length 95th (ft) 0 1 5
Control Delay (s) 0.0 0.5 14.2
Lane LOS A B
Approach Delay (s) 0.0 0.5 14.2
Approach LOS B
Intersection Summary
Average Delay 0.6
Intersection Capacity Utilization 32.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 9
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 0.6
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 287 115 10 254 14 7
Future Vol, veh/h 287 115 10 254 14 7
Conflicting Peds, #/hr 0 0 0 0 1 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 -1 -
Peak Hour Factor 79 79 79 79 79 79
Heavy Vehicles, % 2 0 10 2 0 0
Mvmt Flow 363 146 13 322 18 9

Major/Minor Major1 Major2 Minor1


Conflicting Flow All 0 0 509 0 785 436
Stage 1 - - - - 436 -
Stage 2 - - - - 349 -
Critical Hdwy - - 4.4 - 6.2 6.1
Critical Hdwy Stg 1 - - - - 5.2 -
Critical Hdwy Stg 2 - - - - 5.2 -
Follow-up Hdwy - - 3.1 - 3 3.1
Pot Cap-1 Maneuver - - 770 - 423 665
Stage 1 - - - - 762 -
Stage 2 - - - - 835 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 770 - 414 665
Mov Cap-2 Maneuver - - - - 414 -
Stage 1 - - - - 762 -
Stage 2 - - - - 817 -

Approach EB WB NB
HCM Control Delay, s 0 0.4 13
HCM LOS B

Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT


Capacity (veh/h) 474 - - 770 -
HCM Lane V/C Ratio 0.056 - - 0.016 -
HCM Control Delay (s) 13 - - 9.8 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.2 - - 0.1 -

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 10
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 76 204 8 18 188 5 13 10 5 2 29 48
Future Volume (vph) 76 204 8 18 188 5 13 10 5 2 29 48
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 0% 1% -1% -1%
Satd. Flow (prot) 0 1855 0 0 1861 0 0 1693 0 0 1681 0
Flt Permitted 0.987 0.996 0.978 0.998
Satd. Flow (perm) 0 1855 0 0 1861 0 0 1693 0 0 1681 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 445 215 319 515
Travel Time (s) 12.1 5.9 8.7 14.0
Confl. Peds. (#/hr) 1 8 8 1
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 17% 0% 0% 50% 7% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 360 0 0 264 0 0 35 0 0 99 0
Sign Control Stop Stop Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 44.9% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 11
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Stop Stop
Traffic Volume (vph) 76 204 8 18 188 5 13 10 5 2 29 48
Future Volume (vph) 76 204 8 18 188 5 13 10 5 2 29 48
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Hourly flow rate (vph) 95 255 10 23 235 6 16 13 6 3 36 60
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total (vph) 360 264 35 99
Volume Left (vph) 95 23 16 3
Volume Right (vph) 10 6 6 60
Hadj (s) 0.05 0.02 0.12 -0.29
Departure Headway (s) 4.6 4.7 5.7 5.1
Degree Utilization, x 0.46 0.35 0.05 0.14
Capacity (veh/h) 745 731 547 621
Control Delay (s) 11.6 10.2 9.0 9.0
Approach Delay (s) 11.6 10.2 9.0 9.0
Approach LOS B B A A
Intersection Summary
Delay 10.6
Level of Service B
Intersection Capacity Utilization 44.9% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 12
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Intersection
Intersection Delay, s/veh 10.8
Intersection LOS B

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 76 204 8 18 188 5 13 10 5 2 29 48
Future Vol, veh/h 76 204 8 18 188 5 13 10 5 2 29 48
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles, % 0 1 0 0 1 0 17 0 0 50 7 0
Mvmt Flow 95 255 10 23 235 6 16 13 6 3 36 60
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 11.6 10.2 9.2 10.1
HCM LOS B B A B

Lane NBLn1 EBLn1 WBLn1 SBLn1


Vol Left, % 46% 26% 9% 3%
Vol Thru, % 36% 71% 89% 37%
Vol Right, % 18% 3% 2% 61%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 28 288 211 79
LT Vol 13 76 18 2
Through Vol 10 204 188 29
RT Vol 5 8 5 48
Lane Flow Rate 35 360 264 99
Geometry Grp 1 1 1 1
Degree of Util (X) 0.056 0.463 0.344 0.161
Departure Headway (Hd) 5.77 4.628 4.7 5.86
Convergence, Y/N Yes Yes Yes Yes
Cap 614 774 762 607
Service Time 3.866 2.677 2.755 3.944
HCM Lane V/C Ratio 0.057 0.465 0.346 0.163
HCM Control Delay 9.2 11.6 10.2 10.1
HCM Lane LOS A B B B
HCM 95th-tile Q 0.2 2.5 1.5 0.6

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 13
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 4 0 0 0 0 0 0 26 0 0 127 1
Future Volume (vph) 4 0 0 0 0 0 0 26 0 0 127 1
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 12 12 12 12 12 12 12 12 12
Grade (%) -5% 0% 1% 0%
Satd. Flow (prot) 0 1727 0 0 1900 0 0 1890 0 0 1898 0
Flt Permitted 0.950
Satd. Flow (perm) 0 1727 0 0 1900 0 0 1890 0 0 1898 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 151 181 206 204
Travel Time (s) 4.1 4.9 5.6 5.6
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 4 0 0 0 0 0 28 0 0 138 0
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 16.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 14
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 4 0 0 0 0 0 0 26 0 0 127 1
Future Volume (Veh/h) 4 0 0 0 0 0 0 26 0 0 127 1
Sign Control Stop Stop Free Free
Grade -5% 0% 1% 0%
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Hourly flow rate (vph) 4 0 0 0 0 0 0 28 0 0 137 1
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 166 166 138 166 166 28 138 28
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 166 166 138 166 166 28 138 28
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1
tC, 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 804 731 916 803 730 1053 1458 1599
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 4 0 28 138
Volume Left 4 0 0 0
Volume Right 0 0 0 1
cSH 804 1700 1458 1599
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 9.5 0.0 0.0 0.0
Lane LOS A A
Approach Delay (s) 9.5 0.0 0.0 0.0
Approach LOS A A
Intersection Summary
Average Delay 0.2
Intersection Capacity Utilization 16.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 15
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 0 0 0 0 0 0 26 0 0 127 1
Future Vol, veh/h 4 0 0 0 0 0 0 26 0 0 127 1
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - -5 - - 0 - - 1 - - 0 -
Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 4 0 0 0 0 0 0 28 0 0 137 1

Major/Minor Minor2 Minor1 Major1 Major2


Conflicting Flow All 166 166 138 166 166 28 138 0 0 28 0 0
Stage 1 138 138 - 28 28 - - - - - - -
Stage 2 28 28 - 138 138 - - - - - - -
Critical Hdwy 6.1 5.5 5.7 7.1 6.5 6.2 4.3 - - 4.3 - -
Critical Hdwy Stg 1 5.1 4.5 - 6.1 5.5 - - - - - - -
Critical Hdwy Stg 2 5.1 4.5 - 6.1 5.5 - - - - - - -
Follow-up Hdwy 3 4 3.1 3 4 3.1 3 - - 3 - -
Pot Cap-1 Maneuver 970 765 990 926 730 1120 1077 - - 1174 - -
Stage 1 1045 817 - 1158 876 - - - - - - -
Stage 2 1167 883 - 1005 786 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 970 765 990 926 730 1120 1077 - - 1174 - -
Mov Cap-2 Maneuver 970 765 - 926 730 - - - - - - -
Stage 1 1045 817 - 1158 876 - - - - - - -
Stage 2 1167 883 - 1005 786 - - - - - - -

Approach EB WB NB SB
HCM Control Delay, s 8.7 0 0 0
HCM LOS A A

Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1077 - - 970 - 1174 - -
HCM Lane V/C Ratio - - - 0.004 - - - -
HCM Control Delay (s) 0 - - 8.7 0 0 - -
HCM Lane LOS A - - A A A - -
HCM 95th %tile Q(veh) 0 - - 0 - 0 - -

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 16
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 2 8 1 1 60 0 0 0 3 0 0 1
Future Volume (vph) 2 8 1 1 60 0 0 0 3 0 0 1
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 11 11
Grade (%) 3% -4% 0% -3%
Satd. Flow (prot) 0 1831 0 0 1619 0 0 1644 0 0 1613 0
Flt Permitted 0.992 0.999
Satd. Flow (perm) 0 1831 0 0 1619 0 0 1644 0 0 1613 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 131 186 162 179
Travel Time (s) 3.6 5.1 4.4 4.9
Confl. Peds. (#/hr) 2 2 1 1
Peak Hour Factor 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58
Heavy Vehicles (%) 0% 0% 0% 0% 20% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 19 0 0 105 0 0 5 0 0 2 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 14.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 17
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 2 8 1 1 60 0 0 0 3 0 0 1
Future Volume (Veh/h) 2 8 1 1 60 0 0 0 3 0 0 1
Sign Control Free Free Stop Stop
Grade 3% -4% 0% -3%
Peak Hour Factor 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58
Hourly flow rate (vph) 3 14 2 2 103 0 0 0 5 0 0 2
Pedestrians 1 2
Lane Width (ft) 12.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 103 18 133 130 17 133 131 104
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 103 18 133 130 17 133 131 104
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 1502 1609 836 760 1066 836 760 955
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 19 105 5 2
Volume Left 3 2 0 0
Volume Right 2 0 5 2
cSH 1502 1609 1066 955
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 1.2 0.1 8.4 8.8
Lane LOS A A A A
Approach Delay (s) 1.2 0.1 8.4 8.8
Approach LOS A A
Intersection Summary
Average Delay 0.7
Intersection Capacity Utilization 14.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 18
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 0.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 2 8 1 1 60 0 0 0 3 0 0 1
Future Vol, veh/h 2 8 1 1 60 0 0 0 3 0 0 1
Conflicting Peds, #/hr 0 0 2 2 0 0 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 3 - - -4 - - 0 - - -3 -
Peak Hour Factor 58 58 58 58 58 58 58 58 58 58 58 58
Heavy Vehicles, % 0 0 0 0 20 0 0 0 0 0 0 0
Mvmt Flow 3 14 2 2 103 0 0 0 5 0 0 2

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 103 0 0 18 0 0 132 130 17 131 131 104
Stage 1 - - - - - - 23 23 - 107 107 -
Stage 2 - - - - - - 109 107 - 24 24 -
Critical Hdwy 4.3 - - 4.3 - - 7.1 6.5 6.2 6.5 5.9 5.9
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 5.5 4.9 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 5.5 4.9 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1107 - - 1183 - - 977 764 1136 1000 780 1024
Stage 1 - - - - - - 1165 880 - 1065 825 -
Stage 2 - - - - - - 1044 811 - 1168 883 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1107 - - 1181 - - 969 759 1134 992 775 1023
Mov Cap-2 Maneuver - - - - - - 969 759 - 992 775 -
Stage 1 - - - - - - 1159 876 - 1062 823 -
Stage 2 - - - - - - 1039 809 - 1159 879 -

Approach EB WB NB SB
HCM Control Delay, s 1.5 0.1 8.2 8.5
HCM LOS A A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1134 1107 - - 1181 - - 1023
HCM Lane V/C Ratio 0.005 0.003 - - 0.001 - - 0.002
HCM Control Delay (s) 8.2 8.3 0 - 8.1 0 - 8.5
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0 0 - - 0 - - 0

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 19
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 117 29 289 137 25 5 306 1130 16 9 1181 58
Future Volume (vph) 117 29 289 137 25 5 306 1130 16 9 1181 58
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 14 14 14 12 12 12 12 12 12 12 12 12
Grade (%) -2% 0% -1% -2%
Storage Length (ft) 150 0 0 0 400 0 160 0
Storage Lanes 1 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1771 1939 1632 0 1722 0 1702 3297 0 1727 3366 0
Flt Permitted 0.740 0.743 0.072 0.219
Satd. Flow (perm) 1378 1939 1632 0 1332 0 129 3297 0 398 3366 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 307 1 1 4
Link Speed (mph) 25 25 35 35
Link Distance (ft) 357 317 547 1233
Travel Time (s) 9.7 8.6 10.7 24.0
Confl. Peds. (#/hr) 1 1
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 4% 0% 1% 0% 0% 0% 1% 4% 6% 0% 2% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 124 31 307 0 178 0 326 1219 0 10 1318 0
Turn Type Perm NA pm+ov Perm NA pm+pt NA pm+pt NA
Protected Phases 4 5 8 5 2 1 6
Permitted Phases 4 4 8 2 6
Detector Phase 4 4 5 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0
Minimum Split (s) 24.2 24.2 11.4 24.2 24.2 11.4 24.4 11.4 24.4
Total Split (s) 24.2 24.2 24.0 24.2 24.2 24.0 66.4 11.4 53.8
Total Split (%) 17.3% 17.3% 17.1% 17.3% 17.3% 17.1% 47.4% 8.1% 38.4%
Yellow Time (s) 3.0 3.0 3.8 3.0 3.0 3.8 3.8 3.8 3.8
All-Red Time (s) 3.2 3.2 2.6 3.2 3.2 2.6 2.6 2.6 2.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.2 5.2 5.4 5.2 5.4 5.4 5.4 5.4
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None
Act Effct Green (s) 19.3 19.3 42.6 19.3 73.6 71.8 55.3 49.2
Actuated g/C Ratio 0.18 0.18 0.39 0.18 0.67 0.66 0.50 0.45
v/c Ratio 0.51 0.09 0.37 0.76 0.91 0.56 0.04 0.87
Control Delay 52.2 43.2 3.5 65.4 61.4 15.6 12.2 36.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 52.2 43.2 3.5 65.4 61.4 15.6 12.2 36.1
LOS D D A E E B B D
Approach Delay 19.2 65.4 25.3 35.9
Approach LOS B E C D
Queue Length 50th (ft) 73 17 0 109 157 166 2 375
Queue Length 95th (ft) #192 57 40 #321 #506 616 14 #873

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 20
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 38.0
Total Split (s) 38.0
Total Split (%) 27%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 21
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 277 237 467 1153
Turn Bay Length (ft) 150 400 160
Base Capacity (vph) 242 341 822 235 357 2159 274 1512
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.51 0.09 0.37 0.76 0.91 0.56 0.04 0.87
Intersection Summary
Area Type: Other
Cycle Length: 140
Actuated Cycle Length: 109.6
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.91
Intersection Signal Delay: 30.5 Intersection LOS: C
Intersection Capacity Utilization 84.0% ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 7: S 32nd Street & Harvard Avenue

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 22
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 23
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 7 397 16 34 404 7 51 8 23 6 25 21
Future Volume (vph) 7 397 16 34 404 7 51 8 23 6 25 21
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 1% 1% 2% -2%
Satd. Flow (prot) 0 1660 0 0 1676 0 0 1644 0 0 1594 0
Flt Permitted 0.999 0.996 0.970 0.994
Satd. Flow (perm) 0 1660 0 0 1676 0 0 1644 0 0 1594 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 426 373 515 207
Travel Time (s) 11.6 10.2 14.0 5.6
Confl. Peds. (#/hr) 1 1 1 1 1 3 3 1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 0% 2% 0% 0% 1% 0% 11% 0% 0% 0% 4% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 457 0 0 484 0 0 89 0 0 57 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 59.2% ICU Level of Service B
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 24
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 7 397 16 34 404 7 51 8 23 6 25 21
Future Volume (Veh/h) 7 397 16 34 404 7 51 8 23 6 25 21
Sign Control Free Free Stop Stop
Grade 1% 1% 2% -2%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 8 432 17 37 439 8 55 9 25 7 27 23
Pedestrians 1 3 1 1
Lane Width (ft) 12.0 12.0 12.0 12.0
Walking Speed (ft/s) 3.5 3.5 3.5 3.5
Percent Blockage 0 0 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 373
pX, platoon unblocked 0.91 0.91 0.91 0.91 0.91 0.91
vC, conflicting volume 448 450 1012 980 444 1007 984 445
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 340 450 962 926 444 956 931 337
tC, single (s) 4.1 4.1 7.2 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.6 4.0 3.3 3.5 4.0 3.3
p0 queue free % 99 97 68 96 96 96 88 96
cM capacity (veh/h) 1115 1120 174 235 615 195 230 643
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 457 484 89 57
Volume Left 8 37 55 7
Volume Right 17 8 25 23
cSH 1115 1120 226 302
Volume to Capacity 0.01 0.03 0.39 0.19
Queue Length 95th (ft) 1 3 44 17
Control Delay (s) 0.2 1.0 31.0 19.7
Lane LOS A A D C
Approach Delay (s) 0.2 1.0 31.0 19.7
Approach LOS D C
Intersection Summary
Average Delay 4.1
Intersection Capacity Utilization 59.2% ICU Level of Service B
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 25
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 3.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 397 16 34 404 7 51 8 23 6 25 21
Future Vol, veh/h 7 397 16 34 404 7 51 8 23 6 25 21
Conflicting Peds, #/hr 1 0 1 1 0 1 1 0 3 3 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 1 - - 1 - - 2 - - -2 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 0 2 0 0 1 0 11 0 0 0 4 0
Mvmt Flow 8 432 17 37 439 8 55 9 25 7 27 23

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 448 0 0 450 0 0 1001 980 445 995 984 445
Stage 1 - - - - - - 458 458 - 518 518 -
Stage 2 - - - - - - 543 522 - 477 466 -
Critical Hdwy 4.3 - - 4.3 - - 7.61 6.9 6.4 6.7 6.14 6
Critical Hdwy Stg 1 - - - - - - 6.61 5.9 - 5.7 5.14 -
Critical Hdwy Stg 2 - - - - - - 6.61 5.9 - 5.7 5.14 -
Follow-up Hdwy 3 - - 3 - - 3.1 4 3.1 3 4.036 3.1
Pot Cap-1 Maneuver 842 - - 841 - - 209 226 634 277 275 666
Stage 1 - - - - - - 606 542 - 651 561 -
Stage 2 - - - - - - 536 504 - 683 589 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 841 - - 840 - - 175 210 632 243 255 665
Mov Cap-2 Maneuver - - - - - - 175 210 - 243 255 -
Stage 1 - - - - - - 598 534 - 642 527 -
Stage 2 - - - - - - 462 474 - 635 581 -

Approach EB WB NB SB
HCM Control Delay, s 0.2 0.7 31.3 17.8
HCM LOS D C

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 224 841 - - 840 - - 337
HCM Lane V/C Ratio 0.398 0.009 - - 0.044 - - 0.168
HCM Control Delay (s) 31.3 9.3 0 - 9.5 0 - 17.8
HCM Lane LOS D A A - A A - C
HCM 95th %tile Q(veh) 1.8 0 - - 0.1 - - 0.6

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 26
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 5 418 4 19 405 10 45 8 8 4 0 18
Future Volume (vph) 5 418 4 19 405 10 45 8 8 4 0 18
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Grade (%) -1% 0% -2% -1%
Satd. Flow (prot) 0 1593 0 0 1774 0 0 1551 0 0 1433 0
Flt Permitted 0.996 0.977 0.771 0.951
Satd. Flow (perm) 0 1588 0 0 1736 0 0 1239 0 0 1375 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 1 2 8 55
Link Speed (mph) 25 25 25 25
Link Distance (ft) 373 270 277 210
Travel Time (s) 10.2 7.4 7.6 5.7
Confl. Peds. (#/hr) 1 2 2 1
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 0% 2% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 454 0 0 462 0 0 66 0 0 23 0
Turn Type Perm NA Perm NA Perm NA Perm NA
Protected Phases 2 6 8 4
Permitted Phases 2 6 8 4
Detector Phase 2 2 6 6 8 8 4 4
Switch Phase
Minimum Initial (s) 30.0 30.0 30.0 30.0 3.0 3.0 3.0 3.0
Minimum Split (s) 35.0 35.0 35.0 35.0 7.6 7.6 7.6 7.6
Total Split (s) 35.0 35.0 35.0 35.0 10.0 10.0 10.0 10.0
Total Split (%) 43.8% 43.8% 43.8% 43.8% 12.5% 12.5% 12.5% 12.5%
Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
All-Red Time (s) 2.0 2.0 2.0 2.0 1.6 1.6 1.6 1.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 4.0 4.0 3.6 3.6
Lead/Lag
Lead-Lag Optimize?
Recall Mode Min Min Min Min None None None None
Act Effct Green (s) 39.6 39.6 6.7 6.7
Actuated g/C Ratio 0.71 0.71 0.12 0.12
v/c Ratio 0.40 0.38 0.43 0.11
Control Delay 10.2 9.4 34.1 3.3
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 10.2 9.4 34.1 3.3
LOS B A C A
Approach Delay 10.2 9.4 34.1 3.3
Approach LOS B A C A
Queue Length 50th (ft) 35 35 14 0
Queue Length 95th (ft) #307 294 #88 6
Internal Link Dist (ft) 293 190 197 130
Turn Bay Length (ft)
Base Capacity (vph) 1122 1226 155 212

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 27
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 9.0
Minimum Split (s) 35.0
Total Split (s) 35.0
Total Split (%) 44%
Yellow Time (s) 2.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 28
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.40 0.38 0.43 0.11
Intersection Summary
Area Type: Other
Cycle Length: 80
Actuated Cycle Length: 56
Natural Cycle: 80
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.43
Intersection Signal Delay: 11.2 Intersection LOS: B
Intersection Capacity Utilization 52.3% ICU Level of Service A
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 9: 29th Street & Market Street

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 29
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: Weekday Midday P

Lane Group Ø9
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 30
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 21 217 134 14 305 1 0 0 138 1 0 43
Future Volume (vph) 21 217 134 14 305 1 0 0 138 1 0 43
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 11 11 11 12 12 12
Grade (%) 0% 0% -2% 0%
Storage Length (ft) 0 150 0 0 0 0 0 0
Storage Lanes 0 1 0 0 1 0 0 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 0 1875 1615 0 1896 0 1855 1577 0 0 1648 0
Flt Permitted 0.996 0.998 0.999
Satd. Flow (perm) 0 1875 1615 0 1896 0 1855 1577 0 0 1648 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 325 227 190 155
Travel Time (s) 8.9 6.2 5.2 4.2
Confl. Peds. (#/hr) 1 1 1 1
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Heavy Vehicles (%) 0% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 261 147 0 351 0 0 152 0 0 48 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 42.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 1
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 21 217 134 14 305 1 0 0 138 1 0 43
Future Volume (Veh/h) 21 217 134 14 305 1 0 0 138 1 0 43
Sign Control Free Free Stop Stop
Grade 0% 0% -2% 0%
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Hourly flow rate (vph) 23 238 147 15 335 1 0 0 152 1 0 47
Pedestrians 1 1
Lane Width (ft) 12.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 325
pX, platoon unblocked 0.95 0.95 0.95 0.95 0.95 0.95
vC, conflicting volume 337 385 698 651 238 802 798 338
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 337 326 655 606 171 765 760 338
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 98 99 100 100 82 100 100 93
cM capacity (veh/h) 1232 1182 330 381 834 244 311 708
Direction, Lane # EB 1 EB 2 WB 1 NB 1 NB 2 SB 1
Volume Total 261 147 351 0 152 48
Volume Left 23 0 15 0 0 1
Volume Right 0 147 1 0 152 47
cSH 1232 1700 1182 1700 834 681
Volume to Capacity 0.02 0.09 0.01 0.00 0.18 0.07
Queue Length 95th (ft) 1 0 1 0 17 6
Control Delay (s) 0.9 0.0 0.5 0.0 10.3 10.7
Lane LOS A A A B B
Approach Delay (s) 0.6 0.5 10.3 10.7
Approach LOS B B
Intersection Summary
Average Delay 2.6
Intersection Capacity Utilization 42.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 2
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 2.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 217 134 14 305 1 0 0 138 1 0 43
Future Vol, veh/h 21 217 134 14 305 1 0 0 138 1 0 43
Conflicting Peds, #/hr 1 0 0 0 0 1 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 150 - - - 0 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - -2 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 0 1 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 23 238 147 15 335 1 0 0 152 1 0 47

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 337 0 0 385 0 0 674 651 238 801 798 338
Stage 1 - - - - - - 284 284 - 367 367 -
Stage 2 - - - - - - 390 367 - 434 431 -
Critical Hdwy 4.3 - - 4.3 - - 6.7 6.1 6 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 5.7 5.1 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 5.7 5.1 - 6.1 5.5 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 920 - - 886 - - 447 420 864 339 321 748
Stage 1 - - - - - - 860 702 - 748 626 -
Stage 2 - - - - - - 758 652 - 685 586 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 919 - - 886 - - 401 397 864 268 304 747
Mov Cap-2 Maneuver - - - - - - 401 397 - 268 304 -
Stage 1 - - - - - - 832 679 - 723 612 -
Stage 2 - - - - - - 694 638 - 546 567 -

Approach EB WB NB SB
HCM Control Delay, s 0.5 0.4 10.1 10.4
HCM LOS B B

Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 864 919 - - 886 - - 718
HCM Lane V/C Ratio - 0.176 0.025 - - 0.017 - - 0.067
HCM Control Delay (s) 0 10.1 9 0 - 9.1 0 - 10.4
HCM Lane LOS A B A A - A A - B
HCM 95th %tile Q(veh) - 0.6 0.1 - - 0.1 - - 0.2

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 3
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 250 182 227 190 143 5 190 1276 108 66 1264 251
Future Volume (vph) 250 182 227 190 143 5 190 1276 108 66 1264 251
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 12 12 14 10 10 10 11 11 11 10 11 11
Grade (%) -1% -1% 1% -1%
Storage Length (ft) 250 250 150 0 640 0 110 0
Storage Lanes 1 1 1 0 1 0 1 1
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1702 1809 1640 1604 1663 0 1612 3181 0 1407 3290 1457
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1698 1809 1618 1600 1663 0 1612 3181 0 1403 3290 1457
Right Turn on Red No No Yes Yes
Satd. Flow (RTOR) 6 176
Link Speed (mph) 35 25 35 35
Link Distance (ft) 525 325 1233 312
Travel Time (s) 10.2 8.9 24.0 6.1
Confl. Peds. (#/hr) 1 1 1 1 2 2
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Heavy Vehicles (%) 1% 0% 0% 0% 1% 0% 2% 2% 2% 14% 1% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 255 186 232 194 151 0 194 1412 0 67 1290 256
Turn Type Split NA pm+ov Split NA Prot NA Prot NA pm+ov
Protected Phases 4 4 5 8 8 5 2 1 6 4
Permitted Phases 4 6
Detector Phase 4 4 5 8 8 5 2 1 6 4
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 10.0 7.0 10.0 7.0
Minimum Split (s) 13.0 13.0 13.5 13.1 13.1 13.5 16.5 13.5 16.5 13.0
Total Split (s) 22.0 22.0 19.0 19.0 19.0 19.0 53.5 13.5 48.0 22.0
Total Split (%) 14.7% 14.7% 12.7% 12.7% 12.7% 12.7% 35.7% 9.0% 32.0% 14.7%
Yellow Time (s) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
All-Red Time (s) 2.3 2.3 2.8 2.4 2.4 2.8 2.8 2.8 2.8 2.3
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.0 5.0 5.5 5.1 5.1 5.5 5.5 5.5 5.5 5.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None None
Act Effct Green (s) 17.3 17.3 30.5 14.1 14.1 13.7 48.8 8.1 43.2 66.1
Actuated g/C Ratio 0.15 0.15 0.26 0.12 0.12 0.12 0.42 0.07 0.37 0.57
v/c Ratio 1.01 0.69 0.54 1.00 0.75 1.02 1.06 0.68 1.06 0.28
Control Delay 109.4 63.0 28.4 115.8 73.3 122.2 73.8 87.5 77.6 6.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 109.4 63.0 28.4 115.8 73.3 122.2 73.8 87.5 77.6 6.5
LOS F E C F E F E F E A
Approach Delay 68.6 97.2 79.6 66.8
Approach LOS E F E E
Queue Length 50th (ft) 177 122 89 135 102 136 498 46 462 22
Queue Length 95th (ft) #506 #332 167 #407 #300 #411 #1108 #167 #1019 114

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 4
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 7.0
Minimum Split (s) 42.0
Total Split (s) 42.0
Total Split (%) 28%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 5
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 445 245 1153 232
Turn Bay Length (ft) 250 250 150 640 110
Base Capacity (vph) 252 268 427 194 202 190 1338 98 1222 903
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 1.01 0.69 0.54 1.00 0.75 1.02 1.06 0.68 1.06 0.28
Intersection Summary
Area Type: Other
Cycle Length: 150
Actuated Cycle Length: 116.4
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 1.06
Intersection Signal Delay: 74.4 Intersection LOS: E
Intersection Capacity Utilization 88.5% ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 2: S 32nd Street & Trindle Road/Chestnut Street

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 6
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 7
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (vph) 238 96 17 261 17 26
Future Volume (vph) 238 96 17 261 17 26
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 0% 0% -1%
Satd. Flow (prot) 1826 0 0 1894 1679 0
Flt Permitted 0.997 0.981
Satd. Flow (perm) 1826 0 0 1894 1679 0
Link Speed (mph) 25 25 25
Link Distance (ft) 227 445 204
Travel Time (s) 6.2 12.1 5.6
Confl. Peds. (#/hr) 1 1 2
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 0% 0% 0% 0% 0% 4%
Shared Lane Traffic (%)
Lane Group Flow (vph) 363 0 0 302 46 0
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 37.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 8
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Movement EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (veh/h) 238 96 17 261 17 26
Future Volume (Veh/h) 238 96 17 261 17 26
Sign Control Free Free Stop
Grade 0% 0% -1%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 259 104 18 284 18 28
Pedestrians 2 1
Lane Width (ft) 12.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 552
pX, platoon unblocked
vC, conflicting volume 364 634 312
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 364 634 312
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 99 96 96
cM capacity (veh/h) 1205 439 723
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 363 302 46
Volume Left 0 18 18
Volume Right 104 0 28
cSH 1700 1205 577
Volume to Capacity 0.21 0.01 0.08
Queue Length 95th (ft) 0 1 6
Control Delay (s) 0.0 0.6 11.8
Lane LOS A B
Approach Delay (s) 0.0 0.6 11.8
Approach LOS B
Intersection Summary
Average Delay 1.0
Intersection Capacity Utilization 37.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 9
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 238 96 17 261 17 26
Future Vol, veh/h 238 96 17 261 17 26
Conflicting Peds, #/hr 0 1 1 0 2 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 -1 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 0 0 0 0 0 4
Mvmt Flow 259 104 18 284 18 28

Major/Minor Major1 Major2 Minor1


Conflicting Flow All 0 0 364 0 634 312
Stage 1 - - - - 312 -
Stage 2 - - - - 322 -
Critical Hdwy - - 4.3 - 6.2 6.14
Critical Hdwy Stg 1 - - - - 5.2 -
Critical Hdwy Stg 2 - - - - 5.2 -
Follow-up Hdwy - - 3 - 3 3.1
Pot Cap-1 Maneuver - - 901 - 518 778
Stage 1 - - - - 868 -
Stage 2 - - - - 859 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 900 - 504 777
Mov Cap-2 Maneuver - - - - 504 -
Stage 1 - - - - 867 -
Stage 2 - - - - 837 -

Approach EB WB NB
HCM Control Delay, s 0 0.6 11.1
HCM LOS B

Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT


Capacity (veh/h) 640 - - 900 -
HCM Lane V/C Ratio 0.073 - - 0.021 -
HCM Control Delay (s) 11.1 - - 9.1 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.2 - - 0.1 -

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 10
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 82 178 5 23 197 10 5 19 7 7 31 55
Future Volume (vph) 82 178 5 23 197 10 5 19 7 7 31 55
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 0% 1% -1% -1%
Satd. Flow (prot) 0 1855 0 0 1838 0 0 1782 0 0 1750 0
Flt Permitted 0.985 0.995 0.992 0.996
Satd. Flow (perm) 0 1855 0 0 1838 0 0 1782 0 0 1750 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 445 215 319 515
Travel Time (s) 12.1 5.9 8.7 14.0
Confl. Peds. (#/hr) 4 7 7 4 3 7 7 3
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Heavy Vehicles (%) 0% 1% 0% 9% 1% 0% 0% 5% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 278 0 0 242 0 0 32 0 0 98 0
Sign Control Stop Stop Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 43.6% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 11
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Stop Stop
Traffic Volume (vph) 82 178 5 23 197 10 5 19 7 7 31 55
Future Volume (vph) 82 178 5 23 197 10 5 19 7 7 31 55
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 86 187 5 24 207 11 5 20 7 7 33 58
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total (vph) 278 242 32 98
Volume Left (vph) 86 24 5 7
Volume Right (vph) 5 11 7 58
Hadj (s) 0.06 0.02 -0.05 -0.34
Departure Headway (s) 4.6 4.6 5.2 4.8
Degree Utilization, x 0.35 0.31 0.05 0.13
Capacity (veh/h) 761 752 612 669
Control Delay (s) 10.1 9.6 8.5 8.5
Approach Delay (s) 10.1 9.6 8.5 8.5
Approach LOS B A A A
Intersection Summary
Delay 9.6
Level of Service A
Intersection Capacity Utilization 43.6% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 12
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Intersection
Intersection Delay, s/veh 9.7
Intersection LOS A

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 82 178 5 23 197 10 5 19 7 7 31 55
Future Vol, veh/h 82 178 5 23 197 10 5 19 7 7 31 55
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Heavy Vehicles, % 0 1 0 9 1 0 0 5 0 0 0 0
Mvmt Flow 86 187 5 24 207 11 5 20 7 7 33 58
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 10 9.9 8.4 8.6
HCM LOS A A A A

Lane NBLn1 EBLn1 WBLn1 SBLn1


Vol Left, % 16% 31% 10% 8%
Vol Thru, % 61% 67% 86% 33%
Vol Right, % 23% 2% 4% 59%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 31 265 230 93
LT Vol 5 82 23 7
Through Vol 19 178 197 31
RT Vol 7 5 10 55
Lane Flow Rate 33 279 242 98
Geometry Grp 1 1 1 1
Degree of Util (X) 0.046 0.352 0.314 0.13
Departure Headway (Hd) 5.126 4.543 4.673 4.792
Convergence, Y/N Yes Yes Yes Yes
Cap 695 789 767 745
Service Time 3.184 2.579 2.711 2.842
HCM Lane V/C Ratio 0.047 0.354 0.316 0.132
HCM Control Delay 8.4 10 9.9 8.6
HCM Lane LOS A A A A
HCM 95th-tile Q 0.1 1.6 1.3 0.4

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 13
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 3 0 0 1 0 0 0 40 1 0 111 1
Future Volume (vph) 3 0 0 1 0 0 0 40 1 0 111 1
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 12 12 12 12 12 12 12 12 12
Grade (%) -5% 0% 1% 0%
Satd. Flow (prot) 0 1727 0 0 1805 0 0 1831 0 0 1898 0
Flt Permitted 0.950 0.950
Satd. Flow (perm) 0 1727 0 0 1805 0 0 1831 0 0 1898 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 151 181 206 204
Travel Time (s) 4.1 4.9 5.6 5.6
Confl. Peds. (#/hr) 3 3
Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 3% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 4 0 0 1 0 0 50 0 0 136 0
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 16.6% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 14
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 3 0 0 1 0 0 0 40 1 0 111 1
Future Volume (Veh/h) 3 0 0 1 0 0 0 40 1 0 111 1
Sign Control Stop Stop Free Free
Grade -5% 0% 1% 0%
Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82
Hourly flow rate (vph) 4 0 0 1 0 0 0 49 1 0 135 1
Pedestrians 3
Lane Width (ft) 10.0
Walking Speed (ft/s) 3.5
Percent Blockage 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 188 188 138 185 188 50 139 50
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 188 188 138 185 188 50 139 50
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1
tC, 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 99 100 100 100 100 100 100 100
cM capacity (veh/h) 774 708 913 779 708 1025 1453 1570
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 4 1 50 136
Volume Left 4 1 0 0
Volume Right 0 0 1 1
cSH 774 779 1453 1570
Volume to Capacity 0.01 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 9.7 9.6 0.0 0.0
Lane LOS A A
Approach Delay (s) 9.7 9.6 0.0 0.0
Approach LOS A A
Intersection Summary
Average Delay 0.3
Intersection Capacity Utilization 16.6% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 15
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 3 0 0 1 0 0 0 40 1 0 111 1
Future Vol, veh/h 3 0 0 1 0 0 0 40 1 0 111 1
Conflicting Peds, #/hr 0 0 0 0 0 0 3 0 0 0 0 3
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - -5 - - 0 - - 1 - - 0 -
Peak Hour Factor 82 82 82 82 82 82 82 82 82 82 82 82
Heavy Vehicles, % 0 0 0 0 0 0 0 3 0 0 0 0
Mvmt Flow 4 0 0 1 0 0 0 49 1 0 135 1

Major/Minor Minor2 Minor1 Major1 Major2


Conflicting Flow All 189 189 139 186 189 50 139 0 0 50 0 0
Stage 1 139 139 - 50 50 - - - - - - -
Stage 2 50 50 - 136 139 - - - - - - -
Critical Hdwy 6.1 5.5 5.7 7.1 6.5 6.2 4.3 - - 4.3 - -
Critical Hdwy Stg 1 5.1 4.5 - 6.1 5.5 - - - - - - -
Critical Hdwy Stg 2 5.1 4.5 - 6.1 5.5 - - - - - - -
Follow-up Hdwy 3 4 3.1 3 4 3.1 3 - - 3 - -
Pot Cap-1 Maneuver 942 748 989 898 709 1089 1076 - - 1154 - -
Stage 1 1044 816 - 1126 857 - - - - - - -
Stage 2 1141 869 - 1008 785 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 940 747 987 898 708 1089 1073 - - 1154 - -
Mov Cap-2 Maneuver 940 747 - 898 708 - - - - - - -
Stage 1 1042 814 - 1126 857 - - - - - - -
Stage 2 1141 869 - 1008 783 - - - - - - -

Approach EB WB NB SB
HCM Control Delay, s 8.8 9 0 0
HCM LOS A A

Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1073 - - 940 898 1154 - -
HCM Lane V/C Ratio - - - 0.004 0.001 - - -
HCM Control Delay (s) 0 - - 8.8 9 0 - -
HCM Lane LOS A - - A A A - -
HCM 95th %tile Q(veh) 0 - - 0 0 0 - -

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 16
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 1 7 5 15 36 0 1 0 22 1 0 0
Future Volume (vph) 1 7 5 15 36 0 1 0 22 1 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 11 11
Grade (%) 3% -4% 0% -3%
Satd. Flow (prot) 0 1641 0 0 1911 0 0 1650 0 0 1771 0
Flt Permitted 0.997 0.986 0.998 0.950
Satd. Flow (perm) 0 1641 0 0 1911 0 0 1650 0 0 1771 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 131 186 162 179
Travel Time (s) 3.6 5.1 4.4 4.9
Confl. Peds. (#/hr) 1 1 1 1
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Heavy Vehicles (%) 0% 14% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 16 0 0 65 0 0 29 0 0 1 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 16.9% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 17
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 1 7 5 15 36 0 1 0 22 1 0 0
Future Volume (Veh/h) 1 7 5 15 36 0 1 0 22 1 0 0
Sign Control Free Free Stop Stop
Grade 3% -4% 0% -3%
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Hourly flow rate (vph) 1 9 6 19 46 0 1 0 28 1 0 0
Pedestrians 1 1
Lane Width (ft) 12.0 11.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 47 16 99 100 13 127 103 47
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 47 16 99 100 13 127 103 47
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 99 100 100 97 100 100 100
cM capacity (veh/h) 1572 1613 877 783 1072 819 780 1027
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 16 65 29 1
Volume Left 1 19 1 1
Volume Right 6 0 28 0
cSH 1572 1613 1064 819
Volume to Capacity 0.00 0.01 0.03 0.00
Queue Length 95th (ft) 0 1 2 0
Control Delay (s) 0.5 2.2 8.5 9.4
Lane LOS A A A A
Approach Delay (s) 0.5 2.2 8.5 9.4
Approach LOS A A
Intersection Summary
Average Delay 3.6
Intersection Capacity Utilization 16.9% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 18
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 3.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 7 5 15 36 0 1 0 22 1 0 0
Future Vol, veh/h 1 7 5 15 36 0 1 0 22 1 0 0
Conflicting Peds, #/hr 1 0 1 1 0 1 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 3 - - -4 - - 0 - - -3 -
Peak Hour Factor 79 79 79 79 79 79 79 79 79 79 79 79
Heavy Vehicles, % 0 14 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 1 9 6 19 46 0 1 0 28 1 0 0

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 47 0 0 16 0 0 99 100 13 113 103 47
Stage 1 - - - - - - 15 15 - 85 85 -
Stage 2 - - - - - - 84 85 - 28 18 -
Critical Hdwy 4.3 - - 4.3 - - 7.1 6.5 6.2 6.5 5.9 5.9
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 5.5 4.9 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 5.5 4.9 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1157 - - 1185 - - 1028 794 1142 1025 805 1097
Stage 1 - - - - - - 1177 887 - 1092 840 -
Stage 2 - - - - - - 1078 828 - 1163 887 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1156 - - 1184 - - 1014 779 1141 986 790 1096
Mov Cap-2 Maneuver - - - - - - 1014 779 - 986 790 -
Stage 1 - - - - - - 1175 885 - 1090 826 -
Stage 2 - - - - - - 1061 814 - 1133 885 -

Approach EB WB NB SB
HCM Control Delay, s 0.6 2.4 8.3 8.7
HCM LOS A A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1135 1156 - - 1184 - - 986
HCM Lane V/C Ratio 0.026 0.001 - - 0.016 - - 0.001
HCM Control Delay (s) 8.3 8.1 0 - 8.1 0 - 8.7
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 19
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 71 18 279 155 13 10 242 1499 15 7 1714 35
Future Volume (vph) 71 18 279 155 13 10 242 1499 15 7 1714 35
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 14 14 14 12 12 12 12 12 12 12 12 12
Grade (%) -2% 0% -1% -2%
Storage Length (ft) 150 0 0 0 400 0 160 0
Storage Lanes 1 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1738 1939 1540 0 1694 0 1719 3399 0 1727 3410 0
Flt Permitted 0.785 0.740 0.053 0.121
Satd. Flow (perm) 1431 1939 1540 0 1309 0 96 3399 0 220 3410 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 282 2 1 2
Link Speed (mph) 25 25 35 35
Link Distance (ft) 357 317 547 1233
Travel Time (s) 9.7 8.6 10.7 24.0
Confl. Peds. (#/hr) 3 3 1 1
Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99
Heavy Vehicles (%) 6% 0% 7% 1% 0% 0% 0% 1% 0% 0% 1% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 72 18 282 0 180 0 244 1529 0 7 1766 0
Turn Type Perm NA pm+ov Perm NA pm+pt NA pm+pt NA
Protected Phases 4 5 8 5 2 1 6
Permitted Phases 4 4 8 2 6
Detector Phase 4 4 5 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0
Minimum Split (s) 24.2 24.2 11.4 24.2 24.2 11.4 24.4 11.4 24.4
Total Split (s) 24.2 24.2 19.0 24.2 24.2 19.0 76.4 11.4 68.8
Total Split (%) 16.1% 16.1% 12.7% 16.1% 16.1% 12.7% 50.9% 7.6% 45.9%
Yellow Time (s) 3.0 3.0 3.8 3.0 3.0 3.8 3.8 3.8 3.8
All-Red Time (s) 3.2 3.2 2.6 3.2 3.2 2.6 2.6 2.6 2.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.2 5.2 5.4 5.2 5.4 5.4 5.4 5.4
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None
Act Effct Green (s) 19.3 19.3 37.5 19.3 83.5 81.7 70.4 64.3
Actuated g/C Ratio 0.16 0.16 0.31 0.16 0.70 0.68 0.59 0.54
v/c Ratio 0.31 0.06 0.42 0.85 0.96 0.66 0.03 0.96
Control Delay 52.1 48.3 4.8 82.1 83.1 16.4 11.0 41.4
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 52.1 48.3 4.8 82.1 83.1 16.4 11.0 41.4
LOS D D A F F B B D
Approach Delay 16.1 82.1 25.6 41.3
Approach LOS B F C D
Queue Length 50th (ft) 46 11 0 125 129 240 1 570
Queue Length 95th (ft) 120 42 47 #356 #431 #913 11 #1258

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 20
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 38.0
Total Split (s) 38.0
Total Split (%) 25%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 21
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 277 237 467 1153
Turn Bay Length (ft) 150 400 160
Base Capacity (vph) 230 311 675 212 253 2322 206 1833
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.31 0.06 0.42 0.85 0.96 0.66 0.03 0.96
Intersection Summary
Area Type: Other
Cycle Length: 150
Actuated Cycle Length: 119.6
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.96
Intersection Signal Delay: 34.0 Intersection LOS: C
Intersection Capacity Utilization 95.8% ICU Level of Service F
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 7: S 32nd Street & Harvard Avenue

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 22
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 23
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 17 391 9 51 436 13 29 14 31 8 16 13
Future Volume (vph) 17 391 9 51 436 13 29 14 31 8 16 13
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 1% 1% 2% -2%
Satd. Flow (prot) 0 1677 0 0 1672 0 0 1742 0 0 1628 0
Flt Permitted 0.998 0.995 0.981 0.990
Satd. Flow (perm) 0 1677 0 0 1672 0 0 1742 0 0 1628 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 426 373 515 207
Travel Time (s) 11.6 10.2 14.0 5.6
Confl. Peds. (#/hr) 4 1 1 4
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 434 0 0 521 0 0 77 0 0 39 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 58.2% ICU Level of Service B
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 24
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 17 391 9 51 436 13 29 14 31 8 16 13
Future Volume (Veh/h) 17 391 9 51 436 13 29 14 31 8 16 13
Sign Control Free Free Stop Stop
Grade 1% 1% 2% -2%
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Hourly flow rate (vph) 18 407 9 53 454 14 30 15 32 8 17 14
Pedestrians 1 4
Lane Width (ft) 12.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 373
pX, platoon unblocked 0.90 0.90 0.90 0.90 0.90 0.90
vC, conflicting volume 472 417 1038 1026 412 1058 1024 465
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 357 417 986 974 412 1009 971 349
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 98 95 83 93 95 95 92 98
cM capacity (veh/h) 1087 1152 179 213 643 169 214 626
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 434 521 77 39
Volume Left 18 53 30 8
Volume Right 9 14 32 14
cSH 1087 1152 268 262
Volume to Capacity 0.02 0.05 0.29 0.15
Queue Length 95th (ft) 1 4 29 13
Control Delay (s) 0.5 1.3 23.8 21.1
Lane LOS A A C C
Approach Delay (s) 0.5 1.3 23.8 21.1
Approach LOS C C
Intersection Summary
Average Delay 3.3
Intersection Capacity Utilization 58.2% ICU Level of Service B
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 25
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 3.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 17 391 9 51 436 13 29 14 31 8 16 13
Future Vol, veh/h 17 391 9 51 436 13 29 14 31 8 16 13
Conflicting Peds, #/hr 4 0 1 1 0 4 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 1 - - 1 - - 2 - - -2 -
Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96
Heavy Vehicles, % 0 1 0 0 1 0 0 0 0 0 0 0
Mvmt Flow 18 407 9 53 454 14 30 15 32 8 17 14

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 472 0 0 417 0 0 1032 1027 413 1042 1024 465
Stage 1 - - - - - - 449 449 - 571 571 -
Stage 2 - - - - - - 583 578 - 471 453 -
Critical Hdwy 4.3 - - 4.3 - - 7.5 6.9 6.4 6.7 6.1 6
Critical Hdwy Stg 1 - - - - - - 6.5 5.9 - 5.7 5.1 -
Critical Hdwy Stg 2 - - - - - - 6.5 5.9 - 5.7 5.1 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 826 - - 863 - - 208 211 662 258 266 649
Stage 1 - - - - - - 639 548 - 611 541 -
Stage 2 - - - - - - 529 473 - 688 603 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 823 - - 862 - - 177 187 661 211 236 647
Mov Cap-2 Maneuver - - - - - - 177 187 - 211 236 -
Stage 1 - - - - - - 620 532 - 591 494 -
Stage 2 - - - - - - 459 432 - 619 586 -

Approach EB WB NB SB
HCM Control Delay, s 0.4 1 24.7 19.1
HCM LOS C C

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 259 823 - - 862 - - 294
HCM Lane V/C Ratio 0.298 0.022 - - 0.062 - - 0.131
HCM Control Delay (s) 24.7 9.5 0 - 9.4 0 - 19.1
HCM Lane LOS C A A - A A - C
HCM 95th %tile Q(veh) 1.2 0.1 - - 0.2 - - 0.4

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 26
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 6 432 7 39 460 11 27 4 9 9 6 9
Future Volume (vph) 6 432 7 39 460 11 27 4 9 9 6 9
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Grade (%) -1% 0% -2% -1%
Satd. Flow (prot) 0 1607 0 0 1770 0 0 1524 0 0 1502 0
Flt Permitted 0.995 0.950 0.917
Satd. Flow (perm) 0 1601 0 0 1689 0 0 1569 0 0 1397 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 1 2 9 9
Link Speed (mph) 25 25 25 25
Link Distance (ft) 373 270 277 210
Travel Time (s) 10.2 7.4 7.6 5.7
Confl. Peds. (#/hr) 4 2 2 4 1 2 2 1
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 458 0 0 525 0 0 41 0 0 24 0
Turn Type Perm NA Perm NA Perm NA Perm NA
Protected Phases 2 6 8 4
Permitted Phases 2 6 8 4
Detector Phase 2 2 6 6 8 8 4 4
Switch Phase
Minimum Initial (s) 30.0 30.0 30.0 30.0 3.0 3.0 3.0 3.0
Minimum Split (s) 35.0 35.0 35.0 35.0 7.6 7.6 7.6 7.6
Total Split (s) 35.0 35.0 35.0 35.0 10.0 10.0 10.0 10.0
Total Split (%) 43.8% 43.8% 43.8% 43.8% 12.5% 12.5% 12.5% 12.5%
Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
All-Red Time (s) 2.0 2.0 2.0 2.0 1.6 1.6 1.6 1.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 4.0 4.0 3.6 3.6
Lead/Lag
Lead-Lag Optimize?
Recall Mode Min Min Min Min None None None None
Act Effct Green (s) 43.3 43.3 6.8 6.8
Actuated g/C Ratio 0.82 0.82 0.13 0.13
v/c Ratio 0.35 0.38 0.20 0.13
Control Delay 8.9 9.4 23.6 22.1
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 8.9 9.4 23.6 22.1
LOS A A C C
Approach Delay 8.9 9.4 23.6 22.1
Approach LOS A A C C
Queue Length 50th (ft) 0 0 6 3
Queue Length 95th (ft) #309 #394 46 30
Internal Link Dist (ft) 293 190 197 130
Turn Bay Length (ft)
Base Capacity (vph) 1305 1377 207 185

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 27
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 9.0
Minimum Split (s) 35.0
Total Split (s) 35.0
Total Split (%) 44%
Yellow Time (s) 2.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 28
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.35 0.38 0.20 0.13
Intersection Summary
Area Type: Other
Cycle Length: 80
Actuated Cycle Length: 53.1
Natural Cycle: 80
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.38
Intersection Signal Delay: 10.0 Intersection LOS: B
Intersection Capacity Utilization 61.9% ICU Level of Service B
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 9: 29th Street & Market Street

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 29
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: P.M. Peak Hour

Lane Group Ø9
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 30
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 4 166 194 21 240 3 0 0 208 0 0 10
Future Volume (vph) 4 166 194 21 240 3 0 0 208 0 0 10
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 11 11 11 12 12 12
Grade (%) 0% 0% -2% 0%
Storage Length (ft) 0 150 0 0 0 0 0 0
Storage Lanes 0 1 0 0 1 0 0 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 0 1898 1615 0 1881 0 1855 1577 0 0 1644 0
Flt Permitted 0.999 0.996
Satd. Flow (perm) 0 1898 1615 0 1881 0 1855 1577 0 0 1644 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 325 227 190 155
Travel Time (s) 8.9 6.2 5.2 4.2
Confl. Peds. (#/hr) 2 1 1 2 1 1
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Heavy Vehicles (%) 0% 0% 0% 0% 0% 33% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 200 228 0 311 0 0 245 0 0 12 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 46.0% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 1
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 4 166 194 21 240 3 0 0 208 0 0 10
Future Volume (Veh/h) 4 166 194 21 240 3 0 0 208 0 0 10
Sign Control Free Free Stop Stop
Grade 0% 0% -2% 0%
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Hourly flow rate (vph) 5 195 228 25 282 4 0 0 245 0 0 12
Pedestrians 1 1 2
Lane Width (ft) 12.0 11.0 12.0
Walking Speed (ft/s) 3.5 3.5 3.5
Percent Blockage 0 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 325
pX, platoon unblocked
vC, conflicting volume 288 424 553 544 196 786 770 287
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 288 424 553 544 196 786 770 287
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 98 100 100 71 100 100 98
cM capacity (veh/h) 1283 1145 430 437 850 217 324 755
Direction, Lane # EB 1 EB 2 WB 1 NB 1 NB 2 SB 1
Volume Total 200 228 311 0 245 12
Volume Left 5 0 25 0 0 0
Volume Right 0 228 4 0 245 12
cSH 1283 1700 1145 1700 850 755
Volume to Capacity 0.00 0.13 0.02 0.00 0.29 0.02
Queue Length 95th (ft) 0 0 2 0 30 1
Control Delay (s) 0.2 0.0 0.9 0.0 10.9 9.8
Lane LOS A A A B A
Approach Delay (s) 0.1 0.9 10.9 9.8
Approach LOS B A
Intersection Summary
Average Delay 3.1
Intersection Capacity Utilization 46.0% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 2
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 2.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 166 194 21 240 3 0 0 208 0 0 10
Future Vol, veh/h 4 166 194 21 240 3 0 0 208 0 0 10
Conflicting Peds, #/hr 2 0 1 1 0 2 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 150 - - - 0 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - -2 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 0 0 0 0 0 33 0 0 0 0 0 0
Mvmt Flow 5 195 228 25 282 4 0 0 245 0 0 12

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 288 0 0 424 0 0 547 544 196 778 770 287
Stage 1 - - - - - - 206 206 - 336 336 -
Stage 2 - - - - - - 341 338 - 442 434 -
Critical Hdwy 4.3 - - 4.3 - - 6.7 6.1 6 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 5.7 5.1 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 5.7 5.1 - 6.1 5.5 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 957 - - 858 - - 540 477 910 352 333 800
Stage 1 - - - - - - 942 752 - 779 645 -
Stage 2 - - - - - - 803 669 - 678 585 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 955 - - 857 - - 514 456 909 249 318 798
Mov Cap-2 Maneuver - - - - - - 514 456 - 249 318 -
Stage 1 - - - - - - 934 746 - 772 621 -
Stage 2 - - - - - - 763 644 - 492 580 -

Approach EB WB NB SB
HCM Control Delay, s 0.1 0.7 10.4 9.6
HCM LOS B A

Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 909 955 - - 857 - - 798
HCM Lane V/C Ratio - 0.269 0.005 - - 0.029 - - 0.015
HCM Control Delay (s) 0 10.4 8.8 0 - 9.3 0 - 9.6
HCM Lane LOS A B A A - A A - A
HCM 95th %tile Q(veh) - 1.1 0 - - 0.1 - - 0

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 3
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 261 146 159 156 82 8 171 999 121 101 1042 181
Future Volume (vph) 261 146 159 156 82 8 171 999 121 101 1042 181
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 12 12 14 10 10 10 11 11 11 10 11 11
Grade (%) -1% -1% 1% -1%
Storage Length (ft) 250 250 150 0 640 0 110 0
Storage Lanes 1 1 1 0 1 0 1 1
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1719 1809 1640 1604 1664 0 1628 3208 0 1604 3290 1457
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1711 1809 1616 1595 1664 0 1628 3208 0 1604 3290 1457
Right Turn on Red No No Yes Yes
Satd. Flow (RTOR) 10 164
Link Speed (mph) 35 25 35 35
Link Distance (ft) 525 325 1233 312
Travel Time (s) 10.2 8.9 24.0 6.1
Confl. Peds. (#/hr) 2 2 2 2
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 1% 1% 0% 0% 1% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 269 151 164 161 93 0 176 1155 0 104 1074 187
Turn Type Split NA pm+ov Split NA Prot NA Prot NA pm+ov
Protected Phases 4 4 5 8 8 5 2 1 6 4
Permitted Phases 4 6
Detector Phase 4 4 5 8 8 5 2 1 6 4
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 10.0 7.0 10.0 7.0
Minimum Split (s) 13.0 13.0 13.5 13.1 13.1 13.5 16.5 13.5 16.5 13.0
Total Split (s) 20.0 20.0 17.0 16.0 16.0 17.0 38.5 13.5 35.0 20.0
Total Split (%) 15.4% 15.4% 13.1% 12.3% 12.3% 13.1% 29.6% 10.4% 26.9% 15.4%
Yellow Time (s) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
All-Red Time (s) 2.3 2.3 2.8 2.4 2.4 2.8 2.8 2.8 2.8 2.3
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.0 5.0 5.5 5.1 5.1 5.5 5.5 5.5 5.5 5.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None None
Act Effct Green (s) 15.4 15.4 26.6 11.2 11.2 11.8 33.8 8.2 30.2 51.2
Actuated g/C Ratio 0.16 0.16 0.28 0.12 0.12 0.12 0.35 0.09 0.31 0.53
v/c Ratio 0.98 0.52 0.37 0.87 0.48 0.89 1.02 0.76 1.04 0.22
Control Delay 92.5 47.5 19.4 83.5 52.6 84.2 64.1 79.5 73.0 4.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 92.5 47.5 19.4 83.5 52.6 84.2 64.1 79.5 73.0 4.9
LOS F D B F D F E E E A
Approach Delay 60.4 72.2 66.7 64.2
Approach LOS E E E E
Queue Length 50th (ft) 148 77 44 88 49 97 320 57 305 5
Queue Length 95th (ft) #474 #222 117 #309 #155 #333 #826 #217 #782 62

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 4
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 7.0
Minimum Split (s) 42.0
Total Split (s) 42.0
Total Split (%) 32%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 5
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 445 245 1153 232
Turn Bay Length (ft) 250 250 150 640 110
Base Capacity (vph) 274 288 449 185 193 198 1131 136 1031 851
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.98 0.52 0.37 0.87 0.48 0.89 1.02 0.76 1.04 0.22
Intersection Summary
Area Type: Other
Cycle Length: 130
Actuated Cycle Length: 96.4
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 1.04
Intersection Signal Delay: 65.1 Intersection LOS: E
Intersection Capacity Utilization 79.1% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 2: S 32nd Street & Trindle Road/Chestnut Street

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 6
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 7
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (vph) 242 119 9 216 9 9
Future Volume (vph) 242 119 9 216 9 9
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 0% 0% -1%
Satd. Flow (prot) 1816 0 0 1878 1737 0
Flt Permitted 0.998 0.976
Satd. Flow (perm) 1816 0 0 1878 1737 0
Link Speed (mph) 25 25 25
Link Distance (ft) 227 445 204
Travel Time (s) 6.2 12.1 5.6
Confl. Peds. (#/hr) 6 6
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86
Heavy Vehicles (%) 0% 0% 0% 1% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 419 0 0 261 20 0
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 30.2% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 8
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Movement EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (veh/h) 242 119 9 216 9 9
Future Volume (Veh/h) 242 119 9 216 9 9
Sign Control Free Free Stop
Grade 0% 0% -1%
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86
Hourly flow rate (vph) 281 138 10 251 10 10
Pedestrians 6
Lane Width (ft) 12.0
Walking Speed (ft/s) 3.5
Percent Blockage 1
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 552
pX, platoon unblocked
vC, conflicting volume 425 627 356
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 425 627 356
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 99 98 99
cM capacity (veh/h) 1139 444 689
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 419 261 20
Volume Left 0 10 10
Volume Right 138 0 10
cSH 1700 1139 540
Volume to Capacity 0.25 0.01 0.04
Queue Length 95th (ft) 0 1 3
Control Delay (s) 0.0 0.4 11.9
Lane LOS A B
Approach Delay (s) 0.0 0.4 11.9
Approach LOS B
Intersection Summary
Average Delay 0.5
Intersection Capacity Utilization 30.2% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 9
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 0.5
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 242 119 9 216 9 9
Future Vol, veh/h 242 119 9 216 9 9
Conflicting Peds, #/hr 0 6 6 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 -1 -
Peak Hour Factor 86 86 86 86 86 86
Heavy Vehicles, % 0 0 0 1 0 0
Mvmt Flow 281 138 10 251 10 10

Major/Minor Major1 Major2 Minor1


Conflicting Flow All 0 0 425 0 627 356
Stage 1 - - - - 356 -
Stage 2 - - - - 271 -
Critical Hdwy - - 4.3 - 6.2 6.1
Critical Hdwy Stg 1 - - - - 5.2 -
Critical Hdwy Stg 2 - - - - 5.2 -
Follow-up Hdwy - - 3 - 3 3.1
Pot Cap-1 Maneuver - - 858 - 523 738
Stage 1 - - - - 829 -
Stage 2 - - - - 906 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 853 - 513 734
Mov Cap-2 Maneuver - - - - 513 -
Stage 1 - - - - 824 -
Stage 2 - - - - 893 -

Approach EB WB NB
HCM Control Delay, s 0 0.4 11.2
HCM LOS B

Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT


Capacity (veh/h) 604 - - 853 -
HCM Lane V/C Ratio 0.035 - - 0.012 -
HCM Control Delay (s) 11.2 - - 9.3 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.1 - - 0 -

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 10
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 63 173 12 8 176 4 6 8 4 0 17 40
Future Volume (vph) 63 173 12 8 176 4 6 8 4 0 17 40
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 0% 1% -1% -1%
Satd. Flow (prot) 0 1849 0 0 1881 0 0 1819 0 0 1692 0
Flt Permitted 0.987 0.998 0.984
Satd. Flow (perm) 0 1849 0 0 1881 0 0 1819 0 0 1692 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 445 215 319 515
Travel Time (s) 12.1 5.9 8.7 14.0
Confl. Peds. (#/hr) 1 8 8 1 2 2
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Heavy Vehicles (%) 0% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 3%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 283 0 0 214 0 0 21 0 0 64 0
Sign Control Stop Stop Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 40.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 11
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Stop Stop
Traffic Volume (vph) 63 173 12 8 176 4 6 8 4 0 17 40
Future Volume (vph) 63 173 12 8 176 4 6 8 4 0 17 40
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Hourly flow rate (vph) 72 197 14 9 200 5 7 9 5 0 19 45
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total (vph) 283 214 21 64
Volume Left (vph) 72 9 7 0
Volume Right (vph) 14 5 5 45
Hadj (s) 0.03 -0.01 -0.08 -0.39
Departure Headway (s) 4.4 4.4 5.0 4.7
Degree Utilization, x 0.34 0.26 0.03 0.08
Capacity (veh/h) 802 785 639 691
Control Delay (s) 9.7 9.0 8.2 8.1
Approach Delay (s) 9.7 9.0 8.2 8.1
Approach LOS A A A A
Intersection Summary
Delay 9.2
Level of Service A
Intersection Capacity Utilization 40.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 12
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Intersection
Intersection Delay, s/veh 9.2
Intersection LOS A

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 63 173 12 8 176 4 6 8 4 0 17 40
Future Vol, veh/h 63 173 12 8 176 4 6 8 4 0 17 40
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Heavy Vehicles, % 0 1 0 0 0 0 0 0 0 0 0 3
Mvmt Flow 72 197 14 9 200 5 7 9 5 0 19 45
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 9.6 9 8.2 8
HCM LOS A A A A

Lane NBLn1 EBLn1 WBLn1 SBLn1


Vol Left, % 33% 25% 4% 0%
Vol Thru, % 44% 70% 94% 30%
Vol Right, % 22% 5% 2% 70%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 18 248 188 57
LT Vol 6 63 8 0
Through Vol 8 173 176 17
RT Vol 4 12 4 40
Lane Flow Rate 20 282 214 65
Geometry Grp 1 1 1 1
Degree of Util (X) 0.028 0.34 0.261 0.083
Departure Headway (Hd) 5.012 4.349 4.392 4.595
Convergence, Y/N Yes Yes Yes Yes
Cap 714 829 818 779
Service Time 3.047 2.368 2.412 2.624
HCM Lane V/C Ratio 0.028 0.34 0.262 0.083
HCM Control Delay 8.2 9.6 9 8
HCM Lane LOS A A A A
HCM 95th-tile Q 0.1 1.5 1 0.3

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 13
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 2 0 0 1 0 0 0 20 0 0 128 0
Future Volume (vph) 2 0 0 1 0 0 0 20 0 0 128 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 12 12 12 12 12 12 12 12 12
Grade (%) -5% 0% 1% 0%
Satd. Flow (prot) 0 1727 0 0 1805 0 0 1890 0 0 1900 0
Flt Permitted 0.950 0.950
Satd. Flow (perm) 0 1727 0 0 1805 0 0 1890 0 0 1900 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 151 181 206 204
Travel Time (s) 4.1 4.9 5.6 5.6
Confl. Peds. (#/hr) 2 2 2 2 7 3 3 7
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 3 0 0 1 0 0 25 0 0 162 0
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 18.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 14
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 2 0 0 1 0 0 0 20 0 0 128 0
Future Volume (Veh/h) 2 0 0 1 0 0 0 20 0 0 128 0
Sign Control Stop Stop Free Free
Grade -5% 0% 1% 0%
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Hourly flow rate (vph) 3 0 0 1 0 0 0 25 0 0 162 0
Pedestrians 7 3 2 2
Lane Width (ft) 10.0 12.0 12.0 12.0
Walking Speed (ft/s) 3.5 3.5 3.5 3.5
Percent Blockage 1 0 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 196 197 171 192 197 30 169 28
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 196 197 171 192 197 30 169 28
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1
tC, 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 757 697 872 764 696 1045 1413 1594
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 3 1 25 162
Volume Left 3 1 0 0
Volume Right 0 0 0 0
cSH 757 764 1413 1594
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 9.8 9.7 0.0 0.0
Lane LOS A A
Approach Delay (s) 9.8 9.7 0.0 0.0
Approach LOS A A
Intersection Summary
Average Delay 0.2
Intersection Capacity Utilization 18.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 15
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 2 0 0 1 0 0 0 20 0 0 128 0
Future Vol, veh/h 2 0 0 1 0 0 0 20 0 0 128 0
Conflicting Peds, #/hr 2 0 2 2 0 2 7 0 3 3 0 7
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - -5 - - 0 - - 1 - - 0 -
Peak Hour Factor 79 79 79 79 79 79 79 79 79 79 79 79
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 3 0 0 1 0 0 0 25 0 0 162 0

