Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets ES-i
The Water Environment Research Foundation, a not-for-profit organization, funds and manages water quality
research for its subscribers through a diverse public-private partnership between municipal utilities, corporations,
academia, industry, and the federal government. WERF subscribers include municipal and regional water and
wastewater utilities, industrial corporations, environmental engineering firms, and others that share a commitment to
cost-effective water quality solutions. WERF is dedicated to advancing science and technology addressing water
quality issues as they impact water resources, the atmosphere, the lands, and quality of life.
This report was co-published by the following organizations. For non-subscriber sales information, contact:
IWA Publishing
Alliance House, 12 Caxton Street
London SW1H 0QS, United Kingdom
Tel: +44 (0) 20 7654 5500
Fax: +44 (0) 20 7654 5555
www.iwapublishing.com
publications@iwap.co.uk
© Copyright 2007 by the Water Environment Research Foundation. All rights reserved. Permission to copy must be
obtained from the Water Environment Research Foundation.
Library of Congress Catalog Card Number: 2006940526
Printed in the United States of America
IWAP ISBN: 1-84339-785-4
This report was prepared by the organization(s) named below as an account of work sponsored by the
Water Environment Research Foundation (WERF). Neither WERF, members of WERF, the
organization(s) named below, nor any person acting on their behalf: (a) makes any warranty, express or
implied, with respect to the use of any information, apparatus, method, or process disclosed in this
report or that such use may not infringe on privately owned rights; or (b) assumes any liabilities with
respect to the use of, or for damages resulting from the use of, any information, apparatus, method, or
process disclosed in this report.
CSIRO, MWH
The research on which this report is based was developed, in part, by the United States Environmental Protection
Agency (EPA) through Cooperative Agreement No. CP-83112101 with the Water Environment Research
Foundation (WERF). However, the views expressed in this document are solely those of CSIRO and MWH and
neither EPA, nor WERF, nor AWWA Research Foundation, endorses any products or commercial services
mentioned in this publication. This report is a publication of WERF, not EPA. Funds awarded under the Cooperative
Agreement cited above were not used for editorial services, reproduction, printing, or distribution.
This document was reviewed by a panel of independent experts selected by WERF. Mention of trade names or
commercial products does not constitute WERF, nor EPA, nor AWWA Research Foundation endorsement or
recommendations for use. Similarly, omission of products or trade names indicates nothing concerning WERF's or
EPA's positions regarding product effectiveness or applicability.
ii
ACKNOWLEDGMENTS
The researchers would like to acknowledge the kind assistance of all those who
contributed to this project. Special thanks are due to CSIRO for its role in the implementation of
this project and inkind contributions (staff days).
Report Preparation
Principal Investigators:
Antony Urquhart, Dip.Bus, CPEng., MWH
Stewart Burn, CSIRO
Project Team:
David Marlow, Ph.D., CSIRO
Simon Heart, M.S., PE, MWH
Scott Gould, BEng, BBus Admin., CSIRO
Max Anderson, CPEng., MWH
Steve Cook, M.S., CSIRO
Michael Ambrose, CSIRO
Belinda Madin, MWH
Andrew Fitzgerald, MWH
Project Subcommittee
Stephen Allbee, United States Environmental Protection Agency
Greg Cawston, Sydney Water
John Colbert, Massachusetts Water Resources Authority
Wayne Dillard, Burns & McDonnell
John W. Fortin, Asset Management Consultant, Cohasset, MA
Susan Karlins, City of Houston
Jon Schellpfeffer, Madison Metropolitan Sewerage Department
Jennifer Warner, AWWA Research Foundation
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets iii
ABSTRACT AND BENEFITS
Abstract
A Water Environmental Research Foundation (WERF) sponsored workshop held in
March 2002 identified that there were no standardized guidelines for conducting condition
assessments, and that there is a need for protocols to help utilities better understand asset
condition and performance. A research project jointly funded by WERF, the American Water
Works Association Research Foundation (AwwaRF) and the United States Environmental
Protection Agency (U.S. EPA) was developed to fill this gap. This report presents the findings of
this research, focusing on the following objectives: 1) documenting the broad range of available
asset assessment tools and techniques, and 2) providing guidance on how to incorporate
condition assessment strategies into a utility’s asset management philosophy.
The important links between accepted and emerging principles of asset management and
approaches to condition assessment are discussed. Generic approaches to assessment program
design and tool selection are offered for both strategic asset management and day-to-day
maintenance purposes, which can be applied across a range of asset types. The information
presented draws upon a range of case studies undertaken with utilities in the United States,
Australia, New Zealand, and the United Kingdom. A tool selection procedure is presented that
uses an exclusion process in which tools and techniques are excluded from further consideration
based on criteria relating to technical feasibility, technical suitability and utility technical
capacity. Remaining options must then be evaluated through economic or financial analysis so
that final selection is made with regard to available resources, the cost-benefits accrued and
utility affordability issues. The report outlines approaches that can be taken in this analysis.
The report also provides descriptions and reviews of 85 individual condition assessment
tools and techniques used in the water and wastewater industry, including a discussion of
principles, applications, practical considerations, advantages and limitations. A prototype expert
system was developed to investigate the use of this technology and also to facilitate the
production of tool selection tables for inclusion in the final report. While these tables are a
pragmatic paper-based solution, it is recommended that the prototype expert system be further
developed to provide the sector with 1) a more flexible selection tool, and 2) a framework for
future updating, maintaining and distributing refinements of the tool reviews and information.
Benefits
Provides a step-wise approach for developing a cost-effective condition and performance
assessment program for water and wastewater utilities.
Provides guidance for integrating condition and performance assessment programs into a
utility’s overall asset management framework.
Recommends criteria for selecting assessment tools and techniques.
Describes and reviews available condition assessment tools and techniques used in the
water and wastewater industry, including principles, applications, practical
considerations, advantages and limitations.
Includes case study examples of applications of condition and performance assessment
techniques at leading water and wastewater utilities throughout the world.
iv
Keywords: Condition assessment, asset condition, asset performance, asset management, tool
selection, utility infrastructure, risk management, case studies, assessment tools
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets v
TABLE OF CONTENTS
Acknowledgments.......................................................................................................................... iii
Abstract and Benefits..................................................................................................................... iv
List of Tables .................................................................................................................................ix
List of Figures .................................................................................................................................x
List of Acronyms ………………………………………………………………………………………………....xi
Executive Summary .................................................................................................................. ES-1 53H
2.3 Condition Assessment as an Input to Strategic Asset Management ..................... 2-11 64H
3.2 The Role of Risk in the Design of an Assessment Program.................................... 3-2 68H
4.0 Justifying a Condition and Performance Assessment Program ............................... 4-1 73H
4.2 Key Benefits of Condition and Performance Assessment Programs ...................... 4-2 75H
4.3 Key Cost Elements for Effective Condition Assessment Programs........................ 4-4 76H
vi
4.6 Optimizing Cost and Benefits Associated with Assessment Programs .................. 4-8 79H
6.2 A Protocol for Selecting Condition Assessment Tools ........................................... 6-2 89H
6.6 The Impact of Risk and Cost on Tool Selection ...................................................... 6-8 93H
7.3 Mapping Tools onto the Asset Stock ....................................................................... 7-4 98H
8.3 Case Study 1: Scottish Water’s Program of Treatment Plant Assessments............ 8-3 103H
8.4 Case Study 2: Scottish Water’s Approach to Grading of Water Mains .................. 8-7 104H
8.5 Case Study 3: Water Corporation’s ACA Program ............................................... 8-10 105H
8.6 Case Study 4: Water Corp’s Assessment Approach for Water Tanks ................. 8-13 106H
8.7 Case Study 5: Water Corp’s Investigation of a Trunk Main Failure …. .............. 8-15 107H
8.8 Case Study 6: Water Care Services Limited Assessments of Sewerage Assets ... 8-19 108H
8.9 Case Study 7: Water Care’s Assessments of A Critical Sewer ............................. 8-21 109H
8.10 Case Study 8: Melbourne Water’s Assessments of Steel Tanks ........................... 8-24 10H
8.11 Case Study 9: Sydney Water’s Management of M&E Assets .............................. 8-28 1H
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets vii
8.12 Case Study 10: City of Bellevue’s Risk-Based Approaches ................................. 8-31 12H
8.13 Case Study 11: Massachusetts Water Resources Authority RCM Program......... 8-33 13H
8.14 Case Study 12: MWRA’s Strategies for Pipe Network Management .................. 8-35 14H
8.15 Case Study 13: CSIRO’s Assessment of a Cast Iron Transmission Main ............ 8-37 15H
8.16 Case Study 14: CSIRO’s Assessment of an Asbestos Cement Force Main ......... 8-40 16H
viii
LIST OF TABLES
2-1
0H Approaches to Asset Management Adopted.................................................................... 2-7 12H
2-2
1H The Impact of Scale on Asset Management Resources (after Shaw 2001) ................... 2-11 123H
2-3
2H Strategic Objectives, Related KPIs and Approach to Assessment ................................ 2-17 124H
2-4
3H Drivers for Undertaking Condition and Performance Assessment................................ 2-20 125H
3-1
4H Condition and Performance Assessment Criteria .......................................................... 3-11 126H
3-2
5H Ofwat PR99 Information Sewer Grading System (Ofwat, 1998) .................................. 3-12 127H
3-3
6H Approaches to Assessing Different Asset Types ............................................................3-.25
4-1
7H Benefits of Undertaking Condition/Performance Assessment ........................................ 4-3 129H
4-2
8H Cost Elements .................................................................................................................. 4-4 130H
5.1
9H Estimated Projection of the Vibration Monitoring Cost Avoidance Benefits ............... 5-19 13H
5-2
10H Ten-Year Projected Condition Monitoring Costs .......................................................... 5-20 132H
5-3
1H Estimated Projection of the Oil Analysis Cost Avoidance Benefits.............................. 5-21 13H
6-1
12H Exclusion Criteria for Inspection and Survey Tools/Techniques .................................... 6-6 134H
6-2
13H Exclusion Criteria for Asset Management and Assessment Tools/Techniques............... 6-7 135H
6-3
14H Utility Criteria that Influence the Choice of Tools/Techniques....................................... 6-7 136H
6-4
15H Sliding Scale of Assessment Standards ......................................................................... 6-11 137H
7-1
16H Service Area: Water Supply............................................................................................ 7-3 138H
7-2
17H Service Area: Wastewater Collection and Disposal ........................................................ 7-4 139H
7-3
18H Hierarchical Representations for Complex Assets .......................................................... 7-5 140H
7-4
19H Hierarchical Representations for Complex Assets .......................................................... 7-6 14H
7-5
20H Hierarchical Representations for Complex Assets .......................................................... 7-6 142H
7-6
21H Tool and Technique Selection Tables.............................................................................. 7-8 143H
8-1
2H Guidance for the Grading of Condition. ........................................................................ 8-14 14H
8-2
23H Weighted Scoring for Asset Components...................................................................... 8-27 145H
8-3
24H Inspection Tools and Techniques Used by SWC........................................................... 8-30 146H
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets ix
LIST OF FIGURES
ES-1
25H A 10-Step Approach to Specifying a Condition Assessment Program..........................ES-3 147H
ES-2
26H A Generic Approach to Specifying Condition Monitoring Techniques ........................ES-5 148H
2-1
27H Business Drivers and Utility Capabilities ........................................................................ 2-2 149H
2-2
28H The PAS 55 Physical Asset Management Framework .................................................... 2-5 150H
2-3
29H Determining Data Requirements through Information Needs ......................................... 2-6 15H
2-4
30H The Asset Management Cycle ......................................................................................... 2-8 152H
2-5
31H The Relationship between Asset Condition, Age and Failure Probability .................... 2-12 153H
2-6
32H The Process of Developing a Performance Management System ................................. 2-15 154H
2-7
3H The Role of Condition Assessment in Utility Decision Making ................................... 2-18 15H
2-8
34H Condition Assessment Undertaken in Response to Individual Drivers ......................... 2-19 156H
5-1
36H Business Drivers and Utility Capabilities ........................................................................ 5-2 158H
5-2
37H The Failure Process as Described by the P-F Curve........................................................ 5-5 159H
5-3
38H A Generic Approach to Specifying Condition Monitoring Techniques ........................ 5-14 160H
6-1
39H Process Flowchart for Developing Condition Monitoring Programs .............................. 6-3 16H
6-2
40H Approach to Selecting Condition Assessment Tools....................................................... 6-4 162H
6-3
41H Iterative use of Condition and Performance Assessments............................................. 6-12 163H
8-1
42H Comparison of Assets in Condition Grade 4/5 by Asset Value....................................... 8-5 164H
8-2
43H Schematic of Water Corporation’s ACA Process.......................................................... 8-11 165H
8-3
4H Typical Failure Mode for Cast Iron Pipe ....................................................................... 8-37 16H
8-4
45H Weibull Plot for Corrosion Data .................................................................................... 8-38
167H
8-5
46H Expected Failure Rate per Year ..................................................................................... 8-39
168H
8-6
47H Determining Residual Strength of the Cores ................................................................. 8-41 169H
8-7
48H Weibull Plot for Deterioration Rates ............................................................................. 8-41
170H
8-8
49H Distribution of Remaining Lives ................................................................................... 8-42
17H
8-9
50H Life Time Distribution Along the Pipeline .................................................................... 8-42 172H
x
LIST OF ACRONYMS & ABBREVIATIONS
3D Three Dimensional
AC Asbestos Cement
ACA Asset Condition Assessment
AwwaRF American Water Works Association Research Foundation
BBEM Broadband Electro Magnetic
C&B Civil and Building
CARD Condition Assessment and Risk Determination
CARE-S Computer Aided Rehabilitation of Sewer And Storm Water Networks
CCTV Closed Circuit Television
CG Condition Grade
CI Cast Iron
CMMS Computerized Maintenance Management System
CMOM Capacity assurance, Management, Operation and Maintenance
CSO Combined Sewer Overflow
DCVG Direct Current Voltage Gradient
DITP Dear Island Treatment Plant
DSS Decision Support System
DT Destructive Testing
ECARD Electrical Condition Assessment and Risk Determination
ES Expert System
FMEA Failure Modes and Effects Analysis
FMECA Failure Modes, Effect and Criticality Analysis
FTEs Full Time Equivalents
GIS Geographic Information System
GPR Ground Penetrating Radar
GUI Graphical User Interface
ICA Instrumentation, Control and Automation
ICGs Internal Condition Grades
IE Impact Echo
I&I Infiltration and Inflow
INMS Integrated Network Management System
Km Kilometers
KPI Key Performance Indicator
LPR Linear Polarization Resistance
m Meters
mm Millimeter
M&E Mechanical and Electrical
mgd Million Gallons Per Day
MM Millimeter
MO Maintenance Optimization
MWRA Massachusetts Water Resources Authority
NASSCO National Association of Sewer Service Companies
NRC National Research Council of Canada
NDT Non-Destructive Testing
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets xi
O&M Operations and Maintenance
Ofgem Office of Gas and Electricity Markets
Ofwat Office of Water Services
PARMS Pipeline Asset and Risk Management System
PDF Probability Density Function
PE Polyethylene
PG Performance Grade
PM Preventive Maintenance
PMO Preventative Maintenance Optimization
Q&S Quality and Standards
QC Quality Control
RBI Risk-Based Inspection
RCM Reliability Centered Maintenance
RPN Risk Priority Number
ROI Return on Investment
SAM Strategic Asset Management
SASW Spectral Analysis of Surface Wave
SCRAPS Sewer Cataloguing, Retrieval and Prioritization System
SIMPLE Sustainable Infrastructure Management Program Learning Environment
SRM Sewer Rehabilitation Manual
SSET Sewer Scanner and Evaluation Technology
STPs Sewage Treatment Plants
SPG Structural Performance Grade
SWC Sydney Water Corporation
TEV Transient Earth Voltage
TFI Transverse Flux Inspection
UID Unacceptable Intermittent Discharge
U.S. EPA United States Environmental Protection Agency
Water Care Water Care Services Limited
WERF Water Environment Research Foundation
WIC Water Industry Commissioner
WRc Water Research Centre
WQ Water Quality
xii
EXECUTIVE SUMMARY
Water and wastewater utilities in developed countries are faced with the challenge of how
to most cost effectively manage a large investment in physical assets while providing safe and
reliable services to their customers. A strategic asset management (SAM) approach can help
utilities meet this challenge. A key element of SAM is the assessment of asset condition and
performance. The objective of this research was to provide water and wastewater utilities with
guidance and information on how to effectively use condition assessment tools and techniques to
improve both the long-term planning and day-to-day management of assets.
The research was undertaken in two phases. Phase 1 of the project involved a web-based
survey and a review of the literature and other information sources. Phase 2 was undertaken as a
refinement stage, where concepts developed in Phase 1 were developed further, drawing on the
knowledge from a range of case study partners and professionals working within the sector. To
this end, various case studies were undertaken during Phase 2 to gain input from a range of
utilities and industry practitioners across the globe.
This report is structured for two distinct audiences:
Utility planning managers who are seeking to understand how to embark upon cost-
effective condition and performance assessment programs, in order to support long-term
planning decisions.
Engineering or maintenance managers that are seeking to identify and understand the
advantages and disadvantages of various available tools and techniques for measuring the
condition and performance of utility assets, in order to support daily maintenance and
operation of assets.
The remainder of this Executive Summary, and the following report, is structured to
assist these two audiences.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets ES-1
latter case, the utility will ideally undertake high-level performance monitoring (through
appropriate key performance indicators) to drive SAM decision making, and only undertake
asset-level condition and performance assessments where there is a need to fill a specific gap in
the information arising from this performance monitoring. Asset-level condition and
performance assessment for SAM are also often undertaken because some form of internal or
external (e.g., regulatory) driver is imposed on the utility that necessitates these specific
assessments.
A key purpose of condition assessment is to establish the current condition of assets as a
means of prioritizing and forecasting maintenance and rehabilitation efforts. Some assets are,
however, more important than others and should receive proportionally more attention. A
standard way to characterize the importance of an asset is to evaluate the risk of it failing. Risk is
an important consideration in asset management and the design of cost-effective condition
assessment programs.
Condition assessment can be used to understand the level of asset deterioration and the
impact it has on the probability of asset failure, which is one component of risk; the other
component being the consequences of asset failure. The utility can then attempt to either reduce
the probability of failure through some operational or capital intervention, or accept the level of
risk associated with the asset’s condition.
When undertaking condition assessments, inspection data are collected using tools that
provide information on such things as the presence of defects and their severity. However, even
when a defect, such as a crack or corrosion is identified, the question still remains as to the
significance of the findings. Data collected during inspection of assets must be interpreted
through appropriate analysis to give an assessment of condition in terms of the operating
demands placed on the asset.
Assessment Program Design
A generic approach to designing a program of assessments has been developed that can
be applied within a range of asset management sophistications, using different approaches to
condition assessment across a range of asset types. Within this generic approach, the integration
of a condition and performance assessment program within asset management is achieved
through 10 steps, which are shown in Figure ES-1.
Assessment Program Cost and Benefit Considerations
Condition and performance assessment programs provide many benefits, but can also be
expensive and time-consuming activities. Ideally, the expenditure on assessment programs
should be balanced against the anticipated benefits. This requires that the cost and benefits
associated with the programs be identified and evaluated in some way.
The costs associated with condition and performance programs can vary greatly
depending on a utility’s current state of program and tool development, and the current
training levels of its staff. Program-specific costs will also vary depending on the
frequency of asset inspection prescribed and the number of assets to be inspected.
While benefits are typically more difficult to quantify than costs, several methods are
outlined, including: improved operations and maintenance efficiencies; catastrophic
failure avoidance; and improved service levels and program efficiencies.
ES-2
It was noted during the research that many of the utilities contacted did not carry out
explicit cost-benefit analyses to justify their assessment programs. Assessments were instead
commonly undertaken within the context of available budgets, and a justification process driven
more by affordability and cost-effectiveness issues than explicit consideration of cost-benefits.
Protocols for Assessing Condition and Performance of Water and Wastewater Assets ES-3
For assets of low value and/or where the impact of failure is not significant, additional
maintenance is not cost-effective and utilities should adopt a reactive run-to-failure
strategy.
At a certain level of asset importance, it becomes desirable to use proactive maintenance
strategies, including condition assessment or monitoring, to manage the probability of
failure.
Proactive Maintenance Strategies
A key requirement for the implementation of a proactive maintenance strategy is the
ability to anticipate when a failure will occur. Inspection of condition and monitoring of asset
performance, either by manual or automated means, plays a significant role in this. Development
of an effective inspection program is centered on knowing when, where and how to inspect. If a
utility finds evidence that an asset is in a state that will eventually lead to a functional failure, it
may be possible to take action to prevent it from failing completely and/or avoid/mitigate the
failure consequences. Many assets have failure modes that give some sort of warning that a
problem is about to occur. Inspection tasks designed to detect potential failure are often referred
to as condition-monitoring tasks.
Condition-monitoring task intervals must be determined based on the time between the
point at which the onset of the failure process becomes detectable, and the point at which a
functional failure occurs (referred to as the P-F interval). If a condition-monitoring task is
performed on intervals longer than the P-F interval, the potential failure may not be detected in
time to prevent failure. On the other hand, if the condition-monitoring task is performed too
frequently compared to the P-F interval, resources are wasted.
Specifying Appropriate Condition Monitoring Tasks
A number of approaches are available to help utilities develop an effective maintenance
strategy. These methods are based on the generation and comparison of relative risk for different
maintenance strategies, and include Reliability Centered Maintenance (RCM) and Risk Based
Inspection. A generic approach to specifying condition monitoring tasks is shown in Figure
ES-2.
ES-4
Figure ES-2: A Generic Approach to Specifying Condition Monitoring Techniques.
When considering a change to any maintenance activity, the key challenge faced by a
maintenance manager is to consider what level of activity is appropriate. In practice, this often
reduces to the need to determine what percentage of the maintenance budget and resources can
or should be dedicated to an activity such as condition monitoring. Various issues need to be
considered, including what condition monitoring technologies to use, the increase in
maintenance tasks anticipated (especially in the short term before the benefits of the improved
maintenance regime start to be observed), resources and equipment required and/or available,
and the anticipated cost and benefits of the program.
Selecting Condition Assessment Tools and Techniques
A key goal of this research was to provide a framework that would assist utilities in the
selection and use of condition assessment tools. Selection tables have been developed to
facilitate this and are based on summaries and detailed write-ups of the available inspection,
survey and condition assessment tools and techniques. The selection process is summarized as:
1. Determine technical feasibility - identify the types of tools that are appropriate to the
condition assessment application under consideration.
2. Review the tool summary information - identify applicable techniques.
3. Detailed review of potential tools – examine detailed tool descriptions to determine most
appropriate candidate tools.
Protocols for Assessing Condition and Performance of Water and Wastewater Assets ES-5
4. For viable options, undertake cost-benefit analysis – give due consideration to the
accuracy of the tool, the level of asset risk, and the available budgets.
Selection criteria have been developed to guide the selection of tools and techniques.
Where relevant information could be found, the attributes relating to the exclusion criteria have
been evaluated for each of the tools and techniques identified and reviewed in this project. These
attributes therefore summarize the application and use of the tools, and provide the information
necessary to identify the range of tools and techniques that are applicable to the condition
assessment application under consideration. Initial work has also been undertaken to develop a
prototype expert system to facilitate this tool selection process, and it is recommended that this
work be completed as part of a follow-on project.
Cost Effective Condition Monitoring
Understanding the risk associated with an asset is critical to determining the appropriate
proactive level of attention to give that asset. A direct extension of risk-based arguments is that
the more important the asset is (the higher the consequences of failure), the more expense can be
justified in assessments undertaken to ensure the asset does not fail. However, to minimize costs,
inexpensive tools should still be used where possible. As such, the following can be stated:
Inexpensive screening tools and approaches should be used routinely.
The results of the screening approach may dictate that there is a need for additional
information and/or accuracy. This may require the use of more sophisticated/accurate
assessment or inspection tools.
Additional expense should be considered only when justified in terms of risk costs
avoided or benefits accrued.
An iterative approach to the use of tools is therefore suggested, where increasing levels of
sophistication are used that build on the results of previous tools and assessments. In this
approach, tools are initially selected that perform a screening function; for example, to identify
the early signs of deterioration. More detailed inspection and analysis can then be used to
investigate the asset condition further, if and when justified.
ES-6
PROJECT RECOMMENDATIONS
A research project of this scope and depth inevitably leaves some issues unresolved and
identifies areas for future research. As such, the project team recommends the following actions
for future consideration by the project sponsors:
1. The prototype expert system for tool and technique selection be further developed into a
finished software tool, and that this tool be designed to allow the information contained
within it to be kept current through an effective update mechanism.
2. Work be undertaken to integrate effectively the outputs of this research and the expert system
into the Sustainable Infrastructure Management Program Learning Environment (SIMPLE)
web site. If possible, this should include a facility for utilities to provide representative cost-
benefit data for condition and performance assessment programs they undertake.
3. A drinking-water version of the SIMPLE web site be produced for the benefit of the drinking
water sector.
4. Further research is undertaken into the use of condition and performance assessment in the
estimation of asset remaining life across all key drinking and wastewater asset types.
5. Further research and development of non-destructive assessment techniques be considered,
especially research aimed at developing inspection techniques for buried pipe assets such that
appropriate condition information is gathered while the assets remain in service. (See also,
Section 5 of U.S. EPA, 2005, which calls for this type of research).
Protocols for Assessing Condition and Performance of Water and Wastewater Assets ES-7
ES-8
CHAPTER 1.0
INTRODUCTION
Chapter Highlights
This report represents the culmination of a two-year research project jointly sponsored by
the Water Environment Research Foundation (WERF), the American Water Works
Association Research Foundation (AwwaRF) and the United States Environmental
Protection Agency (U.S. EPA).
Utilities throughout the world are faced with the challenge of how best to manage their
existing asset stock to provide satisfactory customer service with limited funds.
A key element of effective asset management is a cost-effective program for assessing
the condition and performance of existing assets. However:
− No standardized guidelines or protocols currently exist for utilities to understand
how to develop and implement condition assessment programs and to show how
these programs should fit into an overall asset management program.
− No single resource currently exists for utilities to identify and understand the tools
and techniques that are available to assess the condition and performance of their
assets.
This research has been undertaken as an initial effort to fill these two important voids. In
doing so, this report attempts to reach two audiences:
− The utility planning managers who are seeking to understand how to embark
upon cost-effective condition and performance assessment programs and how
these efforts should fit within an overall asset management approach. This
audience will be most interested in Chapters 1.0-4.0 and the case studies
presented in Chapter 8.0.
− The utility field engineering, operations and maintenance managers who are
seeking to identify and understand the advantages and disadvantages of various
available tools and techniques for measuring the condition and performance of
utility assets. This audience will be most interested in Chapters 5.0-7.0 and the
case studies presented in Chapter 8.0.
To facilitate the use of the report further, an attempt has been made to anticipate
questions a user may wish to answer and to provide an indication of where in the
document related information can be found.
− These questions are presented as a document road map within this chapter.
While this report focuses on condition assessment tools and techniques more so than
performance assessment, the subject of performance assessment is recognized (and
covered to a lesser extent) as an important means of understanding asset condition.
Protocols for Assessing Condition and Performance of Water and Wastewater Assets 1-1
1.1 Introduction
Recent infrastructure studies undertaken in the United Kingdom, Australia and the United
States have shown a common cause for concern—there is widespread deterioration of critical
water and wastewater infrastructure assets, with significant shortfalls in the renewal/replacement
investment required to ensure that water and wastewater utilities can deliver sustainable services
to their communities. For example, in the United States, the American Society of Civil Engineers
(ASCE, 2005) released a report that assigned letter grades to 15 categories of public works. The
grades were allocated on the basis of condition and performance, capacity versus need, and
funding versus need. The rating given to water and wastewater infrastructure was D-, considered
to be a “poor” rating, and only one grade higher than “inadequate/failing.”
The long-term cost implications of continuing with a poorly structured replacement/
renewal regime could be dramatic. For example, the United States based Water Infrastructure
Network estimated that the gap between spending levels and the investment required to meet the
United States’ national environmental and public health priorities embodied in its Clean Water
Act and Safe Drinking Water Act will reach US$23 billion a year over the next 20 years (Water
Infrastructure Network, 2000). Similarly, the American Water Works Association estimated that
US$250 billion over 30 years might be required nationwide for the replacement of just water
distribution pipes and their associated valves and fittings (AWWA, 2001).
This situation is, to a greater or lesser extent, common to the water sectors of many
countries, and has largely come about through assets reaching the end of their life expectancy
without being replaced. This in turn can be related to the adoption of management practices with
a short-term focus, which has led to the deferral of investment required for asset renewals. For
example, in the United States, there has been a tendency to focus on 12-18 month funding cycles
and project deliverables due to the nature of annual government budgets. This funding trend,
combined with two to four year election cycles, has created an atmosphere that encourages short-
term decision making on infrastructure matters, rather than a long-term view (Rast, 2003).
The challenge for many water utilities today is to determine how best to manage their
asset stocks with limited replacement funds, while maintaining a satisfactory level of service in
the long term. Given this challenge, WERF held a workshop in March 2002, entitled “Research
Priorities for Successful Asset Management.” The workshop addressed asset management issues
across public water and wastewater utilities and recommended a research agenda to promote the
next generation of tools for reducing risk and improving competitiveness. Workshop participants
identified that there were no standardized guidelines for conducting condition assessments and
that there was a lack of protocols to help utilities better understand asset condition and
performance.
The workshop determined that undertaking condition assessment within an appropriate
asset management framework would be a significant step forward for the water utility sector of
the United States. For example, this step would enable a utility to better:
Meet customer service expectations as well as legislative requirements.
Determine the risk of failure (considering both failure probability and consequence)
associated with different assets, and therefore, prioritize spending within limited budgets.
Understand asset condition and remaining life, allowing for proactive budgeting for
renewal/replacement of assets.
1-2
Quantify the benefits of different management/operational strategies.
Determine asset value and comply with accounting standards.
With these and other advantages in mind, a primary objective of this report is to
demonstrate the important link between accepted and emerging principles of asset management
and approaches to condition assessment. The report also provides information to facilitate the
selection and effective use of condition assessment tools and techniques when undertaking asset
inspection and condition monitoring within a framework of various levels of asset management
sophistication. A comprehensive scope of tools is considered, covering those applicable to above
and below ground assets (pipeline and non-pipeline assets) used in the delivery of potable and
wastewater services.
1.2 Project Delivery
This research project was undertaken in two overlapping phases. Phase 1 of the project
involved a review of literature and other information sources and led to the drafting of a
condition and performance assessment framework, along with an initial review of available tools
and techniques. Phase 2 was undertaken as a refinement stage, where concepts developed in
Phase 1 were developed further, drawing on the knowledge from a range of case study partners
and professionals working within the sector.
Phase 1 included a web-based industry survey undertaken as a means of obtaining
baseline information about the sector in the United States (some responses were also obtained
from utilities who accessed the survey in other countries). Phase 1 also included a review of the
literature relating to asset management and condition assessment tools and techniques. This
consisted of performing an initial electronic search of the literature using combinations of key
words, screening results and developing lists of articles pertaining to above and below ground
assets from journals, proceedings and conferences. This allowed a first pass assessment of the
tools and techniques used for condition and performance assessment in various sectors to be
made. These tools were researched further during Phase 2 of the project, drawing on information
sources available to the research team, the academic and commercial literature and the Internet.
Draft summaries of individual tools were then sent out to a range of industry
professionals, including venders, researchers and users for peer review. A data collection
spreadsheet that detailed all of the tools and techniques identified in the project was also sent to
each reviewer. The reviewers were asked to use the spreadsheet to confirm the applicability of
tools included on the list and to add any additional tools that were used by or known to them.
Conceptual design of a range of condition and performance related protocols were also
carried out in Phase 1, drawing on the available literature and the experience of the project team.
These protocols were developed further in light of industry interactions carried out as part of the
Phase 2 case studies.
1.3 Linkage to Related Research
In conjunction with other WERF and AwwaRF projects, the project outputs will help
utilities move towards better practice in both condition assessment and asset management. To
this end, the reader is referred to the Sustainable Infrastructure Management Program Learning
Environment (SIMPLE) tool accessible through the WERF web site (accessible to WERF
members only): http://simple.ghd.com.au/Default.aspx.
51H
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 1-3
SIMPLE is a web-based knowledge management tool that helps utilities in developing a
life-cycle asset management approach. The tool guides utilities on how to determine the most
cost-effective investments—acquisition, maintenance, renewal—in their asset portfolio,
including how to extend the life of existing assets by implementing optimal maintenance
practices and rehabilitation interventions.
1.4 Report Structure
The report is presented in eight chapters:
Chapter 2.0 Provides background information on accepted and emerging principles of
asset management, why water and wastewater utilities (hereafter generally referred to as
‘utilities’) undertake condition and performance assessments and the role such
assessments should play in the overall strategic asset management process.
Chapter 3.0 Discusses issues relating to the design of a condition assessment program
for strategic asset management and presents a generic 10-step approach to this design.
Chapter 4.0 Considers how a condition assessment program can be justified.
Chapter 5.0 Provides background information on why utilities undertake condition and
performance assessments and the role such assessments should play in day-to-day
maintenance; this chapter also includes a generic approach to selecting techniques for
condition monitoring.
Chapter 6.0 Presents the approach developed in the project to aid the selection of
condition assessment tools/techniques.
Chapter 7.0 Summarizes the tools and techniques available for use with different assets.
Chapter 8.0 Presents details of the case studies.
Supporting appendices are presented at the end of the report:
Appendix A: Utility Objectives and Related Key Performance Indicators
Appendix B: Individual Drivers for Assessment
Appendix C: Condition and Performance Assessment Criteria
Appendix D: A Generic Condition Assessment Form
Appendix E: Development of a Prototype Expert System
Appendix F: Details of Available Tools and Techniques
1.4.1 Presentation of Detailed Information on Tools and Techniques
The detailed information on condition assessment tools and techniques has also been built
into a prototype electronic expert system to aid users in the tool/technique selection process
(described in Appendix E). It is a recommendation of this project that the prototype be developed
into a finished software tool and made available through the SIMPLE web site.
For the purposes of this report, however, the detail of the tools and techniques reviewed
in the project are incorporated into Appendix F, with selected summary information included in
Chapter 7.0 of the report to guide selection.
1-4
1.4.2 Note on Case Study Insets
Interactions with industry practitioners were undertaken throughout this research,
particularly during Phase 2 when a range of case studies were undertaken with a number of
utilities in the United States, Australia, New Zealand, and the United Kingdom. The case studies
are detailed in Chapter 8.0 of this report. Case Study Insets are also distributed throughout the
report to provide practical insight into the points under discussion. In general, these insets
provide summary information that has been drawn from one of the case studies detailed in
Chapter 8.0. Where this is the case, the linkage to the case study is explicitly stated so the reader
can refer to the relevant case study. In many cases, the full case study provides additional insight
into the issues under discussion.
1.5 How to Use this Report
The initial focus of this project was the consideration of condition assessment as a
strategic asset management tool. Direction from the Project Steering Committee after completion
of Phase 1, however, indicated that the focus of the project needed to be expanded to include the
use of condition monitoring techniques in maintenance. As a result of this guidance, this report
includes specific chapters relating to
1. Strategic Asset Management.
2. Maintenance Management.
Chapters with a Strategic Asset Management Focus
Readers interested in condition assessment from the perspective of strategic asset
management are directed to the following chapters:
Chapter 2.0 Reviews a range of issues related to strategic asset management.
Chapter 3.0 Considers the design of condition and performance assessment programs
from a strategic asset management perspective.
Chapter 4.0 Outlines the approach to program justification using cost-benefit analysis.
Chapter 6.0 Provides guidance on tool selection.
Chapter 7.0 Considers the range of tools available for condition assessment.
Chapter 8.0 Presents case studies.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 1-5
1.6 Document Road Map
To further facilitate the use of the report, an attempt has been made to anticipate
questions a user may want to answer and to provide an indication of where in the document
related information can be found.
In line with the overall design of the document, questions are presented below and split
according to the two target audiences:
1. Questions relevant to strategic asset managers.
2. Questions relevant to maintenance professionals.
It is also anticipated that the user may want to access information relating to specific
asset types, so an indication is also given as to where this information can be found within the
report.
1.6.1 Road Map for Asset Managers
1-6
How do I go about justifying my condition assessment program?
− See Section 4.
Information on Tools and Techniques
What factors should I consider when selecting tools and techniques?
− See Chapters 6, specifically Table 6.1 and Table 6.2.
How do I select which tools to use for a given asset type or situation?
− See Chapters 6 and 7, specifically Figure 6.2 and Table 7.6.
I need information on a specific tool, where can I find this?
− See Appendix F.
1.6.2 Road Map for Maintenance Managers and Engineers
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 1-7
How do I select which tools to use for a given asset type or situation?
− See Chapters 6.0 and 7.0, specifically Figure 6.2 and Table 7.6.
I need information on a specific tool, where can I find this?
− See Appendix F.
1.6.3 Asset Related Sections
1-8
CHAPTER 2.0
CONDITION ASSESSMENT AS A
STRATEGIC ASSET MANAGEMENT TOOL
Chapter Highlights
Utilities share a common business driver: the need to provide sustained service delivery
at an acceptable cost and in accordance with regulatory requirements. They provide this
delivery of service through a combination of the utility’s business and asset capabilities.
A key business capability of a utility is its ability to effectively manage and maintain its
asset stock.
Strategic asset management philosophies have developed over time to facilitate this. The
more advanced approaches focus on risk and service, rather than condition and
performance. Condition assessment, however, remains a key component of risk-based
asset management.
Various levels of asset management sophistication can be identified (informal, core and
advanced) and various drivers exist that create a tendency towards increasing levels of
sophistication.
Utilities should manage asset condition and performance within the context of the
utility’s overall asset management strategy and service level goals.
Condition and performance assessment activities should be designed to fill specific asset-
related information gaps in order to facilitate decision making.
Since condition and performance data collection and management is costly, it is
important that a utility strive to collect only sufficient data to support the information
needs of the business.
Ideally, various measures of performance (key performance indicators or KPIs) would be
used to drive asset management, with asset-level condition and performance assessments
only being undertaken when there is a need for additional information.
In practice, however, utilities need to undertake asset-level condition and performance
assessments in response to a range of drivers unconnected with KPI management
systems, not least because of the need to satisfy the requirements of regulators.
Protocols for Assessing Condition and Performance of Water and Wastewater Assets 2-1
2.1 Introduction
Utilities are tasked with supplying critical water and wastewater services to communities
and the environment. From this perspective, a utility’s business drivers are to provide sustained
service delivery at an acceptable cost and in line with regulatory requirements such as the need to
maintain water and environmental quality and give due regard to public health and safety. The
capacity to deliver these services depends strongly on the business capabilities of the water
utility (e.g., the people, processes, data and technology used within the business) and asset
capabilities (e.g., the capacity, condition and performance of individual assets and systems).
The concept that service levels are dictated by the utility’s business drivers but
underpinned by business and asset capabilities is illustrated in Figure 2-1. For example, business
drivers such as customer expectations and requirements of regulators dictate the level of service
that must be delivered, whereas asset and business capabilities impose a limit on the level of
service that can be sustained over the long term. Where there is a disparity between the demand
for service and the capacity to deliver that service, investment is required in the utility’s asset
and/or business capabilities.
In an asset-intensive sector, one of the key business capabilities a utility can develop to
facilitate service delivery is the effective management of its asset stock, which will in turn
underpin the construction and maintenance of an asset base that has the capability to sustain the
required service levels.
As discussed in Chapters 3.0 and 4.0, effective management of assets requires both
strategic management approaches and an effective approach to condition and performance
assessments undertaken in support of strategic asset management. In this context, condition and
performance assessments provide information on issues such as:
The value of existing assets.
Asset remaining life.
The reasons for shortfalls in service provision.
The potential for future problems; that is, the risk of failure (probability versus
consequence) associated with different assets.
2-2
The way in which condition and performance assessments are used, however, varies
significantly because of the range of asset management approaches adopted by different utilities.
This chapter explores the concepts that underlie the approaches to asset management
applied in the water sectors of countries such as the United States, Australia, New Zealand, and
the United Kingdom and illustrates the role condition and performance assessments plays within
various asset management philosophies. Since the meaning of asset management varies
significantly from practitioner to practitioner, the definition of asset management adopted within
this project is first presented, along with an outline of the overall asset management cycle. The
development of asset management and its underlying philosophies are then reviewed, including a
discussion of the emerging drivers for greater asset management sophistication.
A generic protocol for specifying when and where to undertake condition and
performance assessments is then presented. An ideal approach that uses performance
assessments based on KPIs to measure asset capabilities is outlined, along with a more pragmatic
approach where the need for assessments is dictated by discrete drivers. Examples of protocols
for undertaking condition assessment for the purposes of strategic management in other sectors
are also presented.
It should be noted that this chapter considers issues only from the perspective of strategic
asset management (defined below). Issues relating to day-to-day maintenance management are
discussed in Chapter 5.0.
2.2 Strategic Asset Management
Asset management remains an ill-defined term, and many definitions exist in the
literature. For example, Vanier & Rahman (2004) give the following definition:
Asset management is a business process and decision-support framework that: (1) covers the
extended service life of an asset, (2) draws from engineering as well as economics, and (3)
considers a diverse range of assets.
Similarly, the U.S. EPA (2002a) notes that:
Asset management is a continuous process that guides the acquisition, use, and disposal of
infrastructure assets to optimize service delivery and minimize costs over the asset’s entire
life.
Notwithstanding the value of these definitions, for the purposes of this project, the
following definition, modified from that given in the International Infrastructure Management
Manual (IPWEA, 2006), is considered by the authors to encapsulate the main features of this
emerging discipline as it is practiced today:
The combination of management, financial, economic, engineering and other practices
applied to physical assets with the objective of providing the required levels of service to
customers and the environment at acceptable levels of risk and in the most efficient manner.
While “asset management” is used as a general term throughout this report to indicate
issues relating to this definition, the expression “Strategic Asset Management” (SAM) is also
used to differentiate practices specifically with a medium to long term view, from those practices
specifically with a short to medium term view, which are considered to be part of maintenance
management discussed in Chapter 5.0.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 2-3
Many practitioners refer to asset management with a medium view as “Tactical Asset
Management,” however, this term is not used within this work.
2.2.1 Asset Management as a Framework
The adoption of formal asset management by utilities has generally lagged behind the
development of the asset stock. As such, asset management has commonly evolved and
developed around existing utility systems and in light of existing assets.
When starting to implement formal asset management approaches, utilities generally
begin from a position of poor knowledge regarding the asset stock. However, as discussed in
Section 2.2.2, a fundamental requirement of all asset management systems is information on the
assets. Utilities in this position must therefore address the six “whats” of asset management
(Vanier, 2000 & 2001):
1. What assets are owned?
2. What are they worth?
3. What is the deferred maintenance? (In this context, deferred maintenance is taken to be
an overview of the amount of expenditure required to bring the maintenance and repair
under control, rather than being a measure of renewal backlog).
4. What condition are the assets in?
5. What is the remaining service life of the assets?
6. What should be fixed first?
Various asset management tools and approaches are needed to help answer these
questions. In particular, condition and performance assessment are widely used, not least because
they provide the information required to answer the last three of the “whats” of asset
management listed above.
While these tools are important to the implementation of asset management, it should be
understood that they are not asset management per se. Instead, it is useful to consider asset
management as a framework within which various tools and approaches are applied. For
example, the “Publicly Available Standard” for asset management (PAS 55) in the United
Kingdom (BSI, 2004), provides a complex framework (scope) for asset management, which for
most practical purposes can be simplified to the process shown in Figure 2-2.
It is interesting to note that the later steps in Figure 2-2 (set condition and performance
targets, produce asset management plans, and implement and operate) indicate that the on-going
management of asset condition and performance is a key aspect of this framework. Management
of asset condition and performance can only be achieved if appropriate measures are available to
compare against the condition and performance targets, so the implementation of this particular
framework would, like the six “whats” of asset management given above, explicitly drive the
requirement for condition and performance assessments. However, as will be discussed later,
management of condition and performance is just one asset management philosophy adopted in
the water sector.
The reader is referred to national and international standards for more information on
asset management frameworks (for example, IPWEA, 2006; BSI, 2004).
2-4
Figure 2-2. The PAS 55 Physical Asset Management Framework.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 2-5
Operational context
Environmental conditions
Information on reported defects and failures
Maintenance and inspection records
Given the large number of assets involved in the provision of water and wastewater
services, there is potentially a great deal of data that could be included in a database. However,
since data collection and management is costly, it is important that a utility collect only sufficient
data to support the information needs of the business. This concept is illustrated in Figure 2-3,
which shows the relationship between data, business processes and information needs. To
optimize data collection, the utility should first consider the business information needs, which
will then dictate what input data are relevant, including the amount of asset condition and
performance data required. This mapping needs to be reviewed periodically as business
information and data needs change due to changes in emphasis given to different management
issues, changes in regulation, and so forth.
2-6
(This question can often be related to the asset’s condition, but may not be.) If not, maintenance
and/or capital investment are required. Again, this is a natural way for engineers to consider
management of assets.
A more customer-focused approach is taken in service-based asset management.
Performance is not viewed in terms of local considerations (the design intent of individual
assets), but instead is considered in more inclusive terms and at a higher level. The question is
posed, “is the asset contributing appropriately to the delivery of service?” This consideration is
made independently of asset condition or its performance relative to design intent.
Service-based asset management thus seeks to maintain the service provided by the asset
stock at both the local and regional level. Due consideration is normally given to the need to
deliver at least minimum levels of service to all customers. This approach is less intuitive for
engineers, since it can mean that maintenance/investment is not always justified for poor
condition assets or even poor performing assets where the impact on service is acceptable.
Risk-based asset management seeks to achieve optimum life cycle management of assets
through consideration of risk to service provision, with risk generally being defined as the
product of ‘probability of failure’ and ‘consequence of failure’. The condition and performance
of an asset are simply factors in the assessment of risk. Other factors taken into account include
business risk factors such as those associated with safety and the environment, customer
expectations, reliability, efficiency and effectiveness, finance, reputation and regulatory
relationships.
In the web-based industry survey undertaken as part of this research, surveyed utilities
were asked to specify which of these categories best described their approach to asset
management. The results are shown in Table 2-1 for a sample of 30 respondents, 21 of which
were from the United States. The table shows that there is a wide range of philosophies still
being adopted within the sector, and that nearly one-third of the respondents indicated that there
was no defined strategy being used.
Table 2-1. Approaches to Asset Management Adopted.
Asset management approach adopted Proportion
Condition-based 28%
Performance-based 19%
Service-based 10%
Risk-based 14%
No defined strategy 29%
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 2-7
Figure 2-4. The Asset Management Cycle.
From the categorizations given in Table 2-1, it is clear that utilities address the asset
management cycle shown in Figure 2-4 in a variety of ways. Nevertheless, all utilities must, in
broad terms, deliver the same range of core services and manage an asset stock throughout its
life cycle. As such, all utilities must address various asset management building blocks in some
way, even when the overall asset management approach is not formalized. These include the
asset-related tasks shown in the asset management cycle (Figure 2-4), as well as other
fundamental building blocks such as:
Asset information
Condition and performance assessments
Risk management
Planning for maintenance and renewals
Optimizing asset investment
Monitoring service provision
Setting appropriate pricing
The level of asset management adopted to co-ordinate and align these building blocks
depends in part on the utility’s business environment. For example, the more exacting the service
mandates are in relation to budgetary constraints, the more sophisticated the asset and business
capabilities need to be; these conditions then drive the need for adopting formalized asset
management approaches.
2.2.5 Three Levels of Strategic Asset Management
The International Infrastructure Management Manual (IPWEA, 2006) defines two levels
of formal asset management: core and advanced.
Core asset management relies primarily on the use of an asset register, maintenance
management systems, job/resource management, inventory control, condition assessment and
defined levels of service, in order to select appropriate interventions and make long-term
2-8
cash flow predictions. Priorities are usually established based on financial return rather than
risk analysis and optimized decision making.
Advanced asset management employs predictive modeling, risk management and optimized
decision making techniques to establish asset lifecycle intervention options and related long-
term cash flow predictions. Advanced asset management is heavily reliant on the use of
computerized systems and is possible only when detailed data on assets are available.
However, since data quality improves over time as it becomes embedded within a ‘business
as usual’ environment, early adoption of advanced asset management approaches can act as a
facilitator for improving the quality and accuracy of data.
Since the results given in Table 2-1 indicate that 29% of respondents have no defined
strategy for asset management, it can be inferred that a significant proportion of utilities in the
United States have not yet implemented core asset management, as defined in the International
Infrastructure Management Manual (IPWEA, 2006). As noted above, however, in an asset
intensive sector, all utilities must be undertaking management of assets in one form or another.
As such, for the purposes of this project, utilities undertaking management of assets without
adopting a formal approach to SAM, were deemed to be applying a third level, which can be
termed Informal Asset Management.
2.2.6 The Drive Toward Increasing Asset Management Sophistication
If there were no drive towards greater sophistication, it can be assumed that informal
asset management approaches would remain in place, since these are the least expensive
approaches to implement. In the United States, as with other countries, an informal approach has
been acceptable in the past; however, this trend appears to be shifting.
Some of the drivers behind this shift include decreased availability of federal grants for
capital projects, and more stringent service and cost drivers. Rast (2003) identified four key
drivers for the adoption of formal asset management approaches in the United States:
Changes in demands placed on infrastructure and budgets.
Changes in public perception relating to asset management.
Changes in regulatory requirements.
Availability of new technology.
The first of these drivers relates to the combination of increased demand on
infrastructure systems combined with a significant budget shortfall. The second driver relates to
public perception of the management of infrastructure assets and a growing awareness of the
impact of aging infrastructure and environmental factors on water quality and quantity. In a
similar vein, the U.S. Department of Transport (US DoT, 1999) noted that asset owners will be
facing increased system and budget needs with limited staff resources. At the same time,
individual states will be required to deal with increased system complexity and public demands
for accountability and expectations regarding levels of service. As noted in Chapter 1.0 of this
report, these demands are occurring at a time of deteriorating asset stocks.
The third driver noted by Rast (2003) is a change in regulations, which promote and/or
require the adoption of asset management principles. These regulations include the U.S.
Government Accounting Standards Board (GASB) issued Statement No. 34, and ‘Capacity
assurance, Management, Operation and Maintenance’ (CMOM), discussed further in Case Study
Insets 2-1 and 2-2. The final driver is the availability of new computer technology, which has
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 2-9
prompted a significant increase in the availability of tools (e.g. GIS and hydraulic models) that
can assist in the complex analysis and decision making required for formal asset management.
2-10
operational and maintenance strategies on the achievement of strategic business objectives and
deliver them in a cost effect manner and at an acceptable level of risk.
The added value (perceived or actual) realized by investing in asset management
approaches will, to a degree, depend on the size and complexity of the utility’s operations. The
issue of affordability and cost-benefits need to be considered in all cases, but economies of scale
favor the larger utility. For example, Shaw (2001) indicated that it is possible to increase the
assets under management without a proportional increase in asset management overheads. Table
2-2, gives an indication of how asset management labor input, in terms of full time equivalents;
(FTEs), might vary with the value of assets being managed.
Table 2-2. The Impact of Scale on Asset Management Resources (after Shaw, 2001).
Asset management FTEs
Asset base Asset base x 2 Asset base x 4
114.8 FTEs 134.3 FTEs 179.3 FTEs
(25% increase) (67% increase)
While such economies of scale may well exist, this does not preclude smaller utilities
from adopting sophisticated strategies for the management of specific asset types. For example,
small utilities may (and do) adopt sophisticated geographical information system (GIS) based
analytical approaches for the management of pipe networks.
2.3 Condition Assessment as an Input to Strategic Asset Management
As discussed in previous sections, there has been a succession of asset management
philosophies (from a focus on asset condition and performance, to a focus on service provision
and business risk) and an increase in asset management sophistication in the utility sectors of a
number of countries. Since the more developed asset management philosophies do not focus on
asset condition, it can be concluded that SAM does not seek to manage asset condition or
performance per se. For many types of assets, however, there is a general relationship between
age, condition and the asset’s propensity to fail, as illustrated schematically in Figure 2-5.
Such relationships occur when failure mechanisms such as fatigue, corrosion and wear-
out start to predominate as the asset reaches the end of its useful life. The rate of deterioration
(i.e., the worsening of condition and/or performance) is highly asset and context-specific, and
depends upon such factors as the type and design of the asset, the existence of deterioration
mechanisms such as corrosion and wear, any protection systems used, local environmental
conditions, its operating context and the maintenance strategy adopted. Relationships such as
those illustrated in Figure 2-5 are seldom straightforward. Nevertheless, the condition and
performance of many types of assets progressively deteriorate over a characteristic timescale,
eventually reaching the point where they need to be replaced or rehabilitated because they are
uneconomic to operate, provide unacceptable performance or are deemed to represent too high a
risk.
