FOUNDATION LOADINGS

BEFORE CASTING THE FOUNDATION VERIFY THE DIMENSIONS OF THE WIND SPEED (M/SEC) 39
FOUNDATION BOLT (DIA.& QTY.) AND ANCHOR PLATE (PCD) WITH BENDING MOMENT (T-M) 2.316
RESPECT TO THE DIMENSIONS MENTIONED IN THIS DRG. HORIZONTAL SHEAR (T) 0.440
VERTICAL LOAD (T) 0.669
MAX GR BEARING
PRESSURE (T/M2) 6.272
900 20 nos 12 tor (T1) SAFETY FACTOR AGAINST
OVERTURNING 2.203
CONCRETE MIX VIBRATED M-20
MIN COVER (MM) 50
900

8 tor 190 c/c (T3) STEEL Fe-415


SOIL BEARING CAPACITY (T/M2) 10.00
Bolt Nos. = 4 PROJECTED AREA (M2) 0.970
Bolt Dia. = 24 mm
DETAIL OF PEDESTAL Length = 850 mm

900

120 Anchor Pl. Thk.(mm) = 8 mm


PCD (mm) = 445 mm
300

Nos.of hole/Dia.(mm) = 4 / 26

20 nos 12 tor (T1)


1100

8 tor 190 c/c (T3)


1500

8 nos 10 tor Bothways (T4)


300

SECTIONAL ELEVATION
PCC (1:4:8)
100

BAR BENDING SCHEDULE


100 1800 100 MK QTY SIZE LENGTH SHAPE
8 nos 10 tor Bothways (T2) 100

1575
SECTIONAL ELEVATION T1 20 12 1995

1800 320

100
T2 16 10 1900
1700
800
4 nos.

800
Bolts T3 9 8 3392
1800

100
T4 16 10 1900
1700
QUANTITIES
8 nos 10 tor Bothways (T4) RCC PCC STEEL
8 nos 10 tor Bothways (T2) (M3) (M3) (kg)

2.11 0.40 89.3109


8 nos 10 tor Bothways (T4)
8 nos 10 tor Bothways (T2) NOTES
1- ALL DIMENSIONS ARE IN MM. DO NOT SCALE THE DRAWING
SECTIONAL PLAN 2- MIN. LAP LENGTH OF BARS SHALL BE 50xD. UNLESS OTHERWISE STATED.
3- WE RECOMMANDED THAT MAST FLANGE REMAIN UNGROUTED
4- IF GROUTING IS CARRIED OUT IT IS ESSENTIAL TO LEAVE A MINIMUM
OF 4 NOS 25MM DIA DUCTS EQUALLY SPACED AROUND THE FLANGE TO
ALLOW DRAINGE AND VENTILATION
REV DESCRIPTION DATE 5- BARS DRAWN IN THE DRAWING ARE FOR ILLUSTRATION ONLY. REFER TO
THE NUMBERS SHOWN FOR ACTUAL REINFORCEMENT QUANTITY.
This drawing is the property of "BAJAJ ELECTRICALS LTD." & must be returned on
request. It is submitted as confidential information in connection with enquiry, tender,
orders or contracts. It is not to be used for any other purpose or order nor may it re-
copied or lent without our authority in writing
DATE 20/5/16 TITLE: General Arrangement Foundation Sheet No. Rev.
Bajaj Electricals Limited
DRN BY AUTO Drawing for 11m High Mast 01 of 01 0
DSGD BY VDH PROJECT: M/s- DRAWING NUMBER: -
CHKD BY SRH
APPRD BY CSM BHMRL11B-39mps
SCALE NTS

Page 1

Vous aimerez peut-être aussi