Major/Minor Minor2 Minor1 Major1 Major2


Conflicting Flow All 196 197 171 192 197 30 169 0 0 28 0 0
Stage 1 169 169 - 28 28 - - - - - - -
Stage 2 27 28 - 164 169 - - - - - - -
Critical Hdwy 6.1 5.5 5.7 7.1 6.5 6.2 4.3 - - 4.3 - -
Critical Hdwy Stg 1 5.1 4.5 - 6.1 5.5 - - - - - - -
Critical Hdwy Stg 2 5.1 4.5 - 6.1 5.5 - - - - - - -
Follow-up Hdwy 3 4 3.1 3 4 3.1 3 - - 3 - -
Pot Cap-1 Maneuver 933 742 953 889 702 1117 1051 - - 1174 - -
Stage 1 1013 799 - 1158 876 - - - - - - -
Stage 2 1168 883 - 972 763 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 926 735 946 885 696 1112 1045 - - 1171 - -
Mov Cap-2 Maneuver 926 735 - 885 696 - - - - - - -
Stage 1 1007 794 - 1155 873 - - - - - - -
Stage 2 1166 880 - 970 758 - - - - - - -

Approach EB WB NB SB
HCM Control Delay, s 8.9 9.1 0 0
HCM LOS A A

Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1045 - - 926 885 1171 - -
HCM Lane V/C Ratio - - - 0.003 0.001 - - -
HCM Control Delay (s) 0 - - 8.9 9.1 0 - -
HCM Lane LOS A - - A A A - -
HCM 95th %tile Q(veh) 0 - - 0 0 0 - -

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 16
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 4 0 1 56 1 0 0 1 0 0 0
Future Volume (vph) 0 4 0 1 56 1 0 0 1 0 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 11 11
Grade (%) 3% -4% 0% -3%
Satd. Flow (prot) 0 1872 0 0 1932 0 0 1644 0 0 1864 0
Flt Permitted 0.999
Satd. Flow (perm) 0 1872 0 0 1932 0 0 1644 0 0 1864 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 131 186 162 179
Travel Time (s) 3.6 5.1 4.4 4.9
Peak Hour Factor 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 8 0 0 116 0 0 2 0 0 0 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 13.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 17
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 0 4 0 1 56 1 0 0 1 0 0 0
Future Volume (Veh/h) 0 4 0 1 56 1 0 0 1 0 0 0
Sign Control Free Free Stop Stop
Grade 3% -4% 0% -3%
Peak Hour Factor 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Hourly flow rate (vph) 0 8 0 2 112 2 0 0 2 0 0 0
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 114 8 125 126 8 127 125 113
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 114 8 125 126 8 127 125 113
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 1488 1625 853 767 1080 849 768 945
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 8 116 2 0
Volume Left 0 2 0 0
Volume Right 0 2 2 0
cSH 1488 1625 1080 1700
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 0.0 0.1 8.3 0.0
Lane LOS A A A
Approach Delay (s) 0.0 0.1 8.3 0.0
Approach LOS A A
Intersection Summary
Average Delay 0.3
Intersection Capacity Utilization 13.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 18
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 4 0 1 56 1 0 0 1 0 0 0
Future Vol, veh/h 0 4 0 1 56 1 0 0 1 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 3 - - -4 - - 0 - - -3 -
Peak Hour Factor 50 50 50 50 50 50 50 50 50 50 50 50
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 0 8 0 2 112 2 0 0 2 0 0 0

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 114 0 0 8 0 0 125 126 8 126 125 113
Stage 1 - - - - - - 8 8 - 117 117 -
Stage 2 - - - - - - 117 118 - 9 8 -
Critical Hdwy 4.3 - - 4.3 - - 7.1 6.5 6.2 6.5 5.9 5.9
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 5.5 4.9 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 5.5 4.9 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1098 - - 1193 - - 988 768 1149 1007 785 1013
Stage 1 - - - - - - 1188 893 - 1053 818 -
Stage 2 - - - - - - 1033 802 - 1188 894 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1098 - - 1193 - - 986 766 1149 1004 783 1013
Mov Cap-2 Maneuver - - - - - - 986 766 - 1004 783 -
Stage 1 - - - - - - 1188 893 - 1053 816 -
Stage 2 - - - - - - 1031 800 - 1186 894 -

Approach EB WB NB SB
HCM Control Delay, s 0 0.1 8.1 0
HCM LOS A A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1149 1098 - - 1193 - - -
HCM Lane V/C Ratio 0.002 - - - 0.002 - - -
HCM Control Delay (s) 8.1 0 - - 8 0 - 0
HCM Lane LOS A A - - A A - A
HCM 95th %tile Q(veh) 0 0 - - 0 - - -

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 19
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 115 16 334 144 22 1 315 1062 8 6 1114 76
Future Volume (vph) 115 16 334 144 22 1 315 1062 8 6 1114 76
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 14 14 14 12 12 12 12 12 12 12 12 12
Grade (%) -2% 0% -1% -2%
Storage Length (ft) 150 0 0 0 400 0 160 0
Storage Lanes 1 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1806 1939 1632 0 1710 0 1719 3399 0 1727 3388 0
Flt Permitted 0.750 0.743 0.079 0.250
Satd. Flow (perm) 1420 1939 1632 0 1324 0 143 3399 0 454 3388 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 348 1 6
Link Speed (mph) 25 25 35 35
Link Distance (ft) 357 317 547 1233
Travel Time (s) 9.7 8.6 10.7 24.0
Confl. Peds. (#/hr) 4 4 1 1
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 2% 0% 1% 1% 0% 0% 0% 1% 0% 0% 1% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 120 17 348 0 174 0 328 1114 0 6 1239 0
Turn Type Perm NA pm+ov Perm NA pm+pt NA pm+pt NA
Protected Phases 4 5 8 5 2 1 6
Permitted Phases 4 4 8 2 6
Detector Phase 4 4 5 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0
Minimum Split (s) 24.2 24.2 11.4 24.2 24.2 11.4 24.4 11.4 24.4
Total Split (s) 24.2 24.2 22.0 24.2 24.2 22.0 56.4 11.4 45.8
Total Split (%) 18.6% 18.6% 16.9% 18.6% 18.6% 16.9% 43.4% 8.8% 35.2%
Yellow Time (s) 3.0 3.0 3.8 3.0 3.0 3.8 3.8 3.8 3.8
All-Red Time (s) 3.2 3.2 2.6 3.2 3.2 2.6 2.6 2.6 2.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.2 5.2 5.4 5.2 5.4 5.4 5.4 5.4
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None
Act Effct Green (s) 18.6 18.6 40.0 18.6 63.7 62.0 47.4 41.3
Actuated g/C Ratio 0.19 0.19 0.40 0.19 0.64 0.63 0.48 0.42
v/c Ratio 0.45 0.05 0.40 0.70 0.91 0.52 0.02 0.87
Control Delay 44.8 38.6 3.3 55.8 57.3 15.6 13.0 36.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 44.8 38.6 3.3 55.8 57.3 15.6 13.0 36.1
LOS D D A E E B B D
Approach Delay 14.8 55.8 25.1 36.0
Approach LOS B E C D
Queue Length 50th (ft) 61 8 0 93 139 143 1 324
Queue Length 95th (ft) 164 36 37 #284 #488 535 10 #796

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 20
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 38.0
Total Split (s) 38.0
Total Split (%) 29%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 21
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 277 237 467 1153
Turn Bay Length (ft) 150 400 160
Base Capacity (vph) 278 380 867 259 362 2130 296 1417
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.43 0.04 0.40 0.67 0.91 0.52 0.02 0.87
Intersection Summary
Area Type: Other
Cycle Length: 130
Actuated Cycle Length: 98.9
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.91
Intersection Signal Delay: 29.2 Intersection LOS: C
Intersection Capacity Utilization 83.2% ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 7: S 32nd Street & Harvard Avenue

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 22
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 23
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 7 437 8 34 418 6 46 4 28 11 15 14
Future Volume (vph) 7 437 8 34 418 6 46 4 28 11 15 14
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 1% 1% 2% -2%
Satd. Flow (prot) 0 1678 0 0 1676 0 0 1712 0 0 1623 0
Flt Permitted 0.999 0.996 0.971 0.986
Satd. Flow (perm) 0 1678 0 0 1676 0 0 1712 0 0 1623 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 426 373 515 207
Travel Time (s) 11.6 10.2 14.0 5.6
Confl. Peds. (#/hr) 3 4 4 3 4 2 2 4
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 4% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 481 0 0 487 0 0 83 0 0 43 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 57.9% ICU Level of Service B
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 24
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 7 437 8 34 418 6 46 4 28 11 15 14
Future Volume (Veh/h) 7 437 8 34 418 6 46 4 28 11 15 14
Sign Control Free Free Stop Stop
Grade 1% 1% 2% -2%
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Hourly flow rate (vph) 7 465 9 36 445 6 49 4 30 12 16 15
Pedestrians 4 2 4 3
Lane Width (ft) 12.0 12.0 12.0 12.0
Walking Speed (ft/s) 3.5 3.5 3.5 3.5
Percent Blockage 0 0 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 373
pX, platoon unblocked 0.91 0.91 0.91 0.91 0.91 0.91
vC, conflicting volume 454 478 1034 1014 476 1040 1015 455
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 348 478 987 964 476 994 966 349
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 99 97 73 98 95 93 93 98
cM capacity (veh/h) 1106 1091 183 223 582 185 223 630
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 481 487 83 43
Volume Left 7 36 49 12
Volume Right 9 6 30 15
cSH 1106 1091 246 268
Volume to Capacity 0.01 0.03 0.34 0.16
Queue Length 95th (ft) 0 3 36 14
Control Delay (s) 0.2 1.0 26.9 21.0
Lane LOS A A D C
Approach Delay (s) 0.2 1.0 26.9 21.0
Approach LOS D C
Intersection Summary
Average Delay 3.4
Intersection Capacity Utilization 57.9% ICU Level of Service B
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 25
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 3.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 437 8 34 418 6 46 4 28 11 15 14
Future Vol, veh/h 7 437 8 34 418 6 46 4 28 11 15 14
Conflicting Peds, #/hr 3 0 4 4 0 3 4 0 2 2 0 4
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 1 - - 1 - - 2 - - -2 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94
Heavy Vehicles, % 0 1 0 0 1 0 0 0 4 0 0 0
Mvmt Flow 7 465 9 36 445 6 49 4 30 12 16 15

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 454 0 0 478 0 0 1028 1014 476 1026 1015 455
Stage 1 - - - - - - 488 488 - 523 523 -
Stage 2 - - - - - - 540 526 - 503 492 -
Critical Hdwy 4.3 - - 4.3 - - 7.5 6.9 6.44 6.7 6.1 6
Critical Hdwy Stg 1 - - - - - - 6.5 5.9 - 5.7 5.1 -
Critical Hdwy Stg 2 - - - - - - 6.5 5.9 - 5.7 5.1 -
Follow-up Hdwy 3 - - 3 - - 3.1 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 838 - - 822 - - 206 215 604 264 269 658
Stage 1 - - - - - - 589 524 - 647 566 -
Stage 2 - - - - - - 548 502 - 662 582 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 836 - - 819 - - 180 199 601 233 249 654
Mov Cap-2 Maneuver - - - - - - 180 199 - 233 249 -
Stage 1 - - - - - - 580 516 - 638 531 -
Stage 2 - - - - - - 487 471 - 616 573 -

Approach EB WB NB SB
HCM Control Delay, s 0.1 0.7 27.4 18.5
HCM LOS D C

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 242 836 - - 819 - - 310
HCM Lane V/C Ratio 0.343 0.009 - - 0.044 - - 0.137
HCM Control Delay (s) 27.4 9.3 0 - 9.6 0 - 18.5
HCM Lane LOS D A A - A A - C
HCM 95th %tile Q(veh) 1.5 0 - - 0.1 - - 0.5

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 26
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 9 466 3 16 431 4 44 2 12 3 3 8
Future Volume (vph) 9 466 3 16 431 4 44 2 12 3 3 8
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Grade (%) -1% 0% -2% -1%
Satd. Flow (prot) 0 1609 0 0 1773 0 0 1532 0 0 1486 0
Flt Permitted 0.992 0.981 0.816 0.946
Satd. Flow (perm) 0 1598 0 0 1743 0 0 1296 0 0 1422 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 1 13 8
Link Speed (mph) 25 25 25 25
Link Distance (ft) 373 270 277 210
Travel Time (s) 10.2 7.4 7.6 5.7
Confl. Peds. (#/hr) 2 3 3 2
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 0% 1% 0% 6% 1% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 497 0 0 470 0 0 61 0 0 14 0
Turn Type Perm NA Perm NA Perm NA Perm NA
Protected Phases 2 6 8 4
Permitted Phases 2 6 8 4
Detector Phase 2 2 6 6 8 8 4 4
Switch Phase
Minimum Initial (s) 30.0 30.0 30.0 30.0 3.0 3.0 3.0 3.0
Minimum Split (s) 35.0 35.0 35.0 35.0 7.6 7.6 7.6 7.6
Total Split (s) 35.0 35.0 35.0 35.0 10.0 10.0 10.0 10.0
Total Split (%) 43.8% 43.8% 43.8% 43.8% 12.5% 12.5% 12.5% 12.5%
Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
All-Red Time (s) 2.0 2.0 2.0 2.0 1.6 1.6 1.6 1.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 4.0 4.0 3.6 3.6
Lead/Lag
Lead-Lag Optimize?
Recall Mode Min Min Min Min None None None None
Act Effct Green (s) 40.7 40.7 6.7 6.7
Actuated g/C Ratio 0.75 0.75 0.12 0.12
v/c Ratio 0.41 0.36 0.35 0.08
Control Delay 10.5 9.0 28.4 20.6
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 10.5 9.0 28.4 20.6
LOS B A C C
Approach Delay 10.5 9.0 28.4 20.6
Approach LOS B A C C
Queue Length 50th (ft) 40 36 11 1
Queue Length 95th (ft) #380 300 #72 20
Internal Link Dist (ft) 293 190 197 130
Turn Bay Length (ft)
Base Capacity (vph) 1203 1313 172 183

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 27
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 9.0
Minimum Split (s) 35.0
Total Split (s) 35.0
Total Split (%) 44%
Yellow Time (s) 2.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 28
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.41 0.36 0.35 0.08
Intersection Summary
Area Type: Other
Cycle Length: 80
Actuated Cycle Length: 54
Natural Cycle: 80
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.41
Intersection Signal Delay: 11.0 Intersection LOS: B
Intersection Capacity Utilization 49.5% ICU Level of Service A
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 9: 29th Street & Market Street

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 29
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions Timing Plan: Saturday Midday

Lane Group Ø9
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions Synchro 10 Report


TPD Page 30
2020 Projected (Build) Conditions with Improvements
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 74 207 44 4 226 3 0 0 44 2 0 10
Future Volume (vph) 74 207 44 4 226 3 0 0 44 2 0 10
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 11 11 11 12 12 12
Grade (%) 0% 0% -2% 0%
Storage Length (ft) 0 150 0 0 0 0 0 0
Storage Lanes 0 1 0 0 1 0 0 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 0 1862 1615 0 1858 0 1855 1577 0 0 1670 0
Flt Permitted 0.987 0.999 0.992
Satd. Flow (perm) 0 1862 1615 0 1858 0 1855 1577 0 0 1670 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 325 227 190 155
Travel Time (s) 8.9 6.2 5.2 4.2
Confl. Peds. (#/hr) 3 1 1 3
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 0% 1% 0% 0% 2% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 299 47 0 247 0 0 47 0 0 13 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 40.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 1
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 74 207 44 4 226 3 0 0 44 2 0 10
Future Volume (Veh/h) 74 207 44 4 226 3 0 0 44 2 0 10
Sign Control Free Free Stop Stop
Grade 0% 0% -2% 0%
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Hourly flow rate (vph) 79 220 47 4 240 3 0 0 47 2 0 11
Pedestrians 1 3
Lane Width (ft) 11.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 325
pX, platoon unblocked
vC, conflicting volume 246 268 640 633 221 678 678 244
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 246 268 640 633 221 678 678 244
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 94 100 100 100 94 99 100 99
cM capacity (veh/h) 1328 1306 366 374 823 330 352 797
Direction, Lane # EB 1 EB 2 WB 1 NB 1 NB 2 SB 1
Volume Total 299 47 247 0 47 13
Volume Left 79 0 4 0 0 2
Volume Right 0 47 3 0 47 11
cSH 1328 1700 1306 1700 823 654
Volume to Capacity 0.06 0.03 0.00 0.00 0.06 0.02
Queue Length 95th (ft) 5 0 0 0 5 2
Control Delay (s) 2.5 0.0 0.2 0.0 9.6 10.6
Lane LOS A A A A B
Approach Delay (s) 2.1 0.2 9.6 10.6
Approach LOS A B
Intersection Summary
Average Delay 2.1
Intersection Capacity Utilization 40.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 2
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 74 207 44 4 226 3 0 0 44 2 0 10
Future Vol, veh/h 74 207 44 4 226 3 0 0 44 2 0 10
Conflicting Peds, #/hr 3 0 1 1 0 3 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 150 - - - 0 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - -2 - - 0 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94
Heavy Vehicles, % 0 1 0 0 2 0 0 0 0 0 0 0
Mvmt Flow 79 220 47 4 240 3 0 0 47 2 0 11

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 246 0 0 268 0 0 634 633 221 678 679 245
Stage 1 - - - - - - 379 379 - 253 253 -
Stage 2 - - - - - - 255 254 - 425 426 -
Critical Hdwy 4.3 - - 4.3 - - 6.7 6.1 6 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 5.7 5.1 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 5.7 5.1 - 6.1 5.5 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 989 - - 972 - - 475 429 882 412 376 845
Stage 1 - - - - - - 768 645 - 867 701 -
Stage 2 - - - - - - 890 721 - 694 589 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 986 - - 971 - - 433 385 881 359 337 843
Mov Cap-2 Maneuver - - - - - - 433 385 - 359 337 -
Stage 1 - - - - - - 694 583 - 782 695 -
Stage 2 - - - - - - 874 715 - 595 532 -

Approach EB WB NB SB
HCM Control Delay, s 2 0.1 9.3 10.3
HCM LOS A B

Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 881 986 - - 971 - - 688
HCM Lane V/C Ratio - 0.053 0.08 - - 0.004 - - 0.019
HCM Control Delay (s) 0 9.3 9 0 - 8.7 0 - 10.3
HCM Lane LOS A A A A - A A - B
HCM 95th %tile Q(veh) - 0.2 0.3 - - 0 - - 0.1

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 3
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 306 164 118 102 100 15 123 1368 134 27 1002 222
Future Volume (vph) 306 164 118 102 100 15 123 1368 134 27 1002 222
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 12 12 14 10 10 10 11 11 11 10 11 11
Grade (%) -1% -1% 1% -1%
Storage Length (ft) 250 250 150 0 640 0 110 0
Storage Lanes 1 1 1 0 1 0 1 1
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1601 1680 1562 1588 1608 0 1566 3186 0 1458 3257 1472
Flt Permitted 0.950 0.984 0.950 0.950 0.950
Satd. Flow (perm) 1591 1677 1541 1583 1608 0 1566 3186 0 1458 3257 1472
Right Turn on Red No No Yes Yes
Satd. Flow (RTOR) 7 214
Link Speed (mph) 35 25 35 35
Link Distance (ft) 525 325 1233 312
Travel Time (s) 10.2 8.9 24.0 6.1
Confl. Peds. (#/hr) 3 1 1 3
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 2% 0% 5% 1% 2% 7% 5% 2% 1% 10% 2% 1%
Shared Lane Traffic (%) 25%
Lane Group Flow (vph) 250 261 128 111 125 0 134 1633 0 29 1089 241
Turn Type Split NA pm+ov Split NA Prot NA Prot NA pm+ov
Protected Phases 4 4 5 8 8 5 2 1 6 4
Permitted Phases 4 6
Detector Phase 4 4 5 8 8 5 2 1 6 4
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 10.0 7.0 10.0 7.0
Minimum Split (s) 13.0 13.0 13.5 13.1 13.1 13.5 16.5 13.5 16.5 13.0
Total Split (s) 24.0 24.0 16.0 15.0 15.0 16.0 55.5 13.5 53.0 24.0
Total Split (%) 16.0% 16.0% 10.7% 10.0% 10.0% 10.7% 37.0% 9.0% 35.3% 16.0%
Yellow Time (s) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
All-Red Time (s) 2.3 2.3 2.8 2.4 2.4 2.8 2.8 2.8 2.8 2.3
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.0 5.0 5.5 5.1 5.1 5.5 5.5 5.5 5.5 5.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None None
Act Effct Green (s) 19.3 19.3 29.5 10.1 10.1 10.7 56.7 8.1 48.3 73.3
Actuated g/C Ratio 0.17 0.17 0.25 0.09 0.09 0.09 0.49 0.07 0.41 0.63
v/c Ratio 0.94 0.94 0.33 0.81 0.90 0.94 1.05 0.28 0.81 0.24
Control Delay 91.2 88.8 24.3 92.6 107.3 112.9 67.8 63.9 36.9 3.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 91.2 88.8 24.3 92.6 107.3 112.9 67.8 63.9 36.9 3.5
LOS F F C F F F E E D A
Approach Delay 76.8 100.4 71.2 31.6
Approach LOS E F E C
Queue Length 50th (ft) 180 187 51 76 87 93 ~680 19 325 6
Queue Length 95th (ft) #507 #524 89 #251 #286 #303 #1320 64 #752 63

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 4
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 7.0
Minimum Split (s) 42.0
Total Split (s) 42.0
Total Split (%) 28%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 5
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 445 245 1153 232
Turn Bay Length (ft) 250 250 150 640 110
Base Capacity (vph) 265 278 392 137 139 143 1555 102 1352 1005
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.94 0.94 0.33 0.81 0.90 0.94 1.05 0.28 0.81 0.24
Intersection Summary
Area Type: Other
Cycle Length: 150
Actuated Cycle Length: 116.4
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 1.05
Intersection Signal Delay: 60.4 Intersection LOS: E
Intersection Capacity Utilization 87.9% ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 2: S 32nd Street & Trindle Road/Chestnut Street

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 6
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 7
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (vph) 226 61 17 196 12 18
Future Volume (vph) 226 61 17 196 12 18
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 0% 0% -1%
Satd. Flow (prot) 1819 0 0 1875 1720 0
Flt Permitted 0.996 0.981
Satd. Flow (perm) 1819 0 0 1875 1720 0
Link Speed (mph) 25 25 25
Link Distance (ft) 227 445 204
Travel Time (s) 6.2 12.1 5.6
Confl. Peds. (#/hr) 7 7
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89
Heavy Vehicles (%) 1% 3% 0% 1% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 323 0 0 239 33 0
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 34.4% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 8
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Movement EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (veh/h) 226 61 17 196 12 18
Future Volume (Veh/h) 226 61 17 196 12 18
Sign Control Free Free Stop
Grade 0% 0% -1%
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89
Hourly flow rate (vph) 254 69 19 220 13 20
Pedestrians 7
Lane Width (ft) 12.0
Walking Speed (ft/s) 3.5
Percent Blockage 1
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 552
pX, platoon unblocked
vC, conflicting volume 330 554 296
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 330 554 296
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 98 97 97
cM capacity (veh/h) 1233 486 744
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 323 239 33
Volume Left 0 19 13
Volume Right 69 0 20
cSH 1700 1233 615
Volume to Capacity 0.19 0.02 0.05
Queue Length 95th (ft) 0 1 4
Control Delay (s) 0.0 0.8 11.2
Lane LOS A B
Approach Delay (s) 0.0 0.8 11.2
Approach LOS B
Intersection Summary
Average Delay 0.9
Intersection Capacity Utilization 34.4% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 9
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 0.9
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 226 61 17 196 12 18
Future Vol, veh/h 226 61 17 196 12 18
Conflicting Peds, #/hr 0 7 7 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 -1 -
Peak Hour Factor 89 89 89 89 89 89
Heavy Vehicles, % 1 3 0 1 0 0
Mvmt Flow 254 69 19 220 13 20

Major/Minor Major1 Major2 Minor1


Conflicting Flow All 0 0 330 0 554 296
Stage 1 - - - - 296 -
Stage 2 - - - - 258 -
Critical Hdwy - - 4.3 - 6.2 6.1
Critical Hdwy Stg 1 - - - - 5.2 -
Critical Hdwy Stg 2 - - - - 5.2 -
Follow-up Hdwy - - 3 - 3 3.1
Pot Cap-1 Maneuver - - 925 - 577 797
Stage 1 - - - - 883 -
Stage 2 - - - - 919 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 919 - 559 792
Mov Cap-2 Maneuver - - - - 559 -
Stage 1 - - - - 877 -
Stage 2 - - - - 897 -

Approach EB WB NB
HCM Control Delay, s 0 0.7 10.6
HCM LOS B

Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT


Capacity (veh/h) 679 - - 919 -
HCM Lane V/C Ratio 0.05 - - 0.021 -
HCM Control Delay (s) 10.6 - - 9 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.2 - - 0.1 -

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 10
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 63 139 21 25 140 10 16 19 4 37 76 58
Future Volume (vph) 63 139 21 25 140 10 16 19 4 37 76 58
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 0% 1% -1% -1%
Satd. Flow (prot) 0 1818 0 0 1862 0 0 1801 0 0 1766 0
Flt Permitted 0.986 0.993 0.980 0.989
Satd. Flow (perm) 0 1818 0 0 1862 0 0 1801 0 0 1766 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 445 215 319 515
Travel Time (s) 12.1 5.9 8.7 14.0
Confl. Peds. (#/hr) 16 1 1 16 3 3
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles (%) 0% 2% 5% 0% 0% 0% 6% 0% 0% 0% 3% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 279 0 0 219 0 0 49 0 0 214 0
Sign Control Stop Stop Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 39.2% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 11
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Stop Stop
Traffic Volume (vph) 63 139 21 25 140 10 16 19 4 37 76 58
Future Volume (vph) 63 139 21 25 140 10 16 19 4 37 76 58
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Hourly flow rate (vph) 79 174 26 31 175 13 20 24 5 46 95 73
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total (vph) 279 219 49 214
Volume Left (vph) 79 31 20 46
Volume Right (vph) 26 13 5 73
Hadj (s) 0.03 -0.01 0.06 -0.13
Departure Headway (s) 5.0 5.0 5.6 5.1
Degree Utilization, x 0.38 0.30 0.08 0.30
Capacity (veh/h) 687 675 558 646
Control Delay (s) 11.0 10.2 9.1 10.3
Approach Delay (s) 11.0 10.2 9.1 10.3
Approach LOS B B A B
Intersection Summary
Delay 10.5
Level of Service B
Intersection Capacity Utilization 39.2% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 12
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Intersection
Intersection Delay, s/veh 10.3
Intersection LOS B

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 63 139 21 25 140 10 16 19 4 37 76 58
Future Vol, veh/h 63 139 21 25 140 10 16 19 4 37 76 58
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles, % 0 2 5 0 0 0 6 0 0 0 3 2
Mvmt Flow 79 174 26 31 175 13 20 24 5 46 95 73
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 10.8 10.1 9.1 10.2
HCM LOS B B A B

Lane NBLn1 EBLn1 WBLn1 SBLn1


Vol Left, % 41% 28% 14% 22%
Vol Thru, % 49% 62% 80% 44%
Vol Right, % 10% 9% 6% 34%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 39 223 175 171
LT Vol 16 63 25 37
Through Vol 19 139 140 76
RT Vol 4 21 10 58
Lane Flow Rate 49 279 219 214
Geometry Grp 1 1 1 1
Degree of Util (X) 0.076 0.375 0.298 0.296
Departure Headway (Hd) 5.631 4.837 4.905 4.986
Convergence, Y/N Yes Yes Yes Yes
Cap 640 736 724 712
Service Time 3.631 2.917 2.989 3.073
HCM Lane V/C Ratio 0.077 0.379 0.302 0.301
HCM Control Delay 9.1 10.8 10.1 10.2
HCM Lane LOS A B B B
HCM 95th-tile Q 0.2 1.7 1.2 1.2

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 13
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 2 0 0 0 0 1 0 23 0 0 77 0
Future Volume (vph) 2 0 0 0 0 1 0 23 0 0 77 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 12 12 12 12 12 12 12 12 12
Grade (%) -5% 0% 1% 0%
Satd. Flow (prot) 0 1727 0 0 1644 0 0 1890 0 0 1863 0
Flt Permitted 0.950
Satd. Flow (perm) 0 1727 0 0 1644 0 0 1890 0 0 1863 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 151 181 206 204
Travel Time (s) 4.1 4.9 5.6 5.6
Confl. Peds. (#/hr) 2 3 3 2
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 2% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 3 0 0 1 0 0 29 0 0 96 0
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 14.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 14
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 2 0 0 0 0 1 0 23 0 0 77 0
Future Volume (Veh/h) 2 0 0 0 0 1 0 23 0 0 77 0
Sign Control Stop Stop Free Free
Grade -5% 0% 1% 0%
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Hourly flow rate (vph) 3 0 0 0 0 1 0 29 0 0 96 0
Pedestrians 2 3
Lane Width (ft) 10.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 128 130 98 128 130 32 98 32
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 128 130 98 128 130 32 98 32
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1
tC, 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 845 761 962 845 761 1045 1505 1589
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 3 1 29 96
Volume Left 3 0 0 0
Volume Right 0 1 0 0
cSH 845 1045 1505 1589
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 9.3 8.4 0.0 0.0
Lane LOS A A
Approach Delay (s) 9.3 8.4 0.0 0.0
Approach LOS A A
Intersection Summary
Average Delay 0.3
Intersection Capacity Utilization 14.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 15
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 2 0 0 0 0 1 0 23 0 0 77 0
Future Vol, veh/h 2 0 0 0 0 1 0 23 0 0 77 0
Conflicting Peds, #/hr 0 0 0 0 0 0 2 0 3 3 0 2
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - -5 - - 0 - - 1 - - 0 -
Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 2 0
Mvmt Flow 3 0 0 0 0 1 0 29 0 0 96 0

Major/Minor Minor2 Minor1 Major1 Major2


Conflicting Flow All 128 130 98 128 130 32 98 0 0 32 0 0
Stage 1 98 98 - 32 32 - - - - - - -
Stage 2 30 32 - 96 98 - - - - - - -
Critical Hdwy 6.1 5.5 5.7 7.1 6.5 6.2 4.3 - - 4.3 - -
Critical Hdwy Stg 1 5.1 4.5 - 6.1 5.5 - - - - - - -
Critical Hdwy Stg 2 5.1 4.5 - 6.1 5.5 - - - - - - -
Follow-up Hdwy 3 4 3.1 3 4 3.1 3 - - 3 - -
Pot Cap-1 Maneuver 1018 792 1037 983 764 1114 1112 - - 1170 - -
Stage 1 1088 840 - 1152 872 - - - - - - -
Stage 2 1165 880 - 1061 818 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1015 788 1035 980 760 1111 1110 - - 1167 - -
Mov Cap-2 Maneuver 1015 788 - 980 760 - - - - - - -
Stage 1 1086 838 - 1149 869 - - - - - - -
Stage 2 1164 877 - 1061 816 - - - - - - -

Approach EB WB NB SB
HCM Control Delay, s 8.6 8.2 0 0
HCM LOS A A

Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1110 - - 1015 1111 1167 - -
HCM Lane V/C Ratio - - - 0.002 0.001 - - -
HCM Control Delay (s) 0 - - 8.6 8.2 0 - -
HCM Lane LOS A - - A A A - -
HCM 95th %tile Q(veh) 0 - - 0 0 0 - -

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 16
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 5 0 1 15 1 0 0 1 0 0 0
Future Volume (vph) 0 5 0 1 15 1 0 0 1 0 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 11 11
Grade (%) 3% -4% 0% -3%
Satd. Flow (prot) 0 1872 0 0 1919 0 0 1644 0 0 1864 0
Flt Permitted 0.997
Satd. Flow (perm) 0 1872 0 0 1919 0 0 1644 0 0 1864 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 131 186 162 179
Travel Time (s) 3.6 5.1 4.4 4.9
Peak Hour Factor 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 11 0 0 37 0 0 2 0 0 0 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 17
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 0 5 0 1 15 1 0 0 1 0 0 0
Future Volume (Veh/h) 0 5 0 1 15 1 0 0 1 0 0 0
Sign Control Free Free Stop Stop
Grade 3% -4% 0% -3%
Peak Hour Factor 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46
Hourly flow rate (vph) 0 11 0 2 33 2 0 0 2 0 0 0
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 35 11 49 50 11 51 49 34
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 35 11 49 50 11 51 49 34
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 1589 1621 955 844 1076 951 845 1045
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 11 37 2 0
Volume Left 0 2 0 0
Volume Right 0 2 2 0
cSH 1589 1621 1076 1700
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 0.0 0.4 8.4 0.0
Lane LOS A A A
Approach Delay (s) 0.0 0.4 8.4 0.0
Approach LOS A A
Intersection Summary
Average Delay 0.6
Intersection Capacity Utilization 13.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 18
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 0.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 5 0 1 15 1 0 0 1 0 0 0
Future Vol, veh/h 0 5 0 1 15 1 0 0 1 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 3 - - -4 - - 0 - - -3 -
Peak Hour Factor 46 46 46 46 46 46 46 46 46 46 46 46
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 0 11 0 2 33 2 0 0 2 0 0 0

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 35 0 0 11 0 0 49 50 11 50 49 34
Stage 1 - - - - - - 11 11 - 38 38 -
Stage 2 - - - - - - 38 39 - 12 11 -
Critical Hdwy 4.3 - - 4.3 - - 7.1 6.5 6.2 6.5 5.9 5.9
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 5.5 4.9 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 5.5 4.9 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1168 - - 1190 - - 1112 845 1145 1119 853 1115
Stage 1 - - - - - - 1183 890 - 1150 873 -
Stage 2 - - - - - - 1143 866 - 1184 892 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1168 - - 1190 - - 1110 843 1145 1116 851 1115
Mov Cap-2 Maneuver - - - - - - 1110 843 - 1116 851 -
Stage 1 - - - - - - 1183 890 - 1150 871 -
Stage 2 - - - - - - 1141 864 - 1182 892 -

Approach EB WB NB SB
HCM Control Delay, s 0 0.5 8.2 0
HCM LOS A A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1145 1168 - - 1190 - - -
HCM Lane V/C Ratio 0.002 - - - 0.002 - - -
HCM Control Delay (s) 8.2 0 - - 8 0 - 0
HCM Lane LOS A A - - A A - A
HCM 95th %tile Q(veh) 0 0 - - 0 - - -

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 19
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 16 8 68 99 8 2 135 1596 10 21 1247 12
Future Volume (vph) 16 8 68 99 8 2 135 1596 10 21 1247 12
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 14 14 14 12 12 12 12 12 12 12 12 12
Grade (%) -2% 0% -1% -2%
Storage Length (ft) 150 0 0 0 400 0 160 0
Storage Lanes 1 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1406 1939 1600 0 1704 0 1719 3366 0 1727 3384 0
Flt Permitted 0.774 0.739 0.103 0.070
Satd. Flow (perm) 1146 1939 1600 0 1316 0 186 3366 0 127 3384 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 74 1 1
Link Speed (mph) 25 25 35 35
Link Distance (ft) 357 317 547 1233
Travel Time (s) 9.7 8.6 10.7 24.0
Confl. Peds. (#/hr) 1 1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 31% 0% 3% 1% 0% 0% 0% 2% 0% 0% 2% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 17 9 74 0 119 0 147 1746 0 23 1368 0
Turn Type Perm NA pm+ov Perm NA pm+pt NA pm+pt NA
Protected Phases 4 5 8 5 2 1 6
Permitted Phases 4 4 8 2 6
Detector Phase 4 4 5 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0
Minimum Split (s) 24.2 24.2 11.4 24.2 24.2 11.4 24.4 11.4 24.4
Total Split (s) 24.2 24.2 16.2 24.2 24.2 16.2 76.4 11.4 71.6
Total Split (%) 16.1% 16.1% 10.8% 16.1% 16.1% 10.8% 50.9% 7.6% 47.7%
Yellow Time (s) 3.0 3.0 3.8 3.0 3.0 3.8 3.8 3.8 3.8
All-Red Time (s) 3.2 3.2 2.6 3.2 3.2 2.6 2.6 2.6 2.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.2 5.2 5.4 5.2 5.4 5.4 5.4 5.4
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None
Act Effct Green (s) 16.0 16.0 31.4 16.0 77.0 73.3 67.0 60.8
Actuated g/C Ratio 0.15 0.15 0.29 0.15 0.70 0.67 0.61 0.55
v/c Ratio 0.10 0.03 0.15 0.62 0.52 0.78 0.14 0.73
Control Delay 48.8 48.1 6.7 62.1 17.8 19.9 11.4 23.8
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 48.8 48.1 6.7 62.1 17.8 19.9 11.4 23.8
LOS D D A E B B B C
Approach Delay 17.6 62.1 19.8 23.6
Approach LOS B E B C
Queue Length 50th (ft) 9 5 0 69 24 283 3 314
Queue Length 95th (ft) 41 26 28 #208 #142 #1154 25 #770

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 20
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 38.0
Total Split (s) 38.0
Total Split (%) 25%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 21
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 277 237 467 1153
Turn Bay Length (ft) 150 400 160
Base Capacity (vph) 205 346 515 235 286 2248 167 2108
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.08 0.03 0.14 0.51 0.51 0.78 0.14 0.65
Intersection Summary
Area Type: Other
Cycle Length: 150
Actuated Cycle Length: 109.7
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.78
Intersection Signal Delay: 22.7 Intersection LOS: C
Intersection Capacity Utilization 77.4% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 7: S 32nd Street & Harvard Avenue

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 22
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 23
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 1 350 22 63 232 4 17 13 69 7 72 24
Future Volume (vph) 1 350 22 63 232 4 17 13 69 7 72 24
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 1% 1% 2% -2%
Satd. Flow (prot) 0 1633 0 0 1636 0 0 1687 0 0 1667 0
Flt Permitted 0.990 0.991 0.997
Satd. Flow (perm) 0 1633 0 0 1636 0 0 1687 0 0 1667 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 426 373 515 207
Travel Time (s) 11.6 10.2 14.0 5.6
Confl. Peds. (#/hr) 1 1 3 1 1 3
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Heavy Vehicles (%) 0% 3% 9% 2% 3% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 414 0 0 332 0 0 110 0 0 115 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 56.7% ICU Level of Service B
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 24
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 1 350 22 63 232 4 17 13 69 7 72 24
Future Volume (Veh/h) 1 350 22 63 232 4 17 13 69 7 72 24
Sign Control Free Free Stop Stop
Grade 1% 1% 2% -2%
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Hourly flow rate (vph) 1 389 24 70 258 4 19 14 77 8 80 27
Pedestrians 3 1 1
Lane Width (ft) 12.0 12.0 12.0
Walking Speed (ft/s) 3.5 3.5 3.5
Percent Blockage 0 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 373
pX, platoon unblocked 0.98 0.98 0.98 0.98 0.98 0.98
vC, conflicting volume 262 414 874 806 403 888 816 263
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 241 414 864 794 403 878 805 242
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 94 90 95 88 96 73 97
cM capacity (veh/h) 1315 1144 197 297 650 216 294 786
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 414 332 110 115
Volume Left 1 70 19 8
Volume Right 24 4 77 27
cSH 1315 1144 420 335
Volume to Capacity 0.00 0.06 0.26 0.34
Queue Length 95th (ft) 0 5 26 37
Control Delay (s) 0.0 2.2 16.6 21.3
Lane LOS A A C C
Approach Delay (s) 0.0 2.2 16.6 21.3
Approach LOS C C
Intersection Summary
Average Delay 5.2
Intersection Capacity Utilization 56.7% ICU Level of Service B
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 25
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Intersection
Int Delay, s/veh 4.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 350 22 63 232 4 17 13 69 7 72 24
Future Vol, veh/h 1 350 22 63 232 4 17 13 69 7 72 24
Conflicting Peds, #/hr 0 0 1 1 0 0 3 0 1 1 0 3
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 1 - - 1 - - 2 - - -2 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 0 3 9 2 3 0 0 0 0 0 0 0
Mvmt Flow 1 389 24 70 258 4 19 14 77 8 80 27

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 262 0 0 414 0 0 861 806 403 850 816 263
Stage 1 - - - - - - 404 404 - 400 400 -
Stage 2 - - - - - - 457 402 - 450 416 -
Critical Hdwy 4.3 - - 4.3 - - 7.5 6.9 6.4 6.7 6.1 6
Critical Hdwy Stg 1 - - - - - - 6.5 5.9 - 5.7 5.1 -
Critical Hdwy Stg 2 - - - - - - 6.5 5.9 - 5.7 5.1 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 977 - - 865 - - 280 291 671 344 343 837
Stage 1 - - - - - - 681 576 - 749 633 -
Stage 2 - - - - - - 632 577 - 706 623 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 977 - - 864 - - 201 263 670 270 310 835
Mov Cap-2 Maneuver - - - - - - 201 263 - 270 310 -
Stage 1 - - - - - - 680 575 - 748 573 -
Stage 2 - - - - - - 475 522 - 608 622 -

Approach EB WB NB SB
HCM Control Delay, s 0 2 16.7 19.7
HCM LOS C C

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 418 977 - - 864 - - 359
HCM Lane V/C Ratio 0.263 0.001 - - 0.081 - - 0.319
HCM Control Delay (s) 16.7 8.7 0 - 9.5 0 - 19.7
HCM Lane LOS C A A - A A - C
HCM 95th %tile Q(veh) 1 0 - - 0.3 - - 1.3

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 26
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 5 407 11 26 276 3 13 4 18 3 6 18
Future Volume (vph) 5 407 11 26 276 3 13 4 18 3 6 18
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Grade (%) -1% 0% -2% -1%
Satd. Flow (prot) 0 1567 0 0 1743 0 0 1467 0 0 1384 0
Flt Permitted 0.997 0.952 0.912 0.959
Satd. Flow (perm) 0 1564 0 0 1666 0 0 1360 0 0 1332 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 2 1 20 20
Link Speed (mph) 25 25 25 25
Link Distance (ft) 373 270 277 210
Travel Time (s) 10.2 7.4 7.6 5.7
Confl. Peds. (#/hr) 4 1 1 4 1 2 2 1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 20% 3% 9% 0% 3% 0% 0% 0% 0% 0% 0% 7%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 459 0 0 331 0 0 38 0 0 30 0
Turn Type Perm NA Perm NA Perm NA Perm NA
Protected Phases 2 6 8 4
Permitted Phases 2 6 8 4
Detector Phase 2 2 6 6 8 8 4 4
Switch Phase
Minimum Initial (s) 30.0 30.0 30.0 30.0 3.0 3.0 3.0 3.0
Minimum Split (s) 35.0 35.0 35.0 35.0 7.6 7.6 7.6 7.6
Total Split (s) 35.0 35.0 35.0 35.0 10.0 10.0 10.0 10.0
Total Split (%) 43.8% 43.8% 43.8% 43.8% 12.5% 12.5% 12.5% 12.5%
Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
All-Red Time (s) 2.0 2.0 2.0 2.0 1.6 1.6 1.6 1.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 4.0 4.0 3.6 3.6
Lead/Lag
Lead-Lag Optimize?
Recall Mode Min Min Min Min None None None None
Act Effct Green (s) 43.0 43.0 6.8 6.8
Actuated g/C Ratio 0.81 0.81 0.13 0.13
v/c Ratio 0.36 0.24 0.20 0.16
Control Delay 9.2 7.5 19.7 18.1
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 9.2 7.5 19.7 18.1
LOS A A B B
Approach Delay 9.2 7.5 19.7 18.1
Approach LOS A A B B
Queue Length 50th (ft) 0 0 3 2
Queue Length 95th (ft) #340 200 37 30
Internal Link Dist (ft) 293 190 197 130
Turn Bay Length (ft)
Base Capacity (vph) 1275 1358 192 188

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 27
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 9.0
Minimum Split (s) 35.0
Total Split (s) 35.0
Total Split (%) 44%
Yellow Time (s) 2.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 28
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.36 0.24 0.20 0.16
Intersection Summary
Area Type: Other
Cycle Length: 80
Actuated Cycle Length: 52.8
Natural Cycle: 80
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.36
Intersection Signal Delay: 9.3 Intersection LOS: A
Intersection Capacity Utilization 44.7% ICU Level of Service A
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 9: 29th Street & Market Street

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 29
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: A.M. Peak Hour

Lane Group Ø9
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 30
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 26 173 202 20 202 3 0 0 213 3 0 50
Future Volume (vph) 26 173 202 20 202 3 0 0 213 3 0 50
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 11 11 11 12 12 12
Grade (%) 0% 0% -2% 0%
Storage Length (ft) 0 150 0 0 0 0 0 0
Storage Lanes 0 1 0 0 1 0 0 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 0 1825 1615 0 1830 0 1855 1577 0 0 1652 0
Flt Permitted 0.994 0.995 0.997
Satd. Flow (perm) 0 1825 1615 0 1830 0 1855 1577 0 0 1652 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 325 227 190 155
Travel Time (s) 8.9 6.2 5.2 4.2
Confl. Peds. (#/hr) 2 2 1 1
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Heavy Vehicles (%) 0% 4% 0% 0% 3% 33% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 214 217 0 242 0 0 229 0 0 57 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 45.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 1
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 26 173 202 20 202 3 0 0 213 3 0 50
Future Volume (Veh/h) 26 173 202 20 202 3 0 0 213 3 0 50
Sign Control Free Free Stop Stop
Grade 0% 0% -2% 0%
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Hourly flow rate (vph) 28 186 217 22 217 3 0 0 229 3 0 54
Pedestrians 1 2
Lane Width (ft) 12.0 11.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 325
pX, platoon unblocked
vC, conflicting volume 220 405 562 508 188 734 724 220
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 220 405 562 508 188 734 724 220
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 98 98 100 100 73 99 100 93
cM capacity (veh/h) 1361 1163 398 452 858 240 340 824
Direction, Lane # EB 1 EB 2 WB 1 NB 1 NB 2 SB 1
Volume Total 214 217 242 0 229 57
Volume Left 28 0 22 0 0 3
Volume Right 0 217 3 0 229 54
cSH 1361 1700 1163 1700 858 731
Volume to Capacity 0.02 0.13 0.02 0.00 0.27 0.08
Queue Length 95th (ft) 2 0 1 0 27 6
Control Delay (s) 1.2 0.0 0.9 0.0 10.7 10.3
Lane LOS A A A B B
Approach Delay (s) 0.6 0.9 10.7 10.3
Approach LOS B B
Intersection Summary
Average Delay 3.7
Intersection Capacity Utilization 45.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 2
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 3.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 26 173 202 20 202 3 0 0 213 3 0 50
Future Vol, veh/h 26 173 202 20 202 3 0 0 213 3 0 50
Conflicting Peds, #/hr 0 0 2 2 0 0 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 150 - - - 0 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - -2 - - 0 -
Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93
Heavy Vehicles, % 0 4 0 0 3 33 0 0 0 0 0 0
Mvmt Flow 28 186 217 22 217 3 0 0 229 3 0 54

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 220 0 0 405 0 0 535 508 188 728 724 220
Stage 1 - - - - - - 244 244 - 263 263 -
Stage 2 - - - - - - 291 264 - 465 461 -
Critical Hdwy 4.3 - - 4.3 - - 6.7 6.1 6 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 5.7 5.1 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 5.7 5.1 - 6.1 5.5 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1010 - - 872 - - 550 498 919 381 354 873
Stage 1 - - - - - - 901 727 - 856 694 -
Stage 2 - - - - - - 852 714 - 658 569 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1010 - - 870 - - 489 465 917 272 330 872
Mov Cap-2 Maneuver - - - - - - 489 465 - 272 330 -
Stage 1 - - - - - - 866 699 - 824 674 -
Stage 2 - - - - - - 776 693 - 475 547 -

Approach EB WB NB SB
HCM Control Delay, s 0.6 0.8 10.2 10
HCM LOS B B

Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 917 1010 - - 870 - - 775
HCM Lane V/C Ratio - 0.25 0.028 - - 0.025 - - 0.074
HCM Control Delay (s) 0 10.2 8.7 0 - 9.2 0 - 10
HCM Lane LOS A B A A - A A - B
HCM 95th %tile Q(veh) - 1 0.1 - - 0.1 - - 0.2

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 3
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 269 162 164 139 96 18 164 934 134 102 938 203
Future Volume (vph) 269 162 164 139 96 18 164 934 134 102 938 203
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 12 12 14 10 10 10 11 11 11 10 11 11
Grade (%) -1% -1% 1% -1%
Storage Length (ft) 250 250 150 0 640 0 110 0
Storage Lanes 1 1 1 0 1 0 1 1
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1601 1688 1562 1588 1597 0 1566 3158 0 1458 3257 1472
Flt Permitted 0.950 0.987 0.950 0.950 0.950
Satd. Flow (perm) 1591 1685 1537 1575 1597 0 1566 3158 0 1451 3257 1472
Right Turn on Red No No Yes Yes
Satd. Flow (RTOR) 11 201
Link Speed (mph) 35 25 35 35
Link Distance (ft) 525 325 1233 312
Travel Time (s) 10.2 8.9 24.0 6.1
Confl. Peds. (#/hr) 3 3 3 3 3 3
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 2% 0% 5% 1% 2% 7% 5% 2% 1% 10% 2% 1%
Shared Lane Traffic (%) 21%
Lane Group Flow (vph) 231 237 178 151 124 0 178 1161 0 111 1020 221
Turn Type Split NA pm+ov Split NA Prot NA Prot NA pm+ov
Protected Phases 4 4 5 8 8 5 2 1 6 4
Permitted Phases 4 6
Detector Phase 4 4 5 8 8 5 2 1 6 4
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 10.0 7.0 10.0 7.0
Minimum Split (s) 13.0 13.0 13.5 13.1 13.1 13.5 16.5 13.5 16.5 13.0
Total Split (s) 22.0 22.0 18.0 16.0 16.0 18.0 46.0 14.0 42.0 22.0
Total Split (%) 15.7% 15.7% 12.9% 11.4% 11.4% 12.9% 32.9% 10.0% 30.0% 15.7%
Yellow Time (s) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
All-Red Time (s) 2.3 2.3 2.8 2.4 2.4 2.8 2.8 2.8 2.8 2.3
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.0 5.0 5.5 5.1 5.1 5.5 5.5 5.5 5.5 5.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None None
Act Effct Green (s) 17.3 17.3 29.6 11.1 11.1 12.8 41.3 8.7 37.3 60.2
Actuated g/C Ratio 0.16 0.16 0.28 0.10 0.10 0.12 0.39 0.08 0.35 0.57
v/c Ratio 0.89 0.86 0.41 0.92 0.75 0.95 0.94 0.94 0.89 0.24
Control Delay 78.2 73.5 22.3 99.1 74.5 102.5 47.2 118.0 45.0 4.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 78.2 73.5 22.3 99.1 74.5 102.5 47.2 118.0 45.0 4.0
LOS E E C F E F D F D A
Approach Delay 61.1 88.0 54.6 44.3
Approach LOS E F D D
Queue Length 50th (ft) 148 151 58 94 76 111 342 70 301 5
Queue Length 95th (ft) #447 #450 125 #316 #251 #359 #837 #255 #728 62

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 4
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 7.0
Minimum Split (s) 42.0
Total Split (s) 42.0
Total Split (%) 30%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 5
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 445 245 1153 232
Turn Bay Length (ft) 250 250 150 640 110
Base Capacity (vph) 260 274 430 165 166 187 1233 118 1140 920
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.89 0.86 0.41 0.92 0.75 0.95 0.94 0.94 0.89 0.24
Intersection Summary
Area Type: Other
Cycle Length: 140
Actuated Cycle Length: 106.4
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.95
Intersection Signal Delay: 54.4 Intersection LOS: D
Intersection Capacity Utilization 75.8% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 2: S 32nd Street & Trindle Road/Chestnut Street

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 6
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 7
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (vph) 287 115 10 254 14 7
Future Volume (vph) 287 115 10 254 14 7
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 0% 0% -1%
Satd. Flow (prot) 1800 0 0 1853 1765 0
Flt Permitted 0.998 0.968
Satd. Flow (perm) 1800 0 0 1853 1765 0
Link Speed (mph) 25 25 25
Link Distance (ft) 227 445 204
Travel Time (s) 6.2 12.1 5.6
Confl. Peds. (#/hr) 1
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79
Heavy Vehicles (%) 2% 0% 10% 2% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 509 0 0 335 27 0
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 32.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 8
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Movement EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (veh/h) 287 115 10 254 14 7
Future Volume (Veh/h) 287 115 10 254 14 7
Sign Control Free Free Stop
Grade 0% 0% -1%
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79
Hourly flow rate (vph) 363 146 13 322 18 9
Pedestrians 1
Lane Width (ft) 12.0
Walking Speed (ft/s) 3.5
Percent Blockage 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 552
pX, platoon unblocked
vC, conflicting volume 509 785 436
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 509 785 436
tC, single (s) 4.2 6.4 6.2
tC, 2 stage (s)
tF (s) 2.3 3.5 3.3
p0 queue free % 99 95 99
cM capacity (veh/h) 1016 359 625
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 509 335 27
Volume Left 0 13 18
Volume Right 146 0 9
cSH 1700 1016 419
Volume to Capacity 0.30 0.01 0.06
Queue Length 95th (ft) 0 1 5
Control Delay (s) 0.0 0.5 14.2
Lane LOS A B
Approach Delay (s) 0.0 0.5 14.2
Approach LOS B
Intersection Summary
Average Delay 0.6
Intersection Capacity Utilization 32.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 9
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 0.6
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 287 115 10 254 14 7
Future Vol, veh/h 287 115 10 254 14 7
Conflicting Peds, #/hr 0 0 0 0 1 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 -1 -
Peak Hour Factor 79 79 79 79 79 79
Heavy Vehicles, % 2 0 10 2 0 0
Mvmt Flow 363 146 13 322 18 9

Major/Minor Major1 Major2 Minor1


Conflicting Flow All 0 0 509 0 785 436
Stage 1 - - - - 436 -
Stage 2 - - - - 349 -
Critical Hdwy - - 4.4 - 6.2 6.1
Critical Hdwy Stg 1 - - - - 5.2 -
Critical Hdwy Stg 2 - - - - 5.2 -
Follow-up Hdwy - - 3.1 - 3 3.1
Pot Cap-1 Maneuver - - 770 - 423 665
Stage 1 - - - - 762 -
Stage 2 - - - - 835 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 770 - 414 665
Mov Cap-2 Maneuver - - - - 414 -
Stage 1 - - - - 762 -
Stage 2 - - - - 817 -

Approach EB WB NB
HCM Control Delay, s 0 0.4 13
HCM LOS B

Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT


Capacity (veh/h) 474 - - 770 -
HCM Lane V/C Ratio 0.056 - - 0.016 -
HCM Control Delay (s) 13 - - 9.8 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.2 - - 0.1 -

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 10
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 76 204 8 18 188 5 13 10 5 2 29 48
Future Volume (vph) 76 204 8 18 188 5 13 10 5 2 29 48
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 0% 1% -1% -1%
Satd. Flow (prot) 0 1855 0 0 1861 0 0 1693 0 0 1681 0
Flt Permitted 0.987 0.996 0.978 0.998
Satd. Flow (perm) 0 1855 0 0 1861 0 0 1693 0 0 1681 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 445 215 319 515
Travel Time (s) 12.1 5.9 8.7 14.0
Confl. Peds. (#/hr) 1 8 8 1
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 17% 0% 0% 50% 7% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 360 0 0 264 0 0 35 0 0 99 0
Sign Control Stop Stop Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 44.9% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 11
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Stop Stop
Traffic Volume (vph) 76 204 8 18 188 5 13 10 5 2 29 48
Future Volume (vph) 76 204 8 18 188 5 13 10 5 2 29 48
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Hourly flow rate (vph) 95 255 10 23 235 6 16 13 6 3 36 60
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total (vph) 360 264 35 99
Volume Left (vph) 95 23 16 3
Volume Right (vph) 10 6 6 60
Hadj (s) 0.05 0.02 0.12 -0.29
Departure Headway (s) 4.6 4.7 5.7 5.1
Degree Utilization, x 0.46 0.35 0.05 0.14
Capacity (veh/h) 745 731 547 621
Control Delay (s) 11.6 10.2 9.0 9.0
Approach Delay (s) 11.6 10.2 9.0 9.0
Approach LOS B B A A
Intersection Summary
Delay 10.6
Level of Service B
Intersection Capacity Utilization 44.9% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 12
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Intersection
Intersection Delay, s/veh 10.8
Intersection LOS B

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 76 204 8 18 188 5 13 10 5 2 29 48
Future Vol, veh/h 76 204 8 18 188 5 13 10 5 2 29 48
Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Heavy Vehicles, % 0 1 0 0 1 0 17 0 0 50 7 0
Mvmt Flow 95 255 10 23 235 6 16 13 6 3 36 60
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 11.6 10.2 9.2 10.1
HCM LOS B B A B

Lane NBLn1 EBLn1 WBLn1 SBLn1


Vol Left, % 46% 26% 9% 3%
Vol Thru, % 36% 71% 89% 37%
Vol Right, % 18% 3% 2% 61%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 28 288 211 79
LT Vol 13 76 18 2
Through Vol 10 204 188 29
RT Vol 5 8 5 48
Lane Flow Rate 35 360 264 99
Geometry Grp 1 1 1 1
Degree of Util (X) 0.056 0.463 0.344 0.161
Departure Headway (Hd) 5.77 4.628 4.7 5.86
Convergence, Y/N Yes Yes Yes Yes
Cap 614 774 762 607
Service Time 3.866 2.677 2.755 3.944
HCM Lane V/C Ratio 0.057 0.465 0.346 0.163
HCM Control Delay 9.2 11.6 10.2 10.1
HCM Lane LOS A B B B
HCM 95th-tile Q 0.2 2.5 1.5 0.6

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 13
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 4 0 0 0 0 0 0 26 0 0 127 1
Future Volume (vph) 4 0 0 0 0 0 0 26 0 0 127 1
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 12 12 12 12 12 12 12 12 12
Grade (%) -5% 0% 1% 0%
Satd. Flow (prot) 0 1727 0 0 1900 0 0 1890 0 0 1898 0
Flt Permitted 0.950
Satd. Flow (perm) 0 1727 0 0 1900 0 0 1890 0 0 1898 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 151 181 206 204
Travel Time (s) 4.1 4.9 5.6 5.6
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 4 0 0 0 0 0 28 0 0 138 0
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 16.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 14
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 4 0 0 0 0 0 0 26 0 0 127 1
Future Volume (Veh/h) 4 0 0 0 0 0 0 26 0 0 127 1
Sign Control Stop Stop Free Free
Grade -5% 0% 1% 0%
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Hourly flow rate (vph) 4 0 0 0 0 0 0 28 0 0 137 1
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 166 166 138 166 166 28 138 28
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 166 166 138 166 166 28 138 28
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1
tC, 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 804 731 916 803 730 1053 1458 1599
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 4 0 28 138
Volume Left 4 0 0 0
Volume Right 0 0 0 1
cSH 804 1700 1458 1599
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 9.5 0.0 0.0 0.0
Lane LOS A A
Approach Delay (s) 9.5 0.0 0.0 0.0
Approach LOS A A
Intersection Summary
Average Delay 0.2
Intersection Capacity Utilization 16.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 15
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 0 0 0 0 0 0 26 0 0 127 1
Future Vol, veh/h 4 0 0 0 0 0 0 26 0 0 127 1
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - -5 - - 0 - - 1 - - 0 -
Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 4 0 0 0 0 0 0 28 0 0 137 1

Major/Minor Minor2 Minor1 Major1 Major2


Conflicting Flow All 166 166 138 166 166 28 138 0 0 28 0 0
Stage 1 138 138 - 28 28 - - - - - - -
Stage 2 28 28 - 138 138 - - - - - - -
Critical Hdwy 6.1 5.5 5.7 7.1 6.5 6.2 4.3 - - 4.3 - -
Critical Hdwy Stg 1 5.1 4.5 - 6.1 5.5 - - - - - - -
Critical Hdwy Stg 2 5.1 4.5 - 6.1 5.5 - - - - - - -
Follow-up Hdwy 3 4 3.1 3 4 3.1 3 - - 3 - -
Pot Cap-1 Maneuver 970 765 990 926 730 1120 1077 - - 1174 - -
Stage 1 1045 817 - 1158 876 - - - - - - -
Stage 2 1167 883 - 1005 786 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 970 765 990 926 730 1120 1077 - - 1174 - -
Mov Cap-2 Maneuver 970 765 - 926 730 - - - - - - -
Stage 1 1045 817 - 1158 876 - - - - - - -
Stage 2 1167 883 - 1005 786 - - - - - - -

Approach EB WB NB SB
HCM Control Delay, s 8.7 0 0 0
HCM LOS A A

Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1077 - - 970 - 1174 - -
HCM Lane V/C Ratio - - - 0.004 - - - -
HCM Control Delay (s) 0 - - 8.7 0 0 - -
HCM Lane LOS A - - A A A - -
HCM 95th %tile Q(veh) 0 - - 0 - 0 - -

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 16
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 2 8 1 1 60 0 0 0 3 0 0 1
Future Volume (vph) 2 8 1 1 60 0 0 0 3 0 0 1
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 11 11
Grade (%) 3% -4% 0% -3%
Satd. Flow (prot) 0 1831 0 0 1619 0 0 1644 0 0 1613 0
Flt Permitted 0.992 0.999
Satd. Flow (perm) 0 1831 0 0 1619 0 0 1644 0 0 1613 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 131 186 162 179
Travel Time (s) 3.6 5.1 4.4 4.9
Confl. Peds. (#/hr) 2 2 1 1
Peak Hour Factor 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58
Heavy Vehicles (%) 0% 0% 0% 0% 20% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 19 0 0 105 0 0 5 0 0 2 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 14.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 17
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 2 8 1 1 60 0 0 0 3 0 0 1
Future Volume (Veh/h) 2 8 1 1 60 0 0 0 3 0 0 1
Sign Control Free Free Stop Stop
Grade 3% -4% 0% -3%
Peak Hour Factor 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58
Hourly flow rate (vph) 3 14 2 2 103 0 0 0 5 0 0 2
Pedestrians 1 2
Lane Width (ft) 12.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 103 18 133 130 17 133 131 104
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 103 18 133 130 17 133 131 104
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 1502 1609 836 760 1066 836 760 955
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 19 105 5 2
Volume Left 3 2 0 0
Volume Right 2 0 5 2
cSH 1502 1609 1066 955
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 1.2 0.1 8.4 8.8
Lane LOS A A A A
Approach Delay (s) 1.2 0.1 8.4 8.8
Approach LOS A A
Intersection Summary
Average Delay 0.7
Intersection Capacity Utilization 14.3% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 18
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 0.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 2 8 1 1 60 0 0 0 3 0 0 1
Future Vol, veh/h 2 8 1 1 60 0 0 0 3 0 0 1
Conflicting Peds, #/hr 0 0 2 2 0 0 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 3 - - -4 - - 0 - - -3 -
Peak Hour Factor 58 58 58 58 58 58 58 58 58 58 58 58
Heavy Vehicles, % 0 0 0 0 20 0 0 0 0 0 0 0
Mvmt Flow 3 14 2 2 103 0 0 0 5 0 0 2

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 103 0 0 18 0 0 132 130 17 131 131 104
Stage 1 - - - - - - 23 23 - 107 107 -
Stage 2 - - - - - - 109 107 - 24 24 -
Critical Hdwy 4.3 - - 4.3 - - 7.1 6.5 6.2 6.5 5.9 5.9
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 5.5 4.9 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 5.5 4.9 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1107 - - 1183 - - 977 764 1136 1000 780 1024
Stage 1 - - - - - - 1165 880 - 1065 825 -
Stage 2 - - - - - - 1044 811 - 1168 883 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1107 - - 1181 - - 969 759 1134 992 775 1023
Mov Cap-2 Maneuver - - - - - - 969 759 - 992 775 -
Stage 1 - - - - - - 1159 876 - 1062 823 -
Stage 2 - - - - - - 1039 809 - 1159 879 -

Approach EB WB NB SB
HCM Control Delay, s 1.5 0.1 8.2 8.5
HCM LOS A A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1134 1107 - - 1181 - - 1023
HCM Lane V/C Ratio 0.005 0.003 - - 0.001 - - 0.002
HCM Control Delay (s) 8.2 8.3 0 - 8.1 0 - 8.5
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0 0 - - 0 - - 0