Given theses considerations, although it is true that SAM does not seek to manage asset
condition as such, measures of asset condition and performance are clearly an important input
into asset management decision making and other processes. In turn, the development of asset
management processes also facilitates the effective implementation of condition assessments, as
summarized in Case Study Inset 2-3.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 2-11
Figure 2-5. The Relationship between Asset Condition, Age and Failure Probability.
Case Study Inset 2-3: Increasing Condition Assessment Effectiveness through SAM
When it was corporatized in the early 1990’s, Melbourne Water inherited a fragmented
approach to the management of its water tanks. Basic information relating to the construction
of the tanks was available in the form of design drawings. However, on-going assessments
were undertaken separately by various departments focusing on individual issues, such as
corrosion, mechanical and electrical components, valves, etc. Information recorded during
these assessments was in a summary format (e.g., “asset satisfactory”) and not collated
together.
It was recognized that this assessment strategy did not provide the information required to
support effective stewardship of complex assets. As such, Melbourne Water started to develop
a structured approach to the management of these assets. Asset specific policies and
procedures were developed, in line with the development of corporate risk and asset
management policies, and with appropriate resourcing and lines of responsibility.
Subsequent experience within Melbourne Water has shown that detailed investigations can be
required when there is an unexpected failure or deterioration of any asset. The ability to
undertake these investigations and implement risk management strategies is greatly enhanced
by the development of asset management approaches.
See Case Study 8 in Chapter 8.0.
2-12
periodic condition assessments in order to make the best life-cycle decisions regarding
maintenance and replacement.
In addition to playing a key role in the assessment and understanding of asset
deterioration, condition and performance assessments can also provide information to meet other
strategic asset management needs, for example:
What assets are worth.
How assets are performing in relation to requirements (in some cases, this involves
comparing asset performance to service measures).
The impact of operation and maintenance practices on asset condition and performance.
Case Study Inset 2-4 illustrates the role condition and performance assessments can play
in regulatory reporting, which encapsulate these issues.
Case Study Inset 2-4: Use of Condition and Performance Assessment in Reporting
In Scotland, the assessment of asset condition and performance was required by the Economic
regulator for Scotland and included in the Asset Inventory and System Performance
Submission (Table H). Table H was part of the Scottish Water’s annual reporting
requirements and summarized the asset stock, its condition and performance and value
(modern equivalent). The guidance notes for the production of Table H indicated the
information in the table would form a record of the asset stock and provide a strategic
framework of investment levels for sustainable stewardship for coming years. The stated
objectives of Table H were to:
1. Enable Scottish Water to produce a strategic framework that provided asset stewardship
output measures, set against investment levels for each asset category.
2. Enable Scottish Water to demonstrate that asset information was adequate and that the
Authority had a comprehensive and systematic basis for the long-term stewardship of the
assets in regard to financial performance and customer service.
3. Enable Scottish Water to summarize the latest investigations and audits of their asset
stock. This included the level of risk, condition, age and performance of assets.
See Case Studies 1 and 2 in Chapter 8.0.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 2-13
2.4 When to Undertake Condition Assessment
One challenge for this project was to consider the application of condition assessment for
the whole range of asset management approaches currently in use; from informal asset
management through to advanced asset management. To this end, the project team determined
what it considers to be the ideal practice for specifying the need for condition assessment, while
allowing for the fact that a significant proportion of utilities will not be in a position to adopt this
ideal. (It should be noted that the use of the term ‘ideal practice’ does not imply each utility
should aim to adopt this approach; what is practical and affordable also needs to be taken into
account – best practice for a given utility must be considered in terms of its business drivers,
existing systems and available budgets.)
The first step in developing an assessment program that will allow the utility to control
costs and sustain the desired level of service is the definition of required system-level
performance standards (ASCE, 2004). As such, and to aid discussion of the ideal route for
specifying condition assessment, it is worthwhile considering first the development of
appropriate performance standards, and then showing how the strategic measures of asset
management performance generated can be used to specify the need for asset-level condition and
performance assessments.
2.4.1 Strategic Goals and Performance Management
Each utility has a range of institutional aspirations (things the utility wants to do) and
imperatives (things the utility must do), commonly expressed in the form of business goals.
These business goals will in turn reflect the requirements of stakeholders and customers, and will
in part depend on the ownership model adopted (whether a public council/authority or private
business).
Ideally, the utility will establish strategic objectives that embody these goals and
imperatives, select appropriate KPIs and set corresponding targets that will allow the utility to
measure progress towards the strategic objectives, as well as measure operational/maintenance
performance. Case Study Insets 2-5 and 2-6 show a number of relevant KPIs and associated
targets for two of the case study partners in the United States.
The process of defining relevant KPIs is illustrated in Figure 2-6. The targets and
requirements box shows how the KPIs feed into the asset management cycle shown in Figure 2-4
(via the targets and requirements box in Figure 2-4).
Utilities need a set of KPIs that measure performance across a range of business
activities. Various types of KPIs can be specified, including: level of service KPIs; asset-related
KPIs; and derived KPIs. For the purposes of this work, these are defined as follows:
Level of service KPIs (e.g., interruptions to service) give a measure of service as
perceived by the customer or environment and are an indirect measure of asset condition
and performance. These KPIs are often the driver behind asset management expenditure
and prioritization processes.
Asset related KPIs (e.g., equipment or pipe failures) give a measure that can be related
directly to asset condition or performance. These KPIs are often used to target and
prioritize asset management expenditure effectively.
2-14
Derived KPIs (e.g., amount of rehabilitation and annual investment) are those that
measure asset management effort. These KPIs can reflect asset condition and
performance, but are strongly influenced by policy decisions and available budgets.
Case Study Inset 2-5: KPIs and Targets for a U.S. Utility
Massachusetts Water Resources Authority (MWRA) uses an extensive set of KPIs to measure
performance aspects of operations and maintenance programs; for example:
Equipment availability (exceeds industry benchmark of 97%).
Replacement asset value per maintenance technician (exceeds industry best in class
target range of $8M to $10M).
Maintenance cost/replacement asset value (in range of industry benchmark of 1-2%).
Preventive maintenance compliance > 95% per month completed.
Predictive maintenance is increasing and currently accounts for 10% of all work
orders.
See Case Studies 11 and 12 in Chapter 8.0.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 2-15
Case Study Inset 2-6: KPIs and Targets for a U.S. Council
The City of Bellevue Council uses a suite of KPIs to drive asset management programs. KPIs
are organized according to effectiveness, efficiency and staff workload. Certain effectiveness
KPIs, such as water service interruptions, sewer system dry weather overflows and claims
relate to overall condition and performance of assets. KPIs and associated targets relevant to
this research include:
Customer satisfaction rating (target > 85%).
Claims per year (target <10 (wastewater) and <5 (water), with no single claim greater
than $20,000).
Water service interruptions (target < 3 per 1,000 service connections).
Wastewater pump station overflows (target<0.11 per 1,000 service connections).
Sewer main line stoppages per year (target < 0.4 per 1,000 service connections).
Percent completion of planned inspection programs (target 100%).
See Case Study 10 in Chapter 8.0.
Once an appropriate set of KPIs is selected and targets set, the data needed for KPI
measurement must be collected and/or collated as a routine activity and analyzed in an
appropriate manner. This includes analysis of supporting statistics required to help understand
variations and trends in KPIs.
Analysis of KPIs can be undertaken at a range of granularities (local to utility wide), as
an on-going management task and as a feed into periodic planning cycles for capital investment,
such as in Case Study Inset 2-7. Aitkin and Davis (2001) note that performance monitoring of
this type:
1. Provides a comprehensive picture of how the utility is progressing towards achieving its
strategic goals.
2. Provides early indications of emerging issues that may require remedial action.
3. Establishes a basis for service standard, resource and pricing negotiations between
stakeholders.
4. Provides a logical and defensible basis for changes in policy and/or practices and the
pursuit of negotiations with external stakeholders (e.g., customers and regulators).
The comparison of measured KPIs to the associated targets, in conjunction with trending
analysis, also informs and drives asset management effort; a shortfall in a KPI measured against
its target indicates that a strategic objective is not being met and that some action is required. For
example, Table 2-3 shows a number of strategic objectives and related KPIs applicable to the
management of water supply assets, along with an outline of the approaches used to assess why a
shortfall exists in the KPIs against targets. A more comprehensive list of strategic objectives and
related KPIs for both water and wastewater services is provided in Appendix A.
2-16
Case Study Inset 2-7: Investment Planning through KPI Assessments
An approach akin to the high-level performance monitoring protocol was used by Scottish
Water in Quality and Standards (Q&S) II. Q&S II involved planned investment of £1.8 billion
between April 2002 and March 2006. Bursts and quality KPIs were used in a condition and
performance matrix to identify problem water supply zones. Once identified, more detailed
studies were undertaken.
A strategic gap analysis was also undertaken by Scottish Water as part of its third investment
planning cycle; referred to as Q&S III. Q&S III spans April 2006 to March 2014. This gap
analysis was essentially a systematic review of asset capabilities and service provision
compared to current and future targets, so as to identify where investment was needed. This
involved assessment of a range of KPIs and other data. As is the general practice in the United
Kingdom, the resulting investment program was driven by gaps in service levels and KPIs.
See Case Study 1 in Chapter 8.0.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 2-17
generated. However, the assets are still deteriorating at an unknown rate and eventually will start
to fail, potentially with unacceptable consequences.
Even when strategic performance management is undertaken effectively, there is still a
gap in the information required to manage the assets, which can be filled by undertaking asset-
level condition and performance assessments. Figure 2-7 illustrates the process of using level of
service and asset related KPIs as a means of undertaking high-level performance assessment to
drive SAM decision making, only undertaking asset-level condition and performance
assessments specifically for the purposes of SAM where it is needed to fill a gap in the
information arising from this performance monitoring.
2-18
It should be noted that the approach implicit in Figure 2-7 does not, in any way, imply
that condition assessment/monitoring should not be undertaken routinely by a utility for the
purposes of managing individual assets (see Chapter 5.0); it is only condition assessment
undertaken specifically for the purposes of informing SAM decision making that is being
considered here.
As in Figure 2-6, Figure 2-7 illustrates that a set of KPIs is used that embody the utility’s
strategic objectives. Data from routine operations and maintenance feed assessment of
performance through KPI measurement and thereby supports decision making. A gap in the
asset-related information from this KPI management system drives the need for undertaking
condition and performance assessment at the asset level.
2.4.3 Alternative Routes for Specifying Condition Assessment
This formalized approach to KPI management, which only uses asset-level condition and
performance assessment for the purposes of SAM to fill specific information gaps (as illustrated
in Figure 2-7), is considered ideal practice. However, asset-level condition and performance
assessment can also be undertaken without any formal asset management approach being in
place or because some form of internal or external driver is imposed on the utility that
necessitates the assessment. For example, there may be a requirement to report the overall
condition of the asset stock to a regulator, or to undertake condition assessment as part of
financial reporting procedures. Both of these drivers are independent of the ideal route for
specifying the need for asset-level condition and performance assessment.
This alternative route, which is (or can be) independent of KPI management systems, is
also depicted in Figure 2-7 as the steps below the horizontal dotted line and shown separately in
Figure 2-8 for clarity.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 2-19
A range of individual drivers for specifying the need for asset-level condition and
performance assessments can be identified. For example, Table 2-4 lists a number of individual
drivers for undertaking condition and performance assessments. In essence, each driver still
relates to a gap in information that has to be filled, but the driver does not arise out of the
management of KPIs. A more comprehensive list of individual drivers for undertaking condition
and performance assessments is provided in Appendix B.
Table 2-4. Drivers for Undertaking Condition and Performance Assessment.
Focus Driver Asset type
Assess renewal budgets and Condition and performance assessment to provide data for use Any asset type.
timing of spend. in budget setting and/or justification of capital deferment.
Prioritize capital programs. Condition and performance assessment to target priorities for Any asset type.
renewal spend.
Determine appropriate Condition assessment to determine the level of renovation Any asset type, but more
intervention. required and specify rehabilitation approach; selection of least likely to be pipes.
whole life costing approach (partial replacement, lining, etc.).
Forensic investigations. Condition assessment to understand failure and support Any asset type.
litigation.
A clear case where the need for assessment and investigation is not driven by high level
performance measures is where there is an unexpected and serious failure of an asset, as
described in Case Study Inset 2-8. It should be emphasized that, except where the driver is
imposed by an external body (e.g., a regulator), this disjointed approach to specifying the need
for a condition and performance assessment program is not deemed ideal practice, although it
may be appropriate practice for a given utility taking into account its drivers and particular
circumstances.
2-20
CHAPTER 3.0
Chapter Highlights
The greatest value from condition assessment is gained when efforts focus on the more
critical (higher consequence of failure) assets.
When undertaking condition assessments, inspection data is collected through a number
of tools and provides information on such things as the presence of defects and their
severity.
Data collected during inspection of assets must also be contextualized through
appropriate analysis to give an assessment of condition in terms of the operating demands
placed on the asset.
Outputs of the condition assessment process can be expressed in a variety of ways. For
example, probability of failure, remaining life estimations and condition and/or
performance grades are commonly used.
Condition data collected over time can yield deterioration curves that can aid in the
estimation of asset remaining life; in addition to condition, performance standards and/or
risk factors should influence the age at which assets are considered for renewal.
Condition and performance grading systems enable a useful categorization of assets and
summary of information collected to date on individual assets.
A 10-step approach to specifying a condition assessment program is offered to align
information collection efforts with utility drivers and objectives as well as decision
support needs:
Step 1. Document program drivers.
Step 2. Specify program objectives.
Step 3. Identify asset types to assess.
Step 4. Collate and analyze available data.
Step 5. Determine what assets to inspect, if any.
Step 6. Select inspection/assessment technique.
Step 7. Plan inspection program to minimize cost.
Step 8. Undertake asset inspection and other data collection.
Step 9. Analyze data and assess asset condition.
Step 10. Utilize condition assessment information for decision making.
In addition to these 10 steps, documentation and reporting of the overall process, data and
information collected must be implemented as an ongoing process.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 3-1
To this end, there is a need for effective data collection forms and information
management systems
3.1 Introduction
As discussed in Chapter 2.0, asset-level condition and performance assessments can be
undertaken in response to a number of strategic asset management drivers. These assessments
involve the collection of data using inspection tools/techniques, but other data are also required
to allow interpretation and contextualization of the results. When designing an assessment
program, it is thus necessary to have an understanding of what data are to be collected and how
the data are to be analyzed and used.
Assessing condition first requires an understanding of the assets and the business needs
that are driving the condition assessment. The process of condition and performance assessment
then involves a number of distinct steps, for example, determining what assets to inspect and
selecting tools for use.
This chapter describes the generic steps involved when designing an effective assessment
program. The role of risk in condition assessment is first discussed, followed by a consideration
of the outputs of the assessment process that may be sought. A number of protocols used in
developing condition assessment programs are then presented, including a detailed treatment of
the generic 10-step process adopted in this research.
3.2 The Role of Risk in the Design of an Assessment Program
As noted by Rahman & Vanier (2004), one of the functions of condition assessment is to
establish the current condition of assets as a means of prioritizing maintenance and rehabilitation
effort. Some assets are more important than others are, and asset condition is only one of the
metrics used when prioritizing interventions. Other measures are required that provide
information on the importance of the asset as well as the cost and benefits of available options.
A standard way to characterize the importance of an asset is to evaluate the risk of
failure. Risk is determined by taking into account both the probability and consequence of asset
failure. However, since consequences are related to the asset’s operational context and system
configuration, the potential consequences of asset failure generally remain relatively constant
over time. As such, consequence of failure is often used on its own to determine whether a
proactive or reactive maintenance strategy should be adopted, as shown in Figure 3-1.
In contrast, as discussed in Section 2.3, the probability of failure of many asset types does
not stay constant, but increases over the life of the asset as it deteriorates. Condition assessment
can therefore be used to understand the level of asset deterioration and the impact this has on the
probability of failure. The utility can then attempt to reduce that probability of failure through
some operational or capital intervention or accept the level of risk associated with the asset’s
condition.
When an intervention is carried out as a result of the assessment, the benefit derived is
proportional to both the reduction in probability of failure and the expected consequence of that
failure. This potential benefit (often difficult to quantify) must be balanced against the cost of
undertaking the assessment and subsequent interventions.
3-2
When undertaken as part of a risk management strategy, condition assessment is only
warranted when it has the potential for facilitating improved management of service delivery or
has for reducing risk sufficiently to justify the cost of the assessments. Where no action is taken
as a result of an assessment, the benefit is then implicit in the improved knowledge of the asset
and asset base.
From the perspective of risk and cost effectiveness, a utility will realize the greatest value
from condition assessments by targeting its resources on more critical (higher consequence of
failure) assets. This concept is embedded in the maintenance strategies shown in Figure 3-1,
which requires condition assessment to be undertaken for high consequence assets (this topic is
considered further in Chapter 5.0).
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 3-3
Case Study Inset 3-1: Regulatory Driver for Periodic Assessments
Sydney Water has an inspection program in which all assets are visually inspected and
appropriately tested every five years. The five-year interval is a statutory requirement and
was determined by the New South Wales Government (Australia).
See Case Study 9 in Chapter 8.0.
As well as being a useful metric with which to target condition assessment effort, the
management of utility risk itself is an important driver behind undertaking condition assessment.
In particular, third party risk associated with asset failure (such as property damage) may be
unconnected with the importance of the asset itself, as illustrated in Case Study Inset 3-2. It is
therefore important to characterize consequence in terms of business risk, considering issues
such as third party damage and environmental impacts.
Case Study 3-2: The use of Inspections to Manage Third Party Risk
The City of Bellevue Council is very interested in reducing claims from property damage or
business interruptions. This has increased focus on system performance and reliability.
A risk-based leak detection program has therefore been underway for several years. High-risk
pipes were identified by overlaying several property damage-related risk factors, including:
properties where home elevations were below adjacent street levels, areas where older (pre-
1986) ductile iron water mains were installed and areas of high percolation soils (likely to
transmit water rather than force it to the surface where it would be observed). Acoustic leak
detection efforts have targeted areas with these three risk factors to prevent minor leaks from
becoming major problems.
City staff have also performed hydraulic and surface water modeling to determine areas of the
system and hydraulic conditions that would cause the sewer hydraulic grade line to be above
basement floor levels and thus where the City may be susceptible to property damage claims.
Condition assessment and operations and maintenance activities are then prioritized
accordingly.
See Case Study 10 in Chapter 8.0.
3-4
Estimations and Condition and/or Performance Grades (ratings) are commonly used. Each of
these approaches is discussed briefly below.
3.3.1 Engineering Calculations
Engineering calculations can be used to interpret inspection data deterministically. In this
approach, the results of a structural inspection (e.g., the presence of critical defects, remaining
wall thickness, etc.) are used to calculate whether the asset still provides sufficient safety
margins to comply with required standards and codes, considering both static and dynamic
operational loads (e.g., calculating the loads applied to the remaining cross-sectional area of a
corroded structural member). Case Study Inset 3-3 gives an example of the use of condition
assessment to determine the presence of critical defects, and the structural analysis subsequently
undertaken to assess the propensity for asset failures.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 3-5
The need to calculate probability of failure often arises because loading conditions are
inherently uncertain; understanding load-capacity relationships is of central importance to the
prediction of asset failure. From the perspective of condition assessment, however, the issue
often being considered (implicitly or explicitly) is how the probability of failure is changing over
time due to (say) reduction in structural capacity. In general, this information cannot be derived
from a single condition assessment. Repeated measurements over time are required to calculate
the rate at which conditions are reducing, and probability of failure increasing.
Condition data collected over time can be used to produce deterioration (or decay) curves
that allow the probability of asset failure to be modeled (see Case Study Inset 3-4 for an
overview of such an approach). Such deterioration (or decay) curves can also be used to give an
estimate of remaining life.
Case Study Inset 3-4: Estimating Probability of Failure for Water Pipes
There are principally two approaches used to determine the probability of failure of buried
water pipelines:
Statistical approaches based on analysis of available failure records.
Physical probabilistic approaches derived from physical principles of pipeline failure
combined with a stochastic representation of input variables. Physical probabilistic
approaches can also be compared to and calibrated against available failure records
data and can also use condition-monitoring data as input.
In both approaches, various asset parameters are considered in the analysis, such as pipeline
diameter, material type, installation year, etc., along with other risk factors such as operating
pressure, soil type and soil pH.
The outputs of failure probability predictions are of two main types:
Failure rates for groups of pipes (i.e., statistical expectation of the number of failures
per length of pipe). This is typically given in predicted failures per unit length per
year.
A probability density function for the time to first failure for a given pipe.
See Case Studies 13 and 14 in Chapter 8.0.
3-6
Case Study Inset 3-5: Remaining Life of Ferrous Pipes
In the approach used by Scottish Water, the structural condition of ferrous water mains is
determined via an estimation of remaining service life.
Remaining service life is assessed using excavated sections of water main, which are shot-
blasted to remove the graphitized corrosion products. Remaining life is predicted from the
derived corrosion rate (based on pit depths and age) in conjunction with the remaining pipe
wall thickness.
See Case Study 2 in Chapter 8.0.
Realistic remaining life estimations are required if this approach is to be used in asset
management. For mechanical and electrical assets, condition monitoring techniques (vibration
monitoring, oil testing, and thermography) can be used to track deterioration rates and therefore
estimate remaining life (condition monitoring in this context is discussed fully in Chapter 5.0).
For pipeline assets especially, a reasonable understanding of the degradation and failure
processes is required to define appropriate end of life criteria, as well as the expected life of
assets and/or the implications of critical defects to remaining life. For pipeline assets, the
identification of a defect does not in itself always given an indicator of asset remaining life. As
illustrated in Case Study Insets 3-6 and 3-7, significant amounts of analysis may be needed to
interpret the results of pipeline inspections.
To understand remaining life fully, utilities also need to consider other reasons why an
asset may need replacing, for example, when an asset is under-capacity, obsolete, under-utilized
or too expensive to maintain.
Performance standards and/or risk factors should also influence the age at which assets
are considered due for replacement. Performance is not always directly related to condition,
since assets can continue to perform their functions satisfactorily even when their condition has
significantly deteriorated. Hence, expenditure priorities are often more effectively determined by
assessing asset performance, rather than merely structural condition.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 3-7
Case Study Insets 3-6: Remaining Life Calculations for a Water Main
CSIRO undertook a condition assessment of a 250 millimeter (mm) diameter cast iron water
main on behalf of a client. The main was installed in the 1860’s and remained unlined until
1980 when it was cement lined in-situ.
Five sections of pipe, each approximately one meter long, were exhumed by the water
authority and assessed to determine the remaining wall thickness (in this case the defect under
consideration was loss of metal due to corrosion).
The raw data from residual wall thickness measurements was first used to derive a probability
density function (PDF) for the corrosion rate. This PDF was then used in conjunction with a
physical failure model to assess the propensity for asset failure. The failure model considered
both the resistance of the CI pipe as it corroded and the applied service loads (including
internal pressure, soil dead loads, and surface loads).
The outputs of the modeling study were summarized in terms of a plot that shows the
expected pipeline failure rate as the pipe ages. In combination with data on failure costs, this
type of plot can be used to analyze remaining economic life.
See Case Study 13 in Chapter 8.0.
Case Study Inset 3-7: Remaining Life Calculations for a Sewer Force Main
CSIRO undertook a condition assessment of a 300 mm AC pressure sewer pipe constructed in
1978 on behalf of a client.
Soil testing was carried out at seven locations along the route of the pipeline to determine the
soil aggressiveness (pH, soil characteristics). With this data, a preliminary analysis was
carried out to identify sections with high probability of failure (hot spots). Several of the
positions were recommended for core sampling of the AC pipe.
Cores were taken and the residual tensile strength of the pipe wall assessed (in this case the
defect under consideration was loss of wall strength due to material deterioration). The data
on residual strength was used to derive a PDF that quantified the variation in deterioration rate
for two distinct soil environments.
This PDF was then used in conjunction with a physical failure model to assess the propensity
for asset failure. The model considered both the resistance of an AC pipe as it ages and the
applied service loads (including internal pressure, soil dead loads and surface loads).
The outputs of the modeling study were summarized in terms of a plot that shows the
expected time to first failure for various loading conditions. In combination with data on
failure costs, this type of plot can be used to analyze remaining economic life.
See Case Study 14 in Chapter 8.0.
3-8
deterministic (decay) curves, analytical models or probabilistic models (see Vanier & Rahman,
2004 for more details):
Testing of materials or components offer the possibility of obtaining data that can be
subsequently used in the development of models for service life prediction. The testing
may include the gathering of data either from the periodic inspection of components or
direct field measurements of performance indicators over months and years. Typically,
short-term tests are carried out in a laboratory. Long-term studies may be undertaken in
either laboratory or field conditions.
The factor method is a weighted factor approach developed for use in management of
building assets. A number of independent factors affecting service life (e.g., design,
construction quality, load, maintenance level and material quality) are identified,
evaluated and rated. The estimated service life is calculated by multiplying a
predetermined reference service life by all of the weighted factors.
Deterministic (decay) curves model the deterioration of assets. Curves can be developed
for asset types either based on the use of expert opinion or historical asset failure data.
Analytical models calculate the remaining service life by modeling the deterioration
process itself.
Probabilistic models attempt to account for the apparent randomness of the failure of
components and systems through appropriate means, including Markov chain and Monte
Carlo analysis.
Utilities can also develop in-house systems for estimating the remaining life of assets
based on operational experience. These can be combined with grading procedures, as illustrated
in Case Study Inset 3-8. Such approaches are pragmatic, especially when there is insufficient
data upon which to base quantitative assessments. However, the use of operational experience is
subjective, can be influenced by recent problems and is not generally auditable. As such, while
such approaches may be pragmatic in the short term, data collection systems would ideally be
put in place to provide the data required for more quantitative assessments in the future.
Case Study Inset 3-8: Estimating Remaining Life Using Operational Experience
Sydney Water has extended the use of grading procedures (see Section 3.3.4) to allow an
estimate of remaining life to be generated. Each asset is categorized into five grades by
analyzing information from the following sources:
1. Planned maintenance and overhaul.
2. Feedback from operators and maintenance staff.
Scores are given for a range of parameters, including consequence of failure and occurrence
of failure. Occurrence of failure is developed using an annual failure rate.
The scores for each of the grading systems are inputted into a formula that gives an estimate
of the remaining life of each asset. Depreciation is determined as well as required
maintenance and whether replacement or renewal of the asset is required.
See Case Study 9 in Chapter 8.0.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 3-9
3.3.4 Grading/Rating Systems
While desirable, assessing the probability of asset failure or specifying a meaningful
remaining life can be challenging and difficult to benchmark. It is often more feasible to simply
specify thresholds of condition and performance where interventions must occur, and identify if
a given asset has reached that threshold. This approach is implicitly incorporated into the design
of grading systems commonly used for strategic asset management purposes. Two types of grade
are commonly applied:
Condition grades are allocated through visual inspection of an asset and with reference to
specified descriptions of each grade. Grading asset condition in this way gives a measure
of the level of physical deterioration with respect to the ‘as new’ condition. A condition
grade can be allocated reliably only after explicit visual examination of the asset.
‘Desktop’ assessments of an individual asset are less reliable. Various modelling
approaches can, however, be used to allocate grades that are valid in a statistical sense
(see for example Case Study 1 and 2 in Chapter 8.0).
Performance grades give a broad categorization of an asset’s ability to function in
accordance with the utility’s requirements and are allocated using operational knowledge
of the asset, again with reference to specified descriptions of each grade. A performance
grade can only be allocated reliably with reference to detailed local operational
knowledge. Grading asset performance in this way gives a measure of asset performance
with respect to local (asset-level) requirements.
As noted in the International Infrastructure Management Manual (IPWEA, 2006),
grading systems can be developed that are simple (Grade 1 to 5), intermediate (Grade 1 to 5 with
subgrading for the worst three grades) and sophisticated (multi-faceted) ranking schemes,
although these multi-faceted schemes can be reduced to 1 to 5 when necessary.
The design of an effective grading system involves two stages:
Asset observations that are deemed to be important to the condition or performance (as
appropriate) of the asset type in question are first identified (see examples in Table 3-1).
These asset observations are then mapped to a given grading system.
With regards to the first point, it is possible to determine asset characteristics that reflect
good or bad condition/performance for any asset type. These characteristics then form the basis
of the grading system. For example, Table 3-1 presents asset observations that relate to the
condition and performance of various categories of assets.
Appendix C presents a more comprehensive list of asset characteristics used in grading
systems for a range of representative asset types.
3-10
Table 3-1. Condition and Performance Assessment Criteria.
Assessment type Assessment criteria
Electrical Asset Condition Electrically safe (O/M)
Level and urgency of maintenance required (O)
Visible wear and tear (V)
Condition of insulation (V/M)
Break downs and failure history (M)
Maintenance costs (M)
Health and safety issues (V/O)
Serviceability (V/O/M)
Mechanical Asset Condition Soundness of unit; as new? (V)
Level and urgency of maintenance required (O)
Level of wear and tear (V)
Condition of protective coatings (V/M)
Corrosion (V/M)
Break down and failure history (M)
Maintenance costs (M)
Serviceability (V/O/M)
Health and safety issues (V/O)
KEY:
(V): Visual; an auditor would be able to evaluate the assessment criteria directly (visually).
(O): Opinion based; the auditor would be able to evaluate the assessment criteria indirectly (by interview).
(M): Measurable; the assessment criteria could be directly measured (inspected/monitored) or assessed through
analysis of available operations/maintenance data.
To illustrate the process of developing a grading system, it is informative to consider the
design of sewer grading systems commonly used in many countries, including the United States,
Australia and the United Kingdom. Structural condition of sewers is often assessed through
closed circuit television (CCTV) inspection. A range of defects are evaluated in these
inspections, including cracking, fractures, deformation, loss of fabric; including mortar loss,
brick displacement, etc., joint/connection defects and loss of level. A grading system must
incorporate consideration of these defects in a manner that reflects the various stages of asset
deterioration. The grading of individual assets then informs asset management by summarizing
asset condition and thus the requirement for some form of action.
Grading approaches for sewers often use a scoring procedure in which defects are given a
score corresponding to the severity of the defect and its potential impact on asset failure. Defects
observed during the CCTV inspection are noted in a standard report, which can then be run
through software to score the sewer lengths and provide an overall 1 to 5 grade. This grade
summarizes the condition of a sewer length, generally from manhole to manhole. The 1 to 5
grades can also be allocated directly by the inspector.
Table 3-2 shows a grading system that has been used by the Office of Water Services
(Ofwat) in the United Kingdom, and is consistent with the grading system presented in the Water
Research Centre (WRc) Sewer Rehabilitation Manual and other grade systems used in the United
States and Australia.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 3-11
Table 3-2. Ofwat PR99 Information Sewer Grading System (Ofwat, 1998).
Condition Description for brick sewers For other sewers
grade
1 No structural defects. No structural defects.
2 Minor cracking or no deformation or loss of bricks Circumferential cracking or moderate joint defects.
and mortar loss confined to surface and line and
level as built and connections satisfactory.
3 Deformation 0-5%, no fracture and only moderate Deformation 0-5% and cracked or fractured or
mortar loss or displaced bricks or total mortar longitudinal/multiple cracking or occasional fractures
loss without other defects or occasional defective or severe joint defects or minor loss of level or badly
connections. made connections.
4 Deformation 5-10% and fractured or total mortar Deformation 5-10% and cracked or fractured or
loss or small number of missing bricks or broken or serious loss of level.
displaced/hanging brickwork or moderate loss of
level or frequent badly made connections or
dropped invert.
5 Already collapsed or deformation >10% and Already collapsed or deformation >10% and cracked
fractured or extensive area of missing bricks or fractured or broken or extensive areas of missing
and/or displaced/hanging brickwork or missing fabric.
invert.
The general interpretation of grades used in Ofwat’s regulatory reporting is consistent
with the interpretation placed on sewer grades used in the United States (e.g., National
Association of Sewer Service Companies or ‘NASSCO’ grades) and Australasia. This
interpretation is as follows:
Grade 1: Asset as new.
Grade 2: Asset showing initial signs of deterioration.
Grade 3: Asset condition generally satisfactory (unless in an area of high risk, for
example, sewer prone to surcharging or in running sand).
Grade 4: Asset in poor condition; action needed soon (especially in an area of high risk,
for example, sewer prone to surcharging or in running sand).
Grade 5: Asset in need of urgent action.
These (or similar) interpretations can be placed on all grade systems, although as noted
previously there is no requirement for the grades to be based on a 1 to 5 system. For example,
some legacy grading systems used were based on a 3-grade system, as indicated in Case Study
Inset 3-9.
3-12
Case Study Inset 3-9: Legacy Grades used within MWRA
Massachusetts Water Resources Authority (MWRA) has performed closed-circuit television
(CCTV) inspection of its entire gravity sewer interceptor system, and used these data to assign
condition grades to each pipeline segment. MWRA recently shifted to the NASSCO standard
1-5 rating system, but much of their historical condition data are still in a legacy A, B, C
condition rating system.
See Case Study 12 in Chapter 8.
Condition and performance grades give a useful summary of structural condition and the
priority for action. However, the results of the grading procedures should be interpreted with
some care, as outlined in Case Study Inset 3-10.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 3-13
Lower level assessments provide a fine level of detail (grades are allocated at the unit or
lower level), require more time consuming and expensive assessment programs, but
provide better discrimination and decision support.
3.3.4.2 Recommended Approach to Grading
Although grade systems give a useful summary of data collected in the assessment of an
asset, the aggregation of asset observations into a single grade at the point of survey leads to a
loss of information. As such, all observations/defects observed during a condition or
performance assessment should ideally be recorded, with the combination of these observations
into a single grade being made subsequently and away from the point of survey.
When applied in practice, the accuracy and consistency of grading depends on the
inspector’s experience and the reliability of the grading system used. Auditing is therefore an
important aspect of grading programs, as discussed in Case Study Inset 3-11.
3-14
The use of grade systems beyond their intended scope as initial screening tools may be
understandable given the effort in collecting them, but the impacts of this practice on the
effectiveness of decision support should be considered, since it may have implications on the
utility’s ability to optimize capital and operational expenditure. Limitations to the use of grading
schemes when used in regulatory reporting are highlighted in Case Study Inset 3-12.
Case Study Inset 3-12: Limitations of Grade Profiles as a Metric for Benchmarking
As part of the regulatory reporting and planning cycles, the regulators in the United Kingdom
required that companies summarize the state of the asset stock in terms of condition and
performance grade profiles.
Grade systems used by different utilities for above and below ground assets varied in the level
of detail and the specifics of grade definitions. Hence, while the overall interpretation of
grades 4 or 5 would be consistent (being indicative of assets requiring some investment),
differences in the level of detail of the grading procedures used, as well as differences in the
calculation of asset values meant that comparison with grade profiles produced was not a
rigorous benchmark.
Profiles of asset condition and performance grades do not therefore provide an appropriate
benchmark for inter-company comparisons due to uncertainties introduced by differences in,
for example:
Grade definitions (including consideration of whether an asset’s design/capacity is
suitable in performance grades).
Asset valuation techniques applied (assuming grade profiles are developed in terms of
the value of assets in a given grade band).
Granularity of analysis (grading systems were developed by different companies in the
United Kingdom that were applied at the works level, process level and unit level).
Comparable results are only obtained with consistent grade definitions and grading
procedures, with grades allocated at the same level in the asset hierarchy. Calculation of asset
value must also be done in a consistent manner.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 3-15
Case Study Inset 3-13 Infraguide’s Protocol for an Integrated Approach to Assessment
and Evaluation of Municipal Road Sewer and Water Networks
Given the social costs associated with infrastructure renewal and the need to deliver better
value, an integrated approach to the replacement of road, sewers and water systems is
desirable. As such, NGSMI (2003) proposed a five-stage approach for the assessment and
evaluation of these systems:
Task 1: Compile a detailed asset inventory with physical attributes, and appropriate
cross- referencing and geo-referencing (preferably using GIS).
Task 2: Undertake investigations of components at a frequency related to condition
and importance. Results of investigations should be documented to allow the rate of
deterioration to be understood.
Task 3: Undertake condition assessment using condition-rating systems based on
performance indicators to identify and prioritize the renewal requirements. Some
consideration should be given to capacity issues within the rating system.
Task 4: Evaluate performance over a specified planning horizon (e.g., 20 years),
projecting the investment required to maintain performance levels, considering both
proactive and reactive maintenance expenditure and availability of budgets.
Task 5: Develop a renewal plan using appropriate economic tools to identify
appropriate interventions, taking into account socio-economic impacts, risk, capacity
issues, changes in regulations and policies, adjacent infrastructure condition and
emerging technologies.
It was noted that these tasks are not necessarily distinct, nor do they have to be conducted
sequentially.
Condition rating (grading) systems are used to identify and prioritize the renewal
requirements for roads, sewers and water mains. Several performance indicators (e.g.,
structural defects, capacity and asset importance) are used to assess asset structural condition
and functional adequacy. The number of indicators used in the condition rating system will
vary among municipalities, depending on the size of the municipality, the data available and
the specific conditions of the system.
The protocol indicates that all components of infrastructure should be assessed at a frequency
that is shorter than half its expected life.
The above protocol has also been applied specifically to the assessment and evaluation of
storm and wastewater collection systems (see NGSMI, 2004).
3-16
Case Study Inset 3-14: Hydro One’s Asset Condition Assessment Protocol
This case study is drawn from Hydro One Networks' Applications to the Ontario Energy
Board. Hydro One’s asset condition assessment (ACA) protocol is as follows (after Hydro
One 2005).
Asset condition assessment information is routinely and consistently collected by Hydro One
and updated to support decision processes. Since gathering detailed condition information on
every individual asset is both practically and economically infeasible, Hydro One’s
distribution assets are grouped into 20 logical asset classes. These classes are prioritized into
three categories, Priority 1 (P1), Priority 2 (P2) and Priority 3 (P3), based on the value of the
asset class to the business. This in turn determines the importance of acquiring the condition
information. The ACA process is outlined below:
1. Identify asset classes and demographics, and prioritize the asset classes (P1, P2, P3).
2. Define the asset information needed to determine and evaluate asset condition for all P1
and P2 asset classes, including asset condition and asset end-of-life criteria.
3. For all P1 and P2 asset classes, determine the additional condition information required to
adequately assess asset condition.
4. Collect the necessary asset condition information from existing databases or through
regular testing, surveys or inspections. The objective is to collect statistically relevant
population samples of asset condition information, which will enable a condition
assessment of the asset population in question.
5. Analyze the asset condition and performance information to identify population condition,
performance trends and high risks and impacts of asset condition on meeting business
objectives, including service quality standards.
6. Verify and confirm that the asset condition assessment results reflect actual field condition
(spot audits).
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 3-17
Notwithstanding the value of these and other approaches identified in the research, given
the range of asset management strategies currently being adopted within the water sector, a more
generic approach to designing a program of condition assessment was deemed necessary. A 10-
step approach was developed, drawing on the various protocols reviewed in the project (for
examples, see the case study insets above). This approach is in line with the best practice
concepts discussed in Chapter 2.0, and can be applied by utilities with a range of asset
management sophistications, using different approaches to condition assessment across a range
of asset types. The 10-steps are presented in Figure 3-2 and discussed in more detail below.
In addition to these 10 steps, documentation and reporting of the overall process, data and
information collected must be implemented as an ongoing process.
3-18
3.4.1 Step 1: Document Drivers
Various general drivers can be identified for undertaking condition/performance
assessments and it is desirable that the utility explicitly states what these drivers are as part of the
program design. As detailed in Appendix B, these can include the need to:
Understand/forecast budgetary requirements.
Spend budgets effectively.
Meet regulatory reporting requirements.
Refine asset financial valuation.
Undertake risk management.
Improve asset management approaches.
Improve operation and maintenance (O&M) strategies.
3.4.2 Step 2: Specify Explicitly the Objectives of the Assessment Program
It is important that the utility understands not only the drivers behind the assessments, but
the objectives of the assessment program itself. In particular, it is important to determine from
the outset how the results of the condition assessment (and/or data arising from the assessment)
will be used in decision making. Once the general drivers are understood, it is useful to
document what the objectives of the assessment program are, for example, see Case Study Inset
3-15.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 3-19
Where KPIs are used to inform asset management, there may be a specific objective to
provide more information on a measured shortfall in a KPI. As noted previously, the relationship
between a range of asset management objectives, the associated KPIs and condition or
performance assessment is summarized in Appendix A.
In summary, the objectives in undertaking an assessment program are to:
Understand the structural condition of individual assets or groups of assets where this
condition is not known (required for regulatory reporting, financial planning, asset
stewardship, due diligence and/or to identify deficiencies and areas of potential weakness
or concern).
Understand the performance of individual assets or groups of assets where this is not
known and/or assess the reasons for poor performance.
Detect the progression of deterioration and/or assess remaining lives including
collecting inspection data for use in deterioration models (for capital renewal planning
and risk management).
3.4.3 Step 3: Identify the Asset Type to Assess
Once the objectives of the program are clearly specified, the asset types that need to be
assessed may be obvious. Where this is not the case, or where multiple drivers exist, the
assessment program should be initially formulated in the context of all relevant asset types. For
example, given water quality incidents in a supply zone, it might be necessary to assess the
performance of treatment work assets, as well as assets involved in transmission and supply of
treated water.
At a later stage of the design process, it may be necessary to limit the asset types
considered and focus in on those where condition assessment will deliver most benefit (see
Chapter 4.0).
3.4.4 Step 4: Collate and Analyze Available Data
Data are routinely generated for many asset types and where there are records this may be
sufficient for the purposes of the condition and performance assessment; that is, the objective of
the assessment could be met by collating and analyzing available data. Since it is potentially low
cost relative to undertaking a program of asset inspection and environmental surveys, this
approach is recommended as a precursor to undertaking a detailed assessment program.
For assets that are managed proactively, condition and performance related data may
already be available from previous surveys, either on utility systems or in paper records. If this is
the case, the available data should be reviewed as a precursor to any inspection or survey work.
Failure event data are more generally produced for low consequence (reactive) assets, to
which a run-to-failure maintenance model is applied (see Chapter 5.0). The data may be
available on corporate systems (e.g., maintenance management systems), but not analyzed in the
manner required to understand asset condition or performance. Data of interest will vary
according to asset type, but will include such data items as:
Asset-related data (material, wall thickness, configuration, vintage, etc.).
Site/installation factors (surface and traffic, bedding, depth).
Environmental data (e.g., for water mains, quality of conveyed water, soil category, soil
temp, soil pH, soil moisture content, soil resistivity).
3-20
Available asset condition and performance related data (from job management systems,
opportunistic condition assessments, local knowledge, etc.).
Previous assessments of risk and consequence of asset failure.
Service conditions (environmental attributes; operating context).
Operational and maintenance data (from maintenance management system).
Failure data (type of failure, probable cause of failure).
When assessing the data that could be used in this type of analysis, the utility must
consider both the quantity of data and the quality of data. The collated data should be assessed
according to specified confidence criteria, which can include some or all of the following aspects
of data quality:
Accuracy – Are the available data reliable?
Completeness – What is the data coverage; are there any gaps?
Currency – Are the data sufficiently up to date?
Consistency – Is there any contradictory data or information?
Compatibility – Are the data produced on the same basis as other similar information?
Credibility – Does the data align with local knowledge or typical ranges of values?
Analysis of suitable data should then be undertaken at an appropriate level of detail, as
dictated by the objectives of the assessment program. Through this analysis of data, an initial
assessment of system performance and asset condition can often be made. Gaps in data can also
be identified and/or clarified, which can be subsequently filled through environmental surveys
and asset inspections.
This initial data collation and review is an approach widely undertaken by (or on behalf
of) utilities that are in the process of developing formal asset management approaches, but that
have an immediate driver imposed on them to undertake some form of condition assessment.
Analysis of data can then be undertaken to provide summary statistics on the frequency, spatial
and temporal distribution of (say) failure events, costs, etc.
It should be emphasized that where corporate data systems do not exist, a significant
amount of information will still be available in the form of operator knowledge. This can be
collated through communication with operational and engineering staff, for example, in a
workshop setting. Capturing this information can be a critical step in design of an effective
assessment program.
3.4.5 Step 5: Determine What Assets to Inspect, if Any
After review and analysis of available data, it should be clear whether there remains a gap
in asset information, and thus whether or not assets will need to be inspected. If this is the case,
the specific assets to inspect are often dictated by the objectives of the assessment program. For
example, the objectives and/or outcomes of the initial data review (step four) may dictate those
assets to inspect, for example, problem assets or assets related to problems in service provision.
Where the assets to inspect are not obvious, some sort of sampling procedure is required.
As noted in the International Infrastructure Management Manual (IPWEA, 2006), statistical
samples can be designed with various approaches, including:
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 3-21
Sampling all assets.
Concentrating on high risk/high consequence or representative assets only.
Actuarial sample (statistically valid) using appropriate means of stratification.
The type of asset being assessed has an influence on the sampling strategy adopted.
Above ground assets can be accessed and assessed more readily, so comprehensive programs
may be economic, though the benefits of the assessment must still be compared against the costs.
The assessment of below ground assets is more expensive and often focuses on important assets
that should not be allowed to fail. However, pipe sampling can also be driven by the need to
understand condition across a network, which requires the utility obtain a reasonable sample.
The number of samples taken is often based on affordability, rather than statistical,
considerations (see Case Study 2 in Chapter 8.0 for an example). Generally, it is easier to
undertake condition assessments of wastewater assets because of the open nature of the network;
access can be readily gained through the many access points.
If statistical samples are employed as part of the condition assessment program, the
rationale and sampling methods must be documented. Methods will ideally be applied
consistently over time, and any changes documented.
3.4.5.1 Stratified Sampling Schemes
When the assessment program is undertaken to comply with financial or regulatory
reporting requirements, statistical sampling can often be adopted because some of the
information relating to the asset stock can be obtained from data for a relatively small number of
assets (compared to the asset stock). In this approach, the asset stock is stratified according to
appropriate criteria, a sample of assets randomly selected and data collected for the samples
using a range of approaches according to the asset type. Case Study Inset 3-16 gives an example
of this approach.
Once collected, the data are analyzed and various techniques are used to determine the
statistics of the sample and to extrapolate this to the asset stock. For example, standard statistical
packages can be used to generate mathematical relationships that describe the probability that an
asset with a given set of characteristics will be within a certain condition grade. With appropriate
data for the rest of the asset stock, such relationships can then be used to give an assessment of
the condition profile for an asset type (that is, results of the analysis of the sample can be
extrapolated to the rest of the asset stock).
Greater precision is achieved by more intensive sampling. Intensity of sampling can be
considered to be the proportion of the assets sampled (by number or length) from a given
population of assets (individual pipelines, pipe cohorts, systems or utility-wide). The objectives
of the condition assessment program influence the precision required. For example, short-term
planning to maximize the benefit from available budgets can involve intense inspection of part of
the system, whereas long-term planning can be supported by less intensive inspection across the
whole asset stock.
Normally, the sample size is derived from two interrelated pieces of information: 1) the
degree of uncertainty that can be accepted in the estimates, and 2) the unexplained variability in
the statistical model. Higher levels of confidence require more data to be collected and analyzed.
If the sample is small, the estimates will tend to be more uncertain. Complete certainty requires
all the assets to be inspected.
3-22
Case Study 3-16: Sampling to Understand the State of an Asset Stock
Profiles of condition and performance grade plotted against asset value (modern equivalent)
provide a useful insight into the state of an asset stock.
The overall (utility wide) condition and performance profile of the asset stock can be most
accurately defined when there are sufficiently valid (current) grades for all the assets. For
periodic reporting, this is likely to require reassessment of those assets where the grades are
too old to be considered valid.
Whilst having grades for all assets minimizes the uncertainty in the profiles generated, it
requires a costly rolling assessment program to be undertaken such that each asset is
periodically inspected to provide updated grades as the existing grades become invalid (the
existing grades become too old compared to the life category of the asset in question).
Conversely, a representative sample strategy allows the profiles to be produced at less cost,
but with defined levels of uncertainty in the profiles generated.
When Scottish Water used this approach, the asset stock (water and wastewater treatment
works) was stratified according to a range of criteria that biased the sample to larger, more
important works. Assets were then randomly selected. The overall sampling process can be
summarized as follows:
Sites were categorized according to the categories already used in regulatory reporting
(categories based on service area – waste/clean –the treatment complexity used in the
works and works size band).
Existing (legacy) condition data were used to classify the sites into three bands with
good, fair and poor overall condition. This allowed a bigger proportion of sites in poor
condition to be selected with the aim of gaining better confidence in the estimates of
asset value in condition grades four and five (since grades four and five imply
immediate investment is needed, these grade bands are of most interest).
Within each condition band, sites were ordered by category (treatment type), then size
band and then geographical area.
A systematic sample was chosen from each condition band; every nth site was
selected, with n chosen to give a reasonable sample number from each band.
An initial assessment of sample size was made by a statistical expert and, once the data was
collected, the confidence limits for the predicted grade profiles estimated to determine if
further data was required.
See Case Study 1 in Chapter 8.0.
The number of assets that must be assessed also depends on how prevalent a
characteristic of concern is within the asset stock; if the characteristic (for example, poor
condition) is common, then relatively fewer samples will be required than if the characteristic is
rare. Since the prevalence of a characteristic of interest will not be known in advance, the design
of a sampling program may need to be iterative. Expert judgment should be used to assess the
initial sample size deemed appropriate. The data should then be collected and analyzed and the
confidence (uncertainty) in the results assessed. If the results are considered too uncertain,
further data must be collected.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 3-23
3.4.6 Step 6: Select Inspection Techniques
The selection of an inspection technique must be made in terms of technical suitability
given the asset type and objectives of the assessment program. For many strategic asset
management purposes, the grading approach discussed previously is likely to provide
satisfactory results.
Where such an approach is not deemed appropriate, the tool selection procedure
presented in Chapter 6.0 should be followed. Economic factors that influence affordability and
cost of the program must also be considered, these are discussed in Chapter 4.0.
3.4.7 Step 7: Plan Program of Inspection to Minimize Cost
A project plan should be drawn up that either:
Minimizes the cost of undertaking the condition assessment program, or
Maximizes the value derived from the assessments.
Costs can be reduced by clustering activities to minimize travel time and other costs.
Appropriate quality assurance procedures should be specified as part of the program plan,
including appropriate levels of third-party auditing.
3.4.8 Step 8: Undertake Inspection and Data Collection
The asset inspection may need to be augmented by additional data collection relating to
the operating context and or relevant environmental factors.
3.4.9 Step 9: Analyze Data and Assess Asset Condition
The raw data collected from individual inspections need to be analyzed to allow
assessment of asset condition/performance. As far as is practicable, data should be analyzed as it
becomes available as initial results can influence the way in which the rest of the program is
undertaken, preventing wasted effort.
As discussed in step five, data from a stratified sample may also need to be analyzed to
give a view on the overall asset stock, if this is required.
3.4.10 Step 10: Utilize Condition Assessment Information for Decision Making
The analysis undertaken in step nine is essentially the conversion of raw data into
information that can be either reported or used in decision making. When it is to be used in
decision making, the information is either implicitly or explicitly interpreted in risk management
terms; that is, the condition and performance data are used to give an assessment of risk, place
this assessment into context and determine interventions.
Condition assessment or inspection does not in itself affect the likelihood of failure.
Action must be taken in light of the assessed condition to repair or replace the assets (physical
intervention), modify operational, maintenance, failure response, or inspection procedures
(procedural changes), or address human factors (through increased supervision or training).
These mitigation activities reduce the failure frequency and hence the risk.
3.5 Additional Implementation Issues
As well as addressing the 10-step approach given above, a water utility embarking on a
condition assessment program should also consider the following implementation issues.
3-24
3.5.1 Asset Specific Considerations
The type of asset has an important bearing on the overall approach to the design of the
assessment program. For example, Table 3-3 indicates approaches to assessment of condition
and performance for a range of asset classes.
Table 3-3. Approaches to Assessing Different Asset Types.
Asset class Suitable approach
Treatment works Inspection of a representative sample (condition/performance grade
Pumping stations assessment and collection of other attributes) and estimation of the overall
Sludge treatment grade profiles from that of the sample.
Raw water intakes
Sea outfalls
Water storage Since service reservoirs have to be drained down for inspection and cleaning,
the sample inspected each year is influenced by operational considerations.
Dams/impounding reservoirs Inspection frequency may be dictated by statutory requirements.
Potable mains, raw water aqueducts Assess condition and performance using:
− Material, year laid, ground types and similar information.
− Quality problems.
− History of leaks or bursts, valve failures, etc., if any.
− Leakage monitoring.
− Potential consequences of failures through network modeling or other
risk assessment technique.
− Condition assessment/cut-out samples.
Mains (non-potable) Generally as for raw water aqueducts but less detail is needed as consequence
of failure is lower.
Communication pipes Assess problems by material, history of problems and possibly time period laid.
Water meters Use metered customer data to assess potential problems; for example:
− Apparently stopped meters.
− Customers with anomalous low consumption.
− Meters that have passed unexpectedly high volumes of water.
Sewage and sludge pumping mains Assess condition and performance using:
− Material, year laid, ground types and similar information.
− History of leaks or bursts, valve failures, etc., if any.
