EHS – Vision, Mission, Policy, Process -
6 5, 9.3(iii), 8.1
Objective & Organization . Induction
training
First Aid /
Sustainability Parameters Reports
12 Medical 31
and initiative Services
Traffic
14 Safety Defenses 43
Management
Traffic
16 Safety Defenses 43
Management
Welfare
49 Contractor selection & Management 51.3
arrangements
Legal
50 Safety Defenses 4, 34.13
Compliance
Questions & guiding note
Has a site specific emergency plan and evacuation plan been developed
identifying foreseeable emergencies? Is the plan kept up to date when
site conditions change? Are off-site emergency services identified,
contacted and assessed? Is there evidence that monthly emergency drills
have been carried out at the site to test the emergency/evacuation plan
on monthly basis?
Does the site have a clearly identified traffic management plan, posted
and maintained up to date?( map, maximum speed limits, parking
requirements, pedestrian accesses, areas forbidden for vehicles etc.) Are
walkways, routes and emergency access/egress unobstructed and
segregated from vehicle traffic? Are safety traffic signs and pedestrian
crossways in place and clearly visible ?
Do delivery truck drivers receive information about site EHS rules and PPE
requirements? Are all the drivers and all passengers in any motor vehicles
shall wear seat belts.
Are all the vehicles fitted reverse alarms and maintained in good working
condition?
Are garbage bin and signages provided all over the camp area? Are the
garbages disposed off on regular basis? Are the utility area cleaned in
regular basis?
Is the legal register updated ?. Are MSDS available in the storage areas,
office and medical facilities. Are chemical containers labelled to identify
contents and provide hazard warning?
Total Summary
RJ300 Remark
NA
Technical tools calibration certs to be filed
1.site specific emergency plan and evacuation plan been avialable and
shared to client.
2.Evidence of monthly emergency drills are available.
3) Off site emergency plan to be prepared
Inspection pending from admin side and HSE Person will ensure all the
things in monthly basis-
Vehicle checks to be carried out on monthly basis
C
NA
NC
Sl. No Topic No of Points C
1 EHS – Vision, Mission, Policy, Objective & Organization . 7 4
2 EHS KPI 2 2
3 EHS Leadership 3 3
4 Safety Defenses 28 15
5 Contractor selection & Management 9 7
6 Sustainability Parameters Reports and initiative 1 1
Total 50 32
NC NA
3 0
0 0
0 0
2 11
1 1
0 0
6 12