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 19
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 117 29 289 137 25 5 306 1130 16 9 1181 58
Future Volume (vph) 117 29 289 137 25 5 306 1130 16 9 1181 58
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 14 14 14 12 12 12 12 12 12 12 12 12
Grade (%) -2% 0% -1% -2%
Storage Length (ft) 150 0 0 0 400 0 160 0
Storage Lanes 1 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1771 1939 1632 0 1722 0 1702 3297 0 1727 3366 0
Flt Permitted 0.740 0.743 0.072 0.219
Satd. Flow (perm) 1378 1939 1632 0 1332 0 129 3297 0 398 3366 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 307 1 1 4
Link Speed (mph) 25 25 35 35
Link Distance (ft) 357 317 547 1233
Travel Time (s) 9.7 8.6 10.7 24.0
Confl. Peds. (#/hr) 1 1
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 4% 0% 1% 0% 0% 0% 1% 4% 6% 0% 2% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 124 31 307 0 178 0 326 1219 0 10 1318 0
Turn Type Perm NA pm+ov Perm NA pm+pt NA pm+pt NA
Protected Phases 4 5 8 5 2 1 6
Permitted Phases 4 4 8 2 6
Detector Phase 4 4 5 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0
Minimum Split (s) 24.2 24.2 11.4 24.2 24.2 11.4 24.4 11.4 24.4
Total Split (s) 24.2 24.2 24.0 24.2 24.2 24.0 66.4 11.4 53.8
Total Split (%) 17.3% 17.3% 17.1% 17.3% 17.3% 17.1% 47.4% 8.1% 38.4%
Yellow Time (s) 3.0 3.0 3.8 3.0 3.0 3.8 3.8 3.8 3.8
All-Red Time (s) 3.2 3.2 2.6 3.2 3.2 2.6 2.6 2.6 2.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.2 5.2 5.4 5.2 5.4 5.4 5.4 5.4
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None
Act Effct Green (s) 19.3 19.3 42.6 19.3 73.6 71.8 55.3 49.2
Actuated g/C Ratio 0.18 0.18 0.39 0.18 0.67 0.66 0.50 0.45
v/c Ratio 0.51 0.09 0.37 0.76 0.91 0.56 0.04 0.87
Control Delay 52.2 43.2 3.5 65.4 61.4 15.6 12.2 36.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 52.2 43.2 3.5 65.4 61.4 15.6 12.2 36.1
LOS D D A E E B B D
Approach Delay 19.2 65.4 25.3 35.9
Approach LOS B E C D
Queue Length 50th (ft) 73 17 0 109 157 166 2 375
Queue Length 95th (ft) #192 57 40 #321 #506 616 14 #873

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 20
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 38.0
Total Split (s) 38.0
Total Split (%) 27%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 21
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 277 237 467 1153
Turn Bay Length (ft) 150 400 160
Base Capacity (vph) 242 341 822 235 357 2159 274 1512
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.51 0.09 0.37 0.76 0.91 0.56 0.04 0.87
Intersection Summary
Area Type: Other
Cycle Length: 140
Actuated Cycle Length: 109.6
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.91
Intersection Signal Delay: 30.5 Intersection LOS: C
Intersection Capacity Utilization 84.0% ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 7: S 32nd Street & Harvard Avenue

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 22
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 23
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 7 397 16 34 404 7 51 8 23 6 25 21
Future Volume (vph) 7 397 16 34 404 7 51 8 23 6 25 21
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 1% 1% 2% -2%
Satd. Flow (prot) 0 1660 0 0 1676 0 0 1644 0 0 1594 0
Flt Permitted 0.999 0.996 0.970 0.994
Satd. Flow (perm) 0 1660 0 0 1676 0 0 1644 0 0 1594 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 426 373 515 207
Travel Time (s) 11.6 10.2 14.0 5.6
Confl. Peds. (#/hr) 1 1 1 1 1 3 3 1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 0% 2% 0% 0% 1% 0% 11% 0% 0% 0% 4% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 457 0 0 484 0 0 89 0 0 57 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 59.2% ICU Level of Service B
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 24
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 7 397 16 34 404 7 51 8 23 6 25 21
Future Volume (Veh/h) 7 397 16 34 404 7 51 8 23 6 25 21
Sign Control Free Free Stop Stop
Grade 1% 1% 2% -2%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 8 432 17 37 439 8 55 9 25 7 27 23
Pedestrians 1 3 1 1
Lane Width (ft) 12.0 12.0 12.0 12.0
Walking Speed (ft/s) 3.5 3.5 3.5 3.5
Percent Blockage 0 0 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 373
pX, platoon unblocked 0.91 0.91 0.91 0.91 0.91 0.91
vC, conflicting volume 448 450 1012 980 444 1007 984 445
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 340 450 962 926 444 956 931 337
tC, single (s) 4.1 4.1 7.2 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.6 4.0 3.3 3.5 4.0 3.3
p0 queue free % 99 97 68 96 96 96 88 96
cM capacity (veh/h) 1115 1120 174 235 615 195 230 643
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 457 484 89 57
Volume Left 8 37 55 7
Volume Right 17 8 25 23
cSH 1115 1120 226 302
Volume to Capacity 0.01 0.03 0.39 0.19
Queue Length 95th (ft) 1 3 44 17
Control Delay (s) 0.2 1.0 31.0 19.7
Lane LOS A A D C
Approach Delay (s) 0.2 1.0 31.0 19.7
Approach LOS D C
Intersection Summary
Average Delay 4.1
Intersection Capacity Utilization 59.2% ICU Level of Service B
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 25
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Intersection
Int Delay, s/veh 3.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 397 16 34 404 7 51 8 23 6 25 21
Future Vol, veh/h 7 397 16 34 404 7 51 8 23 6 25 21
Conflicting Peds, #/hr 1 0 1 1 0 1 1 0 3 3 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 1 - - 1 - - 2 - - -2 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 0 2 0 0 1 0 11 0 0 0 4 0
Mvmt Flow 8 432 17 37 439 8 55 9 25 7 27 23

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 448 0 0 450 0 0 1001 980 445 995 984 445
Stage 1 - - - - - - 458 458 - 518 518 -
Stage 2 - - - - - - 543 522 - 477 466 -
Critical Hdwy 4.3 - - 4.3 - - 7.61 6.9 6.4 6.7 6.14 6
Critical Hdwy Stg 1 - - - - - - 6.61 5.9 - 5.7 5.14 -
Critical Hdwy Stg 2 - - - - - - 6.61 5.9 - 5.7 5.14 -
Follow-up Hdwy 3 - - 3 - - 3.1 4 3.1 3 4.036 3.1
Pot Cap-1 Maneuver 842 - - 841 - - 209 226 634 277 275 666
Stage 1 - - - - - - 606 542 - 651 561 -
Stage 2 - - - - - - 536 504 - 683 589 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 841 - - 840 - - 175 210 632 243 255 665
Mov Cap-2 Maneuver - - - - - - 175 210 - 243 255 -
Stage 1 - - - - - - 598 534 - 642 527 -
Stage 2 - - - - - - 462 474 - 635 581 -

Approach EB WB NB SB
HCM Control Delay, s 0.2 0.7 31.3 17.8
HCM LOS D C

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 224 841 - - 840 - - 337
HCM Lane V/C Ratio 0.398 0.009 - - 0.044 - - 0.168
HCM Control Delay (s) 31.3 9.3 0 - 9.5 0 - 17.8
HCM Lane LOS D A A - A A - C
HCM 95th %tile Q(veh) 1.8 0 - - 0.1 - - 0.6

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 26
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 5 418 4 19 405 10 45 8 8 4 0 18
Future Volume (vph) 5 418 4 19 405 10 45 8 8 4 0 18
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Grade (%) -1% 0% -2% -1%
Satd. Flow (prot) 0 1593 0 0 1774 0 0 1551 0 0 1433 0
Flt Permitted 0.996 0.977 0.771 0.951
Satd. Flow (perm) 0 1588 0 0 1736 0 0 1239 0 0 1375 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 1 2 8 55
Link Speed (mph) 25 25 25 25
Link Distance (ft) 373 270 277 210
Travel Time (s) 10.2 7.4 7.6 5.7
Confl. Peds. (#/hr) 1 2 2 1
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 0% 2% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 454 0 0 462 0 0 66 0 0 23 0
Turn Type Perm NA Perm NA Perm NA Perm NA
Protected Phases 2 6 8 4
Permitted Phases 2 6 8 4
Detector Phase 2 2 6 6 8 8 4 4
Switch Phase
Minimum Initial (s) 30.0 30.0 30.0 30.0 3.0 3.0 3.0 3.0
Minimum Split (s) 35.0 35.0 35.0 35.0 7.6 7.6 7.6 7.6
Total Split (s) 35.0 35.0 35.0 35.0 10.0 10.0 10.0 10.0
Total Split (%) 43.8% 43.8% 43.8% 43.8% 12.5% 12.5% 12.5% 12.5%
Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
All-Red Time (s) 2.0 2.0 2.0 2.0 1.6 1.6 1.6 1.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 4.0 4.0 3.6 3.6
Lead/Lag
Lead-Lag Optimize?
Recall Mode Min Min Min Min None None None None
Act Effct Green (s) 39.6 39.6 6.7 6.7
Actuated g/C Ratio 0.71 0.71 0.12 0.12
v/c Ratio 0.40 0.38 0.43 0.11
Control Delay 10.2 9.4 34.1 3.3
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 10.2 9.4 34.1 3.3
LOS B A C A
Approach Delay 10.2 9.4 34.1 3.3
Approach LOS B A C A
Queue Length 50th (ft) 35 35 14 0
Queue Length 95th (ft) #307 294 #88 6
Internal Link Dist (ft) 293 190 197 130
Turn Bay Length (ft)
Base Capacity (vph) 1122 1226 155 212

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 27
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 9.0
Minimum Split (s) 35.0
Total Split (s) 35.0
Total Split (%) 44%
Yellow Time (s) 2.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 28
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.40 0.38 0.43 0.11
Intersection Summary
Area Type: Other
Cycle Length: 80
Actuated Cycle Length: 56
Natural Cycle: 80
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.43
Intersection Signal Delay: 11.2 Intersection LOS: B
Intersection Capacity Utilization 52.3% ICU Level of Service A
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 9: 29th Street & Market Street

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 29
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Weekday Midday P

Lane Group Ø9
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 30
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 21 217 134 14 305 1 0 0 138 1 0 43
Future Volume (vph) 21 217 134 14 305 1 0 0 138 1 0 43
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 11 11 11 12 12 12
Grade (%) 0% 0% -2% 0%
Storage Length (ft) 0 150 0 0 0 0 0 0
Storage Lanes 0 1 0 0 1 0 0 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 0 1875 1615 0 1896 0 1855 1577 0 0 1648 0
Flt Permitted 0.996 0.998 0.999
Satd. Flow (perm) 0 1875 1615 0 1896 0 1855 1577 0 0 1648 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 325 227 190 155
Travel Time (s) 8.9 6.2 5.2 4.2
Confl. Peds. (#/hr) 1 1 1 1
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Heavy Vehicles (%) 0% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 261 147 0 351 0 0 152 0 0 48 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 42.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 1
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 21 217 134 14 305 1 0 0 138 1 0 43
Future Volume (Veh/h) 21 217 134 14 305 1 0 0 138 1 0 43
Sign Control Free Free Stop Stop
Grade 0% 0% -2% 0%
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Hourly flow rate (vph) 23 238 147 15 335 1 0 0 152 1 0 47
Pedestrians 1 1
Lane Width (ft) 12.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 325
pX, platoon unblocked
vC, conflicting volume 337 385 698 651 238 802 798 338
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 337 385 698 651 238 802 798 338
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 98 99 100 100 81 100 100 93
cM capacity (veh/h) 1232 1185 326 378 806 241 311 708
Direction, Lane # EB 1 EB 2 WB 1 NB 1 NB 2 SB 1
Volume Total 261 147 351 0 152 48
Volume Left 23 0 15 0 0 1
Volume Right 0 147 1 0 152 47
cSH 1232 1700 1185 1700 806 680
Volume to Capacity 0.02 0.09 0.01 0.00 0.19 0.07
Queue Length 95th (ft) 1 0 1 0 17 6
Control Delay (s) 0.9 0.0 0.5 0.0 10.5 10.7
Lane LOS A A A B B
Approach Delay (s) 0.6 0.5 10.5 10.7
Approach LOS B B
Intersection Summary
Average Delay 2.6
Intersection Capacity Utilization 42.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 2
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 2.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 217 134 14 305 1 0 0 138 1 0 43
Future Vol, veh/h 21 217 134 14 305 1 0 0 138 1 0 43
Conflicting Peds, #/hr 1 0 0 0 0 1 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 150 - - - 0 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - -2 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 0 1 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 23 238 147 15 335 1 0 0 152 1 0 47

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 337 0 0 385 0 0 674 651 238 801 798 338
Stage 1 - - - - - - 284 284 - 367 367 -
Stage 2 - - - - - - 390 367 - 434 431 -
Critical Hdwy 4.3 - - 4.3 - - 6.7 6.1 6 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 5.7 5.1 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 5.7 5.1 - 6.1 5.5 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 920 - - 886 - - 447 420 864 339 321 748
Stage 1 - - - - - - 860 702 - 748 626 -
Stage 2 - - - - - - 758 652 - 685 586 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 919 - - 886 - - 401 397 864 268 304 747
Mov Cap-2 Maneuver - - - - - - 401 397 - 268 304 -
Stage 1 - - - - - - 832 679 - 723 612 -
Stage 2 - - - - - - 694 638 - 546 567 -

Approach EB WB NB SB
HCM Control Delay, s 0.5 0.4 10.1 10.4
HCM LOS B B

Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 864 919 - - 886 - - 718
HCM Lane V/C Ratio - 0.176 0.025 - - 0.017 - - 0.067
HCM Control Delay (s) 0 10.1 9 0 - 9.1 0 - 10.4
HCM Lane LOS A B A A - A A - B
HCM 95th %tile Q(veh) - 0.6 0.1 - - 0.1 - - 0.2

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 3
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 250 182 227 190 143 5 190 1276 108 66 1264 251
Future Volume (vph) 250 182 227 190 143 5 190 1276 108 66 1264 251
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 12 12 14 10 10 10 11 11 11 10 11 11
Grade (%) -1% -1% 1% -1%
Storage Length (ft) 250 250 150 0 640 0 110 0
Storage Lanes 1 1 1 0 1 0 1 1
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1616 1702 1640 1604 1663 0 1612 3181 0 1407 3290 1457
Flt Permitted 0.950 0.992 0.950 0.950 0.950
Satd. Flow (perm) 1613 1701 1618 1600 1663 0 1612 3181 0 1403 3290 1457
Right Turn on Red No No Yes Yes
Satd. Flow (RTOR) 6 174
Link Speed (mph) 35 25 35 35
Link Distance (ft) 525 325 1233 312
Travel Time (s) 10.2 8.9 24.0 6.1
Confl. Peds. (#/hr) 1 1 1 1 2 2
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Heavy Vehicles (%) 1% 0% 0% 0% 1% 0% 2% 2% 2% 14% 1% 2%
Shared Lane Traffic (%) 15%
Lane Group Flow (vph) 217 224 232 194 151 0 194 1412 0 67 1290 256
Turn Type Split NA pm+ov Split NA Prot NA Prot NA pm+ov
Protected Phases 4 4 5 8 8 5 2 1 6 4
Permitted Phases 4 6
Detector Phase 4 4 5 8 8 5 2 1 6 4
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 10.0 7.0 10.0 7.0
Minimum Split (s) 13.0 13.0 13.5 13.1 13.1 13.5 16.5 13.5 16.5 13.0
Total Split (s) 20.0 20.0 20.0 19.0 19.0 20.0 55.5 13.5 49.0 20.0
Total Split (%) 13.3% 13.3% 13.3% 12.7% 12.7% 13.3% 37.0% 9.0% 32.7% 13.3%
Yellow Time (s) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
All-Red Time (s) 2.3 2.3 2.8 2.4 2.4 2.8 2.8 2.8 2.8 2.3
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.0 5.0 5.5 5.1 5.1 5.5 5.5 5.5 5.5 5.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None None
Act Effct Green (s) 15.3 15.3 29.5 14.1 14.1 14.8 50.9 8.1 44.3 65.1
Actuated g/C Ratio 0.13 0.13 0.25 0.12 0.12 0.13 0.44 0.07 0.38 0.56
v/c Ratio 1.03 1.00 0.56 1.00 0.75 0.95 1.01 0.68 1.03 0.29
Control Delay 118.9 112.6 28.9 115.8 73.3 102.9 60.5 87.5 69.6 6.8
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 118.9 112.6 28.9 115.8 73.3 102.9 60.5 87.5 69.6 6.8
LOS F F C F E F E F E A
Approach Delay 85.8 97.2 65.6 60.4
Approach LOS F F E E
Queue Length 50th (ft) 160 164 91 135 102 134 480 46 454 23
Queue Length 95th (ft) #472 #482 #173 #407 #300 #400 #1085 #167 #1007 117

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 4
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 7.0
Minimum Split (s) 42.0
Total Split (s) 42.0
Total Split (%) 28%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 5
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 445 245 1153 232
Turn Bay Length (ft) 250 250 150 640 110
Base Capacity (vph) 211 223 412 194 202 204 1393 98 1251 891
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 1.03 1.00 0.56 1.00 0.75 0.95 1.01 0.68 1.03 0.29
Intersection Summary
Area Type: Other
Cycle Length: 150
Actuated Cycle Length: 116.4
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 1.03
Intersection Signal Delay: 69.4 Intersection LOS: E
Intersection Capacity Utilization 89.0% ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 2: S 32nd Street & Trindle Road/Chestnut Street

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 6
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 7
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (vph) 238 96 17 261 17 26
Future Volume (vph) 238 96 17 261 17 26
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 0% 0% -1%
Satd. Flow (prot) 1826 0 0 1894 1679 0
Flt Permitted 0.997 0.981
Satd. Flow (perm) 1826 0 0 1894 1679 0
Link Speed (mph) 25 25 25
Link Distance (ft) 227 445 204
Travel Time (s) 6.2 12.1 5.6
Confl. Peds. (#/hr) 1 1 2
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 0% 0% 0% 0% 0% 4%
Shared Lane Traffic (%)
Lane Group Flow (vph) 363 0 0 302 46 0
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 37.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 8
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Movement EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (veh/h) 238 96 17 261 17 26
Future Volume (Veh/h) 238 96 17 261 17 26
Sign Control Free Free Stop
Grade 0% 0% -1%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate (vph) 259 104 18 284 18 28
Pedestrians 2 1
Lane Width (ft) 12.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 552
pX, platoon unblocked
vC, conflicting volume 364 634 312
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 364 634 312
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 99 96 96
cM capacity (veh/h) 1205 439 723
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 363 302 46
Volume Left 0 18 18
Volume Right 104 0 28
cSH 1700 1205 577
Volume to Capacity 0.21 0.01 0.08
Queue Length 95th (ft) 0 1 6
Control Delay (s) 0.0 0.6 11.8
Lane LOS A B
Approach Delay (s) 0.0 0.6 11.8
Approach LOS B
Intersection Summary
Average Delay 1.0
Intersection Capacity Utilization 37.7% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 9
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 238 96 17 261 17 26
Future Vol, veh/h 238 96 17 261 17 26
Conflicting Peds, #/hr 0 1 1 0 2 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 -1 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 0 0 0 0 0 4
Mvmt Flow 259 104 18 284 18 28

Major/Minor Major1 Major2 Minor1


Conflicting Flow All 0 0 364 0 634 312
Stage 1 - - - - 312 -
Stage 2 - - - - 322 -
Critical Hdwy - - 4.3 - 6.2 6.14
Critical Hdwy Stg 1 - - - - 5.2 -
Critical Hdwy Stg 2 - - - - 5.2 -
Follow-up Hdwy - - 3 - 3 3.1
Pot Cap-1 Maneuver - - 901 - 518 778
Stage 1 - - - - 868 -
Stage 2 - - - - 859 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 900 - 504 777
Mov Cap-2 Maneuver - - - - 504 -
Stage 1 - - - - 867 -
Stage 2 - - - - 837 -

Approach EB WB NB
HCM Control Delay, s 0 0.6 11.1
HCM LOS B

Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT


Capacity (veh/h) 640 - - 900 -
HCM Lane V/C Ratio 0.073 - - 0.021 -
HCM Control Delay (s) 11.1 - - 9.1 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.2 - - 0.1 -

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 10
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 82 178 5 23 197 10 5 19 7 7 31 55
Future Volume (vph) 82 178 5 23 197 10 5 19 7 7 31 55
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 0% 1% -1% -1%
Satd. Flow (prot) 0 1855 0 0 1838 0 0 1782 0 0 1750 0
Flt Permitted 0.985 0.995 0.992 0.996
Satd. Flow (perm) 0 1855 0 0 1838 0 0 1782 0 0 1750 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 445 215 319 515
Travel Time (s) 12.1 5.9 8.7 14.0
Confl. Peds. (#/hr) 4 7 7 4 3 7 7 3
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Heavy Vehicles (%) 0% 1% 0% 9% 1% 0% 0% 5% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 278 0 0 242 0 0 32 0 0 98 0
Sign Control Stop Stop Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 43.6% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 11
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Stop Stop
Traffic Volume (vph) 82 178 5 23 197 10 5 19 7 7 31 55
Future Volume (vph) 82 178 5 23 197 10 5 19 7 7 31 55
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Hourly flow rate (vph) 86 187 5 24 207 11 5 20 7 7 33 58
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total (vph) 278 242 32 98
Volume Left (vph) 86 24 5 7
Volume Right (vph) 5 11 7 58
Hadj (s) 0.06 0.02 -0.05 -0.34
Departure Headway (s) 4.6 4.6 5.2 4.8
Degree Utilization, x 0.35 0.31 0.05 0.13
Capacity (veh/h) 761 752 612 669
Control Delay (s) 10.1 9.6 8.5 8.5
Approach Delay (s) 10.1 9.6 8.5 8.5
Approach LOS B A A A
Intersection Summary
Delay 9.6
Level of Service A
Intersection Capacity Utilization 43.6% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 12
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Intersection
Intersection Delay, s/veh 9.7
Intersection LOS A

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 82 178 5 23 197 10 5 19 7 7 31 55
Future Vol, veh/h 82 178 5 23 197 10 5 19 7 7 31 55
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Heavy Vehicles, % 0 1 0 9 1 0 0 5 0 0 0 0
Mvmt Flow 86 187 5 24 207 11 5 20 7 7 33 58
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 10 9.9 8.4 8.6
HCM LOS A A A A

Lane NBLn1 EBLn1 WBLn1 SBLn1


Vol Left, % 16% 31% 10% 8%
Vol Thru, % 61% 67% 86% 33%
Vol Right, % 23% 2% 4% 59%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 31 265 230 93
LT Vol 5 82 23 7
Through Vol 19 178 197 31
RT Vol 7 5 10 55
Lane Flow Rate 33 279 242 98
Geometry Grp 1 1 1 1
Degree of Util (X) 0.046 0.352 0.314 0.13
Departure Headway (Hd) 5.126 4.543 4.673 4.792
Convergence, Y/N Yes Yes Yes Yes
Cap 695 789 767 745
Service Time 3.184 2.579 2.711 2.842
HCM Lane V/C Ratio 0.047 0.354 0.316 0.132
HCM Control Delay 8.4 10 9.9 8.6
HCM Lane LOS A A A A
HCM 95th-tile Q 0.1 1.6 1.3 0.4

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 13
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 3 0 0 1 0 0 0 40 1 0 111 1
Future Volume (vph) 3 0 0 1 0 0 0 40 1 0 111 1
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 12 12 12 12 12 12 12 12 12
Grade (%) -5% 0% 1% 0%
Satd. Flow (prot) 0 1727 0 0 1805 0 0 1831 0 0 1898 0
Flt Permitted 0.950 0.950
Satd. Flow (perm) 0 1727 0 0 1805 0 0 1831 0 0 1898 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 151 181 206 204
Travel Time (s) 4.1 4.9 5.6 5.6
Confl. Peds. (#/hr) 3 3
Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 3% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 4 0 0 1 0 0 50 0 0 136 0
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 16.6% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 14
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 3 0 0 1 0 0 0 40 1 0 111 1
Future Volume (Veh/h) 3 0 0 1 0 0 0 40 1 0 111 1
Sign Control Stop Stop Free Free
Grade -5% 0% 1% 0%
Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82
Hourly flow rate (vph) 4 0 0 1 0 0 0 49 1 0 135 1
Pedestrians 3
Lane Width (ft) 10.0
Walking Speed (ft/s) 3.5
Percent Blockage 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 188 188 138 185 188 50 139 50
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 188 188 138 185 188 50 139 50
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1
tC, 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 99 100 100 100 100 100 100 100
cM capacity (veh/h) 774 708 913 779 708 1025 1453 1570
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 4 1 50 136
Volume Left 4 1 0 0
Volume Right 0 0 1 1
cSH 774 779 1453 1570
Volume to Capacity 0.01 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 9.7 9.6 0.0 0.0
Lane LOS A A
Approach Delay (s) 9.7 9.6 0.0 0.0
Approach LOS A A
Intersection Summary
Average Delay 0.3
Intersection Capacity Utilization 16.6% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 15
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 3 0 0 1 0 0 0 40 1 0 111 1
Future Vol, veh/h 3 0 0 1 0 0 0 40 1 0 111 1
Conflicting Peds, #/hr 0 0 0 0 0 0 3 0 0 0 0 3
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - -5 - - 0 - - 1 - - 0 -
Peak Hour Factor 82 82 82 82 82 82 82 82 82 82 82 82
Heavy Vehicles, % 0 0 0 0 0 0 0 3 0 0 0 0
Mvmt Flow 4 0 0 1 0 0 0 49 1 0 135 1

Major/Minor Minor2 Minor1 Major1 Major2


Conflicting Flow All 189 189 139 186 189 50 139 0 0 50 0 0
Stage 1 139 139 - 50 50 - - - - - - -
Stage 2 50 50 - 136 139 - - - - - - -
Critical Hdwy 6.1 5.5 5.7 7.1 6.5 6.2 4.3 - - 4.3 - -
Critical Hdwy Stg 1 5.1 4.5 - 6.1 5.5 - - - - - - -
Critical Hdwy Stg 2 5.1 4.5 - 6.1 5.5 - - - - - - -
Follow-up Hdwy 3 4 3.1 3 4 3.1 3 - - 3 - -
Pot Cap-1 Maneuver 942 748 989 898 709 1089 1076 - - 1154 - -
Stage 1 1044 816 - 1126 857 - - - - - - -
Stage 2 1141 869 - 1008 785 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 940 747 987 898 708 1089 1073 - - 1154 - -
Mov Cap-2 Maneuver 940 747 - 898 708 - - - - - - -
Stage 1 1042 814 - 1126 857 - - - - - - -
Stage 2 1141 869 - 1008 783 - - - - - - -

Approach EB WB NB SB
HCM Control Delay, s 8.8 9 0 0
HCM LOS A A

Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1073 - - 940 898 1154 - -
HCM Lane V/C Ratio - - - 0.004 0.001 - - -
HCM Control Delay (s) 0 - - 8.8 9 0 - -
HCM Lane LOS A - - A A A - -
HCM 95th %tile Q(veh) 0 - - 0 0 0 - -

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 16
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 1 7 5 15 36 0 1 0 22 1 0 0
Future Volume (vph) 1 7 5 15 36 0 1 0 22 1 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 11 11
Grade (%) 3% -4% 0% -3%
Satd. Flow (prot) 0 1641 0 0 1911 0 0 1650 0 0 1771 0
Flt Permitted 0.997 0.986 0.998 0.950
Satd. Flow (perm) 0 1641 0 0 1911 0 0 1650 0 0 1771 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 131 186 162 179
Travel Time (s) 3.6 5.1 4.4 4.9
Confl. Peds. (#/hr) 1 1 1 1
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Heavy Vehicles (%) 0% 14% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 16 0 0 65 0 0 29 0 0 1 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 16.9% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 17
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 1 7 5 15 36 0 1 0 22 1 0 0
Future Volume (Veh/h) 1 7 5 15 36 0 1 0 22 1 0 0
Sign Control Free Free Stop Stop
Grade 3% -4% 0% -3%
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Hourly flow rate (vph) 1 9 6 19 46 0 1 0 28 1 0 0
Pedestrians 1 1
Lane Width (ft) 12.0 11.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 47 16 99 100 13 127 103 47
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 47 16 99 100 13 127 103 47
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 99 100 100 97 100 100 100
cM capacity (veh/h) 1572 1613 877 783 1072 819 780 1027
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 16 65 29 1
Volume Left 1 19 1 1
Volume Right 6 0 28 0
cSH 1572 1613 1064 819
Volume to Capacity 0.00 0.01 0.03 0.00
Queue Length 95th (ft) 0 1 2 0
Control Delay (s) 0.5 2.2 8.5 9.4
Lane LOS A A A A
Approach Delay (s) 0.5 2.2 8.5 9.4
Approach LOS A A
Intersection Summary
Average Delay 3.6
Intersection Capacity Utilization 16.9% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 18
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 3.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 7 5 15 36 0 1 0 22 1 0 0
Future Vol, veh/h 1 7 5 15 36 0 1 0 22 1 0 0
Conflicting Peds, #/hr 1 0 1 1 0 1 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 3 - - -4 - - 0 - - -3 -
Peak Hour Factor 79 79 79 79 79 79 79 79 79 79 79 79
Heavy Vehicles, % 0 14 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 1 9 6 19 46 0 1 0 28 1 0 0

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 47 0 0 16 0 0 99 100 13 113 103 47
Stage 1 - - - - - - 15 15 - 85 85 -
Stage 2 - - - - - - 84 85 - 28 18 -
Critical Hdwy 4.3 - - 4.3 - - 7.1 6.5 6.2 6.5 5.9 5.9
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 5.5 4.9 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 5.5 4.9 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1157 - - 1185 - - 1028 794 1142 1025 805 1097
Stage 1 - - - - - - 1177 887 - 1092 840 -
Stage 2 - - - - - - 1078 828 - 1163 887 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1156 - - 1184 - - 1014 779 1141 986 790 1096
Mov Cap-2 Maneuver - - - - - - 1014 779 - 986 790 -
Stage 1 - - - - - - 1175 885 - 1090 826 -
Stage 2 - - - - - - 1061 814 - 1133 885 -

Approach EB WB NB SB
HCM Control Delay, s 0.6 2.4 8.3 8.7
HCM LOS A A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1135 1156 - - 1184 - - 986
HCM Lane V/C Ratio 0.026 0.001 - - 0.016 - - 0.001
HCM Control Delay (s) 8.3 8.1 0 - 8.1 0 - 8.7
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 19
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 71 18 279 155 13 10 242 1499 15 7 1714 35
Future Volume (vph) 71 18 279 155 13 10 242 1499 15 7 1714 35
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 14 14 14 12 12 12 12 12 12 12 12 12
Grade (%) -2% 0% -1% -2%
Storage Length (ft) 150 0 0 0 400 0 160 0
Storage Lanes 1 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1738 1939 1540 0 1694 0 1719 3399 0 1727 3410 0
Flt Permitted 0.785 0.740 0.053 0.121
Satd. Flow (perm) 1431 1939 1540 0 1309 0 96 3399 0 220 3410 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 282 2 1 2
Link Speed (mph) 25 25 35 35
Link Distance (ft) 357 317 547 1233
Travel Time (s) 9.7 8.6 10.7 24.0
Confl. Peds. (#/hr) 3 3 1 1
Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99
Heavy Vehicles (%) 6% 0% 7% 1% 0% 0% 0% 1% 0% 0% 1% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 72 18 282 0 180 0 244 1529 0 7 1766 0
Turn Type Perm NA pm+ov Perm NA pm+pt NA pm+pt NA
Protected Phases 4 5 8 5 2 1 6
Permitted Phases 4 4 8 2 6
Detector Phase 4 4 5 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0
Minimum Split (s) 24.2 24.2 11.4 24.2 24.2 11.4 24.4 11.4 24.4
Total Split (s) 24.2 24.2 19.0 24.2 24.2 19.0 76.4 11.4 68.8
Total Split (%) 16.1% 16.1% 12.7% 16.1% 16.1% 12.7% 50.9% 7.6% 45.9%
Yellow Time (s) 3.0 3.0 3.8 3.0 3.0 3.8 3.8 3.8 3.8
All-Red Time (s) 3.2 3.2 2.6 3.2 3.2 2.6 2.6 2.6 2.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.2 5.2 5.4 5.2 5.4 5.4 5.4 5.4
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None
Act Effct Green (s) 19.3 19.3 37.5 19.3 83.5 81.7 70.4 64.3
Actuated g/C Ratio 0.16 0.16 0.31 0.16 0.70 0.68 0.59 0.54
v/c Ratio 0.31 0.06 0.42 0.85 0.96 0.66 0.03 0.96
Control Delay 52.1 48.3 4.8 82.1 83.1 16.4 11.0 41.4
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 52.1 48.3 4.8 82.1 83.1 16.4 11.0 41.4
LOS D D A F F B B D
Approach Delay 16.1 82.1 25.6 41.3
Approach LOS B F C D
Queue Length 50th (ft) 46 11 0 125 129 240 1 570
Queue Length 95th (ft) 120 42 47 #356 #431 #913 11 #1258

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 20
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 38.0
Total Split (s) 38.0
Total Split (%) 25%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 21
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 277 237 467 1153
Turn Bay Length (ft) 150 400 160
Base Capacity (vph) 230 311 675 212 253 2322 206 1833
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.31 0.06 0.42 0.85 0.96 0.66 0.03 0.96
Intersection Summary
Area Type: Other
Cycle Length: 150
Actuated Cycle Length: 119.6
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.96
Intersection Signal Delay: 34.0 Intersection LOS: C
Intersection Capacity Utilization 95.8% ICU Level of Service F
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 7: S 32nd Street & Harvard Avenue

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 22
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 23
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 17 391 9 51 436 13 29 14 31 8 16 13
Future Volume (vph) 17 391 9 51 436 13 29 14 31 8 16 13
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 1% 1% 2% -2%
Satd. Flow (prot) 0 1677 0 0 1672 0 0 1742 0 0 1628 0
Flt Permitted 0.998 0.995 0.981 0.990
Satd. Flow (perm) 0 1677 0 0 1672 0 0 1742 0 0 1628 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 426 373 515 207
Travel Time (s) 11.6 10.2 14.0 5.6
Confl. Peds. (#/hr) 4 1 1 4
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 434 0 0 521 0 0 77 0 0 39 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 58.2% ICU Level of Service B
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 24
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 17 391 9 51 436 13 29 14 31 8 16 13
Future Volume (Veh/h) 17 391 9 51 436 13 29 14 31 8 16 13
Sign Control Free Free Stop Stop
Grade 1% 1% 2% -2%
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Hourly flow rate (vph) 18 407 9 53 454 14 30 15 32 8 17 14
Pedestrians 1 4
Lane Width (ft) 12.0 12.0
Walking Speed (ft/s) 3.5 3.5
Percent Blockage 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 373
pX, platoon unblocked 0.90 0.90 0.90 0.90 0.90 0.90
vC, conflicting volume 472 417 1038 1026 412 1058 1024 465
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 357 417 986 974 412 1009 971 349
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 98 95 83 93 95 95 92 98
cM capacity (veh/h) 1087 1152 179 213 643 169 214 626
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 434 521 77 39
Volume Left 18 53 30 8
Volume Right 9 14 32 14
cSH 1087 1152 268 262
Volume to Capacity 0.02 0.05 0.29 0.15
Queue Length 95th (ft) 1 4 29 13
Control Delay (s) 0.5 1.3 23.8 21.1
Lane LOS A A C C
Approach Delay (s) 0.5 1.3 23.8 21.1
Approach LOS C C
Intersection Summary
Average Delay 3.3
Intersection Capacity Utilization 58.2% ICU Level of Service B
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 25
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Intersection
Int Delay, s/veh 3.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 17 391 9 51 436 13 29 14 31 8 16 13
Future Vol, veh/h 17 391 9 51 436 13 29 14 31 8 16 13
Conflicting Peds, #/hr 4 0 1 1 0 4 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 1 - - 1 - - 2 - - -2 -
Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96
Heavy Vehicles, % 0 1 0 0 1 0 0 0 0 0 0 0
Mvmt Flow 18 407 9 53 454 14 30 15 32 8 17 14

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 472 0 0 417 0 0 1032 1027 413 1042 1024 465
Stage 1 - - - - - - 449 449 - 571 571 -
Stage 2 - - - - - - 583 578 - 471 453 -
Critical Hdwy 4.3 - - 4.3 - - 7.5 6.9 6.4 6.7 6.1 6
Critical Hdwy Stg 1 - - - - - - 6.5 5.9 - 5.7 5.1 -
Critical Hdwy Stg 2 - - - - - - 6.5 5.9 - 5.7 5.1 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 826 - - 863 - - 208 211 662 258 266 649
Stage 1 - - - - - - 639 548 - 611 541 -
Stage 2 - - - - - - 529 473 - 688 603 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 823 - - 862 - - 177 187 661 211 236 647
Mov Cap-2 Maneuver - - - - - - 177 187 - 211 236 -
Stage 1 - - - - - - 620 532 - 591 494 -
Stage 2 - - - - - - 459 432 - 619 586 -

Approach EB WB NB SB
HCM Control Delay, s 0.4 1 24.7 19.1
HCM LOS C C

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 259 823 - - 862 - - 294
HCM Lane V/C Ratio 0.298 0.022 - - 0.062 - - 0.131
HCM Control Delay (s) 24.7 9.5 0 - 9.4 0 - 19.1
HCM Lane LOS C A A - A A - C
HCM 95th %tile Q(veh) 1.2 0.1 - - 0.2 - - 0.4

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 26
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 6 432 7 39 460 11 27 4 9 9 6 9
Future Volume (vph) 6 432 7 39 460 11 27 4 9 9 6 9
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Grade (%) -1% 0% -2% -1%
Satd. Flow (prot) 0 1607 0 0 1770 0 0 1524 0 0 1502 0
Flt Permitted 0.995 0.950 0.917
Satd. Flow (perm) 0 1601 0 0 1689 0 0 1569 0 0 1397 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 1 2 9 9
Link Speed (mph) 25 25 25 25
Link Distance (ft) 373 270 277 210
Travel Time (s) 10.2 7.4 7.6 5.7
Confl. Peds. (#/hr) 4 2 2 4 1 2 2 1
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 458 0 0 525 0 0 41 0 0 24 0
Turn Type Perm NA Perm NA Perm NA Perm NA
Protected Phases 2 6 8 4
Permitted Phases 2 6 8 4
Detector Phase 2 2 6 6 8 8 4 4
Switch Phase
Minimum Initial (s) 30.0 30.0 30.0 30.0 3.0 3.0 3.0 3.0
Minimum Split (s) 35.0 35.0 35.0 35.0 7.6 7.6 7.6 7.6
Total Split (s) 35.0 35.0 35.0 35.0 10.0 10.0 10.0 10.0
Total Split (%) 43.8% 43.8% 43.8% 43.8% 12.5% 12.5% 12.5% 12.5%
Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
All-Red Time (s) 2.0 2.0 2.0 2.0 1.6 1.6 1.6 1.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 4.0 4.0 3.6 3.6
Lead/Lag
Lead-Lag Optimize?
Recall Mode Min Min Min Min None None None None
Act Effct Green (s) 43.3 43.3 6.8 6.8
Actuated g/C Ratio 0.82 0.82 0.13 0.13
v/c Ratio 0.35 0.38 0.20 0.13
Control Delay 8.9 9.4 23.6 22.1
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 8.9 9.4 23.6 22.1
LOS A A C C
Approach Delay 8.9 9.4 23.6 22.1
Approach LOS A A C C
Queue Length 50th (ft) 0 0 6 3
Queue Length 95th (ft) #309 #394 46 30
Internal Link Dist (ft) 293 190 197 130
Turn Bay Length (ft)
Base Capacity (vph) 1305 1377 207 185

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 27
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 9.0
Minimum Split (s) 35.0
Total Split (s) 35.0
Total Split (%) 44%
Yellow Time (s) 2.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 28
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.35 0.38 0.20 0.13
Intersection Summary
Area Type: Other
Cycle Length: 80
Actuated Cycle Length: 53.1
Natural Cycle: 80
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.38
Intersection Signal Delay: 10.0 Intersection LOS: B
Intersection Capacity Utilization 61.9% ICU Level of Service B
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 9: 29th Street & Market Street

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 29
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: P.M. Peak Hour

Lane Group Ø9
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 30
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 4 166 194 21 240 3 0 0 208 0 0 10
Future Volume (vph) 4 166 194 21 240 3 0 0 208 0 0 10
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 11 11 11 12 12 12
Grade (%) 0% 0% -2% 0%
Storage Length (ft) 0 150 0 0 0 0 0 0
Storage Lanes 0 1 0 0 1 0 0 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 0 1898 1615 0 1881 0 1855 1577 0 0 1644 0
Flt Permitted 0.999 0.996
Satd. Flow (perm) 0 1898 1615 0 1881 0 1855 1577 0 0 1644 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 325 227 190 155
Travel Time (s) 8.9 6.2 5.2 4.2
Confl. Peds. (#/hr) 2 1 1 2 1 1
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Heavy Vehicles (%) 0% 0% 0% 0% 0% 33% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 200 228 0 311 0 0 245 0 0 12 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 46.0% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 1
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 4 166 194 21 240 3 0 0 208 0 0 10
Future Volume (Veh/h) 4 166 194 21 240 3 0 0 208 0 0 10
Sign Control Free Free Stop Stop
Grade 0% 0% -2% 0%
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Hourly flow rate (vph) 5 195 228 25 282 4 0 0 245 0 0 12
Pedestrians 1 1 2
Lane Width (ft) 12.0 11.0 12.0
Walking Speed (ft/s) 3.5 3.5 3.5
Percent Blockage 0 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 325
pX, platoon unblocked
vC, conflicting volume 288 424 553 544 196 786 770 287
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 288 424 553 544 196 786 770 287
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 98 100 100 71 100 100 98
cM capacity (veh/h) 1283 1145 430 437 850 217 324 755
Direction, Lane # EB 1 EB 2 WB 1 NB 1 NB 2 SB 1
Volume Total 200 228 311 0 245 12
Volume Left 5 0 25 0 0 0
Volume Right 0 228 4 0 245 12
cSH 1283 1700 1145 1700 850 755
Volume to Capacity 0.00 0.13 0.02 0.00 0.29 0.02
Queue Length 95th (ft) 0 0 2 0 30 1
Control Delay (s) 0.2 0.0 0.9 0.0 10.9 9.8
Lane LOS A A A B A
Approach Delay (s) 0.1 0.9 10.9 9.8
Approach LOS B A
Intersection Summary
Average Delay 3.1
Intersection Capacity Utilization 46.0% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 2
1: N-S Alley & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 2.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 166 194 21 240 3 0 0 208 0 0 10
Future Vol, veh/h 4 166 194 21 240 3 0 0 208 0 0 10
Conflicting Peds, #/hr 2 0 1 1 0 2 1 0 0 0 0 1
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 150 - - - 0 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - -2 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 0 0 0 0 0 33 0 0 0 0 0 0
Mvmt Flow 5 195 228 25 282 4 0 0 245 0 0 12

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 288 0 0 424 0 0 547 544 196 778 770 287
Stage 1 - - - - - - 206 206 - 336 336 -
Stage 2 - - - - - - 341 338 - 442 434 -
Critical Hdwy 4.3 - - 4.3 - - 6.7 6.1 6 7.1 6.5 6.2
Critical Hdwy Stg 1 - - - - - - 5.7 5.1 - 6.1 5.5 -
Critical Hdwy Stg 2 - - - - - - 5.7 5.1 - 6.1 5.5 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 957 - - 858 - - 540 477 910 352 333 800
Stage 1 - - - - - - 942 752 - 779 645 -
Stage 2 - - - - - - 803 669 - 678 585 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 955 - - 857 - - 514 456 909 249 318 798
Mov Cap-2 Maneuver - - - - - - 514 456 - 249 318 -
Stage 1 - - - - - - 934 746 - 772 621 -
Stage 2 - - - - - - 763 644 - 492 580 -

Approach EB WB NB SB
HCM Control Delay, s 0.1 0.7 10.4 9.6
HCM LOS B A

Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 909 955 - - 857 - - 798
HCM Lane V/C Ratio - 0.269 0.005 - - 0.029 - - 0.015
HCM Control Delay (s) 0 10.4 8.8 0 - 9.3 0 - 9.6
HCM Lane LOS A B A A - A A - A
HCM 95th %tile Q(veh) - 1.1 0 - - 0.1 - - 0

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 3
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 261 146 159 156 82 8 171 999 121 101 1042 181
Future Volume (vph) 261 146 159 156 82 8 171 999 121 101 1042 181
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 12 12 14 10 10 10 11 11 11 10 11 11
Grade (%) -1% -1% 1% -1%
Storage Length (ft) 250 250 150 0 640 0 110 0
Storage Lanes 1 1 1 0 1 0 1 1
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1633 1694 1640 1604 1664 0 1628 3208 0 1604 3290 1457
Flt Permitted 0.950 0.986 0.950 0.950 0.950
Satd. Flow (perm) 1623 1692 1615 1595 1664 0 1628 3208 0 1604 3290 1457
Right Turn on Red No No Yes Yes
Satd. Flow (RTOR) 10 164
Link Speed (mph) 35 25 35 35
Link Distance (ft) 525 325 1233 312
Travel Time (s) 10.2 8.9 24.0 6.1
Confl. Peds. (#/hr) 2 2 2 2
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 1% 1% 0% 0% 1% 2%
Shared Lane Traffic (%) 23%
Lane Group Flow (vph) 207 213 164 161 93 0 176 1155 0 104 1074 187
Turn Type Split NA pm+ov Split NA Prot NA Prot NA pm+ov
Protected Phases 4 4 5 8 8 5 2 1 6 4
Permitted Phases 4 6
Detector Phase 4 4 5 8 8 5 2 1 6 4
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 10.0 7.0 10.0 7.0
Minimum Split (s) 13.0 13.0 13.5 13.1 13.1 13.5 16.5 13.5 16.5 13.0
Total Split (s) 17.0 17.0 17.0 16.0 16.0 17.0 41.5 13.5 38.0 17.0
Total Split (%) 13.1% 13.1% 13.1% 12.3% 12.3% 13.1% 31.9% 10.4% 29.2% 13.1%
Yellow Time (s) 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
All-Red Time (s) 2.3 2.3 2.8 2.4 2.4 2.8 2.8 2.8 2.8 2.3
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.0 5.0 5.5 5.1 5.1 5.5 5.5 5.5 5.5 5.0
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None None
Act Effct Green (s) 12.3 12.3 23.6 11.2 11.2 11.8 36.9 8.2 33.3 51.2
Actuated g/C Ratio 0.13 0.13 0.24 0.12 0.12 0.12 0.38 0.09 0.35 0.53
v/c Ratio 1.00 0.99 0.41 0.87 0.48 0.89 0.94 0.76 0.95 0.22
Control Delay 106.2 102.2 21.7 83.5 52.6 84.2 44.3 79.5 48.6 4.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 106.2 102.2 21.7 83.5 52.6 84.2 44.3 79.5 48.6 4.9
LOS F F C F D F D E D A
Approach Delay 81.0 72.2 49.6 44.9
Approach LOS F E D D
Queue Length 50th (ft) 121 124 47 88 49 97 301 57 288 5
Queue Length 95th (ft) #412 #417 117 #309 #155 #333 #791 #217 #746 62

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 4
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 7.0
Minimum Split (s) 42.0
Total Split (s) 42.0
Total Split (%) 32%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 5
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 445 245 1153 232
Turn Bay Length (ft) 250 250 150 640 110
Base Capacity (vph) 208 216 397 185 193 198 1233 136 1136 851
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 1.00 0.99 0.41 0.87 0.48 0.89 0.94 0.76 0.95 0.22
Intersection Summary
Area Type: Other
Cycle Length: 130
Actuated Cycle Length: 96.4
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 1.00
Intersection Signal Delay: 54.6 Intersection LOS: D
Intersection Capacity Utilization 78.8% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 2: S 32nd Street & Trindle Road/Chestnut Street

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 6
2: S 32nd Street & Trindle Road/Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 7
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (vph) 242 119 9 216 9 9
Future Volume (vph) 242 119 9 216 9 9
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 0% 0% -1%
Satd. Flow (prot) 1816 0 0 1878 1737 0
Flt Permitted 0.998 0.976
Satd. Flow (perm) 1816 0 0 1878 1737 0
Link Speed (mph) 25 25 25
Link Distance (ft) 227 445 204
Travel Time (s) 6.2 12.1 5.6
Confl. Peds. (#/hr) 6 6
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86
Heavy Vehicles (%) 0% 0% 0% 1% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 419 0 0 261 20 0
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 30.2% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 8
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Movement EBT EBR WBL WBT NBL NBR


Lane Configurations
Traffic Volume (veh/h) 242 119 9 216 9 9
Future Volume (Veh/h) 242 119 9 216 9 9
Sign Control Free Free Stop
Grade 0% 0% -1%
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86
Hourly flow rate (vph) 281 138 10 251 10 10
Pedestrians 6
Lane Width (ft) 12.0
Walking Speed (ft/s) 3.5
Percent Blockage 1
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 552
pX, platoon unblocked
vC, conflicting volume 425 627 356
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 425 627 356
tC, single (s) 4.1 6.4 6.2
tC, 2 stage (s)
tF (s) 2.2 3.5 3.3
p0 queue free % 99 98 99
cM capacity (veh/h) 1139 444 689
Direction, Lane # EB 1 WB 1 NB 1
Volume Total 419 261 20
Volume Left 0 10 10
Volume Right 138 0 10
cSH 1700 1139 540
Volume to Capacity 0.25 0.01 0.04
Queue Length 95th (ft) 0 1 3
Control Delay (s) 0.0 0.4 11.9
Lane LOS A B
Approach Delay (s) 0.0 0.4 11.9
Approach LOS B
Intersection Summary
Average Delay 0.5
Intersection Capacity Utilization 30.2% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 9
3: 31st Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 0.5
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 242 119 9 216 9 9
Future Vol, veh/h 242 119 9 216 9 9
Conflicting Peds, #/hr 0 6 6 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 -1 -
Peak Hour Factor 86 86 86 86 86 86
Heavy Vehicles, % 0 0 0 1 0 0
Mvmt Flow 281 138 10 251 10 10

Major/Minor Major1 Major2 Minor1


Conflicting Flow All 0 0 425 0 627 356
Stage 1 - - - - 356 -
Stage 2 - - - - 271 -
Critical Hdwy - - 4.3 - 6.2 6.1
Critical Hdwy Stg 1 - - - - 5.2 -
Critical Hdwy Stg 2 - - - - 5.2 -
Follow-up Hdwy - - 3 - 3 3.1
Pot Cap-1 Maneuver - - 858 - 523 738
Stage 1 - - - - 829 -
Stage 2 - - - - 906 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 853 - 513 734
Mov Cap-2 Maneuver - - - - 513 -
Stage 1 - - - - 824 -
Stage 2 - - - - 893 -

Approach EB WB NB
HCM Control Delay, s 0 0.4 11.2
HCM LOS B

Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT


Capacity (veh/h) 604 - - 853 -
HCM Lane V/C Ratio 0.035 - - 0.012 -
HCM Control Delay (s) 11.2 - - 9.3 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.1 - - 0 -

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 10
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 63 173 12 8 176 4 6 8 4 0 17 40
Future Volume (vph) 63 173 12 8 176 4 6 8 4 0 17 40
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 0% 1% -1% -1%
Satd. Flow (prot) 0 1849 0 0 1881 0 0 1819 0 0 1692 0
Flt Permitted 0.987 0.998 0.984
Satd. Flow (perm) 0 1849 0 0 1881 0 0 1819 0 0 1692 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 445 215 319 515
Travel Time (s) 12.1 5.9 8.7 14.0
Confl. Peds. (#/hr) 1 8 8 1 2 2
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Heavy Vehicles (%) 0% 1% 0% 0% 0% 0% 0% 0% 0% 0% 0% 3%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 283 0 0 214 0 0 21 0 0 64 0
Sign Control Stop Stop Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 40.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 11
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Stop Stop
Traffic Volume (vph) 63 173 12 8 176 4 6 8 4 0 17 40
Future Volume (vph) 63 173 12 8 176 4 6 8 4 0 17 40
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Hourly flow rate (vph) 72 197 14 9 200 5 7 9 5 0 19 45
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total (vph) 283 214 21 64
Volume Left (vph) 72 9 7 0
Volume Right (vph) 14 5 5 45
Hadj (s) 0.03 -0.01 -0.08 -0.39
Departure Headway (s) 4.4 4.4 5.0 4.7
Degree Utilization, x 0.34 0.26 0.03 0.08
Capacity (veh/h) 802 785 639 691
Control Delay (s) 9.7 9.0 8.2 8.1
Approach Delay (s) 9.7 9.0 8.2 8.1
Approach LOS A A A A
Intersection Summary
Delay 9.2
Level of Service A
Intersection Capacity Utilization 40.1% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 12
4: 30th Street & Chestnut Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Intersection
Intersection Delay, s/veh 9.2
Intersection LOS A

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 63 173 12 8 176 4 6 8 4 0 17 40
Future Vol, veh/h 63 173 12 8 176 4 6 8 4 0 17 40
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Heavy Vehicles, % 0 1 0 0 0 0 0 0 0 0 0 3
Mvmt Flow 72 197 14 9 200 5 7 9 5 0 19 45
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 9.6 9 8.2 8
HCM LOS A A A A

Lane NBLn1 EBLn1 WBLn1 SBLn1


Vol Left, % 33% 25% 4% 0%
Vol Thru, % 44% 70% 94% 30%
Vol Right, % 22% 5% 2% 70%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 18 248 188 57
LT Vol 6 63 8 0
Through Vol 8 173 176 17
RT Vol 4 12 4 40
Lane Flow Rate 20 282 214 65
Geometry Grp 1 1 1 1
Degree of Util (X) 0.028 0.34 0.261 0.083
Departure Headway (Hd) 5.012 4.349 4.392 4.595
Convergence, Y/N Yes Yes Yes Yes
Cap 714 829 818 779
Service Time 3.047 2.368 2.412 2.624
HCM Lane V/C Ratio 0.028 0.34 0.262 0.083
HCM Control Delay 8.2 9.6 9 8
HCM Lane LOS A A A A
HCM 95th-tile Q 0.1 1.5 1 0.3

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 13
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 2 0 0 1 0 0 0 20 0 0 128 0
Future Volume (vph) 2 0 0 1 0 0 0 20 0 0 128 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 10 10 10 12 12 12 12 12 12 12 12 12
Grade (%) -5% 0% 1% 0%
Satd. Flow (prot) 0 1727 0 0 1805 0 0 1890 0 0 1900 0
Flt Permitted 0.950 0.950
Satd. Flow (perm) 0 1727 0 0 1805 0 0 1890 0 0 1900 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 151 181 206 204
Travel Time (s) 4.1 4.9 5.6 5.6
Confl. Peds. (#/hr) 2 2 2 2 7 3 3 7
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 3 0 0 1 0 0 25 0 0 162 0
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 18.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 14
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 2 0 0 1 0 0 0 20 0 0 128 0
Future Volume (Veh/h) 2 0 0 1 0 0 0 20 0 0 128 0
Sign Control Stop Stop Free Free
Grade -5% 0% 1% 0%
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Hourly flow rate (vph) 3 0 0 1 0 0 0 25 0 0 162 0
Pedestrians 7 3 2 2
Lane Width (ft) 10.0 12.0 12.0 12.0
Walking Speed (ft/s) 3.5 3.5 3.5 3.5
Percent Blockage 1 0 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 196 197 171 192 197 30 169 28
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 196 197 171 192 197 30 169 28
tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1
tC, 2 stage (s)
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 757 697 872 764 696 1045 1413 1594
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 3 1 25 162
Volume Left 3 1 0 0
Volume Right 0 0 0 0
cSH 757 764 1413 1594
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 9.8 9.7 0.0 0.0
Lane LOS A A
Approach Delay (s) 9.8 9.7 0.0 0.0
Approach LOS A A
Intersection Summary
Average Delay 0.2
Intersection Capacity Utilization 18.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 15
5: 31st Street & E-W Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 2 0 0 1 0 0 0 20 0 0 128 0
Future Vol, veh/h 2 0 0 1 0 0 0 20 0 0 128 0
Conflicting Peds, #/hr 2 0 2 2 0 2 7 0 3 3 0 7
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - -5 - - 0 - - 1 - - 0 -
Peak Hour Factor 79 79 79 79 79 79 79 79 79 79 79 79
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 3 0 0 1 0 0 0 25 0 0 162 0

Major/Minor Minor2 Minor1 Major1 Major2


Conflicting Flow All 196 197 171 192 197 30 169 0 0 28 0 0
Stage 1 169 169 - 28 28 - - - - - - -
Stage 2 27 28 - 164 169 - - - - - - -
Critical Hdwy 6.1 5.5 5.7 7.1 6.5 6.2 4.3 - - 4.3 - -
Critical Hdwy Stg 1 5.1 4.5 - 6.1 5.5 - - - - - - -
Critical Hdwy Stg 2 5.1 4.5 - 6.1 5.5 - - - - - - -
Follow-up Hdwy 3 4 3.1 3 4 3.1 3 - - 3 - -
Pot Cap-1 Maneuver 933 742 953 889 702 1117 1051 - - 1174 - -
Stage 1 1013 799 - 1158 876 - - - - - - -
Stage 2 1168 883 - 972 763 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 926 735 946 885 696 1112 1045 - - 1171 - -
Mov Cap-2 Maneuver 926 735 - 885 696 - - - - - - -
Stage 1 1007 794 - 1155 873 - - - - - - -
Stage 2 1166 880 - 970 758 - - - - - - -

Approach EB WB NB SB
HCM Control Delay, s 8.9 9.1 0 0
HCM LOS A A

Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1045 - - 926 885 1171 - -
HCM Lane V/C Ratio - - - 0.003 0.001 - - -
HCM Control Delay (s) 0 - - 8.9 9.1 0 - -
HCM Lane LOS A - - A A A - -
HCM 95th %tile Q(veh) 0 - - 0 0 0 - -

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 16
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 4 0 1 56 1 0 0 1 0 0 0
Future Volume (vph) 0 4 0 1 56 1 0 0 1 0 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 11 11 11
Grade (%) 3% -4% 0% -3%
Satd. Flow (prot) 0 1872 0 0 1932 0 0 1644 0 0 1864 0
Flt Permitted 0.999
Satd. Flow (perm) 0 1872 0 0 1932 0 0 1644 0 0 1864 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 131 186 162 179
Travel Time (s) 3.6 5.1 4.4 4.9
Peak Hour Factor 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 8 0 0 116 0 0 2 0 0 0 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 13.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 17
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 0 4 0 1 56 1 0 0 1 0 0 0
Future Volume (Veh/h) 0 4 0 1 56 1 0 0 1 0 0 0
Sign Control Free Free Stop Stop
Grade 3% -4% 0% -3%
Peak Hour Factor 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Hourly flow rate (vph) 0 8 0 2 112 2 0 0 2 0 0 0
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 114 8 125 126 8 127 125 113
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 114 8 125 126 8 127 125 113
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 100 100 100 100 100 100 100 100
cM capacity (veh/h) 1488 1625 853 767 1080 849 768 945
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 8 116 2 0
Volume Left 0 2 0 0
Volume Right 0 2 2 0
cSH 1488 1625 1080 1700
Volume to Capacity 0.00 0.00 0.00 0.00
Queue Length 95th (ft) 0 0 0 0
Control Delay (s) 0.0 0.1 8.3 0.0
Lane LOS A A A
Approach Delay (s) 0.0 0.1 8.3 0.0
Approach LOS A A
Intersection Summary
Average Delay 0.3
Intersection Capacity Utilization 13.8% ICU Level of Service A
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 18
6: Bramar Road & N-S Alley WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 4 0 1 56 1 0 0 1 0 0 0
Future Vol, veh/h 0 4 0 1 56 1 0 0 1 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 3 - - -4 - - 0 - - -3 -
Peak Hour Factor 50 50 50 50 50 50 50 50 50 50 50 50
Heavy Vehicles, % 0 0 0 0 0 0 0 0 0 0 0 0
Mvmt Flow 0 8 0 2 112 2 0 0 2 0 0 0

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 114 0 0 8 0 0 125 126 8 126 125 113
Stage 1 - - - - - - 8 8 - 117 117 -
Stage 2 - - - - - - 117 118 - 9 8 -
Critical Hdwy 4.3 - - 4.3 - - 7.1 6.5 6.2 6.5 5.9 5.9
Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 5.5 4.9 -
Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 5.5 4.9 -
Follow-up Hdwy 3 - - 3 - - 3 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 1098 - - 1193 - - 988 768 1149 1007 785 1013
Stage 1 - - - - - - 1188 893 - 1053 818 -
Stage 2 - - - - - - 1033 802 - 1188 894 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1098 - - 1193 - - 986 766 1149 1004 783 1013
Mov Cap-2 Maneuver - - - - - - 986 766 - 1004 783 -
Stage 1 - - - - - - 1188 893 - 1053 816 -
Stage 2 - - - - - - 1031 800 - 1186 894 -

Approach EB WB NB SB
HCM Control Delay, s 0 0.1 8.1 0
HCM LOS A A

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1149 1098 - - 1193 - - -
HCM Lane V/C Ratio 0.002 - - - 0.002 - - -
HCM Control Delay (s) 8.1 0 - - 8 0 - 0
HCM Lane LOS A A - - A A - A
HCM 95th %tile Q(veh) 0 0 - - 0 - - -

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 19
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 115 16 334 144 22 1 315 1062 8 6 1114 76
Future Volume (vph) 115 16 334 144 22 1 315 1062 8 6 1114 76
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Lane Width (ft) 14 14 14 12 12 12 12 12 12 12 12 12
Grade (%) -2% 0% -1% -2%
Storage Length (ft) 150 0 0 0 400 0 160 0
Storage Lanes 1 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Satd. Flow (prot) 1806 1939 1632 0 1710 0 1719 3399 0 1727 3388 0
Flt Permitted 0.750 0.743 0.079 0.250
Satd. Flow (perm) 1420 1939 1632 0 1324 0 143 3399 0 454 3388 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 348 1 6
Link Speed (mph) 25 25 35 35
Link Distance (ft) 357 317 547 1233
Travel Time (s) 9.7 8.6 10.7 24.0
Confl. Peds. (#/hr) 4 4 1 1
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 2% 0% 1% 1% 0% 0% 0% 1% 0% 0% 1% 0%
Shared Lane Traffic (%)
Lane Group Flow (vph) 120 17 348 0 174 0 328 1114 0 6 1239 0
Turn Type Perm NA pm+ov Perm NA pm+pt NA pm+pt NA
Protected Phases 4 5 8 5 2 1 6
Permitted Phases 4 4 8 2 6
Detector Phase 4 4 5 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0
Minimum Split (s) 24.2 24.2 11.4 24.2 24.2 11.4 24.4 11.4 24.4
Total Split (s) 24.2 24.2 22.0 24.2 24.2 22.0 56.4 11.4 45.8
Total Split (%) 18.6% 18.6% 16.9% 18.6% 18.6% 16.9% 43.4% 8.8% 35.2%
Yellow Time (s) 3.0 3.0 3.8 3.0 3.0 3.8 3.8 3.8 3.8
All-Red Time (s) 3.2 3.2 2.6 3.2 3.2 2.6 2.6 2.6 2.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 5.2 5.2 5.4 5.2 5.4 5.4 5.4 5.4
Lead/Lag Lead Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes
Recall Mode None None None None None None None None None
Act Effct Green (s) 18.6 18.6 40.0 18.6 63.7 62.0 47.4 41.3
Actuated g/C Ratio 0.19 0.19 0.40 0.19 0.64 0.63 0.48 0.42
v/c Ratio 0.45 0.05 0.40 0.70 0.91 0.52 0.02 0.87
Control Delay 44.8 38.6 3.3 55.8 57.3 15.6 13.0 36.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 44.8 38.6 3.3 55.8 57.3 15.6 13.0 36.1
LOS D D A E E B B D
Approach Delay 14.8 55.8 25.1 36.0
Approach LOS B E C D
Queue Length 50th (ft) 61 8 0 93 139 143 1 324
Queue Length 95th (ft) 164 36 37 #284 #488 535 10 #796

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 20
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 5.0
Minimum Split (s) 38.0
Total Split (s) 38.0
Total Split (%) 29%
Yellow Time (s) 3.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 21
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Internal Link Dist (ft) 277 237 467 1153
Turn Bay Length (ft) 150 400 160
Base Capacity (vph) 278 380 867 259 362 2130 296 1417
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.43 0.04 0.40 0.67 0.91 0.52 0.02 0.87
Intersection Summary
Area Type: Other
Cycle Length: 130
Actuated Cycle Length: 98.9
Natural Cycle: 150
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.91
Intersection Signal Delay: 29.2 Intersection LOS: C
Intersection Capacity Utilization 83.2% ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 7: S 32nd Street & Harvard Avenue

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 22
7: S 32nd Street & Harvard Avenue WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group Ø9
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 23
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 7 437 8 34 418 6 46 4 28 11 15 14
Future Volume (vph) 7 437 8 34 418 6 46 4 28 11 15 14
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Grade (%) 1% 1% 2% -2%
Satd. Flow (prot) 0 1678 0 0 1676 0 0 1712 0 0 1623 0
Flt Permitted 0.999 0.996 0.971 0.986
Satd. Flow (perm) 0 1678 0 0 1676 0 0 1712 0 0 1623 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 426 373 515 207
Travel Time (s) 11.6 10.2 14.0 5.6
Confl. Peds. (#/hr) 3 4 4 3 4 2 2 4
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 0% 1% 0% 0% 1% 0% 0% 0% 4% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 481 0 0 487 0 0 83 0 0 43 0
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 57.9% ICU Level of Service B
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 24
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 7 437 8 34 418 6 46 4 28 11 15 14
Future Volume (Veh/h) 7 437 8 34 418 6 46 4 28 11 15 14
Sign Control Free Free Stop Stop
Grade 1% 1% 2% -2%
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Hourly flow rate (vph) 7 465 9 36 445 6 49 4 30 12 16 15
Pedestrians 4 2 4 3
Lane Width (ft) 12.0 12.0 12.0 12.0
Walking Speed (ft/s) 3.5 3.5 3.5 3.5
Percent Blockage 0 0 0 0
Right turn flare (veh)
Median type None None
Median storage veh)
Upstream signal (ft) 373
pX, platoon unblocked 0.91 0.91 0.91 0.91 0.91 0.91
vC, conflicting volume 454 478 1034 1014 476 1040 1015 455
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol 348 478 987 964 476 994 966 349
tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2
tC, 2 stage (s)
tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3
p0 queue free % 99 97 73 98 95 93 93 98
cM capacity (veh/h) 1106 1091 183 223 582 185 223 630
Direction, Lane # EB 1 WB 1 NB 1 SB 1
Volume Total 481 487 83 43
Volume Left 7 36 49 12
Volume Right 9 6 30 15
cSH 1106 1091 246 268
Volume to Capacity 0.01 0.03 0.34 0.16
Queue Length 95th (ft) 0 3 36 14
Control Delay (s) 0.2 1.0 26.9 21.0
Lane LOS A A D C
Approach Delay (s) 0.2 1.0 26.9 21.0
Approach LOS D C
Intersection Summary
Average Delay 3.4
Intersection Capacity Utilization 57.9% ICU Level of Service B
Analysis Period (min) 15

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 25
8: 30th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Intersection
Int Delay, s/veh 3.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 437 8 34 418 6 46 4 28 11 15 14
Future Vol, veh/h 7 437 8 34 418 6 46 4 28 11 15 14
Conflicting Peds, #/hr 3 0 4 4 0 3 4 0 2 2 0 4
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 1 - - 1 - - 2 - - -2 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94
Heavy Vehicles, % 0 1 0 0 1 0 0 0 4 0 0 0
Mvmt Flow 7 465 9 36 445 6 49 4 30 12 16 15

Major/Minor Major1 Major2 Minor1 Minor2


Conflicting Flow All 454 0 0 478 0 0 1028 1014 476 1026 1015 455
Stage 1 - - - - - - 488 488 - 523 523 -
Stage 2 - - - - - - 540 526 - 503 492 -
Critical Hdwy 4.3 - - 4.3 - - 7.5 6.9 6.44 6.7 6.1 6
Critical Hdwy Stg 1 - - - - - - 6.5 5.9 - 5.7 5.1 -
Critical Hdwy Stg 2 - - - - - - 6.5 5.9 - 5.7 5.1 -
Follow-up Hdwy 3 - - 3 - - 3.1 4 3.1 3 4 3.1
Pot Cap-1 Maneuver 838 - - 822 - - 206 215 604 264 269 658
Stage 1 - - - - - - 589 524 - 647 566 -
Stage 2 - - - - - - 548 502 - 662 582 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 836 - - 819 - - 180 199 601 233 249 654
Mov Cap-2 Maneuver - - - - - - 180 199 - 233 249 -
Stage 1 - - - - - - 580 516 - 638 531 -
Stage 2 - - - - - - 487 471 - 616 573 -

Approach EB WB NB SB
HCM Control Delay, s 0.1 0.7 27.4 18.5
HCM LOS D C

Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 242 836 - - 819 - - 310
HCM Lane V/C Ratio 0.343 0.009 - - 0.044 - - 0.137
HCM Control Delay (s) 27.4 9.3 0 - 9.6 0 - 18.5
HCM Lane LOS D A A - A A - C
HCM 95th %tile Q(veh) 1.5 0 - - 0.1 - - 0.5

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 26
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 9 466 3 16 431 4 44 2 12 3 3 8
Future Volume (vph) 9 466 3 16 431 4 44 2 12 3 3 8
Ideal Flow (vphpl) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800
Grade (%) -1% 0% -2% -1%
Satd. Flow (prot) 0 1609 0 0 1773 0 0 1532 0 0 1486 0
Flt Permitted 0.992 0.981 0.816 0.946
Satd. Flow (perm) 0 1598 0 0 1743 0 0 1296 0 0 1422 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 1 13 8
Link Speed (mph) 25 25 25 25
Link Distance (ft) 373 270 277 210
Travel Time (s) 10.2 7.4 7.6 5.7
Confl. Peds. (#/hr) 2 3 3 2
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 0% 1% 0% 6% 1% 0% 0% 0% 0% 0% 0% 0%
Parking (#/hr) 0 0 0 0 0 0 0 0 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 497 0 0 470 0 0 61 0 0 14 0
Turn Type Perm NA Perm NA Perm NA Perm NA
Protected Phases 2 6 8 4
Permitted Phases 2 6 8 4
Detector Phase 2 2 6 6 8 8 4 4
Switch Phase
Minimum Initial (s) 30.0 30.0 30.0 30.0 3.0 3.0 3.0 3.0
Minimum Split (s) 35.0 35.0 35.0 35.0 7.6 7.6 7.6 7.6
Total Split (s) 35.0 35.0 35.0 35.0 10.0 10.0 10.0 10.0
Total Split (%) 43.8% 43.8% 43.8% 43.8% 12.5% 12.5% 12.5% 12.5%
Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
All-Red Time (s) 2.0 2.0 2.0 2.0 1.6 1.6 1.6 1.6
Lost Time Adjust (s) -1.0 -1.0 -1.0 -1.0
Total Lost Time (s) 4.0 4.0 3.6 3.6
Lead/Lag
Lead-Lag Optimize?
Recall Mode Min Min Min Min None None None None
Act Effct Green (s) 40.7 40.7 6.7 6.7
Actuated g/C Ratio 0.75 0.75 0.12 0.12
v/c Ratio 0.41 0.36 0.35 0.08
Control Delay 10.5 9.0 28.4 20.6
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 10.5 9.0 28.4 20.6
LOS B A C C
Approach Delay 10.5 9.0 28.4 20.6
Approach LOS B A C C
Queue Length 50th (ft) 40 36 11 1
Queue Length 95th (ft) #380 300 #72 20
Internal Link Dist (ft) 293 190 197 130
Turn Bay Length (ft)
Base Capacity (vph) 1203 1313 172 183

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 27
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group Ø9
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Peak Hour Factor
Heavy Vehicles (%)
Parking (#/hr)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases 9
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s) 9.0
Minimum Split (s) 35.0
Total Split (s) 35.0
Total Split (%) 44%
Yellow Time (s) 2.0
All-Red Time (s) 0.0
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode None
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 28
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.41 0.36 0.35 0.08
Intersection Summary
Area Type: Other
Cycle Length: 80
Actuated Cycle Length: 54
Natural Cycle: 80
Control Type: Semi Act-Uncoord
Maximum v/c Ratio: 0.41
Intersection Signal Delay: 11.0 Intersection LOS: B
Intersection Capacity Utilization 49.5% ICU Level of Service A
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.