− Potential consequences of failures.
Combined sewer overflows (CSO) Inspect as part of drainage area (catchment) study program.
and other sewer system structures
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 3-25
As well as requiring different approaches to program design, the range of assets used in
the delivery of service means a utility will in general also need to use a variety of tools in its
condition assessment programs. For example, Case Study Inset 3-17 lists some of the condition
assessment tools used by Massachusetts Water Resources Authority (MWRA). The full range of
tools available for use by utilities is detailed in Chapter 7.0.
3-26
rolling program of inspection used to ensure that all assets are eventually assessed as part of the
condition monitoring program, as detailed in Case Study Inset 3-18.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 3-27
Summary information is also required at the program level, so the specific information
required for decision making must also be extracted and presented in a manner useful to decision
makers. Decision makers are more often interested in the implications of the assessment, rather
than the details of the assessment process and inspection results. In this context, effective
reporting and communication requires that assessment results be contextualized and provided in
sufficient detail to support the recommended actions, and no more. Summary approaches such as
the use of traffic light systems (green for ‘asset in satisfactory condition’, amber for ‘asset
deteriorating, but OK’ and red for ‘asset requiring immediate attention’) can be useful in
management reports.
3-28
CHAPTER 4.0
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 4-1
4.1 Introduction
Condition and performance assessment programs provide many benefits, but can also be
expensive and time-consuming activities. Ideally, the expenditure on assessment programs should
be balanced against the anticipated benefits. This requires that the cost and benefits associated with
the programs be identified and evaluated in some way.
This chapter highlights the key cost and benefits of condition and performance assessment
programs and presents the steps that can be undertaken to justify these programs through economic
analysis, including potential methodologies for estimating program benefits.
Many of the benefits accrued are, however, indirect and/or intangible and thus difficult to
quantify. Furthermore, while the direct costs associated with the assessments are readily
determined, the indirect costs associated with setting up the necessary asset management systems
may not be. The economic value of undertaking condition assessment programs within the context
of asset management systems may therefore be difficult to estimate.
Perhaps for these reasons, it was noted during this research that many of the utilities
contacted did not claim to carry out explicit cost benefit analysis to justify their assessment
programs. Assessments were instead commonly undertaken within the context of available budgets
and the justification process driven more by due diligence, the need to understand performance
issues, and/or affordability and cost-effectiveness considerations, rather than explicit cost-benefit
analysis. These issues are considered in more detail in this chapter.
4.2 Key Benefits of Condition and Performance Assessment Programs
One of the key benefits of condition and performance assessment is that it allows utilities to
understand risk and determine when to intervene in the deterioration process to avoid failures that
impose unacceptable costs or consequences (social, environmental or economic). However, as noted
in Chapter 3.0, assessment of an asset in and of itself does not generate any of the benefits
associated with risk reduction. It is only when an intervention is undertaken that reduces the
probability of asset failure that a benefit is actually realized. The benefit is then proportional to both
the reduction in probability of failure and the expected consequence of that failure.
Where no action is taken, for example, where the asset is shown to be in reasonable
condition, it may be tempting to consider the assessment as wasted effort accruing no benefit.
However, in many cases the knowledge gained can be applied in a wider context (to other assets). In
such cases, the improved knowledge of the asset base can be considered an intangible benefit.
The magnitude of the benefits derived from any new assessment programs will depend on
the actual current physical state of the existing assets (probability of failure), the failure
consequences associated with assets and the value derived from the enhanced level of information
that is gathered beyond that already available. Since asset management is reliant on asset
information, the improved knowledge of assets also yields a range of asset management benefits.
Table 4-1 details many of the benefits associated with condition assessment programs. The
benefits are categorized as either direct or indirect. For the purposes of this discussion, direct
benefits are considered to arise directly from the condition assessment itself. As such, these benefits
would not be realized if the assessments were not undertaken. Indirect benefits are considered to be
those benefits that are facilitated by an effective assessment program, but rely heavily on other
business processes or are realized only after an intervention has occurred.
4-2
This categorization is used simply to highlight the fact that condition and performance
assessments are usually a feed into decision making and/or some other action, rather than being an
end in and of themselves.
Table 4-1. Benefits of Undertaking Condition/Performance Assessment.
Category of benefit Benefit
Direct Capital deferment.
Budget setting and/or justification.
Capital works prioritization.
Data that can be used in the production of deterioration curves (for some asset types).
Ability to predict probability of failures.
Demonstration of asset stewardship and the ability to adopt more favorable financial reporting
approaches (modified GASB 34).
Indirect Extension of asset life (when subsequent work is undertaken following the assessment).
Reduced risk-cost associated with reduction in unanticipated asset failure (including avoidance of
social and environmental impacts).
Better management of life cycle costs and more effective capital planning and budgeting.
Improved productivity, efficiency and effectiveness.
Improved morale.
Improved availability of assets and levels of service.
Improved financial analysis.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 4-3
systematic, risk-based program for monitoring and proactive management will also reduce
overall utility risk, including liability for unforeseen damages.
Management of life cycle costs: appropriate investments in understanding asset condition
and performance can reduce overall life cycle costs by, for example, avoiding costly failures
and reducing costly reactive maintenance requirements.
Improved productivity and efficiency: in a similar vein, an effective assessment program
takes much of the guesswork out of asset repair efforts, leading to more efficient and
productive rehabilitation programs and improved overall economic efficiency of the utility.
Improved utility image and staff morale: with improved asset condition and performance
understanding, staff members have a higher level of confidence in the cost-efficiencies and
service delivery of their programs.
Improved levels of service: with better understanding of asset condition and performance,
appropriate measures can be taken to promote higher reliability of operation and improved
delivery of services to the customer.
Improved financial valuation and transparency: more accurate and transparent asset
valuations are possible with improved data on asset condition and actual historical useful
lives of assets. The utility will also be able to present more transparent and defensible
justifications to its board members and customers.
4.3 Key Cost Elements for Effective Condition Assessment Programs
As with most activities undertaken by utilities, condition and performance assessment
programs have a range of fixed and variable costs associated with them. As shown in Table 4-2,
these include costs associated with both the collection and analysis of the data. There is also a
component related to the number of assets inspected and the frequency of that inspection over time.
These factors are a major consideration in the development of sampling programs.
Table 4-2. Cost Elements.
Category Cost element
Fixed costs Procedure development
IT system development
Tools costs (license and maintenance)
Cost of implementation
Time variable Frequency of asset inspection
Spatial variable Number of assets inspected
Other variable Access costs
Training
Analysis and interpretation
Reporting
Maintenance of tools, etc.
Reliability variable costs Cost of unnecessary intervention or incurred failures
With regard to the last category in Table 4-2, since many condition assessments and
inspections are undertaken to determine the need for action, the cost implications of assessment
reliability should also be considered in the justification process. In this context, ‘assessment
reliability’ is taken to be any unnecessary cost incurred as a result of imperfect information
4-4
generated by the assessment. As discussed further in U.S. EPA (2005), such reliability costs occur
when:
A condition assessment indicated that an intervention was required, when in reality it was
not; or
Asset failure costs are incurred because a condition assessment indicated an intervention
was not required, when in fact it was.
The first issue is particularly problematic when undertaking interventions for buried pipeline
assets based on the evidence provided by a limited sample; for example, when a pipe asset is
programmed for replacement because of poor condition, but only a small section of the asset was
inspected. The occurrence of such an error might only become apparent during the rehabilitation
process, which will incur some expense at least. Reliability costs are minimized by the use of either
inspecting more of the asset (or assets), more accurate tools or analytical approaches during the
inspection and assessment process. However, the result of this is higher condition assessment costs,
so these two conflicting cost drivers must be traded off against each other, depending on the
requirements of the assessment program.
In addition to the cost elements shown in Table 4-2, the costs of assessment programs
undertaken in the context of formal asset management also include a proportion of the costs
associated with the design and implementation of the asset management and other business systems
required to undertake strategic planning. Such costs include identification and collation of the
necessary data, data management systems, software tools and procedures. This up-front investment
is needed to maximize the impact of the condition assessment efforts and to utilize the information
within the utility’s strategic asset management systems.
To the knowledge of the researchers, however, there is little evidence that utilities formally
justify the investment in these and other improved asset management capabilities. Given the
increasingly wide acceptance of asset management as a business philosophy, it can be inferred that
there is an assumption that this investment will yield staff efficiencies, more consistent data, and
that the overall asset management effort will result in the desired utility benefits.
As such, the decision to go forward with the development of business systems is likely to be
undertaken as a strategic management decision, based on the assumption that there will be an
overall net benefit, rather than any detailed cost-benefit justification. There is, however, an
increasing body of evidence throughout the sector to show that the investment in asset management
sophistication and other business systems allows utilities to deliver improved levels of service to
customers and the environment with reduced operational and capital budgets. For example, the
privatized United Kingdom companies have delivered significant operational and capital efficiency
savings, while meeting increasingly stringent standards associated with European Union regulations
relating to the environment and water quality issues. Similarly, see Case Study Inset 4-1, which
relates to the efficiencies realized by Scottish Water since its formation in April 2002.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 4-5
Case Study Inset 4-1: Scottish Water’s Improvement in Efficiency
Scottish Water has reduced operational expenditure by £150million per year (from
£380million per year expenditure in 2002) and is delivering higher standards with around
£1billion removed from the capital program. Much of the saving is associated with the ability
to do more with less through better targeting of problem assets and/or necessary interventions.
This has been greatly facilitated through the improvements in data and a better understanding
of the condition and performance of the asset stock.
These improvements have come at a cost, however, with £100million being invested in IT
systems to provide a single asset management system across Scotland, and with an additional
£200million being invested in the transformation process required to integrate the three
former Authorities into Scottish Water. However, as noted above this has resulted in yearly
saving of £150million in Opex alone. (Figures quoted are approximate and as related in the
case study interviews; see Auditor General 2005 and references referred to therein for more
details).
See Case Studies 1 and 2 in Chapter 8.0.
4-6
maintenance effort (with all spare parts on hand and purchased without rush charges) and a
reactive, emergency repair (potentially with overtime labor costs) can be quantified as a
benefit.
Catastrophic Failure Avoidance. These benefits can be quantified by calculating the
potential cost and probability of occurrence of a major asset failure. Costs incurred might
include emergency repair, permit violations and fees, liability and legal costs and reduced
public trust.
The benefit can be quantified as the reduction in risk cost (due to reduced probability of
occurrence) with an effective risk-based condition assessment program in place. For
example, if the potential consequences of a catastrophic event (e.g., failure of large sewer
interceptor next to a sensitive water body) are estimated to be in excess of US$5 million, and
the probability of this occurring in a given year is reduced from a 2% chance to a 1% chance
due to proactive condition assessment efforts that trigger necessary maintenance activities or
other interventions, then the reduced risk cost (benefit) can be estimated at US$50,000
($5 million consequence) x (2% probability) – ($5 million x 1%) = $50,000 benefit.
For many utility managers, the indirect consequences (such as job losses) associated with
this type of scenario helps justify the cost of condition assessment efforts. However, by their
very nature, it is difficult to assign a monetary value to such consequences.
Improved Program Efficiencies. Another approach to quantifying benefits is presented in
the International Infrastructure Management Manual (IPWEA, 2006), where the program
budget (costs) multiplied by the anticipated improvement percentage is used to develop a
quantified benefit estimate. For example, if a utility has an annual sewer inspection and
maintenance budget of US$5 million, and risk-based screening efforts (i.e., better
determination of the critical assets to inspect) and targeted condition assessment efforts
(using the right tools to get data that will directly improve decision making) are anticipated
to improve the efficiency and effectiveness of this program by roughly five percent, then the
annual benefit could be quantified as:
US$5 million x 0.05 = US$250,000.
4.5 Other Approaches to Justification
While it is acknowledged that an economic analysis is the ideal approach to justification, as
noted earlier in this chapter, during the research it was determined that many utilities do not carry
out explicit cost-benefit analysis in justifying assessment programs. This is because many of the
programs undertaken are driven by some perceived need and/or due diligence requirements.
Similarly, other programs are undertaken in response to an explicit requirement, such as the need to
report condition to a regulator or other statutory body, or to provide evidence in support of a
proposed asset replacement program.
In these cases, justifications are often undertaken within the context of available budgets.
The justification process is driven more by affordability and cost-effectiveness issues than explicit
cost-benefit analysis. Nevertheless, it is still considered important for utilities to put together a
business case for the assessment program. In this approach, the perceived or actual need for
undertaking the condition assessment is outlined, along with any anticipated benefits (not
necessarily in monetary terms), along with an estimate of costs involved. This provides
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 4-7
management with the information necessary to determine whether or not the proposed assessment
program is necessary and viable.
4.6 Optimizing Cost and Benefits Associated with Assessment Programs
As noted in the previous sections, any expenditure on assessment programs should be
balanced against the benefits realized. Since these benefits are difficult to quantify, in practice, the
degree to which condition assessment is carried out is often a strategic management decision.
This has been demonstrated in a survey of asset management practices undertaken on behalf
of the Office of Gas and Electricity Markets (Ofgem), a utility regulator in the United Kingdom.
This survey found that there was a range of approaches to the definition, collection and recording of
asset condition information. Some utilities routinely collected and acted on condition information,
while other utilities considered that the effort involved in doing this produced insufficient benefits
for long-term stewardship and thus did not adopt this approach (see Ofgem, 2002).
There are, however, implications related to the amount of condition and performance data
collected. At one extreme, data collected is insufficient to support effective asset management. At
the opposite extreme, too much assessment effort is focused on assets where no significant risks are
present, thus leading to an inappropriate allocation of utility resources. A balance somewhere
between these two extremes is required, but the ideal balance is different for each utility depending
on the real or perceived asset risks, preferences for performance and risk avoidance, customer and
political demands and the financial resources and liabilities of the utility.
Given that there is no set practice for determining the extent of condition assessment, it is
important that the utility design assessment programs to obtain the outputs needed for its particular
asset management approach. In effect, this is the same argument presented in Figure 2-3, which
illustrates that a utility should consider its information needs before determining what asset-related
data it should collect.
It is also important to note that, in practice, a utility cannot explicitly determine whether or
not the ideal balance between assessment costs and other business metrics has been achieved.
However, by following the step-wise methodology outlined in Chapter 3.0, a utility can
continuously move towards the most appropriate investment level and maximize its potential for a
cost-effective program by:
Understanding its drivers and objectives.
Defining the critical information gaps that are affecting decision making.
Limiting condition assessment efforts to those steps necessary to filling the critical
information gaps for enhanced decision making.
Selecting appropriate tools and techniques that are fit for the purpose.
Establishing the appropriate supporting people, processes and data management
infrastructure to effectively analyze and continuously benefit from the assessment data
captured.
4-8
CHAPTER 5.0
CONDITION ASSESSMENT AS A
MAINTENANCE MANAGEMENT TOOL
Chapter Highlights
Effective maintenance practices help to minimize the whole life cost of asset ownership.
The maintenance strategy (reactive or proactive) applied to an asset should depend on the
importance of that asset to the utility’s business objectives and the role the asset plays in
service delivery.
Condition monitoring is applicable as a proactive maintenance task when the benefits of
undertaking the monitoring outweigh any avoided costs.
Development of an effective condition monitoring program is centered on knowing when,
where and how to inspect different asset types. These programs should be geared towards
the stages of failure of individual asset types.
Performance assessment also has a role as a condition monitoring technique. Observed
changes in operational variables such as pressure, temperature, power consumption and/or
asset capacity can indicate the on-set of failure.
Several risk-based approaches, including reliability-centered maintenance (RCM) and risk-
based inspection (RBI), are available to help utilities develop cost-effective maintenance
strategies and determine those assets that should be managed reactively and proactively.
A generic approach to specifying condition monitoring tasks is offered, including the
following steps:
− Characterize asset importance.
− Assess failure modes and significance.
− Identify potential performance monitoring approaches.
o Identify measurable parameters.
o Determine performance thresholds.
o Identify potential tests or monitoring approaches.
− Identify potential condition inspection approaches.
o Identify degradation mechanisms.
o Determine critical defects.
o Identify potential inspection techniques.
− Select appropriate condition and performance assessment approaches based on cost,
benefit and risk.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 5-1
A case study is also presented to illustrate how a water utility went about changing its
condition monitoring practices in order to increase the amount of condition-based
maintenance being undertaken.
5.1 Introduction
Utilities are tasked with supplying critical water and wastewater services to communities
and the environment. From this perspective, a utility’s business drivers are to provide sustained
service delivery at an acceptable cost and in line with regulatory requirements, such as the need to
maintain water and environmental quality and give due regard to public health and safety. The
ability to deliver these services depends strongly on the business capabilities of the water utility
(i.e., the people, processes, data and technology used within the business) and asset capabilities (i.e.,
the capacity, condition and performance of individual assets and systems).
The concept that service levels are dictated by the utility’s business drivers but underpinned
by business and asset capabilities is illustrated in Figure 5-1 (this figure is also used in Chapter 2.0
and repeated here for the reader’s convenience given the difference in target audience of the
chapters). For example, business drivers such as customer expectations and requirements of
regulators dictate the level of service that must be delivered, whereas asset and business capabilities
impose a limit on the level of service that can be sustained over the long term. Where there is a
disparity between the demand for service and the capacity to deliver that service, investment is
required in the utility’s asset and/or business capabilities.
In any asset-intensive sector, asset capabilities are a key component of service delivery.
Effective maintenance practices help to preserve asset capabilities and in turn underpin the delivery
of service over the short to medium term. However, as discussed in the Chapter 2.0, strategic asset
management approaches and other business capabilities are also required to sustain the service
provision over the medium to long term.
Vanier (2000) noted that asset maintenance generally consists of: 1) inspections that are
carried out periodically to monitor and record how systems are performing, 2) preventive
5-2
maintenance that ensures that systems or components will continue to perform their intended
functions throughout their service life, 3) repairs that are required when defects occur and
unplanned intervention is required, 4) rehabilitation that replaces one major component of a system
when it fails at the end of its service life and 5) capital renewal that replaces a system because of
economic, obsolescence, modernization or compatibility issues.
Approaches used in the specification of maintenance strategies are outlined in this chapter;
including the role that categorization of assets plays in determining whether a proactive
maintenance strategy should be adopted. The role that condition monitoring plays in proactive
management strategies is then discussed, including the concepts underlying P-F curves and the role
of asset inspection and performance monitoring. Risk-based assessment procedures are then
discussed, including reliability-centered maintenance (RCM) and risk-based inspection (RBI).
A generic approach to the specification of condition monitoring tasks is then presented,
which draws on the issues raised throughout the chapter.
5.2 Approaches to Maintenance
Effective maintenance practices help to minimize the whole life cost of asset ownership. De
Sitter’s “Law of Fives” (De Sitter, 1984, referred to in Vanier, 2000 & 2001) approximates this
effect: if maintenance is not performed, then repairs equaling five times the maintenance costs are
required. In turn, if the repairs are not carried out, then renewal expenses can reach five times the
repair costs. As will be discussed later in this chapter, the use of risk concepts in the development of
maintenance programs can also help to manage whole life costs by reducing the frequency of
significant failures and minimizing the impact of those asset failures that do occur.
The U.S. EPA (2002a) identifies two different approaches to maintenance: 1) the asset
management model and 2) the run-to-failure management model. In the asset management model,
components of assets are regularly maintained and finally replaced when deterioration outweighs
the benefit of further maintenance. Costs are well distributed over the life of the asset. In contrast, in
the run-to-failure management model, assets are not regularly maintained, and can deteriorate faster
than expected and led to higher replacement and emergency response costs.
While the treatment given in the U.S. EPA (2002a) applies explicitly to sewer network
management, this categorization is broadly applicable to maintenance for all buried assets. The
categorization can also be applied to above ground assets with the proviso that routine maintenance
tasks should in general be carried out in line with equipment manufacturer’s recommendations
and/or industry standards, as appropriate, to prolong the life of an asset and minimize the cost of
asset ownership.
The asset management model requires that planned maintenance tasks (i.e., maintenance
tasks that are scheduled in some way rather than being carried out in response to asset failures) be
carried out in an effective manner and in particular requires that proactive maintenance tasks be
undertaken when justified. Proactive maintenance tasks are, by definition, carried out to:
Prevent failures before they occur; or
Detect the onset of failures (or occurrence of hidden failures) before they have an impact on
the performance of the system.
In practice, utilities have far too many assets to carry out proactive maintenance on them all,
or at least any attempt to do so would be uneconomic. Even within the asset management model of
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 5-3
asset maintenance given above, a run-to-failure strategy should be applied to assets when
applicable. This approach will certainly apply to many pipeline assets of small diameter. However,
this strategy should not be the default maintenance philosophy. Instead, the level of maintenance
applied to an asset should depend on the importance of that asset to the utility’s business objectives
and, by inference, the role the asset plays in service delivery.
5.2.1 Proactive and Reactive Assets
While proactive maintenance might seem the most effective approach to the management of
assets, the cost of undertaking preventive maintenance is only justified where it helps to reduce the
whole life cost of asset ownership (e.g., by extending service life or avoiding failures) or avoids
unacceptable impacts. In light of this, an appropriate asset categorization scheme is one in which
assets are divided into proactive and reactive assets based on the different maintenance practices
applied.
As discussed in Buckland (2000), the term “reactive asset” refers to assets with a low
consequence of failure (see Figure 3-1 in Chapter 3.0). Since the impact of failure is low, with the
exception of any routine preventative maintenance tasks such as lubrication, etc., the assets can
generally be left to operate until failure. Once failed, a decision is made whether or not to replace
the asset. Such a decision would include consideration of the economics of continuing to operate the
existing asset (including the social impacts of ongoing failures), the levels of customer service
needed and operational strategies that could be economically implemented to reduce the impact of
retaining the failing asset. It is interesting to note that the condition of reactive assets can often be
predicted using statistical methods, because significant quantities of failure data are available.
As the consequence of failure increases, the assets may still be operated to failure, but many
utilities would prefer to take some failure prevention measures, providing they are economically
justifiable. At a certain level of consequence though, it becomes necessary to use proactive
maintenance strategies, including condition assessment or monitoring, to manage the probability of
failure. Active protection techniques such as cathodic protection may also be applied to mitigate
degradation for some asset types.
While proactive strategies tend to be more justifiable at the high consequence end of the
spectrum, they may also apply to lower consequence assets if the economics of this are favorable,
for example, if low-cost condition assessment is available. In theory at least, the converse is also
true for reactive strategies, whereby even though the consequence of failure of an asset may be
high, if the cost of failure prevention is prohibitive, that asset may be operated to failure. However,
in practice it is anticipated that utilities would use other strategies, such as redesign of assets or
reconfiguration of networks, to manage such risks.
5.3 The Role of Condition Monitoring in Proactive Maintenance
A key requirement for the implementation of proactive maintenance is the ability to
anticipate when a failure will occur. Inspection of condition and monitoring of asset performance
either by manual or automated means plays a significant role in proactive maintenance.
5.3.1 Asset Inspections
Inspection programs are established to detect and evaluate deterioration of assets due to in-
service operation. The tools and techniques, frequency and acceptance criteria used in the
inspections can significantly influence the probability of component failure. Development of an
effective inspection program is thus centered on knowing when, where and how to inspect.
5-4
If evidence can be found that an asset is in a state that will eventually lead to a functional
failure, it may be possible to take action to prevent it from failing completely and/or avoid/mitigate
the failure consequences. This approach presupposes that there is some kind of deterioration in
either asset condition or performance occurs and that this can be detected in some way. For asset
components whose failure modes are essentially random or cannot be detected, then other risk
management approaches must be used. Many failure modes will however give some sort of warning
that they are about to occur. Inspection tasks designed to detect potential failure are often referred
to as condition-monitoring tasks.
Figure 5-2 illustrates the stages of asset failure in a plot called a P-F curve. The conceptual
basis behind these curves is that asset condition of many assets deteriorates over time and the level
of deterioration eventually progress to the point where it is significant and can be detected (Point P).
At this point, it is possible to intervene in the deterioration process and correct the defects or replace
failing components (or at the very least, take action to minimize the consequences of failure). If the
deterioration is not detected and corrected, the asset continues to deteriorate until it reaches the
point of functional failure (Point F).
In practice, there are many ways of determining the onset of the failure process, for
example, hot spots showing deterioration of electrical insulation, vibrations indicating imminent
bearing failure or increasing level of contaminants in lubricating oil. The succession of techniques
that can be used is discussed in Chapter 6.0. Summaries of the available inspection tools and
techniques are detailed in Chapter 7.0.
Figure 5-2. The Failure Process as Described by the P-F Curve (adapted from ABS, 2004).
The time interval between point P and point F is called the P-F interval. This is the time
between the point at which the onset of the failure process becomes detectable and the point at
which a functional failure occurs. Condition-monitoring maintenance task intervals must be
determined based on the expected P-F interval. If a condition-monitoring task is performed on
intervals longer than the P-F interval, the potential failure may not be detected. On the other hand, if
the condition-monitoring task is performed too frequently compared to the P-F interval, resources
are wasted. The following sources may be referred to as an aid to determine the P-F interval (ABS,
2004):
Manufacturer’s recommendations.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 5-5
Expert opinion and judgment.
Published information about condition-monitoring tasks.
Historical practices (e.g., current condition-monitoring task intervals).
The P-F interval can vary in practice and in some cases can be very inconsistent. For such
cases, a condition monitoring task interval should be selected that is substantially less than the
shortest of the likely P-F intervals.
5.3.2 The Role of Performance Assessment
The International Infrastructure Management Manual (IPWEA, 2006) notes that asset
condition and performance failure can be considered as a ‘cause’ and ‘effect’ respectively, in that
deterioration of condition is a cause of failure, and the effect of failure is poor asset performance.
In conjunction with an appropriate inspection regime, performance assessments therefore
represent another key component to management of asset capabilities. Performance assessments can
be undertaken at three levels of detail:
Strategic assessments
Tactical assessments
Asset level
At a strategic level, a well-implemented performance management system provides
information that can be used for optimizing maintenance strategies and identifying issues related to
capacity. For example, through collection and analysis of asset-related KPIs, utilities can evaluate
the effectiveness of their maintenance programs and modify policies and procedures appropriately.
This type of strategic performance assessment is considered in more detail in Chapter 2.0.
At a tactical level, maintenance planning can be facilitated through prediction and trend
analysis based on reliable performance information, especially in the form of reactive maintenance
tasks (tasks undertaken in response to failure events). This functionality is often provided by a
computerized maintenance management system (CMMS). A CMMS facilitates utilities in creating
and tracking work orders and transferring data to and from other modules in corporate databases.
This allows the maintenance data within a CMMS to be mapped, analyzed and combined with other
condition assessment information to yield maintenance solutions (ASCE, 2004).
At the asset level, on-going assessment of asset performance against current and future
performance requirements helps to determine the assets current capability (considering issues such
as obsolescence and capacity requirements) and the need for preventive maintenance.
In this later context, monitoring asset performance is also a condition-monitoring technique.
As such, the process of identifying the onset of failure through monitoring of performance can also
be described using the P-F curve given in Figure 5-2. In condition monitoring of this type, however,
the approach is to anticipate the onset of a functional failure through the early identification of
changes in operational variables such as pressure, temperature, flow rate, electrical power
consumption and/or asset capacity.
5.4 Risk-based Assessment Procedures
As described previously, proactive maintenance can, in practice, only be applied to a limited
number of assets. As a sub-set of proactive maintenance tasks, condition monitoring is similarly
applicable only when the benefits of undertaking the monitoring outweigh the costs. A number of
5-6
approaches are available to help utilities develop an effective maintenance strategy and to determine
the assets that should be reactively managed and the assets for which proactive maintenance is
required.
These methods are based on the generation and comparison of relative risk for different
maintenance strategies. Case Study Inset 5-1 encapsulates the key components of the analysis at the
asset level.
When applied across a system of assets, the characterization of asset risk in conjunction with
assessments of cost allows the utility’s maintenance regime to be optimized in terms of the total
cost of proactive and reactive maintenance, including the impact of asset failures. Examples of risk-
based assessment methods include risk based inspection (RBI) and reliability centered maintenance
(RCM).
RCM involves consideration of all proactive maintenance tasks and is applied across a range
of asset types, generally above ground assets, whereas RBI focuses more narrowly on the
optimization of inspection programs for static assets, especially pressure equipment and structures.
These techniques are considered in more detail below.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 5-7
5.4.1 Reliability Centered Maintenance
Nowlan and Heap (1978) coined the term “reliability centered maintenance” as a process to
be used to draw up maintenance programs for aircraft before they entered service (Moubray, 1997).
In this original context, RCM was developed specifically for use in the design phase of an asset’s
life cycle. However, Moubray (1997) subsequently defined RCM as a process used to determine
maintenance requirements of any physical asset in a given operating context. As such, RCM is now
applied retrospectively to systems of assets well into their life cycle.
According to Moubray (1997) and SAE JA1011 (1999), the RCM process involves asking
seven questions about the assets/components within a system under review. The questions are asked
and answered in a structured manner by a facilitated RCM team. A process analogous to failure
modes and effects analysis (FMEA) is used to analyze the asset failures. Software tools can be used
to facilitate the process. It should be noted that RCM by design is intended to preserve system
function (Nowlan and Heap, 1978), rather than preserve the asset/equipment condition.
The seven RCM questions are shown in Case Study Inset 5-2 with additional comments
included in the discussion that follows.
The start of the RCM process requires that each asset function be determined and a
performance standard assigned (Q1). The functions of an asset must be specified in sufficient detail
to allow the analyst to define functional failures.
All failed states associated with each asset function must then be identified (Q2). If
functions are well defined, listing functional failures is a relatively straightforward task. For
example, if the defined function is “to keep system pressure between 4 and 7 bar,” then functional
failures will include – unable to raise pressure, unable to keep system pressure above 4 bar or
unable to keep system pressure below 7 bar.
All failure modes that are reasonably likely to cause each functional failure must be
identified (Q3). The list of failure modes should include 1) failure modes that have happened
before, 2) failure modes that are currently being prevented by existing maintenance programs and 3)
failure modes that have not yet happened but are thought to be reasonably likely given the operating
context.
5-8
Failure modes are identified to allow the physical effects of a failure to be evaluated (Q4),
including what would happen if no action were taken to anticipate or prevent it. The consequences
of each failure mode must then be specified (Q5) as if nothing were being done to prevent it. RCM
assigns consequences to one of four categories: hidden, evident safety/environmental, evident
operational and evident non-operational.
The question is then asked, “what can be done to prevent the failure?” to determine what
maintenance tasks should be carried out to predict or prevent failures (Q6). As discussed previously,
only those tasks that are worth doing (to prevent consequences) should be undertaken. An important
corollary of this is that when considering existing maintenance schedules, tasks that have little
effect on failure rates or consequences should be eliminated. This elimination of redundant tasks is
an important part of the RCM optimization process.
The final task in the RCM analysis is to consider what should be done in the event that the
failure cannot be either predicted or prevented (Q7). Approaches that may be considered include
unscheduled failure management policies and changing the asset’s operating context (such as its
design or the way it is operated).
It can be seen that condition monitoring will form part of the actions undertaken to address
Q6, that is: “Pro-active tasks: what can be done to predict or prevent each failure (proactive tasks
and task intervals)?” The task interval would be set in proportion to the risk and the P-F interval
described earlier.
Case Study Inset 5-3 shows how one utility’s approach to RCM contributes to the
management of its pumping station assets. Case Study Inset 5-4 shows the scale of benefits that can
be accrued through the adoption of this approach.
Case Study Inset 5-3: Water Care’s Management of its Pumping Station
Water Care (New Zealand) has 51 pumping stations in its network (ranging from 10
liters/second to 4,000 liters/second). SCADA monitoring all stations includes alarms, hours
run and pump stop/start data.
The overall maintenance strategy is set using an RCM approach. Maintenance tasks and
frequency are set on the basis of past experience, review of manufacturer’s manuals and
feedback from maintenance teams. FMECA analysis is used to understand implications of
system, sub-system and component reliability.
Planned preventive maintenance program includes monthly inspections, scheduled wet well
cleaning, general civil and site maintenance and standard mechanical and electrical
maintenance tasks. Inspections include scheduled pump vibration analysis, thermography and
electrical mega testing.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 5-9
Case Study Inset 5-4: Massachusetts Water Resources Authority (MWRA) RCM
Program
Implementation of a formal RCM program has been a very effective way for MWRA to
enhance asset reliability and performance and to reduce life cycle costs of its large facility
equipment. Benefits accrued have been primarily from the Deer Island Treatment Plant RCM
program and associated condition monitoring on major equipment. MWRA has recognized
the following benefits:
Demonstrated reduction in over 20,000 maintenance work hours per year as a result of
all reliability programs including RCM, condition monitoring, preventive maintenance
optimization and productivity improvements, resulting in labor savings of over
US$700,000 annually.
Proactive oil sampling program resulted in avoided (scheduled) oil changes valued at
roughly US$50,000 per year.
Substantial (non-quantifiable) avoided and deferred costs due to enhanced equipment
reliability and performance, extended equipment life, avoided permit violations, etc.
Qualitative staff improvements in terms of teamwork, communications and
commitment to success.
Investments in staff training, sophisticated mechanical alignment equipment and permanent
monitors on certain major equipment have also yielded savings in asset life cycle costs and
performance reliability.
See Case Study 11 in Chapter 8.0.
5-10
Case Study Inset 5-5: Scottish Water’s Screening of Treatment Works
When Scottish Water was designing the implementation of a risk based maintenance strategy,
it was determined that not every site (treatment works, pumping station, etc.) could be
analyzed in detail. As such, they ranked sites in terms of importance considering a range of
factors, including:
− Size (population served)
− Available standby capacity
− Storage
− Plant complexity (number of assets, SCADA, etc)
− Stringency of consents (for wastewater)
From this ranking, the maintenance strategy to be adopted was specified such that: 1) the top
10% of assets were subject to full risk based maintenance planning procedure, 2) the next
20% were treated with a generic approach using task lists and 3) the final 70% were allocated
standard tasks and frequencies (e.g., an annual visit) associated with basic care.
For the full risk based maintenance planning procedure, a full failure mode analysis was
undertaken (using FMECA) at the unit level. The analysis was undertaken by a specialized
team in conjunction with operational and maintenance staff. Three fundamental questions
were asked of each asset to focus the analysis:
− Is the asset operating?
− Is the asset performing satisfactorily in terms of failures?
− Is the asset ‘fit for purpose’?
As well as undertaking screening analysis to determine which assets the RCM process
should be applied to, the cost of undertaking RCM analysis can be reduced by adopting a
streamlined RCM approach. According to Moubray (2002), the different streamlined approaches are
characterized by a retroactive focus. The RCM starts not by defining the functions of the asset, but
with existing maintenance tasks. Furthermore, generic lists of failure modes are used and the
analysis performed on one system is applied to other similar systems (Backlund, 2003).
Proponents of streamlined RCM claim they achieve similar results to the full RCM process,
but with much less time and thus lower costs (Backland, 2003). In contrast, Moubray (2002)
considers that the use of such streamlined approaches do not achieve the same results as full RCM
studies. However, as noted by Turner (undated), few organizations have applied RCM to anything
other than their most critical assets, suggesting that there is a real need for an alternative. As such,
streamlined RCM approaches such as preventative maintenance optimization (PMO) offer a
pragmatic approach to the process of review for assets that have an established maintenance
program (formal or informal) but where that maintenance program was inefficient or misaligned
with business needs (Turner, undated).
5.4.2 Risk Based Inspection
In the past, inspection techniques and frequencies were typically based on manufacturer’s
recommendations, industry standards or regulatory requirements. Inspection frequencies were set in
terms of time-based or calendar-based intervals. Since knowledge of asset operation and
deterioration evolves over time through user experience, such practices do provide an adequate
level of maintenance and asset protection.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 5-11
These traditional approaches do not, however, explicitly consider risk, the asset’s operating
context, or the impact of the assessed condition on the required inspection interval. As a result, the
inspection programs generated do not necessarily provide an optimal balance between cost of
inspection and asset-related risk throughout the asset lifecycle. In contrast, by considering current
condition, risk and operating context, an acceptable level of reliability and risk could be achieved at
lower cost.
Various sectors have recognized that significant benefits may be gained from adopting more
informed inspection scheduling techniques (ABS, 2003). Factors such as operating experience,
deterioration rates and consequences of failure are considered along with the asset condition to give
an inspection interval that seeks to achieve a balance between risk and the level of inspection effort.
A technique that applies this philosophy is RBI. RBI focuses on the optimization of
inspection programs for static assets; especially pressure equipment and structures. RBI begins with
the recognition that the essential goal of inspection is to prevent failures. By explicitly considering
risk, RBI assures inspection resources are focused on the areas of greater concern and provides a
methodology for determining the optimum combination of inspection methods and frequencies
(ABS, 2003). Case Study Inset 5-6 shows the basic elements of the RBI approach.
The setting of inspection frequency within RBI is not a rigid process with fixed,
predetermined inspection intervals. Inspection intervals may change throughout the life of the
asset as risk increases or decreases. There is, however, a general logic to the inspections and
frequency of the inspections, as highlighted in Case Study Inset 5-7, which can be summarized
thus:
Higher risk systems/components generally have the shorter frequencies of inspection and
have potentially larger inspection population requirements.
Lower risk systems/components often have extended inspection frequency (or even no
inspection) and have reduced inspection population requirements.
5-12
Case Study Inset 5-7: Risk Based Inspection of Melbourne Water’s Tanks
In 2005, Melbourne Water operated thirty-eight steel service reservoirs (40 were being
operated at the time of writing), with an estimated replacement value of AU$190 million.
Due to a design issue inherited by Melbourne Water (see Case Study 8 for details), a number
of these tanks are prone to under floor corrosion. The failure mode associated with this under
floor corrosion is not catastrophic. However, significant leaks can occur. Given the high
visibility of water conservation issues in Australia, coupled with the proximity of the tanks to
residential areas, such leaks can result in significant adverse publicity as well as having the
potential for causing property damage and associated community distress.
Given the perceived level of risk, Melbourne Water’s steel service reservoirs are now
regularly inspected to ensure that the potential for asset failure is appropriately managed.
Inspection strategies have been developed in consultation with external consultants and are
considered by Melbourne Water to be industry best practice.
Comprehensive corrosion assessments are undertaken on a periodic basis ranging from one to
five years. Generally speaking, assets that are deemed to pose a significant risk are inspected
on a one to two year basis, whereas those that pose a smaller risk are inspected on a three to
five year basis. Outage strategies are implemented based on business risk and operational
needs with due consideration given to both water quality standards and structural integrity
requirements. The inspection can be timed in accordance with cleaning requirements; tanks
have to be cleaned every three to eight years, depending on the level of silt build up.
See Case Study 8 in Chapter 8.0.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 5-13
It is again important to note that the selection process embedded in Figure 5-3 presupposes
that there is some kind of detectable deterioration in either asset condition or performance. For
assets or components whose failure modes are essentially random or cannot be detected, then
condition monitoring is not an appropriate strategy and other risk management approaches must be
used.
Optimization of condition monitoring should ideally be done across the asset stock, although
this optimization does not necessarily have to be undertaken formally; the process of analyzing risk
and assessing cost of condition monitoring relative to potential consequences will provide
optimization to a degree.
5-14
5.5.1 Critical Defects and Performance Thresholds
The performance thresholds and critical defects indicated in Figure 5-3 should be taken as
being equivalent to point ‘P’ in the P-F curve shown in Figure 5-2, that is, they are thresholds that
indicate that the failure process has progressed to the point where action is required.
As noted previously, there is a tendency for engineers to manage the condition of assets, not
least because early intervention in the deterioration process can significantly prolong the life of an
asset. However, there are in general more tasks to do than there are resources with which to do
them. Therefore, it is important to prioritize activities in some way.
A key task in the development of any effective condition monitoring process is the need to
determine what critical defects and performance thresholds are, and what these mean in relation to
the asset’s remaining service life and need for action. For example, given that a defect is observed,
the interventions available range from doing nothing through repair or replace. In the later case, the
observed defect would indicate the asset was at the end of its useful life.
When determining what intervention to adopt for a particular asset, there is a great reliance
on expert opinion drawing on previous actions to address defects and taking into consideration a
range of data, including:
The type and severity of the defect.
The context of operation.
Consequential impacts should the asset fail.
In essence, the engineer assessing the defect needs to decide if maintenance is needed, and if
so, what scale (repair, replacement) and if not, what action should be taken instead. This could
range from doing nothing through implementing condition monitoring or specify a re-inspection
within a time interval deemed appropriate to the risk.
In interpreting defects, there is a tendency for individuals to be risk averse in their
interpretations and recommendations. There is thus a need for standard guidance on what
constitutes a significant defect for a range of asset types in a range of operational contexts. Such
guidance is, however, beyond the scope of this report.
5.6 Development of a Condition Monitoring Program
When considering a change to any maintenance activity, the key challenge faced by a
maintenance manager is to consider what level of activity is appropriate. In practice, this often
reduces to the need to determine what percentage of the maintenance budget and resources can or
should be dedicated to a given activity. The remainder of this chapter considers this challenge from
the perspective of developing a condition monitoring program, including how such a program is
justified. For the purposes of this discussion, it is assumed that condition monitoring is already
undertaken in one form or another, so any program will involve a change to the current practices.
A case study is provided below to illustrate how a water utility went about changing its
condition monitoring practices to increase the amount of condition-based maintenance being
undertaken. While the case study shows some of the logic behind the development of a predictive
maintenance program, no attempt is made to give an exhaustive treatment of this subject; the
interested reader is referred to the literature on maintenance program development (e.g., the work of
R. Keith Mobley, The Plant Performance Group).
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 5-15
The case study presented relates to a project undertaken in 2002/2003 by MWRA. The
project sought to determine how MWRA should build upon its existing condition monitoring
capacity at the Deer Island Treatment Plant (DITP). At the time the case study project was
conceived, various condition-monitoring technologies were already in use at the DITP; including
vibration monitoring, oil analysis, infrared thermography and ultrasonic detection. Data collection
and analysis had, however, not been fully implemented, and management of the technologies was
being undertaken by different groups, for example:
The Electrical Engineering group managed the use of thermography.
The Maintenance Work Coordination group managed the use of oil sampling.
Since a major strength of a predictive maintenance program is achieved when two or more
complimentary technologies are used together (an example of this would be when a gearbox
exhibits high levels of wear particles in an oil sample; vibration analysis could then be used to
determine how extensive the wear is), the MWRA management team at DITP recognized that this
separation of responsibilities and, more importantly, the inevitable separation of findings/data did
not allow the full benefit of the condition monitoring techniques to be realized.
The case study project was initiated to develop a program under which condition-monitoring
responsibilities could be brought together within a single group. In addition, a key objective was to
increase the predictive monitoring capacity at the DITP to create a more effective maintenance
regime and move away from interval based maintenance where possible.
5.6.1 Program Development
An important first step in any program development is to understand and document what is
to be achieved. In the case of a change to a condition-monitoring program, the main driver will
often be a reduction in overall cost through a combination of:
Improvements to maintenance regimes, to increase asset reliability/availability and thereby
reduce the cost of asset failures and equipment downtime; and
Justifiable reduction in overall maintenance effort; for example, converting a non-condition
based (interval based) preventive maintenance program to a condition based program, which
can realize significant savings in maintenance hours, parts, and so forth.
Once drivers are clarified, some technique must then be used to determine what condition
monitoring activities are required to achieve the program’s objectives. The necessary resources and
equipment must be identified.
When undertaking these tasks, two approaches can be adopted. The ideal approach is to
assess the maintenance tasks required through a systematic technique such as RCM, and then assess
the budgets and resources necessary to allow these tasks to be undertaken. The more pragmatic
approach is to assess what can be done given available resources and level of management
commitment, and tailor the plan to these constraints. Whichever approach is taken, the
implementation of a program to modify any maintenance practice requires a well-structured plan for
staffing and work management to be developed. In general, staff will be required to fulfill the
following functions:
Management of the maintenance activities and team members.
Collation and analysis of data.
Undertake the condition monitoring tasks themselves.
5-16
5.6.2 Planning for Program Success
Justification of a condition-monitoring program should ideally be based on economic
analysis in which the relative cost-benefits of the program are assessed. The data for costs can
generally be obtained from a utility’s records or by contacting practitioners who either offer the
required services or have experience using the condition monitoring techniques of interest. Accurate
information on benefits is, however, difficult to obtain because it requires that the benefits of
avoiding future failures are estimated in some way. Unfortunately, the variables that influence the
cost of failure are often unique (due to variations in conditions, events, equipment types, operational
situations, etc.), and various assumptions must be made when undertaking analysis of a proposed
program. The analysis can incorporate a high degree of subjectivity and associated uncertainty.
As well as issues relating to uncertainty of benefits, any change to a maintenance regime can
be expected to cause some disruption to the activities of maintenance staff. For example, converting
a non-condition based (interval based) preventive maintenance program to a condition based
program requires the reassigning of resources from the existing maintenance program to the new
program. However, there is often a lag between the introduction of the new maintenance regime and
the benefits of the program (e.g., reduction in failures). A period of disruption and additional
workload can be anticipated for the maintenance department until the results of the program start to
be seen. While additional resources and funding can be made available to help overcome this initial
period of net-disruption, it makes sense to start the predictive maintenance program with the least
amount of impact on the existing maintenance program, while supporting the effort well enough to
ensure a successful transition.
In recognition of these issues, a phased implementation plan can be developed in an attempt
to minimize the impact of uncertainties and any disruption. For example, in the case of the DITP
program, it was determined that the most logical approach for planning the implementation of a
predictive maintenance program was to:
• Start out slowly, beginning with the implementation of the most versatile predictive
maintenance tools as they apply to a given facility.
• Establish and ensure that the minimum amount of savings required to break even on the
investment of capital and resources was achievable.
• Expand the program as “real” savings were realized and when the most beneficial
applications of the technology at the plant were identified.
In DITP’s case, significant capacity existed in vibration monitoring, oil analysis, and
thermography. Since all three of these technologies were being used, it was anticipated that each
would require little initial investment and minimal additional training to progress the programs.
Initial focus was given to the increased use of these technologies. It was also considered likely that
ultrasonic detection could be implemented due to the low cost of equipment and the simplicity of
the technology.
5.6.3 Resource Issues
Mobilizing sufficient resources to ensure a new program’s success can often be an issue,
given the demands of existing tasks. Again, a pragmatic approach may be needed in light of
resource constraints. For example, in the case study it was recognized that the most effective course
for guaranteeing the success of the overall program would be to devote selected maintenance
personnel to a new condition-monitoring group on a full time basis. The group consisted of a
condition-monitoring manager and two condition-monitoring engineers, with responsibilities for
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 5-17
analyzing all condition monitoring data, providing recommended corrective actions, and to organize
and implement condition-monitoring technologies. To supplement this group and to support the
condition-monitoring effort, technicians throughout the facility were trained on basic condition
monitoring techniques and to take all vibration readings and oil samples. These technicians work
part time each month on these activities. As the program evolved and demonstrated its cost
effectiveness, the commitment of technicians to supplement the group’s activities increased
significantly.
5.6.4 Cost Benefit Analysis
As noted above, justification of a condition-monitoring program is ideally based on
economic analysis in which the relative cost-benefits of the program are assessed. The development
of a cost-benefit analysis requires that the following tasks be undertaken:
An evaluation of the condition monitoring tasks to be undertaken (in terms of the
technologies and approaches to be used, and frequency/asset coverage).
An evaluation of equipment.
An estimation of resources.
An estimate of associated costs, including:
o Training.
o Software and equipment.
o Labor.
o Contracted support services (e.g., lab testing and specialized data).
o Program management/administration.
An estimate of benefits (in essence, an evaluation of failure avoidance and other benefits
such as improvements in asset reliability/availability and reduction in maintenance spend).
5.1.4.1 Case Study Example
In the case of the DITP, prior to providing a full commitment of resources to the program, a
cost benefit analysis was conducted for five condition-monitoring technologies: vibration
monitoring; oil analysis; thermography; ultrasonic detection, and motor current signature analysis.
However, rather than attempt to predict all potential savings that could be achieved at DITP, a cost
benefit analysis was undertaken to:
Establish the costs associated with instituting a basic condition monitoring group, and then,
Identify if there was the potential to recoup the investment based on the type of equipment,
the expected failures, and the estimated average savings that could safely be attributed to
predicting a percentage of those failures.
Resourcing of the Group
Given a pragmatic review of the available resources, and the level of condition monitoring
to meet the aims of the initial program, it was recommended the Condition Monitoring Group
structure as originally constructed included the following positions and associated labor dedication:
Group Manager – 30% of full time for managing the group.
Data Coordinator / Planner – 100% of full time.
Vibration Technician – 20% of full time to begin evolving to a minimum of 50%.
5-18
Oil Sampling Technician – 20% of full time to begin evolving to a minimum of 50%.
Thermography Technician – 20% of full time to begin evolving to a minimum of 50%
Ultrasonic Technician – 10% of full time to begin evolving to a minimum of 20%.
Specialized training in each of the specific technologies was recommended for each of the
positions, including training for the data coordinator and group manager in all of the technologies. It
was further recommended that the number of technicians to be trained should be based on the level
of back-up personnel required to cover for vacations, sickness and so forth. After further
development of the condition monitoring program additional resources were allocated, which
included a group manager and two data coordinators/planners. In addition, as noted above,
technician support throughout the facility is provided.
Program Costs
Based on the recommended group structure and estimated percentages of full time effort for
each position, MWRA was able to estimate the cost of operation for the Condition Monitoring
Group over a 10 year period, as summarized in Table 5-2. Much of the capital expenditure
(equipment costs) had already been made, so this cost element could be excluded from the analysis.
Vibration Monitoring Benefits
To quantify the benefits of the vibration-monitoring program over the course of 10 years it
was necessary to make the following assumptions:
The program would be expanded from the initial population of 98 pieces of equipment to a
population of 318 pieces of equipment.
The incidence of failure avoidance will increase at a rate of 3% per year as the plant
equipment began to experience more age related failures.
The incidence of failure avoidance will increase at a rate of 2% per year as the vibration
monitoring personnel become more experienced.
The documented cost avoidance (the estimated cost of avoided damage directly attributable
to the condition monitoring) for the vibration-monitoring program over the previous two and a half
years was a total of US$57,700 for an average of US$23,080 per year.
Based on the above assumptions and documented cost avoidance, Table 5-1 shows the
estimated projection of the vibration monitoring cost avoidance benefits over a 10-year period.
Table 5.1. Estimated Projection of the Vibration Monitoring Cost Avoidance Benefits (US$).
FY1 FY2 FY3 FY4 FY5 FY6 FY7 FY8 FY9 FY10 10-Year Total
Failure Cost 51.3k 82.4k 86.6k 91.0k 95.6k 100k 105k 110k 116k 122k 960k
Avoidance
FY0 = 23k
A simple return on investment (ROI) calculation for the vibration-monitoring program over
a 10-year period was undertaken, as represented by the following:
ROI = [(US$960k (10 Yr Benefit) – US$483.1k (10 Yr Cost)) / US$483.1k (10 Yr Cost)] x
100
ROI = 98.7%
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 5-19
Table 5-2. Ten-Year Projected Condition Monitoring Costs (US$).
First Year Costs
Vibration monitoring Oil sampling Thermography Ultrasonic Miscellaneous
detection group management
Initial training $16,000 (8 Persons) $8,000 (4 persons) $9,000 (4 persons) $4,800 (4 persons)
Software purchase Included with equipment Not required Included with equipment Not required
Equipment purchase $40,000 (2 port. Units) $1,000 (sample equip) $40,000 $3,000
Manager labor $4,600 $4,600 $4,600 $2,280 $6,920
Data coordinator labor $16,800 $16,800 $10,080 $6,720 $16,800
Note: Total expenditure excluded Equipment Purchase as investment had already been made in the necessary equipment.
Subsequent Years Costs (average): all future costs are listed at present day values without consideration of discount rate (NOT net present value).
Training $1,500 $1,500 $1,500 $500
Calibration and upgrades $5,000 $0 $2,000 $0
Manager labor $4,600 $4,600 $4,600 $2,280 $6,920
Data coordinator labor $16,800 $16,800 $10,080 $6,720 $16,800
Technician labor $24,000 $24,000 $24,000 $9,600
Contracted support services $1,000 $18,000 (lab costs) $0 $0
Annual costs $47,900 $64,900 $42,180 $19,100 $23,720
Subsequent 9-year cost $431,100 $584,100 $379,620 $171,900 $213,480
Estimated 10-year cost $483,100 $632,100 $412,900 $190,500 $237,200
5-20
Oil Analysis Benefits
To quantify the benefits of the oil analysis program over the course of 10 years it was
necessary to make the following assumptions:
The program would expand from the initial population of 106 pieces to approximately
300 pieces of equipment.
The incidence of failure avoidance will increase at a rate of 3% per year as the plant
equipment begins to experience more age related failures.
The incidence of failure avoidance will increase at a rate of 2% per year as the oil
analysis personnel become more experienced.
The incidence of oil usage cost avoidance will increase at the rate of US$10,000/year as
equipment is added to the program over the next three years.
