Vous êtes sur la page 1sur 4

EPC CPF PHASE 2

AT BADRA OILFIELD, IRAQ

DOCUMENT DETAILS
EMPLOYER CONTRACT NO. : 090-13-BD-205-00

PROJECT : EPC CPF PHASE 2 AT BADRA OILFIELD, IRAQ

EMPLOYER : Gazprom Neft Badra B.V.

EMPLOYER JOB NO. : GB090

CONTRACTOR : Samsung Engineering Co. Ltd

CONTRACTOR JOB NO. : SG-2614

DOCUMENT NO. : GB090-2614-250-IN-DL-4001

REVISION NO. : B No. of pages (incl. sheet) : 252

DOCUMENT DESCRIPTION : INSTRUMENT INDEX

B Re-Issued for Information 20/06/2013 S.M.Lim S.R.Lee K.Y.Kim

A Issued for Information 25/07/2013 CFF K.H. Kim K.Y.Kim

Rev Description Date Prepared Checked Approved


Electronic Filename : GB090-2614-250-IN-DL-4001_REV B Doc Size : A4

EPC CPF PHASE 2 AT BADRA OILFIELD, IRAQ


INSTRUMENT INDEX
Doc No.: GB090-2614-250-IN-DL-4001 Rev. : B Page : 2 of 252

SUMMARY OF DOCUMENT REVISIONS


Rev. Date Section Revised Revision Description
Revised
A 25/07/2013 Issued for Information Issued for Employer Information
B 20/06/2014 Re-Issued for Re-Issued for Employer Information
Information

Thank you for using www.freepdfconvert.com service!


Only two pages are converted. Please Sign Up to convert all pages.
https://www.freepdfconvert.com/membership
OILFIELD, IRAQ

es (incl. sheet) : 252

K.Y.Kim JSK/TGK

K.Y.Kim JSK/KHS

Approved EM/PD
Doc Size : A4

AQ

Page : 2 of 252

sion Description

Employer Information
or Employer Information

com service!
rt all pages.

Vous aimerez peut-être aussi