Splits and Phases: 9: 29th Street & Market Street

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 29
9: 29th Street & Market Street WMSC.00002
Projected 2020 Conditions with Improvements Timing Plan: Saturday Midday

Lane Group Ø9
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
Intersection Summary

WMSC.00002 01/08/2019 Projected 2020 Conditions with Improvements Synchro 10 Report


TPD Page 30
APPENDIX H:
Traffic Signal Plans
AM

SAT
PM

MID

AM

SAT
MID
PM
APPENDIX I:
Critical and Follow-up Headway Calculation Worksheets
WMSC.00002 Int. 1
Chestnut Street & N-S Alley/Select Medical PT Parking Lot

Crititcal Headway
tc base tc hv phv t cg G t 3lt Base Crit
AM EBL 4.3 1 0% 0 0 0 4.3
Major left PM EBL 4.3 1 0% 0 0 0 4.3
SAT EBL 4.3 1 0% 0 0 0 4.3
AM WBL 4.3 1 0% 0 0 0 4.3
Major left PM WBL 4.3 1 0% 0 0 0 4.3
SAT WBL 4.3 1 0% 0 0 0 4.3
AM NBL 7.1 1 0% 0.2 -2 0 6.7
Minor left PM NBL 7.1 1 0% 0.2 -2 0 6.7
SAT NBL 7.1 1 0% 0.2 -2 0 6.7
AM NBT 6.5 1 0% 0.2 -2 0 6.1
Minor
PM NBT 6.5 1 0% 0.2 -2 0 6.1
through
SAT NBT 6.5 1 0% 0.2 -2 0 6.1
AM NBR 6.2 1 0% 0.1 -2 0 6.0
Minor right PM NBR 6.2 1 0% 0.1 -2 0 6.0
SAT NBR 6.2 1 0% 0.1 -2 0 6.0
AM SBL 7.1 1 0% 0.2 0 0 7.1
Minor left PM SBL 7.1 1 0% 0.2 0 0 7.1
SAT SBL 7.1 1 0% 0.2 0 0 7.1
AM SBT 6.5 1 0% 0.2 0 0 6.5
Minor
PM SBT 6.5 1 0% 0.2 0 0 6.5
Through
SAT SBT 6.5 1 0% 0.2 0 0 6.5
AM SBR 6.2 1 0% 0.1 0 0 6.2
Minor right PM SBR 6.2 1 0% 0.1 0 0 6.2
SAT SBR 6.2 1 0% 0.1 0 0 6.2

Follow-up headway
t fbase t fhv phv Follow-up
AM EBL 3 0.9 0% 3.0
Major left PM EBL 3 0.9 0% 3.0
SAT EBL 3 0.9 0% 3.0
AM WBL 3 0.9 0% 3.0
Major left PM WBL 3 0.9 0% 3.0
SAT WBL 3 0.9 0% 3.0
AM NBL 3 0.9 0% 3.0
Minor left PM NBL 3 0.9 0% 3.0
SAT NBL 3 0.9 0% 3.0
AM NBT 4 0.9 0% 4.0
Minor
PM NBT 4 0.9 0% 4.0
through
SAT NBT 4 0.9 0% 4.0
AM NBR 3.1 0.9 0% 3.1
Minor right PM NBR 3.1 0.9 0% 3.1
SAT NBR 3.1 0.9 0% 3.1
AM SBL 3 0.9 0% 3.0
Minor left PM SBL 3 0.9 0% 3.0
SAT SBL 3 0.9 0% 3.0
AM SBT 4 0.9 0% 4.0
Minor
PM SBT 4 0.9 0% 4.0
Through
SAT SBT 4 0.9 0% 4.0
AM SBR 3.1 0.9 0% 3.1
Minor right PM SBR 3.1 0.9 0% 3.1
SAT SBR 3.1 0.9 0% 3.1
WMSC.00002 Int. 3
Chestnut Street & 31st Street

Crititcal Headway
tc base tc hv phv t cg G t 3lt Base Crit
AM WBL 4.3 1 0% 0 0 0 4.3
major left PM WBL 4.3 1 0% 0 0 0 4.3
SAT WBL 4.3 1 0% 0 0 0 4.3
AM NBR 6.2 1 0% 0.1 -1 0 6.1
minor right PM NBR 6.2 1 4% 0.1 -1 0 6.1
SAT NBR 6.2 1 0% 0.1 -1 0 6.1
AM NBL 7.1 1 0% 0.2 -1 0.7 6.2
minor left PM NBL 7.1 1 0% 0.2 -1 0.7 6.2
SAT NBL 7.1 1 0% 0.2 -1 0.7 6.2

Follow-up headway
t fbase t fhv phv Follow-up
AM WBL 3 0.9 0% 3.0
major left PM WBL 3 0.9 0% 3.0
SAT WBL 3 0.9 0% 3.0
AM NBR 3.1 0.9 0% 3.1
minor right PM NBR 3.1 0.9 4% 3.1
SAT NBR 3.1 0.9 0% 3.1
AM NBL 3 0.9 0% 3.0
minor left PM NBL 3 0.9 0% 3.0
SAT NBL 3 0.9 0% 3.0
WMSC.00002 Int. 5
31st Street & E-W Alley

Crititcal Headway
tc base tc hv phv t cg G t 3lt Base Crit
AM NBL 4.3 1 0% 0 1 0 4.3
Major left PM NBL 4.3 1 0% 0 1 0 4.3
SAT NBL 4.3 1 0% 0 1 0 4.3
AM SBL 4.3 1 0% 0 0 0 4.3
Major left PM SBL 4.3 1 0% 0 0 0 4.3
SAT SBL 4.3 1 0% 0 0 0 4.3
AM EBL 7.1 1 0% 0.2 -5 0 6.1
Minor left PM EBL 7.1 1 0% 0.2 -5 0 6.1
SAT EBL 7.1 1 0% 0.2 -5 0 6.1
AM EBT 6.5 1 0% 0.2 -5 0 5.5
Minor
PM EBT 6.5 1 0% 0.2 -5 0 5.5
through
SAT EBT 6.5 1 0% 0.2 -5 0 5.5
AM EBR 6.2 1 0% 0.1 -5 0 5.7
Minor right PM EBR 6.2 1 0% 0.1 -5 0 5.7
SAT EBR 6.2 1 0% 0.1 -5 0 5.7
AM WBL 7.1 1 0% 0.2 0 0 7.1
Minor left PM WBL 7.1 1 0% 0.2 0 0 7.1
SAT WBL 7.1 1 0% 0.2 0 0 7.1
AM WBT 6.5 1 0% 0.2 0 0 6.5
Minor
PM WBT 6.5 1 0% 0.2 0 0 6.5
Through
SAT WBT 6.5 1 0% 0.2 0 0 6.5
AM WBR 6.2 1 0% 0.1 0 0 6.2
Minor right PM WBR 6.2 1 0% 0.1 0 0 6.2
SAT WBR 6.2 1 0% 0.1 0 0 6.2

Follow-up headway
t fbase t fhv phv Follow-up
AM NBL 3 0.9 0% 3.0
Major left PM NBL 3 0.9 0% 3.0
SAT NBL 3 0.9 0% 3.0
AM SBL 3 0.9 0% 3.0
Major left PM SBL 3 0.9 0% 3.0
SAT SBL 3 0.9 0% 3.0
AM EBL 3 0.9 0% 3.0
Minor left PM EBL 3 0.9 0% 3.0
SAT EBL 3 0.9 0% 3.0
AM EBT 4 0.9 0% 4.0
Minor
PM EBT 4 0.9 0% 4.0
through
SAT EBT 4 0.9 0% 4.0
AM EBR 3.1 0.9 0% 3.1
Minor right PM EBR 3.1 0.9 0% 3.1
SAT EBR 3.1 0.9 0% 3.1
AM WBL 3 0.9 0% 3.0
Minor left PM WBL 3 0.9 0% 3.0
SAT WBL 3 0.9 0% 3.0
AM WBT 4 0.9 0% 4.0
Minor
PM WBT 4 0.9 0% 4.0
Through
SAT WBT 4 0.9 0% 4.0
AM WBR 3.1 0.9 0% 3.1
Minor right PM WBR 3.1 0.9 0% 3.1
SAT WBR 3.1 0.9 0% 3.1
WMSC.00002 Int. 6
Bramar Road & N-S Alley

Crititcal Headway
tc base tc hv phv t cg G t 3lt Base Crit
AM EBL 4.3 1 0% 0 3 0 4.3
Major left PM EBL 4.3 1 0% 0 3 0 4.3
SAT EBL 4.3 1 0% 0 3 0 4.3
AM WBL 4.3 1 0% 0 -4 0 4.3
Major left PM WBL 4.3 1 0% 0 -4 0 4.3
SAT WBL 4.3 1 0% 0 -4 0 4.3
AM NBL 7.1 1 0% 0.2 0 0 7.1
Minor left PM NBL 7.1 1 0% 0.2 0 0 7.1
SAT NBL 7.1 1 0% 0.2 0 0 7.1
AM NBT 6.5 1 0% 0.2 0 0 6.5
Minor
PM NBT 6.5 1 0% 0.2 0 0 6.5
through
SAT NBT 6.5 1 0% 0.2 0 0 6.5
AM NBR 6.2 1 0% 0.1 0 0 6.2
Minor right PM NBR 6.2 1 0% 0.1 0 0 6.2
SAT NBR 6.2 1 0% 0.1 0 0 6.2
AM SBL 7.1 1 0% 0.2 -3 0 6.5
Minor left PM SBL 7.1 1 0% 0.2 -3 0 6.5
SAT SBL 7.1 1 0% 0.2 -3 0 6.5
AM SBT 6.5 1 0% 0.2 -3 0 5.9
Minor
PM SBT 6.5 1 0% 0.2 -3 0 5.9
Through
SAT SBT 6.5 1 0% 0.2 -3 0 5.9
AM SBR 6.2 1 0% 0.1 -3 0 5.9
Minor right PM SBR 6.2 1 0% 0.1 -3 0 5.9
SAT SBR 6.2 1 0% 0.1 -3 0 5.9

Follow-up headway
t fbase t fhv phv Follow-up
AM EBL 3 0.9 0% 3.0
Major left PM EBL 3 0.9 0% 3.0
SAT EBL 3 0.9 0% 3.0
AM WBL 3 0.9 0% 3.0
Major left PM WBL 3 0.9 0% 3.0
SAT WBL 3 0.9 0% 3.0
AM NBL 3 0.9 0% 3.0
Minor left PM NBL 3 0.9 0% 3.0
SAT NBL 3 0.9 0% 3.0
AM NBT 4 0.9 0% 4.0
Minor
PM NBT 4 0.9 0% 4.0
through
SAT NBT 4 0.9 0% 4.0
AM NBR 3.1 0.9 0% 3.1
Minor right PM NBR 3.1 0.9 0% 3.1
SAT NBR 3.1 0.9 0% 3.1
AM SBL 3 0.9 0% 3.0
Minor left PM SBL 3 0.9 0% 3.0
SAT SBL 3 0.9 0% 3.0
AM SBT 4 0.9 0% 4.0
Minor
PM SBT 4 0.9 0% 4.0
Through
SAT SBT 4 0.9 0% 4.0
AM SBR 3.1 0.9 0% 3.1
Minor right PM SBR 3.1 0.9 0% 3.1
SAT SBR 3.1 0.9 0% 3.1
WMSC.00002 Int. 8
Market Street & 30th Street

Crititcal Headway
tc base tc hv phv t cg G t 3lt Base Crit
AM EBL 4.3 1 0% 0 1 0 4.3
MID EBL 4.3 1 0% 0 1 0 4.3
Major left
PM EBL 4.3 1 0% 0 1 0 4.3
SAT EBL 4.3 1 0% 0 1 0 4.3
AM WBL 4.3 1 2% 0 -1 0 4.3
MID WBL 4.3 1 0% 0 -1 0 4.3
Major left
PM WBL 4.3 1 0% 0 -1 0 4.3
SAT WBL 4.3 1 0% 0 -1 0 4.3
AM NBL 7.1 1 0% 0.2 2 0 7.5
MID NBL 7.1 1 11% 0.2 2 0 7.6
Minor left
PM NBL 7.1 1 0% 0.2 2 0 7.5
SAT NBL 7.1 1 0% 0.2 2 0 7.5
AM NBT 6.5 1 0% 0.2 2 0 6.9
Minor MID NBT 6.5 1 0% 0.2 2 0 6.9
through PM NBT 6.5 1 0% 0.2 2 0 6.9
SAT NBT 6.5 1 0% 0.2 2 0 6.9
AM NBR 6.2 1 0% 0.1 2 0 6.4
MID NBR 6.2 1 0% 0.1 2 0 6.4
Minor right
PM NBR 6.2 1 0% 0.1 2 0 6.4
SAT NBR 6.2 1 0% 0.1 2 0 6.4
AM SBL 7.1 1 0% 0.2 -2 0 6.7
MID SBL 7.1 1 0% 0.2 -2 0 6.7
Minor left
PM SBL 7.1 1 0% 0.2 -2 0 6.7
SAT SBL 7.1 1 0% 0.2 -2 0 6.7
AM SBT 6.5 1 0% 0.2 -2 0 6.1
Minor MID SBT 6.5 1 4% 0.2 -2 0 6.1
Through PM SBT 6.5 1 0% 0.2 -2 0 6.1
SAT SBT 6.5 1 0% 0.2 -2 0 6.1
AM SBR 6.2 1 0% 0.1 -2 0 6.0
MID SBR 6.2 1 0% 0.1 -2 0 6.0
Minor right
PM SBR 6.2 1 0% 0.1 -2 0 6.0
SAT SBR 6.2 1 0% 0.1 -2 0 6.0

Follow-up headway
t fbase t fhv phv Follow-up
AM EBL 3 0.9 0% 3.0
MID EBL 3 0.9 0% 3.0
Major left
PM EBL 3 0.9 0% 3.0
SAT EBL 3 0.9 0% 3.0
AM WBL 3 0.9 2% 3.0
MID WBL 3 0.9 0% 3.0
Major left
PM WBL 3 0.9 0% 3.0
SAT WBL 3 0.9 0% 3.0
AM NBL 3 0.9 0% 3.0
MID NBL 3 0.9 11% 3.1
Minor left
PM NBL 3 0.9 0% 3.0
SAT NBL 3 0.9 0% 3.0
AM NBT 4 0.9 0% 4.0
Minor MID NBT 4 0.9 0% 4.0
through PM NBT 4 0.9 0% 4.0
SAT NBT 4 0.9 0% 4.0
AM NBR 3.1 0.9 0% 3.1
MID NBR 3.1 0.9 0% 3.1
Minor right
PM NBR 3.1 0.9 0% 3.1
SAT NBR 3.1 0.9 0% 3.1
AM SBL 3 0.9 0% 3.0
MID SBL 3 0.9 0% 3.0
Minor left
PM SBL 3 0.9 0% 3.0
SAT SBL 3 0.9 0% 3.0
AM SBT 4 0.9 0% 4.0
Minor MID SBT 4 0.9 4% 4.0
Through PM SBT 4 0.9 0% 4.0
SAT SBT 4 0.9 0% 4.0
AM SBR 3.1 0.9 0% 3.1
MID SBR 3.1 0.9 0% 3.1
Minor right
PM SBR 3.1 0.9 0% 3.1
SAT SBR 3.1 0.9 0% 3.1
APPENDIX J:
Auxiliary Turn Lane Warrant Analysis Worksheets
Turn Lane Warrant and Length Analysis
Workbook

STUDY LOCATION AND ANALYSIS INFORMATION


Municipality: Camp Hill Borough Analysis Date: 2/16/2019
County: Cumberland County Conducted By: JJS
PennDOT Engineering District: 8 Checked By: JLN
Agency/Company Name: Traffic Planning & Design, Inc.

Intersection & Approach Description: Chestnut Street & N-S Alley

Analysis Period: 2020 Build Number of Approach Lanes: 1


Design Hour: AM Peak Hour Undivided or Divided Highway: Undivided
Intersection Control: Unsignalized
Posted Speed Limit (MPH): 25 Type of Analysis
Type of Terrain: Level Left or Right-Turn Lane Analysis?: Left Turn Lane

VOLUME CALCULATIONS
Left Turn Lane Volume Calculations

Movement Include? Volume % Trucks PCEV


Left Yes 4 0.0% 4 Advancing Volume: 236
Advancing Through - 226 2.0% 229 Opposing Volume: 327
Right Yes 3 0.0% 3 Left Turn Volume: 4
Left Yes 74 0.0% 74
Opposing Through - 207 1.0% 209
Right Yes 44 0.0% 44 % Left Turns in Advancing Volume: 1.69%

Right Turn Lane Volume Calculations

Movement Include? Volume % Trucks PCEV


Left Yes 74 0.0% N/A
Advancing Through - 207 1.0% N/A Advancing Volume: N/A
Right - 44 0.0% N/A Right Turn Volume: N/A

TURN LANE WARRANT FINDINGS


Left Turn Lane Warrant Findings Right Turn Lane Warrant Findings

Applicable Warrant Figure: Figure 1 Applicable Warrant Figure: N/A


Warrant Met?: No Warrant Met?: N/A
TURN LANE LENGTH CALCULATIONS
Intersection Control: Unsignalized
Design Hour Volume of Turning Lane: 4
Cycles Per Hour (Assumed): 60
Cycles Per Hour (If Known): Average # of Vehicles/Cycle: N/A

PennDOT Publication 46, Exhibit 11-6


Speed (MPH)
25-35 40-45 50-60
Type of Traffic Control
Turn Demand Volume
High Low High Low High Low
Signalized A A B or C B or C B or C B or C
Unsignalized A A C B B or C B

Left Turn Lane Storage Length, Condition A: N/A Feet


Condition B: N/A Feet
Condition C: N/A Feet
Required Left Turn Lane Storage Length: N/A Feet

Additional Findings:
N/A
Additional Comments / Justifications:

2/16/2019 Turn Lane Warrant and Length Analysis Workbook Chestnut AM.xlsx
Figure 1. Warrant for left turn lanes on two-lane roadways
(speeds to 35 mph, unsignalized and signalized intersections)
(L = % Left Turns in Advancing Volume)

900

800

700
Left Turn Lane
Warranted
600
Opposing Volume (VPH)

500 Volume Data Point


1.7%
400

236, 327
300

200
Left Turn
Lane Not
Warranted
100
40%30%20%15% 10% 5% 4% 3% 2% 1%

0
0 200 400 600 800 1000 1200 1400 1600 1800
Advancing Volume (VPH)
Turn Lane Warrant and Length Analysis
Workbook

STUDY LOCATION AND ANALYSIS INFORMATION


Municipality: Camp Hill Borough Analysis Date: 2/16/2019
County: Cumberland County Conducted By: JJS
PennDOT Engineering District: 8 Checked By: JLN
Agency/Company Name: Traffic Planning & Design, Inc.

Intersection & Approach Description: Chestnut Street & N-S Alley

Analysis Period: 2020 Build Number of Approach Lanes: 1


Design Hour: AM Peak Hour Undivided or Divided Highway: Undivided
Intersection Control: Unsignalized
Posted Speed Limit (MPH): 25 Type of Analysis
Type of Terrain: Level Left or Right-Turn Lane Analysis?: Right Turn Lane

VOLUME CALCULATIONS
Left Turn Lane Volume Calculations

Movement Include? Volume % Trucks PCEV


Left Yes 4 0.0% N/A Advancing Volume: N/A
Advancing Through - 226 2.0% N/A Opposing Volume: N/A
Right Yes 3 0.0% N/A Left Turn Volume: N/A
Left Yes 74 0.0% N/A
Opposing Through - 207 1.0% N/A
Right Yes 44 0.0% N/A % Left Turns in Advancing Volume: N/A

Right Turn Lane Volume Calculations

Movement Include? Volume % Trucks PCEV


Left Yes 74 0.0% 74
Advancing Through - 207 1.0% 209 Advancing Volume: 327
Right - 44 0.0% 44 Right Turn Volume: 44

TURN LANE WARRANT FINDINGS


Left Turn Lane Warrant Findings Right Turn Lane Warrant Findings

Applicable Warrant Figure: N/A Applicable Warrant Figure: Figure 9


Warrant Met?: N/A Warrant Met?: No
TURN LANE LENGTH CALCULATIONS
Intersection Control: Unsignalized
Design Hour Volume of Turning Lane: 44
Cycles Per Hour (Assumed): 60
Cycles Per Hour (If Known): Average # of Vehicles/Cycle: N/A

PennDOT Publication 46, Exhibit 11-6


Speed (MPH)
25-35 40-45 50-60
Type of Traffic Control
Turn Demand Volume
High Low High Low High Low
Signalized A A B or C B or C B or C B or C
Unsignalized A A C B B or C B

Right Turn Lane Storage Length, Condition A: N/A Feet


Condition B: N/A Feet
Condition C: N/A Feet
Required Right Turn Lane Storage Length: N/A Feet

Additional Findings:
N/A
Additional Comments / Justifications:

2/16/2019 Turn Lane Warrant and Length Analysis Workbook Chestnut AM.xlsx
Figure 9. Warrant for right turn lanes on two-lane roadways
(40 mph or lower speeds, unsignalized and signalized intersections)

160

140

120

Right Turn Lane


Right Turning Traffic (VPH)

100 Warranted

Volume Data Point


80

60

327, 44
40
Right Turn
Lane Not
Warranted
20

0
200 400 600 800 1000 1200

Advancing Volume including Right Turns (VPH)


Turn Lane Warrant and Length Analysis
Workbook

STUDY LOCATION AND ANALYSIS INFORMATION


Municipality: Camp Hill Borough Analysis Date: 4/5/2019
County: Cumberland County Conducted By: JJS
PennDOT Engineering District: 8 Checked By: JLN
Agency/Company Name: Traffic Planning & Design, Inc.

Intersection & Approach Description: Chestnut Street & N-S Alley

Analysis Period: 2020 Build Number of Approach Lanes: 1


Design Hour: Weekday Midday Peak Hour Undivided or Divided Highway: Undivided
Intersection Control: Unsignalized
Posted Speed Limit (MPH): 25 Type of Analysis
Type of Terrain: Level Left or Right-Turn Lane Analysis?: Left Turn Lane

VOLUME CALCULATIONS
Left Turn Lane Volume Calculations

Movement Include? Volume % Trucks PCEV


Left Yes 20 0.0% 20 Advancing Volume: 230
Advancing Through - 202 3.0% 206 Opposing Volume: 405
Right Yes 3 33.0% 4 Left Turn Volume: 20
Left Yes 26 0.0% 26
Opposing Through - 173 4.0% 177
Right Yes 202 0.0% 202 % Left Turns in Advancing Volume: 8.70%

Right Turn Lane Volume Calculations

Movement Include? Volume % Trucks PCEV


Left Yes 26 0.0% N/A
Advancing Through - 173 4.0% N/A Advancing Volume: N/A
Right - 202 0.0% N/A Right Turn Volume: N/A

TURN LANE WARRANT FINDINGS


Left Turn Lane Warrant Findings Right Turn Lane Warrant Findings

Applicable Warrant Figure: Figure 1 Applicable Warrant Figure: N/A


Warrant Met?: No Warrant Met?: N/A
TURN LANE LENGTH CALCULATIONS
Intersection Control: Unsignalized
Design Hour Volume of Turning Lane: 20
Cycles Per Hour (Assumed): 60
Cycles Per Hour (If Known): Average # of Vehicles/Cycle: N/A

PennDOT Publication 46, Exhibit 11-6


Speed (MPH)
25-35 40-45 50-60
Type of Traffic Control
Turn Demand Volume
High Low High Low High Low
Signalized A A B or C B or C B or C B or C
Unsignalized A A C B B or C B

Left Turn Lane Storage Length, Condition A: N/A Feet


Condition B: N/A Feet
Condition C: N/A Feet
Required Left Turn Lane Storage Length: N/A Feet

Additional Findings:
N/A
Additional Comments / Justifications:

4/5/2019 Turn Lane Warrant and Length Analysis Workbook Chestnut MID.xlsx
Figure 1. Warrant for left turn lanes on two-lane roadways
(speeds to 35 mph, unsignalized and signalized intersections)
(L = % Left Turns in Advancing Volume)

900

800

700
Left Turn Lane
Warranted
600
Opposing Volume (VPH)

500 Volume Data Point


8.7%
400 230, 405

300

200
Left Turn
Lane Not
Warranted
100
40%30%20%15% 10% 5% 4% 3% 2% 1%

0
0 200 400 600 800 1000 1200 1400 1600 1800
Advancing Volume (VPH)
Turn Lane Warrant and Length Analysis
Workbook

STUDY LOCATION AND ANALYSIS INFORMATION


Municipality: Camp Hill Borough Analysis Date: 4/5/2019
County: Cumberland County Conducted By: JJS
PennDOT Engineering District: 8 Checked By: JLN
Agency/Company Name: Traffic Planning & Design, Inc.

Intersection & Approach Description: Chestnut Street & N-S Alley

Analysis Period: 2020 Build Number of Approach Lanes: 1


Design Hour: Weekday Midday Peak Hour Undivided or Divided Highway: Undivided
Intersection Control: Unsignalized
Posted Speed Limit (MPH): 25 Type of Analysis
Type of Terrain: Level Left or Right-Turn Lane Analysis?: Right Turn Lane

VOLUME CALCULATIONS
Left Turn Lane Volume Calculations

Movement Include? Volume % Trucks PCEV


Left Yes 20 0.0% N/A Advancing Volume: N/A
Advancing Through - 202 3.0% N/A Opposing Volume: N/A
Right Yes 3 33.0% N/A Left Turn Volume: N/A
Left Yes 26 0.0% N/A
Opposing Through - 173 4.0% N/A
Right Yes 202 0.0% N/A % Left Turns in Advancing Volume: N/A

Right Turn Lane Volume Calculations

Movement Include? Volume % Trucks PCEV


Left Yes 26 0.0% 26
Advancing Through - 173 4.0% 177 Advancing Volume: 405
Right - 202 0.0% 202 Right Turn Volume: 202

TURN LANE WARRANT FINDINGS


Left Turn Lane Warrant Findings Right Turn Lane Warrant Findings

Applicable Warrant Figure: N/A Applicable Warrant Figure: Figure 9


Warrant Met?: N/A Warrant Met?: Yes
TURN LANE LENGTH CALCULATIONS
Intersection Control: Unsignalized
Design Hour Volume of Turning Lane: 202
Cycles Per Hour (Assumed): 60
Cycles Per Hour (If Known): Average # of Vehicles/Cycle: 3.0

PennDOT Publication 46, Exhibit 11-6


Speed (MPH)
25-35 40-45 50-60
Type of Traffic Control
Turn Demand Volume
High Low High Low High Low
Signalized A A B or C B or C B or C B or C
Unsignalized A A C B B or C B

Right Turn Lane Storage Length, Condition A: 150 Feet


Condition B: N/A Feet
Condition C: N/A Feet
Required Right Turn Lane Storage Length: 150 Feet

Additional Findings:
N/A
Additional Comments / Justifications:

4/5/2019 Turn Lane Warrant and Length Analysis Workbook Chestnut MID.xlsx
Figure 9. Warrant for right turn lanes on two-lane roadways
(40 mph or lower speeds, unsignalized and signalized intersections)

250

200 405, 202

Right Turn Lane


Right Turning Traffic (VPH)

Warranted
150

Volume Data Point

100

Right Turn
50 Lane Not
Warranted

0
200 400 600 800 1000 1200

Advancing Volume including Right Turns (VPH)


Turn Lane Warrant and Length Analysis
Workbook

STUDY LOCATION AND ANALYSIS INFORMATION


Municipality: Camp Hill Borough Analysis Date: 2/13/2019
County: Cumberland County Conducted By: JJS
PennDOT Engineering District: 8 Checked By: JLN
Agency/Company Name: Traffic Planning & Design, Inc.

Intersection & Approach Description: Chestnut Street & N-S Alley

Analysis Period: 2020 Build Number of Approach Lanes: 1


Design Hour: PM Peak Hour Undivided or Divided Highway: Undivided
Intersection Control: Unsignalized
Posted Speed Limit (MPH): 25 Type of Analysis
Type of Terrain: Level Left or Right-Turn Lane Analysis?: Left Turn Lane

VOLUME CALCULATIONS
Left Turn Lane Volume Calculations

Movement Include? Volume % Trucks PCEV


Left Yes 14 0.0% 14 Advancing Volume: 317
Advancing Through - 305 0.0% 302 Opposing Volume: 374
Right Yes 1 0.0% 1 Left Turn Volume: 14
Left Yes 21 0.0% 21
Opposing Through - 217 1.0% 219
Right Yes 134 0.0% 134 % Left Turns in Advancing Volume: 4.42%

Right Turn Lane Volume Calculations

Movement Include? Volume % Trucks PCEV


Left Yes 21 0.0% N/A
Advancing Through - 217 1.0% N/A Advancing Volume: N/A
Right - 134 0.0% N/A Right Turn Volume: N/A

TURN LANE WARRANT FINDINGS


Left Turn Lane Warrant Findings Right Turn Lane Warrant Findings

Applicable Warrant Figure: Figure 1 Applicable Warrant Figure: N/A


Warrant Met?: No Warrant Met?: N/A
TURN LANE LENGTH CALCULATIONS
Intersection Control: Unsignalized
Design Hour Volume of Turning Lane: 14
Cycles Per Hour (Assumed): 60
Cycles Per Hour (If Known): Average # of Vehicles/Cycle: N/A

PennDOT Publication 46, Exhibit 11-6


Speed (MPH)
25-35 40-45 50-60
Type of Traffic Control
Turn Demand Volume
High Low High Low High Low
Signalized A A B or C B or C B or C B or C
Unsignalized A A C B B or C B

Left Turn Lane Storage Length, Condition A: N/A Feet


Condition B: N/A Feet
Condition C: N/A Feet
Required Left Turn Lane Storage Length: N/A Feet

Additional Findings:
N/A
Additional Comments / Justifications:

2/16/2019 Turn Lane Warrant and Length Analysis Workbook Chestnut PM.xlsx
Figure 1. Warrant for left turn lanes on two-lane roadways
(speeds to 35 mph, unsignalized and signalized intersections)
(L = % Left Turns in Advancing Volume)

900

800

700
Left Turn Lane
Warranted
600
Opposing Volume (VPH)

500 Volume Data Point


4.4%
400
317, 374

300

200
Left Turn
Lane Not
Warranted
100
40%30%20%15% 10% 5% 4% 3% 2% 1%

0
0 200 400 600 800 1000 1200 1400 1600 1800
Advancing Volume (VPH)
Turn Lane Warrant and Length Analysis
Workbook

STUDY LOCATION AND ANALYSIS INFORMATION


Municipality: Camp Hill Borough Analysis Date: 2/16/2019
County: Cumberland County Conducted By: JJS
PennDOT Engineering District: 8 Checked By: JLN
Agency/Company Name: Traffic Planning & Design, Inc.

Intersection & Approach Description: Chestnut Street & N-S Alley

Analysis Period: 2020 Build Number of Approach Lanes: 1


Design Hour: PM Peak Hour Undivided or Divided Highway: Undivided
Intersection Control: Unsignalized
Posted Speed Limit (MPH): 25 Type of Analysis
Type of Terrain: Level Left or Right-Turn Lane Analysis?: Right Turn Lane

VOLUME CALCULATIONS
Left Turn Lane Volume Calculations

Movement Include? Volume % Trucks PCEV


Left Yes 14 0.0% N/A Advancing Volume: N/A
Advancing Through - 305 0.0% N/A Opposing Volume: N/A
Right Yes 1 0.0% N/A Left Turn Volume: N/A
Left Yes 21 0.0% N/A
Opposing Through - 217 1.0% N/A
Right Yes 134 0.0% N/A % Left Turns in Advancing Volume: N/A

Right Turn Lane Volume Calculations

Movement Include? Volume % Trucks PCEV


Left Yes 21 0.0% 21
Advancing Through - 217 1.0% 219 Advancing Volume: 374
Right - 134 0.0% 134 Right Turn Volume: 134

TURN LANE WARRANT FINDINGS


Left Turn Lane Warrant Findings Right Turn Lane Warrant Findings

Applicable Warrant Figure: N/A Applicable Warrant Figure: Figure 9


Warrant Met?: N/A Warrant Met?: Yes
TURN LANE LENGTH CALCULATIONS
Intersection Control: Unsignalized
Design Hour Volume of Turning Lane: 134
Cycles Per Hour (Assumed): 60
Cycles Per Hour (If Known): Average # of Vehicles/Cycle: 2.0

PennDOT Publication 46, Exhibit 11-6


Speed (MPH)
25-35 40-45 50-60
Type of Traffic Control
Turn Demand Volume
High Low High Low High Low
Signalized A A B or C B or C B or C B or C
Unsignalized A A C B B or C B

Right Turn Lane Storage Length, Condition A: 100 Feet


Condition B: N/A Feet
Condition C: N/A Feet
Required Right Turn Lane Storage Length: 100 Feet

Additional Findings:
N/A
Additional Comments / Justifications:

2/16/2019 Turn Lane Warrant and Length Analysis Workbook Chestnut PM.xlsx
Figure 9. Warrant for right turn lanes on two-lane roadways
(40 mph or lower speeds, unsignalized and signalized intersections)

160

140
374, 134

120

Right Turn Lane


Right Turning Traffic (VPH)

100 Warranted

Volume Data Point


80

60

40
Right Turn
Lane Not
Warranted
20

0
200 400 600 800 1000 1200

Advancing Volume including Right Turns (VPH)


Turn Lane Warrant and Length Analysis
Workbook

STUDY LOCATION AND ANALYSIS INFORMATION


Municipality: Camp Hill Borough Analysis Date: 2/16/2019
County: Cumberland County Conducted By: JJS
PennDOT Engineering District: 8 Checked By: JLN
Agency/Company Name: Traffic Planning & Design, Inc.

Intersection & Approach Description: Chestnut Street & N-S Alley

Analysis Period: 2020 Build Number of Approach Lanes: 1


Design Hour: Saturday Midday Peak Hour Undivided or Divided Highway: Undivided
Intersection Control: Unsignalized
Posted Speed Limit (MPH): 25 Type of Analysis
Type of Terrain: Level Left or Right-Turn Lane Analysis?: Left Turn Lane

VOLUME CALCULATIONS
Left Turn Lane Volume Calculations

Movement Include? Volume % Trucks PCEV


Left Yes 21 0.0% 21 Advancing Volume: 265
Advancing Through - 240 0.0% 240 Opposing Volume: 364
Right Yes 3 33.0% 4 Left Turn Volume: 21
Left Yes 4 0.0% 4
Opposing Through - 166 0.0% 166
Right Yes 194 0.0% 194 % Left Turns in Advancing Volume: 7.92%

Right Turn Lane Volume Calculations

Movement Include? Volume % Trucks PCEV


Left Yes 4 0.0% N/A
Advancing Through - 166 0.0% N/A Advancing Volume: N/A
Right - 194 0.0% N/A Right Turn Volume: N/A

TURN LANE WARRANT FINDINGS


Left Turn Lane Warrant Findings Right Turn Lane Warrant Findings

Applicable Warrant Figure: Figure 1 Applicable Warrant Figure: N/A


Warrant Met?: No Warrant Met?: N/A
TURN LANE LENGTH CALCULATIONS
Intersection Control: Unsignalized
Design Hour Volume of Turning Lane: 21
Cycles Per Hour (Assumed): 60
Cycles Per Hour (If Known): Average # of Vehicles/Cycle: N/A

PennDOT Publication 46, Exhibit 11-6


Speed (MPH)
25-35 40-45 50-60
Type of Traffic Control
Turn Demand Volume
High Low High Low High Low
Signalized A A B or C B or C B or C B or C
Unsignalized A A C B B or C B

Left Turn Lane Storage Length, Condition A: N/A Feet


Condition B: N/A Feet
Condition C: N/A Feet
Required Left Turn Lane Storage Length: N/A Feet

Additional Findings:
N/A
Additional Comments / Justifications:

2/16/2019 Turn Lane Warrant and Length Analysis Workbook Chestnut SAT.xlsx
Figure 1. Warrant for left turn lanes on two-lane roadways
(speeds to 35 mph, unsignalized and signalized intersections)
(L = % Left Turns in Advancing Volume)

900

800

700
Left Turn Lane
Warranted
600
Opposing Volume (VPH)

500 Volume Data Point


7.9%
400
265, 364

300

200
Left Turn
Lane Not
Warranted
100
40%30%20%15% 10% 5% 4% 3% 2% 1%

0
0 200 400 600 800 1000 1200 1400 1600 1800
Advancing Volume (VPH)
Turn Lane Warrant and Length Analysis
Workbook

STUDY LOCATION AND ANALYSIS INFORMATION


Municipality: Camp Hill Borough Analysis Date: 2/16/2019
County: Cumberland County Conducted By: JJS
PennDOT Engineering District: 8 Checked By: JLN
Agency/Company Name: Traffic Planning & Design, Inc.

Intersection & Approach Description: Chestnut Street & N-S Alley

Analysis Period: 2020 Build Number of Approach Lanes: 1


Design Hour: Saturday Midday Peak Hour Undivided or Divided Highway: Undivided
Intersection Control: Unsignalized
Posted Speed Limit (MPH): 25 Type of Analysis
Type of Terrain: Level Left or Right-Turn Lane Analysis?: Right Turn Lane

VOLUME CALCULATIONS
Left Turn Lane Volume Calculations

Movement Include? Volume % Trucks PCEV


Left Yes 21 0.0% N/A Advancing Volume: N/A
Advancing Through - 240 0.0% N/A Opposing Volume: N/A
Right Yes 3 33.0% N/A Left Turn Volume: N/A
Left Yes 4 0.0% N/A
Opposing Through - 166 0.0% N/A
Right Yes 194 0.0% N/A % Left Turns in Advancing Volume: N/A

Right Turn Lane Volume Calculations

Movement Include? Volume % Trucks PCEV


Left Yes 4 0.0% 4
Advancing Through - 166 0.0% 166 Advancing Volume: 364
Right - 194 0.0% 194 Right Turn Volume: 194

TURN LANE WARRANT FINDINGS


Left Turn Lane Warrant Findings Right Turn Lane Warrant Findings

Applicable Warrant Figure: N/A Applicable Warrant Figure: Figure 9


Warrant Met?: N/A Warrant Met?: Yes
TURN LANE LENGTH CALCULATIONS
Intersection Control: Unsignalized
Design Hour Volume of Turning Lane: 194
Cycles Per Hour (Assumed): 60
Cycles Per Hour (If Known): Average # of Vehicles/Cycle: 3.0

PennDOT Publication 46, Exhibit 11-6


Speed (MPH)
25-35 40-45 50-60
Type of Traffic Control
Turn Demand Volume
High Low High Low High Low
Signalized A A B or C B or C B or C B or C
Unsignalized A A C B B or C B

Right Turn Lane Storage Length, Condition A: 150 Feet


Condition B: N/A Feet
Condition C: N/A Feet
Required Right Turn Lane Storage Length: 150 Feet

Additional Findings:
N/A
Additional Comments / Justifications:

2/16/2019 Turn Lane Warrant and Length Analysis Workbook Chestnut SAT.xlsx
Figure 9. Warrant for right turn lanes on two-lane roadways
(40 mph or lower speeds, unsignalized and signalized intersections)

250

200
364, 194

Right Turn Lane


Right Turning Traffic (VPH)

Warranted
150

Volume Data Point

100

Right Turn
50 Lane Not
Warranted

0
200 400 600 800 1000 1200

Advancing Volume including Right Turns (VPH)


APPENDIX K:
Drive-Thru Count Data
Drive Thru Rate Calculations

Saturday
sf trips rate
store 0721 4971 107 21.52484
store 3536 5200 105 20.19231
10171 212 20.84

Weekday Midday
sf trips rate
Lansdale 4943 107 21.64677
Lindle Rd 4739 116 24.47774
Lincoln Hwy 4831 81 16.76671
14513 304 20.95
Standalone Payments
Time Date
1200 - 1300 1/26/2019

Drive - Thru
Drive - Thru Times Total
Vehicles Drive - Thru Times (Sec) No Car Vehicles Drive - Thru Times (Sec) Times Total (Sec) (Mins)
1 104 41 29 3472 57.86666667
2 40 42 28
3 23 43 36 No Car (Sec)
4 42 44 49 Average (Sec) 39
5 11 45 130 46.91891892
6 39 46 57
7 16 47 14 Average No Car (Sec)
8 25 48 119 Highest (Sec) 19.5
9 39 49 20 224
10 10 50 84
11 103 51 17
12 25 52 68 Lowest (Sec)
13 92 53 37 10
14 17 54 16
15 27 55 17
16 26 56 33 Mode (Sec)
17 53 57 37 17
18 19 58 14
27
19 180 59 23
20 15 60 113
21 28 61 35
22 34 62 59
23 19 63 88
24 16 64 17
25 17 65 16
26 88 66 64
27 30 67 24
28 224 68 53
29 45 69 17
30 34 70 29
31 36 71 17
32 22 72 16
12
33 56 73 201
34 84 74 15
35 45
36 23
37 20
38 47
39 49
40 57
Time Date
1200 - 1300 1/26/2019

Drive - Thru Drive - Thru


Times Total Times Total
Vehicles Drive - Thru Times (Sec) No Car Vehicles Drive - Thru Times (Sec) (Sec) (Mins) No Car (Sec)
1 22 41 31 3426 57.1 0
2 18 42 29
3 62 43 42
4 63 44 81 Average (Sec) Average No Car (Sec)
5 45 45 22 45.07894737 #DIV/0!
6 31 46 27
7 39 47 18
8 21 48 31 Highest (Sec)
9 99 49 21 140
10 52 50 24
11 114 51 31
12 21 52 23 Lowest (Sec)
13 38 53 38 15
14 33 54 40
15 139 55 53
16 40 56 58 Mode (Sec)
17 24 57 74 31
18 140 58 49
19 54 59 80
20 39 60 36
21 63 61 101
22 21 62 65
23 30 63 44
24 31 64 18
25 15 65 29
26 50 66 61
27 29 67 32
28 46 68 23
29 32 69 31
30 17 70 30
31 45 71 17
32 18 72 22
33 16 73 63
34 91 74 99
35 40 75 34
36 55 76 27
37 51
38 114
39 35
40 29
Time Date
1200 - 1300 1/26/2019

Drive - Thru Drive - Thru


Times Total Times Total
Vehicles Drive - Thru Times (Sec) No Car Vehicles Drive - Thru Times (Sec) (Sec) (Mins) No Car (Sec)
1 26 41 37 3326 55.43333333 0
2 42 42 75
3 53 43 32
4 53 44 36 Average (Sec) Average No Car (Sec)
5 30 45 68 42.40740741 #DIV/0!
6 70 46 67
7 33 47 36
8 48 48 21 Highest (Sec)
9 35 49 50 165
10 28 50 21
11 165 51 24
12 41 52 37 Lowest (Sec)
13 35 53 21 15
14 47 54 33
15 52 55 31
16 28 56 20 Mode (Sec)
17 24 57 29 29
18 68 58 68
19 37 59 40
20 22 60 61
21 29 61 73
22 31 62 80
23 39 63 64
24 23 64 29
25 31 65 18
26 15 66 30
27 54 67 41
28 65 68 22
29 32 69 52
30 30 70 74
31 29 71 27
32 34 72 81
33 57 73 29
34 40 74 34
35 39 75 32
36 34 76 26
37 117 77 60
38 31 78 21
39 27 79 41
40 53 80 22
81 25
Pay Station
11:00 AM - 12:00 PM PEAK 12:00 PM PEAK
Vehicles Dwell Time Vehicles Dwell Time Vehicles Dwell Time Vehicles Dwell Time
1 30.6 51 63.9 1 70 51 20.7
2 81.8 52 35.9 2 35.2 52 43.1
3 23.9 53 34.5 3 18.8 53 12.3
4 22.3 54 20.1 4 24.5 54 8.1
5 37.8 55 17.9 5 35.3 55 89.6
6 50.2 56 26.1 6 100.1 56 40.2
7 38.3 57 51.2 7 78.4 57 29.3
8 41.6 58 42.1 8 16.8 58 14.5
9 16.4 59 22.6 9 92.1 59 49.4
10 22.3 60 34.5 10 99.1 60 18.9
11 60.2 61 38.3 11 63.6 61 44.3
12 57.7 62 22.3 12 46.4 62 18.8
13 60.7 63 58.5 13 19.1 63 9.7
14 49.2 64 112.4 14 59.7 64 30.2
15 63.5 65 19.8 15 20.7 65 13.8
16 19.1 66 59.2 16 8.4 66 131.4
17 53.3 67 82.8 17 30.9 67 16.3
18 25.1 68 24 18 10.9 68 109.3
19 39.9 69 12.4 19 15.1 69 15.5
20 129.8 70 19.8 20 21.8 70 47.2
21 99.7 71 13 21 29.2 71 23.3
22 10.6 72 8.7 22 27.9 72 65.8
23 85.7 73 11.4 23 48.5 73 18
24 16.2 74 27.9 24 30.4 74 14.7
25 26 75 21.5 25 53.6 75 45.9
26 22.4 76 20.1 26 31.5 76 41.8
27 27.5 77 20.8 27 11.5 77 17.6
28 29 78 33.9 28 11.2 78 30.7
29 16.6 79 12.3 29 17 79 23.6
30 11.4 80 11.1 30 56.2 80 30.2
31 37.7 81 69.8 31 46.5 81 16.2
32 13 82 19.9 32 151.9 82 12.8
33 14.8 83 15.9 33 21.1 83 28
34 16.1 84 68.2 34 50.6 84 23.9
35 14.9 35 26.5 85 16.4
36 18.5 36 75.4 86 13.2
37 49 37 15.9 87 37
38 17.8 38 38.6 88 33.9
39 9.5 39 98.2 89 17.3
40 69.3 40 17.6 90 16.7
41 20.6 41 25.9 91 62.8
42 21.3 42 97.9 92 50.5
43 70.8 43 11.9 93 28
44 13.6 44 27 94 102.3
45 67.6 45 17.2
46 40 46 15
47 36.4 47 54
48 33.8 48 59
49 25.6 49 22.5
50 43.5 50 36

36.37380952 38.57234043

39
iPad orders with assisted pick-up
Time Date
1200 - 1300 1/26/2019

Drive - Thru Drive - Thru


Times Total Times Total
Vehicles Drive - Thru Times (Sec) No Car Vehicles Drive - Thru Times (Sec) (Sec) (Mins) No Car (Sec)
1 10 41 30 3570 59.5 18
2 8 42 36
3 48 43 48
4 15 44 49 Average (Sec) Average No Car (Sec)
5 20 45 32 33.36448598 0
6 19 46 70
7 32 47 77
8 5 48 20 Highest (Sec)
9 25 49 23 171
10 15 50 33
11 11 51 43
12 87 52 18 Lowest (Sec)
13 24 53 10 3
14 25 54 44
15 100 55 13
16 22 56 38 Mode (Sec)
17 28 57 26 15
18 16 58 34
0
19 26 59 32
20 20 60 26
21 20 61 65
22 11 62 19
23 73 63 9
24 14 64 9
25 18 65 16
26 33 66 70
27 20 67 35
28 30 68 5
29 70 69 75
30 9 70 15
31 36 71 55
32 23 72 10
0
33 40 73 12
34 15 74 30
35 42 75 15
36 26 76 30
18
37 27 77 25
38 28 78 25
39 15 79 11
40 29 80 24
81 31
82 22
83 47
84 78
85 79
86 8
87 8
88 3
89 4
90 10
91 35
92 32
93 15
94 160
95 25
96 171
97 24
98 76
99 36
100 72
101 38
102 22
103 74
104 35
105 18
106 25
107 30
Time Date
1200 - 1300 2/9/2019

Drive - Thru Drive - Thru


Times Total Times Total
Vehicles Drive - Thru Times (Sec) No Car Vehicles Drive - Thru Times (Sec) (Sec) (Mins) No Car (Sec)
1 28 41 14 3600 60 0
2 10 42 13
3 12 43 15
4 10 44 17 Average (Sec) Average No Car (Sec)
5 70 45 38 34.28571429 0
6 30 46 20
7 15 47 21
8 100 48 6 Highest (Sec)
9 20 49 8 180
10 21 50 18
11 38 51 85
12 9 52 43 Lowest (Sec)
13 10 53 85 6
14 12 54 15
15 60 55 10
16 11 56 14 Mode (Sec)
17 14 57 13 10
18 14 58 15
0
19 14 59 93
20 25 60 95
21 49 61 75
22 67 62 9
23 8 63 27
24 16 64 19
25 10 65 9
26 21 66 33
27 31 67 20
28 90 68 21
29 53 69 22
30 10 70 33
31 22 71 24
32 54 72 25
0
33 29 73 57
34 20 74 15
35 25 75 10
36 31 76 18
0
37 16 77 13
38 21 78 100
39 94 79 22
40 18 80 21
81 17
82 12
83 40
84 13
85 180
86 65
87 20
88 30
89 42
90 20
91 27
92 20
93 17
94 13
95 14
96 25
97 60
98 15
99 40
100 10
101 52
102 51
103 43
104 175
105 180
APPENDIX L:
SimTraffic Analysis Printouts
Queuing and Blocking Report WMSC.00002
Projected 2020 Conditions Saturday Midday

Intersection: 7: Site Egress/Site Driveway & Drive-Thru Lane


Movement EB WB WB
Directions Served T T R
Maximum Queue (ft) 54 79 70
Average Queue (ft) 23 3 7
95th Queue (ft) 49 26 34
Link Distance (ft) 60 16 16
Upstream Blk Time (%) 0 7
Queuing Penalty (veh) 0 7
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

Intersection: 13: N-S Alley & Site Driveway/E-W Alley


Movement EB SB
Directions Served LTR LTR
Maximum Queue (ft) 30 44
Average Queue (ft) 30 3
95th Queue (ft) 31 21
Link Distance (ft) 16 149
Upstream Blk Time (%) 12
Queuing Penalty (veh) 26
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

Intersection: 24: Drive-Thru Booth & Drive-Thru Lane


Movement WB B23 B23 NB
Directions Served T T T
Maximum Queue (ft) 119 112 164 80
Average Queue (ft) 115 65 70 56
95th Queue (ft) 137 115 160 68
Link Distance (ft) 69 113 113 40
Upstream Blk Time (%) 94 6 17 12
Queuing Penalty (veh) 98 3 9 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

Zone Summary
Zone wide Queuing Penalty: 144

WMSC.00002 SimTraffic Report


TPD Page 1
APPENDIX M:
Conceptual Pedestrian Improvements Plan
CHESTNUT STREET PROPOSED RAISED CROSSWALK (TYP.)

RELOCATED STOP
SIGN (TYP.)

24"/W (TYP.)

MATCHLINE A
S 31
ST S
TR E
ET
S 32N
D ST

Est. 1989
R EET

TRAFFIC PLANNING
0 25 50 FEET
AND DESIGN, INC.
www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com
1:25

CONCEPT PLAN NOTES DISTRICT COUNTY ROUTE SECTION SHEET


THESE NOTES ARE AN INTEGRAL PART OF THIS CONCEPT PLAN. THIS CONCEPT PLAN HAS BEEN PREPARED AT ANY UTILITY FACILITIES DEPICTED ON THIS PLAN ARE UNVERIFIED AND MUST BE CONFIRMED THROUGH SURVEY ALTHOUGH NOT NECESSARILY DEPICTED ON THIS CONCEPT PLAN, DRAINAGE AND STORMWATER MANAGEMENT
CLIENT'S REQUEST, IS CONCEPTUAL AND PRELIMINARY IN NATURE, AND SHALL NOT BE USED FOR PURPOSES OF AND UTILITY RESEARCH. SUBSURFACE UTILITY ENGINEERING MAY BE NECESSARY TO ACCURATELY LOCATE IMPROVEMENTS MAY BE NECESSARY IN ORDER TO IMPLEMENT ANY PROPOSED IMPROVEMENTS. 8-0 CUMBERLAND -- -- 1 OF 3
CONSTRUCTION OR ANY OTHER USE. THIS PLAN IS SUBJECT TO CHANGE AND REFINEMENT AS THE DESIGN IS UNDERGROUND UTILITY FACILITIES. EVEN IF NOT DEPICTED HEREIN, UTILITY RELOCATIONS MAY BE
CAMP HILL BOROUGH
2:01:09 PM

FURTHER DEVELOPED AND REVIEWED BY MUNICIPALITIES, AGENCIES, AND OTHERS. NECESSARY AS PART OF THIS PROJECT. UTILITY RELOCATIONS SHALL BE BASED ON ENGINEERED AND APPROVED ALL DOCUMENTS, DESIGNS, DRAWINGS AND SPECIFICATIONS ("INSTRUMENTS OF SERVICE") PREPARED
PLANS. SPECIFICALLY FOR THIS PROJECT BY PREPARER ("ENGINEER") ARE NOT INTENDED OR REPRESENTED TO BE
ENGINEER DOES NOT MAKE ANY REPRESENTATION REGARDING THE ACCURACY OF THE INFORMATION CONTAINED SUITABLE FOR USE BY CLIENT OR ANYONE ELSE ON FURTHER DEVELOPMENT OF THE PROJECT OR ON ANY OTHER
HEREIN AND ACCEPTS NO LIABILITY FOR THE INFORMATION CONTAINED HEREIN.

CLIENT MUST OBTAIN WRITTEN APPROVAL FROM PREPARER PRIOR TO RELEASE OF THIS PLAN TO ANY THIRD PARTY.
ANY ENVIRONMENTAL RESOURCES DEPICTED ON THIS PLAN ARE UNVERIFIED AND MUST BE CONFIRMED THROUGH
RESEARCH, FIELD SURVEYS, AND STUDIES. EVEN IF NOT DEPICTED HEREIN, ENVIRONMENTAL RESOURCES MAY
PROJECT. IN ACCEPTING AND UTILIZING INSTRUMENTS OF SERVICE, OR ANY FORM OF ELECTRONIC MEDIA
GENERATED AND PROVIDED BY ENGINEER WITH RESPECT TO THIS PROJECT, ANY REUSE OR MODIFICATION OF
CHESTNUT STREET
ANY OTHER USE BY A THIRD PARTY IS STRICTLY PROHIBITED. BE IMPACTED AS PART OF THIS PROJECT. THIS CONCEPT PLAN DOES NOT PURPORT TO CONSIDER ALL INSTRUMENTS OF SERVICE WITHOUT WRITTEN CONSENT BY ENGINEER FOR THE SPECIFIC PURPOSE INTENDED

THIS CONCEPT PLAN IS BASED ON UNVERIFIED SURVEY/MAPPING INFORMATION PROVIDED TO PREPARER BY OTHERS.
ENVIRONMENTAL RESOURCE IMPACTS THAT MAY BE REQUIRED DUE TO ANY PROPOSED IMPROVEMENTS. WILL BE AT CLIENT'S SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO ENGINEER. CLIENT AGREES
TO WAIVE ALL CLAIMS AGAINST ENGINEER RESULTING IN ANY WAY FROM ANY UNAUTHORIZED CHANGES OR REUSE
PEDESTRIAN IMPROVEMENTS
FINAL PROJECT DESIGN SHALL BE BASED ON ACTUAL SURVEY PREPARED UNDER THE SUPERVISION AND CONTROL OF A
ANY ROADWAY STRUCTURES (E.G. BRIDGES, CULVERTS, RETAINING WALLS) DEPICTED ON THIS PLAN ARE OF INSTRUMENTS OF SERVICE BY ANYONE OTHER THAN ENGINEER. IN ADDITION, CLIENT AGREES, TO THE
PROFESSIONAL LICENSED SURVEYOR.
UNVERIFIED AND MUST BE CONFIRMED THROUGH RESEARCH, FIELD SURVEYS, AND STUDIES. EVEN IF NOT FULLEST EXTENT PERMITTED BY LAW, TO INDEMNIFY, DEFEND AND HOLD ENGINEER HARMLESS FROM ANY CONCEPT
7/30/2019

ANY RIGHT-OF-WAY LINES OR PROPERTY LINES DEPICTED ON THIS PLAN ARE UNVERIFIED AND MUST BE CONFIRMED BY DEPICTED HEREIN, ROADWAY STRUCTURES MAY BE IMPACTED AS PART OF THIS PROJECT. THIS CONCEPT DAMAGE, LIABILITY, OR COST, INCLUDING REASONABLE ATTORNEYS' FEES AND COSTS OF DEFENSE,
A PROFESSIONAL LICENSED SURVEYOR. EVEN IF NOT DEPICTED HEREIN, RIGHT-OF-WAY OR EASEMENT ACQUISITIONS PLAN DOES NOT PURPORT TO CONSIDER ALL IMPACTS TO ROADWAY STRUCTURES THAT MAY BE REQUIRED DUE TO ARISING FROM ANY UNAUTHORIZED REUSE OR CHANGES TO INSTRUMENTS OF SERVICE.
MAY BE NECESSARY AS PART OF THIS PROJECT. FINAL RIGHT-OF-WAY OR EASEMENT ACQUISITIONS SHALL BE BASED ANY PROPOSED IMPROVEMENTS.
ON ENGINEERED AND APPROVED PLANS. 12/17/2018
S 29
TH
STR
EET
24"/W (TYP.)

RELOCATED STOP
SIGN (TYP.)

PROPOSED RAISED INTERSECTION

CHESTNUT STREET
MATCHLINE A

MATCHLINE B
S 30
TH
STR
EET Est. 1989

TRAFFIC PLANNING
0 25 50 FEET
AND DESIGN, INC.
www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com
1:25

CONCEPT PLAN NOTES DISTRICT COUNTY ROUTE SECTION SHEET


THESE NOTES ARE AN INTEGRAL PART OF THIS CONCEPT PLAN. THIS CONCEPT PLAN HAS BEEN PREPARED AT ANY UTILITY FACILITIES DEPICTED ON THIS PLAN ARE UNVERIFIED AND MUST BE CONFIRMED THROUGH SURVEY ALTHOUGH NOT NECESSARILY DEPICTED ON THIS CONCEPT PLAN, DRAINAGE AND STORMWATER MANAGEMENT
CLIENT'S REQUEST, IS CONCEPTUAL AND PRELIMINARY IN NATURE, AND SHALL NOT BE USED FOR PURPOSES OF AND UTILITY RESEARCH. SUBSURFACE UTILITY ENGINEERING MAY BE NECESSARY TO ACCURATELY LOCATE IMPROVEMENTS MAY BE NECESSARY IN ORDER TO IMPLEMENT ANY PROPOSED IMPROVEMENTS. 8-0 CUMBERLAND -- -- 2 OF 3
CONSTRUCTION OR ANY OTHER USE. THIS PLAN IS SUBJECT TO CHANGE AND REFINEMENT AS THE DESIGN IS UNDERGROUND UTILITY FACILITIES. EVEN IF NOT DEPICTED HEREIN, UTILITY RELOCATIONS MAY BE
12:12:19 PM

FURTHER DEVELOPED AND REVIEWED BY MUNICIPALITIES, AGENCIES, AND OTHERS. NECESSARY AS PART OF THIS PROJECT. UTILITY RELOCATIONS SHALL BE BASED ON ENGINEERED AND APPROVED ALL DOCUMENTS, DESIGNS, DRAWINGS AND SPECIFICATIONS ("INSTRUMENTS OF SERVICE") PREPARED CAMP HILL BOROUGH
PLANS. SPECIFICALLY FOR THIS PROJECT BY PREPARER ("ENGINEER") ARE NOT INTENDED OR REPRESENTED TO BE
ENGINEER DOES NOT MAKE ANY REPRESENTATION REGARDING THE ACCURACY OF THE INFORMATION CONTAINED SUITABLE FOR USE BY CLIENT OR ANYONE ELSE ON FURTHER DEVELOPMENT OF THE PROJECT OR ON ANY OTHER
HEREIN AND ACCEPTS NO LIABILITY FOR THE INFORMATION CONTAINED HEREIN.

