1. Scope
2. General
The generating set shall be designed for fully automatic operation on mains
failure and is robust constructed, factory tested and assembled to ensure
perfect alignment of engine and alternator constructed of rolled steel sections
and complete with anti-vibration resilient mountings, and to ensure that there
is no transfer of vibration from the generator set to the structural and casing
the in bond structural noise. All the equipment shall be fully tropicalized and
suitable for use in a hot humid atmosphere having an ambient temperature of
about 40C.
3. Standards
4. Diesel Engine
TSE/28
The engine shall be of the industrial type, water cooled and designed for
continuous operation and shall be in accordance with BS 649/58 and/or SAE
85F, 29”Hg. The engine shall be suitable for running on fuel oil specified in
BS 2869/70 and shall be sufficiently silenced to reduce the noise to a
minimum. A running hour counter shall be provided for the engine to record
the number of hours of operation.
5. Starting
6. Cooling
7. Lubrication
Lubrication shall be pressure lubricating oil system with engine driven oil
pump throughout the whole engine in conjunction with the built-in-oil to
coolant heat exchanger. Full flow filters with removable elements to be
provided with easy access. Automatic shut down of the generating set
through low lubricating oil pressure must be incorporated. A failure indicate
the generating set has shut down due to low lubricant pressure. Oil pressure
gauge shall be provided. The warning light shall be left on until it is reset
manually.
8. Governor
The governor shall be of the Woodward hydraulic SGX type, and suitable for
maintaining constant engine speeds within the limits specified in BSS 639/58
Class ‘A2’. A speedometer must be provided and automatic shut down of the
engine through overspeed must be incorporated.
9. Exhaust
TSE/29
silicate and the outside shall be neatly wrapped with asbestos cloth sewn with
asbestos string.
The fuel tank shall have a capacity capable of storing sufficient fuel to run the
generating set continuously for twelve (12) hours under normal operating
conditions and shall be fitted with a plastic gauge complete with shut of
cocks to indicate the level of fuel in the tank.
A day tank of suitable capacity for 48 hours operation at full load and of
approved design shall be supplied with each generator set. The tank should
be supplied protected against corrosion externally and internally. A suitable
mechanically protected glass-tube level gauge shall be provided to indicate
fuel level in the tank. Suitable pipework and pumpset for connection to the
service tank shall be provided.
All pipe work for water, lubricating oil, fuel oil and exhaust shall be designed
to suit the standard arrangement for a radiator cool system mounted on anti-
vibration mountings. Piping between the engine and the dairy service fuel
tank for fuel line and fuel overflow shall be copper with braided flexible
connection at the engine.
A pre-cleaner and multi-disc or felt type main filter with replaceable cartridge
shall be provided in the fuel line to the engine.
The Sub-Contractor shall take care to keep all dirt, grease, water and similar
foreign matter out of the fuel lines and equipment.
13. Pumps
An electric fuel transformer pump, fuel piping and float switch shall be
supplied and fitted for the daily service fuel tank to enable replenishment of
the tank from the storage fuel tank.
TSE/30
A suitable semi-rotary hand pump and sufficient length of flexible hose with a
quick action coupling shall be supplied for filling the storage fuel tank from
fuel oil drums.
The housing shall be screened protected and drip proof in accordance with
BS 5000 : Part 99/73.
16. Insulation
The insulation shall be Class ‘F’ and shall be fully impregnated for use in
tropical climate with humid atmosphere of ambient temperature 40C. The
stator and rotor windings of the alternator and exciter shall have oil resistant
finishing varnish.
17. Bearings
TSE/31
A rapid response voltage regulator shall be provided to regulate the
generated voltage. The overall voltage regulator from no load to full load,
including cold to hot variations and load power factor 0.8 lagging to unity
shall be within 2% of the nominal voltage. The excitation system shall be
designed to promote rapid voltage recovery following sudden application or
disconnection of load. The voltage shall recover to within 3% steady state
value within 0.35 second after application or disconnection of load. The
transient voltage dip on application of full load shall be less than 20%.