The documented failure avoidance cost (the estimated cost of avoided damage directly
attributable to the condition monitoring) for the oil analysis program over the previous eight
months was a total of US$56,970 for an average of US$85,455 per year. The documented annual
oil usage avoidance cost for the oil analysis program over the previous eight months was a total
of US$30,000.
Based on the above assumptions and documented cost avoidance, Table 5-3 shows the
estimated projection of the oil analysis cost avoidance benefits over a 10-year period.
Table 5-3. Estimated Projection of the Oil Analysis Cost Avoidance Benefits (US$).
FY1 FY2 FY3 FY4 FY5 FY6 FY7 FY8 FY9 FY10 10-year total
Failure cost 144k 208k 279k 293k 307k 323k 339k 356k 375k 394k 2.8M
avoidance
FY0 = 85k
Usage cost 40k 50k 60k 60k 60k 60k 60k 60k 60k 60k 570k
avoidance
FY0 = 30k
A simple ROI calculation for oil analysis program over a 10-year period was undertaken,
as represented by the following:
ROI = [(US$3.37M (10 Yr Benefit) – US$.632M (10 Yr Cost)) / US$.632M (10 Yr
Cost)] x 100
ROI = 433%
Thermography Benefits
Because DITP did not have documented data on cost avoidance for the thermography
program, a predictive maintenance consulting company was contacted for assistance in
developing cost benefit values. The consulting company provided figures that represented typical
costs and savings for a large facility; the annual gross benefits provided by the consulting
company were estimated at US$300k.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 5-21
A simple ROI calculation for the thermography program over a 10-year period was
undertaken using a more conservative annual gross benefits figure of $100k, as represented by
the following:
ROI = [($1.0M (10 Yr Benefit) – $.413M (10 Yr Cost)) / $.413M (10 Yr Cost)] x 100
ROI = 142%
Ultrasonic Detection Benefits
Because ultrasonic detection had not been used at DITP for any extended period of time
and data associated with failure avoidance was not available, anticipated benefits could not be
calculated.
The anticipated use of the ultrasonic unit was to include evaluation of rotating element
bearings on equipment where the criticality of the equipment did not warrant the time and effort
associated with vibration analysis. For the purposes of the analysis it was assumed that if it could
be determined that the program would detect a sufficient number of bearing problems to avoid
maintenance costs exceeding the cost of the program, the ultrasonic program would be
considered be viable. Actions that would avoid maintenance costs include alignment, lubrication
and bearing replacement prior to damaging pump/shaft. A value of US$1,000 per avoided cost of
bearing failure was used in the following calculation.
No. of Bearing Failures/yr = Avg. Annual Program Cost/Avoided Cost of Bearing Failure
No. of Bearing Failures/yr = US$19,050 / US$1,000
No. of Bearing Failures/yr = 19
Since the ultrasonic program would be surveying hundreds of bearings per year, it was
concluded that 19 bearing problems detected per year was almost certain.
Results of the Analysis
From the above analysis it was determined that continued implementation of vibration
monitoring, oil analysis, thermography and ultrasonic detection would produce a return on
investment.
Although justifiable from a cost benefit viewpoint, it was recommended that the
implementation of motor current signature analysis should be delayed in an effort to minimize
the commitment of labor resources and training for the condition-monitoring program.
5-22
CHAPTER 6.0
Chapter Highlights
A significant number of assessment techniques and inspection tools have been identified
in this project. Research has shown that the selection of an appropriate tool or technique
is highly context specific.
A generic approach to tool selection is outlined, which uses an exclusion process to
identify options that can be considered. Tools are excluded on the basis of technical
feasibility, suitability and capacity. Useable options are then evaluated through economic
or financial analysis.
A number of important selection criteria have been identified to guide the selection
process. Where possible, the attributes relating to the criteria have been evaluated for
each of the tools and techniques identified and reviewed in this research. These attributes
summarize the application and use of the tools and provide the information necessary to
undertake the selection process.
A key goal of the research was to provide a framework that would assist organizations in
the selection of condition assessment tools. A paper-based solution is presented to
facilitate this process. Initial work has also been undertaken into the development of a
prototype expert system for this application.
A direct extension of risk-based arguments used herein is that the more important the
asset is, the more expense can be justified in assessments undertaken to ensure the asset
does not fail. However, to minimize costs, inexpensive tools should still be used where
possible. As such:
− Inexpensive screening tools and approaches should be used routinely.
− The results of the screening approach may dictate that there is a need for
additional information and/or accuracy. This may require the use of more
sophisticated assessment or inspection tools.
− Additional expense should be considered only when justified in terms of risk costs
avoided or benefits accrued.
This logic is used to present an iterative approach to the use of tools, where more
sophistication and accuracy is used to fill information gaps left by screening tools.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 6-1
6.1 Introduction
A significant number of assessment techniques and inspection tools were identified in
this project. Furthermore, the research showed that the selection of an appropriate inspection tool
or condition assessment approach is highly dependent upon what outcomes are required from the
assessment, the capacity of the tool/technique to provide the necessary information, the
availability of appropriate data to interpret the results, the capacity of the utility to utilize the
selected tool/technique and economic factors. The issues involved in tool selection are thus
complex, and can be summarized by considering condition assessment from three overlapping
viewpoints, namely:
Asset Focused View: how critical is the asset in question and what is justified to manage
the risk; this is the RCM type approach discussed in Chapter 5.0.
Situation Focused View: what are the drivers and what is justified to address them; for
example, the need to understand risk and impact of capital deferral; need to address
litigation.
Tool Focused View: when would a specific tool normally be used; for example,
opportunistically, as a screening tool, for the regular inspection of important assets,
monitoring of critical assets, etc.
This chapter presents an approach to aid utilities in selecting appropriate condition
assessment tools and techniques, which takes into account each of these views.
A generic approach to tool selection is first outlined, which uses an exclusion process to
identify options that can be considered. The role of risk and cost in determining what tool to use
for a particular set of circumstances is then considered, and a sliding scale of assessment
standards suggested.
6.2 A Protocol for Selecting Condition Assessment Tools
As noted above, a significant number of assessment techniques and inspection tools were
identified during this research. Listing all these tools and mapping them onto the asset stock is a
useful task, but it is more desirable to help utilities to undertake their own selection of suitable
tools and techniques given their unique knowledge of the assets that need assessing, the drivers
behind the assessment, and the likely end uses of the information.
The International Infrastructure Management Manual (IPWEA, 2006) presents an
approach to the selection of condition monitoring techniques that involves a process where the
utility 1) assesses the condition and performance assessment techniques being used already, and
2) develops an understanding of any shortfalls. This gap analysis then drives the selection of new
approaches and/or tools. This process is shown in Figure 6-1 (this is a simplified version of the
flow chart given in the International Infrastructure Management Manual (IPWEA, 2006). An
example of a utility using this type of approach is summarized in Case Study Inset 6-1.
While this approach is perfectly valid, it assumes that condition monitoring already plays
a central role in the utility’s asset management approach, and that the utility simply wants to
assess whether better approaches are available to those already in use. This logic is generally
applicable to the use of condition assessment/monitoring within day-to-day maintenance, as
discussed within Chapter 5.0.
6-2
Case Study Inset 6-1: Selection of a Tool at the Asset Level
When considering adopting a new condition assessment tool or technique, Sydney Water
compares the effectiveness of the new tool with the current tool, if a tool is currently used.
The comparison involves a cost-benefit evaluation per asset. Maintenance cost history for
each asset is used as the fundamental benchmark. If a new tool will cost more, it still may be
considered if it gives an earlier warning of failure.
See Case Study 9 in Chapter 8.0.
Within the context of SAM, as noted previously, some utilities adopt an informal
approach where condition and performance assessments are not yet undertaken or are undertaken
in a somewhat unstructured manner. At the other end of the spectrum, more sophisticated asset
management approaches do not focus on condition and performance, although condition
monitoring is undertaken for specific assets where it is shown to be a useful approach to risk
management (see Chapter 5.0) or where there is a regulatory driver to undertake the monitoring.
The protocol adopted for tool selection in this research has been designed with all these
potential end uses in mind, and is based on a process of exclusion according to a range of
criteria, followed by an economic assessment of the viable alternatives. An overview of the
approach is shown in Figure 6-2.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 6-3
Figure 6-2. Approach to Selecting Condition Assessment Tools.
As illustrated in Figure 6-2, the selection of a suitable tool (step six of the process
described in Chapter 3.0) requires consideration and evaluation of four factors:
Technical feasibility: The utility identifies what inspection/assessment options are
feasible for the asset(s) in question.
Technical suitability: The utility evaluates whether the potential options will meet its
specific needs, for example, by providing suitable data and/or level of decision support
required.
Technical capacity: The utility then evaluates if it possesses the required technical
capacity to allow the potential options to be used and, if not, what the gaps in capacity
are, including an initial assessment of whether these gaps can be filled.
Economic assessment: The utility evaluates whether the remaining options add value
based on the goals of the assessment, considering costs (including capacity building
and/or out-sourcing of work) and benefits, and whether one approach clearly gives the
best value compared to other available options. Final selection is made in terms of
available resources, the cost-benefits accrued and affordability issues.
6.3 Exclusion Criteria
According to the process described above, the selection of an appropriate inspection tool
or assessment technique involves a criteria-based technical exclusion process. Necessary and/or
desirable criteria are specified and tools approaches excluded based on their inability to satisfy
these criteria. For example, the assessment of technical feasibility is based on asset-related
criteria. Exclusion of tools on that basis provides a list of all feasible options for the asset type in
question. The subsequent assessment of technical suitability and technical capacity allow the list
6-4
of feasible options to be reduced to a list of options that could be used by the utility. An
economic appraisal allows this list to be ranked and the appropriate tool selected.
A number of important criteria related to the first three steps of the exclusion process
were identified to guide the selection of tools and techniques using the process illustrated in
Figure 6-2. Two separate sets of criteria are presented herein:
Criteria relating to inspection tools: these criteria relate to specific inspection tools and
techniques, such as ultrasonic thickness gauges.
Criteria relating to assessment tools: these criteria relate to asset management tools or
condition assessment tools that use inspection and other data to characterize asset or
system condition.
Table 6-1 details the criteria for inspection tool selection and Table 6-2 details the criteria
for selection of assessment tools.
Various characteristics of a utility also influence what approaches to condition and
performance assessment should be selected. Characteristics of significance are summarized in
Table 6-3.
6.4 Application of Exclusion Protocol
Where relevant information could be found, the attributes relating to the exclusion
criteria detailed in Tables 6-1 and 6-2 have been evaluated for each of the tools and techniques
identified and reviewed in this project. These attributes summarize the application and use of the
tools and provide the information necessary to identify the range of tools and techniques that
apply to the application under consideration.
It is assumed that once a list of useable options is identified, the utility will undertake a
cost-benefit analysis to select the appropriate tool. The factors shown in Table 6-3 influence this
analysis, along with economic factors such as:
The capital and operational costs associated with the inspection.
Costs associated with analysis and interpretation of the inspection data.
The accuracy and precision of the results.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 6-5
Table 6-1. Exclusion Criteria for Inspection and Survey Tools/Techniques.
Category Selection criteria Notes
Technical Assets covered What type of asset is covered by the tool?
selection
Material type What material is covered by the tool?
Service area Potable or wastewater?
Access requirements Are there any specific access requirements (launch
assemblies, power, etc.)?
Limitations relating to asset condition Is there a restriction if the asset is in bad condition (this
includes presence or absence of lining/coating)?
Limitations relating to asset size/geometry Is there a size/diameter restriction and is there a restriction
in asset geometry?
Continuous/discrete Does the technique give continuous/discrete readings (in
time and space)?
Destructive/non destructive Is the asset (or part thereof) destroyed or is it a non-
destructive test?
Interruption to supply/function Can the inspection be undertaken on-line or must the asset
be taken off line?
Technical Assessment parameters What is measured (defects, blockage, integrity, wall section,
suitability etc.)?
Integration with software tools Is the tool/approach stand-alone or can the output be
integrated into utility systems easily (e.g., telemetered, up
loading via mobile phones)?
Commercialization of tool Is the approach/tool fully developed? Can it be used off-the-
shelf?
Previous/existing use of the tool in sector History of use in terms of uptake in the water and other
sectors and acceptability to stakeholders?
Accuracy/reliability Any measure of accuracy (qualitative and/or quantitative)?
Ease of validation of results Can the results be easily validated or are they indicative at
best?
Utility technical Asset management sophistication required Is the approach associated with high levels of asset
capacity management sophistication or can any utility use it?
Skills required (level of tool sophistication), What level of operator skill is needed?
usability
Technology required (level of tool What level of technological sophistication is needed (high
sophistication) power computers, sophisticated assets)?
Documentation Is the tool documented? Are standards available?
Availability of technical support Is the tool supported (helpline or other point of contact)?
6-6
Table 6-2. Exclusion Criteria for Asset Management and Assessment Tools/Techniques.
Category Selection criteria Notes
Technical Assets covered What type of asset is covered by the tool?
selection
Granularity What level of detail is covered (asset level, area/zone,
utility)?
Service area Potable or wastewater?
Technical Focus of analysis What is assessed (remaining life, probability of failure, level
suitability of service, risk, etc.)?
Scalability of tool/approach Is the tool/approach only suitable for small/large utilities?
Commercialization Is the approach/tool fully developed? Can it be used off the
shelf?
Previous/existing use of the tool History of use in terms of uptake in the water and other
sectors and acceptability to stakeholders?
Ease of validation Can the results be validated?
Flexibility with respect to analysis (asset Is the tool flexible in terms of service or asset focus?
types) and granularity (system, asset level)
Integration with other tools/GIS Can the tool be integrated with existing system?
Utility technical Asset management sophistication Is the approach associated with high levels of asset
capacity management sophistication or can any utility use it?
In-house skills required What level of skill is needed (technician, engineer, etc.)?
Technology required What level of technological sophistication is needed (high
power computers, sophisticated networks)?
Documentation Is the tool documented? Are standards available?
Data Requirements What data are required by the tool?
Linking to asset data Does the tool provide facility to use ‘TAG’ numbers or other
asset identifications?
Availability of software and technical
Is the tool supported (helpline or other point of contact)?
support
Usability Is the approach considered useable?
Attribute Characteristics
Size Large/medium/small (population served)
Location Urban/rural/mixed
Service areas Drinking/waste water, pipeline assets/non-pipeline assets
Data quality/quantity Good/average/poor
Technical development of asset stock High (state-of-art)/average (mix)/low (obsolete)
Degree of asset management process development Well developed/developing/not developed
Available budgets Cash rich/cash poor
Managerial commitment Board-level commitment/engineers/etc.
Network state Good/mixed/near collapse
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 6-7
6.5 Development of a Prototype Expert System (ES)
A key goal of this research was to provide a framework to assist a utility in the selection
and use of condition assessment tools. A paper-based solution has been developed to facilitate
this process (see Chapter 7.0). However, the complexity of tool selection, in combination with
the number of tools and techniques used within the water sector, make such an approach
unwieldy.
The research team considers that a better approach is to incorporate the information and
selection procedure within a software tool. After review of a number of options, an ES was
identified as an appropriate vehicle for delivering the research outputs for the following reasons:
Importantly from the perspective of the research, the development of the ES provided a
focus for the development of the tool selection logic and criteria and guided the tool
reviews and design of the paper-based selection process.
Within the context of the research deliverables, an ES provides a user-friendly tool that
helps a utility to identify tools and techniques appropriate to its needs.
The ES also provides a means of organizing information in a way as to allow easy access.
Unlike a purely paper based approach, an ES can be expanded and refined as new
information becomes available and made available via the world wide web.
With these issues in mind, initial development was undertaken of a prototype ES for this
application, as described in Appendix E.
6.6 The Impact of Risk and Cost on Tool Selection
The role of risk in determining the level of attention given to an asset has been discussed
in various sections throughout this report. A direct extension of these risk-based arguments is
that the more important the asset is (the higher the consequences of failure are), the more
expense can be justified in assessments to ensure the asset does not fail. However, to minimize
costs, inexpensive tools should still be used where possible. As such, the following can be stated:
Inexpensive screening tools and approaches should be used routinely.
The results of the screening approach may dictate that there is a need for additional
information and/or accuracy. This may require the use of more sophisticated/accurate
assessment or inspection tools.
Additional expense should be considered only when justified in terms of risk costs
avoided or benefits accrued.
These basic guidelines led to the conclusion that, while there may be a range of tools and
techniques available to inspect/assess a given asset, the utility should select the cheapest of any
suitable options available that meets its immediate needs. Take, for example, the case of a large
(>300 horsepower) centrifugal pump, for which the following condition monitoring techniques
are feasible:
Visual observation
Performance monitoring (pump performance trending)
Oil Analysis
6-8
Vibration analysis
Bearing temperature trending
Acoustic monitoring techniques
Ultrasonic thickness measurement
Infrared thermography
Motor circuit analysis
While it is useful to identify the tools that are feasible, the question still remains, “which
of the techniques should be applied?”
To help manage costs, the most inexpensive screening tools should be applied first.
Therefore, since they are the cheapest monitoring techniques available, as a minimum,
maintenance and operators should perform a routine monitoring role (e.g., listening for
unexpected noise, making visual assessments of deterioration and providing feedback on
performance issues to maintenance planners). When appropriate data capture systems have been
set up (e.g., telemetry), trending of operational parameters should also be carried out routinely as
part of condition monitoring and for energy efficiency purposes.
Depending on the importance of the asset, and its operating context (e.g., whether there is
any redundancy or significant levels of storage available), other condition monitoring tasks
might be deemed necessary. Risk-based approaches like RCM provide a means of determining if
a maintenance task is worth doing and at what interval inspections should be undertaken. In this
example, it is likely that a utility would find it cost-effective to undertake periodic oil testing,
vibration analysis of the pump and motor and trending of bearing temperatures.
Once a trigger threshold has been detected by one of the routine monitoring approaches,
some action needs to be taken. This action could be:
A repair/replacement of a failing component.
A change to the monitoring regime (to monitor the asset more closely to determine when
a critical condition is reached or to provide information on the rate of deterioration).
Additional inspections using other feasible, but more costly, techniques than those used
for screening.
The cost of any additional investigation should be in proportion to the cost of subsequent
maintenance tasks. For example, if the inspection cost is a significant proportion of the
maintenance task, then further investigation is only warranted under specific circumstances (such
as the lead time for spare parts and the operational context means is desirable to continue to run
the asset, but the level of risk associated with this decision needs to be understood). For other
cases, it can be assumed that when averaged across a number of assets, carrying out the
maintenance immediately, rather than undertaking additional investigation, would realize cost
savings.
In such circumstances, the utility may develop a policy for determining when to
undertake additional investigations, in light of overall maintenance costs and operational
experience.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 6-9
6.7 An Iterative Approach to Asset Assessments
The example of the centrifugal pump given above can be generalized to give an iterative
approach to the use of tools where increasing levels of sophistication are used that build upon the
results of previous tools and assessments.
In this approach, tools are initially selected that perform a screening function, for
example, to identify the early signs of deterioration. More detailed inspection and analysis can
then be performed to investigate the asset condition further, if and when justified. If an
appropriate screening tool cannot be identified, it may be necessary to use a more sophisticated
approach in the first instance.
A similar approach to this was adopted by a company in the United Kingdom in the
analysis of water transmission pipe failures, as summarized in Case Study Inset 6-2. The concept
of a sliding scale of assessment standards presented in the case study is considered useful,
especially when generalized to consider assessments undertaken for reasons other than failure
investigation. Such an approach is outlined in Table 6-4.
As shown in Table 6-4, the assessment standard applied is dictated by the type of asset
(reactive or proactive), access considerations and the driver behind the assessment (condition
monitoring, failure investigation, etc.).
In general, it can be concluded that the more there is at stake, the greater the level of
assessment that is justified. As in the example in Case Study Inset 6-2, the application of lower
assessment standards should always precede higher assessment levels where possible. In
6-10
particular, opportunistic and routine assessments should be carried out as a precursor to more
detailed assessments when practicable (see Case Study Inset 6-3).
Table 6-4. Sliding Scale of Assessment Standards.
Typical Typical
Standard Focus Sample Frequency Accuracy Expertise
asset tools
Opportunistic Reactive Data collection Representative Opportunistic Visual Qualitative Operations
Routine Proactive Regular Asset specific Regular to Visual, low Qualitative, Maintenance
asset with inspection and/or continuous cost low accuracy specialist
access routine screening quantitative
monitoring
undertaken to
anticipate
impending faults
Bronze Proactive Regular Representative Regular to Higher end Qualitative, Engineer
asset with inspection and/or or asset continuous NDT low to
some access routine specific moderate
restriction or monitoring accuracy
deemed to be undertaken to quantitative
of concern anticipate
due to age or impending faults,
condition individual
assessment for
renewal planning
Silver Proactive Individual Representative Infrequent Higher end High Consultant
assets with assessment for or asset NDT or DT accuracy
difficult renewal planning specific quantitative
access
Gold Known Individual Asset specific Individual Higher end High Specialist
problem assessment for assessment NDT or DT accuracy consultant
asset with renewal planning quantitative
poor
performance
Platinum Failed asset Forensic Asset specific Individual High end Highest Expert in
with potential investigation assessment NDT and achievable field
or actual DT, with accuracy
litigation lab tests as
associated required
with failure
event
This concept is shown in Figure 6-3, which indicates that once initial condition and
performance assessments have been undertaken, there is an explicit requirement to consider if
the information gap has been filled, or if the decision being considered necessitates an increase in
data quality or quantity. In the later case, additional assessments are undertaken, using more
sophisticated tools and techniques, until the information gap is filled.
In the case of large important assets where risk analysis (e.g., RCM or FMECA) shows
that on-going condition monitoring tasks using sophisticated tools and techniques is justified,
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 6-11
opportunistic and routine assessments should still be carried out in conjunction with the more
sophisticated techniques to improve the reliability of the overall asset monitoring.
Case Study Inset 6-3: Water Corp’s Approach to Assessment of Water Tanks
Inspection of tanks by Water Corp is undertaken periodically under its asset condition
assessment (ACA) program. Often, this is aligned with maintenance activities. Similarly,
when emptied for cleaning, operators will undertake visual inspection.
The tank site is divided into assessable elements for the purposes of condition assessment.
Inspection templates are used to guide the inspector to assess the components of the tank that
should be examined, for example, walls and floor, stand and roof to facilitate the capture of
information about the appearance of the asset.
More detailed or technical assessments are normally undertaken on the basis of some
perceived need: 1) visual inspections reveal some issues (defects) that warrant further
investigation, 2) issues with assets of a similar type have been identified or 3) it is known that
visual inspection will be insufficient to identify defects for example, under floor corrosion. A
range of non-destructive techniques can be used in these assessments, including:
Magnetic flux leakage floor scanners to scan floor plates.
Ultrasonic sensors (to evaluate floor scanner results, and to test walls and areas of
floor not accessible to the floor scanner).
Concrete cover meter.
See Case Study 4 in Chapter 8.0.
6-12
The cost of inspection should be considered in light of the cost of subsequent tasks, such
as repair or replacement. For example, if the cost of inspection is likely to be a significant
proportion of the cost of replacement, it could be more cost effective to just to replace the asset.
In this context, Elliot et al (AwwaRF, 2001) noted that prior to initiating test procedures on
electric motors, it is necessary to compare the cost of replacing the motor to the cost of the
testing. For some small commodity size (less than 25Hp) motors, it is cheaper to replace them
than to completely evaluate and repair them. Motors that are 25 Hp and larger may or may not be
cheaper to replace outright instead of evaluating and repairing. Even for high consequence
assets, the cost of the condition assessment should be considered in light of the cost of
subsequent maintenance tasks.
Given the impact on risk and operational budgets, it is up to individual utilities to
determine what they consider to be an appropriate balance between the cost of further
investigation and the cost of subsequent maintenance tasks.
In some cases, an asset type known to be performing poorly can be replaced
opportunistically, without any further consideration of the asset condition, because over a
number of assets this approach will accrue benefits for the utility. For example, see Case Study
Inset 6-4.
Case Study Inset 6-4: Bellevue’s Asbestos Cement Pipe Replacement Program
Bellevue council determined that its asbestos cement (AC) pipes were in poor condition
through on-going review of failure data; over the last nine years, roughly 69% of the main
breaks occurred in AC pipes.
Due to this high failure rate, an AC pipe replacement program is underway; pipes are replaced
when breaks occur and/or when the roadways are resurfaced.
This replacement was undertaken without any additional condition assessment of the pipe.
See Case Study 10 in Chapter 8.0.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 6-13
6-14
CHAPTER 7.0
Chapter Highlights
The categorization of assets used in this project to allow tools and techniques to be
mapped on to the asset stock is:
− Service Area: clean, waste; then
− Pipeline assets: valves, meters, fittings and pipes, or
− Non-pipeline assets: mechanical, electrical, ICA, civil and building.
A summary table is provided showing the applicability of various tools and techniques in
terms of these asset categories and other selection criteria.
The selection process is summarized as follows:
1. Determine technical feasibility; determine the part of the selection table that is
appropriate to the application under consideration.
2. Review summary information; to identify techniques that could be used.
3. Review each of the potential tools; refer to the detailed write up in Appendix F and
consider the information presented.
4. For viable options undertake cost-benefit analysis; with due consideration given to
the accuracy of the tool, the level of asset risk and the available budgets.
Protocols for Assessing Condition and Performance of Water and Wastewater Assets 7-1
7.1 Introduction
A large range of condition assessment tools and techniques can be applied to different
water and wastewater service areas and to different parts of the asset stock. These include
inspection tools, environmental surveys and condition monitoring techniques. In presenting the
available tools and techniques, it is necessary to first consider how to categorize the asset stock
and then to map the available tools and techniques onto this representation.
This chapter describes the categorization of the asset stock adopted in this project. The
various condition and performance assessment techniques identified are then mapped onto this
representation.
This mapping is then developed to provide a tabular approach to initial selection of
tools/techniques by asset type, in line with the selection protocol detailed in Chapter 6.0.
7.2 Representation of the Asset Stock
Various approaches are used to categorize asset stocks in different sectors. For example,
the categorization of assets used in the International Infrastructure Management Manual
(IPWEA, 2006) is given in terms of static and dynamic assets. The Manual applies to a range of
sectors, including roads, electricity, water supply, property, wastewater and gas. Given the range
of sectors (and thus asset types) considered in the Manual, categorizing the asset stock as
dynamic and passive is an effective way of dealing with the range of asset types covered.
However, given that the current project is focused on one sector, it is more logical to consider the
asset stock in terms of the two main service areas - water and wastewater.
It is also natural to consider discrete non-pipeline assets and distributed pipeline assets
separately. Discrete assets are generally above ground, contained within a given site, more
accessible and easier to assess than pipeline assets. In contrast, pipeline assets are spatially
distributed, generally below ground and more difficult to access and assess. Various other
descriptors can be used to help describe the asset under consideration.
The representation of the asset stock used in this project is presented in
Tables 7-1 and 7-2. As indicated in the tables, assets are categorized according to unit type; a
unit being defined as a sub-system of a larger asset or a section of pipeline considered separately
for asset management purposes. For above ground (non-pipeline assets), units are categorized as:
Mechanical and electrical (M&E) assets.
Civil and building (C&B) assets.
Instrumentation, control and automation (ICA) assets.
7-2
Table 7-1. Service Area: Water Supply.
*A unit is considered to be a sub-system of a larger asset or a section of pipeline considered separately for asset management
purposes. Note: M&E: Mechanical and Electrical; C&B: Civil and Building; ICA: Instrumentation Control and Automation
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 7-3
Table 7-2. Service Area: Wastewater Collection and Disposal.
*A unit is considered to be a sub-system of a larger asset or a section of pipeline considered separately for asset management
purposes. Note: M&E: Mechanical and Electrical; C&B: Civil and Building; ICA: Instrumentation Control and Automation.
7-4
7.3.2 Mapping for Non-Pipeline Assets
Mapping of tools onto non-pipeline assets is not so straightforward because of the range
and type of assets used within the sector.
Complex assets, such as wastewater and water treatment facilities, are however often
categorized in terms of an asset hierarchy. The hierarchies used by utilities differ in detail, but
follow the same overall logic, namely, dividing a discrete facility into distinct parts according to
the needs of the management system. For example, Table 7-3 shows a range of hierarchies used
in the sector.
Table 7-3. Hierarchical Representations for Complex Assets.
Level 1 Level 2 Level 3 Level 4 Level 5 Level 6
Site Stage Sub-stage Unit Component Assembly
Facility System Subsystem Unit Component -
Facility - Sub-facility Unit - -
Notes:
1) Component in this context means the mechanical, electrical and civil component of the unit.
2) Unit is often considered to be an asset that does a defined job and is large enough to be included as a
separate item in a renewal program.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 7-5
Using this approach, the hierarchical representation given in Table 7-4 reduces to that given in
Table 7-5.
Table 7-4. Hierarchical Representations for Complex Assets.
Facility System Subsystem Units Components
Water treatment plant Water treatment Clarifier Basin Access hatches, ladders, rungs, stairs
Coating system
Drain
Floor
Foundation
Gratings
Handrail
Launder supports
Launders
Tray
Walls; baffle
Walls; structural
Weirs
Gates/actuators Actuator
Body
Frame
Seals/seats
Stem/operator (manual)
Trim
Clarifier Mechanism High torque cutouts/controls
Associated electrical support system
Baffles
Corner sweeps
Drive
Gear box
Motor
Rake arm
This simplified asset categorization of asset components was used to allow the tools and
techniques available to be mapped onto the asset stock. The selection of tools and techniques
therefore depends on:
The type of component in question (whether mechanical, electrical, etc.).
A range of selection criteria (used to refine the potential list of techniques).
The relative cost of the condition assessment, relative to the benefits accrued.
7-6
7.4 Tool Selection Process
As noted in Chapter 6.0, the selection of tools and techniques is a complex issue,
involving review of a significant amount of information and consideration of a range of factors.
A prototype expert system developed in this project (see Appendix E) was intended to facilitate
this selection process, but there is still a need to represent the information within this report.
A manual selection process has therefore been developed, which is based on a tabular
summary of the tools reviewed and includes a few of the key selection criteria, as presented in
Table 7-6. The selection process using Table 7-6 is summarized as follows:
Step 1. Determine technical feasibility: identify the part of Table 7-6 that is appropriate
to the application under consideration.
Step 2. Review summary information: identify techniques that could be used.
Step 3. Review each of the potential tools: refer to the detailed write up in Appendix F
and consider the information presented.
Step 4. Undertake cost-benefit analysis for viable options: with due consideration given
to the accuracy of the tool, the level of asset risk and the available budgets.
For example, consider a user that is interested in the inspection of a wastewater pump,
which is both a mechanical and electric asset. For simplicity, consider the mechanical aspect
only. The user would turn to the part of Table 7-6 relating to Non-Pipeline Assets; Mechanical
assets. The service area of interest is wastewater, which in this case does not exclude any of the
inspection techniques. The remainder of the selection criteria includes:
Assets covered
Assessment (what is measured)
Access requirements
Service interruption
Accuracy
Commercialized
Skills required
From a brief review of the remainder of the attributes, it is clear that the techniques under
consideration are: 1) oil testing, 2) performance testing and 3) vibration analysis.
A review of the descriptions of these techniques (given in Appendix F), indicates that
each of these techniques is still feasible. Cost-benefit analysis would therefore be required,
which necessitates obtaining information from venders. However, it is again stressed, that this
analysis should be undertaken within a risk-informed framework, such as those described in
Chapters 5.0 and 6.0, which balances cost of inspection/monitoring against the risks of failure.
This approach is focused on the selection of a tool to undertake the condition assessment.
The use of grading schemes and performance monitoring could also be selected, depending on the
requirements of the assessment program. The reader is referred to the sections on these approaches
(for condition grading, see Chapter 3.0; for performance monitoring, see Chapter 5.0).
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 7-7
Table 7-6. Tool and Technique Selection Tables.
Tool or Service Assets Material Assessment Service Accuracy Commercialized Skills required
technique type covered interruption
Barcol hardness Waste and NA Plastics and Material NA Semi- Yes – widely Basic
potable cementituous hardness quantitative available
Non-destructive
Carbonation Waste and NA Cementituous Depth of NA Quantitative Yes – widely Basic
testing and potable carbonation available
petrographic in mm
examination
Corrosion burial Waste and NA Ferrous Soil NA Relative - Basic
test potable corrosivity
Schmidt hammer Waste and NA Concrete and Compressive NA Quantitative Yes – widely Basic
potable brick strength available
Condition Waste and Pipes Plastics Material Off line on Quantitative Through Testing Specialized skills
Physical property testing
Slow crack Waste and Pipes PE Resistance Off line on Quantitative Mostly applied Specialized skills
growth potable to slow crack sample as research tool
resistance growth
7-8
Tool or Service Assets Material Assessment Service Access Commercialized Skills required
technique type covered interruption
Active acoustic Waste and Pipes Cementituous Presence of Man entry Man entry Yes – widely Tool training
inspection potable defects available required, with
confined space
Barcol hardness Waste and Pipes Plastics and Material Man entry Man entry Yes – widely Basic with
potable Cementituous hardness available confined space
Carbonation Waste and Pipes Cementituous Depth of Man entry Man entry Yes – widely Basic with
testing and potable carbonation available confined space
petrographic in mm
Inspection technique
examination
In-pipe (man entry)
Pipeline assets
Cover meter Waste and Concrete Reinforced Cover depth Man entry Man entry Yes – widely Basic with
potable assets concrete to available confined space
assets reinforcement
Electrical Waste and All Reinforced Detection of Man entry Man entry Yes – widely Basic with
potential (half potable reinforced concrete corrosion available confined space
cell) concrete
Man entry Waste and Pipes Any Qualitative Man entry Man entry Yes – widely Basic with
inspection potable assessment available confined space
of condition
Pull-off adhesion Waste and Coated Any coated Adhesive Man entry Man entry Yes – widely Basic with
testing potable assets assets strength of available confined space
applied
coatings
Schmidt hammer Waste and Pipes Concrete and Compressive Man entry Man entry Yes – widely Basic with
potable brick strength available confined space
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 7-9
Tool or Service Assets Material Assessment Service Access Commercialized Skills required
technique type covered interruption
Broad band Potable Pipes Steel, cast Remaining Off line as Full bore Yes Specialist
electro magnetic iron and wall pipe needs to access service
ductile iron thickness be
depressurized
CCTV Mostly waste Pipes Any (less Structural Low flow or Internal use; Yes – widely Interpretation
useful for condition – offline for mostly limited available requires
plastics) qualitative pressurized to assets specialist skills
assessment pipes ≥90mm
Fiberscope Waste and Pipes Any Qualitative Online or off Entry point Yes – widely Interpretation
In-pipe (non-man entry)
Inspection technique
7-10
Tool or Service Assets Material Assessment Service Access Commercialized Skills required
technique type covered interruption
Multi-sensor pipe Mainly waste Pipes Any Depends on Depends on Access to pipe No – under Advanced
inspection robots sensors used sensors used interior development
Passive acoustic Waste and Pipes Prestressed Detect On line Access Yes – tool Training required
inspection potable concrete failures of required for available from for tool use
(PCCP) prestressed hydrophone commercial result analysis
In-pipe (non-man entry)
Inspection technique
Remote field Waste and Pipes Iron, steel Internal or Off line Cut-ins Yes - specialist Advanced skills
eddy current potable and external required; pipes consultants for interpretation
prestressed defects >150mm tool applied by
concrete diameter specialist
(PCCP)
Smart Digital Waste Pipes Any Automated On line Scanner No – under Advanced
Sewer Pipe analysis of inserted – not development
Diagnostic defects suited to small
System (VTT) diameter pipes
Smoke testing Waste Gravity Any Indicates On line Manhole Yes – equipment Basic
sewer illegal access to available
connections sewer
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 7-11
Tool or Service Assets Material Assessment Service Access Commercialized Skills required
technique type covered interruption
Acoustic Waste and Pipes Any Detection On line NA Yes – Operator training
emission potable and location commercially is required
of material available from
defects selected vendors
Active acoustic Waste and Pipes Cementituous Presence of Off line and Access to Yes – widely Tool training
inspection potable defects dewatered asset surface available required
Barcol hardness Waste and Pipes Plastics and Material On line Direct access Yes – widely Basic
potable cementituous hardness to pipe surface available
Broad band Potable Pipes Steel, cast Remaining Off line as Exposure of Yes Specialist
electro magnetic iron and wall pipe needs to pipe surface service
ductile iron thickness be
depressurized
Inspection technique
Pipeline assets
On-pipe
Carbonation Waste and Pipes Cementituous Depth of On line Direct contact Yes – widely Basic
testing and potable carbonation with concrete available
petrographic in mm surface
examination
Cover meter Waste and Concrete Reinforced Cover depth On line Direct access Yes – widely Basic
potable assets concrete to to pipe surface available
assets reinforcement
Drop test Waste and Pipes Any Water loss Off line Access to General Basic
potable from pipe monitoring approach
points
Electrical Waste and All Reinforced Detection of On line Direct access Yes – widely Basic
potential (half potable reinforced concrete corrosion to pipe surface available
cell) concrete
Holiday detector Waste and Coated Ferrous and Location of Off line if Direct contact Yes – widely Basic technical
potable assets concrete defects in internal with coating available skills
assets with asset coating is to
coating for coatings be tested
corrosion
protection
7-12
Tool or Service Assets Material Assessment Service Access Commercialized Skills required
technique type covered interruption
Leak detection – Potable Pipes Any – Leak On line Most tests Yes – tools Dependent on
Including effectiveness detection require access widely available technique used
acoustic, tracer depends on to pipe and applied
gas and infrared technique
photography
Linear Waste and Buried Results relate Soil linear On line Access to soil Equipment is Operator training
polarization potable ferrous to ferrous polarization at point of widely available required
resistance assets assets resistance interest
(LPR)
Magnetic flux Waste and Pipes Iron and steel Metal loss Off line Direct access Yes - specialist Specialist
leakage potable to pipe wall consultants service
Inspection technique
required
Pipeline assets
Measurement of Waste and Any NA Stress and On line Access to Yes – Engineer trained
On-pipe
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 7-13
Tool or Service Assets Material Assessment Service Access Commercialized Skills required
technique type covered interruption
Pipe potential Waste and Pipes Ferrous Measures On line Electrical Yes- available Specialist
survey potable electrical contact with from commercial training required
potential asset is suppliers
between pipe required
and soil to
infer
corrosion
potential
Radiographic Potable Pipes Ferrous, Changes in Off line – as Access Yes – tool and Advanced –
testing cementituous material water absorbs required to service requires
and plastics structure radiation both sides of commercially specialized
Inspection technique
voids and
corrosion)
On-pipe
Schmidt hammer Waste and Pipes Concrete and Compressive On line Direct access Yes – widely Basic
potable brick strength to pipe surface available
Ultrasonic Waste and Pipes Iron and steel Level of wall On line Direct contact Yes Basic – tool
measurement – potable thickness required with operation
continuous and corrosion pipe wall Advanced –
(guided wave) pit depth analysis of
results
Ultrasonic Waste and Pipes Iron and steel Level of wall On line Direct contact Yes – widely Trained
measurements - potable thickness with asset - available technician
discrete and corrosion surface must
pit depth be smooth and
clean
Visual inspection Waste and All Any Qualitative On line Physical NA Interpretation
potable visual access requires training
assessment required
7-14
Tool or Service Assets Material Assessment Service Access Commercialized Skills required
technique type covered interruption
Visual inspection Waste and Meter NA Qualitative On line Physical NA Interpretation
(see notes on potable visual access requires operator
water meters in assessment required training
Meter Table 3-3)
Volumetric X-ray Waste and Welded Metal Integrity of Off line for Direct access Yes – Advanced –
or radiographic potable joints, assets laboratory required to commercially requires
testing castings, testing or asset available from specialized
electronic when meter selected vendors contractor
assets, etc. interior is
Inspection technique
assessed
Pipeline assets
CCTV Mostly Valves Any Structural Low flow or Internal use; Yes – widely Interpretation
waste condition – off line for mostly limited available requires training
qualitative pressurized to assets
assessment pipes ≥90mm
Fibrescope Waste and Valves Any Qualitative On line or off Entry point Yes – widely Interpretation
inspection potable assessment line (e.g., tapping) available requires training
of condition
Radiographic Potable Valves Ferrous, Integrity of Off line – as Direct access Yes – tool and Advanced –
Valve
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 7-15
Tool or Service Assessment focus Data needs Commercialized Integration Skills required Asset
technique type management
sophistication
AQUA-Selekt Waste Sewer condition CCTV Yes – has had No – Professional Basic to
inspection data limited standalone engineering advanced
application in tool skills
Europe
AQUA-WertMin Waste Planning of CCTV Requires CCTV Yes – available No – Professional Basic to
inspection, rehabilitation data from Germany; standalone engineering advanced
and construction for limited tool skills
sewer networks application
CARE-S Waste Service levels, budget Dependent on No – research No – Professional Basic to
setting, life cycle cost models applied applications only standalone engineering advanced
and rehabilitation tool skills
planning
Strategic planning
setting, life cycle cost models applied application in standalone engineering advanced
and rehabilitation European cities tool skills
planning
FailNet – Stat Potable Failure forecasting Good asset No – only No – Professional Basic to
model for water and failure data research standalone engineering advanced
pipelines needed application in tool skills
Europe
KANEW Potable Strategic tool that Good asset Yes – basic No – Professional Basic to
estimates length of and failure data version available standalone engineering advanced
water mains to replace desirable through AwwaRF tool skills
or repair each year
KureCAD Waste Applies GIS analysis for Good GIS data Yes Links to GIS Professional Basic to
prioritization of sewer required engineering advanced
rehabilitation skills
PARMS Potable Long term asset Good asset Yes – used by a No – Professional Basic to
Planning management planning and failure data number of standalone engineering advanced
using asset failure needed Australian tool skills
curves developed from utilities
utility data
7-16
Tool or Service Assessment focus Data needs Commercialized Integration Skills required Asset
technique type management
sophistication
PARMS Priority Potable Decision support Good asset Yes – used by a No – Professional Basic to
system to assist in and failure data number of standalone engineering advanced
asset renewal decisions needed Australian tool skills
utilities
PiReP/PiReM Potable Decision support Good asset No – under No – Professional Basic to
Strategic planning
system for rehabilitation and failure data development standalone engineering advanced
planning of water needed with commercial tool skills
networks release planned
SCRAPS Waste Expert systems that Information on Yes – available No – Professional Basic to
prioritizes sewer critical assets from WERF standalone engineering advanced
inspections tool skills
UtilNets Potable Reliability based Good asset No – currently at No – Professional Basic to
Network assessment
decision support system and failure data prototype stage standalone engineering advanced
Pipeline assets
modeling and waste flow, pressure, quality asset commercial and GIS engineering approach
roughness, capacity data needed public domain skills
and service software
available
Inflow and Waste Inflow and infiltration to High NA – framework Potential to Professional Basic – generic
infiltration – sewers approach link with GIS engineering approach
sewer flow and hydraulic skills
survey models
Leak detection Potable Detection of leaks NA Tools widely NA Operator Basic – generic
available training approach
required
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 7-17
Tool or Service Assessment focus Data needs Commercialized Integration Skills required Asset
technique type management
sophistication
Leak detection Potable Detection of leaks NA Tools widely NA Operator Moderate
Network Condition
available training required
WRc sewer Waste Cost effective High – but Framework NA High – Basic – generic
rehabilitation management of assets; can be available as professional approach
man identify service customized to manual engineering
problems in drainage be affordable skills
areas
WRc trunk main Potable Current structural Moderate Framework NA High – Basic – generic
structural condition and remaining available as professional approach
condition service life of water manual engineering
assessment transmission pipes skills
Ground Waste and Location of buried Minimal data Yes- available NA Requires Basic – generic
Network assessment
radar suppliers
Linear Waste and LPR gives indication of NA Yes- equipment Results can Requires Basic – generic
polarization potable soil corrosion rate for available from be input to trained operator approach
resistance buried ferrous assets commercial GIS
suppliers
Pipe potential Waste and Measures electrical NA Yes- available Results can Specialist Basic – generic
Environmental Survey
survey potable potential between from commercial be input to training required approach
ferrous pipe and soil to suppliers GIS
infer corrosion potential
Soil Waste and Soil parameters relevant NA Equipment and Results can Operator Basic – generic
characterization potable to deterioration of buried testing services be input to training; approach
assets widely available GIS interpretation
requires expert
Soil corrosivity Waste and Predicts corrosion rate Pipe Testing services Results can Requires Basic – generic
potable for ferrous assets from characteristics widely available be input to trained operator approach
soil characteristics GIS
Soil resistivity Waste and Indication of soil NA Equipment and Results can Requires Basic – generic
survey potable corrosion potential for testing services be input to trained operator approach
buried ferrous pipeline widely available GIS
assets
7-18
Tool or Service Assets Assessment Access Service Accuracy Commercialized Skills required
technique type covered requirements interruption
AwwaRF’s Potable Water Treatment work NA NA NA Available from Professional
Manager treatment condition and AwwaRF asset manager/
Software works value engineer
Current Waste and Electric motors Measurement of No On-line with Good – Yes Electrician
monitoring potable current in a circuit safety comparison with required
and comparison precautions historical
with design loads in place recordings can be
used to identify
onset of faults
Ductor testing Waste and Electrical Determines the Access to Off-line Good Yes – widely Trained
potable connections, contact resistance normally live available electrical
busbars and in draw–out parts technicians or
Non-pipeline assets
circuit breakers
Insulation test Waste and Motor winding, Electrical Access to Off-line – Good accuracy Yes – widely Trained
potable cables, insulation conductor and Equipment available electrical
switchboards performance insulation needs to be technicians or
and motor isolated engineers
control centers
Load rejection Waste and Power Performance of Site specific On-line Dependent on Widely available High – team of
test potable generation power generation approach in other sectors engineers
systems systems under
these sudden load
changes
Motor circuit Waste and Electric motors Detection and No – portable Off-line Good accuracy Yes – widely Trained
analysis potable monitoring of hand-held available electrical
electrical motors equipment technicians or
and circuits engineers
Oil testing Waste and Mechanical Impurities and Sample of oil Dependent Oil analysis is Yes – Laboratory
potable assets with oil dielectric strength required on equipment accurate, but only commercially analysis
as lubricant or of oil, which may indicative of asset available
coolant indicate asset condition
condition
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 7-19
Tool or Service Assets Assessment Access Service Accuracy Commercialized Skills required
technique type covered requirements interruption
Process control Waste and Networked Monitors assets Assets On line Dependent on Yes – widely Trained
system potable instrumentation and provides connected to measured variable available operator can
(integrated) or electrical preventive field bus assess
equipment maintenance data network condition data
Thermographic Waste and All electrical Infrared imagery to Direct access On line Qualitative Yes Field service
testing potable assets locate defects and to live assets engineer
potential failures
by scanning for
thermal
abnormalities
Non-pipeline assets
Electrical assets
Transformer Waste and High value Testing of Access to high Off line – Indicative tool Yes Field service
circuit potable electrical electrical voltage areas power supply engineer
protection assets protective systems disruptions
coordination
Transient earth Waste and All electrical Detects No On line Qualitative Yes Field service
voltage potable assets discharges to requirement inspection tool engineer
earth through for direct
voids or insulation contact
breakdown
Ultrasonic Waste and Electrical Identify ultrasound Physical On line Qualitative Yes Field service
emission potable assets such as waves that can contact inspection tool engineer
inspection switchboards indicate defects or required to
failures outer casing
Visual Waste and Electrical Qualitative visual Physical On line Qualitative NA Operator
Inspection potable assets assessment; can access training
include grading required required
system (see
section 3.3)
7-20
Tool or Service Assets covered Assessment Access Service Accuracy Commercialized Skills required
technique type requirements interruption
AwwaRF’s Potable Water treatment works Treatment work NA NA NA Available from Professional
Manager condition and AwwaRF asset manager/
Software value engineer
Measurement Waste Any component made Measurement of No specific On line Accurate Yes – Engineer trained
of strain and of homogenous strain requirements commercially in operation of
potable material – e.g., motor available tool
shaft
Oil testing Waste Mechanical assets Impurities and Sample of oil Dependent on Oil analysis is Yes – Laboratory
and with oil as lubricant or dielectric strength required equipment accurate, but commercially analysis
potable coolant of oil, which may only available
indicate asset indicative of
Non-pipeline assets
Mechanical assets
condition asset
condition
Performance Waste Pumps, fans, motors, Performance of No specific On line Dependant Yes Operator
testing of and air blowers, mixers, rotating requirements on the requires training
rotating potable etc. machinery, such accuracy of for interpretation
machinery as head, pressure, measuring of results
noise and vibration device
Process Waste Networked Monitors assets Assets On line Dependent Yes – widely Trained operator
control system and instrumentation or and provides connected to on measured available can assess
(integrated) potable electrical equipment preventive field bus network variable condition data
maintenance data
Thermographic Waste All electrical assets Infrared imagery to Direct access to On line Qualitative Yes Field service
testing and locate defects and live assets engineer
potable potential failures
by scanning for
thermal
abnormalities
Ultrasonic Waste Electrical assets such Identify ultrasound Physical contact On line Qualitative Yes Field service
emission and as switchboards waves that can required to outer inspection engineer
inspection potable indicate defects or casing tool
failures
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 7-21
Tool or Service Assets covered Assessment Access Service Accuracy Commercialized Skills required
technique type requirements interruption
Vibration Waste Rotating machinery, Condition fault Fixed point On line Qualitative – Yes – fully Field service
analysis and such as pumps, diagnosis by testing to ensure assessment developed and engineer
potable electric motors and measurement and consistent based on commercially
fans analysis of measuring point comparison available
Non-pipeline assets
Mechanical assets
7-22
Tool or Service Assets covered Assessment Material Service Accuracy Commercialized Skills required
technique type interruption
Acoustic Waste Storage tanks, Detection and Any On-line Qualitative Yes – Operator training
emission and pressure vessels, location of material estimates of commercially is required
potable aerial lift devices, defects material available from
welded joints damage selected vendors
Air Waste Concrete elements Permeability, Concrete On line Excellent Yes – limited use Basic technical
permeability and with flat surfaces quality class and measure of in water sector skills
potable (slabs, walls, capillary suction of resistance of
pavements, etc.) concrete concrete
against
aggressive
media
AwwaRF’s Potable Water treatment works Representing NA NA NA Available from Professional
Civil and Building Assets
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 7-23
Tool or Service Assets covered Assessment Material Service Accuracy Commercialized Skills required
technique type interruption
Cover meter Waste Concrete assets - Cover depth to Reinforced On line Accurate Yes – widely Basic
and slabs, beams, walls, reinforcement concrete assets survey of available
potable tunnels and dams, etc. reinforcements
in concrete
assets
Crack Waste Concrete assets - Measuring linear Reinforced On line Quantitative Yes – widely Basic
measurement and slabs, beams, walls, deformations, concrete assets available
potable tunnels and dams, etc. cracks,
settlements and
shrinkage
coefficients
Electrical Waste All reinforced concrete Detection of Reinforced On line Up to 95% Yes – widely Basic
Civil and Building Assets
cell) potable
Holiday Waste Coated assets Location of defects Ferrous and Off line if Qualitative Yes – widely Basic technical
detector and in asset coatings concrete assets internal available skills
potable with coating for coating is to
corrosion be tested
protection
Impact echo Waste Concrete assets - Determine Concrete On line Good Yes- available Basic skills for
method and slabs, beams, walls, concrete thickness accuracy for from commercial operation;
potable tunnels, dams, etc. or location of thickness suppliers categorization of
internal defects measurements defects requires
expertise
LPR for Waste Concrete assets - Concrete Reinforced On line Results are Yes – Basic
corrosion and slabs, beams, walls, temperature that concrete indicative only commercially
monitoring potable tunnels, dams, etc. allows structure’s available from
long-term selected vendors
performance to be
determined
Magnetic flux Waste Metal assets – tanks, Metal loss Iron and steel Off line Quantitative Yes - specialist Specialist skills
leakage and etc. assessment consultants
potable
7-24
Tool or Service Assets covered Assessment Material Service Accuracy Commercialized Skills required
technique type interruption
Measurement Waste Any component made Measurement of No specific On line Accurate Yes – Engineer trained
of strain and of homogenous strain requirements commercially in operation of
potable material, dams available tool
Phenolphthalein Waste Any cementituous civil Carbonation depth Cementituous On line Qualitative Yes – widely Basic
indicator and assets available
(carbonation potable
testing)
Pull-off Waste Coated tanks, etc. Adhesive strength Any coated On line Quantitative Yes – widely Basic
adhesion and of applied coatings assets available
Civil and Building Assets
testing potable
Non-pipeline assets
Schmidt Waste Any cementituous civil Compressive Concrete and On line Quantitative Yes – widely Basic
hammer and assets strength brick available
potable
Ultrasonic Waste Steel civil assets Level of wall Steel On line Quantitative Yes – widely Trained
measurements and thickness and available technician
- discrete potable corrosion pit depth
Visual Waste Civil assets Qualitative visual Any On line Qualitative NA Operator
Inspection and assessment; can training required
potable include grading
system (see
section 3.3)
Volumetric X- Waste Welded joints, Non-destructive Metal Off line for Accuracy Yes – Operator
ray or and castings, electronic method used for laboratory dependent on commercially requires training
radiographic potable assets, etc. checking the testing operator available from for image
testing integrity of metal expertise selected vendors interpretation
assets
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 7-25
7-26
CHAPTER 8.0
Chapter Highlights
During the case studies the research team sought input from a range of utilities and
industry practitioners across the globe in an effort to:
− Sense-check the protocols being proposed by the research team.