CLIENT MUST OBTAIN WRITTEN APPROVAL FROM PREPARER PRIOR TO RELEASE OF THIS PLAN TO ANY THIRD PARTY.
ANY ENVIRONMENTAL RESOURCES DEPICTED ON THIS PLAN ARE UNVERIFIED AND MUST BE CONFIRMED THROUGH
RESEARCH, FIELD SURVEYS, AND STUDIES. EVEN IF NOT DEPICTED HEREIN, ENVIRONMENTAL RESOURCES MAY
PROJECT. IN ACCEPTING AND UTILIZING INSTRUMENTS OF SERVICE, OR ANY FORM OF ELECTRONIC MEDIA
GENERATED AND PROVIDED BY ENGINEER WITH RESPECT TO THIS PROJECT, ANY REUSE OR MODIFICATION OF
CHESTNUT STREET
ANY OTHER USE BY A THIRD PARTY IS STRICTLY PROHIBITED. BE IMPACTED AS PART OF THIS PROJECT. THIS CONCEPT PLAN DOES NOT PURPORT TO CONSIDER ALL INSTRUMENTS OF SERVICE WITHOUT WRITTEN CONSENT BY ENGINEER FOR THE SPECIFIC PURPOSE INTENDED

THIS CONCEPT PLAN IS BASED ON UNVERIFIED SURVEY/MAPPING INFORMATION PROVIDED TO PREPARER BY OTHERS.
ENVIRONMENTAL RESOURCE IMPACTS THAT MAY BE REQUIRED DUE TO ANY PROPOSED IMPROVEMENTS. WILL BE AT CLIENT'S SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO ENGINEER. CLIENT AGREES
TO WAIVE ALL CLAIMS AGAINST ENGINEER RESULTING IN ANY WAY FROM ANY UNAUTHORIZED CHANGES OR REUSE
PEDESTRIAN IMPROVEMENTS
FINAL PROJECT DESIGN SHALL BE BASED ON ACTUAL SURVEY PREPARED UNDER THE SUPERVISION AND CONTROL OF A
ANY ROADWAY STRUCTURES (E.G. BRIDGES, CULVERTS, RETAINING WALLS) DEPICTED ON THIS PLAN ARE OF INSTRUMENTS OF SERVICE BY ANYONE OTHER THAN ENGINEER. IN ADDITION, CLIENT AGREES, TO THE
PROFESSIONAL LICENSED SURVEYOR.
UNVERIFIED AND MUST BE CONFIRMED THROUGH RESEARCH, FIELD SURVEYS, AND STUDIES. EVEN IF NOT FULLEST EXTENT PERMITTED BY LAW, TO INDEMNIFY, DEFEND AND HOLD ENGINEER HARMLESS FROM ANY CONCEPT
12/17/2018

ANY RIGHT-OF-WAY LINES OR PROPERTY LINES DEPICTED ON THIS PLAN ARE UNVERIFIED AND MUST BE CONFIRMED BY DEPICTED HEREIN, ROADWAY STRUCTURES MAY BE IMPACTED AS PART OF THIS PROJECT. THIS CONCEPT DAMAGE, LIABILITY, OR COST, INCLUDING REASONABLE ATTORNEYS' FEES AND COSTS OF DEFENSE,
A PROFESSIONAL LICENSED SURVEYOR. EVEN IF NOT DEPICTED HEREIN, RIGHT-OF-WAY OR EASEMENT ACQUISITIONS PLAN DOES NOT PURPORT TO CONSIDER ALL IMPACTS TO ROADWAY STRUCTURES THAT MAY BE REQUIRED DUE TO ARISING FROM ANY UNAUTHORIZED REUSE OR CHANGES TO INSTRUMENTS OF SERVICE.
MAY BE NECESSARY AS PART OF THIS PROJECT. FINAL RIGHT-OF-WAY OR EASEMENT ACQUISITIONS SHALL BE BASED ANY PROPOSED IMPROVEMENTS.
ON ENGINEERED AND APPROVED PLANS. 12/17/2018
24"/W (TYP.)

RELOCATED STOP PROPOSED RAISED CROSSWALK


SIGN (TYP.) PROPOSED RAISED CROSSWALK

CHESTNUT STREET
MATCHLINE B

S 28T

S 27TH S
H STR

TR EET
EET

Est. 1989

TRAFFIC PLANNING
0 25 50 FEET
AND DESIGN, INC.
www.TrafficPD.com 610.326.3100 TPD@TrafficPD.com
1:25

CONCEPT PLAN NOTES DISTRICT COUNTY ROUTE SECTION SHEET


THESE NOTES ARE AN INTEGRAL PART OF THIS CONCEPT PLAN. THIS CONCEPT PLAN HAS BEEN PREPARED AT ANY UTILITY FACILITIES DEPICTED ON THIS PLAN ARE UNVERIFIED AND MUST BE CONFIRMED THROUGH SURVEY ALTHOUGH NOT NECESSARILY DEPICTED ON THIS CONCEPT PLAN, DRAINAGE AND STORMWATER MANAGEMENT
CLIENT'S REQUEST, IS CONCEPTUAL AND PRELIMINARY IN NATURE, AND SHALL NOT BE USED FOR PURPOSES OF AND UTILITY RESEARCH. SUBSURFACE UTILITY ENGINEERING MAY BE NECESSARY TO ACCURATELY LOCATE IMPROVEMENTS MAY BE NECESSARY IN ORDER TO IMPLEMENT ANY PROPOSED IMPROVEMENTS. 8-0 CUMBERLAND -- -- 3 OF 3
CONSTRUCTION OR ANY OTHER USE. THIS PLAN IS SUBJECT TO CHANGE AND REFINEMENT AS THE DESIGN IS UNDERGROUND UTILITY FACILITIES. EVEN IF NOT DEPICTED HEREIN, UTILITY RELOCATIONS MAY BE
12:12:23 PM

FURTHER DEVELOPED AND REVIEWED BY MUNICIPALITIES, AGENCIES, AND OTHERS. NECESSARY AS PART OF THIS PROJECT. UTILITY RELOCATIONS SHALL BE BASED ON ENGINEERED AND APPROVED ALL DOCUMENTS, DESIGNS, DRAWINGS AND SPECIFICATIONS ("INSTRUMENTS OF SERVICE") PREPARED CAMP HILL BOROUGH
PLANS. SPECIFICALLY FOR THIS PROJECT BY PREPARER ("ENGINEER") ARE NOT INTENDED OR REPRESENTED TO BE
ENGINEER DOES NOT MAKE ANY REPRESENTATION REGARDING THE ACCURACY OF THE INFORMATION CONTAINED SUITABLE FOR USE BY CLIENT OR ANYONE ELSE ON FURTHER DEVELOPMENT OF THE PROJECT OR ON ANY OTHER
HEREIN AND ACCEPTS NO LIABILITY FOR THE INFORMATION CONTAINED HEREIN.

CLIENT MUST OBTAIN WRITTEN APPROVAL FROM PREPARER PRIOR TO RELEASE OF THIS PLAN TO ANY THIRD PARTY.
ANY ENVIRONMENTAL RESOURCES DEPICTED ON THIS PLAN ARE UNVERIFIED AND MUST BE CONFIRMED THROUGH
RESEARCH, FIELD SURVEYS, AND STUDIES. EVEN IF NOT DEPICTED HEREIN, ENVIRONMENTAL RESOURCES MAY
PROJECT. IN ACCEPTING AND UTILIZING INSTRUMENTS OF SERVICE, OR ANY FORM OF ELECTRONIC MEDIA
GENERATED AND PROVIDED BY ENGINEER WITH RESPECT TO THIS PROJECT, ANY REUSE OR MODIFICATION OF
CHESTNUT STREET
ANY OTHER USE BY A THIRD PARTY IS STRICTLY PROHIBITED. BE IMPACTED AS PART OF THIS PROJECT. THIS CONCEPT PLAN DOES NOT PURPORT TO CONSIDER ALL INSTRUMENTS OF SERVICE WITHOUT WRITTEN CONSENT BY ENGINEER FOR THE SPECIFIC PURPOSE INTENDED

THIS CONCEPT PLAN IS BASED ON UNVERIFIED SURVEY/MAPPING INFORMATION PROVIDED TO PREPARER BY OTHERS.
ENVIRONMENTAL RESOURCE IMPACTS THAT MAY BE REQUIRED DUE TO ANY PROPOSED IMPROVEMENTS. WILL BE AT CLIENT'S SOLE RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO ENGINEER. CLIENT AGREES
TO WAIVE ALL CLAIMS AGAINST ENGINEER RESULTING IN ANY WAY FROM ANY UNAUTHORIZED CHANGES OR REUSE
PEDESTRIAN IMPROVEMENTS
FINAL PROJECT DESIGN SHALL BE BASED ON ACTUAL SURVEY PREPARED UNDER THE SUPERVISION AND CONTROL OF A
ANY ROADWAY STRUCTURES (E.G. BRIDGES, CULVERTS, RETAINING WALLS) DEPICTED ON THIS PLAN ARE OF INSTRUMENTS OF SERVICE BY ANYONE OTHER THAN ENGINEER. IN ADDITION, CLIENT AGREES, TO THE
PROFESSIONAL LICENSED SURVEYOR.
UNVERIFIED AND MUST BE CONFIRMED THROUGH RESEARCH, FIELD SURVEYS, AND STUDIES. EVEN IF NOT FULLEST EXTENT PERMITTED BY LAW, TO INDEMNIFY, DEFEND AND HOLD ENGINEER HARMLESS FROM ANY CONCEPT
12/17/2018

ANY RIGHT-OF-WAY LINES OR PROPERTY LINES DEPICTED ON THIS PLAN ARE UNVERIFIED AND MUST BE CONFIRMED BY DEPICTED HEREIN, ROADWAY STRUCTURES MAY BE IMPACTED AS PART OF THIS PROJECT. THIS CONCEPT DAMAGE, LIABILITY, OR COST, INCLUDING REASONABLE ATTORNEYS' FEES AND COSTS OF DEFENSE,
A PROFESSIONAL LICENSED SURVEYOR. EVEN IF NOT DEPICTED HEREIN, RIGHT-OF-WAY OR EASEMENT ACQUISITIONS PLAN DOES NOT PURPORT TO CONSIDER ALL IMPACTS TO ROADWAY STRUCTURES THAT MAY BE REQUIRED DUE TO ARISING FROM ANY UNAUTHORIZED REUSE OR CHANGES TO INSTRUMENTS OF SERVICE.
MAY BE NECESSARY AS PART OF THIS PROJECT. FINAL RIGHT-OF-WAY OR EASEMENT ACQUISITIONS SHALL BE BASED ANY PROPOSED IMPROVEMENTS.
ON ENGINEERED AND APPROVED PLANS. 12/17/2018
PRELIMINARY / FINAL SUBDIVISION
& LAND DEVELOPMENT PLANS
3115 - 3133 CHESTNUT STREET
PROPOSED Chick-fil-A RESTAURAN
Borough of Camp Hill Cumberland County, PA

3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT

CONSOLIDATED PROPERTIES

WORMLEYSBURG, PA 17043
SHEET INDEX:

400 NORTH FRONT STREET

CUMBERLAND COUNTY, PA
TELEPHONE: 717-761-3558
INVENTORY OF REQUIRED PERMITS / APPROVALS:
AGENCY DATE SUBMITTED PERMIT NO. APPROVAL DATE

(c/o SCOTT STAIGER)


SHEET DESCRIPTION CUMBERLAND COUNTY
CONSERVATION DISTRICT

SHEET
1 TITLE SHEET
2 TOPOGRAPHIC & BOUNDARY SURVEY PLAN

APPLICANT:
SITE
3 SUBDIVISION PLAN (PROPERTY CONSOLIDATION) REQUESTED WAIVERS:
4 SITE DEMOLITION PLAN SUBDIVISION & LAND DEVELOPMENT:
1. SECTION 404 - PRELIMINARY PLAN SUBMISSION
REQUIREMENTS
5 SITE PLAN

TITLE
STORMWATER MANAGEMENT ORDINANCE:
6 GRADING / UTILITIES PLAN
1. SECTION 174-18 - GROUNDWATER RECHARGE
REQUIREMENTS

WORMLEYSBURG, PA 17043
7 SOIL EROSION & SEDIMENTATION CONTROL PLAN

400 NORTH FRONT STREET

TELEPHONE: 717-761-3558
8 POST CONSTRUCTION STORMWATER MANAGEMENT PLAN

BOROUGH OF CAMP HILL


MICHAEL A. SERLUCO
9 SITE LANDSCAPING PLAN
10 SITE LIGHTING PLAN
11 UTILITY PROFILES & OTHER INFORMATION

OWNER:
12 UTILITY PROFILES & OTHER INFORMATION CAMP HILL BOROUGH COUNCIL
13 MISCELLANEOUS DETAILS & OTHER INFORMATION VICINITY MAP This plan approved by the Borough Council of Camp Hill Borough this
SCALE: 1" = 1,000'
day of 20 .
14 MISCELLANEOUS DETAILS & OTHER INFORMATION
15 MISCELLANEOUS DETAILS & OTHER INFORMATION PRESIDENT
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\Chick-Chestnut-TITLE.dwg, 7/29/2019 1:39:04 PM, briley

16 MISCELLANEOUS DETAILS & OTHER INFORMATION DRAINAGE PLAN CERTIFICATION STORMWATER ACKNOWLEDGEMENT
SECRETARY

Douglas S. Gosik, P.E., on this date Consolidated Properties hereby acknowledges that the stormwater management

OWNER: have reviewed and hereby certify that the Drainage Plan meets all design
standards and criteria of the Camp Hill Borough Stormwater Management
Ordinance.
facilities and BMP's are to be permanent fixtures that can be altered or removed
only after approval of a revised plan by Camp Hill Borough.
CAMP HILL BOROUGH PLANNING COMMISSION
This plan recommended for approval by the Camp Hill Borough Planning
Commission this day of 20 .

MICHAEL A. SERLUCO Douglas S. Gosik, P.E., Design Engineer


Equitable Owner: Consolidated Properties
Michael A. Serluco
CHAIRMAN
400 NORTH FRONT STREET BOROUGH ENGINEER REVIEW STATEMENT OWNER'S CERTIFICATION
SECRETARY
WORMLEYSBURG, PA 17043 This plan reviewed by the Camp Hill Borough Engineer this COMMONWEALTH OF PENNSYLVANIA
COUNTY OF CUMBERLAND
TELEPHONE: (717) 761-3558 day of 20 .
On this, the day of , 20 before me
CUMBERLAND COUNTY PLANNING COMMISSION

the undersigned personally appeared, This plan reviewed by the Cumberland County Planning Commission this

APPLICANT: BOROUGH ENGINEER

MICHAEL A. SERLUCO, OWNER


day of 20 .

SURVEYOR'S CERTIFICATION CHAIRMAN

CONSOLIDATED PROPERTIES I hereby certify that, to the best of my knowledge,the survey and plan shown
and described hereon is true and correct.
Who being duly sworn according to law, depose and say that he is the owner of
the property shown on this plan and that he acknowledges the same to be his act
and deed and desire the same to be recorded as such according to law. SECRETARY

ATTENTION: SCOTT STAIGER Witness my Hand and Notarial Seal the day and date above written.
RECORDER OF DEEDS
400 NORTH FRONT STREET This plan recorded in the Office of the Recorder of Deeds in and for
Registered Surveyor
WORMLEYSBURG, PA 17043 Cumberland County this day of 20 .
James C. Hockenberry, P.L.S.
TELEPHONE: (717) 761-3558 533 Bucks Valley Road
Newport, Pa 17074
INSTRUMENT NUMBER SHEET
MY COMMISSION EXPIRES: NOTARY PUBLIC:
1 OF 16
N SITE
CHESTNUT STREET

LOCATION MAP
SCALE: 1" = 1,000'

ALLEY
LOT / OWNER INFORMATION:
PARCEL 431
PARCEL 431 OWNER: Michael A. Serluco
ADDRESS: 3115 Chestnut Street
PARCEL 434 PARCEL IDENTIFICATION NO.: 01-21-0273-431
PARCEL 436 PARCEL 435 PARCEL 433 PARCEL 432 INSTRUMENT NUMBER: 201725777
PLAN REFERENCE: Lot 7 - Plan Book 1-98
LOT AREA: 8,750 S.F.

TOPOGRAPHIC & BOUNDARY SURVEY PLAN


PARCEL 432
PARCEL 437 OWNER: Michael A. Serluco

3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT


ADDRESS: 3117 Chestnut Street
PARCEL IDENTIFICATION NO.: 01-21-0273-432

CONSOLIDATED PROPERTIES
INSTRUMENT NUMBER: 201320955

WORMLEYSBURG, PA 17043
PLAN REFERENCE: Lot 6 - Plan Book 1-98

400 NORTH FRONT STREET

CUMBERLAND COUNTY, PA
TELEPHONE: 717-761-3558
LOT AREA: 8,687 S.F.
PARCEL 433
1)

OWNER: Michael A. Serluco

(c/o SCOTT STAIGER)


. 001

ADDRESS: 3121 Chestnut Street


PARCEL IDENTIFICATION NO.: 01-21-0273-433
INSTRUMENT NUMBER: 201236272
PLAN REFERENCE: Lot 5 - Plan Book 1-98
R

LOT AREA: 8,750 S.F.


S .

PARCEL 434
(

OWNER: Michael A. Serluco

APPLICANT:
ADDRESS: 3125 Chestnut Street
T

PARCEL IDENTIFICATION NO.: 01-21-0273-434


E

DEED REFERENCE: Deed Book 266, Page 582


E

PLAN REFERENCE: Lot 4 - Plan Book 1-98


R

LOT AREA: 8,750 S.F.


T

PARCEL 435
32nd S

OWNER: Michael A. Serluco


ADDRESS: 3129 Chestnut Street
PARCEL IDENTIFICATION NO.: 01-21-0273-435
DEED REFERENCE: Deed Book 264, Page 2873
PLAN REFERENCE: Lot 3 - Plan Book 1-98
LOT AREA: 8,750 S.F.

WORMLEYSBURG, PA 17043
400 NORTH FRONT STREET

TELEPHONE: 717-761-3558
PARCEL 436
OWNER: Michael A. Serluco

BOROUGH OF CAMP HILL


ADDRESS: 3133 Chestnut Street

MICHAEL A. SERLUCO
PARCEL IDENTIFICATION NO.: 01-21-0273-436
INSTRUMENT NUMBER: 201334742
PLAN REFERENCE: Lot 2 - Plan Book 1-98
LOT AREA: 8,750 S.F.

ALLEY PARCEL 437


OWNER: Michael A. Serluco
PARCEL IDENTIFICATION NO.: 01-21-0273-437
INSTRUMENT NUMBER: 201810765

OWNER:
PLAN REFERENCE: Lot 1 - Plan Book 1-98
LOT AREA: 2,910 S.F.
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\Chick-Chestnut-TOPO.dwg, 7/25/2019 10:02:31 AM, bgrove

LIST OF AREA UTILITY PROVIDERS


(PER PA ONE CALL SERIAL NUMBER 20180523139)

KARST GEOLOGY DISCLAIMER: GENERAL NOTES:

LEGEND:

ONE CALL
IA SY
V AN

ST
YL

EM
PENNS

1-

, INC.
80
0-
24
2-
17

!
76
DI A

G
8- DI
L

SHEET
1-1 O
BEFORE Y

2 OF 16
N SITE
CHESTNUT STREET

LOCATION MAP
SCALE: 1" = 1,000'

LOT / OWNER INFORMATION:


PARCEL 431
PARCEL 431 OWNER: Michael A. Serluco
ADDRESS: 3115 Chestnut Street
PARCEL 434 PARCEL IDENTIFICATION NO.: 01-21-0273-431
PARCEL 436 PARCEL 435 PARCEL 433 PARCEL 432 INSTRUMENT NUMBER: 201725777
PLAN REFERENCE: Lot 7 - Plan Book 1-98
LOT AREA: 8,750 S.F.

SUBDIVISION PLAN (PROPERTY CONSOLIDATION)


PARCEL 432
PARCEL 437 OWNER: Michael A. Serluco

3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT


ADDRESS: 3117 Chestnut Street
PARCEL IDENTIFICATION NO.: 01-21-0273-432

CONSOLIDATED PROPERTIES
INSTRUMENT NUMBER: 201320955

WORMLEYSBURG, PA 17043
PROPOSED PLAN REFERENCE: Lot 6 - Plan Book 1-98

400 NORTH FRONT STREET

CUMBERLAND COUNTY, PA
TELEPHONE: 717-761-3558
LOT AREA: 8,687 S.F.
LOT
60,365.09 S.F. PARCEL 433
11)

OWNER: Michael A. Serluco

(c/o SCOTT STAIGER)


1.39 ACRES ADDRESS: 3121 Chestnut Street
0

PARCEL IDENTIFICATION NO.: 01-21-0273-433


0

INSTRUMENT NUMBER: 201236272


PLAN REFERENCE: Lot 5 - Plan Book 1-98
R .

LOT AREA: 8,750 S.F.


T (S .

PARCEL 434
OWNER: Michael A. Serluco

APPLICANT:
ADDRESS: 3125 Chestnut Street
PARCEL IDENTIFICATION NO.: 01-21-0273-434
E

DEED REFERENCE: Deed Book 266, Page 582


E

PLAN REFERENCE: Lot 4 - Plan Book 1-98


R

LOT AREA: 8,750 S.F.


T

PARCEL 435
32nd S

OWNER: Michael A. Serluco


ADDRESS: 3129 Chestnut Street
PARCEL IDENTIFICATION NO.: 01-21-0273-435
DEED REFERENCE: Deed Book 264, Page 2873
PLAN REFERENCE: Lot 3 - Plan Book 1-98
LOT AREA: 8,750 S.F.

WORMLEYSBURG, PA 17043
400 NORTH FRONT STREET

TELEPHONE: 717-761-3558
PARCEL 436
OWNER: Michael A. Serluco

BOROUGH OF CAMP HILL


ADDRESS: 3133 Chestnut Street

MICHAEL A. SERLUCO
PARCEL IDENTIFICATION NO.: 01-21-0273-436
INSTRUMENT NUMBER: 201334742
PLAN REFERENCE: Lot 2 - Plan Book 1-98
ALLEY LOT AREA: 8,750 S.F.
PARCEL 437
OWNER: Michael A. Serluco
PARCEL IDENTIFICATION NO.: 01-21-0273-437
INSTRUMENT NUMBER: 201810765

OWNER:
PLAN REFERENCE: Lot 1 - Plan Book 1-98

ALLEY
LOT AREA: 2,910 S.F.
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\Chick-Chestnut-SUB.dwg, 7/29/2019 11:05:04 AM, briley

GENERAL NOTES:

LEGEND:

ONE CALL
IA SY
AN

ST
YL

EM
PENNS

1-

, INC.
8
00
- 24
2-
1
77

G!
DI A

DI
8-
L

U
SHEET
1 -1 O
BEFORE Y

3 OF 16
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\Chick-Chestnut-DEMO.dwg, 7/25/2019 1:29:54 PM, briley

LEGEND:
R . 001 1)
T (S .
T R E E
32nd S

DEMOLITION DATA:
CHESTNUT STREET

ALLEY
DI A PENNS
L YL
V

8-
AN
IA

1-1
1-
00 8
24 -
2-
77 1
6
ONE CALL

BEFORE Y
SY

O
U
ST
DI EM
G! , INC.
ALLEY
N

DEMOLITION NOTES:
SCALE: 1" = 1,000'
LOCATION MAP
SITE

3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT

SITE DEMOLITION PLAN


OWNER: APPLICANT:
MICHAEL A. SERLUCO CONSOLIDATED PROPERTIES
400 NORTH FRONT STREET (c/o SCOTT STAIGER)
WORMLEYSBURG, PA 17043 400 NORTH FRONT STREET
TELEPHONE: 717-761-3558 WORMLEYSBURG, PA 17043
TELEPHONE: 717-761-3558
4 OF 16

BOROUGH OF CAMP HILL CUMBERLAND COUNTY, PA


SHEET
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\Chick-Chestnut-SITE.dwg, 7/29/2019 11:27:05 AM, briley

SITE DATA:
. 0 011)
T (S .R
T R E E
32nd S

PARKING DATA:
BYPASS
LANE
5,031± S.F.
PROPOSED
RESTAURANT
AREA
SEATING
OUTDOOR
CHESTNUT STREET

BYPASS
LANE
GENERAL NOTES:
THRU THRU
DRIVE DRIVE

STOP

ALLEY
STOP
STOPSTOP

ALLEY
N

BYPASS
LANE

DI A PENNS
L YL
V
8-
AN
IA

1 -1

1-
80
0-
24
-1 2
77
6
ONE CALL

BE FORE Y
SY

U ST
DI EM
G! , INC.
THRU THRU
DRIVE DRIVE
SCALE: 1" = 1,000'
LOCATION MAP
SITE

LANE DETAIL
DRIVE THRU STACKING

3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT

SITE PLAN
OWNER: APPLICANT:
MICHAEL A. SERLUCO CONSOLIDATED PROPERTIES
400 NORTH FRONT STREET (c/o SCOTT STAIGER)
WORMLEYSBURG, PA 17043 400 NORTH FRONT STREET
TELEPHONE: 717-761-3558 WORMLEYSBURG, PA 17043
TELEPHONE: 717-761-3558
5 OF 16

BOROUGH OF CAMP HILL CUMBERLAND COUNTY, PA


SHEET
N SITE
CHESTNUT STREET

I-5
LOCATION MAP
SCALE: 1" = 1,000'

I-6
CO-4
STORM SEWER SCHEDULE
I-7
PROPOSED CLEANOUT CO-1 TO INLET I-1

CO-2

CO-2
CO-1
I-4
PROPOSED INLET I-1 TO PROPOSED MANHOLE MH-1
I-1
CO-3
CO-3
PROPOSED INLET I-6 TO PROPOSED SUBSURFACE BASIN
PROPOSED
RESTAURANT

3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT


FFE - 406.40

CONSOLIDATED PROPERTIES
CO-1

WORMLEYSBURG, PA 17043
400 NORTH FRONT STREET

CUMBERLAND COUNTY, PA
TELEPHONE: 717-761-3558
1)

GRADING/UTILITIES PLAN

(c/o SCOTT STAIGER)


. 001

PROPOSED
STORMWATER
INFILTRATION
R

BED
(S .

APPLICANT:
PROPOSED INLET I-7 TO PROPOSED INLET I-5
E T

I-DE
E

PROPOSED INLET I-8 TO PROPOSED TERRE KLEEN TK-09


T R
32nd S

I-3 PROPOSED DUMPSTER ENCLOSURE DRAIN TO MANHOLE MH-2

I-2
MH-2

WORMLEYSBURG, PA 17043
400 NORTH FRONT STREET
MH-1
KARST GEOLOGY DISCLAIMER:

TELEPHONE: 717-761-3558

BOROUGH OF CAMP HILL


MICHAEL A. SERLUCO
TK-09

ALLEY

OWNER:
I-8

ALLEY
ES-1 PROPOSED
SUBSURFACE
OS-1 STORMWATER
BASIN
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\Chick-Chestnut-GRADE.dwg, 7/29/2019 12:27:57 PM, briley

GENERAL NOTES: AN
IA
ONE CALL
SY

ST
YL

EM
PENNS

1-

, INC.
80
0-
2
42
-1
77

G!
DI A

DI
8-

L
LEGEND:

U
1 -1 O
BE FORE Y

SHEET
6 OF 16
N SITE
CHESTNUT STREET

I-5
LOCATION MAP
SCALE: 1" = 1,000'

I-6
CO-4

I-7
RECEIVING WATER / CLASSIFICATION
CO-2

CO-2
CO-1
I-4
LIMITS OF DISTURBANCE
I-1
CO-3

SOIL EROSION & SEDIMENTATION CONTROL PLAN


CO-3

PROPOSED
RESTAURANT

3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT


FFE - 406.40 DuA NPDES PERMIT BOUNDARY

CONSOLIDATED PROPERTIES
CO-1

WORMLEYSBURG, PA 17043
400 NORTH FRONT STREET

CUMBERLAND COUNTY, PA
TELEPHONE: 717-761-3558
1)

(c/o SCOTT STAIGER)


. 001

PROPOSED
STORMWATER LIST OF PROPOSED BMPS
INFILTRATION
R

BED
(S .

APPLICANT:
E T

I-DE
R E

NATIVE SOIL TYPE:


T
32nd S

I-3
HaB DuA DUFFIELD SILT LOAM
I-2
MH-2

WORMLEYSBURG, PA 17043
400 NORTH FRONT STREET
MH-1

TELEPHONE: 717-761-3558
HaB HAGERSTOWN SILT LOAM

BOROUGH OF CAMP HILL


MICHAEL A. SERLUCO
TK-09

ALLEY

OWNER:
I-8

ALLEY
ES-1 PROPOSED
SUBSURFACE
OS-1 STORMWATER
BASIN
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\Chick-Chestnut-SOIL.dwg, 7/26/2019 4:30:42 PM, briley

E & S MAINTENANCE PROGRAM:

ONE CALL
IA SY
AN

ST
YL

EM
PENNS

1-

, INC.
80
0-
2
42
-1
77

G!
DI A

DI
8-

U
1 -1 O
BE FORE Y

LEGEND: SOIL EROSION CONTROL MEASURES: INLET PROTECTION


DRAINAGE AREAS RECOMMENDED SEEDING RATES & TYPES:

FOR GENERAL E & S NOTES & RECOMMENDED STAGING OF CONSTRUCTION ACTIVITIES - SEE SHEET 15 SHEET
7 OF 16
N SITE
CHESTNUT STREET

I-5
LOCATION MAP
SCALE: 1" = 1,000'

I-6
CO-4
RECEIVING WATER / CLASSIFICATION
I-7

CO-2

CO-2
CO-1
LIMITS OF DISTURBANCE
I-4

I-1

POST CONSTRUCTION STORMWATER MANAGEMENT PLAN


CO-3
CO-3

PROPOSED DuA NPDES PERMIT BOUNDARY


RESTAURANT

3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT


FFE - 406.40

CONSOLIDATED PROPERTIES
CO-1

WORMLEYSBURG, PA 17043
400 NORTH FRONT STREET

CUMBERLAND COUNTY, PA
TELEPHONE: 717-761-3558
BMP - POROUS PAVEMENT/INFILTRATION BED
) 11

STORMWATER RATE/VOLUME/WATER QUALITY

(c/o SCOTT STAIGER)


LIST OF PROPOSED BMPS
0

PROPOSED
0

STORMWATER
.

INFILTRATION
R

BED
T (S .

APPLICANT:
BMP - STREET SWEEPING
STORMWATER QUALITY NATIVE SOIL TYPE:
E

I-DE
T RE

DuA DUFFIELD SILT LOAM


32nd S

I-3
HaB
MH-2
I-2 HaB HAGERSTOWN SILT LOAM

WORMLEYSBURG, PA 17043
400 NORTH FRONT STREET
MH-1

TELEPHONE: 717-761-3558

BOROUGH OF CAMP HILL


PCSM LEGEND:

MICHAEL A. SERLUCO
TK-09

BMP - SUBSURFACE DETENTION BASIN


ALLEY
STORMWATER RATE/WATER QUALITY

INLET PROTECTION

OWNER:
I-8
DRAINAGE AREAS

ALLEY
ES-1 PROPOSED
SUBSURFACE
OS-1 STORMWATER
BASIN
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\Chick-Chestnut-PCSM.dwg, 7/26/2019 4:35:57 PM, briley

PCSM PLAN STATEMENT OF INTENT:


LEGEND:
·

RECEIVING SURFACE WATER:

ONE CALL
IA SY
AN

ST
YL

EM
PENNS

1-

, INC.
80
0-
24
SHEET

2-
17

G!
76
DI A

DI
8-

L
1 -1 OU
BE FORE Y

8 OF 16
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\Chick-Chestnut-LANDSCAPE.dwg, 7/29/2019 11:13:31 AM, briley

LANDSCAPING NOTES:
R . 001 1)
T (S .
T R E E
32nd S

PROPOSED
RESTAURANT
CHESTNUT STREET

PLANTING SCHEDULE:
LANDSCAPING DATA:

ALLEY

DI A PENNS
L YL
V
8-
AN
IA

1-1

1-
80
0-
24
-1 2
ALLEY

77
6
ONE CALL

BEFORE Y
SY

U O

ST
DI EM
G !
, INC.
N

SCALE: 1" = 1,000'

SHRUB PLANTING DETAIL


LOCATION MAP

TREE PLANTING DETAIL


SITE

3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT

SITE LANDSCAPE PLAN


OWNER: APPLICANT:
MICHAEL A. SERLUCO CONSOLIDATED PROPERTIES
400 NORTH FRONT STREET (c/o SCOTT STAIGER)
WORMLEYSBURG, PA 17043 400 NORTH FRONT STREET
TELEPHONE: 717-761-3558 WORMLEYSBURG, PA 17043
TELEPHONE: 717-761-3558
9 OF 16

BOROUGH OF CAMP HILL CUMBERLAND COUNTY, PA


SHEET
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\Chick-Chestnut-LIGHT.dwg, 7/29/2019 8:58:36 AM, briley

11)

F
A
0

D
0

STATISTICS
(S. R .

SCHEDULE
E E T
2n d S TR
3

E
C

F EE
E

B
E
E
E

F F FF
E

F
E

GENERAL NOTE:
F
PROPOSED
RESTAURANT

F F

B
C

F F
CHESTNUT STREET

E
E

E
E
E

E
E

ALLEY
C

ALLEY
N

SCALE: 1" = 1,000'


LOCATION MAP
SITE

3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT DI A PENNS


L YL
V
8-
AN
IA

1 -1

1-
80
0-
24
-1 2
SITE LIGHTING PLAN 77
6
ONE CALL

BE FORE Y
SY

U ST
DI EM
G! , INC.

OWNER: APPLICANT:
MICHAEL A. SERLUCO CONSOLIDATED PROPERTIES
400 NORTH FRONT STREET (c/o SCOTT STAIGER)
WORMLEYSBURG, PA 17043 400 NORTH FRONT STREET
TELEPHONE: 717-761-3558 WORMLEYSBURG, PA 17043
TELEPHONE: 717-761-3558
10 OF 16

BOROUGH OF CAMP HILL CUMBERLAND COUNTY, PA


SHEET
STORM PIPE TRENCH
BUILDING DOWNSPOUT CONNECTION DETAIL

3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT

CONSOLIDATED PROPERTIES

CUMBERLAND COUNTY, PA
WORMLEYSBURG, PA 17043
400 NORTH FRONT STREET

TELEPHONE: 717-761-3558
UTILITY PROFILES & OTHER INFORMATION

(c/o SCOTT STAIGER)


STORM SEWER PROFILE STORM SEWER PROFILE
INLET I-6 TO SUBSURFACE BASIN INLET I-8 TO INLET TK-09

APPLICANT:
PROPOSED OUTLET STRUCTURE OS-1

WORMLEYSBURG, PA 17043

BOROUGH OF CAMP HILL


400 NORTH FRONT STREET

TELEPHONE: 717-761-3558
STORM SEWER CLEANOUT DETAIL

MICHAEL A. SERLUCO
STANDARD CONSTRUCTION DETAIL #9-1
RIPRAP APRON AT PIPE OUTLET STRUCTURAL STEEL GRATE
WITH FLARED END SECTION OR ENDWALL BICYCLE SAFE

OWNER:
TYPE "C" INLET
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\Chick-Chestnut-PROFILES.dwg, 7/29/2019 12:13:22 PM, briley

NE CALL
IA O SY
AN

YLV

ST
EM,
PENNS

1-
80

INC.
0-
24
2-

!
1
DIA

DIG
77
6
8-

L
1-1 OU
BEFORE Y

SECTION VIEW A-A

STORM SEWER PROFILE


STORM SEWER PROFILE STORM SEWER PROFILE DUMPSTER ENCLOSURE DRAIN
INLET I-7 TO INLET I-5 INLET I-1 TO MANHOLE MH-1 I-DE TO MANHOLE MH-2 A
SUBSURFACE DETENTION BASIN DETAIL
SHEET
11 OF 16
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\Chick-Chestnut-PROFILES.dwg, 7/29/2019 12:09:14 PM, briley

BACKFILLING IN PAVED AREAS

DEEP SEWER SERVICE CONNECTION


SHALLOW SEWER SERVICE CONNECTION
BACKFILLING IN UNPAVED AREAS

COMMERCIAL GREASE INTERCEPTOR


SANITARY SEWER PROFILE
KITCHEN WASTE LATERAL

SANITARY CLEANOUT DETAIL


SANITARY SEWER PROFILE
RESTROOM WASTE LATERAL

NEW CONSTRUCTION & REPAIR OF BUILDING SEWER & LATERAL

3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT

UTILITY PROFILES & OTHER INFORMATION


OWNER: APPLICANT:
MICHAEL A. SERLUCO CONSOLIDATED PROPERTIES
400 NORTH FRONT STREET (c/o SCOTT STAIGER)
WORMLEYSBURG, PA 17043 400 NORTH FRONT STREET
TELEPHONE: 717-761-3558 WORMLEYSBURG, PA 17043
TELEPHONE: 717-761-3558
12 OF 16
SHEET

BOROUGH OF CAMP HILL CUMBERLAND COUNTY, PA


DO NOT
STOP ENTER

TYPICAL SITE PAVEMENT SECTION SAW-CUT/PAVEMENT TIE-IN DETAIL

X X X X

DO NOT ENTER / STOP SIGNS DETAIL


(DRIVE THRU EXIT AREA) HANDICAP PARKING STALL DETAIL

HEAVY DUTY SITE PAVEMENT SECTION

MISCELLANEOUS DETAILS & OTHER INFORMATION


3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT
CONCRETE PAVING

CONSOLIDATED PROPERTIES

CUMBERLAND COUNTY, PA
DRIVE-THRU LANE

WORMLEYSBURG, PA 17043
400 NORTH FRONT STREET

TELEPHONE: 717-761-3558
(c/o SCOTT STAIGER)
APPLICANT:
POROUS PAVEMENT SECTION
STOP BAR PAVEMENT MARKING DETAIL

HANDICAP PARKING SIGN

WORMLEYSBURG, PA 17043

BOROUGH OF CAMP HILL


400 NORTH FRONT STREET

TELEPHONE: 717-761-3558
BOLLARD MOUNTED SIGN DETAIL

MICHAEL A. SERLUCO
NT
PROPOSED RESTAURA
FFE - 40 6. 40

OWNER:
TYPICAL PAVEMENT MARKINGS
TYPICAL CONCRETE SIDEWALK
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\Chick-Chestnut-DETAILS.dwg, 7/26/2019 4:20:33 PM, briley

VAN ACCESSIBLE SIGN (PADOT R7-8A) ADA PARKING FACILITIES DETAIL

CHESTNUT STREET
END TRANSITION FOR STANDARD CURBING

011) S.R. 0
ET (
2 n d S TRE
DUMPSTER 3 EXISTING BUILDING SETBACKEXISTING BUILDING SETBACK
ALONG 32nd STREET ALONG CHESTNUT STREET AN
IA O
NE CALL
SY

ENCLOSURE DETAIL TYPICAL CONCRETE CURB DETAIL

YLV
DUMPSTER PAD SECTION

ST
EM,
PENNS

1-
80

INC.
0-
24
BASIS FOR FRONT YARD BUILDING SETBACKS

2-
SHEET

!
17
DIA

DIG
6 7
8-

L
1-1 OU
BEFORE Y

13 OF 16
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\Chick-Chestnut-DETAILS.dwg, 7/29/2019 12:33:04 PM, briley

CHESTNUT STREET
TYPICAL WIDENING CROSS-SECTION

LANDSCAPE & IRRIGATION PROTECTOR


24" CONCRETE CURB & GUTTER

WEST DRIVE-THRU ADA RAMPS


FFE - 406.
EAST DRIVE-THRU ADA RAMPS
TYPICAL PARKING LOT

40
PROPOSED RESTAURA
LIGHTING STANDARD DETAIL

NT
·
·
·
·
·

STOPSTOP

MAIN ENTRANCE ADA RAMPS


SIDEWALK ACCESSIBLE RAMP

INFILTRATION BED DETAIL

DIA
L PENNS
YLV
8-
AN

1-1

1-
IA O

80
0-
24
2-
17
NE CALL

7
BEFORE Y

6
SY

OU

ST
DIG EM,
! INC.

3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT

MISCELLANEOUS DETAILS & OTHER INFORMATION


OWNER: APPLICANT:
MICHAEL A. SERLUCO CONSOLIDATED PROPERTIES
400 NORTH FRONT STREET (c/o SCOTT STAIGER)
WORMLEYSBURG, PA 17043 400 NORTH FRONT STREET
TELEPHONE: 717-761-3558 WORMLEYSBURG, PA 17043
TELEPHONE: 717-761-3558
14 OF 16
SHEET

BOROUGH OF CAMP HILL CUMBERLAND COUNTY, PA


CURLEX MATTING
ROCK FILTER OUTLET #4-06 INSTALLATION INSTRUCTIONS

MISCELLANEOUS DETAILS & OTHER INFORMATION


3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT

CONSOLIDATED PROPERTIES

CUMBERLAND COUNTY, PA
STANDARD CONSTRUCTION DETAIL #4-16 STANDARD CONSTRUCTION DETAIL #4-15

WORMLEYSBURG, PA 17043
400 NORTH FRONT STREET
FILTER BAG INLET PROTECTION - TYPE M INLET FILTER BAG INLET PROTECTION - TYPE C INLET

TELEPHONE: 717-761-3558
(c/o SCOTT STAIGER)
APPLICANT:
COMPOST FILTER SOCK REPAIR
DETAIL (UTILITY CUT)

WORMLEYSBURG, PA 17043

BOROUGH OF CAMP HILL


400 NORTH FRONT STREET

TELEPHONE: 717-761-3558
MICHAEL A. SERLUCO
OWNER:
STANDARD CONSTRUCTION DETAIL #3-1
ROCK CONSTRUCTION ENTRANCE CONCRETE WASHOUT DETAIL
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\Chick-Chestnut-DETAILS.dwg, 7/25/2019 3:17:28 PM, bgrove

GENERAL E & S NOTES:


RECOMMENDED STAGING OF
CONSTRUCTION ACTIVITIES:

NE CALL
IA O SY
AN

STANDARD CONSTRUCTION DETAIL #3-16 STANDARD CONSTRUCTION DETAIL #4-1

YLV

ST
EM,
PENNS

1-
80

INC.
0-
24
PUMPED WATER FILTER BAG COMPOST FILTER SOCK

2-
SHEET

!
17
DIA

DIG
6 7
8-

L
1-1 OU
BEFORE Y

15 OF 16
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\Chick-Chestnut-DETAILS.dwg, 7/29/2019 10:26:45 AM, briley

PENNDOT TYPE "C"

PENNDOT TYPE "M"


CONCRETE INLET TOP
CONCRETE INLET TOP
12'' x 18'' CATCH BASIN

24'' x 48'' CATCH BASIN

PRECAST INLET MANHOLE


4 FT. DIAMETER W/ FLAT LID
FOR PENNDOT INLET TOPS
PRECAST INLET BOX 24" x 45"

B
B

TERRE KLEEN 09 DETAIL


INVERTED FILTER 2
SINKHOLE TREATMENT

DIA
L PENNS
YLV
8-
AN

1-1

1-
IA O

80
0-
24
2-
17
NE CALL

7
BEFORE Y

6
SY

OU

ST
DIG EM,
! INC.

3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT

MISCELLANEOUS DETAILS & OTHER INFORMATION


OWNER: APPLICANT:
MICHAEL A. SERLUCO CONSOLIDATED PROPERTIES
400 NORTH FRONT STREET (c/o SCOTT STAIGER)
WORMLEYSBURG, PA 17043 400 NORTH FRONT STREET
TELEPHONE: 717-761-3558 WORMLEYSBURG, PA 17043
TELEPHONE: 717-761-3558
16 OF 16
SHEET

BOROUGH OF CAMP HILL CUMBERLAND COUNTY, PA


W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\SWM Plans\Chick-Chestnut-INLET.dwg, 7/29/2019 1:22:42 PM, briley

LEGEND:
R . 001 1)
T (S .
T R E E
32nd S
I-1

I-8

OS-1
MH-1

TK-09
CO-3

I-1

ES-1
I-8
FFE - 406.40
PROPOSED
RESTAURANT

BASIN
PROPOSED
SUBSURFACE
CO-2

STORMWATER
I-DE
I-7

I-7

I-DE

DRAINAGE AREAS
CHESTNUT STREET

INLET PROTECTION
CO-1

MH-2

I-2
I-2

ALLEY
I-4
I-5

I-3
I-3
I-4

BED
I-6

PROPOSED
I-5
I-6

STORMWATER
INFILTRATION

ALLEY

DI A PENNS
L YL
V
8-
AN
IA

1 -1

1-
80
0-
24
2-
17
76
ONE CALL

BEFORE Y
SY

U ST
DI EM
G! , INC.
N

SCALE: 1" = 1,000'


LOCATION MAP
SITE

3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT

INLET DRAINAGE AREA PLAN


OWNER: APPLICANT:
MICHAEL A. SERLUCO CONSOLIDATED PROPERTIES
400 NORTH FRONT STREET (c/o SCOTT STAIGER)
WORMLEYSBURG, PA 17043 400 NORTH FRONT STREET
TELEPHONE: 717-761-3558 WORMLEYSBURG, PA 17043
TELEPHONE: 717-761-3558
DA-INL

BOROUGH OF CAMP HILL CUMBERLAND COUNTY, PA


SHEET
STORMWATER
MANAGEMENT NARRATIVE
AND CALCULATIONS

FOR

3115-3133 Chestnut Street


Proposed Chick-fil-A Restaurant
WSC Project – 2018CFAEST

LOCATED IN:

Camp Hill Borough


Cumberland County, Pennsylvania

CLIENT:

Consolidated Properties, LLC


400 North Front Street
Wormleysburg, PA 17043
Phone: (717) 761-3558

December 4, 2018
Last Revised July 26, 2019

PREPARED BY:

2325 Paxton Church Road


Harrisburg, PA 17110
(717) 412-0142
TABLE OF CONTENTS

SECTION PAGE

INTRODUCTION AND PURPOSE.................................................................................................................................... 1

DESIGN CRITERIA AND TECHNICAL REFERENCES ................................................................................................... 1

QUALIFICATIONS OF THE PREPARER ......................................................................................................................... 1

EXISTING SITE STORMWATER DRAINAGE CHARACTERISTICS ............................................................................... 2

SOIL TYPES ..................................................................................................................................................................... 2

GEOTECHNICAL TESTING ............................................................................................................................................. 2

REQUIREMENTS FOR STORMWATER MANAGEMENT CALCULATION ..................................................................... 2

PREDEVELOPMENT CONDITIONS ................................................................................................................................ 3

POSTDEVELOPMENT CONDITIONS .............................................................................................................................. 3

STORMWATER VOLUME CONTROL .............................................................................................................................. 4

STORMWATER QUALITY VOLUME ................................................................................................................................ 4

THERMAL IMPACTS ........................................................................................................................................................ 4

STORMWATER COLLECTION/CONVEYANCE .............................................................................................................. 4

POSTCONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) ............................................................................ 5

INFILTRATION RATES ..................................................................................................................................................... 5

POLLUTION PREVENTION ............................................................................................................................................. 5

EXHIBITS:

EXHIBIT #1 SITE LOCATION MAP


EXHIBIT #2 U.S.G.S. MAP
EXHIBIT #3 SOIL SURVEY MAP

APPENDICES:

APPENDIX A - STORMWATER MANAGEMENT WORKSHEETS


PREDEVELOPMENT, POSTDEVELOPMENT AND STORM INLET
DRAINAGE AREA, C-FACTOR AND CURVE NUMBER CALCULATIONS
WQV CALCULATIONS
APPENDIX B - HYDROGRAPH SUMMARIES
APPENDIX C - PREDEVELOPMENT HYDROGRAPHS
APPENDIX D - POSTDEVELOPMENT HYDROGRAPHS
APPENDIX E - BASIN DETAIL CALCULATIONS
APPENDIX F - BASIN DEWATERING CALCULATIONS
APPENDIX G - STORM SEWER CONVEYANCE DESIGN
APPENDIX H - GEOTECHNICAL REPORT

BACK POCKETS:

PREDEVELOPMENT DRAINAGE AREA PLAN (SHEET 1 OF 3)


POSTDEVELOPMENT DRAINAGE AREA PLAN (SHEET 2 OF 3)
INLET DRAINAGE AREA PLAN (SHEET 3 OF 3)
INTRODUCTION AND PURPOSE

Consolidated Properties proposes to consolidate six (6) residential properties with a small tract near the
32nd Street/Chestnut Street intersection recently purchase from Camp Hill Borough, and vacate/abandon
portions of two existing private alleys, to develop a 5,000± square foot Chick-fil-A Restaurant. The total
resulting property size is ±1.4 acres. The land is currently used for agricultural purposes, and has been for
at least the past 50-years, and it is located entirely within Camp Hill Borough, Cumberland County,
Pennsylvania (see Exhibits 1 & 2, Site Location Map and U.S.G.S. Map, provided within this Narrative).
The receiving waters for the project area is an unnamed tributary to Cedar Run, with a PA Code
Designation of CWF (Cold Water Fishes), MF (Migratory Fishes).

Improvements associated with the project include construction of the proposed building, new parking
facilities and utility services, site access, completion of various utility connections, and installation of
stormwater management facilities.

Stormwater management for the development will be provided via a subsurface detention facility that has
been designed to control the rate of stormwater runoff for the 1 through 100-year design storms. Due to
the relatively small size of the site, Rational Method has been utilized for rate control calculations,
resulting in smaller basin outflows which is more protective than TR-55 SCS would require. TR-55 SCS
Methodology is recommended/required for much larger areas, 200+ acres in size. However, TR-55 SCS
Methodology has been utilized for volume control calculations that require a full hydrograph. The project
is located within Camp Hill Borough’s 100% Runoff Rate District, therefore postdevelopment runoff rates
will be attenuated to discharge no more than predevelopment runoff rates.

The purpose of this Narrative is to describe proposed stormwater management improvements,


summarize the stormwater analysis performed for the project, and provide supporting calculations.

DESIGN CRITERIA AND TECHNICAL REFERENCES

Design criteria and technical references used to complete the analyses and calculations found in this
Narrative include:

1. Camp Hill Borough Stormwater Management Ordinance No. 2004-1012.

2. Camp Hill Borough Subdivision and Land Development Ordinance, April 1993.

3. Hydraflow Storm Sewers Extension, Version 12, by Autodesk, Inc.

4. HydraCAD Version 10.00-22, (utilizing Soil Conservation Service – Technical Release 20 (TR-20,
SCS, USDA)).

5. Geotechnical Testing Results, dated August 2018, prepared by Maser Consulting Engineers.

6. NOAA Atlas 14 Volume 8, Version 2 – Point Precipitation Frequency (PF) Estimates.

7. Pennsylvania Stormwater Best Practices Manual, PADEP, dated December, 2006.

8. PennDOT Design Manual Part 2 (DM-2), Chapter 10 – Drainage Design and Related Procedures.

9. Erosion and Sediment Pollution Control Program Manual, PADEP, March, 2012.

10. The NRCS Web Soil Survey.

QUALIFICATIONS OF THE PREPARER

Douglas S. Gosik, P.E., Director of Land Development for Williams Site Civil, LLC (2325 Paxton Church
Road, Harrisburg, PA 17110), graduated from Pennsylvania State University in 1985 with a Bachelor of
Science degree in Civil Engineering. He was employed by J. Michael Brill & Associates, Inc. from 1990
until joining Williams Site Civil in March, 2017. Over the past thirty (30) years he’s been intimately
involved with Post Construction Stormwater Management designs for projects ranging in size from less
than one (1) acre to more than 100 acres.

Recent Post Construction Stormwater Management Plans Mr. Gosik has been involved with include:

Project Name County Municipality


La-Z-Boy Furniture Gallery Cumberland Hampden Township
Ahold Supply Chain Facility Cumberland Lower Allen Township
Giant Distribution Center Cumberland Borough of Carlisle

EXISTING SITE STORMWATER DRAINAGE CHARACTERISTICS

The project area currently contains residential/mixed use buildings with various accessory structures
(sheds/garages). Topography across the property generally slopes to the southwest and northeast. Much
of the stormwater runoff from the subject site area drains to a large channel along the southwest side of
the property. The remainder of the site drains northeast to Chestnut Street.

SOIL TYPES

The NRCS Web Soil Survey confirms the project is situated on Duffield Silt Loam and Hagerstown Silt
Loam – see Exhibit #3, Soil Survey Map, included herein.

GEOTECHNICAL TESTING

On-site infiltration tests were performed by Maser Consulting Engineers during November 2018. Due to
the presence of underlying Karst (limestone) geology, the project Geotechnical Engineer recommends
avoiding infiltration because of the inherent risk of promoting sinkhole activity. To maximize volume
control and water quality treatment in accordance with Township requirements, a minimal amount of
infiltration is proposed under porous pavement in the outlying parking spaces. The infiltration bed under
the porous pavement is designed to spread the stored runoff across the greatest area practical.

The Geotechnical Report is contained in Appendix H.

REQUIREMENTS FOR STORMWATER MANAGEMENT CALCULATIONS

The analysis and design of stormwater management facilities has been completed in accordance with the
below criteria, per Camp Hill Borough Stormwater Management Ordinance No. 2004-1012:

1. Post-development discharge rates shall not exceed the pre-development discharge rates for the
1, 2, 5, 10, 25, 50, and 100-year design storms.

2. For the purposes of predevelopment flow rate determination, undeveloped land shall be
considered as "meadow" good condition, unless the natural ground cover generates a lower
curve number or rational "C" value (i.e., forest).

3. Adequate storage and treatment facilities shall be provided necessary to capture and treat a
volume of stormwater runoff termed as “water quality volume” (WQV).

Please note, due to the presence of Karst Geology at the project site, infiltration is not recommended by
the Geotechnical Engineer because of the inherent risk of sinkhole propagation. As a result, a waiver has
been requested from groundwater recharge requirements. However, a minimal amount of infiltration will
occur from the porous pavement area to achieve Camp Hill Borough water quality requirements. Water
quality will be managed in accordance with DEP requirements as determined by the NPDES design and
approval process. Evidence of NPDES permit approval will be provided to the Camp Hill Borough upon
receipt.

PREDEVELOPMENT CONDITIONS

As previously noted, much of the stormwater runoff from the subject site area drains to a large channel
along the southwest side of the property. The remainder of the site drains northeast to Chestnut Street.
The southwesterly channel and the northeasterly Chestnut Street right-of-way are each identified as a
“Point of Interest” (POI “1” and POI “2”) as part of the stormwater analysis.

Point of Interest “1” (POI-“1”)


The predevelopment drainage area to the channel along the southwest side of the property
(Predevelopment Drainage Area 1) is 0.78 acres, and the weighted c-factor is 0.33 for the 1 to 10-year
storms and 0.40 for the 25 to 100-year storms. A Tc flow path analysis calculates the time of
concentration to be 10.4 minutes.

Point of Interest “2” (POI-“2”)


Predevelopment Drainage Area 2 contains 0.79 acres, and its weighted c-factor is 0.43 for the 1 to 10-
year storms and 0.51 for the 25 to 100-year storms. A Tc flow path analysis calculates the time of
concentration to be 10.8 minutes.

Refer to Appendix A for Predevelopment Data Sheets, and Appendix C for Predevelopment Hydrographs.
Additionally, the Predevelopment Drainage Area Plan can be found in the rear pocket of this Narrative.

POSTDEVELOPMENT CONDITIONS

Proposed improvements significantly decrease the size of on-site drainage areas to the Chestnut Street
ROW (POI “2”, Postdevelopment Drainage Area 2). This reduction results in satisfaction of stormwater
rate, water quality and volume control requirements without need for new stormwater management
facilities. However, the drainage area to the large channel along the southwest side of the property (POI
“1”, Postdevelopment Drainage Area 1) is increased, and stormwater management facilities are needed
to control discharge to POI “1”.

Point of Interest “1” (POI-“1”)


Postdevelopment Drainage Area 1 to POI-“1” contains the proposed 5,000 square foot restaurant. Its
size, 1.29 acres, is larger than the predevelopment drainage area to POI “1”, and the resulting additional
runoff will be managed by the subsurface detention and infiltration facilities.

Point of Interest “2” (POI-“ 2”)


Postdevelopment Drainage Area 2 to POI-“2” consists of the northeastern portion of the property near
Chestnut Street, and contains 0.28 acres (about 35 percent of the predevelopment drainage area to POI
“2”).

Time of concentration for each tributary area is assumed to be 5 minutes for rational method and 0.1
hours for SCS calculations, which is the minimum for each method and conservatively produces the
highest peak rate value for postdevelopment flows.

Stormwater rate control requirements are satisfied for the 1 through 100-year design storms for both
POIs. Refer to Appendix B for Hydrograph Summaries.

Refer to Appendix A for Postdevelopment Data Sheets, and Appendix B&C for Postdevelopment
Hydrographs. Additionally, the Postdevelopment Drainage Area Plan can be found in the rear pocket of
this Narrative.
STORMWATER VOLUME CONTROL

Due to the presence of Karst Geology at the project site, infiltration is not recommended by the
Geotechnical Engineer because of the inherent risk of sinkhole propagation. However, a minimal amount
of infiltration will occur from the porous pavement area to achieve Camp Hill Borough water quality
requirements.

STORMWATER QUALITY VOLUME

For the purpose of maintaining and preserving the quality of stormwater runoff that is discharged from the
site, adequate storage and treatment facilities are provided to treat the water quality volume (WQV)
based on calculations located in Section 174-17 of the Camp Hill Borough Stormwater Management
Ordinance No. 2004-1012. The WQV requirement is 0.181 acre-feet. The infiltration bed below the porous
pavement are will infiltrate 0.022 acre-feet of stormwater runoff, and the Terre Kleen TK 09 water quality
structure will treat 0.161 acre-feet for a total of 0.183 acre-feet of treatment volume. Refer to Appendix A
for detailed Water Quality Volume Calculations.

THERMAL IMPACTS

Potential thermal impacts from proposed improvements will be avoided, minimized or mitigated through
the following:

1. Heated stormwater runoff from proposed paved areas and from the building roof areas will be
collected and conveyed to the pervious sediment trap during construction and to pervious subsurface
infiltration and surface extended detention basins post construction. This will promote infiltration of the
initial runoff or "first flush" which is most affected by thermal impacts, and prevent the affected runoff
from entering surface waters.

2. Runoff from the building rooftop will be collected, conveyed directly to a water quality filter and
subsurface extended detention basin (Pond 2) without exposure to elevated temperatures associated
with pavement.
RUNOFF.
STORMWATER COLLECTION/CONVEYANCE

The proposed stormwater collection/conveyance system has been designed using the Rational Formula,
(Q=CiA), based on the following criteria:

• Intensities (i) utilize site-specific intensity-duration-frequency (IDF) curves derived from NOAA
Atlas 14 Volume 8, Version 2 – Point Precipitation Frequency (PF) Estimates.

• Runoff coefficients (C) used in calculations are consistent with Table 10.2.1 – Runoff Factors for
the Rational Equation, as provided in PennDOT Design Manual – Part 2 (DM-2).

• Runoff coefficients (C) used in calculations are consistent with the Camp Hill Borough Stormwater
Management Ordinance No. 2004-1012

• Storm sewers must be able to convey post development runoff from a 25-year storm design
without surcharging inlets.

• Adequate erosion protection shall be provided along all open channels and at all points of
interest.

Since the stormwater conveyance is tributary to a stormwater management facility that manages 1 to 100-
year design storms, the system has been designed for the 100-year storm, and calculations are provided.
In addition to verifying the capacity of pipes within the proposed storm sewer system, inlet control, outlet
control and hydraulic grade line design calculations have been completed.
Refer to Appendix A for Inlet Data Sheets, and Appendix G for stormwater collection/conveyance design
printouts. Additionally, the Inlet Drainage Area Plan can be found in the rear pocket of this Narrative.

INFILTRATION RESULTS

On-site infiltration tests were performed by Maser Consultants P.A. on July 20, 2018 using stand pipes for
percolation testing in accordance with Appendix C of the PA Stormwater BMP Manual. One test was
performed within or in close proximity to the footprint of the proposed porous pavement and infiltration
bed. The resulting infiltration rate was 2.0”/hour. No bedrock, groundwater or redoximorphic features were
observed at the test location.

POSTCONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs)

Due to the presence of Karst Geology, infiltrating the net increase in volume for the 2-year design storm is
not feasible. NPDES and PA Code requirements for POI #1 will be met through a combination of Water
Quality BMPs. Worksheets 11-13 are included to document that the water quality requirements are met.
NPDES and PA Code requirements for POI #2 are met through runoff rate and volume reduction that
results from the reduction of tributary area.

Proposed improvements feature the following BMPs:

• Porous Pavement/Infiltration Bed (POND 1): This BMP receives runoff from the storm sewer and
from the porous pavement. There is 0.5 feet (6 inches) depth of permanent storage that will
infiltrate, and the remaining runoff will be routed to the water quality structure and subsurface
detention facility for treatment. The tested infiltration rate is 2.0 inches/hour. For a reduction factor
of 3 and safety factor of 3 in accordance with the PA BMP Manual, the design rate is reduced to
0.22 inches/hour. For 6 inches of depth, the dewatering time will be approximately 27 hours. (6
inches/0.22 inches per hour = 27 hours)

• Subsurface Stormwater Detention (POND 2): This BMP detains stormwater runoff from
Postdevelopment Drainage Area 1. The basin’s proposed outlet structure has been designed
control discharge rates in accordance with Camp Hill Borough Stormwater Management
Ordinance No. 2004-1012 requirements.

The proposed basin is a network of 24” pipes with a bottom elevation at 397.30.

Per calculations provided in Appendix F, the basins have been designed to detain the 1-yr, 24-hour
design storm with a minimum dewatering time of 24-hours using the SCS Type II distribution. Also, All
detention, water quality and groundwater recharge facilities and BMPs have been designed to be
completely dewatered within 48 hours of any design storm in accordance with the Camp Hill Borough
Stormwater Management Ordinance No. 2004-1012.

• Street Sweeping: The intent of this BMP is to reduce the amount of pollutants entering the storm
sewer conveyance system. Street sweeping of parking lot and access drive areas with a vacuum
filter sweeper shall be conducted on a quarterly basis.

POLLUTION PREVENTION

1. All construction personnel shall be trained via biweekly tailgate sessions pertaining to pollution
prevention for the project site.

2. The site contractor shall not store erodible or hazardous materials on any roadway.

3. All waste material will be collected and disposed of into metal trash dumpsters in the materials
storage area on site. The site contractor is responsible for locating an acceptable upland location
for the disposal of any excess soil or rock waste that cannot be disposed of on the property.
4. Construction equipment and maintenance materials shall be stored at the combined staging area
and materials storage areas. Gravel bag berms shall be installed around the perimeter to
designate the staging and materials storage area. A watertight shipping container shall be used
to store hand tools, small parts, and other construction materials.

5. Several types of vehicles and equipment will be used on-site throughout the project. All major
equipment / vehicle fueling and maintenance shall be performed off-site. A small pickup bed fuel
tank shall be kept on-site in the combined staging area. When vehicle fueling must occur on-site,
the fueling activity shall occur in the staging area. Only minor equipment maintenance shall occur
on-site. All equipment fluids generated from maintenance activities will be disposed of into
designated drums stored on spill pallets. Absorbent, spill-cleanup materials and spill kits shall be
available at the combined staging and materials storage area. Drip pans shall be placed under all
equipment receiving maintenance and vehicles and equipment parked overnight.

6. All spills shall be cleaned up immediately upon discovery. Spent absorbent materials and rags
shall be hauled off-site immediately after the spill is cleaned up for disposal at the local landfill.
Spills large enough to discharge to surface water shall be reported to the National Response
Center at 1-800-424-8802.

7. Dust control shall be implemented as needed once site grading has begun and during windy
conditions (forecasted or actual wind conditions of 20 mph or greater) while site grading is
occurring. Spraying of potable water at a rate of 300 gallons per acre or less shall be performed
by a mobile pressure-type distributor truck no more than three times a day during the months of
May-September and once per day during the months of October-April or whenever the dryness of
the soil warrants it.

8. Landscaping irrigation waters shall not be sprayed onto impermeable surfaces such as paved
driveways and roads. Waters shall be directed onto soil and lawns by using hoses and correctly
sized sprinklers with adjustable spray patterns. To avoid discharges of irrigation water, the
sprinklers shall have low-flow rates and increased watering time. The irrigated area shall be
inspected for excess watering and to adjust watering times and schedules.