The temperature rise shall be in accordance with BS 5000 Part 99/73 for
appropriate insulation class in a 40C ambient temperature.
22. Waveform
The line to line voltage waveform shall be in accordance with BS 5000 Part
99/73.
23.3 Shut down of the machine due to low lubricating oil pressure.
23.5 Shut down of the machine due to overload on any or all the phases.
23.6 Audible and visible alarm on the control panel to indicate that it has
shut down due to any of the abovementioned causes.
TSE/32
23.7 Main voltage monitoring - the mains voltage shall be monitored on
all three phases. Failure on all/or any on phase will initiate starting
of the generating set after ensuring the lock-out on mains supply.
23.9 False start - if the engine fails to start up after the prescribed
number of attempted starts, the generating set which is incorporated
with an automatic system shall be prevented against any further
starting and at the same time sets up an audible and visual alarm
indicating that the plant has shut down as prescribed in items 23.1
to 23.5 above.
23.10 Taking over the load - the load shall only be transferred to the
generating set when the alternator have reached the rated voltage
after approximately 10 seconds from starting of engine.
23.13 Delayed return - an adjustable time delay (0-30 mins) to prevent the
set from shutting down in the event of a momentary mains return
must be provided in the system.
23.14 Slowing down - after reconnection of the load to the main supply,
the unloaded generating set shall continue to run for about 5
minutes before stopping.
TSE/33
23.16.3 No load test - to test the functioning of the standby
generating set without connection to the load. The
test duration shall be terminated automatically by a
timer and adjustable over 15 minutes. Any failure, or
abnormalities that would arise from this test would
bring on the alarm as indicated in items 23.1 to 23.5
above.
The control panel shall be designed for fully automatic operation upon mains
failure and shall contain the following equipment:-
24.13 Local manual engine “start” and “stop” controls and shut down
equipment for low lubricating oil pressure, high coolant
temperature, over speed, overload, earth fault with indicating
lamps, audible bulks and terminal connections for remote indication
“ON”, “ON LOAD” and “FAILURES”.
TSE/34
24.15 HRC fuses for control circuits and instruments.
24.17 Duty selector switch for “Manual” , “Auto” , “Off” and “Test”.
25. Operation
The mains sensing relays shall not only detect a complete mains failure but a
drop of 10% more in the mains voltage. When either of these circumstances
occur, they must trip the mains contactor and this action shall start the engine
and close the alternator contactors. Sensing wiring to the Lift Motor Room
shall also be provided.
26. Installation
The Contract shall include the supply and installation of cables and boxes for
incoming and outgoing cables.
The Contract shall included the supply and installation of underground cables
from the generator set to the control cubicle. The cables shall be laid in the
existing cable trench and supported by cable tray if necessary to avoid loose
dangling.
TSE/35
into the ground and complete with phosphor bronze clamping bolts,
phosphor bronze couplings, nuts and concrete inspection cover pit
fitted with removable inspection cover.
Six (6) copies of the operation, maintenance and spare parts manuals and one
set of standard tools shall be provided for the generating set. Assurance that
all spare parts shall always be available ex-stock locally must also be given.
31. Drawings
32. Guarantee
The Contractor shall guarantee that within 18 months period from the date of
commissioning and acceptance the generating sets, any defects which may
develop shall be rectified promptly at no extra charge to the Employer
whether for materials supplied or labour or both. The form “Guarantee for
Plant & Equipment and Plant Performance” is attached.
The Tender shall include for the comprehensive service and maintenance
required during the 18 months defects liability period on all plant and
equipment supplied under the Contract.
The Sub-Contractor shall supply all necessary lubricating oil, battery water,
coolant, grease, etc. for topping up during the test run and routine
maintenance.
TSE/36
34. Exhaust Piping
(a) Kinetics
(b) Korfund
(c) Mason
(d) VMC
There shall be no rigid ties to structure. All conduits and pipework are to be
looped or flexible. limit stops or restraints are to be fitted to the base to limit
transient movements during stops/starts.
All tests shall be made in a manner prescribed in the relevant British Standard
Specification.
