Vous êtes sur la page 1sur 1

TRAINING

FIELD OBSERVATION REPORT

Trainee Name: 6
22 Name: 1
Training Project Name: Solterra Filing 16 Infrastructure
Training Project Number: 23
Date: April 11, 2011

OBJECTIVES: COMPLETE FILL M/D TESTING TRAINING


 Observe Will as he completes the project requirements. Ask questions and check that he
properly:
o Checks out and transports nuke gauge I had gauge but showed him how to
lock up the gauge
o Takes nuke test good
o Evaluates soil beneath nuke test good, showed Will how to pop the hole
and check the soil to verify he’s using the right proctor
o Obtains sample for check point, hand drive (if required for project) yes for one
point
o Completes field check point yes good
o 4
o Fills out paperwork yes and Will will be the one submitting the paperwork.

PROFICIENCY NOTES:

Trainee Signature: _________________________________

Trainer Signature: .

Reviewed by: _________________________________ Date: April 11, 2011

Start Job Arrived On-Site Left Site End Job Mileage


6:30 7:15 3:30 4:30 60