− Ground the report in practicalities and provide industry insights.
− Identify good practice in condition and performance assessments.
− Provide examples of implementation in different utilities.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-1
8.1 Introduction
An important objective of this research was to draw upon the experience of a wide range
of water industry professionals and utilities, and thereby reflect the current state of the art in
condition assessment practices across the sector. Various aspects of the research program were
designed to facilitate this. For example, a web-based survey was used to gain baseline
information on the U.S. sector. The list of tools identified as having relevance to the water sector
was also distributed to industry practitioners, along with the reviews of individual tools.
Comments received were subsequently integrated into the research outputs.
A major portion of the industry interaction was carried out in Phase 2 of the project.
During this phase, various utilities were approached and asked to provide information on case
studies for inclusion in this report. Case studies were subsequently undertaken with a sample of
utilities across Australia, New Zealand, the United States and the United Kingdom. Information
on each case study was collated using a questionnaire and interview based approach, written up
in a standard format, and sent to each case study partner for review.
This chapter briefly outlines the purpose of the case studies and the utilities that
contributed information. The full texts of the case studies are then presented. Insets relating to
the case studies are distributed throughout the report in appropriate sections and referenced to the
case studies below.
8.2 Purpose of the Case Studies
During the case studies, the research team sought input from a range of utilities and
industry practitioners across the globe in an effort to:
Review and comment on the protocols being proposed by the research team.
Provide industry insights and practical experience.
Identify good practice in condition and performance assessments.
Provide examples of implementation in different utilities.
Case study partners providing a significant contribution to the project were:
Scottish Water, Scotland, United Kingdom
Water Corporation, Perth, Australia
Water Care, Auckland, New Zealand
Melbourne Water, Melbourne, Australia
Sydney Water, Sydney, Australia
City of Bellevue, Washington, United States
Water Resources Authority, Massachusetts, United States
Two asset-specific case studies have also been included that draw upon the research
team’s previous research and consultancy experience. These case studies illustrate the
complexity of analysis that can be required to interpret the results of inspection data.
8-2
8.3 Case Study 1: Scottish Water’s Program of Treatment Plant Assessments
Case Study Summary
Key issues covered in this case study include:
The response of a water utility to the consolidation of three utilities into one large
service provider.
The role of condition assessment in regulatory reporting.
The use of condition and performance grading to categorize the state of assets within
treatment works.
The use of representative sampling and modeling to give a strategic assessment of the
overall asset stock.
See case study insets 2-4, 2-7, 3-11, 3-16 and 4-1.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-3
uncertain quality with new consistent data of known quality, so that strategic assessments could
be made with more confidence. The program in question was therefore undertaken to provide
assessments of asset condition and performance grade profiles across Scotland based on newly
collected (rather than legacy) data.
Scottish Water is/was required to report on the condition and performance of its asset
stock each year. In contrast, England and Wales were required to report similar information
every five years. The program of condition assessment was thus partly driven by the desire of
Scottish Water to understand better the use of condition and performance data in regulatory
reporting in England and Wales.
8.3.5 Key Program Features
Since the program was driven by regulatory reporting needs and was strongly influenced
by the (one-off) circumstance of bringing together three legacy systems into one, the assessment
program had to be undertaken. As such, it was designed more on the basis of affordability and
cost minimization, rather than justified through an explicit cost-benefit analysis.
8.3.5.1 Grading and Assessment of Assets
A system of condition and performance grading was used in the program similar to those
described in Section 3.3.4; the reader is referred to this section for detailed information on this
approach to condition and performance assessment. As noted in Section 3.3.4, with this
approach, condition and performance grades are allocated to assets through visual assessment,
performance review, and with reference to standard grade definitions. The grade definitions used
by Scottish Water arose from a system stipulated by U.K. industry regulators (Ofwat in England
and Wales and the Water Industry Commissioner (WIC) in Scotland). Grading systems are/were
used to give an assessment of asset condition/performance and thus the grade profile across the
asset stock (the proportion of asset value in each grade band).
There was also a fully developed set of guidelines on how to subdivide complex assets
into a consistent asset hierarchy. The grading systems allocated a condition and performance
grade to units (assets) within treatment works. A unit was defined as the smallest type of asset
recorded separately on the asset inventory; a unit was considerably larger than items commonly
found in maintenance management systems. For example, a complete pump set was recorded as
one unit rather than being broken down into its components - the pumps, motors, control gear,
delivery pipework and valves, and so forth.
An assessment of ‘fitness for purpose’ (asset capability) was also made (this allowed the
impact of upstream assets to be considered; a unit may be ‘fit for purpose’ but still be graded as
‘performing badly’ because of an upstream asset). The operational status of units was also
collected along with other asset-related data.
8.3.5.2 Stratified Sampling of Assets
In guidance for regulatory reporting, WIC stated that there was no formal requirement for
Scottish Water to survey its entire asset stock. Instead, the authority could survey sufficient
assets to give a representative view. A representative sampling strategy and statistical modeling
of data was identified as an appropriate means of meeting the objectives of the study; this meant
a sample of treatment works could be surveyed and used to estimate the state of the whole asset
stock.
The approach involved the design of a stratified sampling scheme that focused on
important assets, but also sampled the rest of the asset stock. Data was collected for the sample
8-4
during site surveys. Visual assessment was used to grade assets using data collection protocols
developed by external consultants drawing on grading systems previously used within the legacy
authorities.
8.3.5.3 Analysis of Sample Data
The sample of grades and associated data were analyzed in a statistical package.
Generalized linear modeling was used to produce models that described the probability of an
asset being within a given condition/performance grade. The factors considered in the modeling
exercise were:
Works type (water treatment or wastewater treatment)
Treatment type
Geographical area (former East, North or West of Scotland)
Unit class
Asset life category
A risk grade (good, fair or poor)
As noted, the resulting models expressed the probability that an asset would be in one of
the condition grades, and were of the form:
Probability (Grade) = aX +bY + cZ…
where: a, b and c are coefficients derived from the analysis and X, Y and Z were the
covariates used (works type, treatment type, etc.).
8.3.5.4 Extrapolation across the Asset Stock
In combination with data on the overall asset stock and the value of different assets (in
modern equivalent terms), these models allowed the grade profile for the asset stock to be
calculated; the expected value of assets in each grade band was estimated for all of Scottish
Water’s treatment works. As shown in Figure 8-1, this profile was then used to compare the state
of Scottish Water’s asset stock to that of companies in England and Wales. However, the project
also concluded that interpretability of such plots is limited due to significant differences in the
underlying data and grading procedures.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-5
8.3.6 Key Lessons and Tips for Success
8.3.6.1 Commitment to Data Improvement
Given the starting position of disparate data sources spread across three legacy data
systems, a key strength was the commitment by Scottish Water to improve data on assets and
asset condition/performance to allow analysis to be undertaken for strategic planning and other
purposes.
8.3.6.2 Cost Saving
While a representative sampling approach was used in the assessment program, an
attempt was also made to substitute works that were being assessed as part of the capital
investment planning process when this had no effect on the representative nature or the sample
(the impact of substitution was determined by an expert in statistics). Cost saving was realized
because some works were assessed to meet two drivers: 1) to provide information on capital
investment requirements and 2) to provide the profiles of asset condition and performance to be
used in regulatory reporting.
Cost savings were also realized by clustering assessment tasks to minimize travel time
and to increase the efficiency of the assessment program. Substitutions were again used in this
process, for example, where randomly selected sites were very remote, substitution for similar
but more accessible works was allowed.
8.3.6.3 Consistency of Grading
Grading is a subjective process and effort needs to be expended to ensure consistency. To
facilitate this, Scottish Water therefore provided leveling training to all assessors and also
audited the grading process across a number of teams. In general, consistency of application was
good, although some issues were noted with respect to the consistency of subdivision of assets
into a consistent hierarchy (e.g., what was considered a unit differed between assessors).
8.3.6.4 Focus on Grades of Concern
Generalized linear modeling of allocated condition and performance grades was used to
extrapolate the survey results across the asset stock. However, after undertaking initial analysis,
it was noted that there was an issue with the confidence limits of the statistical modeling of the
grade profiles. This meant that while a 1 to 5 grade system was used in the assessment of assets,
there were insufficient assets of grade 4 and 5 to model in a statistically significant sense. As
such, these grades were combined. Furthermore, it was noted that there was no interest in the
distinction between whether or not an asset was in condition grade 1 or 2, so these grades were
also combined. The final models thus gave the probability that assets would fall into grade bands
1 and 2, 3, and 4 and 5.
8.3.6.5 Confidence Grades
It is desirable to allocate a confidence grade against the condition and performance grade
to indicate the information upon which the grade was allocated (for example, full visual
inspection, opinion of operator, inferred, etc.), and thus the relative confidence in the grading.
8-6
8.4 Case Study 2: Scottish Water’s Approach to Grading of Water Mains
Case Study Summary
Key issues covered in this case study include:
The development and use of sophisticated decision support IT systems for
management of water infrastructure assets.
The use of opportunistic and planned sampling in development of models.
Stepwise justification and development of decision support systems.
Extrapolation of condition/performance across the asset stock and the use of surrogate
data to fill gaps in necessary data sets.
See case study insets 2-4, 3-5 and 4-1.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-7
8.4.5.2 Use of Pipe Sampling
INMS uses a range of information collected through the operation of the network and via
pipe sampling. As discussed further below, both planned and opportunistic sampling has been
used to provide the data from which the models of pipe condition and performance were
developed. All samples were physically cut out and analyzed; none were assessed using non-
destructive testing (NDT).
The INMS models were developed in a stepwise manner. Initial sources of data were
available in the form of previously collected and stored pipe samples and photographs. These
data were re-inspected and the resulting data analyzed to allow relationships between the pipe
characteristics and pipe condition to be generated. For example, corrosion rates of the buried
ferrous mains were calculated using information on pit depth and age. Tuberculation growth
rates for different materials were calculated using tuberculation height measurements, pipe
diameter and material.
The initial pipe samples had, however, been taken in known problem areas and/or taken
opportunistically from exposed sections of burst or leaking water main at the time of excavation
for repair. Opportunistic samples were also taken during other maintenance work, such as the
installation of valves and meters or as part of a rehabilitation program. Opportunistic sampling is,
by definition, unplanned, though selective use of samples may be undertaken to reduce bias (for
example, exclusion of samples from any analysis that would obviously skew the data set). When
compared to random samples taken in structured programs, the use of opportunistic data can
skew the predictive capacity (leading to pessimistic predictions).
To aid the development of INMS, and to improve the models, pipe samples were also
taken in structured programs (essentially a gap filling exercise to supplement the opportunistic
sampling). Random samples were taken in a representative manner; samples being identified
according to combinations of pipe characteristics (material, diameter, age, etc) and factors
relating to the pipe environment (soil type, conveyed water type, etc.). Three pipe samples were
taken from each combination.
Overall, the models have been built up from 7,000 pipe samples, with the sampling being
focused on problem pipe materials (less sampling of plastics pipe). In an average year, a further
200 samples are now taken and used to refine deterioration curves. These samples are taken as
part of rehabilitation schemes and also to investigate areas adjacent to known problem areas (to
determine if the problems are likely to propagate). The samples taken are also used to improve
the model of condition grade. This approach provides data that is not entirely representative, but
is less skewed than opportunistic sampling during failure events (burst repairs) or in the problem
areas themselves.
8.4.5.3 Grading Procedures within INMS
The condition grading procedures used in INMS assign a condition grade of 1 to 5. Two
distinct approaches are used to grade the condition of pipes 1) burst history and 2) a predictive
condition grade model.
The performance grading procedure used in INMS uses a rules-based approach to band
assets. The base data (pipeline attributes) on water mains, held on the GIS, are analyzed to assign
performance grades. Performance grades can be allocated according to three separate
approaches:
8-8
A pipe-sample based predictive model (grades relate to predicted deposits and degree of
tuberculation).
Corporate data (grading based on historical complaints and water quality failures).
Cost grading (grading based on operational costs).
The data sources used within the condition and performance grading procedures are thus
related to structural condition information, characteristics of the pipeline, internal and external
environment and the performance of the system. Similarly, the models relate explanatory
variables to the observed condition/performance grade. For pipe condition, explanatory variables
include pipe characteristics (diameter, material, lining, wall thickness), age, soil type, material
and corrosion rate.
8.4.5.4 Extrapolation across the Asset Stock
To apply the models of condition and performance grades across the asset stock, the
attributes (variables) used in the models must be available for all assets.
Where there are data gaps, various surrogate data are used to allow these gaps to be filled.
For example, the use of material installation dates and housing age to estimate unknown pipe
ages. If no surrogate data exists, such that there is still a data gap, default data (assumed values)
are used. However, the use of default data can have a significant impact on the degree of
certainty associated with the predictions.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-9
8.5 Case Study 3: Water Corporation’s ACA Program
Case Study Summary
Key issues covered in this case study include:
The implementation of a comprehensive condition assessment program using
corporate systems as a repository of information collected and collated.
A systematic process for the condition assessment of assets undertaken for multiple
purposes.
The use of a common assessment framework across the majority of asset types.
See case study inset 3-18.
8.5.1 Utility Details
Water Corporation provides water and wastewater services to thousands of households,
businesses and farms in towns and communities spread over 2.5 million square kilometers.
Water Corporation also maintains drainage and irrigation services for both residential and
commercial properties.
8.5.2 Case Study Focus
Water Corporation has undertaken a rolling program of condition assessment of all
infrastructure assets, excluding water distribution and sewer network assets, under a program
termed ACA.
ACA involves a fit for purpose assessment, which takes into account condition,
performance, the availability of spares, etc.
8.5.3 Assets Considered in the Program
There are 86,000 assessable elements covering most the asset types. These include water
and sewer pipes (larger transmission pipes only), valves, pumps, motors, tanks and reservoirs,
including the roof, storage structure, appurtenances and buildings.
Once fully implemented, it is anticipated that the program will require approximately
6,000 assessments to be undertaken each year.
8.5.4 Key Drivers
The key driver for implementing ACA was to achieve a better understanding of asset
condition and to provide a sound basis for good asset management. This included the need to
develop a better understanding of remaining asset life and the potential asset renewal costs in the
medium to long term.
ACA also provides a structured process for the routine inspection of assets that would not
otherwise have been undertaken.
8.5.5 Key Program Features
8.5.5.1 Overview of ACA
ACA had the over-riding objective to develop a corporate register of asset condition to be
used for various purposes, including maintenance planning, renewals planning, management
reporting and financial reporting (end of asset life). As such, the ACA program provides:
8-10
A register of asset condition.
Information for replacement and refurbishment programs.
Information for maintenance planning.
Information for asset depreciation.
Corporate reporting of condition.
8.5.5.2 The ACA Process
The ACA process provides a consistent assessment of asset condition across a range of
asset types. Information collected and collated during assessments is stored on a custom-built
add on to an existing corporate management system. The ACA database provides a common
framework for the storage of condition-related data, including the interventions (maintenance
tasks, refurbishment, etc.) deemed necessary to address asset deterioration. The ACA database
can be interrogated in various ways, for example, to allow management reports to be generated
and programs of assessments to be compiled for a given period. The ACA process is shown in
Figure 8-2.
Figure 8-2 shows that there are two routes through the assessment process. The first is the
formal ACA process, where condition assessments are made routinely at a time informed by
findings of any previous assessment. The second is an asset deficiency process that runs in
parallel to ACA. Through this second process, assessments and/or interventions can be
undertaken in response to any deficiencies in assets reported by routine operation/maintenance.
The main ACA process involves collecting information on the asset to determine if it is
fit for purpose. Any required interventions are identified and programmed in for action.
Assessment records are updated and the date and requirements of the next assessment specified.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-11
8.5.5.3 Grading of Assets
In the ACA process, information about the asset, which may include data collected
during an inspection, performance history, compliance with regulations, availability of spares
and criticality is used to generate two ratings for the asset. These are on a scale 1 to 5 (1 being
excellent and 5 being very poor condition).
The first rating is current condition, which takes into account inspection results and other
relevant information about the asset performance. The second rating is required condition. This
is dependent on the importance of the asset, but can never be 1 or 5 (an asset can not be required
to be in either new or in derelict condition). The difference between the current and required
condition grades is the gap rating, for example, if the required rating is 3 and the assessed
condition is 5 then the gap rating will be -2.
Where a negative gap rating is generated, it is a requirement that an intervention is
proposed to bring the asset up to the required condition. This may be a capital solution such as
replacement or an operational intervention such as an overhaul or minor refurbishment. There is
also the option to recommend increased monitoring or undertake a more extensive inspection.
The financial year that the intervention needs to be implemented and the estimated cost are also
required.
An assessment of remaining asset life is also made (in three bands: life remaining less
than five years, five to 10 years and more than 10 years). Where the asset is assessed to have less
than 10 years of remaining life, the assessor must assign an intervention if one has not already
been assigned as a response to a negative rating.
8.5.5.4 Data Sources and Inspection Techniques
Since the ACA program covers a wide range of assets, various techniques are used to
provide data on asset condition. Depending on the asset in question, these may include visual and
camera inspection and occasionally inspection techniques such as pressure testing, direct current
voltage gradient (DCVG), incotest (eddy current), phenol, ultrasonics, and magnetic flux leakage
monitoring.
For mechanical and electrical assets, the assessment is usually based on the availability of
spares, support, performance and obsolescence. Pump efficiency and condition monitoring are
carried out, but this is often to optimize maintenance timing and efficiency rather than as part of
the ACA process.
For important (critical) and/or high-risk assets, in depth techniques can be required. In
such cases, the assessment techniques are selected and assets inspected by a specialized team of
personal. Water Corporation has a centre of expertise (the Mechanical and Electrical Services
Branch) that provides technical support to the rest of the organization, including determining the
most appropriate inspection technique (see Case Study 4).
8.5.6 Key Lessons and Tips for Success
8.5.6.1 Size of the Assessment Program
The size of the assessment program has resulted in a significant workload for staff
members and resources have been stretched, especially in clearing the initial backlog. The
development of future assessment programs will have an increased focus on asset criticality to
ensure the prioritization of assessments is effective. However, the commitment to assess all
assets has driven data improvement across the asset stock.
8-12
8.5.6.2 Need for Auditing and Quality Control
Ensuring consistency of assessments is difficult as the utility’s activities are spread across
a large area. Effort needs to be expended in the form of quality control, training and auditing to
ensure this consistency is achieved.
8.5.6.3 Use of Confidence Grades
The ACA system requires confidence grades to be allocated that characterize the data
source upon which the assessment has been made. This is considered good practice.
8.6 Case Study 4: Water Corporation’s Assessment Approach for Water Tanks
Case Study Summary
Key issues covered in this case study include:
An iterative approach to the inspection and assessment of complex assets like tanks,
based on the ACA process given in the previous case study.
The use of a range of tools and techniques to support condition assessment undertaken
for asset-specific and general asset management purposes.
See case study inset 6-3.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-13
The tank site is broken down into assessable elements for the purposes of condition
assessment. These assessable elements usually comprise the water retaining structure, the roof,
the pipes/valves, the ladders/landing and where applicable, the tank stand and the membrane
liner. Each of these elements has their own condition assessment.
Inspection templates are used to guide the inspector to all the components of the tank that
should be examined, for example, walls and floor, stand, roof, and to facilitate the capture of
information about the appearance of the asset. An example of the guidance provided for the walls
and floor is shown in Table 8-1.
Table 8-1. Guidance for the Grading of Condition.
Walls and floor – reinforced concrete/steel plate/panel
A New or near new walls/floor with few minor defects and meeting all functional requirements.
B Walls/floor remain in excellent condition requiring little attention; all functional requirements are met.
C Steel: some external coating defects with surface corrosion to exposed areas – some internal coating defects but
steel is cathodically protected.
Reinforced concrete: some cracking but sealed/calcified and no evidence of active rebar corrosion.
Remains functional; optimal life is not threatened; little remedial action is required at this time.
D Steel: external coating breaking down, significant pitting corrosion to exposed areas – some internal coating defects
with some corrosion of exposed areas (steel not cathodically protected).
Reinforced concrete: cracks/joints weeping but no rebar corrosion; some minor spalling but little metal loss to rebar.
Remains safe/functional but optimal life at risk; increased monitoring or remedial action required.
When an asset falls into category D or E, it is required that the inspector provide adequate
comments to support the observations. For category E assets, photographs and/or a report is
required.
8.6.5.2 More Detailed Assessments
More detailed or technical assessments are normally undertaken based on some perceived
need: 1) visual inspections reveal some issues (defects) that warrant further investigation, 2)
issues with assets of a similar type have been identified, or 3) it is known that visual inspection
will be insufficient to identify defects, for example, under floor corrosion.
The asset manager and specialist engineers within Water Corporation’s Mechanical and
Electrical Services Branch discuss the context of the asset and determine the scope of the
assessment. A range of non-destructive techniques can be used in these assessments, including:
Magnetic flux leakage floor scanners to scan floor plates.
Ultrasonic sensors (to evaluate floor scanner results and to test walls and areas of floor
not accessible to the floor scanner).
Concrete cover meter.
8-14
8.6.6 Key Lessons and Tips for Success
8.6.6.1 Support Material for Condition Assessments
Checklists are a useful aid to the assessment of complex assets. Taking a photographic
record of defects or issues of note provides valuable information.
8.7 Case Study 5: Water Corporation’s Investigation of a Trunk Main Failure
Case Study Summary
Key issues covered in this case study include:
An investigation into a trunk main’s (large diameter water transmission pipe)
condition driven by a significant failure event with an unusual failure cause and failure
mode.
The impact of other infrastructure assets on asset risk.
The use of screening tools and analysis to understand areas of potential risk and to
target more detailed investigations.
The use of indirect inspection techniques (DCVG survey) and other data to identify
sites for pipe excavation and detailed on-pipe inspection.
The use of condition assessment to inform risk management strategies.
The application of experience gained through a specific study to other assets to
leverage value from inspection data.
See case study inset 2-8.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-15
8.7.5 Key Program Features
8.7.5.1 Condition Assessment Approach
Water Corporation’s trunk mains are mostly wrapped steel pipes with cement mortar
lining. The trunk main network has a significant level of flexibility, such that a significant
number of trunk mains can be taken off-line without affecting service provision. As such, Water
Corporation has implemented a routine CCTV inspection program whereby trunk mains are
inspected when the pipes are taken out of service for maintenance purposes. This allows
inspection of the integrity of the lining (e.g., the presence of any significant cracking or
delamination can be determined). In addition, the cement mortar may become stained where
there is corrosion of the steel. This can also be identified during the CCTV inspection, which
allows additional investigations to be undertaken if necessary.
The inspections are undertaken using a proprietary system called Challenger. In addition
to CCTV functionality, Challenger has recently been developed to include the ability to conduct
metal thickness testing at selected locations.
8.7.5.2 Details of the Asset Failure
While significant effort is expended to understand the condition of the trunk mains using
these inspection techniques, a trunk main failure still occurred that led to severe disruption. The
failure mode was due to external scouring of the trunk main by water flowing in two drainage
assets that intersected the trunk main in a drainage pit. Scouring by the drainage water led to
external erosion and corrosion of the trunk main over a significant area.
The CCTV inspection program did not pick up the deterioration of the asset since there
was little internal corrosion to stain the lining. Furthermore, and common for steel mains, the
failure mode was catastrophic. The more usual failure mode for steel pipes is pinhole corrosion,
which leads only to small leaks. Catastrophic failure is related to general loss of metal due to
corrosion/erosion over large areas and is a rare occurrence when normal levels of asset protection
and maintenance are applied.
8.7.5.3 Forensic Investigations
Given the unusual circumstances of the failure and failure mode, Water Corporation
instigated a detailed condition assessment of the trunk main in conjunction with an assessment of
risk to determine if the particulars of the failure represented an isolated case. The investigation
was undertaken to:
Identify any sections of pipe where a similar failure mode could occur (other locations
where drainage infrastructure intersected the trunk main).
To investigate the condition of the asset in sections where similar levels of failure
consequence could be incurred.
The investigations were designed to improve knowledge of the likelihood of further
failure so that the risk of the main failing could be better managed. An extensive study including
coating integrity (DCVG) investigations, metal thickness testing (ultrasonic), internal camera
inspections and visual inspection of the main at selected locations was carried out over a period
of several months. The timeline of the program is summarized as follows:
May Burst occurred.
June Direct Current Voltage Gradient survey.
July Critical infrastructure audit.
8-16
July Internal CCTV inspection.
July/Aug Inspection of drainage infrastructure.
Sept – Dec Excavations and metal thickness testing at defect locations.
Oct Final report on cause of failure event in May.
Oct Contingency plan for future burst event.
Nov Arborist report on trees located near main.
Dec Design report for installation of cathodic protection.
Dec Findings and recommendations reported.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-17
Trees and associated regrowth along the pipe route.
Evidence of marine sediment in pipe right of way.
Representative sites were selected for excavation that had a minimum of two of the main
and one of the secondary indicators given above. As a result, the pipe was exposed and coating
defect investigations carried out at 24 sites.
At each site, the condition of the coating and pipe was investigated and any remedial
work necessary carried out before reinstatement. The characteristics of the defects were also
related to the findings of the DCVG survey. The information gained from the investigation can
be applied in the management of other trunk mains. The observed defects were used to calibrate
the results from the DCVG to improve the interpretability of subsequent surveys on other trunk
mains.
It was concluded that while the internal condition of the main was good, there were a
large number of external defects present. Most external damage existed where third party
infrastructure (especially drainage) impinged on the main and included damage to the coating,
gouge marks, chain marks and pitting. Wall thickness was reduced to around 6 mm over a few
small areas and 3 mm in localized areas of pitting (c.f. original wall thickness of 9.5 mm).
Structural analysis indicated that the trunk main would fail at 287 meters(m) head, which was
still significantly above the operating pressure of 160m head and design pressure of 210m head
(based on design pressure of fittings).
8.7.5.6 Outcomes of the Investigation
As a result of this inspection and survey work, a number of recommendations were made.
These included options for the long and medium term management of the trunk main, as well as
for management of large diameter mains.
Risk reduction strategies for the section of main that failed ranged from the relocation of
the entire length to the replacement of fittings. These options were assessed using a corporate
risk matrix and risk assessment process. The preferred option included the installation of
cathodic protection, remediation of any interference from or to adjacent infrastructure,
replacement of fittings and the monitoring of leakage.
8.7.6 Key Lessons and Tips for Success
8.7.6.1 Use of Risk Analysis to Focus Investigations
Risk along a trunk main should be characterized and used to focus investigations,
preferably before a failure occurs where this is deemed justified. The risk analysis should
consider all risk factors in a systematic way as well as unusual failure modes.
8.7.6.2 Leveraging Value from Investigations
Value was derived from the extensive program of investigations presented in this case
study because it:
Provided insight into the residual risk associated with the asset.
Ensured that replacement of the asset could be deferred with no increase in risk exposure.
Allowed results to be applied in the management of other assets.
8-18
8.7.6.3 Third Party Interference
Third party interference is a significant source of risk for pipeline assets. In particular,
where other infrastructure have been buried in close proximity to a trunk main, it is very likely
that damage to the coating and/or pipe has occurred.
8.7.6.4 Use of a Common Datum
When using in-pipe techniques in conjunction with on-pipe techniques, it is important to
have a common datum (the point measurements are taken from and referenced to) to allow
matching of internal and external observations.
8.8 Case Study 6: Water Care Services Limited Assessments of Sewerage Assets
Case Study Summary
Key issues covered in this case study include:
Condition assessment of a trunk sewer network using various inspection techniques.
The use of existing operational knowledge to prioritize assessments.
The use of a risk-based approach to contextualize the results of inspection.
The use of the results of a condition assessment program to specify on-going
inspection and monitoring activities.
See case study insets 3-3 and 3-15.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-19
8.8.5 Key Program Features
8.8.5.1 Project Goals
Through various risk assessment processes and workshops with staff, Water Care
identified that the condition of the sewer mains was unknown and that in some cases the
consequences of failure would be significant. Project CARD was implemented as a result of this
work. The stated project goals of CARD included:
Develop an asset condition monitoring and performance assessment strategy, including
data management, storage and analysis.
Determine the condition of the identified high-risk pipelines and potential failure modes.
Identify and quantify the risks of failure and economic life of the high-risk pipelines.
Identify management and mitigation measures, including:
− Maintenance and repair activities.
− Rehabilitation needs.
− Replacement needs.
• Develop programs for ongoing monitoring and assessment of the high-risk pipelines.
8.8.5.2 Identification of Inspection Technologies
The inspection technologies used in the program were researched through the World
Wide web, discussions with other utilities, reference to technologies available locally (in New
Zealand) and research trips to the United Kingdom and Canada (mainly to establish the
capabilities of sonar survey equipment and the management of overflows). The techniques
eventually selected for use in the program included:
CCTV of wastewater mains.
Sonar for siphons.
Walk through for larger diameter mains and larger duplicate siphon pipes. Visual
assessment of defects was augmented through video, still photos and cover meter
measurements. Concrete cores were also taken for laboratory testing. Some sections of
sewers had dimensions checked using laser technology.
Manholes were inspected during CCTV sewer inspections or on an ad-hoc basis if
opened for other purposes.
8.8.5.3 Program Implementation and Outcomes
Risk analysis was undertaken at the beginning of the CARD project to identify priorities
for inspection using available operational knowledge.
The project was managed as a normal engineering project; both CCTV and sonar surveys
were undertaken by external contractors. Sonar contracts were awarded by competitive
quotations, CCTV by identifying best level of service (i.e., contractor equipment/capability)
available. It was initially thought that the budget would not allow all pipes to be inspected, but
by 2005, nearly all pipes had been surveyed. Over the period 2000-2005 Water Care undertook a
complete inspection of the entire 300km trunk network, mainly using CCTV and visual
inspection (approximate cost AU$1.5 million).
The condition data, together with previous history and criticality assessment, was
analyzed using Weibull analysis to look for correlations between age, criticality, observed
8-20
condition and fault history. Correlation was poor, and a more detailed analysis using factors such
as pipe material, soil condition, pipe bedding, construction standard and so forth is thus being
developed.
The assessments provided a ranking of critical mains for further monitoring,
rehabilitation or renewal. As well as undertaking necessary maintenance and replacement work,
Water Care’s on-going strategy is to monitor sewers with the poorest internal condition rating
(condition rating grade 5), representing approx 5% of the total network, which includes
monitoring of key brick and concrete sewers. Monitoring is undertaken using CCTV or, in some
limited cases, visual inspection. Where condition dictates, patch lining is undertaken. If the
structural condition of the sewer is compromised, full structural lining is installed. Where
structural lining is not practical, the sewer is either renewed or is relayed on a new alignment
(often using directional drilling).
8.8.6 Key Lessons and Tips for Success:
8.8.6.1 Use of Local Knowledge
An assumption at the start of project CARD was that Water Care and local consultants
did not have the requisite knowledge to put together the program. Water Care professionals now
consider that it is important not to underestimate the value of in-house and local knowledge, nor
overestimate the state of the art in other countries.
8.8.6.2 Capturing Available Operational Knowledge
Capturing available operational knowledge was a key aspect of the prioritization of the
assessment program. While no formal assessments had been undertaken, operational staff had a
reasonable feel for those assets that were in poor condition.
8.8.6.3 Leveling Assessments
Problems can occur in a large program of condition assessment because some
assessments can be more conservative than other assessments, depending upon who performs the
assessment. Water Care now attempts to overcome this by having the same team do the analysis
and reporting.
8.9 Case Study 7: Water Care’s Assessments of a Critical Sewer
Case Study Summary
Key issues covered in this case study include:
A detailed investigation of a critical concrete sewer in poor condition and subject to
significant H2S related corrosion.
The limitation of using defects alone as a means of characterizing condition and risk
of failure.
The iterative use of more detailed studies to understand asset risk, support decision
making and defer capital programs.
The use of structural analysis to understand the probability of asset failure under a
range of loading scenarios.
The collection of auxiliary data to refine the analysis.
See Case Study inset 3-3.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-21
8.9.1 Utility Details
See Case Study 6 for details.
8.9.2 Case Study Focus
A detailed investigation into the risk and condition of an interceptor sewer crossing an
environmentally sensitive area with potential for significant aesthetic and environmental impacts
should the asset fail catastrophically.
8.9.3 Assets Considered in the Program
An 18 kilometers (km) long reinforced concrete interceptor sewer, cast in situ in sections
of 30 feet (10m), and built between 1960 and 1965. The shape and size of the pipeline varies
along its length, as does the earth fill above the pipe. The sections of the pipeline of specific
interest to the case study are 85 inches semi-elliptical.
8.9.4 Key Drivers
Initial inspection of the asset was undertaken under a program to determine the overall
condition of all sewerage assets (see Case Study 6). Preliminary structural analysis was then
required to assess the risk of collapse in sections subjected to significant levels of acid attack.
Collapse of these sections would lead to significant health, environmental and third party
consequences. The implication of this analysis was that there was a risk of collapse under certain
conditions and on-going deterioration would increase the likelihood of failure.
Additional analysis was undertaken to understand better the rate of deterioration and the
risk. In part, the additional analysis was driven by the fact that there was insufficient redundancy
in the network to allow the asset to be replaced.
8.9.5 Key Program Features
8.9.5.1 Results of Initial Condition Assessments
The condition assessment of the sewer was initially undertaken using walk through
inspection techniques. Data was collected in terms of observed defects, supplemented through
photographs and notes. The distance along the asset was measured by wheeling above the
waterline.
The assessment indicated that the interceptor sewer was in poor condition; about 5.5 km
having been subject to significant acid attack, penetrating more than 30mm. A relatively short
section of the sewer (171m) was found to be in very poor condition; 80mm (+/-10mm) having
being lost from the original (as-built) wall thickness of 180mm.
This section was between two siphons (thus having limited air exchange) with a large
connection discharging into it, these factors providing conditions for the generation and release
of H2S. The concrete in the section had corroded to the extent that the inner of two sets of
reinforcement bars (cast within the pipe wall) were exposed in places. In addition, there was
relatively little earth cover above the section, a situation that can lead to a higher live load being
imposed on the sewer.
8.9.5.2 Implications of Structural Analysis
Initial structural analysis was undertaken to consider the impact of existing soil and
groundwater loads as well as traffic on the deteriorated asset. The sewer structure was analyzed
as a two-dimensional plane frame with the sewer modeled as a series of beam elements with
nodes at 150 to 300mm centers and support from the soil being considered as elastic springs at
8-22
the node points. The top one-third of the pipeline was modeled with reduced wall thickness to
represent the impact of acid attack.
Various loading scenarios were analyzed and the calculated safety factors compared to
the requirements of applicable codes. The results of these assessments implied that there was a
risk of structural failure under certain conditions, but that more information was required to
refine the analysis.
Subsequent investigations into the amount of earth cover, water table depth, concrete
thickness, concrete strength and soil parameters were undertaken to refine the assumptions made
in the analysis. The conclusions from the refined analysis were that the sewer could safely
sustain existing soil, ground water and expected traffic loads. However, the remaining wall
thickness was still uncertain and results indicated that the sewer would be over stressed under
certain traffic loading conditions. Significant on-going deterioration of the asset was expected to
occur and increase the probability of failure over time.
8.9.5.3 Risk Mitigation and Additional Investigations
As a result of the assessment, it was determined that immediate remedial action was
required using a sulfate-resistant spray-on lining system. Furthermore, the asset was deemed at
risk and early replacement was considered. Such replacement was not practicable given there
was insufficient capacity in the network to allow the replacement to be readily undertaken. An
expansion of the network was, however, already planned that would provide the spare capacity
required to undertake the capital works.
Additional investigations were undertaken to understand the risk associated with the asset
and to determine if the capital renewal could be deferred until after the additional network
capacity was constructed.
Mapping of the corrosion was undertaken along the section of asset in poor condition. A
cover meter, which induces a magnetic field in the reinforcement bars, was used to measure the
depth of cover to the reinforcement bars along the asset. The results of this inspection were used
in combination with laser profiling to determine the amount of material lost from the wall and
the rate of asset deterioration and thereby predict the change in asset condition over time (in
terms of wall thickness).
More refined structural analysis was then undertaken using three dimensional (3D) finite
element modeling. The modeling showed that the loss of material down to the first reinforcement
bar was not as significant as first thought; the pipe would lose structural integrity when there was
corrosion down to the outer of the two reinforcement bars, rather than the inner. It was concluded
that the level of risk associated with the asset was acceptable and that its renewal could be
deferred until after the network capacity was expanded through other capital projects.
In summary, the initial condition assessment was undertaken using a screening approach
that determined the presence of a significant defect; concrete had corroded to the extent that the
inner reinforcement bar of the pipe wall was showing. The presence of the defect was, however,
only a relative indicator of condition. Structural analysis was required to determine what the
defect meant in terms of asset risk.
Inspection of the asset was then undertaken to determine the rate of deterioration and the
results of the inspections used in refined modeling studies to put the asset deterioration into
context. The cost of the detailed analysis was justified by the need to understand the risk in more
detail and by the lack of affordable risk management options.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-23
8.9.6 Key Lessons and Tips for Success
8.9.6.1 Limitations of Defects as a Metric of Condition
While condition assessment undertaken through visual assessment is a pragmatic
technique in many instances, the presence of structural defects needs to be contextualized to
understand risk fully. In this case, an exposed reinforcement bar was interpreted as being
indicative of a high risk of failure. Additional detailed analysis indicated the probability (and
thus risk) of failure was lower than anticipated. This allowed deferral of a capital project to a
time when the network could support the rehabilitation of the interceptor sewer.
8.9.6.2 Justifying Additional Analysis through Better Knowledge
The cost of the additional analysis was justified because of the high level of perceived
risk and the lack of available options to manage that risk. An iterative approach to assessment
can therefore be justified based on risk, in which more accurate (and expensive) techniques are
used to refine the knowledge of an asset and give better support to decision making.
8.10 Case Study 8: Melbourne Water’s Assessments of Steel Tanks
Case Study Summary
Key issues covered in this case study include:
A comprehensive and planned approach to the inspection and assessment of steel
water storage tanks.
The historical development of condition assessment and other maintenance practices,
from ad hoc approaches used in the early 1990s to the systematic investigations
carried out today in line with strategic asset management needs.
The identification of an unexpected source of asset deterioration associated with
construction of water storage tanks on limestone foundations contaminated with
chlorides and the development of an assessment program to manage the associated
risk.
The use of scoring procedures to facilitate condition grading of complex assets.
See Case Study insets 2-3 and 5-7.
8-24
corrosion management that are now undertaken, which fully align with corporate asset
management policies.
8.10.3 Assets Considered in the Program
Fully enclosed steel water storage tanks constructed on a limestone foundation according
to designs based on standards from the American Petroleum Industry Standard (API 651).
8.10.4 Key Drivers
The need to manage assets of significant value in an effective manner and to address risks
associated with asset deterioration and corresponding water loss.
8.10.5 Key Program Features
Steel water storage tanks started to be constructed in and around Melbourne in the 1960s.
During the 1970s and 1980s a relatively large number of steel tanks were constructed to meet
increased demand or to replace open basins where water quality standards needed to be
improved. In 2005, Melbourne Water operated 38 steel service reservoirs (40 were being
operated at the time of writing), with an estimated replacement value of AU$190 million.
8.10.5.1 Development of Approaches to Management of Water Tanks
When it was incorporated in the early 1990s, Melbourne Water inherited a fragmented
approach to the management of its water tanks. Basic information relating to the construction of
the tanks was available in the form of design drawings. However, on-going assessments were
undertaken separately by various departments focusing on individual issues such as corrosion,
mechanical and electrical components, valves, and so forth. Information recorded during these
assessments was in a summary format (for example, “asset satisfactory”) and was not collated.
As in other water companies, water storage reservoirs represented a significant capital
investment and the assets provided played a critical role in the provision of water services and
management of risk. Furthermore, there was a developing understanding that ad hoc approaches
to management and maintenance were not providing the information necessary for long-term
asset stewardship. Melbourne Water started to develop a structured approach to the management
of these assets drawing on the knowledge of management practices being applied to large
diameter steel pipes. At the time these asset management procedures were being developed, a
particular and unexpected failure mode started to become evident - the corrosion of the tank’s
steel plate floor.
8.10.5.2 A Legacy Design Issue
Melbourne Water’s steel water storage tanks are constructed from steel plates that are
welded in situ. Tank floors are specified as uncoated steel plates, lapped at joints and laid over a
base course of 100mm nominal thickness of crushed limestone; the limestone overlays a sub-
base of crushed basalt rock. The choice of limestone as a base material was primarily for the
purpose of providing a protective alkaline barrier to the uncoated floor plate underside. However,
limestone also has natural propensity to contain large volumes of chlorides (as salts). This issue
was not considered in the original specifications.
During the early 1990s a steel service reservoir floor-plate was found to have perforated.
During October 1994, substantial water leakage was observed coming from the reservoir, which
had to be immediately taken out of service to allow emergency repairs. While the perforation
failure was confirmed as being due to corrosion, the mechanism of deterioration was not
immediately obvious. At the time of the incident, another service reservoir began to show similar
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-25
signs of corrosion and steps were taken to reduce the corrosion rate by implementing cathodic
protection.
Subsequent investigations into the asset deterioration confirmed that the limestone was
heavily contaminated with calcium chlorides. The impact of this salt on the floor plate underside
is typically characterized as pitting corrosion. As a result of these investigations, Melbourne
Water began a program of assessment. Twenty-two tanks were confirmed as having high levels
of chloride contamination within the limestone base-course material with associated high levels
of corrosion. Specifications for new service reservoir construction were revised during the 1990s,
to ensure that this problem did not occur in the future. Nevertheless, Melbourne Water still has to
monitor for, and treat, corrosion in reservoirs that were built prior to this period.
The failure mode associated with this under floor corrosion is not catastrophic, however,
significant (order ML/day) leaks can occur. Given the high visibility of water conservation issues
in Australia coupled with the proximity of the tanks to residential areas, such leaks can result in
significant adverse publicity as well as having the potential for causing property damage and
associated community distress.
8.10.5.3 Current Inspection and Management Strategy
Given the perceived level of risk, Melbourne Water’s steel service reservoirs are now
regularly inspected to ensure that the potential for asset failure is appropriately managed.
Inspection strategies have been developed in consultation with external consultants and are
considered by Melbourne Water to be industry best practice.
Comprehensive corrosion assessments are undertaken on a periodic basis ranging from
one to five years. Generally speaking, assets that are deemed to pose a significant risk are
inspected on a one to two year basis, whereas those that pose a smaller risk are inspected on a
three to five year basis. Outage strategies are implemented based on business risk and
operational needs with due consideration given to both water quality standards and structural
integrity requirements. The inspection can be timed in accordance with cleaning requirements;
tanks have to be cleaned every three to eight years, depending on the level of silt build up.
Melbourne Water tends to avoid the use of divers to undertake structural assessments.
Nevertheless, divers may be used on an ad hoc basis where circumstances limit outage
opportunities. When dewatered, the tanks are inspected using a range of techniques. In particular,
magnetic flux leakage floor scanners are used to map corrosion of steel floor plates. Other
components of the asset are also assessed, typically through visual inspection. Observations are
recorded and reported in a standard format that details the observed feature (asset component)
and any salient remarks. The conditions of functional components of the asset are also assessed
against a standard scoring scheme developed by Melbourne Water. This results in weighted
scoring for various asset components, as illustrated in Table 8-2.
8-26
Table 8-2. Weighted Scoring for Asset Components.
Category Weighting Score Total
Structural stability 6(0-30) 3 18
Light gauge roof adequacy 1(0-2) 1 1
Road and storm water drainage 1(0-3) 0 0
Extraneous fittings 1(0-5) 0 0
Protective coatings adequacy 1(0-2) 1 1
Reservoir security 1(0-2) 1 1
Cathodic protection systems 1(0-3) 2 2
TOTAL 23
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-27
8.11 Case Study 9: Sydney Water’s Management of M&E Assets
Case Study Summary
Key issues covered in this case study include:
The use of qualitative and quantitative techniques to assess and monitor the condition
of important electrical and mechanical assets.
The use of a CMMS in condition and maintenance management.
The range of inspection tools used in asset inspection and condition monitoring of
important mechanical and electrical assets.
See case study insets 3-1, 3-8, 5-1 and 6-1.
8-28
Prior to adopting this approach (termed “Quali-Quanta” by SWC), SWC applied high
standards and regular planned maintenance with little analysis or optimization. The analysis of
asset management information now occurs simultaneously on two levels:
Level 1: Higher level analysis based on qualitative and quantitative analysis. Important
aspects of this level include planning, analysis of long term behavior of assets and
application of experienced staff members’ intuitive reasoning. An asset’s condition is
analyzed in terms of a wide range of detailed parameters including, number and nature of
past failures, meantime between failures, experienced operators’ and managers’ intuition
and cross-checks between the failure and running history of related/linked assets.
Level 2: A more practical level and is based on engineering analysis. Each asset’s
condition is categorized by assigning it a grade after site inspection and condition
assessment.
8.11.5.1 Sources and Use of Data and Information
To facilitate the management of assets, information from a range of sources is collated
and analyzed. Much of the data is held on a CMMS. The CMMS documents asset history,
scheduling, preventive maintenance, work orders, labor and expense tracking, procurement and
reporting associated with assets. Data from the CMMS is supplemented with condition
assessment information such as that from maintenance staff. Desktop information is also added
to this, including the opinions of a wide range of personnel, such as maintenance supervisors.
The collated data is statistically analyzed for each individual asset. Statistical analysis
commonly consists of a Bayesian approach and Weibull correlation analysis. SWC has found
that Weibull analysis is useful when there is limited failure data available, such as a small sample
size.
8.11.5.2 Inspection Tools Used
Table 8-3 outlines the main inspection and condition monitoring tools used by SWC for
electrical and mechanical assets. Condition monitoring is conducted on selective assets
depending on their importance. For example, if a failure would result in significant downtime or
a major replacement cost, the asset is regularly condition monitored or inspected.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-29
Table 8-3. Inspection Tools and Techniques Used by SWC.
Tool Applicable assets Purpose and details Frequency of use
Oil testing and Large motors, transformers, Used on all critical and large assets using oil. Monthly, done through a
analysis diesel engine generators, gas Used where lubrication of engines is critical. service provider.
engines at Malabar STP. Determines how long oil will last.
Infrared Switchboards and motor circuit To take snapshots of hot panels and cables in A program that covers all
thermography motor control centers. order to allow hot spots to be pin-pointed. plants ensures testing every
six months to a year.
On-line Machines with bearings or Determines whether bearings, footings or Once a month or three times
condition couplings. couplings have adequate integrity and have not monthly, depending on the
vibration gone ‘soft’. criticality.
monitoring Includes a data logger.
Vibration 1000kW raw sewage pumps Collects data on machines running uninterrupted. On-line data collected every
analysis and centrifuges. For instance, analysis of friction losses on half an hour.
bearings. SWC has in-house vibration analysis.
specialists who analyze testing data output such
as spectra. Data is extracted into software and a
reactive work order is created in the CMMS. This
allows SWC to do more of its reactive
maintenance in a planned manner.
Motor circuit Motors. Used to assess a range of items, including the Every six months.
analysis integrity of the motor circuit operating the motor,
the condition of insulation between the winding
and the frame of the motor, integrity of the motor
starter and to determine if the winding is short-
circuiting. Offline testing, very reliable.
‘Level 1’ plant All critical plant assets. All assets within a facility are visually inspected. Regularly scheduled as part
condition of ongoing preventive
assessment maintenance program.
x-ray testing Pressure vessels, welded pipe Weld testing. Usually only carried out on a
joints, castings. one-off basis rather than
regularly.
Ultrasound Mostly used on concrete Usually only carried out on a one-off basis on Not commonly used.
structures such as digester assets requiring assessment of structural integrity.
walls and pipelines.
8-30
8.11.6 Key Lessons and Tips for Success
8.11.6.1 Use of Desktop Studies
SWC has demonstrated over a number of years that there is a strong correlation between
results from site condition assessment and desktop analysis. This has enabled SWC to justify
condition assessment programs that have a smaller number of site inspections than previously.
Approximately 10% of site inspections are routinely conducted on an ongoing basis to prove that
the correlation between the desktop and on-site condition grading is being maintained.
8.12 Case Study 10: City of Bellevue’s Risk-Based Approaches
Case Study Summary
Key issues covered in this case study include:
The range of condition assessment programs instigated by a provider of infrastructure
management services to manage risk and reduce costs.
Coordinating with the transportation department to target inspections and minimize
pipe replacement sewer and water main replacement costs.
A focus on system performance and reliability of water and wastewater pipes to
reduce claims from property damage or business interruptions.
The use of risk-based approaches to target inspection effort, including the targeting of
water and sewer pipes that could lead to flooding of basements and property damage.
See Case Study insets 2-6, 3-2 and 6-4.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-31
8.12.5 Key Program Features
Bellevue has undertaken a range of condition assessment programs to improve the management
of the asset stock, as summarized below.
8.12.5.1 AC Pipe Replacement Program
A review of historical water main break data in the 1970s and 1980s determined that 80% of
main breaks occurred in AC pipes between four to six inches in diameter. This led to a program
of replacing all asbestos cement water pipe in the system. This program is still underway; pipes
are replaced when breaks occur and/or when the roadways are resurfaced.
8.12.5.2 Sewer Pipe CCTV Program
A comprehensive CCTV program is underway, in which it is planned to CCTV all sewer
pipelines over a 10 year period. Given this strategy of inspecting all sewers, initial city efforts
focused on the most critical pipelines (with regard to economic, public health or environmental
impact). The program started with critical pipelines (20% of the system), then moved through the
system with newer pipes getting lowest priority.
Pipelines are scored according to the NASSCO system, and those receiving poor condition
scores (4 or 5) are evaluated by senior staff to determine need for renewal.
Any pipe under a roadway scheduled for resurfacing is scheduled for CCTV as a high priority,
this allows pipe replacement to be undertaken in conjunction with the road resurfacing.
City staff members have also performed hydraulic and surface water modeling to determine
areas of the system and hydraulic conditions that would cause the sewer hydraulic gradeline to
be above basement floor levels, and thus where the city may be susceptible to property damage
claims. Condition assessment and operations and maintenance activities are then prioritized
accordingly.
8.12.5.3 Leakage Reduction Program
A risk-based leak detection program has been underway for several years. This initially focused
on reducing system water loss, but subsequently focused on avoiding property damage and the
associated claims.
High-risk pipes were identified by overlaying several property damage-related risk factors,
including properties where home elevations are below adjacent street levels, areas where older
(pre-1986) ductile iron water mains are installed and areas of high percolation soils (likely to
transmit water rather than force it to the surface where the water would be observed).
Acoustic leak detection efforts have targeted areas with these three risk factors to prevent minor
leaks from becoming major problems.
8.12.6 Key Lessons and Tips for Success
8.12.6.1 Coordination with Transportation Department
A critical driver for the pipeline assessment efforts is the schedule for resurfacing of the
roadways in the service area.
Due to considerable savings for the utility if pipeline replacement projects do not incur
repaving costs, much of the sewer CCTV efforts and AC pipe replacement efforts are targeted as
a result of the roadway resurfacing schedule.
8-32
8.13 Case Study 11: Massachusetts Water Resources Authority RCM Program
Case Study Summary
Key issues covered in this case study include:
The use of RCM to optimize maintenance practices at a treatment work facility.
The range of condition monitoring techniques used in condition monitoring of the
assets.
The coordination of various initiatives to increase the effectiveness of maintenance
practices.
See Case Study insets 2-5, 3-17 and 5-4.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-33
workshops determine frequency and type of maintenance for individual equipment, often
recommending condition-monitoring tasks.
MWRA considers that the implementation of a formal RCM program has been very
effective in enhancing the reliability and performance and reducing life cycle costs of its large
facility equipment.
8.13.5.2 Other Related Initiatives
Over US$140 million in equipment is currently monitored via a proactive condition
monitoring program. Condition monitoring programs for the major equipment use a range of
techniques, including oil analysis, temperature analysis, acoustic ultrasonic and vibration
analysis. For larger equipment (value of roughly US$400,000 or greater), permanent vibration
and temperature monitoring equipment has been installed for enhanced trend analysis.
Staff members are also trained in specialized maintenance (e.g., laser alignment)
techniques for equipment rebuilds to improve equipment reliability.
8.13.5.3 Benefits Associated with Initiatives
Specific benefits of these initiatives include:
Demonstrated reduction in over 20,000 maintenance work hours per year as a result of all
reliability programs including RCM, condition monitoring, preventive maintenance
optimization and productivity improvements, resulting in labor savings of over
US$700,000 annually.
Proactive oil sampling program resulted in avoided (scheduled) oil changes valued at
roughly US$50,000 per year.