1. For Engine
TSE/37
(iii) Exhaust gas temperature
2. For Alternator
The manufacturer shall provide a test report embodying the results of all tests
carried out, after completion of the tests. The test report shall contain:-
TSE/38
(ii) The name, address and contract or order number of the Sub-
Contractor ordering the equipment
(iv) The properties tested and the source of the parameters for such
properties, i.e. British Standards
(v) The results of the test and any divergence from the Specification
37.1 General
The Sub-Contractor shall arrange with the Consulting Engineer for all tests at
least 7 working days in advance. He shall supply all necessary instruments,
apparatus, consumable stores, fuel, connections, skilled and unskilled labour
and services with proper, reasonable and safe facilities required for the tests.
Any cost which may be involved in the tests shall be included in the lump sum
tender by the Sub-Contractor. The Sub-Contractor to be used for any tests
are adequate as regards accuracy and calibration for the tests to be
undertaken.
A complete written record shall be made by the Sub-Contractor of all
inspections and tests. These records shall be made at the time of the tests and
shall be countersigned by the Consulting Engineer or his representative as a
true record. A copy of each record sheet shall be included with the operation
and maintenance manual.
TSE/39
Three copies of certificate of test shall be submitted to the Consulting
Engineer within 14 days of completion of tests.
(f) The testing party of and the signature of the Sub-Contractor’s testing
engineer
(g) The results of the tests and any divergence from Specifications and
Drawings
Any faults or defects revealed by the inspection or testing shall be made good
and re-testing shall be made, all at the expense of the Sub-Contractor.
A 4-hour load running test for the generating plant shall also be carried out
by the Sub-Contractor on site. The load shall be slowly increased by steps of
25% of the rated load to full load and then to 110% of full load. Then the
rated load shall be suddenly taken off and taken on again. Finally the load
shall be slowly decreased by steps of 25% of rated load to no load. Between
load changes, a sufficient duration shall be allowed for the generating plant to
reach steady state conditions. The speed and voltage variations, recovery
times, oil and water temperature and pressures shall be recorded.
The operating function of the control panel, with particular attention to any
timing sequences and protection circuits shall be checked and verified.
The performance of the starting equipment and the ability of the set to start
and take up load within specified time shall be checked.
TSE/40
37.3 Control Panel
The Sub-Contractor shall install a glass framed single line diagram of the
main circuit, changeover and supply scheme, and control circuit diagram in
the generator plantroom.
The Sub-Contractor shall countercheck and ensure that the required intake
air supply for engine combustion and air flow cooling of the generating plant
are adequately provided by the supply air ventilation system provided by
others.
The hot air from the engine radiator fan shall be discharged through ducts
fabricated from aluminium sheets of minimum 1.2 mm thickness, and
provided with appropriate stiffeners. A hot air discharge attenuator shall be
incorporated. The duct outlet shall be covered with aluminium lourves and
galvanized steel wire mesh.
The Contractor shall connect the ventilation fans to the control panel so that
the fans will operate when the generating set is running.
The Contractor shall arrange with the main building contractor for the
provision and making good of all wall openings for hot air discharge.
39. Fuel
TSE/41
Before handing over the completed works, the Sub-Contractor shall provide
sufficient diesel fuel to fill up fully the daily service fuel tank and 500 litres of
spare fuel for the storage fuel tank.
APPENDIX
Specifications
1. The primary exhaust silencers shall be installed within the equipment room as
close as practicable to exhaust outlets of the diesel engines.
2. The primary silencer shall be a multiple chamber reactive type designed for
low frequency noise and exhaust pulsation control. The silencers shall be of
welded sheet steel construction, all components shall be stiffened and braced
to minimize vibration, and shall be finished with high quality heat resistant
paint for surface temperature of up to 540C. All silencers are to be thermally
insulated to minimize heat losses.
3. The minimum insertion loss required for the primary exhaust silencers are:-
Insertion Loss in dB
6 18 28 30 28 25 22
TSE/42
4. The tenderer shall submit insertion loss data of the silencers offered for
evaluation.
TSE/43