9. Material safety data sheets, a material inventory, and emergency contact information shall be
maintained at the on-site project trailer.

10. Permanent seeding shall be applied immediately after the final design grades are achieved on
portions of the site but no later than fourteen (14) days after construction activities have
permanently ceased. After the entire site is stabilized, any sediment that has accumulated shall
be removed and hauled off-site for disposal. Construction debris, trash, and temporary BMP’s
shall be removed and any areas disturbed during removal shall be seeded immediately. The
owner and/or operators shall contact the County Conservation District for a final inspection.
APPENDIX A
_______________________________________

PREDEVELOPMENT, POSTDEVELOPMENT AND INLET


DRAINAGE AREA, C-FACTOR AND CURVE NUMBER CALCULATIONS

WQV CALCULATIONS
_______________________________________
3115 - 3133 Chestnut Street Chick-fil-A Restaurant
Drainage Areas, C-Factors and Curve Numbers

Predevelopment
Rate
Area * Cover C-Factor (1 to 10-Yr) C-Factor (25 to 100-Yr)
Pre 1 0.57 Meadow B 0.13 0.19
0.21 Impervious B 0.86 0.96
Total 0.78
Weighted Average 0.33 0.40

Pre 2 0.49 Meadow B 0.13 0.19


0.30 Impervious B 0.86 0.96
Total 0.79
Weighted Average 0.41 0.48

Postdevelopment
Rate Volume
Area Cover C-Factor (1 to 10-Yr) C-Factor (25 to 100-Yr) Curve Number
Post 1 Pond 1 0.05 Lawn B 0.22 0.28 61
0.33 Impervious 0.86 0.96 98
Total 0.38
Weighted Average 0.78 0.87 93

Post 1 Pond 2 0.01 Lawn B 0.22 0.28 61


0.72 Impervious 0.86 0.96 98
Total 0.73
Weighted Average 0.85 0.95 97

Post 1 Bypass 0.17 Lawn B 0.22 0.28 61


0.01 Impervious 0.86 0.96 98
Total 0.18
Weighted Average 0.26 0.32 63

Post 2 0.17 Lawn B 0.22 0.28 61


0.11 Impervious 0.86 0.96 98
Total 0.28
Weighted Average 0.47 0.55 69

Total Impervious Area 1.17


Total Area 1.57

Conveyance
Inlet ID Area C-Factor
I-1 0.15 0.95
I-2 0.06 0.95
I-DE 0.01 0.95
I-3 0.10 0.95
I-4 0.08 0.95
I-5 0.01 0.95
I-6 0.02 0.95
I-7 0.16 0.95
I-8 0.48 0.95
012310425 6789


7889 8787
+,--.-/012.345.67089:.;5.6:<2=7>.?.
@7A1/=7>.>19:B.C19D.E=005.F:>>2G0H1>=15.IJ-K.
@1/=/8L:B.4MN;?O4P5.@7>Q=/8L:B.RSTNU??TP.
V0:YH1/=77>B .4MTNWW.X/KK
98Z[\] 
YY798^_
F,+̀a.FbVCF̀à-a,̀+.cbVdIV+Ce.VJaf̀-aVJ
_]g
h] 7
hgi
hj6 7klmh]n8m h [
"8
opqqho
 "r8 8787
98h
"87 7
h] 7" 
6 l" 7s6 7 
9 "s] ' 87
"
Fc./1t801<
FuJRt12:L.D7=>/.D<:A=D=/1/=7>.X<:v8:>AG.:2/=91/:2.w=/x.UMy.A7>X=L:>A:.=>/:<H102.z=>.=>Ax:2{3
u8<1/=7> 3 -H:<1Q:.<:A8<<:>A:.=>/:<H10.zG:1<2{
; W 3M ;W WM 3MM ;MM WMM 3MMM
WR9=> |40M3N5?};4;&~3|4&M%N%?}O44%03|4%M4N*4}W4;~4%|4%M~N4W}M44~*4|4~M4N~W}T4O*&4|4~M%N*T}34W*3&|4~M3N5T}T4T)&3|4*M0N*S}34;)35|4*M)N&S}S4;3~*|4)M4N5O};4M545
3MR9=> |4%M~N5W}433~*5|4~M%N)T}34M*32|4*M%N*S};4334&|4)M2N)O}M4?35& |43M4NU&}M2;44 |43M*NU*}S2T43 |4530N3M}2W2* |4533N%3}2;0% |243*N};23&% |2232N};2O%0
3WR9=> |4~M)N&T}?4O)24|4*M3N)S}T4T3~% |43M2NU*}32M42 |4534N%M}232& |2432N}3240* |2435N};2?&) |223)N}?2;%) |203%N}423~* |2&3&N}W2;*5 |2&35N}T23)3
?MR9=> |4)M3N0O}S435*5 |453%N%M}2W23 |223~N};2U%& |2&34N}42T*0 |2%35N}T2O3* |2*3%N}O044~ |2);3N}M030& |25;0N}30O%2 |04;5N}40M** |00;&N}W0O3*
TMR9=> |453)N&M}2O02 |2233N}?2;%) |2%33N}T2W3& |2*35NO}0U22 |25;3N};0?%) |00;2N}40U)* |0%;%N}S&S4* |0*?)N}M&4&) |05?5N}4&?34 |&0?%N}S%42~
;Rx< |223&N};2T%4 |2&3)N}W2?)4 |2)3&N}U0?2~ |04;0N};0T~4 |0%;0N}S&?40 |0)?)N}3&?%* |&2?&N}W&S5% |&~4&N}M%W%* |%242N}S~T0~ |%~W5N}?~O5&
?Rx< |203%N}?2O~% |2~34N}T2S3) |23;5N}303&* |00;4N}40T)~ |0*;%N}U&S&2 |&4?0N}4&3)5 |&%?0N}U%M&0 |&34~N}4%?54 |%%W5N};~;)5 |~4W0N}U*M~~
TRx< |2~30N}S2M52 |23;%N}M0W&2 |0&;4N}W0S54 |0*?5N}M&3&3 |&0?~N}T%S24 |&)40N};%4)0 |%04~N}O~S%0 |%3W0N}W*O04 |~*T)N}T)W&5 |*&S5N}W3U%&
3;Rx< |23;&N}M0S&* |00;4N}40U3% |0)?3N}3&4~3 |&0?*N}S%M02 |&543N}W~W2~ |%*W4N}?~M55 |~0T5N}3*T5~ |*4S*N}33?40 |)0O0N}T5?*5 |30U0NU}2T20
;4Rx< |00;0N}403** |0*;)N}U&M04 |&&?*N}T%W40 |&54*N}?%;)% |%3W)N}?~T3* |~*T3N}?*33) |**S0N}43;4% |)*O3N}S5M%4 |5&3%M}N2O2* |2433;}N2T&~
;RL1G |0~;~N}S&U24 |&4?)N}?&W)% |&34~N};%;*5 |%~40N}U~S~0 |~~T%N}3*4)5 |*%S%N};)M5% |)%O)N}45;0) |3*U%N}O2443 |243%;}N23&0 |20344}N23~%
?RL1G |0);0N}U&S03 |&0?)N}W&S5~ |%445N}4%S5~ |%3W4N};~T32 |~3T)N}4)U2% |*3S0N}W3U&& |)3O5N}O5T)4 |5234M}N2?2& |2234;}2NT&3 |203*4}N2S*4
4RL1G |03?5N}3&W%) |&%?3N}S%O2* |%&4%N}S~?02 |~4W3N}W*T24 |*0T4N}O)?%3 |)0S4N}U3O)0 |3&U2N}?2M42 |5~3*M}N2O23 |223~?}2N;%& |2&30W}N2?**
SRL1G |&%?4N}T%O4& |%44)N}4%33& |~4W%N}4~T53 |~3T)N}?*O53 |)2S4N}S3O~4 |32U5N}M543~ |5%32M}N2W2% |2433;}N23&2 |20334}N2T~3 |2%3*T}N2O3&
3MRL1G |&54%N};%4~5 |%)W2N}M~T%5 |~)T*N};*M)2 |**S%N}3)S)* |)5O%N}T5?&0 |54U)N}O2U4) |243&3}N2?00 |223*;}2NU&5 |2&3*W}N2?*~ |2~3%S}N243)
;MRL1G |~%W0N}S*S2) |*%T2N}O);&4 |)*O2N}333*3 |3~U5N}35O32 |2434M}N2S2~ |2230;}2NM03 |203%?}N2W%% |2&33W}N2M*4 |2~33S}N2?3% |2)3%U}N0;4~
?MRL1G |*)S&N}3)4*4 |)5O&N}4335~ |50U*N}O2?4~ |243&3}N2M2) |2235;}2NS&~ |2&324}N23~4 |2%3~W}N2T*~ |2~35S}N2;30 |2)35U}N0W4) |25;~3}N0403
4WRL1G |3~O%N}U5U%5 |2434M}N2W22 |223~;}2N303 |203)?}N24%2 |2%3%W}N2;*4 |2~3)T}N2T)~ |2)34O}N2354 |233%U}N0T4* |04;&3}N0O05 |02;3?}N0W%3
TMRL1G |2430M}N2S2& |2235;}2NW&0 |2&3*4}N2?~4 |2%35W}N2S*~ |2*3)S}N2T3~ |2332U}N0342 |25;~M}N0S2) |02;4;}N0?&% |0&;44}N0W~3 |0%;~T}N0?))
26789


7889|68
! 8
 
 l"8 78l 87889  "
 7
"7
87
8|6
o!l87
 78 8
 7868
! 8 "87  87l 854€9
898
 87 "j8 7l l
"
   789


78898
! 8|7

87
  87 878977898
 87 "
""l878 87   8 87l|7"8   8"87l
~€Z
! 8  87l 78
989m8 
  7l l"8! 
!! 789


|6]68
! 8 ! l8
87  9778 " "
6]6 "8
6"8 87887 opqqq " 2%9!8 7!78
7!

g 9m j
Fc.Q<1Dx=A10

 119 191 1  7


 8 !"#" $%40&3%'"$()*5&&*' $8 '
$8"
'87
8$  21%
012310425 6789


7889 8787

+ 9, -
./01232/456/71
89/7721:/742;455/6<

 119 191 1  7


 8 !"#" $%40&3%'"$()*5&&*' $8 '
$8"
'87
8$  01%
012310425 6789


7889 8787

9
;<7
:
=75
+,-./012,3/04/--,56

9
>??<7
:
@?75
+,-./012,3/07,8

9
>??<7
:
@?75
+,-./012,3/0,/-5,3

 119 191 1  7


 8 !"#" $%40&3%'"$()*5&&*' $8 '
$8"
'87
8$  &1%
012310425 6789


7889 8787

;
=>>?@
<
A>@B

+ 9, -



.8 7 !8 /!!8798
0
 "198 
9 2 ! 87
92!

 7

0
 "38 8787
98
0
 "3 87/8 87
2&045  38 6
 

"87 7
7804524
98
#6/98
: 


9"
!87

 119 191 1  7


 8 !"#" $%40&3%'"$()*5&&*' $8 '
$8"
'87
8$  %1%
012310425 6789


7889 8787
+,--.-/012.345.67089:.;5.6:<2=7>.?.
@7A1/=7>.>19:B.C19D.E=005.F:>>2G0H1>=15.IJ-K.
@1/=/8L:B.4MN;?O4P5.@7>Q=/8L:B.RSTNU??TP.
V0:YH1/=77>B .4MTNWW.X/KK
98Z[\] 
YY798^_
F,+̀a.FbVCF̀à-a,̀+.cbVdIV+Ce.VJaf̀-aVJ
_]g
h] 7
hgi
hj6 7klmh]n8m h [
"8
opqqho
 "r8 8787
98h
"87 7
h] 7" 
6 l" 7s6 7 
9 "s] ' 87
"
Fc./1t801<
FuJRt12:L.D7=>/.D<:A=D=/1/=7>.X<:v8:>AG.:2/=91/:2.w=/x.UMy.A7>X=L:>A:.=>/:<H102.z=>.=>Ax:2{x78<|3
u8<1/=7> 3 -H:<1Q:.<:A8<<:>A:.=>/:<H10.zG:1<2|
; W 3M ;W WM 3MM ;MM WMM 3MMM
WR9=> }&%?)N~O%T&4 }%24&N~T€32% }%3W)N~4*;4€ }€%T4N~M*W)0 }*4T*N~O);€* }*€S€N~?3O04 })4S)N~U3U3* })€O2N~W54%) }34U3N~;2T4& }3€U2N~O2445
3MR9=> }0)?€N~M&S%2 }&0?3N~T%T45 }&343N~?%?30 }%&44N~O€;&* }%3W0N~4*342 }€0W4N~O*T€4 }€€T)N~?*353 }€5T4N~S);%% }*&S&N~;3S4€ }**S%N~T3O€0
3WR9=> }00;5N~W0W3% }0)?€N~M&T%0 }&0?*N~T%44* }&*40N~M%4€4 }%44€N~W€W4€ }%&43N~U€?%) }%*W3N~?€M3) }%5W€N~T*40% }€&T2N~M*U)* }€€T*N~4);20
?MR9=> }2€3*N~S245% }23;5N~303&€ }0&;2N~W0S3) }0*;2N~U&;0% }05?3N~?&W)0 }&0?)N~T%U45 }&€4*N~M%?%* }&34&N~?%T3& }%245N~O€M&0 }%%W*N~3€W)2
TMR9=> }453)N&M~2O02 }2233N~?2;%) }2%33N~T2W3& }2*35NO~0U22 }25;3N~;0?%) }00;2N~40U)* }0%;%N~S&S4* }0*?)N~M&4&) }05?5N~4&?34 }&0?%N~S%42€
;Rx< }4€M*N*T~;4U)42}4*M3N*S~T4W3€0 }43M*NU*~T2T4) }2432N~32?0€ }2032N~?2T€2 }2&33N~W2T)& }2€3)N~S2O5) }2);*N~M0;0& }04;€N~?0O*& }0&;4N~T0U5)
?Rx< }4%M2N04~W4O€2&}4%M5N5W~W4W*02}4*M&N4S~M43)3€}4)M&N%O~34U52€ }43M3NU4~U2M24 }2434N~3240* }223%N~?2M%% }2033N~42S*& }2€34N~S245& }2*3)N~U0S23
TRx< }40M€N%;~O4?&25}4&M4N)?~44;&3*}4&M3N€4~?4M%3%}4%M%N3W~M4?€*€}4€M%N0T~34?*3€}4*M0N0S~M4S)35}4)M4N5O~34454€ }43M4NU€~?2;4& }453%)N3~320& }243)N~;2S%2
3;Rx< }42M€N03~S4325*}42M3N&;~M4S0&*}40M&N4;~T4M05)}40M)N4?~M4S&%5}4&M&N4?~S4S%03}4&M3N04~44M%5)}4%M&N5W~433€))}4€M4N&W~U43**€}4€M5N5S~34T34%}4*M3N0O~;4T503
;4Rx< }44M5N03~M4M222 }42M22N3~4;32&&}42M%N43~W4;2*3}42M*N€3~O4M253}40M4N&;~;440%%}40M&N);~T4?03*}40M)N*?~M4U&&€}4&M0N4?~T4?&50}4&M3N54~44O%30}4%M€N4W~;4T€*%
;RL1G }44M€N&M~W4O4*€}44M*N%M~S4M4)3}44M3N4M~O4O453}44M5N%3~M4422€}42M2N€3~4;O2%0}42M&N%3~W4M2*€}42M€N*3~S4W25&}42M3N4;~M4W00€}40M2N);~W4;0)€}40M€N4;~U44&02
?RL1G }44M&N3M~4434%*}44M%N€M~W4M4€€}44M€N)M~T4;4*5}44M*N)M~S4?432}44M3N0M~U4M455}44M5N€3~M4W22*}42M2N43~4;?2&€}42M0N*3~44?2€)}42M€N03~S4W252}42M)N€;~M4400&
4RL1G }44M&N4M~?4?4&*}44M&N*M~?4U4%&}44M%N€M~44U4€%}44M€N&M~W4O4*%}44M*N€M~S434)3}44M)N€M~O4?452}44M3N)M~U4S24*}42M4N43~34?20&}42M0N43~?4S2%5}42M&N)3~T4M2)&
SRL1G }44M0N4M~;4;40%}44M0N%M~;4T405}44M&N4M~?4?4&*}44M&N€M~?4O4%0}44M%N0M~44T4€2}44M%N5M~W444€5}44M€N*M~T4;4*3}44M*N%M~S4;4)3}44M)N*M~O4S45%}44M3N)3~M4M245
3MRL1G }44M2N*M~34O425}44M0N4M~;4340&}44M0N%M~;4T403}44M0N3M~?4M4&0}44M&N&M~?4T4&5}44M&N3M~4434%%}44M%N&M~44S4€2}44M%N3M~W444€3}44M€N)M~T444*5}44M*N%M~S4?4)3
;MRL1G }44M2N2M~43;42&}44M2N&M~34442€}44M2N*M~34S423}44M2N3M~34U404}44M0N2M~;4;40%}44M0N&M~;4W40)}44M0N*M~;4O4&4}44M0N5M~?434&&}44M&N&M~?4T4&3}44M&N*M~44M4%&
?MRL1G }44M4N5M~34M422}44M2N2M~43;420}44M2N&M~34442€}44M2N%M~34W42*}44M2N)M~34O425}44M2N3M~;4M402}44M0N4M~;4;40&}44M0N0M~;4440€}44M0N€M~;4S405}44M0N)M~?4M4&0
4WRL1G }44M4N3M~M4O445}44M4N5M~34M424}44M22NM~433420}44M2N0M~34;42&}44M2N&M~34442€}44M2N€M~34W42*}44M2N*M~34S423}44M2N)M~34O425}44M2N5M~;4M402}44M0N4M~;4;40&
TMRL1G }44M4N)M~M4S443}44M4N3M~M4U445}44M4N5M~34M424}44M2N4M~343422}44M2N0M~34;42&}44M2N&M~34?42%}44M2N%M~34442€}44M2N€M~34W42*}44M2N*M~34S423}44M2N)M~34O425
26789


7889}68
! 8
 
 l"8 78l 87889  "
 7
"7
87
8}6
o!l87
 78 8
 7868
! 8 "87  87l 8549
898
 87 "j8 7l l
"
   789


78898
! 8}7

87
  87 878977898
 87 "
""l878 87   8 87l}7"8   8"87l
€Z
! 8  87l 78
989m8 
  7l l"8! ‚
!! 789


}6]68
! 8 ! l8
87  9778 " "
6]6 "8
6"8 87887 opqqq " 2%9!8 7!78
7!

g 9m j
Fc.Q<1Dx=A10

 119 191 1  7


 8 !"#" $%40&3%'"$()*5&&*' $
 8
'
$8"
'87
8$  21%
012310425 6789


7889 8787

+ 9, -
./01232/456/71
89/7721:/742;455/6<

 119 191 1  7


 8 !"#" $%40&3%'"$()*5&&*' $
 8
'
$8"
'87
8$  01%
012310425 6789


7889 8787

9
;<7
:
=75
+,-./012,3/04/--,56

9
>??<7
:
@?75
+,-./012,3/07,8

9
>??<7
:
@?75
+,-./012,3/0,/-5,3

 119 191 1  7


 8 !"#" $%40&3%'"$()*5&&*' $
 8
'
$8"
'87
8$  &1%
012310425 6789


7889 8787

;
=>>?@
<
A>@B

+ 9, -



.8 7 !8 /!!8798
0
 "198 
9 2 ! 87
92!

 7

0
 "38 8787
98
0
 "3 87/8 87
2&045  38 6
 

"87 7
7804524
98
#6/98
: 


9"
!87

 119 191 1  7


 8 !"#" $%40&3%'"$()*5&&*' $
 8
'
$8"
'87
8$  %1%
3115 - 3133 Chestnut Street Chick-fil-A Restaurant
Water Quality Volume Calculation

WQV = water quality volume = [(2.0)(Rv)(A)]/12


A = area
Rv = 0.05 + 0.009 (I) where I is percent impervious cover

Rv = 0.05 + 0.009 (1.17/1.57) =


= 0.05 + 0.009 (74.5) =
= 0.72

WQV = [(2.0)(Rv)(A)]/12
= [(2.0)(0.72)(1.57)]/12
= 0.188 ac-ft

Total WQV Volume Treated Pond 1 (0.023 ac-ft) and 2 (0.197 ac-ft) = 0.220 acre feet
Water Quality Type II 24-hr 2-yr Rainfall=2.90"
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC

Summary for Pond 5P: POND 1

Inflow Area = 0.380 ac, 86.84% Impervious, Inflow Depth = 2.16" for 2-yr event
Inflow = 1.38 cfs @ 11.97 hrs, Volume= 0.068 af
Outflow = 1.13 cfs @ 12.02 hrs, Volume= 0.068 af, Atten= 18%, Lag= 2.8 min
Discarded = 0.01 cfs @ 8.71 hrs, Volume= 0.023 af
Primary = 1.12 cfs @ 12.02 hrs, Volume= 0.045 af

Routing by Stor-Ind method, Time Span= 0.00-50.00 hrs, dt= 0.01 hrs
Peak Elev= 400.15' @ 12.02 hrs Surf.Area= 1,944 sf Storage= 837 cf

Plug-Flow detention time= 164.7 min calculated for 0.068 af (100% of inflow)
Center-of-Mass det. time= 164.8 min ( 957.8 - 792.9 )

Volume Invert Avail.Storage Storage Description


#1 399.07' 2,278 cf Custom Stage Data (Prismatic)Listed below (Recalc)
5,696 cf Overall x 40.0% Voids

Elevation Surf.Area Inc.Store Cum.Store


(feet) (sq-ft) (cubic-feet) (cubic-feet)
399.07 1,944 0 0
402.00 1,944 5,696 5,696

Device Routing Invert Outlet Devices


#1 Primary 399.57' 15.0" Round HDPE Round 15"
L= 14.3' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 399.57' / 399.44' S= 0.0091 '/' Cc= 0.900
n= 0.013, Flow Area= 1.23 sf
#2 Discarded 399.07' 0.220 in/hr Exfiltration over Horizontal area

Discarded OutFlow Max=0.01 cfs @ 8.71 hrs HW=399.10' (Free Discharge)


2=Exfiltration (Exfiltration Controls 0.01 cfs)

Primary OutFlow Max=1.12 cfs @ 12.02 hrs HW=400.15' (Free Discharge)


1=HDPE Round 15" (Barrel Controls 1.12 cfs @ 2.99 fps)
Water Quality Type II 24-hr 2-yr Rainfall=2.90"
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC

Summary for Pond 3P: POND 2

Inflow Area = 1.110 ac, 94.59% Impervious, Inflow Depth = 2.17" for 2-yr event
Inflow = 3.93 cfs @ 11.98 hrs, Volume= 0.201 af
Outflow = 0.66 cfs @ 12.25 hrs, Volume= 0.197 af, Atten= 83%, Lag= 16.3 min
Primary = 0.66 cfs @ 12.25 hrs, Volume= 0.197 af

Routing by Stor-Ind method, Time Span= 0.00-50.00 hrs, dt= 0.01 hrs
Peak Elev= 398.89' @ 12.25 hrs Surf.Area= 3,992 sf Storage= 4,465 cf

Plug-Flow detention time= 333.3 min calculated for 0.197 af (98% of inflow)
Center-of-Mass det. time= 320.3 min ( 1,091.8 - 771.5 )

Volume Invert Avail.Storage Storage Description


#1A 396.97' 3,003 cf 31.60'W x 126.33'L x 3.00'H Field A
11,977 cf Overall - 4,470 cf Embedded = 7,507 cf x 40.0% Voids
#2A 397.30' 3,534 cf ADS N-12 24" x 54 Inside #1
Inside= 23.8"W x 23.8"H => 3.10 sf x 20.00'L = 62.0 cf
Outside= 28.0"W x 28.0"H => 3.92 sf x 20.00'L = 78.4 cf
9 Rows of 6 Chambers
29.93' Header x 3.10 sf x 2 = 185.6 cf Inside
6,536 cf Total Available Storage

Storage Group A created with Chamber Wizard

Device Routing Invert Outlet Devices


#1 Primary 396.97' 15.0" Round HDPE Round 15"
L= 4.0' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 396.97' / 396.93' S= 0.0100 '/' Cc= 0.900
n= 0.013, Flow Area= 1.23 sf
#2 Device 1 396.97' 1.0" Vert. Orifice/Grate C= 0.600
#3 Device 1 397.90' 5.2" Vert. Orifice/Grate C= 0.600
#4 Device 1 399.30' 3.7' long Sharp-Crested Rectangular Weir 2 End Contraction(s)

Primary OutFlow Max=0.66 cfs @ 12.25 hrs HW=398.89' (Free Discharge)


1=HDPE Round 15" (Passes 0.66 cfs of 6.58 cfs potential flow)
2=Orifice/Grate (Orifice Controls 0.04 cfs @ 6.60 fps)
3=Orifice/Grate (Orifice Controls 0.63 cfs @ 4.24 fps)
4=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)
Worksheet 4. Change in Runoff Volume for 2-YR Storm Event

PROJECT: 3115-3133 Chestnut Street – Proposed Chick-fil-A


Drainage Area: Drainage Area #1
2-Year Rainfall: 2.90 in

Total Site Area: 0.780 acres


Protected Site Area: 0.000 acres
Managed Area: 0.780 acres

Existing Conditions:
Q Runoff
1 2
Soil Area Area la Runoff Volume
3
Cover Type/Condition Type (sf) (ac) CN S (0.2*S) (in) (ft )
Woodland B 0 0.000 55 8.18 1.64 0.17 0
Meadow B 26,572 0.610 58 7.24 1.45 0.24 537
Meadow C 0 0.000 71 4.08 0.82 0.70 0
Impervious N/A 7,405 0.170 98 0.20 0.04 2.67 1,647

TOTAL: 33,977 0.780 2,184


* NOTE: Total impervious area reflects 20% of the existing impervious area being considered meadow in good condition.

Developed Conditions:
Q Runoff
Soil Area Area la Runoff1 Volume2
Cover Type/Condition Type (sf) (ac) CN S (0.2*S) (in) (ft3)
Open Space B 10,019 0.230 61 6.39 1.28 0.33 274
Open Space C 0 0.000 74 3.51 0.70 0.85 0
Impervious N/A 46,174 1.060 98 0.20 0.04 2.67 10,269

TOTAL: 56,192 1.290 10,543

2-Year Volume Increase (ft3): 8,359

2-Year Volume Increase = Developed Conditions Runoff Volume – Existing Conditions Runoff Volume

1. Runoff (in) = Q = (P-0.2S)2 / (P+0.8S) where


P = 2-Year Rainfall (in)
S = (1000/ CN)-10
2. Runoff Volume (CF) = Q x Area x 1/12
Q = Runoff (in)
Area = Land use area (sq. ft)

Note: Runoff Volume must be calculated for EACH land use type/condition and HSGI.
The use of a weighted CN value for volume calculations is not acceptable.
Worksheet 4. Change in Runoff Volume for 2-YR Storm Event

PROJECT: 3115-3133 Chestnut Street – Proposed Chick-fil-A


Drainage Area: Drainage Area #2
2-Year Rainfall: 2.90 in

Total Site Area: 0.790 acres


Protected Site Area: 0.000 acres
Managed Area: 0.790 acres

Existing Conditions:
Q Runoff
1 2
Soil Area Area la Runoff Volume
3
Cover Type/Condition Type (sf) (ac) CN S (0.2*S) (in) (ft )
Woodland B 0 0.000 55 8.18 1.64 0.17 0
Meadow B 23,958 0.550 58 7.24 1.45 0.24 484
Meadow C 0 0.000 71 4.08 0.82 0.70 0
Impervious N/A 10,454 0.240 98 0.20 0.04 2.67 2,325

TOTAL: 34,412 0.790 2,809


* NOTE: Total impervious area reflects 20% of the existing impervious area being considered meadow in good condition.

Developed Conditions:
Q Runoff
Soil Area Area la Runoff1 Volume2
Cover Type/Condition Type (sf) (ac) CN S (0.2*S) (in) (ft3)
Open Space B 7,405 0.170 61 6.39 1.28 0.33 202
Open Space C 0 0.000 74 3.51 0.70 0.85 0
Impervious N/A 4,792 0.110 98 0.20 0.04 2.67 1,066

TOTAL: 12,197 0.280 1,268

2-Year Volume Increase (ft3): -1,541

2-Year Volume Increase = Developed Conditions Runoff Volume – Existing Conditions Runoff Volume

1. Runoff (in) = Q = (P-0.2S)2 / (P+0.8S) where


P = 2-Year Rainfall (in)
S = (1000/ CN)-10
2. Runoff Volume (CF) = Q x Area x 1/12
Q = Runoff (in)
Area = Land use area (sq. ft)

Note: Runoff Volume must be calculated for EACH land use type/condition and HSGI.
The use of a weighted CN value for volume calculations is not acceptable.
APPENDIX B
_______________________________________

HYDROGRAPH SUMMARIES

_______________________________________
3115 - 3133 Chestnut Street Chick-fil-A Restaurant
Hydrograph Summaries
Runoff Rate Calculations Water Surface Elevation
Cubic Feet/Second (CFS) Feet
Pre 1 Post 1 w/o BMP Post 1 w/ BMPs Decrease Pre 2 Post 2 Decrease Pond 1 Pond 2
1-yr 0.76 3.67 0.19 75% 0.96 0.50 48% 399.99 398.01
2-yr 0.91 4.36 0.23 75% 1.15 0.60 48% 400.05 398.13
5-yr 1.08 5.14 0.30 72% 1.36 0.70 49% 400.10 398.25
10-yr 1.20 5.73 0.40 67% 1.51 0.78 48% 400.14 398.35
25-yr 1.64 7.26 0.59 64% 1.99 1.03 48% 400.24 398.60
50-yr 1.77 7.85 0.66 63% 2.15 1.12 48% 400.28 398.70
100-yr 1.90 8.50 0.72 62% 2.31 1.21 48% 400.32 398.82
APPENDIX C
_______________________________________

PREDEVELOPMENT HYDROGRAPHS

_______________________________________
1S 2S

PRE 1 PRE 2

Subcat Reach Pond Link Routing Diagram for PRE (small)


Prepared by Williams Site Civil, LLC, Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC
PRE (small) PA-Cumberland-Camp Hill 1-yr Duration=11 min, Inten=2.94 in/hr
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 2

Summary for Subcatchment 1S: PRE 1

Runoff = 0.76 cfs @ 0.18 hrs, Volume= 0.012 af, Depth= 0.18"

Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 1-yr Duration=11 min, Inten=2.94 in/hr

Area (ac) C Description


0.570 0.13 MEADOW B
0.210 0.86 IMPERVIOUS B
0.780 0.33 Weighted Average
0.780 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
9.9 100 0.0220 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.90"
0.5 97 0.0380 3.14 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
10.4 197 Total

Subcatchment 1S: PRE 1


Hydrograph

0.85 Runoff
0.8 0.76 cfs

0.75 PA-Cumberland-Camp Hill 1-yr


0.7 Duration=11 min,
0.65 Inten=2.94 in/hr
0.6
Runoff Area=0.780 ac
0.55
0.5
Runoff Volume=0.012 af
Flow (cfs)

0.45 Runoff Depth=0.18"


0.4 Flow Length=197'
0.35 Tc=10.4 min
0.3 C=0.33
0.25
0.2
0.15
0.1
0.05
0
0 1 2 3
Time (hours)
PRE (small) PA-Cumberland-Camp Hill 1-yr Duration=11 min, Inten=2.94 in/hr
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 3

Summary for Subcatchment 2S: PRE 2

Runoff = 0.96 cfs @ 0.18 hrs, Volume= 0.015 af, Depth= 0.22"

Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 1-yr Duration=11 min, Inten=2.94 in/hr

Area (ac) C Description


0.490 0.13 MEADOW B
0.300 0.86 IMPERVIOUS B
0.790 0.41 Weighted Average
0.790 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
10.6 100 0.0480 0.16 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.90"
0.2 41 0.0660 4.14 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
10.8 141 Total

Subcatchment 2S: PRE 2


Hydrograph

Runoff
1 0.96 cfs

PA-Cumberland-Camp Hill 1-yr


Duration=11 min,
Inten=2.94 in/hr
Runoff Area=0.790 ac
Runoff Volume=0.015 af
Flow (cfs)

Runoff Depth=0.22"
Flow Length=141'
Tc=10.8 min
C=0.41

0
0 1 2 3
Time (hours)
PRE (small) PA-Cumberland-Camp Hill 2-yr Duration=11 min, Inten=3.51 in/hr
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 4

Summary for Subcatchment 1S: PRE 1

Runoff = 0.91 cfs @ 0.18 hrs, Volume= 0.014 af, Depth= 0.21"

Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 2-yr Duration=11 min, Inten=3.51 in/hr

Area (ac) C Description


0.570 0.13 MEADOW B
0.210 0.86 IMPERVIOUS B
0.780 0.33 Weighted Average
0.780 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
9.9 100 0.0220 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.90"
0.5 97 0.0380 3.14 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
10.4 197 Total

Subcatchment 1S: PRE 1


Hydrograph

1 Runoff
0.91 cfs

PA-Cumberland-Camp Hill 2-yr


Duration=11 min,
Inten=3.51 in/hr
Runoff Area=0.780 ac
Runoff Volume=0.014 af
Flow (cfs)

Runoff Depth=0.21"
Flow Length=197'
Tc=10.4 min
C=0.33

0
0 1 2 3
Time (hours)
PRE (small) PA-Cumberland-Camp Hill 2-yr Duration=11 min, Inten=3.51 in/hr
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 5

Summary for Subcatchment 2S: PRE 2

Runoff = 1.15 cfs @ 0.18 hrs, Volume= 0.017 af, Depth= 0.26"

Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 2-yr Duration=11 min, Inten=3.51 in/hr

Area (ac) C Description


0.490 0.13 MEADOW B
0.300 0.86 IMPERVIOUS B
0.790 0.41 Weighted Average
0.790 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
10.6 100 0.0480 0.16 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.90"
0.2 41 0.0660 4.14 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
10.8 141 Total

Subcatchment 2S: PRE 2


Hydrograph

Runoff
1.15 cfs

PA-Cumberland-Camp Hill 2-yr


Duration=11 min,
1
Inten=3.51 in/hr
Runoff Area=0.790 ac
Runoff Volume=0.017 af
Flow (cfs)

Runoff Depth=0.26"
Flow Length=141'
Tc=10.8 min
C=0.41

0
0 1 2 3
Time (hours)
PRE (small) PA-Cumberland-Camp Hill 5-yr Duration=11 min, Inten=4.15 in/hr
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 6

Summary for Subcatchment 1S: PRE 1

Runoff = 1.08 cfs @ 0.18 hrs, Volume= 0.016 af, Depth= 0.25"

Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 5-yr Duration=11 min, Inten=4.15 in/hr

Area (ac) C Description


0.570 0.13 MEADOW B
0.210 0.86 IMPERVIOUS B
0.780 0.33 Weighted Average
0.780 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
9.9 100 0.0220 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.90"
0.5 97 0.0380 3.14 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
10.4 197 Total

Subcatchment 1S: PRE 1


Hydrograph

Runoff
1.08 cfs

PA-Cumberland-Camp Hill 5-yr


1 Duration=11 min,
Inten=4.15 in/hr
Runoff Area=0.780 ac
Runoff Volume=0.016 af
Flow (cfs)

Runoff Depth=0.25"
Flow Length=197'
Tc=10.4 min
C=0.33

0
0 1 2 3
Time (hours)
PRE (small) PA-Cumberland-Camp Hill 5-yr Duration=11 min, Inten=4.15 in/hr
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 7

Summary for Subcatchment 2S: PRE 2

Runoff = 1.36 cfs @ 0.18 hrs, Volume= 0.021 af, Depth= 0.31"

Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 5-yr Duration=11 min, Inten=4.15 in/hr

Area (ac) C Description


0.490 0.13 MEADOW B
0.300 0.86 IMPERVIOUS B
0.790 0.41 Weighted Average
0.790 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
10.6 100 0.0480 0.16 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.90"
0.2 41 0.0660 4.14 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
10.8 141 Total

Subcatchment 2S: PRE 2


Hydrograph

Runoff
1.36 cfs

PA-Cumberland-Camp Hill 5-yr


Duration=11 min,
Inten=4.15 in/hr
1
Runoff Area=0.790 ac
Runoff Volume=0.021 af
Flow (cfs)

Runoff Depth=0.31"
Flow Length=141'
Tc=10.8 min
C=0.41

0
0 1 2 3
Time (hours)
PRE (small) PA-Cumberland-Camp Hill 10-yr Duration=11 min, Inten=4.62 in/hr
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 8

Summary for Subcatchment 1S: PRE 1

Runoff = 1.20 cfs @ 0.18 hrs, Volume= 0.018 af, Depth= 0.28"

Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 10-yr Duration=11 min, Inten=4.62 in/hr

Area (ac) C Description


0.570 0.13 MEADOW B
0.210 0.86 IMPERVIOUS B
0.780 0.33 Weighted Average
0.780 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
9.9 100 0.0220 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.90"
0.5 97 0.0380 3.14 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
10.4 197 Total

Subcatchment 1S: PRE 1


Hydrograph

Runoff
1.20 cfs

PA-Cumberland-Camp Hill 10-yr


Duration=11 min,
1 Inten=4.62 in/hr
Runoff Area=0.780 ac
Runoff Volume=0.018 af
Runoff Depth=0.28"
Flow (cfs)

Flow Length=197'
Tc=10.4 min
C=0.33

0
0 1 2 3
Time (hours)
PRE (small) PA-Cumberland-Camp Hill 10-yr Duration=11 min, Inten=4.62 in/hr
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 9

Summary for Subcatchment 2S: PRE 2

Runoff = 1.51 cfs @ 0.18 hrs, Volume= 0.023 af, Depth= 0.35"

Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 10-yr Duration=11 min, Inten=4.62 in/hr

Area (ac) C Description


0.490 0.13 MEADOW B
0.300 0.86 IMPERVIOUS B
0.790 0.41 Weighted Average
0.790 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
10.6 100 0.0480 0.16 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.90"
0.2 41 0.0660 4.14 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
10.8 141 Total

Subcatchment 2S: PRE 2


Hydrograph

Runoff
1.51 cfs

PA-Cumberland-Camp Hill 10-yr


Duration=11 min,
Inten=4.62 in/hr
Runoff Area=0.790 ac
Runoff Volume=0.023 af
1
Runoff Depth=0.35"
Flow (cfs)

Flow Length=141'
Tc=10.8 min
C=0.41

0
0 1 2 3
Time (hours)
1S 2S

PRE 1 PRE 2

Subcat Reach Pond Link Routing Diagram for PRE (large)


Prepared by Williams Site Civil, LLC, Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC
PRE (large) PA-Cumberland-Camp Hill 25-yr Duration=11 min, Inten=5.20 in/hr
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 2

Summary for Subcatchment 1S: PRE 1

Runoff = 1.64 cfs @ 0.18 hrs, Volume= 0.025 af, Depth= 0.38"

Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 25-yr Duration=11 min, Inten=5.20 in/hr

Area (ac) C Description


0.570 0.19 MEADOW B
0.210 0.96 IMPERVIOUS B
0.780 0.40 Weighted Average
0.570 73.08% Pervious Area
0.210 26.92% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
9.9 100 0.0220 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.90"
0.5 97 0.0380 3.14 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
10.4 197 Total

Subcatchment 1S: PRE 1


Hydrograph

Runoff
1.64 cfs

PA-Cumberland-Camp Hill 25-yr


Duration=11 min,
Inten=5.20 in/hr
Runoff Area=0.780 ac
Runoff Volume=0.025 af
Runoff Depth=0.38"
Flow (cfs)

1
Flow Length=197'
Tc=10.4 min
C=0.40

0
0 1 2 3
Time (hours)
PRE (large) PA-Cumberland-Camp Hill 25-yr Duration=11 min, Inten=5.20 in/hr
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 3

Summary for Subcatchment 2S: PRE 2

Runoff = 1.99 cfs @ 0.18 hrs, Volume= 0.030 af, Depth= 0.46"

Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 25-yr Duration=11 min, Inten=5.20 in/hr

Area (ac) C Description


0.490 0.19 MEADOW B
0.300 0.96 IMPERVIOUS B
0.790 0.48 Weighted Average
0.490 62.03% Pervious Area
0.300 37.97% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
10.6 100 0.0480 0.16 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.90"
0.2 41 0.0660 4.14 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
10.8 141 Total

Subcatchment 2S: PRE 2


Hydrograph

Runoff
1.99 cfs
2 PA-Cumberland-Camp Hill 25-yr
Duration=11 min,
Inten=5.20 in/hr
Runoff Area=0.790 ac
Runoff Volume=0.030 af
Runoff Depth=0.46"
Flow (cfs)

Flow Length=141'
1
Tc=10.8 min
C=0.48

0
0 1 2 3
Time (hours)
PRE (large) PA-Cumberland-Camp Hill 50-yr Duration=11 min, Inten=5.62 in/hr
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 4

Summary for Subcatchment 1S: PRE 1

Runoff = 1.77 cfs @ 0.18 hrs, Volume= 0.027 af, Depth= 0.41"

Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 50-yr Duration=11 min, Inten=5.62 in/hr

Area (ac) C Description


0.570 0.19 MEADOW B
0.210 0.96 IMPERVIOUS B
0.780 0.40 Weighted Average
0.570 73.08% Pervious Area
0.210 26.92% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
9.9 100 0.0220 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.90"
0.5 97 0.0380 3.14 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
10.4 197 Total

Subcatchment 1S: PRE 1


Hydrograph

Runoff
1.77 cfs

PA-Cumberland-Camp Hill 50-yr


Duration=11 min,
Inten=5.62 in/hr
Runoff Area=0.780 ac
Runoff Volume=0.027 af
Runoff Depth=0.41"
Flow (cfs)

1 Flow Length=197'
Tc=10.4 min
C=0.40

0
0 1 2 3
Time (hours)
PRE (large) PA-Cumberland-Camp Hill 50-yr Duration=11 min, Inten=5.62 in/hr
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 5

Summary for Subcatchment 2S: PRE 2

Runoff = 2.15 cfs @ 0.18 hrs, Volume= 0.033 af, Depth= 0.49"

Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 50-yr Duration=11 min, Inten=5.62 in/hr

Area (ac) C Description


0.490 0.19 MEADOW B
0.300 0.96 IMPERVIOUS B
0.790 0.48 Weighted Average
0.490 62.03% Pervious Area
0.300 37.97% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
10.6 100 0.0480 0.16 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.90"
0.2 41 0.0660 4.14 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
10.8 141 Total

Subcatchment 2S: PRE 2


Hydrograph

Runoff
2.15 cfs

PA-Cumberland-Camp Hill 50-yr


2 Duration=11 min,
Inten=5.62 in/hr
Runoff Area=0.790 ac
Runoff Volume=0.033 af
Runoff Depth=0.49"
Flow (cfs)

Flow Length=141'
1 Tc=10.8 min
C=0.48

0
0 1 2 3
Time (hours)
PRE (large) PA-Cumberland-Camp Hill 100-yr Duration=11 min, Inten=6.04 in/hr
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 6

Summary for Subcatchment 1S: PRE 1

Runoff = 1.90 cfs @ 0.18 hrs, Volume= 0.029 af, Depth= 0.44"

Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 100-yr Duration=11 min, Inten=6.04 in/hr

Area (ac) C Description


0.570 0.19 MEADOW B
0.210 0.96 IMPERVIOUS B
0.780 0.40 Weighted Average
0.570 73.08% Pervious Area
0.210 26.92% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
9.9 100 0.0220 0.17 Sheet Flow,
Grass: Short n= 0.150 P2= 2.90"
0.5 97 0.0380 3.14 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
10.4 197 Total

Subcatchment 1S: PRE 1


Hydrograph

Runoff
2 1.90 cfs

PA-Cumberland-Camp Hill 100-yr


Duration=11 min,
Inten=6.04 in/hr
Runoff Area=0.780 ac
Runoff Volume=0.029 af
Runoff Depth=0.44"
Flow (cfs)

Flow Length=197'
1
Tc=10.4 min
C=0.40

0
0 1 2 3
Time (hours)
PRE (large) PA-Cumberland-Camp Hill 100-yr Duration=11 min, Inten=6.04 in/hr
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 7

Summary for Subcatchment 2S: PRE 2

Runoff = 2.31 cfs @ 0.18 hrs, Volume= 0.035 af, Depth= 0.53"

Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 100-yr Duration=11 min, Inten=6.04 in/hr

Area (ac) C Description


0.490 0.19 MEADOW B
0.300 0.96 IMPERVIOUS B
0.790 0.48 Weighted Average
0.490 62.03% Pervious Area
0.300 37.97% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
10.6 100 0.0480 0.16 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.90"
0.2 41 0.0660 4.14 Shallow Concentrated Flow,
Unpaved Kv= 16.1 fps
10.8 141 Total

Subcatchment 2S: PRE 2


Hydrograph

Runoff
2.31 cfs

PA-Cumberland-Camp Hill 100-yr


Duration=11 min,
2
Inten=6.04 in/hr
Runoff Area=0.790 ac
Runoff Volume=0.035 af
Runoff Depth=0.53"
Flow (cfs)

Flow Length=141'
Tc=10.8 min
1
C=0.48

0
0 1 2 3
Time (hours)
APPENDIX D
_______________________________________

POSTDEVELOPMENT HYDROGRAPHS

_______________________________________
6S

POST 1 POND 1

5P
1S POND 1 2S 5S
POST 1 POND 2
POST 1 BYPASS
POST 2

3P

POND 2

4L

EAST POI

Subcat Reach Pond Link Routing Diagram for POST (small)


Prepared by Williams Site Civil, LLC, Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC
POST (small) PA-Cumberland-Camp Hill 1-yr Duration=5 min, Inten=3.86 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 2

Summary for Subcatchment 1S: POST 1 POND 2

Runoff = 2.36 cfs @ 0.09 hrs, Volume= 0.033 af, Depth= 0.55"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 1-yr Duration=5 min, Inten=3.86 in/hr

Area (ac) C Description


0.010 0.22 LAWN B
0.720 0.86 IMPERVIOUS B
0.730 0.85 Weighted Average
0.730 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 1S: POST 1 POND 2


Hydrograph

Runoff
2.36 cfs

PA-Cumberland-Camp Hill 1-yr


Duration=5 min,
2 Inten=3.86 in/hr
Runoff Area=0.730 ac
Runoff Volume=0.033 af
Flow (cfs)

Runoff Depth=0.55"
Tc=5.0 min
C=0.85
1

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 1-yr Duration=5 min, Inten=3.86 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 3

Summary for Subcatchment 2S: POST 1 BYPASS

Runoff = 0.18 cfs @ 0.09 hrs, Volume= 0.003 af, Depth= 0.17"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 1-yr Duration=5 min, Inten=3.86 in/hr

Area (ac) C Description


0.170 0.22 LAWN B
0.010 0.86 IMPERVIOUS
0.180 0.26 Weighted Average
0.180 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 2S: POST 1 BYPASS


Hydrograph

Runoff
0.19
0.18 cfs
0.18
PA-Cumberland-Camp Hill 1-yr
0.17
0.16 Duration=5 min,
0.15 Inten=3.86 in/hr
0.14
0.13
Runoff Area=0.180 ac
0.12 Runoff Volume=0.003 af
Flow (cfs)

0.11 Runoff Depth=0.17"


0.1
0.09
Tc=5.0 min
0.08 C=0.26
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 1-yr Duration=5 min, Inten=3.86 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 4

Summary for Subcatchment 5S: POST 2

Runoff = 0.50 cfs @ 0.09 hrs, Volume= 0.007 af, Depth= 0.30"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 1-yr Duration=5 min, Inten=3.86 in/hr

Area (ac) C Description


0.170 0.22 LAWN B
0.110 0.86 IMPERVIOUS
0.280 0.47 Weighted Average
0.280 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 5S: POST 2


Hydrograph

0.55 Runoff
0.50 cfs
0.5 PA-Cumberland-Camp Hill 1-yr
0.45 Duration=5 min,
Inten=3.86 in/hr
0.4
Runoff Area=0.280 ac
0.35 Runoff Volume=0.007 af
Flow (cfs)

0.3 Runoff Depth=0.30"


Tc=5.0 min
0.25
C=0.47
0.2

0.15

0.1

0.05

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 1-yr Duration=5 min, Inten=3.86 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 5

Summary for Subcatchment 6S: POST 1 POND 1

Runoff = 1.13 cfs @ 0.09 hrs, Volume= 0.016 af, Depth= 0.50"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 1-yr Duration=5 min, Inten=3.86 in/hr

Area (ac) C Description


0.050 0.22 LAWN B
0.330 0.86 IMPERVIOUS
0.380 0.78 Weighted Average
0.380 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 6S: POST 1 POND 1


Hydrograph

Runoff
1.13 cfs

PA-Cumberland-Camp Hill 1-yr


1
Duration=5 min,
Inten=3.86 in/hr
Runoff Area=0.380 ac
Runoff Volume=0.016 af
Flow (cfs)

Runoff Depth=0.50"
Tc=5.0 min
C=0.78

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 1-yr Duration=5 min, Inten=3.86 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 6

Summary for Pond 3P: POND 2

Inflow Area = 1.110 ac, 0.00% Impervious, Inflow Depth = 0.53" for 1-yr event
Inflow = 2.58 cfs @ 0.09 hrs, Volume= 0.049 af
Outflow = 0.06 cfs @ 0.59 hrs, Volume= 0.049 af, Atten= 98%, Lag= 29.8 min
Primary = 0.06 cfs @ 0.59 hrs, Volume= 0.049 af

Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 398.01' @ 0.59 hrs Surf.Area= 3,992 sf Storage= 1,972 cf

Plug-Flow detention time= 764.6 min calculated for 0.049 af (100% of inflow)
Center-of-Mass det. time= 764.1 min ( 778.8 - 14.7 )

Volume Invert Avail.Storage Storage Description


#1A 396.97' 3,003 cf 31.60'W x 126.33'L x 3.00'H Field A
11,977 cf Overall - 4,470 cf Embedded = 7,507 cf x 40.0% Voids
#2A 397.30' 3,534 cf ADS N-12 24" x 54 Inside #1
Inside= 23.8"W x 23.8"H => 3.10 sf x 20.00'L = 62.0 cf
Outside= 28.0"W x 28.0"H => 3.92 sf x 20.00'L = 78.4 cf
9 Rows of 6 Chambers
29.93' Header x 3.10 sf x 2 = 185.6 cf Inside
6,536 cf Total Available Storage

Storage Group A created with Chamber Wizard

Device Routing Invert Outlet Devices


#1 Primary 396.97' 15.0" Round HDPE Round 15"
L= 4.0' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 396.97' / 396.93' S= 0.0100 '/' Cc= 0.900
n= 0.013, Flow Area= 1.23 sf
#2 Device 1 396.97' 1.0" Vert. Orifice/Grate C= 0.600
#3 Device 1 397.90' 5.2" Vert. Orifice/Grate C= 0.600
#4 Device 1 399.30' 3.7' long Sharp-Crested Rectangular Weir 2 End Contraction(s)

Primary OutFlow Max=0.06 cfs @ 0.59 hrs HW=398.01' (Free Discharge)


1=HDPE Round 15" (Passes 0.06 cfs of 2.82 cfs potential flow)
2=Orifice/Grate (Orifice Controls 0.03 cfs @ 4.81 fps)
3=Orifice/Grate (Orifice Controls 0.03 cfs @ 1.14 fps)
4=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)
POST (small) PA-Cumberland-Camp Hill 1-yr Duration=5 min, Inten=3.86 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 7

Pond 3P: POND 2


Hydrograph

Inflow
2.58 cfs Primary

Inflow Area=1.110 ac
Peak Elev=398.01'
2 Storage=1,972 cf
Flow (cfs)

0.06 cfs

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 1-yr Duration=5 min, Inten=3.86 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 8

Summary for Pond 5P: POND 1

Inflow Area = 0.380 ac, 0.00% Impervious, Inflow Depth = 0.50" for 1-yr event
Inflow = 1.13 cfs @ 0.09 hrs, Volume= 0.016 af
Outflow = 0.64 cfs @ 0.19 hrs, Volume= 0.016 af, Atten= 43%, Lag= 6.4 min
Primary = 0.64 cfs @ 0.19 hrs, Volume= 0.016 af

Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 399.99' @ 0.19 hrs Surf.Area= 1,944 sf Storage= 327 cf

Plug-Flow detention time= 19.5 min calculated for 0.016 af (100% of inflow)
Center-of-Mass det. time= 19.7 min ( 28.0 - 8.3 )

Volume Invert Avail.Storage Storage Description


#1 399.57' 1,890 cf Custom Stage Data (Prismatic)Listed below (Recalc)
4,724 cf Overall x 40.0% Voids

Elevation Surf.Area Inc.Store Cum.Store


(feet) (sq-ft) (cubic-feet) (cubic-feet)
399.57 1,944 0 0
402.00 1,944 4,724 4,724

Device Routing Invert Outlet Devices


#1 Primary 399.57' 15.0" Round HDPE Round 15"
L= 14.3' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 399.57' / 399.44' S= 0.0091 '/' Cc= 0.900
n= 0.013, Flow Area= 1.23 sf

Primary OutFlow Max=0.64 cfs @ 0.19 hrs HW=399.99' (Free Discharge)


1=HDPE Round 15" (Barrel Controls 0.64 cfs @ 2.64 fps)
POST (small) PA-Cumberland-Camp Hill 1-yr Duration=5 min, Inten=3.86 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 9

Pond 5P: POND 1


Hydrograph

Inflow
1.13 cfs Primary

Inflow Area=0.380 ac
1
Peak Elev=399.99'
Storage=327 cf
15.0"
Flow (cfs)

0.64 cfs
Round Culvert
n=0.013
L=14.3'
S=0.0091 '/'

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 1-yr Duration=5 min, Inten=3.86 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 10

Summary for Link 4L: EAST POI

Inflow Area = 1.290 ac, 0.00% Impervious, Inflow Depth > 0.48" for 1-yr event
Inflow = 0.19 cfs @ 0.09 hrs, Volume= 0.052 af
Primary = 0.19 cfs @ 0.09 hrs, Volume= 0.052 af, Atten= 0%, Lag= 0.0 min

Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs

Link 4L: EAST POI


Hydrograph

Inflow
0.21 0.19 cfs Primary
0.2
0.19 cfs
0.19 Inflow Area=1.290 ac
0.18
0.17
0.16
0.15
0.14
0.13
Flow (cfs)

0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 2-yr Duration=5 min, Inten=4.61 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 11

Summary for Subcatchment 1S: POST 1 POND 2

Runoff = 2.81 cfs @ 0.09 hrs, Volume= 0.040 af, Depth= 0.65"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 2-yr Duration=5 min, Inten=4.61 in/hr

Area (ac) C Description


0.010 0.22 LAWN B
0.720 0.86 IMPERVIOUS B
0.730 0.85 Weighted Average
0.730 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 1S: POST 1 POND 2


Hydrograph

Runoff
3
2.81 cfs

PA-Cumberland-Camp Hill 2-yr


Duration=5 min,
Inten=4.61 in/hr
Runoff Area=0.730 ac
2
Runoff Volume=0.040 af
Flow (cfs)

Runoff Depth=0.65"
Tc=5.0 min
C=0.85
1

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 2-yr Duration=5 min, Inten=4.61 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 12

Summary for Subcatchment 2S: POST 1 BYPASS

Runoff = 0.21 cfs @ 0.09 hrs, Volume= 0.003 af, Depth= 0.20"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 2-yr Duration=5 min, Inten=4.61 in/hr

Area (ac) C Description


0.170 0.22 LAWN B
0.010 0.86 IMPERVIOUS
0.180 0.26 Weighted Average
0.180 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 2S: POST 1 BYPASS


Hydrograph

0.23 Runoff
0.22
0.21 cfs
0.21 PA-Cumberland-Camp Hill 2-yr
0.2
0.19 Duration=5 min,
0.18 Inten=4.61 in/hr
0.17
0.16 Runoff Area=0.180 ac
0.15
0.14
Runoff Volume=0.003 af
Flow (cfs)

0.13 Runoff Depth=0.20"


0.12
0.11 Tc=5.0 min
0.1 C=0.26
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 2-yr Duration=5 min, Inten=4.61 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 13

Summary for Subcatchment 5S: POST 2

Runoff = 0.60 cfs @ 0.09 hrs, Volume= 0.008 af, Depth= 0.36"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 2-yr Duration=5 min, Inten=4.61 in/hr

Area (ac) C Description


0.170 0.22 LAWN B
0.110 0.86 IMPERVIOUS
0.280 0.47 Weighted Average
0.280 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 5S: POST 2


Hydrograph

0.65 Runoff
0.60 cfs
0.6
PA-Cumberland-Camp Hill 2-yr
0.55 Duration=5 min,
0.5 Inten=4.61 in/hr
0.45 Runoff Area=0.280 ac
0.4 Runoff Volume=0.008 af
Flow (cfs)

0.35
Runoff Depth=0.36"
Tc=5.0 min
0.3
C=0.47
0.25

0.2

0.15

0.1

0.05

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 2-yr Duration=5 min, Inten=4.61 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 14

Summary for Subcatchment 6S: POST 1 POND 1

Runoff = 1.34 cfs @ 0.09 hrs, Volume= 0.019 af, Depth= 0.60"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 2-yr Duration=5 min, Inten=4.61 in/hr

Area (ac) C Description


0.050 0.22 LAWN B
0.330 0.86 IMPERVIOUS
0.380 0.78 Weighted Average
0.380 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 6S: POST 1 POND 1


Hydrograph

Runoff
1.34 cfs

PA-Cumberland-Camp Hill 2-yr


Duration=5 min,
Inten=4.61 in/hr
1 Runoff Area=0.380 ac
Runoff Volume=0.019 af
Flow (cfs)

Runoff Depth=0.60"
Tc=5.0 min
C=0.78

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 2-yr Duration=5 min, Inten=4.61 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 15

Summary for Pond 3P: POND 2

Inflow Area = 1.110 ac, 0.00% Impervious, Inflow Depth = 0.63" for 2-yr event
Inflow = 3.12 cfs @ 0.09 hrs, Volume= 0.059 af
Outflow = 0.16 cfs @ 0.44 hrs, Volume= 0.059 af, Atten= 95%, Lag= 20.7 min
Primary = 0.16 cfs @ 0.44 hrs, Volume= 0.059 af

Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 398.13' @ 0.44 hrs Surf.Area= 3,992 sf Storage= 2,293 cf

Plug-Flow detention time= 679.2 min calculated for 0.059 af (100% of inflow)
Center-of-Mass det. time= 678.9 min ( 692.8 - 14.0 )

Volume Invert Avail.Storage Storage Description


#1A 396.97' 3,003 cf 31.60'W x 126.33'L x 3.00'H Field A
11,977 cf Overall - 4,470 cf Embedded = 7,507 cf x 40.0% Voids
#2A 397.30' 3,534 cf ADS N-12 24" x 54 Inside #1
Inside= 23.8"W x 23.8"H => 3.10 sf x 20.00'L = 62.0 cf
Outside= 28.0"W x 28.0"H => 3.92 sf x 20.00'L = 78.4 cf
9 Rows of 6 Chambers
29.93' Header x 3.10 sf x 2 = 185.6 cf Inside
6,536 cf Total Available Storage

Storage Group A created with Chamber Wizard

Device Routing Invert Outlet Devices


#1 Primary 396.97' 15.0" Round HDPE Round 15"
L= 4.0' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 396.97' / 396.93' S= 0.0100 '/' Cc= 0.900
n= 0.013, Flow Area= 1.23 sf
#2 Device 1 396.97' 1.0" Vert. Orifice/Grate C= 0.600
#3 Device 1 397.90' 5.2" Vert. Orifice/Grate C= 0.600
#4 Device 1 399.30' 3.7' long Sharp-Crested Rectangular Weir 2 End Contraction(s)

Primary OutFlow Max=0.16 cfs @ 0.44 hrs HW=398.13' (Free Discharge)


1=HDPE Round 15" (Passes 0.16 cfs of 3.34 cfs potential flow)
2=Orifice/Grate (Orifice Controls 0.03 cfs @ 5.09 fps)
3=Orifice/Grate (Orifice Controls 0.13 cfs @ 1.63 fps)
4=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)
POST (small) PA-Cumberland-Camp Hill 2-yr Duration=5 min, Inten=4.61 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 16

Pond 3P: POND 2


Hydrograph

Inflow
3.12 cfs Primary

Inflow Area=1.110 ac
3
Peak Elev=398.13'
Storage=2,293 cf
Flow (cfs)

0.16 cfs

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 2-yr Duration=5 min, Inten=4.61 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 17

Summary for Pond 5P: POND 1

Inflow Area = 0.380 ac, 0.00% Impervious, Inflow Depth = 0.60" for 2-yr event
Inflow = 1.34 cfs @ 0.09 hrs, Volume= 0.019 af
Outflow = 0.80 cfs @ 0.19 hrs, Volume= 0.019 af, Atten= 40%, Lag= 6.1 min
Primary = 0.80 cfs @ 0.19 hrs, Volume= 0.019 af

Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 400.05' @ 0.19 hrs Surf.Area= 1,944 sf Storage= 369 cf

Plug-Flow detention time= 17.3 min calculated for 0.019 af (100% of inflow)
Center-of-Mass det. time= 17.5 min ( 25.8 - 8.3 )

Volume Invert Avail.Storage Storage Description


#1 399.57' 1,890 cf Custom Stage Data (Prismatic)Listed below (Recalc)
4,724 cf Overall x 40.0% Voids

Elevation Surf.Area Inc.Store Cum.Store


(feet) (sq-ft) (cubic-feet) (cubic-feet)
399.57 1,944 0 0
402.00 1,944 4,724 4,724

Device Routing Invert Outlet Devices


#1 Primary 399.57' 15.0" Round HDPE Round 15"
L= 14.3' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 399.57' / 399.44' S= 0.0091 '/' Cc= 0.900
n= 0.013, Flow Area= 1.23 sf

Primary OutFlow Max=0.80 cfs @ 0.19 hrs HW=400.04' (Free Discharge)


1=HDPE Round 15" (Barrel Controls 0.80 cfs @ 2.77 fps)
POST (small) PA-Cumberland-Camp Hill 2-yr Duration=5 min, Inten=4.61 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 18

Pond 5P: POND 1


Hydrograph

Inflow
1.34 cfs Primary

Inflow Area=0.380 ac
Peak Elev=400.05'
Storage=369 cf
1
15.0"
Flow (cfs)

0.80 cfs
Round Culvert
n=0.013
L=14.3'
S=0.0091 '/'

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 2-yr Duration=5 min, Inten=4.61 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 19

Summary for Link 4L: EAST POI

Inflow Area = 1.290 ac, 0.00% Impervious, Inflow Depth > 0.57" for 2-yr event
Inflow = 0.23 cfs @ 0.09 hrs, Volume= 0.062 af
Primary = 0.23 cfs @ 0.09 hrs, Volume= 0.062 af, Atten= 0%, Lag= 0.0 min

Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs

Link 4L: EAST POI


Hydrograph

Inflow
0.25 0.23 cfs Primary
0.24
0.23 cfs
0.23
0.22
Inflow Area=1.290 ac
0.21
0.2
0.19
0.18
0.17
0.16
0.15
Flow (cfs)

0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 5-yr Duration=5 min, Inten=5.42 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 20

Summary for Subcatchment 1S: POST 1 POND 2

Runoff = 3.31 cfs @ 0.09 hrs, Volume= 0.047 af, Depth= 0.77"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 5-yr Duration=5 min, Inten=5.42 in/hr

Area (ac) C Description


0.010 0.22 LAWN B
0.720 0.86 IMPERVIOUS B
0.730 0.85 Weighted Average
0.730 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 1S: POST 1 POND 2


Hydrograph

Runoff
3.31 cfs

PA-Cumberland-Camp Hill 5-yr


3 Duration=5 min,
Inten=5.42 in/hr
Runoff Area=0.730 ac
Runoff Volume=0.047 af
Flow (cfs)

2 Runoff Depth=0.77"
Tc=5.0 min
C=0.85

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 5-yr Duration=5 min, Inten=5.42 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 21

Summary for Subcatchment 2S: POST 1 BYPASS

Runoff = 0.25 cfs @ 0.09 hrs, Volume= 0.004 af, Depth= 0.23"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 5-yr Duration=5 min, Inten=5.42 in/hr

Area (ac) C Description


0.170 0.22 LAWN B
0.010 0.86 IMPERVIOUS
0.180 0.26 Weighted Average
0.180 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 2S: POST 1 BYPASS


Hydrograph

Runoff
0.26
0.25 cfs

0.24
PA-Cumberland-Camp Hill 5-yr
Duration=5 min,
0.22
Inten=5.42 in/hr
0.2
Runoff Area=0.180 ac
0.18
Runoff Volume=0.004 af
0.16
Flow (cfs)

Runoff Depth=0.23"
0.14
Tc=5.0 min
0.12
C=0.26
0.1

0.08

0.06

0.04

0.02

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 5-yr Duration=5 min, Inten=5.42 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 22

Summary for Subcatchment 5S: POST 2

Runoff = 0.70 cfs @ 0.09 hrs, Volume= 0.010 af, Depth= 0.42"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 5-yr Duration=5 min, Inten=5.42 in/hr

Area (ac) C Description


0.170 0.22 LAWN B
0.110 0.86 IMPERVIOUS
0.280 0.47 Weighted Average
0.280 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 5S: POST 2