Substantial (non-quantifiable) avoided and deferred costs due to enhanced equipment
reliability and performance, extended equipment life, avoided permit violations, etc.
Qualitative staff improvements in terms of teamwork, communications and commitment
to success.
8.13.6 Key Lessons and Tips for Success
A program champion is key, whether for the overall asset management and condition
assessment effort, or for the individual condition assessment programs.
Implementation of the formal RCM program has been a very effective way for MWRA to
enhance the reliability and performance, and reduce life cycle costs of their large facility
equipment;
Proactive maintenance programs for critical equipment have focused on oil, temperature,
acoustic ultrasonic, and vibration analysis.
Investments in staff training, sophisticated mechanical alignment equipment, and
permanent monitors on certain major equipment have yielded savings in asset life cycle
costs and performance reliability.
8-34
8.14 Case Study 12: MWRA’s Strategies for Pipe Network Management
Case Study Summary
Key issues covered in this case study include:
The use of different condition-based approaches used for management of pipeline
assets.
The use of condition-related data to drive operational and capital interventions.
See Case Study insets 2-5, 3-9 and 3-17.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-35
several factors including age, material, size, c-value, literature-based expected life, and local
factors such as known material defects, salt storage and saltmarsh locations.
Once condition scores were established, pipe redundancy (e.g. loop systems to serve
customers) was considered in renewal prioritization scoring. Since MWRA are a wholesale
provider, all retail systems (customers) were considered equally critical, and no consequence of
failure analysis was used. Results of statistical analyses were used in water system master plan
forecast of renewal needs and costs.
8.14.5.3 Wastewater Interceptor Inspection and Renewal Planning Program
MWRA has performed closed-circuit television (CCTV) inspection of its entire gravity
sewer interceptor system, and used these data to assign condition scores to each pipeline
segment. MWRA recently shifted to the NASSCO standard 1-5 rating (grading) system, but
much of their historical condition data are still in a legacy A, B, C condition rating system.
As part of master planning efforts, the pipe sections were prioritized using a scoring
approach to analyze the probability and consequence of failure. The probability-side
prioritization considered physical pipe characteristics such as age material, pipe condition rating,
etc. The consequence of failure analysis utilized GIS to determine what land area would be
negatively impacted in the event of a failure. This analysis also considered the hydraulic
vulnerability of a pipeline (based on capability to divert/bypass flow if failure occurs).
8.14.5.4 Benefits Associated with Initiatives
Specific benefits of these initiatives include:
Experience has shown that equipment works well to identify and pinpoint location of
leaks, triggering staff to prepare a repair work order. MWRA have quantified substantial
reductions in system leaks in recent years; reported system leaks were reduced from 92
per year to 10 per year over an 8-year period.
Systematic programs of condition assessment both improved asset/network performance
and provided the data required for undertaking strategic planning.
8.14.6 Key Lessons and Tips for Success
As with MWRA’s RCM program, it is considered that a “program champion” is key,
whether for the overall asset management and condition assessment effort, or for the
individual condition assessment programs;
MWRA maintains a suite of Key Performance Indicators (KPIs) that drive program
efforts; performance against the KPIs is published quarterly to the Board of Directors.
8-36
8.15 Case Study 13: CSIRO’s Assessment of a Cast Iron Transmission Main
Case Study Summary
Key issues covered in this case study include:
The standard approach to inspection of a large diameter main using grit blasting
(removal of corrosion products using a high-pressure stream of grit and water) and
measurement of residual wall thickness.
The use of physical failure models to assess the remaining life of the asset.
See Case Study insets 3-4 and 3-6.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-37
8.15.4.2 Sampling and Inspection of Pipe
Five sections of pipe, each approximately one meter long, were exhumed by the water
utility and assessed. Each section was grit blasted to remove graphitized corrosion product and
expose the remaining metallic material. A grid pattern of 150 mm x 150 mm was then scribed on
the outer surface of each exhumed section. Exhumed sections were then cut to allow access with
calipers and the minimum remaining wall thickness in each 150 mm x 150 mm grid square
measured.
Values ranged from a maximum remaining wall thickness of 13.9 mm to minimum
values of 0 mm (indicating through wall corrosion). The scatter in residual wall thickness data
illustrates that corrosion damage is inherently uncertain and varies not only between samples, but
also across the surface of each sample.
8.15.4.3 Assessment of Condition
As outlined in the literature (Davis et al. 2004), raw data from residual wall thickness
measurement can be used to forecast failure rates in buried cast iron mains following four steps:
1) Converting measured residual wall thickness data to corrosion rate.
2) Quantifying variations in corrosion rate as a probability density function (PDF).
3) Defining a physical failure model for buried cast iron pipe.
4) Combining the corrosion rate PDF with the physical failure model for buried
pipes in a Monte Carlo Simulation of long pipelines.
In this example, a survivor function (S(x)) for the measured corrosion data was calculated
and used in a Weibull plot, as shown in Figure 8-4 (a survivor function is the probability that a
variable ‘x’, in this case the maximum corrosion rate ‘max corr rate’, is greater to or equal to a
given value; see Davis et al. 2004 for more details). Since the plot was linear, it indicated that a
Weibull PDF could be used to quantify the variation in corrosion rate. This PDF was then used in
conjunction with a physical failure model to assess the propensity for asset failure. The failure
model considered both the resistance of a CI pipe as it corrodes and the applied service loads
(including internal pressure, soil dead loads and surface loads).
3
ln(-ln(S(max. corr rate))
2
1
ln (max. corr rate)
0
-7 -6 -5 -4 -3 -2 -1 -1 0
-2
-3
-4
y = 1.6396x + 5.5431
-5
R2 = 0.9831
-6
Figure 8-4. Weibull Plot for Corrosion Data.
8-38
The outputs of the modeling study were summarized in terms of a plot that shows the
expected pipeline failure rate as the pipe ages, as illustrated in Figure 8-5.
2.5
2
1.5
1
0.5
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Pipe age (years)
Figure 8-5. Expected Failure Rate per Year.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-39
8.16 Case Study 14: CSIRO’s Assessment of an Asbestos Cement Force Main
Case Study Summary
Key issues covered in this case study include:
A novel approach to assessment of an AC main using coring techniques and tensile
strength testing to assess asset deterioration.
The use of physical failure models to assess the remaining life of the asset.
See Case Study insets 3-4 and 3-7.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-40
y
σyy
Cylinder diameter D
(constrained in axial z direction
σzz σxx
Cylinder length L
ln(-ln S(d))
2
1
ln (degradation rate, d)
0
-1.4 -1.2 -1 -0.8 -0.6 -0.4 -0.2 0
-1
52.010-01
y = 5.7317x + 3.5472 -2
52.010-02
R2 = 0.9709
Linear (52.010-01) -3
Linear (52.010-02)
y = 7.6153x + 4.9025
-4
2
R = 0.9576
Figure 8-7. Weibull Plot for Deterioration Rates.
The outputs of the modeling study were summarized in terms of a plot that shows the
expected time to first failure for various loading conditions, as illustrated in Figure 8-8.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-41
0.09 Pressure = 0.45 MPa, Cover depth = 1.23 metres, Live load = Rail Crossing
The results of the investigation were also summarized for the entire pipeline, as
illustrated in Figure 8-9.
Soil environment
Soil environment Degradation rate
52.010-02
Expected failure time (years) 52.010-01 unknown
40
+ 1 std dev
35
30
25
- 1 std dev
20
15
0 500 1000 1500
Chainage (meters)
8-42
8.16.5.2 Use of Economic Factors to Determine Remaining Life
The use of pipeline failure models allow the probability of failure to be constrained. In
conjunction with an evaluation of consequential impacts along the pipeline, the model can be
extended to give a quantified assessment of risk and thereby allow an investigation of economic
life to be undertaken.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets 8-43
8-44
APPENDIX A
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets A-1
Table A-2. Objectives Related to Drinking Water Assets.
Strategic objective KPI Outline of assessment approach
Improve water quality Water quality compliance at Identify problem zones through analysis
works of complaints and sample data.
Turbidity at treatment plants Undertake a program of assessments to
Water quality compliance at tap determine the root cause (works
Coliform compliance (works, capacity, pipe condition, etc.).
service reservoirs) Preferable to combine with other service
Iron pick up in system problems to ensure an integrated
Invest in measures to reduce discolored water Number of complaints approach is taken and eventually,
complaints interventions identified that give the best
Improve drinking taste and odor value for money.
Improve drinking hardness
Improve pressure of water supply to customers at
risk of low pressure
Reduce bursts Bursts per unit length Identify problem zones/cohorts through
Reduce interruptions to supply Unplanned interruptions analysis of event and sample data.
Interruption duration Undertake a program of assessments to
Interruption frequency determine the root cause
Water pumping station Again, preferable to combine analysis
performance (Mean Time with other service problems so as to
Between Failure) ensure an integrated approach is taken
Bursts per unit length and, eventually, interventions identified
that give the biggest bang for the buck.
Reduce leakage; achieve and maintain a Infrastructure Leakage Index Identify problem zones through district
sustainable economic level of leakage Leakage meter area analysis or similar. Analyze
pipe populations to make an assessment
of the problem and undertake
assessments, active leakage control or
pressure management as appropriate.
A-2
APPENDIX B
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets B-1
Table B-1. Drivers in Which Condition and Performance Assessment Play a Major Role.
Category Focus Driver Asset type Assessment
Assess/determin Condition assessment to provide data for analysis of Any asset type. Determine level of
e remaining asset asset lives and thus timing of required spend, could be deterioration in relation
lives done spatially or temporally. Remaining life estimates to expected asset life
can also be undertaken as a risk-screening approach; (defined in terms of
with refined assessments being specified for assets with risk).
Develop a 'moderate' remaining life (assets with little life Any asset type, Characterize level of
deterioration remaining will need replacing in any case, assets with but more likely deterioration.
curves significant remaining lives can be removed from further to be pipes.
consideration).
Assess renewals Condition and performance assessment to provide data Any asset type. Assessment of budget
budgets and for use in budget setting and/or justification of capital requirements in relation
timing of spend deferment. to asset lives and/or
deterioration.
Smooth renewals Condition and performance assessment to provide data Any asset type. Optimization of
spend and/or for use in refining budgets; identifying optimal budgets in terms of
reduce spend interventions based on affordability. affordability.
Prioritize capital Condition and performance assessment to target Any asset type. Assessment of budget
Asset Management
Determine Condition assessment to determine the level of Any asset type, Determine structural
appropriate renovation required and specify rehabilitation approach; but more likely condition in relation to
intervention selection of least whole lifecycle cost approach (partial to be pipes. the needs of available
replacement, lining, etc.). interventions.
Improve service Assessment of condition to understand level of service Any asset type. Hot spots and causes
delivery issues (including firefighting capacity), could involve of service failures.
sampling in areas where service problems occur.
Improve system Assessment of condition/performance to understand Any asset type. Hot spots and causes
reliability non-service related shortfalls; e.g., high cost of of asset failures.
maintenance to prevent outages.
Determine asset Collection of condition and performance data for asset Any asset type. Condition and
stock management. performance grades.
condition/perform
ance
Prevent the Assessment to determine the condition of key assets. Any asset type. Assets in derelict state.
collapse of asset
stock
Demonstrating Condition and performance assessment to demonstrate All assets. Determine profile of
Regulatory/Financia
asset the overall condition and/or value of the asset stock asset condition and
l Reporting
B-2
Category Focus Driver Asset type Assessment
Financial All assets. Determine profile of
reporting (GASB asset condition and
34 modified performance grades.
approach)
Due diligence Assessment of condition to understand the value of the Any asset type. Overall assessment of
asset stock and financial risk exposure. asset condition and
performance.
Identify high risk Condition assessment to understand risk, given Any asset type. Determine condition as
assets knowledge of failure consequences. a proxy for probability
of failure.
Identify/prioritize Condition assessment to identify priorities for risk Any asset type.
risk management mitigation.
interventions
Risk Management
Estimate Condition assessment to quantify/constrain risk. Any asset type. Assessment of budget
probability of requirements in relation
failure/ predicting to asset lives and/or
failure deterioration.
Forensic Condition assessment to understand failure and support Any asset type. Understand causative
investigations litigation. factors.
Understand Targeted condition assessment in an attempt to Any asset type. Understand causative
causes of failures understand asset failures. Could involve sampling of factors relating to asset
(similar to assets in similar environmental and/or operating context failures.
forensic) to determine if at risk.
Risk-informed Determine current condition and consider interval for Above ground Condition as an
inspection next inspection based on assessment of risk and current assets, could indicator of risk and
programs condition. be used for thus time until next
some important inspection.
Operations
pipes.
Increase Again, similar in focus to the RCM/MO driver, but no Above ground Reasons for failure, hot
reliability need for formalized approach. Attempting to find poor assets. spots, remaining life
condition/performing assets or components and replace assessments.
them to improve reliability and reduce direct/indirect
costs.
Table B-2. Drivers in which Condition and Performance Assessment Play a Minor Role.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets B-3
Reduce O&M Essentially the same as RCM/MO refinement, but does Above Ideally
costs not necessarily rely on these formalized approaches ground identification of
being in place. Focus in on reducing direct cost of O&M assets. problem assets,
activities, including identification of problem assets to but could be a
reduce call outs, pumping costs, etc. general
assessment of
maintenance
and operational
practices in light
of costs.
Comprehensive Collect data for asset management purposes, including Any asset Condition and
data an assessment of condition/performance -- likely to be in type. performance
collection/capture terms of grades. grades.
program
Asset Management
Asset capability Collect data and opinion on whether or not assets are Above Performance
assessments currently fit for purpose; ideally this would be a ground grade and or
performance assessment carried out independently of assets. simple flag of
condition, but could involve assessing if condition was whether fit for
affecting ‘fitness for purpose’ (capability). purpose.
Improve the Assessment of condition and performance to Any asset Asset condition
management of understand the impact of maintenance strategies on type. in relation to
asset life cycle asset life. asset
management
practices.
B-4
APPENDIX C
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets C-1
Asset Type Assessment criteria
Serviceability (V/O/M)
C-2
Table C-2 provides some asset observations that relate to the performance of various
categories of asset.
Note:
(V): visual; an auditor would be able to evaluate the assessment criteria directly
(visually).
(O): opinion based; the auditor would be able to evaluate the assessment criteria
indirectly (by interview).
(M): measurable; the assessment criteria could be directly measured
(inspected/monitored) or assessed through analysis of available operations/maintenance
data.
Table C-2. Performance Assessment Criteria.
Asset Type Assessment criteria
Buildings Adequacy for current and foreseeable use; size, location, facilities;
current/anticipated shortcomings (O)
Control and monitoring equipment Capacity to meet current and future requirements; current/anticipated
shortcomings; needs to consider hardware and software (O)
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets C-3
Asset Type Assessment criteria
Raw water storage Flexibility of draw-off arrangements (O)
Susceptibility to eutrophication (O/M)
Effectiveness of circulation/de-stratification (O)
Effectiveness of scour valves (O)
Control of compensation volumes? (O)
C-4
Asset Type Assessment criteria
Wash Water and Sludge Disposal Effectiveness of wash water settlement facilities (O)
Quality of supernatant water produced with respect to consent standards
(M)
Effectiveness of sludge withdrawal and consolidation facilities (O)
Facility to divert returned supernatant (O)
Effectiveness of sludge dewatering (M)
Degree of automation (V/O)
Sewage force mains Hydraulic adequacy at all flows, including storm (O/M)
Appropriate velocity maintained (O/M)
Ease of access for maintenance (O)
Septicity problems (O)
Sewage Pump Stations (including in let works Hydraulic adequacy at all flows (O/M)
pumping station) Capacity of pumps with respect to loads (O/M)
Standby capacity (V/O)
Capacity of sump and storm tanks (O/M)
Ease of access for maintenance and emergency tinkering (O)
Capacity to handle solids/rags (O)
Blockage history (M)
Service history with respect to upstream flooding or premature overflow
(M)
Overflow history with respect to events, loads, consent, and environmental
impact (M)
Service history with respect to odor and noise (M)
Telemetry/alarms
Storm tanks History of discharge to overflow with respect to events, loads, consents
and environmental impact (M)
History of complaints (M)
Return arrangements (automatic?) and impact on downstream processes
(O/M)
Requirement for tank cleaning after use (O)
Overtopping of structure (O)
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets C-5
Asset Type Assessment criteria
Primary settlement Hydraulic adequacy at all flows (O/M)
Carry over of solids (O)
Efficiency of scum trapping and removal (O)
Efficiency of sludge removal (O)
Adequacy of sludge thickness (M)
Presence of rising sludge, septicity or rising gases (O)
Impact on inlet or outlet channels (O)
Flow distribution over weirs and between units (V/O)
Final tanks and RAS pumps Hydraulic adequacy at all flows (O/M)
Carry over of solids (O)
Ability to ‘buffer’ inefficient or over-loaded upstream processes (O)
Efficiency of scum trapping and removal (O)
Presence of rising sludges, gases or septicity (O)
Control of RAS and surplus sludges (O)
Backing up of inlet/outlet channels (O)
Flow distribution over weirs V/O)
Clarity of effluent (O/M)
Sludge reception and screening Sufficiency of reception capacity with respect to economic tankering,
considering normal demands and breakdowns/operational problems (O)
Efficiency of sludge screens and handling equipment (O)
C-6
Asset Type Assessment criteria
Occurrence of downstream problems or blockages from screenings (O/M)
Ease of control/operation (O)
Sludge holding and consolidation tanks Sufficiency of buffer holding capacity regarding economic tank sizing,
considering normal demands and breakdowns/operational problems (O)
Consolidation regarding percent dry solids target (M)
Ease of control/operation (O)
Occurrence of blockages (M)
Environmental impacts (M)
Complaints (M)
Sludge presses and mechanical thickening Consolidation regarding percent dry solids target (M)
Effectiveness of sludge feed and output equipment (O)
Consistency of sludge production (O/M)
Ease of control/operation (O)
Occurrence of blockages (O/M)
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets C-7
C-8
APPENDIX D
CONDITION CODE (check one which best describes the assets current condition)
___ Excellent (no noticeable defects, no reason to expect failure, PMs being done, new asset)
___ Satisfactory (minor defects/wear, low possibility of failure, Some PMs being skipped, )
___ Poor (significant defects/wear, high probability of failure, heath/safety issue, Not being PM'd)
___ Failed (excessive defects/wear, unit is in a failed state/inoperable)
CONDITION ASSESSMENT WORK ORDER DETAILS (Complete ALL Prior to Closing IPM - Required Fields)
Time to complete inspection - _____ minutes/hours Name of Inspector: ______________ Date: _____________
Re-inspection required ( Y / N ) (CA Priority 1 only) within _____ days / months
Inspection PM data entered into COMPASS system on ____________________(date) by __________________________
Comments: __________________________________________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
Form prepared for the Washington Suburban Sanitation Commission’s ‘Industrial Assets Management Group’
by John W. Fortin; PSC member and Asset Management Consultant.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets D-1
D-2
APPENDIX E
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets E-1
Expert System Implementation
A prototype ES was developed within the commercial package Expert System Builder
(http://www.esbuilder.com/). This software package was selected because it is shareware and
52H
thus low cost. However, while suitable for a prototype version, the package has a number of
limitations. The most significant limitation is the inability to exclude options on the basis of
user’s response to specific questions. For example, if the user indicates that only tools relevant to
inspection of wastewater assets are of interest, then tools specific to drinking water assets are
assigned a negative score, but are not removed from further consideration. However, the
software package still provided an efficient way to rapidly develop a prototype ES that
demonstrates the functionality and usefulness of the approach.
An ES contains a knowledge base, a set of questions and a logical rule set. Expert System
Builder has three modules that help to capture these components of the ES:
Question editor: This module develops the structure of the questions to be used in
distinguishing between feasible and unfeasible options. A key feature is the ability to
create reliance so that the asking of a particular question is reliant on a response from a
previous question. This ensures that only appropriate questions are asked. For example, if
a user indicates focus on non-pipeline assets, all other questions related to pipelines are
not asked.
Knowledge acquisition: This module builds a database of knowledge that is used within
the ES. The knowledge acquisition process involves answering each of the questions for
each potential option. This process involves assigning a score for every possible question
response. For example, if the option was Barcol Hardness test and the question related to
granularity of assessment (the level within the asset stock the assessment is undertaken),
then a response indicating the user was focused on network-wide assessment would be
scored -10, while a response indicating the focus was asset specific would be scored +10.
A “don’t know” response has a neutral impact with a score of 0 assigned.
User interface: The final module brings together the question file and the knowledge
database within a user interface. The interface enables the user to navigate through the ES
and input responses to each question. As the user moves through the ES, the scores for
each question are aggregated. This combined score is then used to rank all options and
identify the most appropriate tool or technique. The output result for the user is a list of
all options ranked by confidence interval, with the most suitable options at the top of the
list.
E-2
Figure D-1. Conceptual Overview of Pathways in the Tool Selection Expert System.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets E-3
E-4
APPENDIX F
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-1
Matthew Poulton - Cemagref
Mike Lowe - Imperial College London
Nicola Telcik - YVW
Philip Ferguson - Earth Tec
Raimund Herz - Technische Dresden Universität
Richard Bonds - Ductile Iron Pipe Research Association
Sveinung Sagrov - SINTEF
Tristan Day - Austeck Pty Ltd
Wayne Ganther - CSIRO
Yves Legat - Cemagref
F-2
Table of Contents
Introduction.................................................................................................................................. 1
F1.0 Acoustic Emission ....................................................................................................... 5
F2.0 Active Acoustic Inspection .......................................................................................... 9
F3.0 Air Permeability......................................................................................................... 11
F4.0 AQUA-Selekt............................................................................................................. 15
F5.0 AQUA-WertMin ........................................................................................................ 17
F6.0 AwwaRF’s Manager Software................................................................................... 20
F7.0 Barcol Hardness Test ................................................................................................. 22
F8.0 Broadband Electromagnetic....................................................................................... 25
F9.0 Carbonation Testing and Petrographic Examination ................................................. 28
F10.0 CARE-S ..................................................................................................................... 31
F11.0 CARE-W.................................................................................................................... 34
F12.0 CCTV Inspection ....................................................................................................... 37
F13.0 Concrete Electrical Resistance (Resistivity).............................................................. 41
F14.0 Condition Assessment of Plastic Pipes ...................................................................... 44
F15.0 Core/Coupon Sampling.............................................................................................. 47
F16.0 Corrosion Burial Testing............................................................................................ 49
F17.0 Cover Meter - Reinforcement Location & Measurement .......................................... 51
F18.0 Crack Measurement Tools ......................................................................................... 53
F19.0 Current Monitoring .................................................................................................... 55
F20.0 Cut-out Sampling ....................................................................................................... 57
F21.0 Drop Test ................................................................................................................... 59
F22.0 Ductor (Micro Ohm Resistance) Testing................................................................... 61
F23.0 Electrical Potential (Half Cell) Measurement of Concrete Reinforcement ............... 63
F24.0 FailNet-Reliab............................................................................................................ 67
F25.0 FailNet-Stat ................................................................................................................ 69
F26.0 Fiberscope Inspection ................................................................................................ 71
F27.0 Fracture Toughness (C-Ring) Testing ....................................................................... 74
F28.0 Ground Penetrating Radar (GPR) .............................................................................. 77
F29.0 Holiday Detector........................................................................................................ 81
F30.0 Hydraulic Modeling ................................................................................................... 85
F31.0 Impact Echo Testing .................................................................................................. 88
F32.0 Indirect Tensile Strength Testing............................................................................... 92
F33.0 Infiltration and Inflow – Sewer Flow Survey ............................................................ 94
F34.0 In-Pipe Acoustic Inspection Tools (Sonar)................................................................ 97
F35.0 In-Pipe Hydrophones ............................................................................................... 101
F36.0 Insulation Test.......................................................................................................... 103
F37.0 Intelligent Pigs ......................................................................................................... 105
F38.0 KANEW................................................................................................................... 109
F39.0 KureCAD ................................................................................................................. 112
F40.0 Leak Detection ......................................................................................................... 114
F41.0 Linear Polarization Resistance of Soil (Soil LPR) .................................................. 117
F42.0 Load Rejection Tests................................................................................................ 119
F43.0 LPR for Corrosion Monitoring ................................................................................ 121
F44.0 Magnetic Flux Leakage............................................................................................ 124
F45.0 Man Entry Inspection............................................................................................... 128
F46.0 Measurement of Strain............................................................................................. 131
F47.0 Methylene Chloride Gelation Assessment............................................................... 136
F48.0 Motor Circuit Analysis ............................................................................................ 139
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-3
F49.0 Multi-sensor Pipe Inspection Robots ....................................................................... 141
F50.0 Oil Testing ............................................................................................................... 145
F51.0 On-Line Leak Detection Systems ............................................................................ 149
F52.0 PARMS-Planning .................................................................................................... 151
F53.0 PARMS-Priority ...................................................................................................... 154
F54.0 Passive Acoustic Inspection of Pipes (Acoustic Emission)..................................... 157
F55.0 Performance Testing of Rotating Machinery........................................................... 160
F56.0 Phenolphthalein Indicator (Carbonation Testing).................................................... 163
F57.0 Pipe Potential Surveys ............................................................................................. 166
F58.0 PiReP/PiReM ........................................................................................................... 169
F59.0 Pit Depth Measurement............................................................................................ 171
F60.0 Process Control Systems (Integrated)...................................................................... 174
F61.0 Pull-off Adhesion Testing........................................................................................ 176
F62.0 Radiographic Testing ............................................................................................... 180
F63.0 Remote Field Eddy Current (RFEC and RFEC/TC Tools) ..................................... 183
F64.0 Schmidt Hammer ..................................................................................................... 187
F65.0 SCRAPS (Sewer Cataloging, Retrieval and Prioritization System) ........................ 190
F66.0 Slow Crack Growth Resistance of PE Pipes............................................................ 193
F67.0 Smart Digital Sewer Pipe Diagnostic System (VTT) .............................................. 196
F68.0 Smoke Testing ......................................................................................................... 198
F69.0 Soil Characterization................................................................................................ 200
F70.0 Soil Corrosivity........................................................................................................ 204
F71.0 Soil (Electrical) Resistivity ...................................................................................... 207
F72.0 Thermographic Testing............................................................................................ 210
F73.0 Transformer Circuit Protection Coordination and Protection Relays...................... 212
F74.0 Transient Earth Voltage (TEV)................................................................................ 215
F75.0 Ultrasonic Emission Inspection ............................................................................... 217
F76.0 Ultrasonic Measurements; Continuous (Guided Wave) .......................................... 220
F77.0 Ultrasonic Measurements; Discrete ......................................................................... 223
F78.0 UtilNets .................................................................................................................... 228
F79.0 Valve Exercising...................................................................................................... 231
F80.0 Vibration Analysis ................................................................................................... 234
F81.0 Visual Inspection (Pipes) ......................................................................................... 237
F82.0 WARP ...................................................................................................................... 239
F83.0 WRc Sewer Rehabilitation Manual ......................................................................... 242
F84.0 WRc Trunk Main Structural Condition Assessment Approach............................... 246
F85.0 Volumetric X-Ray or Radiographic Testing............................................................ 249
F-4
F1.0 Acoustic Emission
F1.1 Overview
Acoustic emissions are transient elastic waves that are generated by the rapid release of
strain energy from within a material. A common source of acoustic emission is the sudden
appearance or propagation of a microscopic crack within a material under load.
Material defects such as cracks, pits and gas bubbles act as local stress concentrators
that promote crack propagation. Acoustic emissions indicate the presence of these material
defects. Frequent acoustic emissions are an indication that there are numerous points of high
stress concentration, and that the material is approaching failure. Other sources of acoustic
emission that do not involve material failure include active corrosion, cavitation of pumps, de-
lamination of a composite material, turbulent flow through a leak in a pressure vessel and
phase transformation of a monolithic material.
Acoustic emissions can be detected by a sensor and recorded. In this way, acoustic
emission monitoring can be used as a non-destructive method of condition monitoring. The
frequency of acoustic emissions can be increased by placing a structure under a higher than
normal stress (load). Acoustic emission testing can thus be used to gather additional
information where a structure is tested under high loads for another reason, for example,
factory acceptance testing of pressure vessels.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-5
The intensity of an acoustic emission event will decrease as the distance from the
source increases. By setting up several sensors on the structure and by knowing the attenuation
properties of the material, the location of the acoustic emission source can be determined.
F1.3 Application
Acoustic emission testing is most commonly used for detecting and locating material
defects in pressure vessels, storage tanks, pipes, heat exchanges, aerial lift devices and welded
joints.
Many other applications for acoustic emission testing are currently being researched
and developed. One example is the local, long-term monitoring of civil engineering structures
such as bridges and pipelines. Acoustic emission testing of glass-fiber reinforced parts, such as
fan blades, is also becoming more common.
A number of standards reference this technique for a variety of products ranging from
small parts to pressure vessels.
♦ ASTM-E1067-96, ASTM-E1106-86(1992)e1, ASTM-E1118-95, ASTM-E1139-97,
ASTM-E1211-97, ASTM-E1419-96, ASTM-E1781-98, ASTM-E1888-97, ASTM-
E1930-97, ASTM-E1932-97, ASTM-E569-97, ASTM-E650-97, ASTM-E749-96,
ASTM-E750-98, ASTM-E751-96, ASTM-E976-98, ASTM-F1430-98, ASTM-F1797-
98, ASTM-F914-98.
♦ AAR Procedure for AE Evaluation of Tank Cars and IM101 Tanks.
♦ ASME V, Article 12, Acoustic Emission Examination of Metallic Vessels During
Pressure Testing.
♦ SPI Recommended Practice for Acoustic Emission Testing of Fiberglass Reinforced
Plastic Resin (RP) Tanks/Vessels.
F1.5 Advantages
♦ The ability to observe the creation and growth of material defects within a material over
the entire load history of the structure (with permanently placed sensors).
♦ Testing does not need to disturb the structure/specimen.
F1.6 Limitations
♦ Only qualitative estimates of material damage and failure predictions are possible.
♦ Environments are often noisy and the acoustic emission signals are weak so
distinguishing noise from the measurements can be difficult.
F-6
Table F-1. Summary Acoustic Emission.
Criteria Assessment
Technical Assets covered Pipes, aerial lift devices, pressure vessels,
selection storage tanks.
Material Concrete, masonry, metals, polymers,
composites.
Service area Potable and wastewater.
Access requirements None.
Limitations relating to asset condition None.
Limitations relating to asset size/geometry None.
Continuous/discrete Continuous in time and space.
Destructive/non destructive Non-destructive.
Interruption to supply/function Tests can be undertaken while the asset is on-
line.
Technical Assessment parameters Material defects.
suitability Integration with software tools Acoustic emission remote monitoring equipment
is commercially available.
Commercialization of tool Commercially available acoustic emission
equipment is readily available from a limited
number of suppliers.
Previous/existing use of the tool in sector Widely used in other sectors.
Accuracy/reliability Qualitative estimates.
Ease of validation of results Only through further inspection of components.
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); usability A trained operator is required. Training and
certification courses are commercially available.
Technology required (level of tool sophistication) A straightforward acoustic emission instrument
hardware design includes a transducer,
preamplifier, bandpass filter, amplifier and
several digital signal processors.
Documentation Refer to the Standards listed.
Availability of technical support Commercially available.
Economic Cost per inspection Depends on application.
factors Resource requirements Depends on application.
F1.7 Bibliography
1. AAR Procedure for AE Evaluation of Tank Cars and IM101 Tanks.
2. ASME V, Article 12, Acoustic Emission Examination of Metallic Vessels During Pressure
Testing.
3. ASTM-E1067-96 Standard Practice for Acoustic Emission Examination of Fiberglass
Reinforced Plastic Resin (FRP) Tanks/Vessels.
4. ASTM-E1106-86(1992)e1 Standard Method for Primary Calibration of Acoustic Emission
Sensors.
5. ASTM-E1118-95 Standard Practice for Acoustic Emission Examination of Reinforced
Thermosetting Resin Pipe (RTRP).
6. ASTM-E1139-97 Standard Practice for Continuous Monitoring of Acoustic Emission from
Metal Pressure Boundaries.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-7
7. ASTM-E1211-97 Standard Practice for Leak Detection and Location Using Surface-
Mounted Acoustic Emission Sensors.
8. ASTM-E1419-96 Standard Test Method (STM) for Examination of Seamless, Gas- Filled,
Pressure Vessels Using Acoustic Emission.
9. ASTM-E1781-98 Standard Practice for Secondary Calibration of Acoustic Emission
Sensors.
10. ASTM-E1888-97 STM for Acoustic Emission Testing of Pressurized Containers Made of
Fiberglass Reinforced Plastic with Balsa Wood Cores.
11. ASTM-E1930-97 STM for Examination of Liquid Filled Atmospheric and Low Pressure
Metal Storage Tanks Using Acoustic Emission.
12. ASTM-E1932-97 Standard Guide for Acoustic Emission Examination of Small Parts.
13. ASTM-E569-97 Standard Practice for Acoustic Emission Monitoring of Structures During
Controlled Stimulation.
14. ASTM-E650-97 Standard Guide for Mounting Piezoelectric Acoustic Emission Sensors.
15. ASTM-E749-96 Standard Practice for Acoustic Emission Monitoring During Continuous
Welding.
16. ASTM-E750-98 Standard Practice for Characterizing Acoustic Emission Instrumentation.
17. ASTM-E751-96 Standard Practice for Acoustic Emission Monitoring During Resistance
Spot-Welding.
18. ASTM-E976-98 Standard Guide for Determining the Reproducibility of Acoustic Emission
Sensor Response.
19. ASTM-F1430-98 STM for Acoustic Emission Testing of Insulated Aerial Personnel
Devices with Supplemental Load Handling Attachments.
20. ASTM-F1797-98 STM for Acoustic Emission Testing of Insulated Digger Derricks.
21. ASTM-F914-98 STM for Acoustic Emission for Insulated Aerial Personnel Devices.
22. SPI Recommended Practice for Acoustic Emission Testing of Fiberglass Reinforced Plastic
Resin (RP) Tanks/Vessels.
F-8
F2.0 Active Acoustic Inspection
F2.1 Overview
This non-destructive technique uses the transmission of sound to assess defects in the
structure of pipes; generally of cementituous materials. A known force is imparted to the asset
and sensors measure the response. Cracks, delamination and other discontinuities affect the
transmission of sound. Generally damaged pipes will display lower wave speeds and propagate
less energy to the sensors. Depending on the response, the assessor can thus identify if the asset
has cracks and other defects.
F2.3 Application
Active acoustic inspection is applied to cementituous pipes to identify cracks,
delamination, or other defects. It can be used to assess wire breaks, delamination and cracks in
pre-stressed cylinder concrete pipe (PCCPs).
♦ No ASTM or ISO standards were identified for this application.
F2.5 Advantages
♦ This technique can be conducted quickly with results immediately available.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-9
♦ The results of this technique give information about the overall condition of the pipe.
F2.6 Limitations
♦ Pipe assets must be dewatered before inspection.
♦ Asset must be exposed prior to inspection. However, full exposure of the asset is not
required; exposure only need allow access to points on pipe surface.
♦ This technique may not locate specific small defects).
F2.7 Bibliography
1. Dingus, M., Haven, J. and Austin, R. Nondestructive None Invasive Assessment of
Underground Pipes, AwwaRF, USA, 2002.
2. Makar, J. M. ; Chagnon, N. Inspecting systems for leaks, pits, and corrosion, National
Research Council of Canada, Institute for Research in Construction, NRCC-42802, 1999
(downloaded from www.nrc.ca/irc/ircpubs).
3. Lillie, K., Reed, C. and Rodgers, M. A. R., 2004, Workshop on Condition Assessment
Inspection Devices for Water Transmission Mains, AwwaRF, USA, 2004.
F-10
F3.0 Air Permeability
F3.1 Overview
Air permeability is a non-destructive test that can be used to determine the permeability
and quality class of concrete. Concrete permeability is an excellent measure of the resistance of
concrete against aggressive media. The ingress of water and air into the concrete can cause
corrosion of steel reinforcement, which leads to a deterioration in the durability of the concrete.
Air permeability testing is also referred to as ‘gas’ permeability testing.
There are two main methods for testing air permeability: the Torrent method, which
measures the reduction of an applied vacuum over time, and the Cembureau method for
oxygen permeability. The Torrent method is described here due to its more extensive use as a
concrete durability assessment tool, and its widespread use on road, bridge and tunnel assets.
F3.3 Application
Air permeability testing can be conducted on any concrete structure, including but not
limited to; buildings, tanks, slabs and other such structures.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-11
Standards which reference this test method are:
♦ DIN 28400 ‘Vacuum Technique’ Deutsches Institut fur Normung (DIN)
♦ C497-05 Standard Test Methods for Concrete Pipe, Manhole Sections, or Tile
♦ ASTM C204-05 Standard Test Method for Fineness of Hydraulic Cement by Air
Permeability Apparatus
F3.5 Advantages
♦ The testing method is suitable for both laboratory and onsite application. Testing is
non-destructive and allows a rapid and reliable comparison between laboratory samples
and site concrete.
♦ Measurements taken in the field are usually in good agreement with laboratory methods
such as oxygen permeability, capillary suction, chloride penetration.
♦ Capillary suction can also be estimated from permeability results obtained from testing.
Capillary suction is known to be related to permeability if the surface tension effects are
not disturbed by water repellents.
F3.6 Limitations
♦ The concrete needs to be dry for accurate testing, as permeability times are influenced
by the moisture content of the concrete.
♦ When concrete is moist, air permeability values are significantly lower than when it is
dry. This can result in a distortion in the evaluation of the quality of the concrete,
particularly when it is performed in-situ.
F-12
Table F-3. Summary Air Permeability.
Criteria Assessment
Technical Assets covered Concrete elements with a flat surface such as slabs,
selection beams, columns, walls and pavements
Material type Coated and uncoated concrete.
Service area Potable and wastewater.
Access requirements Direct contact with surface of asset. If asset is buried
then it must be exposed. Surface coatings need to be
removed in order to test permeability of concrete.
Sufficient room is required for an operator where an
asset has been exposed for testing.
Limitations relating to asset condition Concrete surface must be level and not be too porous
or rough as the chambers of the vacuum cell need to
seal effectively against the surface.
Limitations relating to asset size/geometry No limitations relating to size of concrete element.
Surface must be flat.
Continuous/discrete Discrete reading.
Destructive/non destructive Non-destructive.
Interruption to supply/function The asset can remain in use and does not need to be
taken off-line.
Technical Assessment parameters Permeability, quality class and capillary suction of
suitability concrete.
Integration with software tools Compatible with a RS 232 data interface gives a
printout of measured objects and can be transferred
to PC with MS Hyperterminal.
Commercialization of tool Equipment is fully developed, available from selected
commercial vendors.
Previous/existing use of the tool in sector Widespread use internationally on bridges, road, and
tunnel infrastructure. Limited application in the water
industry.
Accuracy/reliability Accuracy better than 3% variation from reading.
Ease of validation of results Results are easily validated by conducting other
standard tests for permeability such as ASTM C
1202.
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); Easy to use by following simple procedure.
usability Unqualified staff can take measurements.
Technology required (level of tool Apparatus comes in a digital version, which calculates
sophistication) and displays permeability. Quality class of concrete,
capillary suction and carbonation depth of concrete
can be estimated using supporting software by
exporting data. The data from up to 200 tests can be
stored and downloaded.
Documentation DIN 28400 Vacuum Technology.
Availability of technical support Technical support available from distributors.
Economic Cost per inspection Low cost per inspection.
factors Resource requirements Resources required depend on asset being
inspected. Buried assets need to be exposed and
surface cleaned and made smooth to ensure a seal
with vacuum cell.
F3.7 Bibliography
1. Torrent, R. The gas permeability of high-performance concretes: site and laboratory tests.
ACI Special Publication 186. pp1-4, 1999.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-13
2. Papworths, Corrosion Monitoring Equipment, ‘TORRENT Water Permeability’ ‘Defelsko
Positest CarbonationTester for Concrete and Metal. Papworths Pty Ltd Concrete
Consultancy Service and NDT Equipment. 2005.
3. DIN 28400 Vacuum Technology.
4. C497-05 Standard Test Methods for Concrete Pipe, Manhole Sections, or Tile.
5. ASTM C204-05 Standard Test Method for Fineness of Hydraulic Cement by Air
Permeability Apparatus.
6. Mastrad, http://www.mastrad.com/torrent.htm, accessed 2006.
F-14
F4.0 AQUA-Selekt
F4.1 Overview
AQUA-Selekt is a software package developed in Germany, designed to assist
infrastructure managers forecast sewer condition using representative CCTV inspection data
(see CCTV Visual Inspection review). A qualitative condition inspection of a representative
sample is first assessed. This data is then used to forecast the condition of sewers that are not
inspected.
F4.3 Application
AQUA-Selekt is designed to assist with the forecasting of sewer condition using
representative CCTV-inspection data.
♦ The selection strategy used by AQUA-Selekt is in accordance with DIN EN 752-5.
F4.5 Advantages
♦ AQUA-Selekt allows the forecasting of sewer condition of an entire network based on
the CCTV data from a representative sample. This helps in the overall planning and
evaluation of sewer rehabilitation and maintenance and helps to target problem areas.
♦ This method used is claimed to be efficient with clear cost benefits, particularly for
large sewer systems of 1000 km and over.
♦ System sections that are in particular need of rehabilitation can be detected early and
given priority for complete inspection and rehabilitation.
♦ PC based software that requires MS-Windows 95/98 and MS Access 2000 to be
installed as minimum requirements (software cannot be used on other operating
systems).
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-15
F4.6 Limitations
♦ AQUA-Selekt was developed for the European context. Vendors only available in
Germany. Requires CCTV data of selected sewer sections in order for the forecasting
model to be effective.
F4.7 Bibliography
1. Eisenbeis, P., P. Le Gauffre, and S. Saegrov, Water Infrastructure Management: An
Overview of European Models and Databases, AwwaRF Infrastructure Conference,
Baltimore MD, 2000.
2. Herz, Raimund K., Aging Processes And Rehabilitation Needs Of Drinking Water
Distribution Networks, Journal of Water, SRT-Aqua Volume 45, pp 221-231, 1996.
3. AQUA-Selekt homepage, http://www.sewer-rehabilitation.com/, accessed 2006
3
4. DIN EN 752-5: 1997 Drain and sewer systems outside buildings - Part 5: Rehabilitation.
F-16
F5.0 AQUA-WertMin
F5.1 Overview
AQUA-WertMin is a software package developed in Germany to assist infrastructure
managers with the planning of CCTV-inspection, rehabilitation and new construction strategies
for sewers networks.
AQUA-WertMin calculates the current market value of assets, forecasts the
deterioration of pipe condition and assesses future rehabilitation needs using inbuilt models
and CCTV inspection data. It enables users to compare the costs of different rehabilitation
strategies based on an economic analysis of costs and time of repair.
The software calculates the probability of an asset (or group of like assets) transitioning
from one condition class to the next lower (worse) class. To determine the transitional
function, the software applies a survival model for groups of similar sewer sections. The
survival functions are calibrated using data collected from the network inspection records
including year of pipe installation, year of inspection, pipe diameter, and pipe condition.
Modules are also provided for the calculation of asset values, and
replacement/rehabilitation costs, which enables the user to compare the costs of different
rehabilitation strategies based on an economic analysis.
F5.3 Application
AQUA-WertMin is designed to assist with the planning of CCTV-inspection,
rehabilitation and new construction strategies for sewer network assets. The program follows
the guidelines for cost-minimizing maintenance of sewers by the Ministry of Environment and
Transport of the German federal state Baden-Württemberg of December 2000.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-17
♦ All data can be selected using specific fields and exported to Microsoft Access 2000 or
97 databases.
F5.5 Advantages
♦ Program installation is simple with step-by-step instructions.
♦ AQUA-WertMin has a consistent and easy-to-use user interface with Explorer-style
navigation structure. On-line help is also available
♦ Freely-configurable import function for Access databases from version 2.0 and
databases linked using ODBC.
♦ All data can be selected using specific fields and exported to Microsoft Access 2000 or
97 databases.
F5.6 Limitations
♦ AQUA-WertMin was developed for the European context.
♦ Vendors are only available in Germany.
F5.7 Bibliography
1. Herz, Raimund K., Aging Processes And Rehabilitation Needs Of Drinking Water
Distribution Networks, Journal of Water, SRT-Aqua Volume 45, pp 221-231, 1996.
F-18
2. Eisenbeis, P., P. Le Gauffre, and S. Saegrov, Water Infrastructure Management: An
Overview of European Models and Databases, AwwaRF Infrastructure Conference,
Baltimore MD, 2000.
3. AQUA-WertMin homepage, http://www.sewer-rehabilitation.com/, accessed 2006.
4H
4. Stone, S., Dzuray, E. J., Meisegeier, D., Dahlborg, A-S., and Erickson, M. Decision-
Support Tools for Predicting the Performance of Water Distribution and Wastewater
Collection Systems, EPA, EPA/600/R-02/029, 2002.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-19
F6.0 AwwaRF’s Manager Software
F6.1 Overview
AwwaRF’s Water Treatment Plant Infrastructure Assessment Manager (Manager
Software) is a software based tool that allows the user to manage information relating to
treatment plant assets. The software provides procedures and instructions to gather information
on the condition and criticality of water treatment facilities and their components, and includes
financial accounting capabilities from the unit level through the facility level.
F6.3 Application
AwwaRF’s Manager Software is designed to facilitate the management of condition
and asset data for water treatment works.
F6.5 Advantages
♦ The Manager Software provides procedures and instructions to gather information on
the condition and criticality of water treatment facilities and their components.
♦ Through the tree structure, the software organizes the assessment process around the
evaluation of systems rather than engineering/maintenance disciplines. A review of
non-destructive assessment methods is also included within the Manager Software.
F-20
♦ The Manager Software allows for wide variations in the type and size of facilities and
in the experience of the staff who will perform the assessment.
♦ It includes financial accounting capabilities from the unit level through the facility
level.
F6.6 Limitations
♦ Functionality would ideally be integrated into corporate systems, rather than a stand-
alone tool.
F6.7 Bibliography
1. AwwaRF. Water Treatment Plant Infrastructure Asset Management: Users Manual,
prepared by L. Elliot et al, AWWA Research Foundation and American Water Works
Association, USA, 2001.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-21
F7.0 Barcol Hardness Test
F7.1 Overview
The Barcol hardness test is a quick and simple non-destructive test using a Barcol
Impressor, which gives a relative measure of the hardness of rigid materials. It is can be used,
for example, on plastic and cementitious pipes.
Barcol hardness can be converted to other hardness measures such as Vickers hardness
but does not relate to any other physical quantity (Dorn et al., 1996).
F7.3 Application
The Barcol hardness test can be used to measure the surface hardness of any asset
dependant on material. Asset that can be inspected include pipes and coatings, testing can be
conducted in the lab or in the field.
♦ The Barcol Impressor is referred to in a number of standards ASTM D2583-95, ASTM
B 648-78, ASTM E140-97.
F-22
♦ The Barcol hardness test has been used to assess deterioration of AC and cementitious
pipes.
F7.5 Advantages
♦ The Barcol Impressor is quick and easy to use and has repeatable measurements on
homogeneous materials. The test can be used on both cementituous and polymeric
materials (Dorn et al., 1996).
F7.6 Limitations
♦ Due to the small area tested each time, the Barcol Impressor is used the results can
show a high degree of scatter in heterogeneous materials, requiring large numbers of
measurements to be taken.
♦ Hardness measurement is an arbitrary scale and does not relate to any other physical
property such as strength (Dorn et al., 1996)
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-23
Criteria Assessment
Availability of technical support Technical support available from retailers and
from Internet.
Economic factors Cost per inspection Low cost per inspection.
Resource requirements Resources required depend on assets being
inspected. Buried assets need to be exposed
and have any coatings removed, man entry
such as into manholes may require multiple
personnel dependant on safety requirements.
F7.7 Bibliography
1. ASTM D2583 95, Standard test method for indentation hardness of rigid plastics by means
of a Barcol Impressor.
2. ASTM E140-97 Standard Hardness Conversion Tables for Metals E1842-96 Standard Test
Method for Macro-Rockwell Hardness Testing of Metallic Materials.
3. ASTM B648-78 Standard Hardness Conversion Tables for Metals E1842-96 Standard Test
Method for Macro-Rockwell Hardness Testing of Metallic Materials.
4. Dorn, R., Howsam, P., Hyde, R.A. and Jarvis, M.A. Water mains: Guidance on assessment
and inspection techniques, CIRIA Report 162, Construction Industry Research and
Information Association, London, England, 1996.
5. Randall-Smith, M., Russell, A. and Oliphant, R., Guidance manual for the structural
condition assessment of trunk mains, WRc, UK, 1992.
F-24
F8.0 Broadband Electromagnetic
F8.1 Overview
The broadband electro magnetic (BBEM) technique is an eddy current method. In eddy
current methods, the thickness of a pipe wall is measured by inducing magnetic fields in the
material. While conventional eddy current inspection techniques use a single frequency (or a
narrow frequency bandwidth), BBEM induction techniques record data over a broad range of
frequencies. Since the depth of penetration is dependent on the frequency of excitation, this
allows information from a range of depths to be obtained.
The BBEM technique works by passing an alternating current through a transmitter coil
at the surface of the pipe, which generates an alternating magnetic field. Flux lines from this
magnetic field pass through the metallic pipe wall, generating a voltage across it. This voltage
produces eddy currents in the pipe wall that produce their own, secondary magnetic field. By
measuring the strength of this magnetic field or the eddy current that produces it, the remaining
metallic wall thickness can be detected.
The technique is non-destructive and commercial suppliers of BBEM state that signal
can be received through all forms of external coating, and in all ferrous materials.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-25
BBEM tool scans the pipe outer surface. Results are reported graphically or as color contour
plots, as in shown Figure F-2.
Figure F-2. Color Contour Plot Representing Variations in Pipe Wall Thicknesses.
F8.3 Application
♦ Broadband electromagnetic techniques can be used to assess ferrous pipe wall condition
and locate illegal tap-ins.
♦ Tools are available for both external and internal use.
F8.5 Advantages
♦ Non-destructive condition monitoring techniques based on electromagnetic induction
principles can provide useful information to assist with pipeline replacement and
rehabilitation decisions for critical mains.
♦ Pipe wall condition assessment is by means of an internal condition assessment probe;
this allows continuous data to be recorded along extensive lengths of pipeline.
♦ The technique is able to survey through external coating and internal linings.
♦ There is no upper limit on pipe diameter.
F8.6 Limitations
♦ Use of the tool requires pipe to be depressurized during the assessment and full bore
access for internal inspections.
Internal inspection rate is reportedly only a few feet per day in large diameters.
F-26
Table F-9. Summary Broadband Electromagnetic.
Criteria Assessment
Technical Assets covered Water pipes.
selection Material type Steel, cast iron, ductile iron.
Service Area Potable.
Access requirements Internal: full bore access required;
external: exposure of pipe surface.
Limitations relating to asset condition No limitations relating to asset condition
provided direct contact with the pipe wall is
available.
Limitations relating to asset size/geometry Minimum 3”.
Continuous/discrete Continuous.
Destructive/non destructive Nondestructive.
Interruption to supply/function Pipe must be depressurized.
Technical Assessment parameters Remaining wall thickness.
suitability Integration with software tools Fully integrated software for analysis of data.
Commercialization of tool Commercially available.
Previous/existing use of the tool in sector Commercial use of the tools reported in
literature and trade journals.
Accuracy/reliability Quantitative assessment; but varied sensitivity
to defects.
Ease of validation of results Validation by other measurement is required,
though data collected can be recalibrated at any
time after the inspection.
Utility technical Asset management sophistication required Associated with high levels of asset
capacity management sophistication.
Skills required (level of tool sophistication); usability Tool operation typically by a third party.
Technology required (level of tool sophistication) Specialized equipment and dedicated computer
software.
Documentation Use and development documented in the
literature.
Availability of technical support Tool operation typically by a third party.
Economic factors Cost per inspection High cost associated with access and tool use.
Resource requirements Sufficient manpower to undertake enabling work
and inspection.
F8.7 Bibliography
1. Burn, L.S., Eiswirth, M., DeSilva D. and Davis P., Condition Monitoring and its Role in
Asset Planning, Pipes Wagga Wagga 2001, Charles Sturt University, Wagga Wagga,
N.S.W., 2001.
2. Lillie, K., Reed, C. and Rodgers, M. A. R., 2004, Workshop on Condition Assessment
Inspection Devices for Water Transmission Mains, AwwaRF, USA, 2004.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-27
F9.0 Carbonation Testing and Petrographic Examination
F9.1 Overview
In normal high quality reinforced concrete, the steel reinforcement is chemically
protected from corrosion by the alkaline nature of the concrete. This alkalinity causes the
formation of a passive oxide layer around the steel reinforcement. However, over time the
concrete reacts with atmospheric carbon dioxide and sulfur dioxide to cause gradual
neutralization of the alkalinity from the outside surface inwards. This process is known as
carbonation and over time the concrete around the steel reinforcement is neutralized allowing it
to corrode, leading to the deterioration of the concrete through cracking and spalling.
Carbonation testing measures the depth of carbonation and can be determined using onsite or
laboratory based assessment techniques. Core samples are taken, but the technique is in
essence non-destructive.
F-28
F9.3 Application
Carbonation testing is commonly undertaken on structures constructed from concrete
materials, to determine the existence and level of carbonation.
♦ BS 8110 Structural use of concrete. Code of practice for design and construction
F9.5 Advantages
• Analysis techniques conducted onsite using phenolphthalein can, in some applications,
be undertaken without the need to take core samples.
F9.6 Limitations
♦ A phenolphthalein test may return a positive result even if alkalinity has reduced to a
pH < 11, where passivation has been lost.
♦ Materials that contain carbonation along micro-cracks and diffusion paths in poorly
compacted concrete may not be readily revealed by the phenolphthalein analysis
methods.
♦ Laboratory based assessment techniques require skilled technical staff who have been
trained and have relevant experience in the preparation, analysis and interpretation of
experimental results.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-29
Table F-10. Summary Carbonation Testing.
Criteria Assessment
Technical Assets covered Concrete assets in contact with air or soil. Can also
selection be used on dispersive soils and crushed stone
base materials.
Material type Cementituous.
Service area Potable and wastewater.
Access requirements Direct contact with concrete surface. Surface
coatings should be removed.
Limitations relating to asset condition No restriction.
Limitations relating to asset size/geometry No limitations relating to size.
Continuous/discrete Discrete readings.
Destructive/non destructive A core is required to be removed.
Interruption to supply/function The asset can remain in use and does not need to
be taken off-line.
Technical Assessment parameters Depth of carbonation in mm.
suitability Integration with software tools Stand alone tool.
Commercialization of tool Test methods are fully developed and are available
from a wide range of commercial vendors.
Previous/existing use of the tool in sector Widespread use throughout many sectors.
Accuracy/reliability Qualitative or quantitative measurement of depth of
carbonation can be obtained.
Ease of validation of results Direct measurement.
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); usability Easy to use by following simple procedure. Basic
training is recommended.
Technology required (level of tool sophistication) Low level of technological sophistication is needed
for hand held, manual tools.
Documentation AASHTO T-259 and AASHTO T-260.
BS 8110.
Availability of technical support Technical support widely available from
distributors.
Economic Cost per inspection Low cost per inspection.
factors Resource requirements One operator required.
F9.7 Bibliography
1. BS 8110 Structural use of concrete. Code of practice for design and construction.
2. Chemical Analysis’ article on MG Associates Construction Consultancy Ltd website.
http://www.mg-assoc.co.uk/serv04.htm Accessed 2006.
5H
F-30
F10.0 CARE-S
F10.1 Overview
CARE-S (Computer Aided Rehabilitation of Sewer and Storm Water Networks) is a
computer-based system for sewer and stormwater network management developed under a
collaborative research project supported by the European Commission under the 5th
Framework program, intended to contribute to the implementation of the key action
“sustainable management and quality of water.”
CARE-S aims to allow cost-efficient programs of maintenance, repair and rehabilitation
of sewer networks to be developed. In structure, CARE-S is a suite of PC based software tools
developed separately, and linked within a common framework by a decision support system
(DSS).
The overall rehabilitation planning process is derived from the European Standard; BS
EN 752-5:1998 “Drain and sewer systems outside buildings. Rehabilitation.” This planning
process is done within the context of an integrated catchment management approach.
F10.3 Application
CARE-S is a flexible computer-based system for improving sewer and stormwater
network management. The overall rehabilitation planning process is derived
♦ BS EN 752-5:1998 “Drain and sewer systems outside buildings. Rehabilitation”
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-31
F10.4 Practical Considerations
♦ The tools are PC based and run under the Windows operating system. While not
commercialized as yet, the CARE-S exists in prototype form. The use by third parties
should therefore be supported by some of the developers for the time being.
♦ Several projects based on the CARE-S methodology are emerging in Europe and
Australia. These projects will serve to verify the suitability of CARE-S modules to
support management of wastewater networks, and are expected to show the pathway
towards full commercialization.
♦ For full details on the CARE-S project and prototype tool see, http://care-s.unife.it/
6H
F10.5 Advantages
♦ CARE-S has allowed the integration of tools for managing sewerage and stormwater
networks. The results can be presented by reports, in tables and graphically (GIS).
♦ A significant effort has been made to allow companies to maintain their own data
formats, yet import them into CARE-S in the standard form required by the suit of
tools.
F10.6 Limitations
♦ The software is still a prototype and thus in need of further development.
♦ The adoption by water authorities is in an early stage and the practical results from
using CARE-S have not yet obtained.
♦ Although the methodologies of CARE-S are generic and independent of worldwide
practice, there are some designs that are made in light of European practices (e.g.,
classification of CCTV inspection).
♦ Approaches in the United States may differ from those adopted by the European
partners, which could affect relevance to the United States market.
F-32
Table F-11. Summary CARE-S.
Criteria Assessment
Technical Assets covered Wastewater networks.
Selection Granularity Spatially drainage area and below; thematic
analysis is also supported.
Service area Wastewater.
Technical Focus of analysis Service levels, budget setting, environmental
suitability impact, life cycle cost, rehabilitation planning.
Scalability of tool/approach Procedure and individual tools can be used by
any size company. However it should be noted
that the complete integrated package is data-
intensive and has the associated cost issues.
Commercialization Not commercialized.
Previous/existing use of the tool Used during case studies for development of
tool and for succeeding projects.
Ease of validation Validity depends on models and data;
independent validation difficult.
Flexibility with respect to analysis (asset types) and Wastewater only; asset to system level.
granularity (system, asset level)
Integration with other tools/GIS Not integrated; but data interface (import/export)
provided.
Utility technical Asset management sophistication Generic approach; intended to map onto
capacity company specific systems. CARE-S provides a
suite of tools that compliment existing asset
management approaches.
In-house skills required Professional engineering skills required.
Technology required PC based.
Documentation A range of papers written on approach; help
files included in package.
Data Requirements Flexible, some tools can be used with limited
data, while other tools are data hungry.
Linking to asset data Data import facilities are provided.
Availability of software and technical support Software is not in a fully commercial format;
technical support is available from an
international networks of developers on a
consultancy basis.
Usability Installation and help tools provided Support
from developers required.
F10.7 Bibliography
1. De Silva, D., Burn, S., Davis, P. and Moglia, M. Development of a Decision Support
System for Sewer Rehabilitation, Pipes Wagga Wagga 2003, Wagga Wagga, NSW,
Australia, 21–23 October 2003.
2. BS EN 752-5:1998 “Drain and sewer systems outside buildings. Rehabilitation”.
3. CARE-S homepage, http://care-s.unife.it/, accessed 2006.
7H
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-33
F11.0 CARE-W
F11.1 Overview
CARE-W is a computer-based system for water network rehabilitation planning
developed under a collaborative research project supported by the European Commission under
the 5th Framework program. CARE-W is a suite of PC-based software tools operated via a
decision support system (DSS).
F11.3 Application
CARE-W is a PC based suite of tools to enable the effective use of water pipes,
including when to rehabilitate a pipe.
F-34
F11.5 Advantages
♦ An attempt has been made to provide an integrated tool for managing water supply
networks. The results are presented by reports, in tables and in graphical/GIS format.
♦ The methodologies of CARE-W are generic and not limited to European practices
worldwide, allowing implementation independent of location.
F11.6 Limitations
♦ As noted above, the software is still in development and is not fully commercialized.
Adoption by water authorities is in an early stage.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-35
F11.7 Bibliography
CARE-W Homepage, http://care-w.unife.it/intro.html, accessed 2006.
8H
F-36
F12.0 CCTV Inspection
F12.1 Overview
CCTV inspection is the standard technology for the non-destructive assessment of the
internal condition of sewers and stormwater pipes and has been employed for over 20 years.
CCTV inspection is conducted by introducing a CCTV module into the pipe being inspected.
As the pipe is inspected, the operator records features of interest, which are used for condition
assessment of the pipe. This enables maintenance budgets to be allocated and provides value
by identifying problems before they become engineering and financial issues.
CCTV inspection can also be conducted on water pipes, but this use is less common.
However, CCTV is commonly used as part of water main rehabilitation processes such as in
situ lining.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-37
F12.3 Application
CCTV inspection is used to view and record visual images of the internal pipe surface.
Generally CCTV inspection is used in gravity flow wastewater and stormwater pipes to
establish the condition of the asset.
CCTV is also used in water pipes to assess the condition of internal cement mortar
linings, evidence of internal corrosion in these lined pipes (corrosion shows up as staining on
the cement mortar), build up of corrosion products and other obstructions.
F12.5 Advantages
♦ Defects present above the flow surface can be located, identified and ranked by a
trained operator.
♦ Technology is proven and widely available. Long lengths of mains can be inspected
relatively quickly (greater than 1 km/day, depending on site conditions, state of pipe
and flow conditions).
♦ Greater coverage per day is possible with large diameter pipes when remotely operated
vehicles are used.
♦ Systems which incorporate fish-eye technology record a full view of a pipe during a
single pass and allow full inspection to be done off-line using the recording. This
reduces the time spent in each pipe system.
F12.6 Limitations
♦ CCTV inspection provides only an assessment of the internal surface. The results are
qualitative and require manual interpretation for analysis. The accuracy of a condition
grading depends on an inspector’s experience.
♦ Storage of records on VHS tape is cumbersome (this is overcome by digital recording
and storage on hard drive or DVD).
F-38
Table F-13. Summary CCTV Visual Inspection.
Criteria Assessment
Technical Assets covered Pipes; stormwater and wastewater pipeline
selection infrastructure, water mains, although less so.
Material type Any pipe material.
Service area Predominantly wastewater, but also potable.
Access requirements Tool available for internal use only. Defects visually
observable. Access to tool and umbilical cord has
to be provided through manholes (wastewater) or
through cut-ins at regular intervals depending on
cord feed length and bends and obstructions on
pipeline.
Limitations relating to asset condition No limitations relating to asset condition provided
obstructions do not impede forward movement of
camera.
Limitations relating to asset size/geometry Generally limited to pipes 90 mm and greater.
However axial cameras can traverse pipes down to
25mm.
Continuous/discrete Continuous recording of CCTV image on VHS tape
(analogue) or computer memory (digital).
Destructive/non destructive Non-destructive.
Interruption to supply/function Low flow conditions are required for gravity pipes.
Pressure pipes need to be off-line.
Technical Assessment parameters Visual image of pipe internal surface analyzed
suitability manually. This can be used to allocate a condition
state for the pipe.
Integration with software tools Software available for converting defect codes into
grades.
Commercialization of tool Commercialized, widely available.
Previous/existing use of the tool in sector CCTV inspection routinely used by water
authorities.
Accuracy/reliability Qualitative.
Ease of validation of results Validation possible only by comparison with other
inspection techniques.
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); usability Interpretation of results for consistent data requires
training. Professional skills required to utilize the
information provided.
Technology required (level of tool sophistication) CCTV camera and related accessories, together
with recording equipment.
Documentation Technique widely documented – generally only for
waste and stormwater though sewer inspection
codes.
Availability of technical support Tech support for tool is widely available. Support
on analysis of results can be obtained from
specialized consulting organizations.
Economic factors Cost per inspection Varies depending on pipe size, accessibility and
purpose of survey. Can be priced on an hourly rate,
a meter rate, or a per observation rate.
Resource requirements Requires team to operate camera and provide
entry into pipeline. Extent of manpower required
depends on pipe type and flow levels.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-39
F12.7 Bibliography
Dorn, R., Howsam, P., Hyde, R.A. and Jarvis, M.A. Water mains: Guidance on assessment
and inspection techniques, CIRIA Report 162, Construction Industry Research and
Information Association, London, England, 1996.
Randall-Smith, M., Russell, A. and Oliphant, R, Guidance manual for the structural condition
assessment of trunk mains, WRc, UK, 1992.
Ratliff, A., An overview of current and developing technologies for pipe condition assessment,
Pipelines 2003, Pipelines 2003, ASCE 2004.
F-40
F13.0 Concrete Electrical Resistance (Resistivity)
F13.1 Overview of Tool
Resistivity meters are used for measuring the electrical potential fields to evaluate the
corrosion rate of the reinforcing bars in the concrete. The influence of various concrete
components on the electrical resistance can be investigated.
The electrical resistance of the concrete is measured according to the Wenner four-point
method. Resistivity measurements can be performed for measuring the permeability of seal
coats on concrete.
F13.3 Applications
Resistivity meters can be used to investigate the influence of various concrete
components on the electrical resistance of reinforcement. Resistivity meters are used in
conjunction with corrosion analyzing instrument to evaluate the corrosion rate of the
reinforcing bars in the concrete.
• There are no specific standards for concrete electrical resistance; however ASTM D-
257, ANSI/ESD STM11.11, and ANSI/ESD STM11.2 cover resistivity meters which
are specifically suited to the manufacturing industry and are used for making surface
and volume resistivity measurements.
F13.5 Advantages
• Resistivity meters provide immediate on-site measurement of concrete resistivity.
F13.6 Limitations
♦ Resistivity measurements are sensitive to the type of reinforcement, so assessment of
the condition of a structure and the likelihood of corrosion needs to be made with
careful reference to its construction.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-41
♦ Testing often requires that at least two holes in the order of 6.5mm to a depth of
approximately 10mm are drilled in order to insert probes.
F-42
F13.7 Bibliography
ASTM D-257 Standard Test Methods for DC Resistance or Conductance of Insulating
Materials.
ANSI/ESD STM11.11:2001—Surface resistance measurement of static dissipative planar
materials.
ANSI/ESD STM11.2:2000—Volume resistance measurement of static dissipative planar
materials.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-43
F14.0 Condition Assessment of Plastic Pipes
F14.1 Overview
Assessing the condition of plastics pipelines requires different approaches to those used
for cementituous and ferrous pipelines. This is because the degradation of plastics pipes with
time is completely different from that of these other materials. The difficulty in assessing the
condition of plastics pipes arises because they do not lose material from the pipe wall. Instead,
fracture in plastic pipes occurs by crack initiation from defects either inherent in the pipe wall
or damage sites at the pipe outer surface.
Non-destructive condition assessment for plastic pipes requires that sub-critical crack
growth through the pipe wall be detected before ultimate fracture failure occurs. Currently no
non-destructive techniques are available to locate cracks in plastic pipes before failure occurs.
However, destructive condition assessment techniques can be used to assess the level of
resistance to this kind of failure.
F14.3 Application
The current techniques used to assess plastic pipes are only able to assess the quality of
plastic pipes. The lifetime of a plastic pipe is dependant on a number of factors, such as
pressure and external loads, which can be measured, and on defect size, which cannot. As
defect size can only be measured after failure the remaining life predictions can only be applied
to a batch of assets using stochastic allocation of defect size and not to a specific asset.
F-44
F14.4 Practical Considerations
♦ The material properties of a plastic pipe sample will give a quantitative assessment of
physical parameters, but can only be used to give a qualitative indication of its
likelihood of failure. An assessment of failed plastic pipes can be conducted to assess
the quality of pipes that have already been exhumed.
♦ For reactive assets (such as distribution mains), statistical analysis of failure data
provides a more practical approach to the identification of problem assets.
F14.5 Advantages
• Condition assessment of samples from important assets could provide information that
would prevent an expensive and unforeseen failure.
F14.6 Limitations
♦ Condition assessment of plastic pipes is currently very difficult, as no techniques are
available to give the remaining service life of an individual pipe.
♦ Approaches available are destructive and can only give a relative measure of pipe
quality; for example, material properties of the sample in comparison to industry
benchmarks.
♦ Gathering field samples for testing will cause a disruption to service while taking such
samples.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-45
F14.7 Bibliography
References for the tools used for the condition plastic pipe can be found in their reviews:
♦ Fracture Toughness C-Ring Testing (F27.0).
♦ Methylene Chloride Gelation Assessment (F47.0).
♦ Slow Crack Growth Resistance (F66.0).
F-46
F15.0 Core/Coupon Sampling
F15.1 Overview of Inspection Tool
Core/coupon sampling is a method for obtaining small samples on which to conduct
testing. The samples obtained by this method are small enough so that pipes can be repaired
using repair clamps. As such, while it is not destructive to the pipe, it does require repair work
to be conducted.
F15.3 Application
Core/coupon sampling is used to obtain a sample from the wall of any pipe type. The
core/coupon removed can then be tested using techniques appropriate to the material. Core
sampling can also be undertaken on civil assets.
♦ No standards are available to which reference this technique.
F15.5 Advantages
♦ Samples can be obtained without removing a section of pipe and so does not require
extensive repair work.
♦ Core/coupon samples can be obtained during normal work practice.
♦ In the case of core samples, samples can be obtained from water pressure pipes without
interrupting service using under pressure tapping techniques.
F15.6 Limitations
♦ Samples taken can only be used for a limited range of tests.
♦ Due to small sample size, samples may not be representative of the entire pipe
circumference nor the condition along the pipeline.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-47
Table F-16. Summary Core/Coupon Sampling.
Criteria Assessment
Technical Assets covered Pipes and civil assets.
selection Material type All except VC.
Service area Potable and wastewater.
Access requirements Access to pipe surface is required and access
for tapping machine.
Limitations relating to asset condition If pipe in poor condition, may not be suitable to
take coupon, this could induce a stress
concentrator.
Limitations relating to asset size/geometry None.
Continuous/discrete Discrete.
Destructive/non destructive Sampling technique, not destructive to pipe but
does require repair work to be conducted.
Interruption to supply/function Pressure pipes must be taken off-line before
sampling, unless sample (tapping) can be made
under-pressure.
Technical Assessment parameters N/A
suitability Integration with software tools None.
Commercialization of tool Contractor services could be used.
Previous/existing use of the tool in sector Industry collects coupons but these are
underutilized for analysis.
Accuracy/reliability N/A
Ease of validation of results Direct measurements.
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); usability Sample as required for installing pipe
connections and basic repairs.
Technology required (level of tool sophistication) Low.
Documentation WSAA under pressure tapping code.
Availability of technical support N/A
Economic factors Cost per inspection Varies with the size of coupon and pipe.
Resource requirements Crew as required for installing pipe connections
and basic repairs.
F-48
F16.0 Corrosion Burial Testing
F16.1 Overview
Corrosion of metals in disturbed soils, such as occurs when pipes are laid in trenches, is
complex and not fully understood. Burial testing is used to give an indication of soil corrosivity
assessed over time, rather than as a snap shot as is obtained from most test methods.
This type of testing is conducted by burying multiple samples near a pipeline, which are
then exhumed incrementally over several years to give an indication of soil corrosivity that
takes into account the seasonal and other variations that the pipe is subject to. This method
allows corrosion measurements to be undertaken without destructive sampling from the
pipeline of interest.
F16.3 Application
Burial testing is conducted to obtain an understanding of soil corrosivity over time,
rather than a ‘snapshot’ measurement technique. This testing can be conducted for any asset
type, however is generally limited to ferrous assets without protective coatings.
F16.5 Advantages
♦ As testing takes place in real time under real conditions, the results represent corrosion
conditions more accurately than tests which only provide a ‘snapshot’ of soil
conditions.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-49
F16.6 Limitations
♦ In the vast majority of pipelines where corrosion is causing problems, the nature of the
corrosion damage is not uniform along the pipeline. Often this is also true along a
single pipe length, limiting the value of results obtained from burial samples.
♦ Corrosion burial testing needs to be planned prior to installation of the pipe for optimal
results.
♦ As there are geometrical, time and location variations between the burial sample and
the actual pipe, results from the sample may not represent the actual corrosion rate at
the pipe outer surface.
♦ Burial testing is a long term test method where results are obtained over many years;
samples need to be buried for extended periods before useable results can be obtained.
F16.7 Bibliography
1. Korb, L., Olsom, D., Davis, J., Destefani, J., Frissell, H., Crankovic, G., Jenkins, D.,
Stedfeld, R., Mills, K., Johnson, J., Kiepura, R. and Humphries, D. Metals Handbook, 9th
edition Volume 13 – Corrosion, ASM International, United States of America, 1987.
F-50
F17.0 Cover Meter - Reinforcement Location and Measurement
F17.1 Overview of Tool
Cover meters are a non-destructive means for determining the depth to concrete
reinforcement, the location of reinforcement at different depths up to 360mm, bar spacing and
anchor setting points in concrete assets. Cover meters use the eddy current testing method.
F17.3 Application
Cover meters can be used on concrete slabs, walls, columns, pipes and spiral mesh.
♦ British Standard BS1881:242
F17.5 Advantages
♦ Non-destructive methods for checking cover have become faster and more accurate in
recent years.
♦ Cover meters are more accurate for determining the penetration depth of the
carbonation front than the traditional method of dye penetration where a freshly
fractured surface is sprayed with a pH indicator, such as phenolphthalein or
thymolphtalein.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-51
F17.6 Limitations
♦ Cover meters lose accuracy at greater depths. Even ‘long range’ cover meters can only
be relied upon to detect rather than measure bars at depths between 250 and 300mm;
and this is subject to bar size.
F17.7 Bibliography
1. BS 1881 Part 204:1988: Recommendations on the Use of Electromagnetic Covermeters.
2. BS1881:242 British Standard 1881.
F-52
F18.0 Crack Measurement Tools
F18.1 Overview of Tools
Cracks in concrete structures can be measured with a range of tools. Crack
measurement tools and their corresponding measuring ranges and accuracies are listed below.
F18.3 Application
Crack measurement tools can be applied to a wide range of substrates including steel.
They are most commonly used on concrete structures.
♦ ASTM E1457-00 Standard Test Method for Measurement of Creep Crack Growth
Rates in Metals
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-53
F18.5 Advantages
♦ Crack measurement tools are accurate, reliable, non-destructive, easy to use, relatively
inexpensive and very portable.
F18.6 Limitations
♦ Results are likely to vary according to changes in parameters such as the water level in
concrete tanks and temperature of concrete due to exposure to sunlight and seasonal
variation.
F18.7 Bibliography
1. ASTM E1457-00 Standard Test Method for Measurement of Creep Crack Growth Rates in
Metals.
F-54
F19.0 Current Monitoring
F19.1 Overview
Current monitoring is a non-destructive on-line condition assessment method that can
be used on assets that contain electric motors. By monitoring variations in current flow the
onset of electrical faults can be identified before equipment breakdown occurs. Current
monitoring analysis can be used to detect electric motor problems such as broken rotor bars,
broken/cracked end rings, flow or machine restriction and machinery misalignment.
F19.3 Application
The technique of current monitoring can be used on electrical induction motors,
synchronous motors, compressors, pumps and motor operated valves, to determine changes in
the level of performance that occur over time and enable repair or replacement prior to
electrical faults or equipment breakdowns occurring.
♦ There is no specific standard for test method.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-55
♦ The sensitivity of portable clamp-on ammeters is often dependant on cost, however
most units can measure current flow with high accuracy.
F19.5 Advantages
♦ Monitoring can be undertaken with the equipment on-line with minimal disruption.
♦ Routine current monitoring enables determination of equipment electrical faults prior to
failure.
F19.6 Limitations
♦ Trained electrical technicians are required to undertake assessment, as equipment must
be under load to enable for reliable results.
♦ While the results obtained typically indicate that a possible problem is present, further
analysis required to identify the exact equipment or component fault.
F19.7 Bibliography
1. Weschler instruments, http://www.weschler.com, accessed 2006.
9H
F-56
F20.0 Cut-out Sampling
F20.1 Overview
Cut-out sampling is a method for obtaining a short pipe ring sample on which a range
of tests can be undertaken. It is a destructive technique that can be applied to pipes of any
material, but is more generally used on smaller diameters.
F20.3 Application
Cut-out sampling is used to obtain a short pipe length for testing from the wall of any
pipe type. The cut-out removed can then be tested to assess the pipe it was removed from. It is
more generally used for assessment of water distribution pipes, but could be applied to
wastewater pipes. No Standards are available to which reference this technique.
F20.5 Advantages
♦ Samples can be obtained without removing a full pipe length section of pipe, thereby
minimizing repair work.
♦ Most condition assessment tests can be conducted on cut-out samples.
F20.6 Limitations
♦ The sample obtained may not be representative of the condition along the pipeline
entire pipe.
♦ Pipes must be taken out of service and pressure pipes emptied to allow sampling.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-57
Table F-22. Summary Cut-out Sampling.
Criteria Assessment
Technical Assets covered Pipes.
selection Material type All.
Service area Generally potable.
Access requirements Access to pipe surface is required. Pipeline to
be depressurized.
Limitations relating to asset condition None.
Limitations relating to asset size/geometry None.
Continuous/discrete Discrete.
Destructive/non destructive Sampling technique, which requires repair work
to be conducted. Destructive.
Interruption to supply/function Pipes must be taken off-line.
Technical Assessment parameters N/A
suitability Integration with software tools None.
Commercialization of tool N/A
Previous/existing use of the tool in sector Technique has been widely used in industry.
Accuracy/reliability Direct measurement.
Ease of validation of results N/A
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); Sample as required for conducting pipe repairs.
usability
Technology required (level of tool Low.
sophistication)
Documentation N/A
Availability of technical support N/A
Economic factors Cost per inspection Varies dependant on location, size, type, etc.
Resource requirements Crew as required for conducting pipe repairs.
F-58
F21.0 Drop Test
F21.1 Overview
Water loss control programs are widely used throughout the water industry (see Leak
Detection review). Drop tests are a simple non-destructive method for identifying areas of a
network containing significant leakage.
A drop test can be undertaken for individual pipelines both new (at the time of
installation) and old, small pipe network areas and larger areas. Drop tests work by isolating
the area of interest and observing either the level of water in a reservoir or water pressure. Loss
of water head/height (beyond normal use if all connections cannot be closed) indicates that
either the pipe(s) or valve(s) are leaking. Similar testing has also been used to measure
exfiltration in sewers.
Leak detection gives both an indication of condition and performance of the asset,
depending upon the amount of leakage on a section of pipe. However, it does not give detail
regarding the overall condition of the pipe.
F21.3 Application
Drop tests are generally applied to detect leakage in large diameter transmission mains,
or area of a network. They can also be applied to sewerage assets to assess exfiltration.
♦ There are no known Standards which reference drop testing.
♦ Practical considerations
♦ As a general approach to assessing water tightness, drop testing can be undertaken by
any utility. The simple nature of the test has let it to be widely used in the water and
other industry sectors. It has been used in the U.K. water sector as a low technology
approach to assessing leaks in transmission mains. It has also been used in research to
assess the level of exfiltration from sewers.
♦ The accuracy of drop testing is limited by the type of method used to assess leakage
(level or pressure drop) and the size of the area being tested.
♦ Advantages
♦ Low tech approach for assessing leakage within pipelines. This technique can also be
applied to pipe sections.
♦ The drop test can be used to gain a quantitative measure of leakage for a pipe or area of
the network.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-59
F21.4 Limitations
♦ The time involved in isolating pipe sections and monitoring the reservoir makes this
method impractical except on an annual basis.
♦ Only the presence of leaks is indicated, no indication is given of location. Leaks can be
associated with the down stream valve.
♦ The drop test requires assets to be taken off-line.
♦ The test does not give detail regarding the overall condition of the pipe.
F-60
F22.0 Ductor (Micro Ohm Resistance) Testing
F22.1 Overview
The Ductor (proprietary name) test is a non-destructive assessment to determine the
contact resistance in draw–out contacts such as circuit breakers on high current devices and bus
bar interconnections located in electrical power distribution boards and switchboards. The test
is normally carried out by applying a high current across the device which is being assessed,
allowing the detection and isolation of a poor connection so that corrective action can be
undertaken.
F22.3 Application
The Ductor assessment method is commonly undertaken to determine the condition of
electrical circuit breakers contacts, switchgear contacts, cable joints and bus bars joints where
high currents are encountered. It is commonly used on new installations for initial verification
and benchmarking, followed by periodic tests.
♦ There is no specific standard for test method.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-61
♦ Access to epoxy resin filled cable joints is not possible. The equipment to be tested
must be electrically isolated and accessible.
♦ A higher test voltage than that specified above is not required nor is it desired. Higher
voltages can break down the joint resistance.
F22.5 Advantages
♦ Ductor test assessments are sensitive and provide measurements of micro Ohms (µΩ).
F22.6 Limitations
♦ Prior to undertaking Ductor testing, the equipment being assessed must be isolated.
♦ Previous test results are required to assess the current condition of the asset.
F22.7 Bibliography
1. T&R test equipment, http://www.trtest.com, accessed 2006.
10H
F-62
F23.0 Electrical Potential (Half Cell) Measurement of Concrete Reinforcement
F23.1 Overview of Tool
Electrical potential measurement is a non-destructive technique that can be used to
identify areas of reinforced concrete in need of repair or protective treatment before corrosion
causes cracking and spalling. It does this by measuring the electrical potential between the
reinforcing and a reference electrode at the surface. By taking regular measurements, the
behavior of new and relatively new structures can be monitored and maintenance costs
minimized.
F23.3 Application
Electrical potential measurement is used to assess the corrosion potential of steel
reinforcement in civil concrete assets.
♦ ASTM Standard C876 provides general guidelines for evaluating corrosion in concrete
structures. Electrical potential measurement is also referenced in BS 1881: Part 201.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-63
♦ Many different electrode configurations have been tried in practice and several of these
have been found to have advantages over standard arrangements.
♦ Surfaces in excess of 4000m2 can be measured.
♦ The reinforcement at the point of measurement has to be electrically connected to the
millivoltmeter for reliable results to be obtained. If multiple sheets of reinforcement
were used and not electrically connected a point of contact must be made to each sheet.
♦ Electrical potential measurement equipment typically readily portable and consists of
electrode rods or wheel, connecting cables and display unit.
F23.5 Advantages
♦ Electrical potential measurement is a safe, rapid, cost-effective and non-destructive
method of condition assessment, which offers key information on the evaluation of
corrosion.
♦ It is the simplest way to assess the severity of steel corrosion, as it measures corrosion
potential, which is qualitatively associated with steel corrosion rate.
♦ Confidence in electrical potential measurement as an indication of corrosion potential
has developed greatly as a result of bridge deck corrosion surveys. An indication of the
relative probability of corrosion activity was empirically obtained through
measurements during the 1970s.
♦ According to the ASTM C876 method, corrosion can only be identified with 95%
certainty at potentials more negative than -350 mV. However experience has shown
that passive structures tend to show values more positive than -200 mV and often
positive potentials. Potentials more negative than -200 mV may be an indicator of the
onset of corrosion. The patterns formed by contours on graphical representations of
corrosion can often be a better guide than single potential readings in these cases.
F23.6 Limitations
♦ Electrical potential measurement does not directly indicate the rate of corrosion. There
are difficulties associated with making reliable quantitative measurements. The factors
influencing the electrical potential measurements are affected by the resistivity of the
concrete and the pH of the pore solution (carbonation). It could be necessary to use a
statistical analysis of measurements on individual structures to establish areas where
corrosion of reinforcement occurs.
♦ Several factors can alter the precision of potentials measured:
− Concrete cover depth
− Concrete resistivity
− High resistive surface layers
− Polarization effects
− Organic coatings and sealers
− Concrete patch repair
− Epoxy coated and galvanized reinforcement
− Use of corrosion inhibitors
− Chloride ion concentration
− Carbonation
− Oxygen concentration
F-64
♦ These factors influence electrical potential readings because when surface potentials are
taken they are measured remotely from the reinforcement due to the concrete cover.
The potentials measured are therefore affected by the potential drop over the distance
between the reinforcement and the electrode.
♦ Electrical potential measurement cannot be used on structures with active cathodic
protection systems. An energized cathodic protection system and stray current will
make electrical potential measurements meaningless.
♦ Electrical potential measurement should never be used in isolation. It should be
combined with the measurement of the chloride content of the concrete and its variation
with depth and also the cover to the steel and the depth of carbonation.
Table F-25. Summary Electrical Potential (Half Cell) Measurement of Concrete Reinforcement.
Criteria Assessment
Technical Assets covered All reinforced concrete assets.
selection Material type Reinforced concrete.
Service area Potable and wastewater.
Access requirements Direct contact with asset. If asset is buried then it
must be exposed, surface coatings do not need
to be removed.
Limitations relating to asset condition No limitations relating to asset condition.
Limitations relating to asset size/geometry No limitations relating directly to geometry.
There are limitations relating thickness of
concrete. With increasing concrete cover, the
potential values at the concrete surface over
actively corroding and passive steel become
similar. Thus the location of small corroding
areas becomes increasingly difficult.
Continuous/discrete Continuous readings in time and space.
Destructive/non destructive Non-destructive.
Interruption to supply/function The asset can remain in use and does not need
to be taken off-line unless an internal surface is
required to be accessed.
Technical Assessment parameters Detection of corrosion.
suitability Integration with software tools Can be integrated with software tools to produce
potential mapping: equipotential lines that allow
the location of the most corroding zones at the
most negative values.
Commercialization of tool Equipment is widely available from selected
commercial vendors.
Previous/existing use of the tool in sector Widespread use on bridge deck corrosion
surveys. Use increasing in the water sector,
gradually becoming acceptable to stakeholders.
Accuracy/reliability Corrosion can be identified with 95% certainty at
potentials more negative than -350 mV.
Ease of validation of results For validation purposes, electrical potential
measurement can be combined with the
measurement of the chloride content of the
concrete and its variation with depth and also the
cover to the steel and the depth of carbonation.
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); usability Easy to use by following simple procedure.
Measurements can be taken by unqualified staff.
Technology required (level of tool sophistication) Sophisticated digital tools. For many tools,
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-65
Criteria Assessment
measurements are automatically converted and
displayed as equipotential lines that allow the
location of the most corroding zones at the most
negative values potentials.
Documentation ASTM C876 and BS 1881:Part 201.
Availability of technical support Technical support widely available from
distributors.
Economic Cost per inspection Low cost per inspection.
factors Resource requirements One operator required. Battery powered.
Resources required can also depend on asset
being inspected. Buried assets need to be
exposed.
F23.7 Bibliography
1. Gu, P. and Beaudoin, J., Obtaining Effective Half-Cell Potential Measurements in
Reinforced Concrete Structures, Construction Technology Update No. 18, pp1-3, July
12H
1998.
2. Naumann, J. and Haardt, P. NDT Methods for the inspection of highway structures’.
International Symposium (NDT-CE 2003). Non-Destructive Testing in Civil Engineering,
pp2-5, 2003.
3. Torrent, R. and Frenzer, G. A method for the rapid determination of the coefficient of
permeability of the “Covercrete”. International Symposium Non-Destructive Testing in
Civil Engineering (NDT-CE). pp985-992, 26-28.09.1995.
4. ASTM Standard C876 provides general guidelines for evaluating corrosion in concrete
structures.
5. BS1881-201:1986 Testing concrete. Guide to the use of non-destructive methods of test for
hardened concrete.
6. Technical brochures produced by MG Associates Construction Consultancy Ltd, 2006.
F-66
F24.0 FailNet-Reliab
F24.1 Overview
FailNet-Reliab is a hydraulic reliability model for water pipelines developed by the
French research organization Cemagref. The approach is based on a hydraulic model (see
Hydraulic Modeling review) of the network coupled with reliability analysis. The output is an
assessment of the networks hydraulic performance expressed in terms of the ability to meet
demand.
F24.3 Application
FailNet-Reliab is used to assess the reliability for water supply networks utilizing
hydraulic models and failure probability estimates. This allows the reliability of a network to
be improved by modeling to compare different asset management strategies.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-67
♦ The software was to be reprogrammed in 2006/2007 to support all hydraulic features
and to improve functionality.
F24.5 Advantages
♦ Provides engineers with a different view of the networks hydraulic performance by
factoring in reliability indices into the modeling process.
F24.6 Limitations
♦ Has only had limited use in France and with research groups.
♦ FailNet-Reliab requires additional information such as failure probability and mean
repair time to gain the full benefit from the package, and these have to be
developed/determined separately.
♦ Some hydraulic features are not supported and may need to be replaced by equivalent
sources/demands.
F24.7 Bibliography
1. Stone, S., Dzuray, E. J., Meisegeier, D., Dahlborg, A-S., and Erickson, M. Decision-
Support Tools for Predicting the Performance of Water Distribution and Wastewater
Collection Systems, EPA, EPA/600/R-02/029, 2002.
F-68
F25.0 FailNet-Stat
F25.1 Overview
FailNet-Stat is a failure forecasting model for water pipelines developed by the French
research organization Cemagref. The approach uses historical data to define survival functions
that are then used in Monte-Carlo analysis to forecast the number of failures within pipe
cohorts.
F25.3 Application
FailNet-Stat is designed to allow water authorities to establish failure probabilities for
the various pipe materials in their water distribution system.
F25.5 Advantages
♦ FailNet-Stat enables reliable failure probabilities to be established for a utility’s water
network (at individual pipe level), which can then be used to more effectively manage
the network and undertake additional analysis functions such as reliability analysis, etc.
F25.6 Limitations
♦ FailNet-Stat has only had limited use in Europe and with research groups. It requires
good asset and failure data. Over-estimation of failure rates for individual pipes is
common if the failure observation period is short. However, the relative failure risk is
considered to be more accurate.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-69
Table F-27. Summary FailNet-Stat.
Criteria Assessment
Technical Assets covered Water pipes.
selection Granularity System and sub system level.
Service areas Potable
Technical Focus of analysis Failure forecasting model for water pipelines.
suitability Scalability of tool/approach Better suited to medium to large authorities
where good data is available.
Commercialization Software available from Cemagref, France. Is
not full commercial version.
Previous/existing use of the tool Only limited use in Europe and with research
groups.
Ease of validation Statistical validation.
Flexibility with regard to analysis (asset types) and Potable only; system or sub system level.
granularity (system, asset level)
Integration with other tools/GIS Through CARE-W Manager.
Utility technical Asset management sophistication Aimed at higher level of asset management.
capacity In-house skills required Asset manager/engineer.
Technology required PC based tool.
Documentation Only limited documentation available.
Data Requirements Good asset and failure data is required.
Linking to asset data Pipe ID.
Availability of software and technical support Software available from Cemagref, France.
Usability Not fully commercialized
F25.7 Bibliography
1. Stone, S., Dzuray, E. J., Meisegeier, D., Dahlborg, A-S., and Erickson, M. Decision-
Support Tools for Predicting the Performance of Water Distribution and Wastewater
Collection Systems, EPA, EPA/600/R-02/029, 2002.
F-70
F26.0 Fiberscope Inspection
F26.1 Overview
Fiberscope inspection works similar to CCTV inspection (see CCTC Visual Inspection
review) but relies on optical fibers to gather images, which can be observed using an eyepiece.
This technique can be used to inspect small diameter pipes and valves. One important feature is
that fiberscope allows internal inspection of charged water mains. Fiberscopes are generally
used to visually inspect a main for corrosion or sediment build-up. A camera can be attached to
the eye piece of the fiberscope to record the inspection.
F26.3 Application
Fiberscope inspection is suitable for capturing visual images of the internal surface of
water mains, primarily small diameter mains, and can be used to assess the condition of
internal linings, the build up of corrosion products, and other features of interest. This
technique can also be used for in-service inspection of valves.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-71
F26.5 Advantages
♦ Internal condition of water main assets can be inspected without exhumation.
♦ Tool allows for in service inspection of valves.
♦ Inspection can be conducted in charged mains; however the actual pressure allowable is
dependant on the pressure rating of the product.
F26.6 Limitations
♦ Particulate matter in mains reduces visibility, potentially to a level that no useful
information can be obtained.
♦ The limited observations achievable may not be representative of the rest of the pipe.
♦ Maximum size of main that can be inspected is limited by the intensity of the available
light source.
♦ Flow in charged mains can affect the controllability of the tool.
F-72
F26.7 Bibliography
1. Dorn, R., Howsam, P., Hyde, R.A. and Jarvis, M.A., Water mains: Guidance on
assessment and inspection techniques, CIRIA Report 162, Construction Industry Research
and Information Association, London, England, 1996.
2. Randall-Smith, M., Russell, A. and Oliphant, R., Guidance manual for the structural
condition assessment of trunk mains, WRc, UK, 1992.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-73
F27.0 Fracture Toughness (C-Ring) Testing
F27.1 Overview
Fracture toughness testing gives an indication of the materials resistance to fracture
failure. Many standards require PVC pipes to achieve a minimum “short term” fracture
toughness value.
Fracture toughness testing is a destructive test where a specimen is statically loaded and
the time to failure measured. It is generally used for quality control testing, but it could be
applied to the testing of samples taken from in service PVC pipes. Fracture toughness can be
measured on many materials, including steel. However, this review focuses on the fracture
toughness testing of PVC used for pressure pipe.
F-74
F27.3 Application
C-ring fracture toughness testing is used to determine if a section of PVC pressure pipe
exceeds a minimum fracture toughness set by the relevant standard or water utility (user).
♦ Standards which describe this test are as follows: ISO 11673, AS/NZS 1462.19:2006.
F27.5 Advantages
♦ This test gives an indication of the pipe susceptibility to fracture failure.
♦ The test can be extended to obtain information about the probable lifetime of a pipe
section.
F27.6 Limitations
♦ The test is destructive and requires exhumation of pipe samples.
♦ The test is subject to variation, so a number of tests may need to be performed.
♦ The test must be conducted at the location of lowest gelation.
♦ The test only relates to the toughness properties of the material and not its susceptibility
to failure due to point loading.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-75
Criteria Assessment
Technology required (level of tool sophistication) Test requires specialized notching tool.
Documentation ISO 11673, AS/NZS 1462.19:2006.
Availability of technical support Test can be conducted by test houses if
required.
Economic factors Cost per inspection Low cost. Cost will vary depending on the time
taken to complete testing.
Resource requirements Test requires a stable temperature environment
and equipment to measure time to failure.
F-76
F28.0 Ground Penetrating Radar (GPR)
F28.1 Overview
Ground Penetrating Radar (GPR) is a technique for acquiring subsurface information.
GPR works by emitting short bursts of electromagnetic radiation into the ground and recording
the radiation reflected to locate buried assets of any material.
The amplitude of each emitted pulse received by the GPR unit is recorded on a time
scale (distance if wave velocity is known) giving a vertical plot for each pulse (called a trace).
As the unit is moved along the ground, a series of traces are taken and colors or grey scale
allocated to the amplitudes of each. The ‘colored’ traces are then placed along a distance scale
and the 2D profile created (Ground Penetrating Radar, 2005).
The depth to which assets can be located is dependant on soil type and the size of the
asset. The location of assets is achieved quickly in the field, though accurate interpretation of
the results requires a skilled operator.
F28.3 Application
GPR can be used to locate buried assets of any material type, but because of its cost,
complexity, and limitations, GPR is usually the method of choice only for targets not locatable
by other means, such as plastic or clay pipe.
♦ ASTM D6432-99 Standard Guide for Using the Surface Ground Penetrating Radar
Method for Subsurface Investigation
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-77
F28.4 Practical Considerations
♦ GPR units are available from a number of suppliers world wide. A trained operator is
required to use the device effectively.
♦ The depth accuracy of GPR assessments is influenced by the knowledge of wave pulse
velocity in the soil; where this is known, accuracy is quite high (usually within 10% of
total depth). Where wave pulse velocity is unknown or estimated the accuracy can vary
by a significant percentage of total depth. The horizontal accuracy is not affected by the
wave pulse velocity, thus the surface location of the asset can be found within inches
even though the depth may not be known with great accuracy.
♦ The repeatability of measurements is very high when there has been no change in soil
conditions; variations in soil conditions will affect the results due to the change in the
soil’s wave pulse velocity and signal attenuation. Exact depth calculation is dependant
on the quality of wave velocity information.
♦ The best results are achieved when the GPR unit is as close to the ground as possible,
as any air gap will reduce the penetration and can induce interference at ground level.
F28.5 Advantages
♦ GPR is quick and gives immediate results. Skilled operators can interpret data in the
field or can it can be post processed.
♦ Unlike other location techniques GPR is able to locate polymer and clay assets.
F28.6 Limitations
♦ Penetration into soils with high electrical conductivity, like mineralogical clays, can be
limited to less than one meter (Ground Penetrating Radar, 2005).
♦ The ability to detect an asset below the water table is reduced by signal loss due to
scattering at water table boundary and signal attenuation due to the high electrical
conductivity below the water table.
♦ Uneven ground may require the unit to be raised off the ground, reducing the
penetration depth and accuracy of the results.
♦ The equipment can be difficult to move on steep slopes.
♦ Skilled operators required for interpretation of data in the field.
F-78
Table F-30. Summary Ground Penetrating Radar (GPR).
Criteria Assessment
Technical Assets covered Environmental survey (buried assets).
selection Material type All materials.
Service area Potable and wastewater.
Access requirements GPR needs clear space at ground level, obstacles
and very uneven ground can prevent use.
Limitations relating to asset condition No restrictions.
Limitations relating to asset size/geometry Assets of any size can be located. However small
assets may be difficult to locate depending on their
depth and the wavelength used. Rule of thumb is
objects with a depth to size ratio of 12:1 to 24:1 are
usually detectable with GPR, providing the signal
can penetrate down to them before being
attenuated.
Continuous/discrete Discrete. GPR uses sets of readings over a short
distance gathered at a number of locations to locate
assets. More advanced systems can use sets of
images to create a 3D map of the subsurface.
Destructive/non destructive Non-destructive.
Interruption to supply/function Inspection does not cause an interruption to supply.
Technical Assessment parameters Location of buried assets.
suitability Integration with software tools Depending on the model used, GPR equipment can
be fed into computer programs to extract more data
from the results obtained.
Commercialization of tool Equipment is available from a number commercial
vendors.
Previous/existing use of the tool in sector GPR has been available for over 20 years, but has
begun to be adopted by the utility locating industry
only in the last 10 as more convenient, user friendly,
and economical units have become available.
Accuracy/reliability Quantitative, though the accuracy of depth
measurements is dependant on frequency and
knowledge of soil properties and so can vary by
several percent of depth. Claims on horizontal
readings accuracy vary from inches to a foot. Ability
to detect assets varies with material.
Ease of validation of results Results can be validated only through exposure of
the asset.
Utility Asset management sophistication required Generic.
technical Skills required (level of tool sophistication); usability Use of GPR requires a skilled operator to gather
capacity useful information.
Technology required (level of tool sophistication) Depending on the amount of data processing
desired, computing can be done onsite by the unit
or post processing can be done on to obtain more
information including 3D plots.
Documentation ASTM D6432-99.
Availability of technical support Training courses are offered by the equipment
manufacturers.
Economic Cost per inspection US$1,000 – $2,000 per day with a skilled operator.
factors Resource requirements GPR can be undertaken by a single person.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-79
F28.7 Bibliography
1. Burn, L.S., Eiswirth, M., DeSilva D. and Davis P., Condition Monitoring and its Role in
Asset Planning, Pipes Wagga Wagga 2001, Charles Sturt University, Wagga Wagga,
N.S.W., 2001.
2. Dingus, M., Haven, J. and Austin, R. Nondestructive None Invasive Assessment of
Underground Pipes, AwwaRF, USA, 2002.
3. Dolphin, L., A brief background on ground penetrating radars,
http://www.ldolphin.org/GPRbkgnd.html , accessed 2005.
13H
4. Eiswirth, M., Burn, L.S. New Methods for Defect Diagnosis of Water Pipelines, 4th
International Conference on Water Pipeline Systems, 28-30, York, UK, March 2001.
5. Ground Penetrating Radar, http://fate.clu-in.org/gpr_main.asp , accessed 2005.
14H
F-80
F29.0 Holiday Detector
F29.1 Overview of Tool
This is a non-destructive method used to detect flaws such as pin holes, air bubbles,
thin points and porosity in non-conductive (insulation type) coatings on conductive substrates
and on concrete (for some detectors).
The substrate of the asset being inspected is connected to a current and a conductive
brush is passed over the coating surface. Flaws are located when the brush moves over a flaw,
which completes the electrical circuit.
Holiday detectors are also commonly known as porosity detectors, spark testers or
jeepers.
F29.3 Application
Holiday detectors are useful for detection of flaws in coatings and wrappings on both
flat and curved surfaces, such as pipes, tanks, valves and steel structures.
♦ Holiday detectors are required to comply with the requirements of AS3894.1-2002.
They are also addressed in the National Association of Corrosion Engineers (NACE)
Standards: TM0186-94; TM0384-94; RP0490-2001; RP0274-98 & RP0188-99
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-81
Figure F-5. Defect Types Detectable by Holiday Testing
(Reprinted with permission from: Buckleys, 2006).
♦ A holiday detector should be used as soon as time and conditions permit after the
coating has been applied and properly cured and, if possible, again prior to final project
completion. When electrical inspection is conducted at the time of coating application,
voids in the coating can be readily located and repaired, plus, it allows the applicator
the opportunity to develop better coating application techniques.
♦ Electrical inspection prior to project completion is recommended as the protective
coating may have been damaged during construction.
♦ Proper grounding of the holiday detector to the coated concrete substrate is essential in
order to complete the electrical circuit of the holiday detector.
♦ Test voltage adjusted at the job site takes into consideration every aspect of the output
circuit in relation to; ground resistance, structure resistance, coating thickness,
capacitance losses, barometric pressure and electrode configuration.
♦ An alternative to setting test voltages in the field is to use the formula developed by the
NACE and incorporated into several standards. The formula for the voltage to be
applied to thin film coatings applied up to 30 mils (0.76 mm) thickness is V = 525 T ,
where T is the coating thickness in mils.
♦ Example: A coating 25 mils (0.64 mm) thick would work out to an inspection voltage
of 2600V. For thicker applied coating the constant changes to 1250. Example: a coating
125 mils (3.175 mm) thick would work out to an inspection voltage of 14,000V.
♦ Care needs to be taken to not exceed the coating manufacturer’s recommendations of
test voltages. Manufacturers of the protective coating should always be consulted by the
consumer with regards to dielectric strength of properly cured coatings and
recommendations of maximum test voltages to be used on every formulated coating.
♦ It is not recommended that electric pulse (low voltage) detectors be used for the
electrical testing of protective coating having a dry film thickness in excess of 0.51
mm.
♦ DC Pinhole/Holiday Detectors are far more efficient and accurate at finding pinholes,
in coatings than AC spark testers.
F29.5 Advantages
♦ Holiday detectors can be used to rapidly test the quality of a coating, including defects
that cannot be detected by visual inspection.
F29.6 Limitations
♦ Holiday detectors can only be used to find flaws in coatings whose substrate is made
from a conductive material such as metal and concrete.
F-82
♦ Pulse type detectors are completely ineffective for inspection of prefabricated films
such as PVC or polyethylene (PE) protective linings.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-83
Criteria Assessment
factors Resource requirements One operator required. Battery powered.
F29.7 Bibliography
1. Buckleys, A Guide to Using DC Holiday Detectors at
http://www.buckleys.co.uk/holidayguide.htm, accessed 2006.
16H
F-84
F30.0 Hydraulic Modeling
F30.1 Overview
Many commercially available software packages are available that model the hydraulic
behavior of pressure and gravity pipelines or networks. Hydraulic models are calibrated against
measured values of pressure and/or flow. Calibration is further fine tuned by adjusting
parameters like friction factors until the model reproduces the measured system response under
a range of conditions.
Once calibrated, the hydraulic model can be used to identify hydraulic issues within the
pipeline or network. When identified, asset inspection and other survey techniques can be used
to investigate further.
F30.3 Application
Hydraulic modeling is used for the analysis and design of pressure and gravity pipelines
and networks.
♦ There are no Standards which require the use of hydraulic models.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-85
♦ Costs of models vary dramatically, models such as EPANET (analysis only) and Netis
are free, while other commercial packages are costly. However, the commercial
packages come with more advanced features and better user interfaces than those freely
available.
♦ Models require good data to be effective and collecting and assembling the data can be
time consuming. In order to preserve their usefulness, the underlying input data must be
maintained.
♦ Model calibration through adjustment of friction factors gives some indication of the
pipe’s internal condition. Where issues relating to service are predicted, asset inspection
and other survey techniques can be used to investigate further.
F30.5 Advantages
♦ Hydraulic models relieve engineers from tedious, iterative calculations and are able to
take account of much more of the complexity of real world systems.
♦ Optimization tools/modules attached with the analysis module help in obtaining least
cost solutions.
♦ They enable alternatives to be explored under a wide range of conditions resulting in
more cost effective and robust interventions.
F30.6 Limitations
♦ Hydraulic modeling software can be expensive to purchase for small companies and
requires the training of staff to use the models.
♦ The majority of costs are mainly related to model development and the benefits are not
realized until later in the form of quicker calculations and better decisions.
♦ Some packages have limitations on the number of network nodes they are able to
handle, while others have limitations on their ability to link to a GIS system.
F-86
Criteria Assessment
Utility technical Asset management sophistication Generic approach.
capacity In-house skills required Asset manager/hydraulic engineer.
Technology required Computer based tool. Many systems link to GIS
data.
Documentation Depends on software being used. Most come
with detailed documentation.
Data Requirements Good quality asset data required, calibration
data is necessary.
Linking to asset data Through asset IDs.
Availability of software and technical support Widely available through many vendors. Some
models can be freely downloaded from the
Internet.