Hydrograph

Runoff
0.75
0.70 cfs
0.7 PA-Cumberland-Camp Hill 5-yr
0.65 Duration=5 min,
0.6
Inten=5.42 in/hr
0.55
Runoff Area=0.280 ac
0.5
Runoff Volume=0.010 af
0.45
Flow (cfs)

Runoff Depth=0.42"
0.4
Tc=5.0 min
0.35
C=0.47
0.3
0.25
0.2

0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 5-yr Duration=5 min, Inten=5.42 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 23

Summary for Subcatchment 6S: POST 1 POND 1

Runoff = 1.58 cfs @ 0.09 hrs, Volume= 0.022 af, Depth= 0.70"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 5-yr Duration=5 min, Inten=5.42 in/hr

Area (ac) C Description


0.050 0.22 LAWN B
0.330 0.86 IMPERVIOUS
0.380 0.78 Weighted Average
0.380 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 6S: POST 1 POND 1


Hydrograph

Runoff
1.58 cfs

PA-Cumberland-Camp Hill 5-yr


Duration=5 min,
Inten=5.42 in/hr
Runoff Area=0.380 ac
Runoff Volume=0.022 af
Flow (cfs)

1
Runoff Depth=0.70"
Tc=5.0 min
C=0.78

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 5-yr Duration=5 min, Inten=5.42 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 24

Summary for Pond 3P: POND 2

Inflow Area = 1.110 ac, 0.00% Impervious, Inflow Depth = 0.75" for 5-yr event
Inflow = 3.71 cfs @ 0.09 hrs, Volume= 0.069 af
Outflow = 0.29 cfs @ 0.37 hrs, Volume= 0.069 af, Atten= 92%, Lag= 16.8 min
Primary = 0.29 cfs @ 0.37 hrs, Volume= 0.069 af

Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 398.25' @ 0.37 hrs Surf.Area= 3,992 sf Storage= 2,645 cf

Plug-Flow detention time= 596.3 min calculated for 0.069 af (100% of inflow)
Center-of-Mass det. time= 596.1 min ( 609.5 - 13.4 )

Volume Invert Avail.Storage Storage Description


#1A 396.97' 3,003 cf 31.60'W x 126.33'L x 3.00'H Field A
11,977 cf Overall - 4,470 cf Embedded = 7,507 cf x 40.0% Voids
#2A 397.30' 3,534 cf ADS N-12 24" x 54 Inside #1
Inside= 23.8"W x 23.8"H => 3.10 sf x 20.00'L = 62.0 cf
Outside= 28.0"W x 28.0"H => 3.92 sf x 20.00'L = 78.4 cf
9 Rows of 6 Chambers
29.93' Header x 3.10 sf x 2 = 185.6 cf Inside
6,536 cf Total Available Storage

Storage Group A created with Chamber Wizard

Device Routing Invert Outlet Devices


#1 Primary 396.97' 15.0" Round HDPE Round 15"
L= 4.0' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 396.97' / 396.93' S= 0.0100 '/' Cc= 0.900
n= 0.013, Flow Area= 1.23 sf
#2 Device 1 396.97' 1.0" Vert. Orifice/Grate C= 0.600
#3 Device 1 397.90' 5.2" Vert. Orifice/Grate C= 0.600
#4 Device 1 399.30' 3.7' long Sharp-Crested Rectangular Weir 2 End Contraction(s)

Primary OutFlow Max=0.29 cfs @ 0.37 hrs HW=398.25' (Free Discharge)


1=HDPE Round 15" (Passes 0.29 cfs of 3.90 cfs potential flow)
2=Orifice/Grate (Orifice Controls 0.03 cfs @ 5.36 fps)
3=Orifice/Grate (Orifice Controls 0.26 cfs @ 2.02 fps)
4=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)
POST (small) PA-Cumberland-Camp Hill 5-yr Duration=5 min, Inten=5.42 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 25

Pond 3P: POND 2


Hydrograph

Inflow
3.71 cfs Primary
4
Inflow Area=1.110 ac
Peak Elev=398.25'
3
Storage=2,645 cf
Flow (cfs)

0.29 cfs

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 5-yr Duration=5 min, Inten=5.42 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 26

Summary for Pond 5P: POND 1

Inflow Area = 0.380 ac, 0.00% Impervious, Inflow Depth = 0.70" for 5-yr event
Inflow = 1.58 cfs @ 0.09 hrs, Volume= 0.022 af
Outflow = 0.98 cfs @ 0.18 hrs, Volume= 0.022 af, Atten= 38%, Lag= 5.7 min
Primary = 0.98 cfs @ 0.18 hrs, Volume= 0.022 af

Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 400.10' @ 0.18 hrs Surf.Area= 1,944 sf Storage= 414 cf

Plug-Flow detention time= 15.5 min calculated for 0.022 af (100% of inflow)
Center-of-Mass det. time= 15.7 min ( 24.0 - 8.3 )

Volume Invert Avail.Storage Storage Description


#1 399.57' 1,890 cf Custom Stage Data (Prismatic)Listed below (Recalc)
4,724 cf Overall x 40.0% Voids

Elevation Surf.Area Inc.Store Cum.Store


(feet) (sq-ft) (cubic-feet) (cubic-feet)
399.57 1,944 0 0
402.00 1,944 4,724 4,724

Device Routing Invert Outlet Devices


#1 Primary 399.57' 15.0" Round HDPE Round 15"
L= 14.3' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 399.57' / 399.44' S= 0.0091 '/' Cc= 0.900
n= 0.013, Flow Area= 1.23 sf

Primary OutFlow Max=0.98 cfs @ 0.18 hrs HW=400.10' (Free Discharge)


1=HDPE Round 15" (Barrel Controls 0.98 cfs @ 2.90 fps)
POST (small) PA-Cumberland-Camp Hill 5-yr Duration=5 min, Inten=5.42 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 27

Pond 5P: POND 1


Hydrograph

Inflow
1.58 cfs Primary

Inflow Area=0.380 ac
Peak Elev=400.10'
Storage=414 cf
0.98 cfs
15.0"
Flow (cfs)

1
Round Culvert
n=0.013
L=14.3'
S=0.0091 '/'

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 5-yr Duration=5 min, Inten=5.42 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 28

Summary for Link 4L: EAST POI

Inflow Area = 1.290 ac, 0.00% Impervious, Inflow Depth > 0.67" for 5-yr event
Inflow = 0.30 cfs @ 0.30 hrs, Volume= 0.072 af
Primary = 0.30 cfs @ 0.30 hrs, Volume= 0.072 af, Atten= 0%, Lag= 0.0 min

Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs

Link 4L: EAST POI


Hydrograph

Inflow
0.30 cfs Primary
0.32
0.30 cfs
0.3 Inflow Area=1.290 ac
0.28
0.26
0.24
0.22
0.2
Flow (cfs)

0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 10-yr Duration=5 min, Inten=6.05 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 29

Summary for Subcatchment 1S: POST 1 POND 2

Runoff = 3.69 cfs @ 0.09 hrs, Volume= 0.052 af, Depth= 0.86"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 10-yr Duration=5 min, Inten=6.05 in/hr

Area (ac) C Description


0.010 0.22 LAWN B
0.720 0.86 IMPERVIOUS B
0.730 0.85 Weighted Average
0.730 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 1S: POST 1 POND 2


Hydrograph

4 Runoff
3.69 cfs

PA-Cumberland-Camp Hill 10-yr


Duration=5 min,
Inten=6.05 in/hr
3
Runoff Area=0.730 ac
Runoff Volume=0.052 af
Runoff Depth=0.86"
Flow (cfs)

2 Tc=5.0 min
C=0.85

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 10-yr Duration=5 min, Inten=6.05 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 30

Summary for Subcatchment 2S: POST 1 BYPASS

Runoff = 0.28 cfs @ 0.09 hrs, Volume= 0.004 af, Depth= 0.26"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 10-yr Duration=5 min, Inten=6.05 in/hr

Area (ac) C Description


0.170 0.22 LAWN B
0.010 0.86 IMPERVIOUS
0.180 0.26 Weighted Average
0.180 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 2S: POST 1 BYPASS


Hydrograph

Runoff
0.3
0.28 cfs
0.28 PA-Cumberland-Camp Hill 10-yr
0.26 Duration=5 min,
0.24
Inten=6.05 in/hr
0.22
Runoff Area=0.180 ac
0.2
Runoff Volume=0.004 af
0.18
Runoff Depth=0.26"
Flow (cfs)

0.16
Tc=5.0 min
0.14
C=0.26
0.12

0.1
0.08
0.06

0.04
0.02
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 10-yr Duration=5 min, Inten=6.05 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 31

Summary for Subcatchment 5S: POST 2

Runoff = 0.78 cfs @ 0.09 hrs, Volume= 0.011 af, Depth= 0.47"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 10-yr Duration=5 min, Inten=6.05 in/hr

Area (ac) C Description


0.170 0.22 LAWN B
0.110 0.86 IMPERVIOUS
0.280 0.47 Weighted Average
0.280 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 5S: POST 2


Hydrograph

0.85 Runoff
0.78 cfs
0.8
PA-Cumberland-Camp Hill 10-yr
0.75
0.7
Duration=5 min,
0.65 Inten=6.05 in/hr
0.6 Runoff Area=0.280 ac
0.55 Runoff Volume=0.011 af
0.5 Runoff Depth=0.47"
Flow (cfs)

0.45
Tc=5.0 min
0.4
C=0.47
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 10-yr Duration=5 min, Inten=6.05 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 32

Summary for Subcatchment 6S: POST 1 POND 1

Runoff = 1.76 cfs @ 0.09 hrs, Volume= 0.025 af, Depth= 0.79"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 10-yr Duration=5 min, Inten=6.05 in/hr

Area (ac) C Description


0.050 0.22 LAWN B
0.330 0.86 IMPERVIOUS
0.380 0.78 Weighted Average
0.380 100.00% Pervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 6S: POST 1 POND 1


Hydrograph

Runoff
1.76 cfs

PA-Cumberland-Camp Hill 10-yr


Duration=5 min,
Inten=6.05 in/hr
Runoff Area=0.380 ac
Runoff Volume=0.025 af
Runoff Depth=0.79"
Flow (cfs)

1 Tc=5.0 min
C=0.78

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 10-yr Duration=5 min, Inten=6.05 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 33

Summary for Pond 3P: POND 2

Inflow Area = 1.110 ac, 0.00% Impervious, Inflow Depth = 0.83" for 10-yr event
Inflow = 4.16 cfs @ 0.09 hrs, Volume= 0.077 af
Outflow = 0.37 cfs @ 0.36 hrs, Volume= 0.077 af, Atten= 91%, Lag= 16.0 min
Primary = 0.37 cfs @ 0.36 hrs, Volume= 0.077 af

Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 398.35' @ 0.36 hrs Surf.Area= 3,992 sf Storage= 2,922 cf

Plug-Flow detention time= 546.1 min calculated for 0.077 af (100% of inflow)
Center-of-Mass det. time= 545.4 min ( 558.5 - 13.1 )

Volume Invert Avail.Storage Storage Description


#1A 396.97' 3,003 cf 31.60'W x 126.33'L x 3.00'H Field A
11,977 cf Overall - 4,470 cf Embedded = 7,507 cf x 40.0% Voids
#2A 397.30' 3,534 cf ADS N-12 24" x 54 Inside #1
Inside= 23.8"W x 23.8"H => 3.10 sf x 20.00'L = 62.0 cf
Outside= 28.0"W x 28.0"H => 3.92 sf x 20.00'L = 78.4 cf
9 Rows of 6 Chambers
29.93' Header x 3.10 sf x 2 = 185.6 cf Inside
6,536 cf Total Available Storage

Storage Group A created with Chamber Wizard

Device Routing Invert Outlet Devices


#1 Primary 396.97' 15.0" Round HDPE Round 15"
L= 4.0' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 396.97' / 396.93' S= 0.0100 '/' Cc= 0.900
n= 0.013, Flow Area= 1.23 sf
#2 Device 1 396.97' 1.0" Vert. Orifice/Grate C= 0.600
#3 Device 1 397.90' 5.2" Vert. Orifice/Grate C= 0.600
#4 Device 1 399.30' 3.7' long Sharp-Crested Rectangular Weir 2 End Contraction(s)

Primary OutFlow Max=0.37 cfs @ 0.36 hrs HW=398.35' (Free Discharge)


1=HDPE Round 15" (Passes 0.37 cfs of 4.31 cfs potential flow)
2=Orifice/Grate (Orifice Controls 0.03 cfs @ 5.57 fps)
3=Orifice/Grate (Orifice Controls 0.34 cfs @ 2.33 fps)
4=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)
POST (small) PA-Cumberland-Camp Hill 10-yr Duration=5 min, Inten=6.05 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 34

Pond 3P: POND 2


Hydrograph

Inflow
4.16 cfs Primary

Inflow Area=1.110 ac
4
Peak Elev=398.35'
Storage=2,922 cf
3
Flow (cfs)

0.37 cfs

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 10-yr Duration=5 min, Inten=6.05 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 35

Summary for Pond 5P: POND 1

Inflow Area = 0.380 ac, 0.00% Impervious, Inflow Depth = 0.79" for 10-yr event
Inflow = 1.76 cfs @ 0.09 hrs, Volume= 0.025 af
Outflow = 1.12 cfs @ 0.18 hrs, Volume= 0.025 af, Atten= 37%, Lag= 5.5 min
Primary = 1.12 cfs @ 0.18 hrs, Volume= 0.025 af

Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 400.14' @ 0.18 hrs Surf.Area= 1,944 sf Storage= 446 cf

Plug-Flow detention time= 14.4 min calculated for 0.025 af (100% of inflow)
Center-of-Mass det. time= 14.6 min ( 22.9 - 8.3 )

Volume Invert Avail.Storage Storage Description


#1 399.57' 1,890 cf Custom Stage Data (Prismatic)Listed below (Recalc)
4,724 cf Overall x 40.0% Voids

Elevation Surf.Area Inc.Store Cum.Store


(feet) (sq-ft) (cubic-feet) (cubic-feet)
399.57 1,944 0 0
402.00 1,944 4,724 4,724

Device Routing Invert Outlet Devices


#1 Primary 399.57' 15.0" Round HDPE Round 15"
L= 14.3' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 399.57' / 399.44' S= 0.0091 '/' Cc= 0.900
n= 0.013, Flow Area= 1.23 sf

Primary OutFlow Max=1.12 cfs @ 0.18 hrs HW=400.14' (Free Discharge)


1=HDPE Round 15" (Barrel Controls 1.12 cfs @ 2.98 fps)
POST (small) PA-Cumberland-Camp Hill 10-yr Duration=5 min, Inten=6.05 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 36

Pond 5P: POND 1


Hydrograph

Inflow
1.76 cfs Primary

Inflow Area=0.380 ac
Peak Elev=400.14'
Storage=446 cf
1.12 cfs
15.0"
Flow (cfs)

1
Round Culvert
n=0.013
L=14.3'
S=0.0091 '/'

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (small) PA-Cumberland-Camp Hill 10-yr Duration=5 min, Inten=6.05 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 37

Summary for Link 4L: EAST POI

Inflow Area = 1.290 ac, 0.00% Impervious, Inflow Depth > 0.75" for 10-yr event
Inflow = 0.40 cfs @ 0.29 hrs, Volume= 0.081 af
Primary = 0.40 cfs @ 0.29 hrs, Volume= 0.081 af, Atten= 0%, Lag= 0.0 min

Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs

Link 4L: EAST POI


Hydrograph

Inflow
0.44 0.40 cfs Primary
0.420.40 cfs
0.4 Inflow Area=1.290 ac
0.38
0.36
0.34
0.32
0.3
0.28
0.26
Flow (cfs)

0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
6S

POST 1 POND 1

5P

POND 1
1S 2S 5S

POST 1 POND 2 POST 1 BYPASS POST 2

3P

POND 2

4L

EAST POI

Subcat Reach Pond Link Routing Diagram for POST (large)


Prepared by Williams Site Civil, LLC, Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC
POST (large) PA-Cumberland-Camp Hill 25-yr Duration=5 min, Inten=6.82 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 2

Summary for Subcatchment 1S: POST 1 POND 2

Runoff = 4.65 cfs @ 0.09 hrs, Volume= 0.066 af, Depth= 1.08"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 25-yr Duration=5 min, Inten=6.82 in/hr

Area (ac) C Description


0.010 0.28 LAWN B
0.720 0.96 IMPERVIOUS
0.730 0.95 Weighted Average
0.010 1.37% Pervious Area
0.720 98.63% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 1S: POST 1 POND 2


Hydrograph

Runoff
5
4.65 cfs

PA-Cumberland-Camp Hill 25-yr


Duration=5 min,
4 Inten=6.82 in/hr
Runoff Area=0.730 ac
Runoff Volume=0.066 af
3
Runoff Depth=1.08"
Flow (cfs)

Tc=5.0 min
C=0.95
2

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 25-yr Duration=5 min, Inten=6.82 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 3

Summary for Subcatchment 2S: POST 1 BYPASS

Runoff = 0.39 cfs @ 0.09 hrs, Volume= 0.005 af, Depth= 0.36"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 25-yr Duration=5 min, Inten=6.82 in/hr

Area (ac) C Description


0.170 0.28 LAWN B
0.010 0.96 IMPERVIOUS
0.180 0.32 Weighted Average
0.170 94.44% Pervious Area
0.010 5.56% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 2S: POST 1 BYPASS


Hydrograph

0.42 Runoff
0.4
0.39 cfs

0.38 PA-Cumberland-Camp Hill 25-yr


0.36 Duration=5 min,
0.34
0.32 Inten=6.82 in/hr
0.3 Runoff Area=0.180 ac
0.28
0.26
Runoff Volume=0.005 af
Runoff Depth=0.36"
Flow (cfs)

0.24
0.22 Tc=5.0 min
0.2
0.18 C=0.32
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 25-yr Duration=5 min, Inten=6.82 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 4

Summary for Subcatchment 5S: POST 2

Runoff = 1.03 cfs @ 0.09 hrs, Volume= 0.015 af, Depth= 0.62"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 25-yr Duration=5 min, Inten=6.82 in/hr

Area (ac) C Description


0.170 0.28 LAWN B
0.110 0.96 IMPERVIOUS
0.280 0.55 Weighted Average
0.170 60.71% Pervious Area
0.110 39.29% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 5S: POST 2


Hydrograph

Runoff
1.03 cfs

1
PA-Cumberland-Camp Hill 25-yr
Duration=5 min,
Inten=6.82 in/hr
Runoff Area=0.280 ac
Runoff Volume=0.015 af
Runoff Depth=0.62"
Flow (cfs)

Tc=5.0 min
C=0.55

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 25-yr Duration=5 min, Inten=6.82 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 5

Summary for Subcatchment 6S: POST 1 POND 1

Runoff = 2.22 cfs @ 0.09 hrs, Volume= 0.031 af, Depth= 0.99"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 25-yr Duration=5 min, Inten=6.82 in/hr

Area (ac) C Description


0.050 0.28 LAWN B
0.330 0.96 IMPERVIOUS
0.380 0.87 Weighted Average
0.050 13.16% Pervious Area
0.330 86.84% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 6S: POST 1 POND 1


Hydrograph

Runoff
2.22 cfs

PA-Cumberland-Camp Hill 25-yr


2 Duration=5 min,
Inten=6.82 in/hr
Runoff Area=0.380 ac
Runoff Volume=0.031 af
Runoff Depth=0.99"
Flow (cfs)

Tc=5.0 min
C=0.87
1

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 25-yr Duration=5 min, Inten=6.82 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 6

Summary for Pond 3P: POND 2

Inflow Area = 1.110 ac, 94.59% Impervious, Inflow Depth = 1.05" for 25-yr event
Inflow = 5.33 cfs @ 0.10 hrs, Volume= 0.097 af
Outflow = 0.53 cfs @ 0.34 hrs, Volume= 0.097 af, Atten= 90%, Lag= 14.8 min
Primary = 0.53 cfs @ 0.34 hrs, Volume= 0.097 af

Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 398.60' @ 0.34 hrs Surf.Area= 3,992 sf Storage= 3,644 cf

Plug-Flow detention time= 455.1 min calculated for 0.097 af (100% of inflow)
Center-of-Mass det. time= 454.6 min ( 467.0 - 12.4 )

Volume Invert Avail.Storage Storage Description


#1A 396.97' 3,003 cf 31.60'W x 126.33'L x 3.00'H Field A
11,977 cf Overall - 4,470 cf Embedded = 7,507 cf x 40.0% Voids
#2A 397.30' 3,534 cf ADS N-12 24" x 54 Inside #1
Inside= 23.8"W x 23.8"H => 3.10 sf x 20.00'L = 62.0 cf
Outside= 28.0"W x 28.0"H => 3.92 sf x 20.00'L = 78.4 cf
9 Rows of 6 Chambers
29.93' Header x 3.10 sf x 2 = 185.6 cf Inside
6,536 cf Total Available Storage

Storage Group A created with Chamber Wizard

Device Routing Invert Outlet Devices


#1 Primary 396.97' 15.0" Round HDPE Round 15"
L= 4.0' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 396.97' / 396.93' S= 0.0100 '/' Cc= 0.900
n= 0.013, Flow Area= 1.23 sf
#2 Device 1 396.97' 1.0" Vert. Orifice/Grate C= 0.600
#3 Device 1 397.90' 5.2" Vert. Orifice/Grate C= 0.600
#4 Device 1 399.30' 3.7' long Sharp-Crested Rectangular Weir 2 End Contraction(s)

Primary OutFlow Max=0.53 cfs @ 0.34 hrs HW=398.60' (Free Discharge)


1=HDPE Round 15" (Passes 0.53 cfs of 5.21 cfs potential flow)
2=Orifice/Grate (Orifice Controls 0.03 cfs @ 6.07 fps)
3=Orifice/Grate (Orifice Controls 0.49 cfs @ 3.35 fps)
4=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)
POST (large) PA-Cumberland-Camp Hill 25-yr Duration=5 min, Inten=6.82 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 7

Pond 3P: POND 2


Hydrograph

Inflow
5.33 cfs Primary

Inflow Area=1.110 ac
5
Peak Elev=398.60'
4
Storage=3,644 cf
Flow (cfs)

1
0.53 cfs

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 25-yr Duration=5 min, Inten=6.82 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 8

Summary for Pond 5P: POND 1

Inflow Area = 0.380 ac, 86.84% Impervious, Inflow Depth = 0.99" for 25-yr event
Inflow = 2.22 cfs @ 0.09 hrs, Volume= 0.031 af
Outflow = 1.47 cfs @ 0.17 hrs, Volume= 0.031 af, Atten= 34%, Lag= 5.1 min
Primary = 1.47 cfs @ 0.17 hrs, Volume= 0.031 af

Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 400.24' @ 0.17 hrs Surf.Area= 1,944 sf Storage= 522 cf

Plug-Flow detention time= 12.4 min calculated for 0.031 af (100% of inflow)
Center-of-Mass det. time= 12.6 min ( 20.9 - 8.3 )

Volume Invert Avail.Storage Storage Description


#1 399.57' 1,890 cf Custom Stage Data (Prismatic)Listed below (Recalc)
4,724 cf Overall x 40.0% Voids

Elevation Surf.Area Inc.Store Cum.Store


(feet) (sq-ft) (cubic-feet) (cubic-feet)
399.57 1,944 0 0
402.00 1,944 4,724 4,724

Device Routing Invert Outlet Devices


#1 Primary 399.57' 15.0" Round HDPE Round 15"
L= 14.3' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 399.57' / 399.44' S= 0.0091 '/' Cc= 0.900
n= 0.013, Flow Area= 1.23 sf

Primary OutFlow Max=1.47 cfs @ 0.17 hrs HW=400.24' (Free Discharge)


1=HDPE Round 15" (Barrel Controls 1.47 cfs @ 3.17 fps)
POST (large) PA-Cumberland-Camp Hill 25-yr Duration=5 min, Inten=6.82 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 9

Pond 5P: POND 1


Hydrograph

Inflow
2.22 cfs Primary

Inflow Area=0.380 ac
2 Peak Elev=400.24'
Storage=522 cf
1.47 cfs 15.0"
Flow (cfs)

Round Culvert
1
n=0.013
L=14.3'
S=0.0091 '/'

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 25-yr Duration=5 min, Inten=6.82 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 10

Summary for Link 4L: EAST POI

Inflow Area = 1.290 ac, 82.17% Impervious, Inflow Depth > 0.95" for 25-yr event
Inflow = 0.59 cfs @ 0.26 hrs, Volume= 0.102 af
Primary = 0.59 cfs @ 0.26 hrs, Volume= 0.102 af, Atten= 0%, Lag= 0.0 min

Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs

Link 4L: EAST POI


Hydrograph

Inflow
0.65 0.59 cfs Primary
0.59 cfs
0.6 Inflow Area=1.290 ac
0.55

0.5

0.45

0.4
Flow (cfs)

0.35

0.3

0.25

0.2

0.15

0.1

0.05

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 50-yr Duration=5 min, Inten=7.38 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 11

Summary for Subcatchment 1S: POST 1 POND 2

Runoff = 5.03 cfs @ 0.09 hrs, Volume= 0.071 af, Depth= 1.17"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 50-yr Duration=5 min, Inten=7.38 in/hr

Area (ac) C Description


0.010 0.28 LAWN B
0.720 0.96 IMPERVIOUS
0.730 0.95 Weighted Average
0.010 1.37% Pervious Area
0.720 98.63% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 1S: POST 1 POND 2


Hydrograph

Runoff
5.03 cfs
5 PA-Cumberland-Camp Hill 50-yr
Duration=5 min,
Inten=7.38 in/hr
4
Runoff Area=0.730 ac
Runoff Volume=0.071 af
Runoff Depth=1.17"
Flow (cfs)

3
Tc=5.0 min
C=0.95
2

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 50-yr Duration=5 min, Inten=7.38 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 12

Summary for Subcatchment 2S: POST 1 BYPASS

Runoff = 0.42 cfs @ 0.09 hrs, Volume= 0.006 af, Depth= 0.39"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 50-yr Duration=5 min, Inten=7.38 in/hr

Area (ac) C Description


0.170 0.28 LAWN B
0.010 0.96 IMPERVIOUS
0.180 0.32 Weighted Average
0.170 94.44% Pervious Area
0.010 5.56% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 2S: POST 1 BYPASS


Hydrograph

0.46 Runoff
0.44
0.42 cfs
0.42 PA-Cumberland-Camp Hill 50-yr
0.4
0.38 Duration=5 min,
0.36 Inten=7.38 in/hr
0.34
0.32 Runoff Area=0.180 ac
0.3
Runoff Volume=0.006 af
0.28
Runoff Depth=0.39"
Flow (cfs)

0.26
0.24
Tc=5.0 min
0.22
0.2 C=0.32
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 50-yr Duration=5 min, Inten=7.38 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 13

Summary for Subcatchment 5S: POST 2

Runoff = 1.12 cfs @ 0.09 hrs, Volume= 0.016 af, Depth= 0.68"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 50-yr Duration=5 min, Inten=7.38 in/hr

Area (ac) C Description


0.170 0.28 LAWN B
0.110 0.96 IMPERVIOUS
0.280 0.55 Weighted Average
0.170 60.71% Pervious Area
0.110 39.29% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 5S: POST 2


Hydrograph

Runoff
1.12 cfs

PA-Cumberland-Camp Hill 50-yr


1
Duration=5 min,
Inten=7.38 in/hr
Runoff Area=0.280 ac
Runoff Volume=0.016 af
Runoff Depth=0.68"
Flow (cfs)

Tc=5.0 min
C=0.55

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 50-yr Duration=5 min, Inten=7.38 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 14

Summary for Subcatchment 6S: POST 1 POND 1

Runoff = 2.40 cfs @ 0.09 hrs, Volume= 0.034 af, Depth= 1.07"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 50-yr Duration=5 min, Inten=7.38 in/hr

Area (ac) C Description


0.050 0.28 LAWN B
0.330 0.96 IMPERVIOUS
0.380 0.87 Weighted Average
0.050 13.16% Pervious Area
0.330 86.84% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 6S: POST 1 POND 1


Hydrograph

Runoff
2.40 cfs

PA-Cumberland-Camp Hill 50-yr


Duration=5 min,
2 Inten=7.38 in/hr
Runoff Area=0.380 ac
Runoff Volume=0.034 af
Runoff Depth=1.07"
Flow (cfs)

Tc=5.0 min
C=0.87
1

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 50-yr Duration=5 min, Inten=7.38 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 15

Summary for Pond 3P: POND 2

Inflow Area = 1.110 ac, 94.59% Impervious, Inflow Depth = 1.13" for 50-yr event
Inflow = 5.81 cfs @ 0.10 hrs, Volume= 0.105 af
Outflow = 0.58 cfs @ 0.34 hrs, Volume= 0.105 af, Atten= 90%, Lag= 14.6 min
Primary = 0.58 cfs @ 0.34 hrs, Volume= 0.105 af

Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 398.70' @ 0.34 hrs Surf.Area= 3,992 sf Storage= 3,941 cf

Plug-Flow detention time= 427.8 min calculated for 0.105 af (100% of inflow)
Center-of-Mass det. time= 427.8 min ( 440.0 - 12.2 )

Volume Invert Avail.Storage Storage Description


#1A 396.97' 3,003 cf 31.60'W x 126.33'L x 3.00'H Field A
11,977 cf Overall - 4,470 cf Embedded = 7,507 cf x 40.0% Voids
#2A 397.30' 3,534 cf ADS N-12 24" x 54 Inside #1
Inside= 23.8"W x 23.8"H => 3.10 sf x 20.00'L = 62.0 cf
Outside= 28.0"W x 28.0"H => 3.92 sf x 20.00'L = 78.4 cf
9 Rows of 6 Chambers
29.93' Header x 3.10 sf x 2 = 185.6 cf Inside
6,536 cf Total Available Storage

Storage Group A created with Chamber Wizard

Device Routing Invert Outlet Devices


#1 Primary 396.97' 15.0" Round HDPE Round 15"
L= 4.0' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 396.97' / 396.93' S= 0.0100 '/' Cc= 0.900
n= 0.013, Flow Area= 1.23 sf
#2 Device 1 396.97' 1.0" Vert. Orifice/Grate C= 0.600
#3 Device 1 397.90' 5.2" Vert. Orifice/Grate C= 0.600
#4 Device 1 399.30' 3.7' long Sharp-Crested Rectangular Weir 2 End Contraction(s)

Primary OutFlow Max=0.58 cfs @ 0.34 hrs HW=398.70' (Free Discharge)


1=HDPE Round 15" (Passes 0.58 cfs of 5.65 cfs potential flow)
2=Orifice/Grate (Orifice Controls 0.03 cfs @ 6.26 fps)
3=Orifice/Grate (Orifice Controls 0.54 cfs @ 3.69 fps)
4=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)
POST (large) PA-Cumberland-Camp Hill 50-yr Duration=5 min, Inten=7.38 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 16

Pond 3P: POND 2


Hydrograph

Inflow
5.81 cfs Primary
6
Inflow Area=1.110 ac
5
Peak Elev=398.70'
Storage=3,941 cf
4
Flow (cfs)

1
0.58 cfs

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 50-yr Duration=5 min, Inten=7.38 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 17

Summary for Pond 5P: POND 1

Inflow Area = 0.380 ac, 86.84% Impervious, Inflow Depth = 1.07" for 50-yr event
Inflow = 2.40 cfs @ 0.09 hrs, Volume= 0.034 af
Outflow = 1.61 cfs @ 0.17 hrs, Volume= 0.034 af, Atten= 33%, Lag= 4.9 min
Primary = 1.61 cfs @ 0.17 hrs, Volume= 0.034 af

Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 400.28' @ 0.17 hrs Surf.Area= 1,944 sf Storage= 551 cf

Plug-Flow detention time= 11.8 min calculated for 0.034 af (100% of inflow)
Center-of-Mass det. time= 11.9 min ( 20.3 - 8.3 )

Volume Invert Avail.Storage Storage Description


#1 399.57' 1,890 cf Custom Stage Data (Prismatic)Listed below (Recalc)
4,724 cf Overall x 40.0% Voids

Elevation Surf.Area Inc.Store Cum.Store


(feet) (sq-ft) (cubic-feet) (cubic-feet)
399.57 1,944 0 0
402.00 1,944 4,724 4,724

Device Routing Invert Outlet Devices


#1 Primary 399.57' 15.0" Round HDPE Round 15"
L= 14.3' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 399.57' / 399.44' S= 0.0091 '/' Cc= 0.900
n= 0.013, Flow Area= 1.23 sf

Primary OutFlow Max=1.61 cfs @ 0.17 hrs HW=400.28' (Free Discharge)


1=HDPE Round 15" (Barrel Controls 1.61 cfs @ 3.24 fps)
POST (large) PA-Cumberland-Camp Hill 50-yr Duration=5 min, Inten=7.38 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 18

Pond 5P: POND 1


Hydrograph

Inflow
2.40 cfs Primary

Inflow Area=0.380 ac
Peak Elev=400.28'
2
Storage=551 cf
1.61 cfs
15.0"
Flow (cfs)

Round Culvert
n=0.013
1
L=14.3'
S=0.0091 '/'

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 50-yr Duration=5 min, Inten=7.38 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 19

Summary for Link 4L: EAST POI

Inflow Area = 1.290 ac, 82.17% Impervious, Inflow Depth > 1.03" for 50-yr event
Inflow = 0.66 cfs @ 0.25 hrs, Volume= 0.111 af
Primary = 0.66 cfs @ 0.25 hrs, Volume= 0.111 af, Atten= 0%, Lag= 0.0 min

Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs

Link 4L: EAST POI


Hydrograph

Inflow
0.66 cfs Primary
0.70.66 cfs
0.65
Inflow Area=1.290 ac
0.6

0.55

0.5
0.45
Flow (cfs)

0.4
0.35

0.3
0.25

0.2
0.15

0.1

0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 100-yr Duration=5 min, Inten=7.99 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 20

Summary for Subcatchment 1S: POST 1 POND 2

Runoff = 5.45 cfs @ 0.09 hrs, Volume= 0.077 af, Depth= 1.26"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 100-yr Duration=5 min, Inten=7.99 in/hr

Area (ac) C Description


0.010 0.28 LAWN B
0.720 0.96 IMPERVIOUS
0.730 0.95 Weighted Average
0.010 1.37% Pervious Area
0.720 98.63% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 1S: POST 1 POND 2


Hydrograph

6 Runoff
5.45 cfs

PA-Cumberland-Camp Hill 100-yr


5 Duration=5 min,
Inten=7.99 in/hr
Runoff Area=0.730 ac
4
Runoff Volume=0.077 af
Runoff Depth=1.26"
Flow (cfs)

3 Tc=5.0 min
C=0.95

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 100-yr Duration=5 min, Inten=7.99 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 21

Summary for Subcatchment 2S: POST 1 BYPASS

Runoff = 0.45 cfs @ 0.09 hrs, Volume= 0.006 af, Depth= 0.43"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 100-yr Duration=5 min, Inten=7.99 in/hr

Area (ac) C Description


0.170 0.28 LAWN B
0.010 0.96 IMPERVIOUS
0.180 0.32 Weighted Average
0.170 94.44% Pervious Area
0.010 5.56% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 2S: POST 1 BYPASS


Hydrograph

0.5 Runoff
0.48
0.45 cfs
0.46
0.44 PA-Cumberland-Camp Hill 100-yr
0.42 Duration=5 min,
0.4
0.38 Inten=7.99 in/hr
0.36
0.34
Runoff Area=0.180 ac
0.32 Runoff Volume=0.006 af
0.3
Runoff Depth=0.43"
Flow (cfs)

0.28
0.26
0.24
Tc=5.0 min
0.22 C=0.32
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 100-yr Duration=5 min, Inten=7.99 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 22

Summary for Subcatchment 5S: POST 2

Runoff = 1.21 cfs @ 0.09 hrs, Volume= 0.017 af, Depth= 0.73"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 100-yr Duration=5 min, Inten=7.99 in/hr

Area (ac) C Description


0.170 0.28 LAWN B
0.110 0.96 IMPERVIOUS
0.280 0.55 Weighted Average
0.170 60.71% Pervious Area
0.110 39.29% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 5S: POST 2


Hydrograph

Runoff
1.21 cfs

PA-Cumberland-Camp Hill 100-yr


Duration=5 min,
1 Inten=7.99 in/hr
Runoff Area=0.280 ac
Runoff Volume=0.017 af
Runoff Depth=0.73"
Flow (cfs)

Tc=5.0 min
C=0.55

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 100-yr Duration=5 min, Inten=7.99 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 23

Summary for Subcatchment 6S: POST 1 POND 1

Runoff = 2.60 cfs @ 0.09 hrs, Volume= 0.037 af, Depth= 1.16"

Runoff by Rational method, Rise/Fall=1.0/3.0 xTc, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
PA-Cumberland-Camp Hill 100-yr Duration=5 min, Inten=7.99 in/hr

Area (ac) C Description


0.050 0.28 LAWN B
0.330 0.96 IMPERVIOUS
0.380 0.87 Weighted Average
0.050 13.16% Pervious Area
0.330 86.84% Impervious Area

Tc Length Slope Velocity Capacity Description


(min) (feet) (ft/ft) (ft/sec) (cfs)
5.0 Direct Entry, MINIMUM

Subcatchment 6S: POST 1 POND 1


Hydrograph

Runoff
2.60 cfs

PA-Cumberland-Camp Hill 100-yr


Duration=5 min,
Inten=7.99 in/hr
2 Runoff Area=0.380 ac
Runoff Volume=0.037 af
Runoff Depth=1.16"
Flow (cfs)

Tc=5.0 min
C=0.87
1

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 100-yr Duration=5 min, Inten=7.99 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 24

Summary for Pond 3P: POND 2

Inflow Area = 1.110 ac, 94.59% Impervious, Inflow Depth = 1.23" for 100-yr event
Inflow = 6.33 cfs @ 0.10 hrs, Volume= 0.114 af
Outflow = 0.63 cfs @ 0.34 hrs, Volume= 0.113 af, Atten= 90%, Lag= 14.5 min
Primary = 0.63 cfs @ 0.34 hrs, Volume= 0.113 af

Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 398.82' @ 0.34 hrs Surf.Area= 3,992 sf Storage= 4,267 cf

Plug-Flow detention time= 403.6 min calculated for 0.113 af (100% of inflow)
Center-of-Mass det. time= 403.2 min ( 415.2 - 12.0 )

Volume Invert Avail.Storage Storage Description


#1A 396.97' 3,003 cf 31.60'W x 126.33'L x 3.00'H Field A
11,977 cf Overall - 4,470 cf Embedded = 7,507 cf x 40.0% Voids
#2A 397.30' 3,534 cf ADS N-12 24" x 54 Inside #1
Inside= 23.8"W x 23.8"H => 3.10 sf x 20.00'L = 62.0 cf
Outside= 28.0"W x 28.0"H => 3.92 sf x 20.00'L = 78.4 cf
9 Rows of 6 Chambers
29.93' Header x 3.10 sf x 2 = 185.6 cf Inside
6,536 cf Total Available Storage

Storage Group A created with Chamber Wizard

Device Routing Invert Outlet Devices


#1 Primary 396.97' 15.0" Round HDPE Round 15"
L= 4.0' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 396.97' / 396.93' S= 0.0100 '/' Cc= 0.900
n= 0.013, Flow Area= 1.23 sf
#2 Device 1 396.97' 1.0" Vert. Orifice/Grate C= 0.600
#3 Device 1 397.90' 5.2" Vert. Orifice/Grate C= 0.600
#4 Device 1 399.30' 3.7' long Sharp-Crested Rectangular Weir 2 End Contraction(s)

Primary OutFlow Max=0.63 cfs @ 0.34 hrs HW=398.82' (Free Discharge)


1=HDPE Round 15" (Passes 0.63 cfs of 6.24 cfs potential flow)
2=Orifice/Grate (Orifice Controls 0.04 cfs @ 6.47 fps)
3=Orifice/Grate (Orifice Controls 0.60 cfs @ 4.04 fps)
4=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)
POST (large) PA-Cumberland-Camp Hill 100-yr Duration=5 min, Inten=7.99 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 25

Pond 3P: POND 2


Hydrograph

Inflow
7 6.33 cfs Primary

Inflow Area=1.110 ac
6
Peak Elev=398.82'
5 Storage=4,267 cf
Flow (cfs)

10.63 cfs

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 100-yr Duration=5 min, Inten=7.99 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 26

Summary for Pond 5P: POND 1

Inflow Area = 0.380 ac, 86.84% Impervious, Inflow Depth = 1.16" for 100-yr event
Inflow = 2.60 cfs @ 0.09 hrs, Volume= 0.037 af
Outflow = 1.77 cfs @ 0.17 hrs, Volume= 0.037 af, Atten= 32%, Lag= 4.8 min
Primary = 1.77 cfs @ 0.17 hrs, Volume= 0.037 af

Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs
Peak Elev= 400.32' @ 0.17 hrs Surf.Area= 1,944 sf Storage= 583 cf

Plug-Flow detention time= 11.2 min calculated for 0.037 af (100% of inflow)
Center-of-Mass det. time= 11.3 min ( 19.7 - 8.3 )

Volume Invert Avail.Storage Storage Description


#1 399.57' 1,890 cf Custom Stage Data (Prismatic)Listed below (Recalc)
4,724 cf Overall x 40.0% Voids

Elevation Surf.Area Inc.Store Cum.Store


(feet) (sq-ft) (cubic-feet) (cubic-feet)
399.57 1,944 0 0
402.00 1,944 4,724 4,724

Device Routing Invert Outlet Devices


#1 Primary 399.57' 15.0" Round HDPE Round 15"
L= 14.3' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 399.57' / 399.44' S= 0.0091 '/' Cc= 0.900
n= 0.013, Flow Area= 1.23 sf

Primary OutFlow Max=1.77 cfs @ 0.17 hrs HW=400.32' (Free Discharge)


1=HDPE Round 15" (Barrel Controls 1.77 cfs @ 3.31 fps)
POST (large) PA-Cumberland-Camp Hill 100-yr Duration=5 min, Inten=7.99 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 27

Pond 5P: POND 1


Hydrograph

Inflow
2.60 cfs Primary

Inflow Area=0.380 ac
Peak Elev=400.32'
2
Storage=583 cf
1.77 cfs
15.0"
Flow (cfs)

Round Culvert
n=0.013
1 L=14.3'
S=0.0091 '/'

0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
POST (large) PA-Cumberland-Camp Hill 100-yr Duration=5 min, Inten=7.99 in/hr
Prepared by Williams Site Civil, LLC Printed 7/29/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC Page 28

Summary for Link 4L: EAST POI

Inflow Area = 1.290 ac, 82.17% Impervious, Inflow Depth > 1.12" for 100-yr event
Inflow = 0.72 cfs @ 0.24 hrs, Volume= 0.120 af
Primary = 0.72 cfs @ 0.24 hrs, Volume= 0.120 af, Atten= 0%, Lag= 0.0 min

Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs

Link 4L: EAST POI


Hydrograph

Inflow
0.8 0.72 cfs Primary
0.750.72 cfs
Inflow Area=1.290 ac
0.7
0.65
0.6
0.55
0.5
Flow (cfs)

0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72
Time (hours)
APPENDIX E

_______________________________________

BASIN DETAIL CALCULATIONS


_______________________________________
Weir Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Wednesday, Jul 24 2019

Emergency Spillway

Rectangular Weir Highlighted


Crest = Sharp Depth (ft) = 0.63
Bottom Length (ft) = 3.77 Q (cfs) = 6.330
Total Depth (ft) = 1.83 Area (sqft) = 2.39
Velocity (ft/s) = 2.65
Calculations Top Width (ft) = 3.77
Weir Coeff. Cw = 3.33
Compute by: Known Q
Known Q (cfs) = 6.33

Depth (ft) Emergency Spillway Depth (ft)

2.00 2.00

1.50 1.50

1.00 1.00

0.50 0.50

0.00 0.00

-0.50 -0.50
0 .5 1 1.5 2 2.5 3 3.5 4 4.5 5
Weir W.S.
Length (ft)
APPENDIX F

_______________________________________

BASIN DEWATERING CALCULATIONS


_______________________________________
Water Quality Type II 24-hr 1-yr Rainfall=2.40"
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC

Hydrograph for Pond 5P: POND 1

Time Inflow Storage Elevation Outflow Discarded Primary


(hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs)
0.00 0.00 0 399.07 0.00 0.00 0.00
1.00 0.00 0 399.07 0.00 0.00 0.00
2.00 0.00 0 399.07 0.00 0.00 0.00
3.00 0.00 0 399.07 0.00 0.00 0.00
4.00 0.00 0 399.07 0.00 0.00 0.00
5.00 0.00 0 399.07 0.00 0.00 0.00
6.00 0.00 2 399.07 0.00 0.00 0.00
7.00 0.00 5 399.08 0.00 0.00 0.00
8.00 0.01 10 399.08 0.00 0.00 0.00
9.00 0.01 17 399.09 0.01 0.01 0.00
10.00 0.02 30 399.11 0.01 0.01 0.00
11.00 0.04 83 399.18 0.01 0.01 0.00
12.00 1.01 741 400.02 0.74 0.01 0.73
13.00 0.05 481 399.69 0.07 0.01 0.06
14.00 0.03 453 399.65 0.04 0.01 0.03
15.00 0.03 441 399.64 0.03 0.01 0.02
16.00 0.02 433 399.63 0.02 0.01 0.01
17.00 0.02 425 399.62 0.02 0.01 0.01
18.00 0.02 420 399.61 0.02 0.01 0.01
19.00 0.01 415 399.60 0.01 0.01 0.00
20.00 0.01 410 399.60 0.01 0.01 0.00
21.00 0.01 406 399.59 0.01 0.01 0.00
22.00 0.01 401 399.59 0.01 0.01 0.00
23.00 0.01 397 399.58 0.01 0.01 0.00
24.00 0.01 394 399.58 0.01 0.01 0.00
25.00 0.00 361 399.53 0.01 0.01 0.00
26.00 0.00 325 399.49 0.01 0.01 0.00
27.00 0.00 290 399.44 0.01 0.01 0.00
28.00 0.00 254 399.40 0.01 0.01 0.00
29.00 0.00 218 399.35 0.01 0.01 0.00
30.00 0.00 183 399.31 0.01 0.01 0.00
31.00 0.00 147 399.26 0.01 0.01 0.00
32.00 0.00 111 399.21 0.01 0.01 0.00
33.00 0.00 76 399.17 0.01 0.01 0.00
34.00 0.00 40 399.12 0.01 0.01 0.00
35.00 0.00 10 399.08 0.00 0.00 0.00
36.00 0.00 2 399.07 0.00 0.00 0.00
37.00 0.00 0 399.07 0.00 0.00 0.00
38.00 0.00 0 399.07 0.00 0.00 0.00
39.00 0.00 0 399.07 0.00 0.00 0.00
40.00 0.00 0 399.07 0.00 0.00 0.00
41.00 0.00 0 399.07 0.00 0.00 0.00
42.00 0.00 0 399.07 0.00 0.00 0.00
43.00 0.00 0 399.07 0.00 0.00 0.00
44.00 0.00 0 399.07 0.00 0.00 0.00
45.00 0.00 0 399.07 0.00 0.00 0.00
46.00 0.00 0 399.07 0.00 0.00 0.00
47.00 0.00 0 399.07 0.00 0.00 0.00
48.00 0.00 0 399.07 0.00 0.00 0.00
49.00 0.00 0 399.07 0.00 0.00 0.00
50.00 0.00 0 399.07 0.00 0.00 0.00
POST (small) PA-Cumberland-Camp Hill 1-yr Duration=5 min, Inten=3.86 in/hr
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC

Hydrograph for Pond 3P: POND 2

Time Inflow Storage Elevation Primary


(hours) (cfs) (cubic-feet) (feet) (cfs)
0.00 0.00 0 396.97 0.00
2.00 0.00 1,856 397.94 0.03
4.00 0.00 1,681 397.88 0.02
6.00 0.00 1,514 397.81 0.02
8.00 0.00 1,350 397.75 0.02
10.00 0.00 1,193 397.68 0.02
12.00 0.00 1,042 397.62 0.02
14.00 0.00 899 397.55 0.02
16.00 0.00 766 397.47 0.02
18.00 0.00 646 397.37 0.02
20.00 0.00 540 397.30 0.01
22.00 0.00 444 397.24 0.01
24.00 0.00 360 397.19 0.01
26.00 0.00 286 397.14 0.01
28.00 0.00 223 397.10 0.01
30.00 0.00 171 397.07 0.01
32.00 0.00 130 397.05 0.00
34.00 0.00 100 397.03 0.00
36.00 0.00 79 397.02 0.00
38.00 0.00 64 397.01 0.00
40.00 0.00 53 397.00 0.00
42.00 0.00 46 397.00 0.00
44.00 0.00 39 396.99 0.00
46.00 0.00 34 396.99 0.00
48.00 0.00 29 396.99 0.00
50.00 0.00 25 396.99 0.00
52.00 0.00 21 396.98 0.00
54.00 0.00 18 396.98 0.00
56.00 0.00 16 396.98 0.00
58.00 0.00 14 396.98 0.00
60.00 0.00 12 396.98 0.00
62.00 0.00 10 396.98 0.00
64.00 0.00 9 396.98 0.00
66.00 0.00 7 396.97 0.00
68.00 0.00 6 396.97 0.00
70.00 0.00 6 396.97 0.00
72.00 0.00 5 396.97 0.00
Porous Pavement/Infiltration Bed (POND 1) Dewatering Time

The tested infiltration rate is 2.0 inches/hour. For a reduction factor of 3 and safety
factor of 3 in accordance with the PA BMP Manual, the design rate is reduced to
0.22 inches/hour.

The elevation bottom of the infiltration bed is 399.07 feet. The outflow pipe invert
elevation is 399.57 feet. Therefore, the infiltration storage depth is 0.5 feet or 6
inches.

For 6 inches of depth, the dewatering time will be approximately 27 hours.

6 inches/0.22 inches per hour = 27 hours


POST (large) PA-Cumberland-Camp Hill 100-yr Duration=5 min, Inten=7.99 in/hr
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC

Hydrograph for Pond 5P: POND 1

Time Inflow Storage Elevation Primary


(hours) (cfs) (cubic-feet) (feet) (cfs)
0.00 0.00 0 399.57 0.00
2.00 0.00 23 399.60 0.00
4.00 0.00 10 399.58 0.00
6.00 0.00 5 399.58 0.00
8.00 0.00 2 399.57 0.00
10.00 0.00 1 399.57 0.00
12.00 0.00 0 399.57 0.00
14.00 0.00 0 399.57 0.00
16.00 0.00 0 399.57 0.00
18.00 0.00 0 399.57 0.00
20.00 0.00 0 399.57 0.00
22.00 0.00 0 399.57 0.00
24.00 0.00 0 399.57 0.00
26.00 0.00 0 399.57 0.00
28.00 0.00 0 399.57 0.00
30.00 0.00 0 399.57 0.00
32.00 0.00 0 399.57 0.00
34.00 0.00 0 399.57 0.00
36.00 0.00 0 399.57 0.00
38.00 0.00 0 399.57 0.00
40.00 0.00 0 399.57 0.00
42.00 0.00 0 399.57 0.00
44.00 0.00 0 399.57 0.00
46.00 0.00 0 399.57 0.00
48.00 0.00 0 399.57 0.00
50.00 0.00 0 399.57 0.00
52.00 0.00 0 399.57 0.00
54.00 0.00 0 399.57 0.00
56.00 0.00 0 399.57 0.00
58.00 0.00 0 399.57 0.00
60.00 0.00 0 399.57 0.00
62.00 0.00 0 399.57 0.00
64.00 0.00 0 399.57 0.00
66.00 0.00 0 399.57 0.00
68.00 0.00 0 399.57 0.00
70.00 0.00 0 399.57 0.00
72.00 0.00 0 399.57 0.00
POST (large) PA-Cumberland-Camp Hill 100-yr Duration=5 min, Inten=7.99 in/hr
Prepared by Williams Site Civil, LLC Printed 7/24/2019
HydroCAD® 10.00-22 s/n 10656 © 2018 HydroCAD Software Solutions LLC

Hydrograph for Pond 3P: POND 2

Time Inflow Storage Elevation Primary


(hours) (cfs) (cubic-feet) (feet) (cfs)
0.00 0.00 0 396.97 0.00
2.00 0.00 2,250 398.11 0.14
4.00 0.00 1,800 397.95 0.03
6.00 0.00 1,616 397.88 0.02
8.00 0.00 1,446 397.81 0.02
10.00 0.00 1,282 397.74 0.02
12.00 0.00 1,124 397.67 0.02
14.00 0.00 975 397.60 0.02
16.00 0.00 834 397.53 0.02
18.00 0.00 703 397.44 0.02
20.00 0.00 588 397.34 0.02
22.00 0.00 485 397.27 0.01
24.00 0.00 394 397.22 0.01
26.00 0.00 314 397.17 0.01
28.00 0.00 245 397.12 0.01
30.00 0.00 188 397.09 0.01
32.00 0.00 141 397.06 0.01
34.00 0.00 107 397.04 0.00
36.00 0.00 82 397.02 0.00
38.00 0.00 65 397.01 0.00
40.00 0.00 54 397.00 0.00
42.00 0.00 46 397.00 0.00
44.00 0.00 39 396.99 0.00
46.00 0.00 33 396.99 0.00
48.00 0.00 28 396.99 0.00
50.00 0.00 24 396.99 0.00
52.00 0.00 21 396.98 0.00
54.00 0.00 18 396.98 0.00
56.00 0.00 15 396.98 0.00
58.00 0.00 13 396.98 0.00
60.00 0.00 11 396.98 0.00
62.00 0.00 10 396.98 0.00
64.00 0.00 8 396.98 0.00
66.00 0.00 7 396.97 0.00
68.00 0.00 6 396.97 0.00
70.00 0.00 5 396.97 0.00
72.00 0.00 4 396.97 0.00
APPENDIX G

_______________________________________

STORM SEWER CONVEYANCE DESIGN

_______________________________________
APPENDIX H

_______________________________________

GEOTECHNICAL REPORT
_______________________________________
Report of Geotechnical
Exploration
FOR
Proposed Chick-fil-A Restaurant #04342
Camp Hill FSU
3115-3133 Chestnut Street
Borough of Camp Hill, Cumberland County, PA

August 17, 2018


Prepared For
John Martinez
Development Manager, Design & Construction
Chick-fil-A, Inc.
5200 Buffington Road
Atlanta, GA 30349

Prepared By
Maser Consulting P.A.
410 Eagleview Boulevard, Suite 104
Exton, PA 19341
610.254.9140

__________________________
Matthew J. Church, PE
License No. PE081072

Maser Project No. 17000373B

MC Project No. 000000000


Engineers 410 Eagleview Blvd., Suite 104
Planners Exton, PA 19341
Surveyors T: 610.254.9140
Landscape Architects F: 610.254.9141
Environmental Scientists www.maserconsulting.com

August 17, 2018

Mr. John Martinez, P.E. (john.martinez@cfacorp.com)


Development Manager, Design & Construction
Chick-fil-A, Inc.
5200 Buffington Road
Atlanta, GA 30349

Re: Report of Geotechnical Exploration Program


Proposed Chick-fil-A Restaurant #04342
Camp Hill FSU
3115-3133 Chestnut Street
Parcel IDs 01-21-0273-431, 01-21-0273-432, 01-21-0273-433, 01-21-0273-434,
01-21-0273-435 & 01-21-0273-436
Borough of Camp Hill, Cumberland County, PA
MC Project No. 17000373B

Dear Mr. Martinez:

Maser Consulting P.A. is pleased to present the results of a geotechnical exploration program
performed for the referenced project. This program was performed in accordance with our
Agreement dated July 17, 2018 and our Master Agreement dated December 1, 2015. This exploration
program included 9 subsurface explorations, laboratory testing, engineering evaluation, and
preparation of this report. The results of the field and laboratory testing and our geotechnical
recommendations for design and construction of the proposed project are included in this report.

Maser appreciates the opportunity to assist you with this project. Please contact this office
should you have questions regarding this report.

Sincerely,
MASER CONSULTING P.A.

John C. Walton, P.E. Matthew J. Church, P.E.


Principal Associate Project Engineer

MJC/jcw
Attachments
cc: Donald Bowman, PE (Maser)

Customer Loyalty through Client Satisfaction


TABLE OF CONTENTS

LIST OF APPENDICES

EXECUTIVE SUMMARY ...................................................................................................................1


INTRODUCTION .................................................................................................................................3
SITE CONDITIONS ..............................................................................................................................4
Location and Surface Features ............................................................................................................4
Geology ...............................................................................................................................................4
PROPOSED CONSTRUCTION ...........................................................................................................5
EXPLORATION AND TESTING ........................................................................................................6
Subsurface Exploration Program ........................................................................................................6
Subsurface Conditions ........................................................................................................................8
Geophysical.........................................................................................................................................8
Groundwater .......................................................................................................................................8
Laboratory Testing ..............................................................................................................................9
CONCLUSIONS AND RECOMMENDATIONS ................................................................................9
General ................................................................................................................................................9
Construction Considerations in Karst Geology ................................................................................10
Demolition ........................................................................................................................................12
Earthwork ..........................................................................................................................................12
Fill and Backfill Materials ................................................................................................................13
Groundwater and Surface Water Control .........................................................................................15
Frost Considerations .........................................................................................................................16
Subsurface Utilities ...........................................................................................................................16
Foundations .......................................................................................................................................16
Seismic Considerations .....................................................................................................................18
Floor Slab ..........................................................................................................................................18
Lateral Earth Pressure Parameters ....................................................................................................19
Stormwater Management ..................................................................................................................20
Pavements .........................................................................................................................................21
LIMITATIONS ....................................................................................................................................22
LIST OF APPENDICES
APPENDIX A – FIGURES
Figure 1 - Site Location Map
Figure 2 - Exploration Location Plan
Figure 3 – Karst Features

APPENDIX B – EXPLORATION LOGS


Test Boring Logs (TB-1 through TB-9)

APPENDIX C – LABORATORY DATA


Summary of Laboratory Test Results
Particle Size Distribution

APPENDIX D – INFILTRATION DATA


Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

EXECUTIVE SUMMARY

Introduction
• This geotechnical engineering program was performed for a proposed Chick-fil-A (CFA)
restaurant considered for construction at a site in the Borough of Camp Hill, Cumberland County,
PA. The subject property is generally located in the southeast quadrant of the intersection formed
by Chestnut Street and South 32nd Street.
• The subject property consists of 6 individual parcels along Chestnut Street. According to
topographic data the ground surface generally slopes down to the northeast and southwest from a
ridgeline extending from the northwestern portion of the site to the southeastern portion of the site
with surface grades ranging from approximately elevation (EL) 402.0 feet to EL 407.0 feet,
respectively.
• According to the Bedrock Geologic Map of Pennsylvania (2001), the site is underlain by the
Ordovician age Pinesburg Station Formation (Ops) in the southern half of the site and the
Ordovician age St. Paul Group (Osp) in the northern half of the site. These formations are
susceptible to karst/sinkhole activity.
• The proposed construction will include a ±5,031 SF Chick-fil-A restaurant (P12-LC-LARGE-V2)
located in the northern portion of the subject parcel, a trash enclosure located southeast of the
proposed CFA building, and the concrete drive-thru will begin in the southeastern portion of the
parcel and continue along the north and west sides of the proposed building.
• Based on proposed grading, mass cuts/fills of less than ±2 feet are anticipated. Excavations
ranging up to ±3 feet below finished grade are anticipated for foundation construction and deeper
excavations for proposed utilities and stormwater structures.
Exploration and Testing
• This study included 9 test borings performed throughout the property. The borings extended to
depths ranging from ±8 to ±16 feet BGS. Laboratory testing was performed on representative
samples obtained from the explorations.
• Topsoil was encountered at the ground surface of the boring locations and ranged from ±3.0 to
±8.0 inches in thickness.
• Natural/residual soils were encountered below the topsoil and extended to the completion depths
of the explorations. The natural/residual soils generally consisted fine-grained soil (silt and clay)
with variable amounts of sand and gravel/rock fragments. SPT N-Values indicate that the in-situ
consistencies of the site soils range from ‘medium stiff’ to ‘hard’, averaging ‘very stiff’.
• Several suspected karst features were encountered during the geophysical survey along with
evidence of underground utilities, previous structures, and site activities. The suspected karst
features generally consist of pinnacled bedrock and near surface voids.
• No evidence of groundwater or seasonal high groundwater was encountered in the explorations
performed for this study.

1
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

Conclusions and Recommendations

• Based on the results of this study, construction of the proposed CFA restaurant is feasible;
however, the geotechnical issues that will likely impact site development include:
o The need to demolish the existing structures and associated site features.
o The presence of carbonate geology and the potential for karst activity.
o The site soils contain high percentages of fine-grained soil (silt and clay) and will
present the following challenges:
▪ They will be sensitive to disturbance from construction equipment and
precipitation.
▪ Their suitability for reuse on-site will likely be dependent on
moisture-conditioning.
▪ They will be subject to frost action.
• There is a moderate to high potential for karst related issues during this project.
• The excavated natural soils will be suitable for reuse as compacted structural fill with some
limitations. The site soils consist primarily of silt and clay and will be subject to moisture-related
compaction problems. Moisture conditioning of the excavated materials should be anticipated
prior to reuse.
• The is potential to encountered cobbles and/or boulders during earthwork and/or footing, utility,
and stormwater management structures. The use of heavy duty equipment such as large track-
mounted excavators equipped with rock teeth and/or rock rippers may be required for portions of
earthwork activities.
• Provided the recommendations contained herein are followed, the proposed building can be
supported on conventional shallow spread footings established in suitable site soils or new
compacted structural fill and may be designed for a maximum allowable net bearing pressure of
3,000 pounds per square foot.
• The project should be designed assuming a Seismic Site Class C– “Very Dense Soil and Soft
Rock” profile.
• The proposed floor slab can be constructed as a slab-on-grade and designed assuming a modulus
of subgrade reaction of 150 pounds per cubic inch.
• Standard thickness pavement sections are acceptable for this project, provided the earthwork
recommendations herein are followed. Timing of pavement construction will be critical to prevent
destabilization of pavement subgrade soils.

This executive summary is provided as an abbreviated general discussion of the geotechnical


considerations that will impact development of the subject project and should not be relied upon
without reading the report in its entirety. The following sections of the report present a detailed
discussion of the findings of this exploration program and our recommendations for design and
construction of the subject project.

2
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

INTRODUCTION
This report presents the results of a geotechnical exploration program performed for a proposed
Chick-fil-A (CFA) restaurant considered for construction in the Borough of Camp Hill, Cumberland
County, PA. The subject property is generally located in the southeast quadrant of the intersection
formed by Chestnut Street and South 32nd Street. Please refer to Figure 1 – Site Location Map included
in Appendix A.

The following information was provided and used as the basis for the subsurface exploration
program and preparation of this report:

• A site plan entitled “Concept Plan” prepared by Maser Consulting, P.A. dated June 26,
2018.
• A survey plan entitled “ALTA/NSPS Land Title Survey for Michael A. Serluco; 3117
– 3133 Chestnut Street” prepared by James C. Hockenberry, PLS dated March 7, 2017.
• A grading plan entitles “Grading Concept Plan: 3117 – 3133 Chestnut Street” prepared
by Williams Site Civil, LLC dated May 2, 2018.

The plans indicate the existing site features, existing utilities, existing topography, conceptual
grading, and conceptual site layout. It should be noted that proposed utilities, structural plans, and
architectural plans were not available at the time of this geotechnical exploration program.

The scope of our exploration program for this project included the following services:
• Subsurface exploration program consisting of 9 borings.
• Laboratory testing of representative soil samples.
• Review of publicly available geologic data as it pertains to the proposed development.
• Preparation of this report, which includes our findings and recommendations regarding:
o Earthwork, including suitability of on-site materials for reuse and
associated compaction requirements
o Foundation and floor slab support, including bearing capacity and
anticipated settlements
o Seismic considerations
o Surface water and groundwater control
o Lateral earth pressure parameters

3
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

o Pavement design parameters


SITE CONDITIONS
Location and Surface Features
The subject property is bordered to the north by Chestnut Street, to the west by South 32 nd
Street, to the south by a commercial property, and to the east by residential properties. The subject
property consisted of 6 individual parcels along Chestnut Street (Parcel IDs 01-21-0273-431, 01-21-
0273-432, 01-21-0273-433, 01-21-0273-434, 01-21-0273-435 & 01-21-0273-436). The subject
property contains 2 alley ways in the eastern and southern portions of the property, respectively. The
individual parcels included 2-story houses with basements set along Chestnut Street. The parcels were
generally separated by fences but also contained sheds set toward the rear of the properties. It should
be noted that the front yards and houses were situated approximately 2 feet above Chestnut Street and
several had a ±2 ft high retaining wall adjacent to the concrete sidewalk along Chestnut Street. It
should also be noted that areas along Chestnut Street were densely vegetated. The balance of the
parcels consisted of asphalt pavements and grass lawn areas. According to topographic data presented
on the referenced survey plan, the ground surface generally slopes down to the northeast and southwest
from a ridgeline extending from the northwestern portion of the site to the southeastern portion of the
site with surface grades ranging from approximately elevation (EL) 402.0 feet to EL 407.0 feet.

Geology
The National Resource Conservation Service (NRCS) Soil Survey indicates the site soils
consist of Duffield silt loam (DuA, 0 to 3 percent slopes) located in the northeastern portion of the site
and Hagerstown silt loam (HaB, 3 to 8 percent slopes) located in the southwestern portion of the site.
Duffield silt loam (DuA, 0 to 3 percent slopes) is generally mapped to consist of silt loam with gravel
present below 56 inches. Hagerstown silt loam (HaB, 3 to 8 percent slopes) is generally mapped to
consist of silt loam and transitioning to silty clay loam/clay loam to the surface of lithic bedrock below
73 inches. The survey indicates that litithic bedrock is typically encountered within 60 to 80 inches
(DuA) and within 43 to 98 inches (HaB) of the ground surface.

The project site is situated within the Great Valley Section of the Ridge and Valley
Physiographic Province. According to the Bedrock Geologic Map of Pennsylvania (2001), the site is
underlain by the Ordovician age Pinesburg Station Formation (Ops) in the southern half of the site and
the Ordovician age St. Paul Group (Osp) in the northern half of the site. The Pinesburg Station

4
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

Formation (Ops) is mapped to consist primarily of “Light-colored, thick-bedded, finely laminated


dolomite; some limestone”. The St. Paul Group (Osp) is mapped to consist primarily of “Very finely
crystalline, "birdseye" limestone at top and base, granular fossiliferous limestone, black chert, and
dolomite in middle”. The Pinesburg Station Formation and St. Paul Group is carbonate bedrock and
is susceptible to karst/sinkhole activity. It should be noted that the geophysical survey indicated
several suspected karst features, there mapped sinkhole activity (a large closed depression) as close as
±200 feet southeast of the site, and several other closed depressions within 1 mile of the project site
(See Figure 3 – Karst Features).

Carbonate bedrock formations can dissolve over geologic time when in direct contact with
acidic soil and/or groundwater, i.e. low pH levels. Depending on the orientation of bedding planes
within the rock mass, this dissolution characteristic often results in weathered rock zones, voids in the
rock mass, soil-filled voids, and a pinnacled bedrock surface characterized by deep troughs and high
ridges. These features develop as accelerated dissolution of less-resistant portions of the rock mass
occurs relative to adjacent portions of the rock mass that are more resistant to dissolution. These
dissolution patterns can be highly variable in size and orientation, with rock voids ranging from small
irregular patterns (similar to that of a sponge) to large open caverns. Over time, the overburden soils
tend to migrate into these rock voids by groundwater transport and gravity effects. As the soil
migrates, arching effects of the overlying soil bridges the ‘washed out’ soil creating a soil void. The
soil voids then collapse resulting in soft soil zones above. As this process continues, subsidence of
the soft soil zones occur, which is manifest as depressions at the ground surface and ultimately
development of sinkholes. These features are collectively referred to as karst.

PROPOSED CONSTRUCTION
The proposed construction will include a ±5,031 SF Chick-fil-A restaurant
(P12-LC-LARGE-V2) located in the northwestern portion of the site, a trash enclosure located
southeast of the proposed CFA building, and the concrete drive-thru will begin in the southeastern
portion of the site and continue along the north and west sides of the site. At-grade parking areas,
drive lanes, and landscaped islands will be provided throughout the remainder of the parcel. The site
will be accessed from ingress/egress points along Chestnut Street and South 32nd Street. Based on the
referenced grading plan, stormwater runoff will be controlled by three (3) potential stormwater
management (SWM) basin locations as follows: an above ground basin located on the western side of

5
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

the site, an underground basin established below the proposed parking field in the southern portion of
the site, and/or an underground basin established below the proposed parking field/drive lane in the
eastern portion of the site.

Based on the referenced grading plan the finished floor elevation (FFE) of the restaurant will
be established at EL ±406.5 feet and proposed site grades will be established at or near existing site
grades. As such, mass cuts and fills of less than ±2 feet are anticipated to achieve the proposed site
grades and cuts/fills are expected to be less than ±1 foot at the proposed building. Excavations for
foundations will range up to 3 feet below proposed finished grade and deeper excavations will likely
be required for installation of subsurface utilities and the proposed SWM systems.

Based on projects of similar scope, we anticipate the building will consist of a wood and steel
frame and a concrete slab-on-grade. It is assumed that the building will have maximum column loads
ranging up to 40 kips and wall loads ranging up to 3 kips per lineal foot.

EXPLORATION AND TESTING


Subsurface Exploration Program
The subsurface exploration program included nine (9) Standard Penetration Test (SPT) borings
(TB-1 through TB-9) performed throughout the site. The borings were performed using Diedrich D-50
drilling equipment and extended to depths ranging from ±8.0 feet to ±16.0 feet below the ground
surface (BGS). The locations of the test borings performed for this exploration program are shown on
Figure 2-Exploration Location Plan in Appendix A. See below for a summary of the explorations
performed for this program.

Exploration Summary
Exploration Approx.
Exploration Depth (Elev.) General Exploration Location
Number G.S. Elev.
TB-1 407.0' 16.0' (391.0') Southwest Corner of Building

TB-2 406.5' 16.0' (390.5') Northwest Corner of Building, Drive-Thru

TB-3 406.5' 16.0' (390.5') Southeast Corner of Building

TB-4 406.5' 10.0' (396.5') Trash Enclosure

TB-5 406.0' 12.0' (394.0') Drive-Thru, Drive-Thru Canopy

TB-6 407.0' 6.0' (401.0') Parking Area

6
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

Exploration Approx.
Exploration Depth (Elev.) General Exploration Location
Number G.S. Elev.
TB-7 405.0' 8.0' (397.0') Parking Area, Potential SWM Basin

TB-8 405.0' 8.0' (397.0') Potential SWM Basin


Parking Area/Drive lane, Potential SWM
TB-9 406.5' 8.0' (398.5') Basin

A geophysical survey was completed using a combination of Ground Penetrating Radar (GPR),
Electromagnetic Induction (EM), and Radio Detection (RD) surveying techniques to evaluate the first
8-to-10 feet below grade. It should be noted that relevant subsurface features collected during the
geophysical survey will be included with the site plans. As indicated previously, several suspected
karst features consisting pinnacled bedrock and/or voids were identified in the geophysical survey and
have been included on Figure 3 – Karst Features as well as the site plans.

The exploration locations were selected by Maser Consulting and field-located by measuring
from existing site features using conventional taping methods. Test borings were performed under the
full-time technical observation of Maser Consulting. Soils encountered were classified in the field in
accordance with the Burmister Soil Classification System. Soil samples obtained from the
explorations were delivered to our office for visual classification, and representative samples were
subjected to limited laboratory testing as discussed in the Laboratory Testing section of this report.

Test borings were advanced by Eichelberger’s Inc., using standard hollow stem auger drilling
techniques. Split spoon sampling was performed in accordance with ASTM D-1586 (Standard
Method for Penetration Test and Split-Barrel Sampling of Soils). The number of blows required to
drive the split spoon every six (6) inches into the soil was recorded and is shown on the logs. The sum
of blows for the 6 to 18-inch interval is the N-value. The SPT N-value indicates the soil resistance
encountered at each sample layer. Sampling was generally performed continuously from the ground
surface to a depth of 12 feet and then at five (5) feet intervals to the completion depth of each test
boring. Details pertaining to the subsurface conditions encountered are presented on the Test Boring Logs
in Appendix B. The ground surface elevations reported on the logs were estimated from topographic
contours as shown on the referenced ALTA/ACSM Land Title Survey and should be considered
approximate.

7
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

Subsurface Conditions
Topsoil was encountered at the ground surface of all the explorations performed for this
program and ranged from ±3.0 to ±8.0 inches in thickness.

Natural/residual soils were encountered below the topsoil at all the test boring locations
performed for this exploration program. The natural/residual soils generally consisted fine-grained
soil (silt and clay) with variable amounts of sand and gravel/rock fragments. It should be noted that
shallow refusal was encountered at 2 of the explorations (TB-1 and TB-7) and is likely evidence of
cobbles and/or evidence of pinnacled bedrock. The natural/residual soils extended to the completion
depths of the explorations. SPT N-Values indicate that the in-situ consistencies of the natural/residual
soils range from ‘medium stiff’ to ‘hard’, averaging ‘very stiff’. It should also be noted that the several
of the higher N-Values were likely the result of increased gravel or friable rock content at the
corresponding sample depths and may not be representative in-situ conditions at those depths.

Geophysical
Geophysical surveying results indicated the presence of buried utilities (stormwater, sewer
connections, etc.) in the subject area within the first ±3 to ±6 feet BGS. The is evidence of foundations
for former structures in the northwest portion of the site (up to ±2.5 feet BGS) and an excavation
scar/pea gravel backfill adjacent to a brick garage in the southwest portion of the site (up to ±4 feet
BGS). As previously indicated, several suspected karst features were identified during the geophysical
survey in the western and eastern portions of the site. There were 2 anomaly’s located in the western
portion of the site and are described as “shallow, pinnacled bedrock and/or decomposed rock” with
possible air voids at approximate ±3.4 feet BGS. The 3rd suspected karst feature located in the eastern
portion of the site is likely an air-void related to uncompacted soil.

Groundwater
Neither evidence of groundwater nor seasonal high groundwater levels was encountered in the
explorations performed for this study. It should be noted that fluctuation in groundwater levels can
occur due to several factors, including variations in precipitation, seasonal changes, and site
development activities, which can alter surface water drainage paths.

8
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

Laboratory Testing
Representative soil samples obtained from the borings were subjected to laboratory testing to
supplement the visual classification of the soils and evaluate their general engineering characteristics.
The testing performed for this program included natural moisture contents, particle size analyses, and
Atterberg limits. A general summary of laboratory test results is presented in the following table and
detailed test results are included in Appendix C.

LABORATORY TESTING SUMMARY

Approx. Sample Moisture Particle Size Liquid


Exploration Limit /
G.S. Depth General Soil Description Content (% passing
Number Plasticity
Elev. (Elev.) (%) #200 Sieve) Index
2.0'
TB-2 406.5' CLAY, some(-) Sand 15.1 77.9 47/25
(404.5')
2.0'
TB-3 406.5' CLAY, little cmf Sand 20.5 84.4 85/60
(404.5')
4.0' cmf SAND, some mf
TB-7 405.0' 16.9 6.7 -
(401.0') Gravel, trace Silt/Clay
4.0' cmf SAND, little(-) f
TB-8 405.0' 22.4 2.6 -
(401.0') Gravel, trace Silt/Clay
4.0' cmf SAND, some f
TB-9 406.5' 21.6 1.9 -
(402.5') Gravel, trace(-) Silt/Clay

CONCLUSIONS AND RECOMMENDATIONS

General
Based on the results of this exploration program, it is our opinion that construction of the
proposed Chick-fil-A restaurant as planned is feasible, given that the geotechnical recommendations
contained herein are followed and that the standard level of care is maintained during construction.
Geotechnical issues identified during this study that will likely impact site development include:

• The need to demolish the existing structures and associated site features.
• The presence of carbonate geology and the potential for karst activity.
• The site soils contain high percentages of fine-grained soil (silt and clay)
and will present the following challenges:
o They will be sensitive to disturbance from construction equipment
and precipitation.

9
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

o Their suitability for reuse on-site will likely be dependent on


moisture-conditioning.
o They will be subject to frost action.

The following sections of this report provide further discussion of these issues and present our
recommendations for design and construction of the subject project.

Construction Considerations in Karst Geology


Based on the evidence revealed by this study, it is anticipated that karst related issues could
pose a risk for this project. With any site in karst geology there are several karst-related issues that
could impact development of the site, including:

• The need to remediate voids and soft soil zones.


• The potential for sinkhole development during construction.
• The need to control surface and subsurface drainage during and after
construction.
• Limitations on designing stormwater systems for infiltration/recharge.

The risk of sinkhole development is typically elevated during construction at sites that are
underlain by karst geology, and the risk at this site is considered moderate to high. The primary
construction activities that can accelerate sinkhole development include reduction of overburden soil
thickness in cut areas and changes in surface water drainage patterns. Removal of overburden soils
can destabilize soil arches and increase the chance of exposing bedrock to the elements. Changes in
surface water drainage patterns as a result of earthwork activities can concentrate the flow of water in
localized areas and accelerate the rate of soil migration into cracks/voids in the rock mass, particularly
after heavy precipitation events.

Taking proper design-phase and construction-phase precautions will reduce the risks
associated with sinkhole development at this site. Final design plans should incorporate precautionary
measures that will reduce/control surface and subsurface drainage, which is the primary cause of
sinkhole development. These measures include but may not be limited to the following:

• Provide water-tight connections of subsurface drainage systems.


• Drain roof leaders directly into the stormwater management system.

10
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

• Avoid utilities in close proximity to building foundations.


• Seal pavements at interface with curbs, catch basins, etc.
• Limit pervious areas directly adjacent to buildings and provide positive drainage
away from buildings.
• Reduce or eliminate stormwater infiltration by using sealed/lined stormwater
detention systems.

During construction, it is critical that surface drainage be controlled as discussed in the Surface
Water and Groundwater Control Section of this report. Should sinkholes develop during construction,
the methods of repair can be numerous and varied because not all sinkholes are the same. In general,
an attempt should be made to locate the throat of the sinkhole, which should be plugged, and the
remainder of the sinkhole should be backfilled in a manner that will stabilize the subgrade and prevent
or limit the flow of water and possible future subsidence. The exact nature of sinkhole repair should
be determined by a qualified geotechnical engineer at the time of construction, but may include the
following:

• Remove sufficient soil, boulders, and/or bedrock to expose the throat.


• Permeation grouting to fill voids in the rock mass.
• Use large stones in conjunction with low slump grout and/or concrete to plug the
throat.
• Backfill the sinkhole with grout or low permeability backfill soils reinforced with
geosynthetics.
• Remove rock pinnacles to accommodate backfill compaction efforts.

Although a considerable volume of soil and/or rock may need to be removed during sinkhole
repair, the excavated materials can sometimes be reused as backfill with some limitations as discussed
in the Fill and Backfill Materials Section of this report. Due to the variable nature of sinkhole repair,
we suggest the contract documents incorporate sinkhole repair on a time and materials basis with unit
fees provided for all aspects of the work. Although it is impossible to predict the magnitude of
sinkhole repair that may be required, we recommended the project budget account for construction-
phase sinkhole repair on a percentage basis of the total construction cost.

11
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

Demolition
Demolition and off-site disposal of the existing buildings and site improvements not to remain,
including their below-grade components, such as foundations, basements, utilities, and storage tanks,
will be required prior to new construction activities. Should excavations to remove existing site
features extend below the proposed building and pavement subgrade levels, the excavations should be
backfilled with structural fill, placed and compacted in accordance with the recommendations
presented in the Fill and Backfill Materials Section of this report.

Existing durable below-grade structural elements, such as existing foundations, may remain
in-place below proposed pavement areas provided the top of the elements remain at least 3 feet below
the finished pavement surface and will not interfere with subsequent underground utility installation.
Basement walls and slabs should be completely removed below the proposed building; however;
basement slabs can remain in-place below parking and landscape areas provided they are sufficiently
broken to facilitate drainage and backfill can be tightly compacted around the remnants. Existing
utilities to be abandoned below proposed pavements may also remain in-place, provided they remain
at least 3 feet below the finished pavement surface and are permanently sealed or in-filled with grout
or flowable fill. If existing utilities are abandoned and only sealed, they should be evaluated to
determine if they are structurally sound.

Earthwork
Following demolition, clearing, and stripping operations, subgrade soils exposed in proposed
areas to remain at-grade or receive fill should be compacted by several passes with a minimum 10-ton
roller and proof-rolled with a fully loaded tandem-axle dump truck under the observation of the
geotechnical engineer. Other proof-rolling methods may be deemed appropriate by the geotechnical
engineer depending on the prevailing weather and subgrade soil conditions at the time earthwork is
performed. Any subgrade areas that are observed to be soft, loose, or otherwise unstable during
proof-rolling operations should be selectively excavated as directed by the geotechnical engineer and
replaced with structural fill, placed and compacted in accordance with the Fill and Backfill Materials
Section of this report.

The soils encountered during this exploration program contain high percentages of fine-grained
soil (silt and clay), which will be sensitive to disturbance during earthwork operations. These soils

12
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

can become unstable under the heavy loads of construction equipment and will become soft when the
soil moisture content increases, such as after precipitation events. It should be expected that the
stripping and earthwork operations may result in extensive disturbance to the subgrade, particularly if
the work is performed during or after wet weather and during the typically colder months. If possible,
peak earthwork activities should be scheduled for the drier summer months, which will limit the
amount of precipitation that the soils are exposed to and will provide better opportunity to air-dry soils
which are too moist.

Due to the potential to encountered cobbles, boulders, and/or pinnacled bedrock, it should be
anticipated that the use of heavy-duty equipment, such as large track-mounted machines equipped with
rock teeth and/or rock rippers may be required for portions of earthwork activities.

All construction excavations should be sloped and shored in accordance with OSHA
excavation regulations or stricter local governing safety codes. It is our opinion that the existing site
soils and new structural fill will generally be classified as “Type C” soils under OSHA excavation
regulations. Excavation stability and corresponding side slopes and/or support requirements should
be evaluated by a qualified professional at the time of construction and should take into consideration
the adverse impacts of groundwater seepage, if encountered.

Fill and Backfill Materials


The excavated soils can be reused as compacted structural fill with some limitations. The
majority of soil encountered during this exploration program contained high percentages of silt and
clay and may be subject to moisture-related compaction problems. Based on the laboratory test results,
it should be anticipated that portions of the excavated site soils will have in-situ moisture contents
above the optimum moisture content required for compaction purposes. Additionally, excavated soils
left unprotected during precipitation events can become unsuitable for compaction. As such, and
depending on the prevailing weather conditions at the time earthwork is performed, moisture
conditioning of the excavated soils will likely be required prior to their reuse as fill or backfill. If
air-drying of the soil is not possible due to precipitation and/or colder temperatures, or if the project
schedule cannot accommodate the time required for air-drying of the soil, it should be anticipated that
the soil will need to be amended with cement to reduce moisture contents and increase workability of

13
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

the soils. If soil amendment is not feasible due to time constraints or cost considerations, it should be
anticipated that unsuitable soils will need to be exported from the site and suitable structural fill
materials will need to be imported. Consideration should be given to placing tarps or similar protective
cover over stockpiles prior to precipitation events to help reduce the amount of moisture conditioning
and/or soil amendment that may be required prior to reuse.

As previously stated, there is the potential to encounter cobbles and boulders during earthwork
and in excavations. As such, there is potential for reuse of cobbles and boulders assuming they can
be processed to a suitable particle size. The maximum particle size of material used in structural fills
should generally be limited to a maximum of 6 inches up to 2 feet below subgrade levels and a
maximum of 2 inches within 2 feet of the subgrade.

It is anticipated that this will be a net import site due to the existing basements. We recommend
using on-site, fine-grained soils to backfill basements in proposed parking/landscape areas, and reserve
imported granular materials for backfill of basements in the proposed building area, as well as for
general fill to establish the building pad and pavement subgrade.

Off-site borrow material, if required to achieve the proposed grading, should consist of
well-graded predominantly granular material and be approved by the geotechnical engineer prior to
use. If clean open-graded stone is used as fill or backfill, it should be completely separated from
adjacent soil with a non-woven geotextile filter fabric to prevent particle migration.

Fill materials supporting loads from buildings and pavements is considered structural fill and
should be installed under the observation of the geotechnical engineer. Mass structural fill consisting
of predominantly fine-grained soil (silt and clay) should be placed in maximum 8-inch thick loose
lifts. Due to the sensitivity of these soils, the use of a pad-foot roller may be required for proper
compaction. Predominantly granular fill materials can be placed in lifts ranging up to 12 inches in
loose thickness and compacted using a smooth drum roller. Backfill placed in confined areas, such as
utility and foundation excavations, should be spread in thinner layers and compacted using the largest
equipment possible without damaging the utilities or compromising the subgrade soils. Backfill
placed within 3 feet of below-grade walls or retaining walls should be compacted with manually

14
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

operated compaction equipment. Fill and backfill should be compacted to the following minimum
requirements:

COMPACTION REQUIREMENTS
Percent of Maximum Dry Density
Location
(ASTM D-1557)
Structural fill below foundations, floor
95%
slabs, and pavements
Backfill for retaining walls, below-grade
92%
walls, and utility trenches
General fill for landscaped and other non-
90%
structural areas

The 2015 International Building Code (IBC) requires that subgrades should be evaluated for
stability by the geotechnical engineer prior to fill placement, and compactive effort for each lift of fill
should be verified by in-place density testing prior to placement of subsequent lifts. Adjustments to
the lift thickness and/or compaction equipment may be required, as directed by the geotechnical
engineer, based on prevailing weather conditions at the time of fill placement and performance of the
compacted soils.

Groundwater and Surface Water Control


Evidence of groundwater was not encountered in the explorations performed for this program.
As such, it is anticipated that groundwater will not pose a significant problem during mass earthwork
or building construction. However, following periods of precipitation or snowmelt, it is possible that
seepage of water perched or trapped atop relatively impermeable soil layers, or emanating from within
relatively porous zones, may occur in open excavations. It is expected that such seepage can be
controlled by pumping from sumps located within the excavations. Sump pits should be filled with
minimum ¾-inch clean stone and lined with geotextile filter fabric to prevent soil migration. Pumped
water should be discharged away from the building pad and open excavations.

Surface grading should be maintained on a continual basis during construction to direct surface
water runoff away from open excavations and prevent water from pooling on subgrade soils and reduce
the potential for development of sinkholes. The contract documents should require the contractor to
provide whatever means and methods are necessary to maintain stable excavations and subgrade

15
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

conditions at all times during construction. Disturbed areas should be compacted daily to seal the
ground surface and inhibit infiltration of surface water.

Frost Considerations
Considering that the site soils contain high percentages of silt and clay, we recommend the use
of finger drains and pavement underdrains to limit the potential for frost heave. Finger drains should
be installed on each side of catch basins in pavement areas and should consist of minimum 4-inch
diameter perforated pipe surrounded by at least 6 inches of clean stone, and the stone should be
wrapped in geotextile filter fabric. The finger drain pipes should penetrate the catch basin and extend
a minimum of 15 feet from the catch basins. The finger drains should be located deep enough to allow
construction of the full pavement section above, including the aggregate subbase layer. Pavement
underdrains should be provided at the interface of flush asphalt and concrete flatwork. The
underdrains should consist of pipe, stone, and fabric, similar to the finger drains; however, the
underdrains should be a minimum of 2 feet wide and extend a minimum of 3 feet below finished
surface grades.

Subsurface Utilities
The site soils and new structural fill materials will be suitable for support of subsurface utilities.
Subsurface utility excavations should be sloped, benched, or shored in accordance with OSHA
requirements as discussed in the Earthwork section of this report. Should very soft, loose, or wet soils
be encountered at the utility invert levels, the subgrade should be over-excavated a minimum depth of
6 inches and backfilled with granular material to provide uniform support. Cobbles and/or boulders
should be completely removed and replaced with structural fill. Utility excavations should be
backfilled using structural fill, placed and compacted in accordance with the Fill and Backfill
Materials section of this report. Utility pipes should use water-tight connections to reduce potential
for sinkholes, and flexible connections should be used at the interface with the building.

Foundations
Based on the results of this exploration program, it is our opinion that the proposed building
can be supported by conventional shallow spread footings established in stable site soils or new
compacted structural fill. Based on the assumed design loads, and provided the earthwork

16
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

recommendations contained herein are followed, foundations can be designed for a maximum
allowable net bearing pressure of 3,000 PSF.

Subgrade materials exposed in foundation excavations should be evaluated by the geotechnical


engineer prior to placement of structural fill, reinforcing steel, or concrete, to confirm stability of the
subgrade and verify adequate bearing exists. The evaluation should consist of proof-rolling and
compacting the subgrade soils with the largest practical equipment and observation or testing as
deemed necessary by the geotechnical engineer. Any subgrade soils that are determined to be soft,
loose, wet, contain cobbles/boulders, or otherwise determined to be unstable should be selectively
excavated and replaced with structural fill, placed and compacted in accordance with the
recommendations presented in the Fill and Backfill Materials section of this report.

The bottom of exterior foundations should be established a minimum depth of 36 inches below
the finished exterior grades to provide protection from frost action, or deeper if required by local code.
Interior foundations in permanently heated portions of the building may be established at convenient
depths below the floor slab that will not interfere with subsequent floor slab construction.

The minimum dimensions of continuous and isolated footings should be 24 inches and 36
inches, respectively, to prevent a punching-type shear failure regardless of the actual applied bearing
pressure. Based on the assumed structural loads, total settlements on the order of 1 inch and
differential settlements on the order of ½ inch can be anticipated for footings established on stable site
soils or new compacted structural fill.

Unless foundation construction proceeds within 24 hours of foundation subgrade preparation,


including approval by the geotechnical engineer, subgrades should be protected from the elements to
reduce exposure and potential weakening of the subgrade soils, particularly if precipitation or freezing
temperatures are expected prior to foundation construction. Preventative measures such as placing a
lean concrete “mud mat” on the subgrade or providing suitable cover for the excavations may be
considered appropriate, depending on the prevailing weather conditions. Foundation excavations
should be protected from frost and water infiltration until the foundations have been constructed and
backfilled.

17
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

Seismic Considerations
Based on the SPT data collected at the site, geologic review, and our experience in the area,
the Site class Definition for the site is “C” in accordance with the latest edition of the International
Building Code [2015] (IBC). As such, the following design parameters are provided utilizing tables
in the IBC code and United States Geological Survey (USGS) design tools:

From the USGS and using ASCE 7-10 information:


Short Period Spectral Acceleration (SS) 0.139g
Spectral Acceleration at 1 Second (S1) 0.053g

Since the site is a Site Class Definition of “C”, straight line interpretation of values for Fa and
Fv based upon SS and S1, respectively are:
Site Coefficient, Fa 1.2
Site Coefficient, Fv 1.7

Utilizing Equations 16-36 thru 16-39 set forth in the IBC, the following design parameters
were calculated:
SMS = Fa*SS = 0.166g ; SM1 = Fv*S1 = 0.091g
SDS = 2/3*SMS = 0.111g ; SD1 = 2/3*SM1 = 0.060g

Floor Slab
It is our opinion that the proposed floor slab can be constructed as a slab-on-grade and designed
assuming a Modulus of Subgrade Reaction of 150 pounds per cubic inch.

The floor slab subgrade soils should be compacted and proof-rolled under the direction of the
geotechnical engineer to evaluate stability. Any areas that are determined to be soft, loose, or
otherwise unstable and/or contain deleterious material should be selectively excavated and replaced.
Fills required to achieve the proposed floor slab subgrade level, including backfill of over-excavations
should consist of structural fill that is placed and compacted in accordance with the Fill and Backfill
Materials section of this report.

We recommend a minimum 4-inch thick bedding of free draining aggregate be placed below
the floor slab to interrupt the rise of capillary moisture through the slab and allow for proper curing of
the concrete. The floor slab may bear on footing projections; however, control joints should be

18
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

provided at the slab and wall/column interfaces to reduce the potential for slab cracking, should the
building settle differentially from the floor slab.

Lateral Earth Pressure Parameters


The excavated predominantly fine-grained (silt/clay) on-site soils are not well-suited for
backfill of below-grade walls and should be avoided, if possible. These soils should also not be used
as backfill within the reinforced zone of segmental block retaining walls. These soils will be sensitive
to moisture-related compaction problems and their inherently poor drainage characteristics typically
result in hydrostatic pressures exerted on the back-face of walls. Predominantly granular portions of
the excavated site soils or imported well-graded granular soils will be better-suited for use as wall
backfill material. The maximum particle size in wall backfill materials should be limited to 3 inches,
and the backfill should be free of deleterious matter and debris. Retaining walls should be designed
with a zone of free-draining material directly behind the back face of the wall to prevent the buildup
of hydrostatic pressures, and include discharge channels, such as weep holes to direct drainage away
from the wall. Walls constructed in cut areas should be designed with back drainage to intercept
seepage that may occur from the excavated slope. Recommended soil parameters for design of below-
grade walls and retaining walls are presented in the following table.

LATERAL EARTH PRESSURE PARAMETERS


Structural
Site Soils
Fill
In-Situ Moist Unit Weight
115 -
(pcf)
Compacted Moist Unit
120 130
Weight (pcf)
Angle of Internal Friction
28 36
(F, degrees)
Coeff. of Friction at Base
0.3 0.6
(Concrete on Soil)
* Values based on industry standard empirical correlations.
Specific values should be confirmed via lab testing prior to final
design.

Walls restrained from lateral movement at the top of the wall and/or intermediate points should
be designed using the at-rest earth pressure coefficient. Walls that are not restrained from lateral
displacement (free to rotate) should be designed using active earth pressure coefficients. We

19
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

recommend that passive earth pressures be omitted from the wall designs. Surcharge loads imposed
by sloping backfill, pavements, terraced walls, material stockpiles, construction equipment, etc. must
be considered in the wall designs. Retaining wall design should consider internal stability and external
global stability at all critical stages during and following construction. Retaining walls should be
designed assuming a maximum allowable net bearing pressure of 3,000 psf.

Light pole bases bearing in the natural site soils can be designed assuming a maximum
allowable lateral soil pressure of 100 psf per foot of base depth BGS in addition to sliding resistance
of 130 psf at the contact between the pole base and subgrade materials.

Stormwater Management
As previously discussed, it is anticipated that stormwater runoff will be controlled by proposed
underground SWM system below the proposed drive lanes/parking areas and/or a basin located at the
ground surface to the west of the proposed building. In-situ infiltration testing was performed at offset
locations from TB-7, TB-8, and TB-9 to establish preliminary permeability characteristics of the site
soils. Infiltration testing was performed in general accordance with Appendix C of the Pennsylvania
Stormwater Best Management Practices Manual (BMP). For design of the new SWM system, the
BMP mandates that a minimum separation of 2 feet be maintained between the infiltration level and
the seasonal high groundwater (SHGW) level. Indicators of seasonal high water were not observed
within the test borings.

SUMMARY OF PERMEABILITY TESTING


Estimated
Ground Tested/Calc. Design
Exploration SHGW or Test Depth
Surface Infiltration Infiltration Rate
Number Restrictive Level (Elevation)
Elevation Rate (In./Hr.) (In./Hr.) (FS=2)
Depth
TB-7 405.0' >8.0' (<397.0') 4.0' (401.0) 0.13 0.06
TB-8 405.0' >8.0' (<397.0') 4.0' (401.0) 14.2 N/A
TB-9 406.5' >8.0' (<398.5') 4.0' (402.5) 2.00 1.00
*Notes: All depths and elevations are approximate. Measurements rounded up to the nearest hundredth.

After comparing the test boring locations to the anomalies identified during the geophysical
survey, it is likely that TB-8 was performed at or near the suspected remnants of a former structure.
As such, it is our opinion that the elevated permeability results observed in TB-8 may have been
influenced by the anomaly. Caution should be exercised when utilizing the permeability data at TB-8.

20
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

It should be noted that additional SWM testing may be required pending regulatory review.
Stormwater management systems should be designed, constructed, and maintained in accordance with
all applicable regulatory agencies, including but not limited to the BMP and associated DEP
requirements, to preserve functionality over the service life of the systems. The systems should be
constructed under the observation of the geotechnical engineer to evaluate compliance with such
regulations and confirm the engineering properties of the subsoils encountered at the detention system
locations are consistent with those encountered during this exploration.

Due to the potential for karst-related activity at this site, we recommend consideration be given
to avoiding designing for infiltration/recharge.

Pavements
New pavements can be constructed on suitable site soils or new compacted structural fill.
Immediately prior to pavement construction, the exposed pavement subgrade should be compacted
with a minimum 10-ton smooth-drum roller and be proof-rolled with a loaded tandem-axle dump truck
under the observation of the geotechnical engineer to evaluate stability. Any subgrade areas that are
observed to be unstable or contain debris/deleterious matter should be selectively excavated and
replaced with compacted structural fill or granular subbase material.

As previously indicated, the site soils have high silt and clay content and will be susceptible to
disturbance from excessive moisture and construction equipment. Depending on the timing between
pavement subgrade preparation and pavement section construction, the contractor should anticipate
that remedial work could be required to achieve a stable subgrade prior to paving, even if the subgrade
soils had previously been compacted to the required densities. Prudent scheduling of pavement
construction and control of construction equipment traffic will reduce the need for potential remedial
work.

Provided the pavement subgrade is prepared in accordance with the recommendations


contained herein, we have assumed a California Bearing Ratio (CBR) of 5 to account for the
fine-grained soils throughout the site. The following tables present recommended minimum flexible
and rigid pavement sections.

21
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

FLEXIBLE ASPHALT PAVEMENT


Standard Duty Heavy Duty
Material
(inches) (inches)
Wearing Course 1.5 1.5
Binder Coarse 2.5 3.5
Aggregate Subbase 5.0 7.0

RIGID CONCRETE PAVEMENT


Heavy-Duty
Material
(inches)
4,000 psi Reinforced Concrete 6.0
Aggregate Subbase 6.0

We recommend that rigid concrete pavements be reinforced with minimum No. 3 bars at 18
inches on-center, each way. These recommended pavement sections may be subject to municipal
approval.

LIMITATIONS
This geotechnical exploration program has been performed in accordance with generally
accepted engineering practice and any applicable design standards as referenced herein. This report
and all supporting documentation have been prepared exclusively for the use of Chick-fil-A Inc.
(Chick-fil-A) pursuant to the Agreement between Maser Consulting P.A. and Chick-fil-A dated July
17, 2018. All provisions set forth in the Agreement and the General Terms and Conditions attached
thereto are incorporated herein by reference. No warranty, express or implied, is made herein.

The findings, conclusions, and recommendations contained in this report are based on data
revealed by limited exploration and testing of the subsurface at the referenced project site. The
explorations indicate subsurface conditions at the specific locations and times explored, and only
within the depths penetrated. Should deviations from the described subsurface conditions be
encountered at any time prior to or during construction, Maser Consulting should be notified
immediately so that modifications to our recommendations can be made, if necessary.

This report is applicable only to the contemplated site design described herein, and any changes
in the design should be brought to our attention so that we may evaluate whether our recommendations
will be affected. Maser Consulting is not responsible for any claims, damages, or liability associated

22
Proposed Chick-fil-A
Borough of Camp Hill, PA August 2018

with interpretation of subsurface data or reuse of the subsurface data or engineering analysis without
the expressed written authorization of Maser Consulting. As such, the conclusions and
recommendations contained in this report are pending our review of final plans and specifications, and
verification of subsurface conditions by direct observation at the time of construction.

This report and supporting documentation are instruments of service. The subject matter of
this report is limited to the facts and matters stated herein.

The scope of this geotechnical program did not include investigation or evaluation of any
environmental issues, such as wetlands, or hazardous or toxic materials on, below, or in the vicinity
of the subject site. Any statements in this report or supporting documentation regarding odors or
unusual or suspicious items or conditions observed are strictly for the information of our Client.

23
APPENDIX A
(FIGURES)
N

SUBJECT
PROPERTY

(*BASE MAP SOURCE: USGS.gov)


TITLE:

SITE LOCATION MAP


PROJECT:

PROPOSED CHICK-FIL-A #04342


BOROUGH OF CAMP HILL
CUMBERLAND COUNTY, PA

DRAWN BY: CHECKED BY: PROJECT NO.:


* MJC 17000373B
SCALE: DATE: FIGURE NO.:
N.T.S. 07/23/2018 1
NORTH
B-9

PLAN
N
B-5

B-4

B-3

B-6

B-7

B-2
B-1

B-8
LEGEND: NOTES:
B-1 INDICATES THE APPROXIMATE LOCATIONS OF 1.) *BASE PLAN PREPARED BY MASER CONSULTING, P.A.,
TEST BORINGS PERFORMED FOR THIS STUDY. TITLED "CONCEPT PLAN," DATED JUNE 26, 2018.

2.) THIS DRAWING IS PART OF MASER CONSUTLING, P.A.'S


GEOTECHNCIAL REPORT (PROJECT NO. 17000373B) DATED
AUGUST 2018 AND SHOULD ONLY BE USED IN CONJUNCTION
WITH THE REPORT.

Title:

EXPLORATION LOCATION PLAN


Project:

PROPOSED CHICK-FIL-A #04342


BOROUGH OF CAMP HILL
CUMBERLAND COUNTY, PA

Drawn By: Checked By: Project No.:


* MJC 17000373B
Scale: Date: Figure No.:
N.T.S. 07/23/2018 2
NORTH
PLAN
N

LEGEND: NOTES:
INDICATES THE APPROXIMATE LOCATION AND 1.) *BASE PLAN PREPARED BY MASER CONSULTING, P.A.,
LIMITS OF MAPPED SURFACE DEPRESSIONS TITLED "CONCEPT PLAN," DATED JUNE 26, 2018 AND
GOOGLE EARTH.

INDICATES THE APPROXIMATE LOCATION AND 2.) THIS DRAWING IS PART OF MASER CONSUTLING, P.A.'S
LIMITS OF SUSPECTED KARST FEATURES PER GEOTECHNCIAL REPORT (PROJECT NO. 17000373B) DATED
THE GEOPHYSICAL SURVEY AUGUST 2018 AND SHOULD ONLY BE USED IN
CONJUNCTION WITH THE REPORT.
Title:

KARST FEATURES
Project:

PROPOSED CHICK-FIL-A #04342


BOROUGH OF CAMP HILL
CUMBERLAND COUNTY, PA

Drawn By: Checked By: Project No.:


* MJC 17000373B
Scale: Date: Figure No.:
N.T.S. 08/16/2018 3
APPENDIX B
(EXPLORATION LOGS)
BORING TB-1
Project: PROPOSED CHICK-FIL-A RESTAURANT #04342 PAGE 1 OF 1
Location: BOROUGH OF CAMP HILL, CUMBERLAND COUNTY, PA
Number: 17000373B

Date Started: 07/20/18 Ground Surface Elevation (ft.): 407


Date Completed: 07/20/18 Datum: Topo
Drilling Contractor: Eichleberger, Inc. Groundwater: Depth (ft.) Date
Driller: Mike First Encountered NE 7/20/2018
Equipment: Diedrich D-50
Drilling Method: Hollow Stem Auger End of Drilling (0 Hrs.) NR 7/20/2018
Sampling Method: Split Spoon After Drilling (> 24 Hrs.)

RECOVERY (in.)
SAMPLE TYPE
ELEVATION
GRAPHIC

NUMBER

N-VALUE
COUNTS
(per 6 in.)
DEPTH

BLOW
LOG

(ft.)

(ft.)
MATERIAL DESCRIPTION REMARKS

0 407.0
7 inches of TOPSOIL S-01 14 2-2-6-4 8
0.6
Light brown, CLAY and Silt, trace mf Sand, trace f Gravel (dry
to moist)
2
Light to dark brown, CLAY and Silt, little mf Sand, trace f Gravel S-02 17 2-5-7-7 12
(moist)

4
Brown, Silty CLAY, trace mf Sand, trace f Gravel (moist) S-03 12 5-6-8-9 14
MASER BORING - KZA DATA TEMPLATE.GDT - 08/17/18 10:02 - \\MVCAD01\GEOTECH\GINT\PROJECTS\17000373B CFA CAMP HILL PA.GPJ

5 402.0

6
Light brown, Silty CLAY, trace mf(+) Sand (moist) S-04 18 8-10-8-7 18

8
Light to dark brown, Silty CLAY, little mf Sand, trace f Rock S-05 24 9-10-11-10 21
Fragments (moist)

10 10 397.0
Light brown, Silty CLAY, trace f Sand, trace f Rock Fragments S-06 21 5-5-5-13 10
(moist)

Spoon broke inside hole at 12


feet. Drilling was offset and
augered down to 14 feet before
continuing.
14
Light brown, Silty CLAY, trace f Sand (moist) S-07 16 17-19-16-16 35
14.8
15 392.0
Light brown, mf Sand, Clayey SILT, trace f Rock Fragments
(moist to wet)
16
Bottom of Boring at 16.0 Ft.

Logged By: AY Checked By: MJC

Notes: BORING TB-1


PAGE 1 OF 1
BORING TB-2
Project: PROPOSED CHICK-FIL-A RESTAURANT #04342 PAGE 1 OF 1
Location: BOROUGH OF CAMP HILL, CUMBERLAND COUNTY, PA
Number: 17000373B

Date Started: 07/20/18 Ground Surface Elevation (ft.): 406.5


Date Completed: 07/20/18 Datum: Topo
Drilling Contractor: Eichleberger, Inc. Groundwater: Depth (ft.) Date
Driller: Mike First Encountered NE 7/20/2018
Equipment: Diedrich D-50
Drilling Method: Hollow Stem Auger End of Drilling (0 Hrs.) NR 7/20/2018
Sampling Method: Split Spoon After Drilling (> 24 Hrs.)

RECOVERY (in.)
SAMPLE TYPE
ELEVATION
GRAPHIC

NUMBER

N-VALUE
COUNTS
(per 6 in.)
DEPTH

BLOW
LOG

(ft.)

(ft.)
MATERIAL DESCRIPTION REMARKS

0 406.5
8 inches of TOPSOIL S-01 18 2-2-2-3 4
0.7
Light brown, SILT and Clay, trace mf(+) Sand (dry to moist)
2
Light to dark brown, CLAY, some(-) cmf Sand (moist) S-02 17 3-2-5-7 7

4
Light to dark brown, CLAY and Silt, trace f Sand (moist) S-03 15 4-7-8-8 15
MASER BORING - KZA DATA TEMPLATE.GDT - 08/17/18 10:02 - \\MVCAD01\GEOTECH\GINT\PROJECTS\17000373B CFA CAMP HILL PA.GPJ

5 401.5

6
Light brown, CLAY and Silt, trace mf Sand, trace f Gravel S-04 24 6-7-8-7 15
(moist)

8
Light to dark brown, CLAY and Silt, trace f Sand (moist) S-05 24 7-7-9-9 16

10 10 396.5
Light brown, CLAY and Silt, little mf Sand, trace f Gravel (moist) S-06 24 11-8-9-7 17

12
Light brown, CLAY and Silt, little mf Sand, some cmf Gravel S-07 18 10-8-4-4 12
(moist)

14
Light to dark brown, Silty CLAY, trace f Sand (moist) S-08 16 4-4-4-4 8
15 391.5

16
Bottom of Boring at 16.0 Ft.

Logged By: AY Checked By: MJC

Notes: BORING TB-2


PAGE 1 OF 1
BORING TB-3
Project: PROPOSED CHICK-FIL-A RESTAURANT #04342 PAGE 1 OF 1
Location: BOROUGH OF CAMP HILL, CUMBERLAND COUNTY, PA
Number: 17000373B

Date Started: 07/20/18 Ground Surface Elevation (ft.): 406.5


Date Completed: 07/20/18 Datum: Topo
Drilling Contractor: Eichleberger, Inc. Groundwater: Depth (ft.) Date
Driller: Mike First Encountered NE 7/20/2018
Equipment: Diedrich D-50
Drilling Method: Hollow Stem Auger End of Drilling (0 Hrs.) NR 7/20/2018
Sampling Method: Split Spoon After Drilling (> 24 Hrs.)

RECOVERY (in.)
SAMPLE TYPE
ELEVATION
GRAPHIC

NUMBER

N-VALUE
COUNTS
(per 6 in.)
DEPTH

BLOW
LOG

(ft.)

(ft.)
MATERIAL DESCRIPTION REMARKS

0 406.5
7 inches of TOPSOIL S-01 22 1-2-2-3 4
0.6
Light to dark brown, SILT and Clay, little mf Sand (moist)
2
Light to dark brown, CLAY, little cmf Sand (moist) S-02 19 2-4-6-6 10

4
Light to dark brown, CLAY and Silt, trace f Sand, trace f Gravel S-03 17 5-6-5-7 11
(moist)
MASER BORING - KZA DATA TEMPLATE.GDT - 08/17/18 10:02 - \\MVCAD01\GEOTECH\GINT\PROJECTS\17000373B CFA CAMP HILL PA.GPJ

5 401.5

6
Light to dark brown, CLAY and Silt, trace mf Sand, trace f S-04 24 7-7-12-12 19
Gravel (moist)

S-05 21 17-15-16-16 31

10 10 396.5
Light brown, CLAY and Silt, trace cmf(+) Sand (moist) S-06 18 17-16-17-17 33

12
Light to dark brown, SILT and Clay, trace f Sand (dry to moist) S-07 17 17-17-18-19 35

S-08 19 17-19-17-17 36
15 391.5

16
Bottom of Boring at 16.0 Ft.

Logged By: JK Checked By: MJC

Notes: BORING TB-3


PAGE 1 OF 1
BORING TB-4
Project: PROPOSED CHICK-FIL-A RESTAURANT #04342 PAGE 1 OF 1
Location: BOROUGH OF CAMP HILL, CUMBERLAND COUNTY, PA
Number: 17000373B

Date Started: 07/20/18 Ground Surface Elevation (ft.): 406.5


Date Completed: 07/20/18 Datum: Topo
Drilling Contractor: Eichleberger, Inc. Groundwater: Depth (ft.) Date
Driller: Mike First Encountered NE 7/20/2018
Equipment: Diedrich D-50
Drilling Method: Hollow Stem Auger End of Drilling (0 Hrs.) NR 7/20/2018
Sampling Method: Split Spoon After Drilling (> 24 Hrs.)

RECOVERY (in.)
SAMPLE TYPE
ELEVATION
GRAPHIC

NUMBER

N-VALUE
COUNTS
(per 6 in.)
DEPTH

BLOW
LOG

(ft.)

(ft.)
MATERIAL DESCRIPTION REMARKS

0 406.5
8 inches of TOPSOIL S-01 18 2-3-4-5 7
0.7
Light brown, SILT and Clay, trace f Sand (moist)
2
Light brown, SILT and Clay, trace f Sand (dry to moist) S-02 16 8-6-10-12 16

S-03 18 8-13-15-17 28
MASER BORING - KZA DATA TEMPLATE.GDT - 08/17/18 10:02 - \\MVCAD01\GEOTECH\GINT\PROJECTS\17000373B CFA CAMP HILL PA.GPJ

5 401.5

6
Light brown, CLAY and Silt, little mf(+) Sand (moist) S-04 22 17-13-19-18 32

8
Light to dark brown, CLAY and Silt, trace f Sand, trace f Gravel S-05 19 13-14-15-14 29
(moist)

10 10 396.5
Bottom of Boring at 10.0 Ft.

Logged By: JK Checked By: MJC

Notes: BORING TB-4


PAGE 1 OF 1
BORING TB-5
Project: PROPOSED CHICK-FIL-A RESTAURANT #04342 PAGE 1 OF 1
Location: BOROUGH OF CAMP HILL, CUMBERLAND COUNTY, PA
Number: 17000373B

Date Started: 07/20/18 Ground Surface Elevation (ft.): 406


Date Completed: 07/20/18 Datum: Topo
Drilling Contractor: Eichleberger, Inc. Groundwater: Depth (ft.) Date
Driller: Mike First Encountered NE 7/20/2018
Equipment: Diedrich D-50
Drilling Method: Hollow Stem Auger End of Drilling (0 Hrs.) NR 7/20/2018
Sampling Method: Split Spoon After Drilling (> 24 Hrs.)

RECOVERY (in.)
SAMPLE TYPE
ELEVATION
GRAPHIC

NUMBER

N-VALUE
COUNTS
(per 6 in.)
DEPTH

BLOW
LOG

(ft.)

(ft.)
MATERIAL DESCRIPTION REMARKS

0 406.0
5 inches of TOPSOIL S-01 15 2-3-4-5 7
0.4
Light brown, SILT and Clay, trace f Sand (dry to moist)
2
Light brown, CLAY and Silt, trace f Sand (moist) S-02 12 5-9-12-14 21

4
Light to dark brown, CLAY and Silt, trace f Sand (moist) S-03 12 7-11-14-15 25
MASER BORING - KZA DATA TEMPLATE.GDT - 08/17/18 10:02 - \\MVCAD01\GEOTECH\GINT\PROJECTS\17000373B CFA CAMP HILL PA.GPJ

5 401.0

6
Dark brown, Silty CLAY, trace f Sand, trace cmf Rock S-04 17 15-17-15-10 32
Fragments (moist)

8
Dark brown, Silty CLAY, trace f Sand (moist) S-05 18 8-11-15-15 26

10 396.0
S-06 24 15-15-17-16 32

12
Bottom of Boring at 12.0 Ft.

Logged By: AY Checked By: MJC

Notes: BORING TB-5


PAGE 1 OF 1
BORING TB-6
Project: PROPOSED CHICK-FIL-A RESTAURANT #04342 PAGE 1 OF 1
Location: BOROUGH OF CAMP HILL, CUMBERLAND COUNTY, PA
Number: 17000373B

Date Started: 07/20/18 Ground Surface Elevation (ft.): 407


Date Completed: 07/20/18 Datum: Topo
Drilling Contractor: Eichleberger, Inc. Groundwater: Depth (ft.) Date
Driller: Mike First Encountered NE 7/20/2018
Equipment: Diedrich D-50
Drilling Method: Hollow Stem Auger End of Drilling (0 Hrs.) NR 7/20/2018
Sampling Method: Split Spoon After Drilling (> 24 Hrs.)

RECOVERY (in.)
SAMPLE TYPE
ELEVATION
GRAPHIC

NUMBER

N-VALUE
COUNTS
(per 6 in.)
DEPTH

BLOW
LOG

(ft.)

(ft.)
MATERIAL DESCRIPTION REMARKS

0 407.0
8 inches of TOPSOIL S-01 20 2-2-3-4 5
0.7
Light to dark brown, SILT and Clay, trace f Sand (moist)
2
Light to dark brown, CLAY and Silt, trace f Sand, trace f Gravel S-02 19 4-6-7-7 13
(moist)

4
Dark brown to gray, CLAY and Silt, trace mf Sand, trace f Rock S-03 18 8-7-11-20 18
Fragments (dry to moist)
MASER BORING - KZA DATA TEMPLATE.GDT - 08/17/18 10:03 - \\MVCAD01\GEOTECH\GINT\PROJECTS\17000373B CFA CAMP HILL PA.GPJ

5 402.0

6
Bottom of Boring at 6.0 Ft.

Logged By: JK Checked By: MJC

Notes: BORING TB-6


PAGE 1 OF 1
BORING TB-7
Project: PROPOSED CHICK-FIL-A RESTAURANT #04342 PAGE 1 OF 1
Location: BOROUGH OF CAMP HILL, CUMBERLAND COUNTY, PA
Number: 17000373B

Date Started: 07/20/18 Ground Surface Elevation (ft.): 405


Date Completed: 07/20/18 Datum: Topo
Drilling Contractor: Eichleberger, Inc. Groundwater: Depth (ft.) Date
Driller: Mike First Encountered NE 7/20/2018
Equipment: Diedrich D-50
Drilling Method: Hollow Stem Auger End of Drilling (0 Hrs.) NR 7/20/2018
Sampling Method: Split Spoon After Drilling (> 24 Hrs.)

RECOVERY (in.)
SAMPLE TYPE
ELEVATION
GRAPHIC

NUMBER

N-VALUE
COUNTS
(per 6 in.)
DEPTH

BLOW
LOG

(ft.)

(ft.)
MATERIAL DESCRIPTION REMARKS

0 405.0
6 inches of TOPSOIL S-01 12 2-4-6-8 10
0.5
Light brown, SILT and Clay, trace f Sand (dry to moist)
2
Light brown, cmf SAND, some mf Gravel, trace Silt/Clay (moist) S-02 10 6-10-50 60

Auger refusal at 3.5 feet.


S-03 17 5-6-7-6/0" 13 Drilling was offset 4 feet south.
MASER BORING - KZA DATA TEMPLATE.GDT - 08/17/18 10:03 - \\MVCAD01\GEOTECH\GINT\PROJECTS\17000373B CFA CAMP HILL PA.GPJ

5 400.0

6
Light brown, CLAY and Silt, some f Sand, trace(+) f Gravel S-04 16 7-8-9-7 17
(moist)

8
Bottom of Boring at 8.0 Ft.

Logged By: AY Checked By: MJC

Notes: BORING TB-7


PAGE 1 OF 1
BORING TB-8
Project: PROPOSED CHICK-FIL-A RESTAURANT #04342 PAGE 1 OF 1
Location: BOROUGH OF CAMP HILL, CUMBERLAND COUNTY, PA
Number: 17000373B

Date Started: 07/20/18 Ground Surface Elevation (ft.): 405


Date Completed: 07/20/18 Datum: Topo
Drilling Contractor: Eichleberger, Inc. Groundwater: Depth (ft.) Date
Driller: Mike First Encountered NE 7/20/2018
Equipment: Diedrich D-50
Drilling Method: Hollow Stem Auger End of Drilling (0 Hrs.) NR 7/20/2018
Sampling Method: Split Spoon After Drilling (> 24 Hrs.)

RECOVERY (in.)
SAMPLE TYPE
ELEVATION
GRAPHIC

NUMBER

N-VALUE
COUNTS
(per 6 in.)
DEPTH

BLOW
LOG

(ft.)

(ft.)
MATERIAL DESCRIPTION REMARKS

0 405.0
5 inches of TOPSOIL S-01 14 3-4-5-5 9
0.4
Brown, SILT and Clay, some (-)cmf Sand, trace f Gravel (dry to
moist)
2
Light to dark brown, SILT and Clay, trace f Sand, little (+)f S-02 13 5-4-8-18 12
Gravel (dry to moist)

4
Light to dark brown, cmf SAND, little(-) f Gravel, trace Silt/Clay S-03 16 9-6-8-11 14
(moist)
MASER BORING - KZA DATA TEMPLATE.GDT - 08/17/18 10:03 - \\MVCAD01\GEOTECH\GINT\PROJECTS\17000373B CFA CAMP HILL PA.GPJ

5 400.0

6
Light brown, Silty CLAY, trace f Sand (moist) S-04 24 8-10-15-16 25

8
Bottom of Boring at 8.0 Ft.

Logged By: AY Checked By: MJC

Notes: BORING TB-8


PAGE 1 OF 1
BORING TB-9
Project: PROPOSED CHICK-FIL-A RESTAURANT #04342 PAGE 1 OF 1
Location: BOROUGH OF CAMP HILL, CUMBERLAND COUNTY, PA
Number: 17000373B

Date Started: 07/20/18 Ground Surface Elevation (ft.): 406.5


Date Completed: 07/20/18 Datum: Topo
Drilling Contractor: Eichleberger, Inc. Groundwater: Depth (ft.) Date
Driller: Mike First Encountered NE 7/20/2018
Equipment: Diedrich D-50
Drilling Method: Hollow Stem Auger End of Drilling (0 Hrs.) NR 7/20/2018
Sampling Method: Split Spoon After Drilling (> 24 Hrs.)

RECOVERY (in.)
SAMPLE TYPE
ELEVATION
GRAPHIC

NUMBER

N-VALUE
COUNTS
(per 6 in.)
DEPTH

BLOW
LOG

(ft.)

(ft.)
MATERIAL DESCRIPTION REMARKS

0 406.5
3 inches of TOPSOIL S-01 15 3-13-13-8 26
0.3
Light brown, CLAY and Silt, little (-)mf Sand (moist)

S-02 12 6-5-7-9 12

4
Light brown, cmf SAND, some f Gravel, trace(-) Silt/Clay (moist) S-03 15 6-8-9-10 17
MASER BORING - KZA DATA TEMPLATE.GDT - 08/17/18 10:03 - \\MVCAD01\GEOTECH\GINT\PROJECTS\17000373B CFA CAMP HILL PA.GPJ

5 401.5

6
Dark brown to brown, mf(+) Sand and Clayey SILT, little mf(+) S-04 12 10-11-11-22 22
Gravel (moist to wet)

8
Bottom of Boring at 8.0 Ft.

Logged By: AY Checked By: MJC

Notes: BORING TB-9


PAGE 1 OF 1
APPENDIX C
(LABORATORY DATA)
Summary of Laboratory Test Results
Moisture <#200 Dry Optimum Satur-
Sample Depth Liquid Plasticity Void
Source Content Sieve K-Class Density Moisture ation
I.D. (Ft.) Limit Index Ratio
(%) (%) (pcf) Content (%) (%)

B-2 S-02 2.0 15.1 77.9 47 25


B-2 S-03 4.0 19.9
B-2 S-04 6.0 27.3
B-2 S-05 8.0 26.0
B-2 S-06 10.0 28.0
B-3 S-02 2.0 20.5 84.4 85 60
B-3 S-03 4.0 23.6
B-3 S-04 6.0 22.0
B-3 S-05 8.0 27.3
B-3 S-06 10.0 31.2
B-7 S-01 0.0 24.9
B-7 S-02 2.0 30.4
B-7 S-03 4.0 16.9 6.7
B-7 S-04 6.0 26.4
B-8 S-01 0.0 14.7
B-8 S-02 2.0 17.1
B-8 S-03 4.0 22.4 2.6
B-8 S-04 6.0 25.2
LAB SUMMARY: NON KZA PROJECTS - US_LAB.GDT - 08/14/18 10:30 - \\MVCAD01\GEOTECH\GINT\PROJECTS\17000373B CFA CAMP HILL PA.GPJ

B-9 S-01 0.0 20.0


B-9 S-02 2.0 20.0
B-9 S-03 4.0 21.6 1.9
B-9 S-04 6.0 29.8

Project: PROPOSED CHICK-FIL-A RESTAURANT #04342


Location: BOROUGH OF CAMP HILL, CUMBERLAND COUNTY, PA
Number: 17000373B
Figure LS- 1
PARTICLE SIZE DISTRIBUTION
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER
4 2 1 1/2 3 6 10 16 30 50 100 200
6 3 1.5 3/4 3/8 4 8 14 20 40 60 140
100
95

90

85

80

75

70

65

60
PERCENT FINER BY WEIGHT

55

50

45

40

35

30

25

20

15

10

5
0
100 10 1 0.1 0.01 0.001
PARTICLE SIZE IN MILLIMETERS

GRAVEL SAND
COBBLES SILT OR CLAY
coarse medium fine coarse medium fine

Source I.D. Depth Classification LL PL PI Cc Cu


B-2 S-02 2.0 CLAY, some(-) cmf Sand 47 22 25
B-3 S-02 2.0 CLAY, little cmf Sand 85 25 60
B-7 S-03 4.0 cmf SAND, some mf Gravel, trace Silt/Clay 0.91 11.67
B-8 S-03 4.0 cmf SAND, little(-) f Gravel, trace Silt/Clay 0.96 5.67
B-9 S-03 4.0 cmf SAND, some f Gravel, trace(-) Silt/Clay 0.31 8.04
Source I.D. Depth W (%) D100 D60 D30 D10 %Gravel %Sand %Silt %Clay
B-2 S-02 2.0 15.1 2 0.0 22.1 77.9
B-3 S-02 2.0 20.5 2 0.0 15.6 84.4
B-7 S-03 4.0 16.9 19 1.18 0.33 0.1 28.2 65.2 6.7
B-8 S-03 4.0 22.4 9.5 0.64 0.26 0.11 10.3 87.1 2.6
B-9 S-03 4.0 21.6 19 0.73 0.14 0.09 23.5 74.6 1.9
*Testing performed in accordance with ASTM Standards

Project: PROPOSED CHICK-FIL-A RESTAURANT #04342


Location: BOROUGH OF CAMP HILL, CUMBERLAND COUNTY, PA
Number: 17000373B
Figure PS- 1
APPENDIX D
(INFILTRATION DATA)
Infiltration Test

Project: Proposed Chick-Fil-A - Camp Hill, PA (Maser Num. 17000373B)


Location: B-7 Location: B-8
G.S. Elev.: 405.0' G.S. Elev.: 405.0'
Test Depth/Elev.: 4.0'/401.0' Test Depth/Elev.: 4.0'/401.0'
Date: 7/20/2018 Date: 7/20/2018

Drop (in.): 0.0 Drop (in.): 5.0


1 1
Time (min.): 30.0 Time (min.): 30.0
Drop (in.): 0.0 Drop (in.): 7.0
2 2
Time (min.): 30.0 Time (min.): 30.0
Drop (in.): 0.0 Drop (in.): 6.0
3 3
Time (min.): 30.0 Time (min.): 30.0
Drop (in.): 0.3 Drop (in.): 8.5
4 4
Time (min.): 30.0 Time (min.): 30.0
Drop (in.): Drop (in.): 9.0
5 5
Time (min.): Time (min.): 30.0
Drop (in.): Drop (in.): 7.0
6 6
Time (min.): Time (min.): 30.0
Drop (in.): Drop (in.):
7 7
Time (min.): Time (min.):
Drop (in.): Drop (in.):
8 8
Time (min.): Time (min.):
Drop (in.): Drop (in.):
9 9
Time (min.): Time (min.):
Drop (in.): Drop (in.):
10 10
Time (min.): Time (min.):
Drop (in.): Drop (in.):
11 11
Time (min.): Time (min.):
Drop (in.): Drop (in.):
12 12
Time (min.): Time (min.):
Drop (in.): Drop (in.):
13 13
Time (min.): Time (min.):

Infiltration Rate (in./hr.) 0.13 Infiltration Rate (in./hr.) 14.2

NOTES: All tests performed in general accordance with the Appendix C of the Pennsylvania
BMP Manual.

Matthew J. Church, P.E.


Lic. No.: PE081072
Infiltration Test

Project: Proposed Chick-Fil-A - Camp Hill, PA (Maser Num. 17000373B)


Location: B-9 Location:
G.S. Elev.: 406.5' G.S. Elev.:
Test Depth/Elev.: 4'/402.5' Test Depth/Elev.:
Date: 7/20/2018 Date:

Drop (in.): 1.0 Drop (in.):


1 1
Time (min.): 30.0 Time (min.):
Drop (in.): 1.0 Drop (in.):
2 2
Time (min.): 30.0 Time (min.):
Drop (in.): 1.0 Drop (in.):
3 3
Time (min.): 30.0 Time (min.):
Drop (in.): 1.0 Drop (in.):
4 4
Time (min.): 30.0 Time (min.):
Drop (in.): Drop (in.):
5 5
Time (min.): Time (min.):
Drop (in.): Drop (in.):
6 6
Time (min.): Time (min.):
Drop (in.): Drop (in.):
7 7
Time (min.): Time (min.):
Drop (in.): Drop (in.):
8 8
Time (min.): Time (min.):
Drop (in.): Drop (in.):
9 9
Time (min.): Time (min.):
Drop (in.): Drop (in.):
10 10
Time (min.): Time (min.):
Drop (in.): Drop (in.):
11 11
Time (min.): Time (min.):
Drop (in.): Drop (in.):
12 12
Time (min.): Time (min.):
Drop (in.): Drop (in.):
13 13
Time (min.): Time (min.):

Infiltration Rate (in./hr.) 2.0 Infiltration Rate (in./hr.)

NOTES: All tests performed in general accordance with the Appendix C of the Pennsylvania
BMP Manual.

Matthew J. Church, P.E.


Lic. No.: PE081072
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\SWM Plans\Chick-Chestnut-PRE.dwg, 7/25/2019 1:48:15 PM, briley

LEGEND:
R . 001 1)
T (S .
T R E E
32nd S

Tc P
ATH
PARCEL 437
PARCEL 436

POI #1
PARCEL 435

D.A. #1
PRE-DEV.
PARCEL 434
PARCEL 433

ALLEY
D.A. #2
CHESTNUT STREET

PRE-DEV.

Tc
PAT
H
PARCEL 432

ALLEY
DI A PENNS
L YL
V

8-
AN
IA

1-1
1-
80
0-
24
2-
17
76
ONE CALL

BEFORE Y
SY

O
U
ST
DI EM
G !
, INC.
POI #2

PARCEL 431
N

SCALE: 1" = 1,000'


LOCATION MAP
SITE

3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT

PRE-DEVELOPMENT DRAINAGE AREA PLAN


OWNER: APPLICANT:
MICHAEL A. SERLUCO CONSOLIDATED PROPERTIES
400 NORTH FRONT STREET (c/o SCOTT STAIGER)
WORMLEYSBURG, PA 17043 400 NORTH FRONT STREET
TELEPHONE: 717-761-3558 WORMLEYSBURG, PA 17043
TELEPHONE: 717-761-3558
DA-PRE

BOROUGH OF CAMP HILL CUMBERLAND COUNTY, PA


SHEET
W:\2018 Land Projects\Chestnut Street\CADD\LD Plans\SWM Plans\Chick-Chestnut-POST.dwg, 7/29/2019 12:57:15 PM, briley

LEGEND:
R . 001 1)
T (S .
E E

POST-DEV.
T R
32nd S

D.A. #1 - BYP
I-1

I-8

OS-1
MH-1

TK-09
CO-3

POI #1
ES-1

POST-DEV.
BMP #2

D.A. #1 - BYP
FFE - 406.40
PROPOSED
RESTAURANT

BASIN
PROPOSED
SUBSURFACE
CO-2

STORMWATER
D.A. #1
I-7

POST-DEV.

I-DE
CHESTNUT STREET

CO-1

MH-2

DRAINAGE AREAS
I-2

INLET PROTECTION

ALLEY
I-4
I-5

BMP #1

I-3
BED
PROPOSED
POI #2

I-6

STORMWATER
INFILTRATION

ALLEY

DI A PENNS
L YL
V
8-
AN
IA

1 -1

1-
00 8
24 -
2-
77 1
6
ONE CALL

BEFORE Y
SY

U ST
DI EM
G! , INC.
D.A. #2
POST-DEV.

POST-DEV.
D.A. #1 - BYP
N
SCALE: 1" = 1,000'
LOCATION MAP
SITE

3115 - 3133 CHESTNUT STREET - PROPOSED CHICK-FIL-A RESTAURANT

POST-DEVELOPMENT DRAINAGE AREA PLAN


OWNER: APPLICANT:
MICHAEL A. SERLUCO CONSOLIDATED PROPERTIES
400 NORTH FRONT STREET (c/o SCOTT STAIGER)
WORMLEYSBURG, PA 17043 400 NORTH FRONT STREET
TELEPHONE: 717-761-3558 WORMLEYSBURG, PA 17043
TELEPHONE: 717-761-3558
DA-POST

BOROUGH OF CAMP HILL CUMBERLAND COUNTY, PA


SHEET