Usability Depends on software. Most systems have an
graphical user interface (GUI) that greatly
improves the usability of the model.
Other IT integration PC based software.
Tools costs (license and maintenance) Varies depending on package. Some models
are free, while some commercial packages are
thousands of dollars. Many also have an annual
license fee.
F30.7 Bibliography
1. Dorn, R., Howsam, P., Hyde, R.A. and Jarvis, M.A. Water mains: Guidance on assessment
and inspection techniques, CIRIA Report 162, Construction Industry Research and
Information Association, London, England, 1996.
2. EPANET, http://www.epa.gov/ORD/NRMRL/wswrd/epanet.html, accessed 2005.
18H
4. Stone, S., Dzuray, E. J., Meisegeier, D., Dahlborg, A-S., and Erickson, M. Decision-
Support Tools for Predicting the Performance of Water Distribution and Wastewater
Collection Systems, EPA, EPA/600/R-02/029, 2002.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-87
F31.0 Impact Echo Testing
F31.1 Overview
The impact echo testing method is a non-destructive method primarily used for
assessment of concrete assets. However, impact echo testing can also be performed on stone,
plastic, masonry materials, wood and some ceramics. Application suitability depends on the
properties and internal structure of the material being tested. Testing is conducted by impacting
the asset surface, recording the signal reflected back to a transducer and analyzing that signal.
Impact echo tests are most often used to find the thickness of plate-like concrete
elements from one side. Another major use is for locating and diagnosing internal flaws such
as voids, honeycombing, delaminating, depth of surface opening cracks, and other damage in
concrete.
If the member thickness is known, impact echo testing can also be performed to predict
the strength of early age concrete. Impact echo testing can also be used to determine relative
concrete quality for test cylinders and other samples with known thickness. This is achieved by
measuring the concrete compression wave velocity.
F-88
Specialist software allows the data acquisition parameters to be set up and performs the
data analysis.
F31.3 Applications
The impact echo technique is most extensively used on flat areas but can also be used
for tests on other geometries. Impact echo testing can be used, but is not limited to, the
following asset types:
♦ Concrete slabs, pavements
♦ Concrete slabs consisting of two layers, including slabs with asphalt overlays
♦ Bond quality at internal interfaces
♦ Circular columns
♦ Square and rectangular beams and columns
♦ Walls
♦ Dams
♦ Hollow cylinders such as pipes and tunnels
♦ Post-tensioned structures for instance locating voids in grouted tendon ducts
♦ Depth of surface-opening cracks
In 1998, ASTM adopted a standard test method on using the Impact echo testing
method to measure the thickness of concrete members:
♦ ASTM C 1383 ‘Standard Test Method for Measuring the P-wave Speed and Thickness
of Concrete Plates Using the Impact echo testing Method’.
The standard test method involves two procedures. The first procedure determines the
P-wave speed in the concrete by measuring the travel time between two surface receivers
separated by a known distance. The second procedure measures the thickness using impact
echo testing. The method is applicable to plate-like structures in which the smallest lateral
dimension is at least six times the thickness of the member.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-89
order to enable Spectral Analysis of Surface Wave (SASW) testing. This second
receiving transducer is often mounted on a detachable arm. In combination with the
impact echo technique, SASW can be used for correlating strength vs. velocity in the
field to laboratory tests of concrete specimens (cubes, beams or cylinders). SASW can
also be combined with ultrasonic pulse velocity measurements for this purpose. The
combination of impact echo thickness and internal flaw detection with SASW velocity
measurement results in the most powerful and accurate way of determining the location
and nature of defects.
♦ An underwater impact echo testing apparatus for point by point testing is also available.
F31.5 Advantages
♦ Impact echo testing measures the thickness of concrete slabs and walls without the need
for drilling, coring, or other destructive means.
♦ Only one side of the structure needs to be accessible for testing.
♦ The impact echo testing method can be used on existing coated structures. It works
through paints, coatings and tiles.
♦ Additional analysis of the echo data allows multiple cracks and other complex internal
flaws to be detected.
F31.6 Limitations
♦ Impact echo testing is restricted in terms of the thickness and geometry of elements to
be measured. The minimum thickness of concrete which can be tested is 38mm.
♦ Naumann and Haardt (2003) argue that there is a need for improved quantification of
capabilities for measuring thickness, mapping or sizing layers of reinforcement,
detecting and mapping of delaminations and cracks parallel to the surface for the
impact echo method. This is especially the case where there is reinforcement
congestion.
F-90
Criteria Assessment
Technical Assessment parameters Thickness of concrete element, location and
suitability diagnosis of internal flaws, strength of early age
concrete, and relative concrete quality.
Integration with software tools Can be integrated with software tools.
Commercialization of tool Equipment is available from selected
commercial vendors.
Previous/existing use of the tool in sector Widespread use.
Accuracy/reliability Accuracy is typically + 2% at high resolution
when calibrated on a known thickness location.
Ease of validation of results Results can be easily validated. For instance
Spectral Analysis of Surface Wave testing
(where a second receiving transducer is added
when conducting echo impact testing) can be
combined with ultrasonic pulse velocity
measurements for determining concrete
strength.
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); usability Easy to use by following simple procedure.
Thickness measurements can be taken by
unqualified staff. However experienced persons
are required to check for flaws such as
delaminations.
Technology required (level of tool sophistication) Apparatus comes in digital versions which
calculate and display a graph concrete
thickness along the member length. Thickness
data table importable into popular spreadsheet
programs. The data from up to 300 tests can be
stored and downloaded. Some tools have a
super thin concrete and surface wave analysis
options built in. Velocity calibration at known
thickness locations.
Documentation ASTM C 1383.
Availability of technical support Technical support available from distributors.
Economic Cost per inspection Low cost per inspection.
factors Resource requirements One operator required. Battery powered.
Resources required can also depend on asset
being inspected. Buried assets need to be
exposed.
F31.7 Bibliography
1. Naumann, J. and Haardt, P. NDT Methods for the inspection of highway structures.
International Symposium (NDT-CE 2003). Non-Destructive Testing in Civil Engineering,
pp2-5, 2003.
2. ASTM C 1383 ‘Standard Test Method for Measuring the P-wave Speed and Thickness of
Concrete Plates Using the Impact echo testing Method’.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-91
F32.0 Indirect Tensile Strength Testing
F32.1 Overview
The tensile strength of cylindrical cores (see Core/Coupon Sampling review) taken
from concrete or asbestos cement pipes is used as a measure of the residual tensile strength of
the pipe. Once extracted, the cores are compressed to failure. The compressive stress at failure
can be used to indirectly obtain the residual tensile strength of the pipe from which the core
was taken.
The testing of the cores is itself destructive. Since only cores are taken, the pipe itself
must be repaired. If only one core is extracted, the pipe can be clamped. However, a common
practice is to remove a section of pipe from which multiple cores are then taken. In this case,
the pipe section must be replaced.
F32.3 Application
Indirect tensile strength testing is a method for obtaining the residual tensile strength of
cementituous pipes in water and wastewater networks. The test procedure for this tool is based
on the following standard;
♦ AS 1012.10 – 2000 “Determination of indirect tensile strength of concrete cylinders
(‘Brazil’ or split test) and ASTM C-496-96 “Standard Test Method for Splitting Tensile
Strength of Cylindrical Concrete Specimens”
F32.5 Advantages
• Tool can be used to predict the remaining life of a cementituous pipe asset.
F32.6 Limitations
♦ This is a new test that is not widely used. The pipe must be exhumed for removal of test
sample, and the pipe repaired or pipe section replaced.
♦ Testing of asbestos cement pipe samples is subject to health and safety considerations.
F-92
Table F-34. Summary Indirect Tensile Strength Testing.
Criteria Assessment
Technical Assets covered Pipe.
selection Material type Asbestos cement, concrete.
Service area Potable and wastewater.
Access requirements Need access to pipe surface to remove core
sample.
Limitations relating to asset condition No restrictions due to asset condition, pipe
lining /coatings need to be removed prior to
testing.
Limitations relating to asset size/geometry No restriction.
Continuous/discrete Discrete.
Destructive/non destructive Destructive.
Interruption to supply/function Pipe must be taken off-line to extract core
sample.
Technical Assessment parameters Tensile strength.
suitability Integration with software tools None.
Commercialization of tool Technique is new and only provided by
specialized consulting groups.
Previous/existing use of the tool in sector Limited; utilized in condition assessment of
several AC wastewater pressure mains.
Accuracy/reliability Quantitative.
Ease of validation of results Direct measurement.
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); usability Service is provided by specialized consulting
groups.
Technology required (level of tool sophistication) Low tech.
Documentation AS 1012.10 – 2000 and ASTM C-496-96.
Availability of technical support Service is provided by specialized consulting
groups.
Economic factors Cost per inspection Depends on level of analysis required.
Resource requirements Personnel and equipment required to remove
cores. Test and lab equipment.
F32.7 Bibliography
1. Davis, P., De Silva, D., Gould, S. & Burn, L.S. Condition assessment and failure
prediction for asbestos cement sewer mains, presented to Pipes Wagga Wagga 2005 Conf.,
Charles Sturt University, Wagga Wagga, NSW, Australia, 17–20 October, 2005.
2. AS 1012.10 – 2000 “Determination of indirect tensile strength of concrete cylinders
(‘Brazil’ or split test).
3. ASTM C-496-96 “Standard Test Method for Splitting Tensile Strength of Cylindrical
Concrete Specimens”.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-93
F33.0 Infiltration and Inflow – Sewer Flow Survey
F33.1 Overview
Sewers flow surveys are often used to calibrate hydraulic models (see Hydraulic
Modeling review), but they can also be used to determine where infiltration of groundwater or
inflow of water (other than infiltrated groundwater such as rain water) into the system is a
problem. Specialized flow surveys can be used to locate the areas of the system where the
flows originate and estimate their magnitude.
The aim of a flow survey is to obtain actual flows in the sewer system during both dry
and wet weather conditions. A calibrated hydraulic model can also be used to analyze scenarios
for reducing infiltration through various interventions.
F33.3 Application
I&I sewer flow surveys are used to obtain a better understanding of I&I issues in
wastewater networks. There are no Standards which require the use of I&I flow surveys
F-94
F33.5 Advantages
♦ I&I flow surveys allow the detection of excessive flows and the targeting of capital
investment to solve operational issues in sewer networks and treatment plants.
♦ Identification of I&I problems can allow for rehabilitation and/or replacement to reduce
the stress of pipe systems and treatment plants.
F33.6 Limitations
♦ Identification of the problem through flow surveys and analysis does not necessarily
lead to solutions.
♦ Reduction in I&I though capital investment in sewerage infrastructure has a variable
impact.
♦ Other interventions and drivers need to be considered in conjunction with the results of
I&I studies.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-95
F33.7 Bibliography
1. Vass, R. Pugh, A, Inflow and Infiltration Study, Ozwater 2003, Proceedings AWA 20th
Convention, Perth, April 2003.
2. Ellis, J. B Sewer inflitration/exfiltration and interactions with sewer flows and groundwater
quality. 2nd International Conference Interactions between sewers, treatment plants and
receiving waters in urban areas – Interurba II 19-22 Feb. 2001, Lisbon, Portugal, 311-319,
2001.
3. Joannis, C., Commaille, J-F and Dupasquier, B. Assessing infiltration flow-rates into
sewers, Proceedings 9th ICUD, Global Solutions for Urban Drainage, Portland, USA, 2003.
4. Berthier, E., Andrieu, H, Fasquel, M and Creutin, J-D. Generation of flows in urban
stormwater drainage systems: The role of soil, 2001
http://www.lcpc.fr/en/sources/blpc/pdf/bl231-079-en.pdf.
20H
F-96
F34.0 In-Pipe Acoustic Inspection Tools (Sonar)
F34.1 Overview
CCTV inspection is the industry standard technology for measuring the internal
condition of sewers and stormwater pipes. However, this technique is limited in that it only
allows inspection above the flow line – interpretable CCTV images can not be obtained below
the flow line due to the turbidity of sewage (see CCTV Visual Inspection review).
An alternative technique, sonar, also provides pictorial evidence of sewer condition.
Unlike CCTV, sonar can be used in full sewers, or to inspect the sewer beneath the flow line.
Sonar can also be used to give an image of the sewer above the flow line. However, different
transducers and electronics are required for operation in air and water. As such, sonar suitable
for below the flow line can not give an image of the sewer above the flow and vice versa.
During the survey, a sonar head is introduced into the sewer on a suitable module (a
tractor, crawler, float, etc.). The head transmits ultrasonic signals that are reflected from the
surface of the sewer; the reflected signals are detected by the head. The time delay associated
with the reflected signal is used to generate a profile of the pipe surface.
Sonar can generate a real time 360-degree outline of the interior of a full pipe, or the
outline of the wetted area in a partially full pipe (or the non-wetted area for air sonar).
In the case of a partially full pipe, sonar can be used in conjunction with CCTV to
allow inspection of the entire sewer, with sonar being used to provide information about the
sewer condition below the flow line.
Sonar inspection has been utilized mainly in sewer pipelines. In water mains, the
resolution of the inspection technique is not sufficient to detect small defects that are
significant in pressure applications. Furthermore, other competing inspection technologies
(including leakage detection) can provide the required information. Nevertheless, the principle
of sonar inspection can still be used to measure the distance to the pipe wall.
Acoustic systems for flaw detection are also available that are based on detecting
vibrations and other phenomena caused by the spreading of mechanical sound waves, and are
suitable for detecting cracks and for determining the state of connections and pipe bedding.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-97
as the pipe wall, displaced bricks and silt/growths to be identified. Results can be recorded on
video or digitally.
When used in conjunction with CCTV equipment, the sonar tool is suspended in the
sewage below the rig. CCTV images are taken of the sewer above the flow line, and sonar
allows inspection below the flow line.
In some applications (for example, inspection of furnace tubes), this technology is used
to give a measure of both the internal pipe geometry and the thickness of the wall. Thickness
measurement is achieved because, on arrival at the tubing wall a portion of the sound pulse
energy reflects back towards the transducer, while a fraction of the energy propagates into the
steel tube wall. At the outer tube surface a similar reflection occurs, sending energy back in the
direction of the inner wall and transducer.
On-board digital signal processing of the returned echoes determines the ‘time of flight’
in the tubing wall. The time between the transmission and reception of the acoustic signals are
then used to compute the tubing wall thickness and radial measurement based on the known
acoustic propagation properties of the tubing material.
F34.3 Application
The primary use for sonar equipment is to inspect and assess the structural condition of
otherwise inaccessible or flooded sections of large diameter sewers. The technology is applied
to inspection of pipes in the process industry and could be adopted for inspection of water
mains, though competing technologies are available for this application.
Acoustic systems based on detecting vibrations and other phenomena caused by
mechanical sound waves, are suitable for detecting cracks as well as for determining the state
of connections and pipe bedding.
F-98
and transducers are needed. It records only the part of the pipe that is above water, or
the part that is below water level.
♦ Studies in the United States showed that air sonar used for measurement above the flow
line was not sufficiently accurate over the larger distances involved in 3.6 m diameter
pipes to allow valid condition assessment.
F34.5 Advantages
♦ Sonar provides a convenient way to measure the cross-sectional area of a sewer.
♦ Sonar can be used to inspect and assess the structural condition of otherwise
inaccessible or flooded sections of large diameter sewers.
♦ Sonar allows inspection of the portion of the sewer below the flow line. When
combined with CCTV, sonar allows an inspection of the entire sewer, with sonar
providing images below the flow line.
F34.6 Limitations
♦ The technique requires specially trained personal to undertake the inspection and
interpret the results.
♦ Sonar can not be operated in air and water simultaneously, as different transducers and
electronics are required.
♦ Sonar is a more specialized service than CCTV, with less service providers.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-99
F34.7 Bibliography
1. ASCE, Sanitary Sewer Overflow Solutions, American Society of Civil Engineers, EPA
Cooperative Agreement CP-828955-01-0, April 2004.
2. McDonald, S.E.; Zhao, J.Q. Condition assessment and rehabilitation of large sewers,
National Research Council of Canada, Institute for Research in Construction, NRCC-
44696, 2001 (downloaded from www.nrc.ca/irc/ircpubs).
21H
3. Ratliff, A., An overview of current and developing technologies for pipe condition
assessment, ASCE 2004.
4. Zhao, J. Q. Trunk Sewers in Canada, APWA International Public Works Congress
NRCC/CPWA Seminar Series “Innovations in Urban Infrastructure,” 1998.
F-100
F35.0 In-Pipe Hydrophones
F35.1 Overview
Water loss control programs are widely used throughout the water industry and a major
phase of these programs is leak detection. Leak detection is used to determine the exact
location of a leak. Repair of the leak saves revenue and conserves water and energy.
To locate a leak precisely, a hydrophone can be inserted directly into a pipe. Leaks are
identified by the noise they create. Once a leak is identified, it can be located by moving the
hydrophone to the position where the noise is clearest, then determining the location of the
hydrophone at this point.
F35.3 Application
Hydrophones are used for the detection of leaks in water distribution and transmission
pipelines. Research has also been undertaken into the use of the technology for pressurized
sewers (force mains).
♦ There are no a standards for In-Pipe Hydrophone use.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-101
F35.5 Advantages
♦ As an in-pipe technique, factors like pipe material and diameter do not influence the
detection of leaks, as they do in on-pipe techniques (see Leakage Detection).
♦ Tethered hydrophone technology can be used to accurately pinpoint leaks.
♦ Non-tethered systems can survey a large length of pipe than tethered systems in each
use.
F35.6 Limitations
♦ The Sahara technology is relatively expensive, so other techniques and equipment
should be used to target and prioritize area to identify where it would be most useful.
♦ Tethered hydrophones can become fouled in valves and have limited range, and require
a minimum flow rate to pull them along the main.
♦ There is a risk of losing free swimming hydrophones.
F35.7 Bibliography
1. Burn, L.S., DeSilva, D., Eiswirth, M., Hunaidi, O., Speers, A. and Thornton, J. Pipe
Leakage – Future Challenges & Solutions, Pipes Wagga Wagga, 1999.
2. Chastain-Howley, A Transmission Main Leakage: How to reduce the risk of a catastrophic
failure, Leakage 2005 - Conference Proceedings, 2005.
F-102
3. Sahara homepage, http://www.wrcplc.co.uk/sahara/, accessed 2006.
2H
F36.3 Application
Electrical insulation testing is a commonly used and recognized technique for assessing
electrical circuits and equipment insulation performance in motor windings, cables,
switchboards and motor control centers.
♦ Insulation testing is referred to in AS/NZS 3000-2000.
F36.5 Advantages
♦ Insulation testing is common practice, inexpensive and easy to use.
F36.6 Limitations
♦ When determining the insulation resistance, the piece of equipment or circuit is
required to be isolated prior to assessment and as a result can not be undertaken as an
on-line assessment technique.
♦ When assessing electrical motors, minor faults may not be identified and sensitive
equipment must be disconnected to avoid possible damage.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-103
Table F-38. Summary Insulation Test.
Criteria Assessment
Technical Assets covered Motor winding, cables, switchboards, motor
Selection control centers.
Material type Electrical insulation.
Service area Potable and wastewater.
Access requirements Access to conductor and insulation.
Limitations relating to asset condition None.
Limitations relating to asset size/geometry None.
Continuous/discrete Discreet readings.
Destructive/non destructive Non-destructive (providing electronic
components isolated).
Interruption to supply/function None.
Technical Assessment parameters Insulation strength.
suitability Integration with software tools Stand alone.
Commercialization of tool Fully developed and off the shelf.
Previous/existing use of the tool in sector Standard sector practice.
Accuracy/reliability Good accuracy.
Ease of validation of results Direct measurement.
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); usability Electrician will already be trained to use.
Technology required (level of tool sophistication) None.
Documentation Well documented. Electric motor.
Availability of technical support N/A
Economic factors Cost per inspection Low cost per inspection
Resource requirements One man no more than half an hour per motor
(allows for disconnection/reconnection).
F36.7 Bibliography
1. AS NZS 3000-2000 Electrical Installations (known as wiring rules).
F-104
F37.0 Intelligent Pigs
F37.1 Overview
Intelligent pigs use different technologies to locate defects or gather other information
about large diameter pipelines. Several non-destructive inspection technologies can be
integrated into these tools:
♦ The Magnetic Flux Leakage technique, used to detect corrosion or thin walls.
♦ Ultrasonic sensors, used to detect coating delamination, cracks, dents and gouges.
♦ Global Positioning System (GPS) technology is being adapted to obtain the exact
location of any problem in the pipe or to map the pipe itself.
♦ Geometry tools, which use mechanical arms or electro-mechanical means to measure
the bore of pipe. In doing so, the tool identifies dents, deformations, and ovality. It can
also sense changes in girth welds and wall thickness. In some cases, these tools can also
detect bends in pipelines.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-105
Three common technologies incorporated into smart pigs are described further below.
Geometry Tools: Geometry tools use mechanical arms or electro-mechanical means to
measure the bore of pipe. In doing so, the tool identifies dents, deformations, and other
variation is cross-section. It can also sense changes in girth welds and wall thickness. In some
cases, these tools can also detect bends in pipelines.
Ultrasonic Tools: There are two types of tools commonly used for inspections of
hazardous liquid pipelines based on ultrasonic measurements.
♦ Compression Wave Ultrasonic Testing (UT) tools measure pipe wall thickness and
metal loss. The first commercial application of UT technology used compression
waves. These tools are equipped with transducers that emit ultrasonic signals
perpendicular to the surface of the pipe. An echo is received from both the internal and
external surfaces of the pipe and, by timing these return signals and comparing them to
the speed of ultrasound in pipe steel, the wall thickness can be determined.
♦ Shear Wave Ultrasonic Testing (also known as Circumferential Ultrasonic Testing, or
C-UT) is the non-destructive examination technique that most reliably detects
longitudinal cracks, longitudinal weld defects, and crack-like defects (such as stress
corrosion cracking). Because most crack-like defects are perpendicular to the main
stress component (i.e., the hoop stress), UT pulses are injected in a circumferential
direction to obtain maximum acoustic response.
Magnetic Flux Tools: There are two types of tools commonly used for inspections of
pipelines based on magnetic flux measurements (for more information see Magnetic Flux
Leakage review).
♦ Magnetic Flux Leakage (MFL) tool: an electronic tool that identifies and measures
metal loss (corrosion, gouges, etc.) through the use of a temporarily applied magnetic
field. As it passes through the pipe, this tool induces a magnetic flux into the pipe wall
between the north and south magnetic poles of onboard magnets. A homogeneous steel
wall – one without defects – creates a homogeneous distribution of magnetic flux.
Anomalies (i.e. metal loss (or gain) associated with the steel wall) result in a change in
distribution of the magnetic flux, which, in a magnetically saturated pipe wall, leaks out
of the pipe wall. Sensors onboard the tool detect and measure the amount and
distribution of the flux leakage. The flux leakage signals are processed, and resulting
data is stored onboard the MFL tool for later analysis and reporting.
♦ A Transverse MFL/Transverse Flux Inspection tool (TFI) identifies and measures metal
loss through the use of a temporarily-applied magnetic field that is oriented
circumferentially, wrapping completely around the circumference of the pipe. It uses
the same principal as other MFL tools except that the orientation of the magnetic field
is different (rotated 90°). The TFI tool is used to determine the location and extent of
longitudinally-oriented corrosion. This makes TFI useful for detecting seam-related
corrosion. Cracks and other defects can be detected also, though not with the same level
of reliability. A TFI tool may be able to detect axial pipe wall defects – such as cracks,
lack of fusion in the longitudinal weld seam, and stress corrosion cracking – that are not
detectable with conventional MFL and ultrasonic tools.
F37.3 Application
Intelligent pig technology is generally used for inspection of large diameter steel
pipeline assets in the oil and gas sector.
F-106
These tools only have limited applicability to the water/wastewater industry, although
some critical steel mains may be candidates for intelligent pig technology.
F37.5 Advantages
♦ High resolution intelligent pigs can accurately detect, size, and locate corrosion or any
other anomalies in pipelines. Once the problem is detected the information can be used
to develop a pipeline de-rating schedule, implement a repair or replacement program,
determine if re-inspection is necessary, and evaluate effectiveness of a corrosion
inhibitor program (Jones et al, 1995).
F37.6 Limitations
♦ Intelligent pigs are expensive devices that need specialized insertion and retrieval
structures. Traditionally they have been used in the gas and oil industry and will only
have only limited applicability to the water/wastewater industry.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-107
Table F-39. Summary Intelligent PIGS.
Criteria Assessment
Technical Assets covered Pipelines.
Selection Material type Large diameter pipes of rigid material; more suited to
welded steel.
Service Area Potable.
Access requirements Require specialized insertion point (pig traps) to avoid
interruption to flow.
Limitations relating to asset condition Asset needs to be in relatively good condition to avoid
the pig getting stuck.
Limitations relating to asset size/geometry Pigs are generally designed for large diameter pipes.
Changes in diameters, including those associated
with valves and other fittings, can be an issue
Continuous/discrete Smart/intelligent pigs provide continuous readings for
a variety of factors.
Destructive/non destructive Non-destructive technique.
Interruption to supply/function Pigs are propelled by the product flow, so no
interruption is required. However, likely to cause
quality issues in water mains. Also, there must be
appropriate launch facilities for uninterrupted function.
Technical Assessment parameters Most common requirements are for
suitability geometry/diameter measurement and for metal-
loss/corrosion.
Integration with software tools Specialized software tools used to interpret data.
Commercialization of tool Large number of commercial providers.
Previous/existing use of the tool in sector Originally developed to remove deposits in pipes.
Now used for a wide variety of purposes. Limited use
in water sector.
Accuracy/reliability Quantitative assessment.
Ease of validation of results Only through visual assessment; though calibration of
tools is done.
Utility technical Asset management sophistication required Associated with high levels of sophistication
capacity Skills required (level of tool sophistication); Smart pigs require trained specialists.
usability
Technology required (level of tool Highly sophisticated tool that requires specialized
sophistication) technology.
Documentation Large range of product information available.
Availability of technical support Large number of providers all offering support.
Economic factors Cost per inspection Relative high cost.
Resource requirements More advanced pigs require specialists to deploy.
F37.7 Bibliography
1. http://www.ppsa-online.com/about-pigs.php, accessed 2005.
23H
2. Willke, T. Five technologies expected to change pipe line industry, Pipe line & gas
industry, vol. 81, No 1, pp. 36-37, 1998.
3. Jones, D.G., Dawson, S.J., and Brown, M. Smart Pigs Assess Reliability of Corroded
Pipelines, Internal Pipeline Corrosion Assessment, Pipeline & Gas Journal, March 1995.
F-108
F38.0 KANEW
F38.1 Overview
KANEW is a software tool used in strategic asset management that estimates lengths of
water distribution mains to be rehabilitated or replaced each year.
KANEW contains a network inventory module, a failure and break forecasting module,
an economic data module and a strategy comparison module. Through these modules,
KANEW predicts when select pipe sections will reach the end of their service lives,
differentiated by date of installation and by type of pipe sections with distinctive life-spans.
Failure statistics
Network
Inventory
Pipe types Pipe lifetimes
Ageing functions
Cohort survival model
Options of rehabilitation
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-109
F38.3 Application
KANEW is a Windows based software package, used to predict the future rehabilitation
needs for water pipeline networks.
F38.5 Advantages
♦ KANEW can be used for planning water main rehabilitation and replacement strategies.
♦ The model can be used both for pipeline renewal planning and for budgeting for future
renewals.
♦ Windows based system that will run on a standard PC
F38.6 Limitations
♦ KANEW is a macro model that estimates a broad range of lengths of water mains to be
rehabilitated or replaced each year. The model does not predict specific water mains
that should be rehabilitated or replaced each year.
♦ The methodology adopted means that factors such as soil and pressure are not taken
into account.
F-110
Table F-40. Summary KANEW.
Criteria Assessment
Technical Assets covered Water pipes.
selection Granularity System and sub-system level only.
Service areas Potable
Technical Focus of analysis KANEW is a cohort survival model for infrastructure
suitability to predict future rehabilitation needs for water
infrastructure.
Scalability of tool/approach KANEW can be used for planning water main
rehabilitation and replacement strategies. The
model is useful both for older utilities having an
urgent need for renewal plans, and younger utilities
budgeting for future renewal plans.
Commercialization Commercial software available through AwwaRF.
Previous/existing use of the tool Used by authorities in the United States and in
Germany.
Ease of validation Difficult to validate except by statistical means.
Flexibility with regard to analysis (asset types) Potable only; cohort to system level.
and granularity (system, asset level)
Integration with other tools/GIS None.
Utility technical Asset management sophistication Since good data is required, more associated with
capacity higher levels of asset management sophistication.
In-house skills required Professional engineer.
Technology required PC based, version 1.0 requires MS Access 97.
Documentation Tool fully documented.
Data Requirements Comprehensive data on pipe assets.
Linking to asset data Linkage through database.
Availability of software and technical support Available through AwwaRF and commercially.
Usability KANEW has GUIs and is capable of providing 13
different sets of graphical and tabular outputs.
F38.7 Bibliography
1. Baur, R. and R. Herz Proceedings of the 13th European Junior Scientist Workshop held at
Dresden University of Technology on “Service life management of water mains and
sewers”. ISBN 3-86005-238-1, 1999.
2. Deb, A.K., Hasit, Y.J., Grablutz, F.M. and Herz., RK. Quantifying future rehabilitation and
replacement needs of water mains. AwwaRF Research Report, 1998.
3. Stone, S., Dzuray, E. J., Meisegeier, D., Dahlborg, A-S., and Erickson, M. Decision-
Support Tools for Predicting the Performance of Water Distribution and Wastewater
Collection Systems, EPA, EPA/600/R-02/029, 2002.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-111
F39.0 KureCAD
F39.1 Overview
KureCAD was developed by the Viatek Group in Finland and uses a GIS to assist in the
management of sewer pipe network rehabilitation. The system can store information on all
infrastructure assets, prioritize the rehabilitation of pipes, and provide the necessary documents
to implement rehabilitation.
F39.3 Application
KureCAD is used to assist asset managers in identifying and prioritizing the
repair/rehabilitation of sewer pipes.
F39.5 Advantages
♦ GIS approach to managing data and providing decision support.
♦ The KureCAD software is able to generate the paperwork necessary to initiate
repair/rehabilitation work, including detailed maps specifications.
F39.6 Limitations
♦ The tool is still in its development stages and at this point in time has only been trialed
in Europe.
♦ If GIS data is not available then maps have to be manually digitized.
F-112
Table F-41. Summary KureCAD.
Criteria Assessment
Technical Assets covered Sewer pipes.
Selection Granularity System and asset level.
Service area Wastewater
Suitability Focus of analysis Uses GIS to manage sewer pipe rehabilitation.
Prioritizes the rehabilitation of pipes and
provides the necessary documents to
implement the rehabilitation.
Scalability of tool/approach Better suited to medium to large authorities
where good GIS data is available.
Commercialization Commercial software available from Viatek
Finland.
Previous/existing use of the tool Used by several Scandinavian authorities.
Ease of validation Difficult to validate except by statistical means.
Flexibility with respect to analysis (asset types) and Wastewater; asset to system level.
granularity (system, asset level)
Integration with other tools/GIS Integrates with GIS system.
Utility technical Asset management sophistication Aimed at higher level of asset management
capacity where GIS data is available.
In-house skills required Professional asset manager/engineer.
Technology required PC based tool. Windows based operating
system.
Documentation Product in development.
Data Requirements GIS data required.
Linking to asset data Through pipe IDs.
Availability of software and technical support Unknown.
Usability Still under development.
F39.7 Bibliography
1. Stone, S., Dzuray, E. J., Meisegeier, D., Dahlborg, A-S., and Erickson, M. Decision-
Support Tools for Predicting the Performance of Water Distribution and Wastewater
Collection Systems, EPA, EPA/600/R-02/029, 2002.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-113
F40.0 Leak Detection
F40.1 Overview
Water loss control programs are widely used throughout the water industry and a major
phase of these programs is leak detection. Leak detection is used to determine the exact
location of a leak in a pipeline. The repair of leaks saves revenue and conserves water and
energy.
Leak detection is currently undertaken using a number of techniques, including acoustic
techniques, tracer gas and infrared photography. Drop tests and in-pipe hydrophones are also
used and are discussed in separate reviews (see Drop Test and In-Pipe Hydrophones reviews).
Leak detection gives an indication of condition and performance of a network or asset,
depending upon the amount of leaks found.
District metered areas (DMA) are used to aid with leak detection of the distribution
system. Also, because DMAs can encompass portions of the transmission system, this
approach is also used as an aid to locating transmission system leaks.
F-114
permeate through the cover soil and pavement to be located by specialized gas detectors above
the leak.
The infrared photography technique or thermography is more commonly used and is
based on water having different thermal characteristics to the surrounding soil and in turn act
like a heat sink relative to the soil. Infrared scanners are the used to detect thermal anomalies
outside of the pipes. Devices used for this can be either hand held or vehicle mounted (Burn et
al 1999).
The use of thermography from fixed or rotary wing aircraft can identify potential areas
of leakage from water mains. The technique detects ground water anomalies (water escaping
from the main creates ‘wet’ patches on the ground) through infrared thermography. Arial
thermography can potentially cover large areas relatively quickly. The technique is limited by
ground conditions (it is not recommended in urban areas), the line of the main, the local ground
temperatures (compared to the water temperature), and local drainage.
Arial thermography can potentially cover large areas relatively quickly. In practice, the
aircraft has to fly a straight line along the main. At every change in course of the pipeline, a
fixed wing aircraft has to circle in order to obtain a level approach to the new line. Helicopters
are not limited as much because they can fly at lower levels and execute level turns, but unit
cost for helicopters are higher.
F40.3 Application
Large leaks in water distribution networks can be identified quickly as the amount of
water flowing from the pipe has noticeable affects at ground level. However, pipe assets which
contain small leaks do not release enough water for surface affects to be seen at ground level.
Leak detection techniques are used to locate these leaks.
♦ There are no a standards for Leak Detection.
F40.5 Advantages
♦ Active leak detection allows leaks that would otherwise have gone unnoticed to be
found.
♦ Data logging techniques can be used to focus the search for leaks.
♦ Arial thermography can potentially cover large areas relatively quickly.
F40.6 Limitations
♦ Noise correlators and data loggers are less suited for use on non-metallic pipe materials
due to the pipe’s low sound propagation properties.
♦ Detection success is sensitive to background noise levels.
♦ Acoustic detectors do not detect weeping type small leaks.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-115
Table F-42. Summary Leak Detection.
Criteria Assessment
Technical Assets covered Pipes.
selection Material type All, effectiveness depends on technique used.
Service area Potable.
Access requirements Noise correlators require access to the pipe; fire
hydrants are sufficient. Data loggers may need
to be located ‘on’ pipes, requiring excavation.
Limitations relating to asset condition None.
Limitations relating to asset size/geometry None.
Continuous/discrete Continuous readings can be achieved.
Destructive/non destructive Non-destructive.
Interruption to supply/function Assessment should be conducted on-line.
Technical Assessment parameters Locates leaks.
suitability Integration with software tools Software packages used to interpret data
Commercialization of tool Tools are widely available in industry.
Previous/existing use of the tool in sector Techniques and tools are widely used.
Accuracy/reliability Quantitative or semi-quantitative; accuracy is
dependant on the technique used.
Ease of validation of results Validated by exhuming the asset.
Utility technical Asset management sophistication required Higher levels of asset management
capacity sophistication will generally result in more
efficient inspections but it is not required.
Skills required (level of tool sophistication); usability Operator needs to trained.
Technology required (level of tool sophistication) The level of technology required depends on the
technique to be used.
Documentation Techniques widely documented
Availability of technical support Tools are supported by suppliers and by
consultants.
Economic factors Cost per inspection Depends on technique.
Resource requirements Requires teams to conduct surveys, actual
manpower depends on technique to be used.
F40.7 Bibliography
1. Burn. L. S., DeSilva. D., Eiswirth. M., Hunaidi. O., Speers. A. and Thornton. J. Pipe
Leakage – Future Challenges & Solutions, Pipes Wagga Wagga, 1999.
3. Dingus, M., Haven, J. and Austin, R. (2002) Nondestructive None Invasive Assessment of
Underground Pipes, AwwaRF, USA.
4. Eiswirth, M., Burn, L.S. (2001) New Methods for Defect Diagnosis of Water Pipelines, 4th
International Conference on Water Pipeline Systems, 28-30 March, York, UK, 2001.
6. Makar, J. M. ; Chagnon, N. Inspecting systems for leaks, pits, and corrosion, National
Research Council of Canada, Institute for Research in Construction, NRCC-42802, 1999
(downloaded from www.nrc.ca/irc/ircpubs).
F-116
F41.0 Linear Polarization Resistance of Soil (Soil LPR)
F41.1 Overview
Linear Polarization Resistance of soil (LPR) is a characteristic used to predict the
corrosion rate of buried ferrous assets. LPR has a negative correlation with corrosion rate in
ferrous assets, meaning that soils with high LPR values will exhibit low corrosion rates.
The empirical relationship between LPR and corrosion rate was initially investigated
for cast iron, establishing a base relationship between corrosion rate and LPR. In a subsequent
study for wrought iron, a much weaker relationship was established, and there was too much
variation in measurements to fully establish a correlation. Consequently there is some debate
over the usefulness of LPR for materials other than cast iron.
F41.3 Application
LPR is used to indirectly determine the corrosion rate of buried ferrous assets using an
empirical relationship.
♦ No standards are known to directly reference this technique; however AS/NZS
2280:2004 does mention its use.
F41.5 Advantages
♦ Low cost technique.
♦ LPR is a simple method which can be used to give an indication of corrosion rate.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-117
F41.6 Limitations
♦ There is disagreement as to the reliability of the method and the relationship with
corrosion rate is empirical only.
♦ The assumption of linearity is not always representative of real conditions and so
reduces the accuracy of the technique.
F41.7 Bibliography
1. Burn, L.S., Eiswirth, M., DeSilva D. and Davis P., Condition Monitoring and its Role in
Asset Planning, Pipes Wagga Wagga 2001, Charles Stuart University, Wagga Wagga,
N.S.W., 2001.
2. Heathcote, M. and Nicholas, D., Life Assessment of Large Cast Iron Watermains, Urban
Water Research Association of Australia, Research Report No 146, 1998.
3. Moglia M., Davis P., Farlie M. and Burn S. Indirect Measurements of Corrosion rates in
buried Wrought Iron pipelines: an application of Linear Polarization Resistance, 6th
National Conference of the Australasian Society for Trenchless Technology, Melbourne
Exhibition and Convention Centre. 27-29 September 2004.
4. AS/NZS 2280:2004, Ductile iron pipes and fittings.
F-118
F42.0 Load Rejection Tests
F42.1 Overview
Power generation systems can experience sudden changes in load as a result of an
emergency shutdown, failure of equipment or changes in consumer power demand. Load
rejection tests or models are intended to analyze and predict the performance of power
generation systems under these sudden load changes.
Either full load rejection tests or partial load rejection tests can be conducted. However,
many tests attempt to examine full load rejection since this is the worst case scenario.
F42.3 Application
Load rejection assessments are often conducted or simulated using computer programs,
to gain an understanding of the effects of power station performance when sudden load
changes are found to occur.
♦ Load rejection tests are covered in the National Grid Code, United Kingdom and the
Transmission Code 2003, Germany.
F42.5 Advantages
♦ By undertaking load rejection tests, the risks and consequences associated with the
event of sudden load rejections of power generation systems can be determined.
F42.6 Limitations
♦ When modeling load rejection events using computer simulation programs, the time in
setting up a computer model is often time consuming.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-119
Table F-44. Summary Load Rejection Tests.
Criteria Assessment
Technical Assets covered Generators.
selection Material type N/A
Service area Potable and wastewater.
Access requirements Access requirements will be site specific.
Limitations relating to asset condition Before a load rejection test is performed on an
actual plant, a hazard identification and risk
assessment is carried out. This will be site
specific and should take into consideration the
condition of the plant.
Limitations relating to asset size/geometry No restrictions.
Continuous/discrete Continuous.
Destructive/non destructive Non-destructive.
Interruption to supply/function On-line.
Technical Assessment parameters Turbine overspeed, penstock pressures,
suitability structural adequacy of surge tanks, pipelines,
penstocks, etc.
Integration with software tools Load rejection tests would usually be carried out
as stand alone tests.
Commercialization of tool Tests need to be developed so that they are site
specific.
Previous/existing use of the tool in sector Commonly used in the power generation
industry; limited use in water sector.
Accuracy/reliability Dependent on the instruments used to record
data.
Ease of validation of results Computer models can be calibrated using
hydraulic transient test data.
Utility technical Asset management sophistication required High level of AM sophistication.
capacity Skills required (level of tool sophistication); usability Usually a team of engineers would be required
to design and carry out the tests.
Technology required (level of tool sophistication) Reasonably high powered computers are
required to run the computer software models.
Documentation No current ASTM standards.
Availability of technical support There are suitable software packages available
with customer support.
Economic Cost per inspection Expensive.
factors Resource requirements Usually a team of engineers would be required
to design and carry out the tests.
F42.7 Bibliography
1. Rebizant, W. & Terzija, V. Asynchronous Generator Behavior after a Sudden Load
Rejection, http://zas.ie.pwr.wroc.pl/wr_bpt03-2.pdf, accessed 2006.
25H
2. Tzuu Bin Ng, Walker, G.J. and Sargison, J.E. Modeling of Transient Behavior in a Francis
Turbine Power Plant, The University of Tasmania, Hobart,
www.aeromech.usyd.edu.au/15afmc/proceedings/papers/AFMC00084.pdf.
26H
F-120
F43.0 LPR for Corrosion Monitoring
F43.1 Overview of Tool
Linear polarization resistance (LPR) corrosion monitoring equipment measures
corrosion rate directly. The probes come in many types for embedding in new infrastructure,
retrofitting to existing infrastructure and a surface probe for more impromptu inspection.
F43.3 Application
Linear polarization resistance has been used in tunnels, bridges and road decks in the
United Kingdom, Singapore and India since 1998. Often linear polarization resistance
measurements are obtained in conjunction with electrical potential and/or concrete resistivity.
♦ The LPR technique is described in ASTM G59.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-121
conductive foam to control the spread of current. Probes come in a range of sizes. Small
probes are useful for tight fitting areas; however large probes give greater accuracy.
♦ It is useful to measure the temperature in different areas of a concrete structure in order
to determine differential temperature gradients and their affect on a concrete structure’s
long-term performance.
F43.5 Advantages
♦ Hand held mobile probes allow linear polarization resistance measurement to be carried
out at any position on the structure chosen by the user.
♦ Surveys of structures can readily be made in dry and wet situations to model best and
worst-case scenarios.
♦ LPR data loggers can be integrated with corrosion data management software. By
inputting rebar alloy density, dimensions and exposure data, the software can calculate
metal loss and corrosion rate.
F43.6 Limitations
♦ Testing often requires that at least two holes in the order of 6.5mm to variable depths
drilled in order to insert probes.
♦ It is important that sufficient time is allowed for a current value to stabilize at a certain
potential (or vice versa). For example, in certain LPR techniques such as potentiostatic,
it will typically take several minutes for the current to reach a stable level after the
polarizing voltage is applied. Shorter times could lead to significant measurement
errors.
♦ Some LPR testing technologies such as testing apparatus with a guard ring do not allow
quick assessing of large concrete surface areas. To reduce evaluation times to
acceptable, practical levels, the corrosion potential values can be mapped, followed by
a selective application of such testing apparatus to critical areas.
F-122
Criteria Assessment
Commercialization of tool Equipment is fully developed, available from selected
commercial vendors and can be used off the shelf.
Previous/existing use of the tool in sector Widespread use internationally on bridges and road
infrastructure. Growing application in the water
industry.
Accuracy/reliability Quantitative.
Ease of validation of results Results are indicative and can be validated by using
two other testing techniques: concrete electrical
resistance and rebar electrical potential.
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); Relatively easy to use by following simple procedure.
usability Trained staff can take measurements. Linear
polarization resistance meters do not require
specialist knowledge or training.
Technology required (level of tool sophistication) Range from moderate to high level of sophistication.
Many automatic corrosion transmitters are capable of
measuring and transmitting data from all types of
corrosion probes. Optional technology includes
programmable alarm circuits.
Documentation ASTM G59. Further guidelines specifically for on-line
in-plant corrosion monitoring are given in ASTM G96.
Availability of technical support Technical support available from distributors.
Economic Cost per inspection Low cost per inspection.
factors Resource requirements One operator required. LPR uses a series of
electrodes, a voltmeter, an ammeter and a current
source.
F43.7 Bibliography
1. ASTM G59-97(2003) Standard Test Method for Conducting Potentiodynamic Polarization
Resistance Measurements.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-123
F44.0 Magnetic Flux Leakage
F44.1 Overview
A magnetic flux leakage (MFL) tool is an electromagnetic tool that identifies and
measures metal loss due to corrosion, physical damage, and so forth through the detection of a
temporarily applied magnetic field. The tool provides a non-destructive means of assessing
ferrous pipes. Tools using the same principle are available for inspecting tank floors.
As illustrated in Figure F-7, as the tool moves along the pipe, it induces a magnetic flux
in the pipe wall. A homogeneous steel wall – one without defects – creates a homogeneous
distribution of magnetic flux. Anomalies such as metal loss associated with corrosion of the
pipe wall result in a change in distribution of the magnetic flux, which, in a magnetically
saturated pipe wall, leaks out. Sensors onboard the tool detect and measure the amount and
distribution of the flux leakage. The flux leakage signals are processed, and resulting data is
stored onboard the MFL tool for later analysis and reporting.
PIPE
WALL STEEL
BRUSHES
F-124
With large diameter pipes, space is available for multiple magnet arrays that can
saturate the entire pipe circumference. However, since the mass of the magnets and backing
steel need to be greater than the pipe wall, it has not been possible to develop internal tools to
suit small diameter distribution pipes.
Direct contact with the pipe wall is required. As such, the pipe surface must be clean.
The tool is mounted on a wheeled carriage and connected to an umbilical cord. Larger units
have onboard computers and power; an umbilical cord is not required.
Access has to be provided by cut-ins at regular intervals depending on the umbilical
length, as well as bends and obstructions in the pipeline.
The TFI tool is used to determine the location and extent of longitudinally-oriented
corrosion. This makes TFI useful for detecting seam-related corrosion. Cracks and other
defects can be detected also, though not with the same level of reliability. A TFI tool may be
able to detect axial pipe wall defects – such as cracks, lack of fusion in the longitudinal weld
seam, and stress corrosion cracking – that are not detectable with conventional MFL and
ultrasonic tools. External units are available for small diameter pipes.
F44.3 Application
MFL tools detect corrosion in ferrous pipelines. MFL detectors are generally used in the oil
and gas industry, incorporated into intelligent pigs for metal loss detection in steel pipelines
(see intelligent pigs review). The MFL probes are bulky and heavy and not suitable for internal
use in small diameter pipes.
Although commonly used in internal inspection, they have been adapted for external inspection
of pipes including water pipes. The external units are available for small diameter pipes.
Tools using the same principle are available for inspecting tank floors.
F44.5 Advantages
♦ When used in the oil sector, accurate assessment of pipeline defects improves decision
making within an Integrity Management Program. Excavation programs can then focus
on required repairs instead of calibration or exploratory digs.
♦ Units used on the pipe external surface can be used without supply interruption.
♦ Wall thickness reductions detected with a high degree of accuracy.
F44.6 Limitations
♦ The magnetic flux leakage techniques used in oil and gas pipe inspection have proven
ineffective for water pipes.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-125
♦ Internal inspection requires pipe cleaning prior to inspection. Pipe has to be off-line and
dry.
♦ Cost is significantly high corresponding to the accuracy, which is not generally
warranted in the water sector.
♦ As MFL techniques require good magnetic contact with the pipe wall internal
inspection is not possible for cement lined pipelines unless the lining is removed.
F-126
F44.7 Bibliography
1. Burn, L.S., Eiswirth, M., DeSilva D. and Davis P., Condition Monitoring and its Role in
Asset Planning, Pipes Wagga Wagga 2001, Charles Sturt University, Wagga Wagga,
N.S.W., 2001.
2. Eiswirth, M., Burn, L.S. New Methods for Defect Diagnosis of Water Pipelines, 4th
International Conference on Water Pipeline Systems, 28-30 March 2001, York, UK, 2001
3. Makar, J. M. ; Chagnon, N. Inspecting systems for leaks, pits, and corrosion, National
Research Council of Canada, Institute for Research in Construction, NRCC-42802
(downloaded from www.nrc.ca/irc/ircpubs), 1999.
27H
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-127
F45.0 Man Entry Inspection
F45.1 Overview
While CCTV is now the industry standard approach for inspecting the internal
condition of sewers, in larger diameter sewers it becomes economical to carry out man entry
inspections. In this approach, the internal condition of the asset is assessed using a walk-
through inspection technique. This requires a team of operatives to enter the pipeline, and
assess the condition of the manhole and the sewer walls above the flow line.
Defects are assessed visually and recorded along with distance using a standard coding
system. Photographs of features of interest can also be taken. When this is done, the picture
reference should ideally be cross-referenced with the survey distance. Hand held videos can
also be used to provide a permanent record of the inspection.
The safety implications of man-entry inspections should be given appropriate
consideration. In particular, when entering a manhole sewer line, it is very important to observe
the appropriate confined space regulations.
F45.3 Application
Man-entry inspections are performed on large-diameter sewer pipelines and tunnels.
This kind of inspection can also be undertaken on large diameter water pipelines.
♦ A number of systems are used for sewer condition grading, a Standard version of which
is EN 13508-2:2001 (CEN 2001).
F-128
− If the flow of wastewater cannot be diverted, inspections should be performed at
night and during dry weather conditions so that the flow is minimal.
− Ventilation fans should be used to ensure good ventilation.
− During the survey, the atmosphere should be constantly monitored and emergency
evacuation procedures strictly adhered to.
− The inspection should be performed by at least two persons and they should have
constant communication with the personnel outside the sewer line.
♦ The crew who carry out the inspection should be trained in order to ensure consistency
and uniformity of the inspection results.
♦ For wastewater pipelines, standards are available for qualitative and quantitative
grading of defects and a system for condition grading commonly used. Condition
assessment is performed by allocating a grade to the sewer that represents the range of
conditions from “like new” to “collapsed” or “collapse imminent.” The accuracy of a
condition grading depends on the inspector’s experience.
F45.5 Advantages
• Man entry inspection is cost-effective for the inspection of large diameter pipelines.
F45.6 Limitations
♦ There are significant health and safety issues associated with the inspection; all
operatives must be fully trained in safety requirements.
♦ The results are qualitative and require manual interpretation for analysis.
♦ The accuracy of a condition grading depends on an inspector’s experience.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-129
Criteria Assessment
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); usability Inspectors must be trained in confined spaces
and condition assessment.
Technology required (level of tool sophistication) Low tech inspection, but high tech safety
equipment.
Documentation No.
Availability of technical support No.
Economic factors Cost per inspection High personnel and mobilization costs.
Resource requirements Team size in line with confined spaces
regulations.
F45.7 Bibliography
1. ASCE, Sanitary Sewer Overflow Solutions, American Society of Civil Engineers, EPA
Cooperative Agreement CP-828955-01-0, April 2004.
2. European Committee for Standardization EN 13508-2:2001 Condition of Drain and Sewer
Systems Outside Building – Part 2: Visual Inspection Coding System, CEN Brussels, 2001.
F-130
F46.0 Measurement of Strain
F46.1 Overview
Several techniques are used to measure strain of assets; electrical resistance strain
gauges and photoelastic techniques are discussed herein.
F46.2 Principles
Electrical Resistance Strain Gauge
The electrical resistance strain gauge is the most common type of strain gauge used
today. This simple strain gauge consists of a very fine wire filament (a resistor) arranged in a
long zig-zag pattern, with the long lengths parallel to the measured strain. The fine wire is
bonded to the strained surface by a thin layer of epoxy resin. As the surface and hence the wire
filament is strained, the wire will become elongated and the diameter will reduce. The
reduction in diameter will cause the resistivity of the wire to increase. An electrical signal
passed through the filament will vary depending on the strain.
‘Gauge Factor’ is a parameter equal to the fractional change in electrical resistance
divided by the actual strain. Since the magnitude of strain rarely exceeds the order of 10-3 and
the Gauge Factor is often about 2, the fractional change in electrical resistance can be
extremely small. This means that the measurements need to be extremely accurate to avoid
errors. To improve the accuracy of the measurements, the strain gauge is inserted into an
electric circuit such as the Wheatstone bridge.
Photoelastic Strain Gauge
A birefringent material is a transparent material such as calcite crystal that exhibits two
different refractive indices. The polarization of the light traveling through the material
determines the extent each refractive index plays.
A photoelastic material is a material that only exhibits the property of birefringence
when the material is under stress. A polarized light beam traveling through a stressed
photoelastic material will be resolved into two components such that the electric field vector in
each component is aligned with one of the two principal stress axes in the material. Each
component of the light beam will experience a different refractive index, causing the two
components to travel at different speeds and thus be out of phase with each other when they
exit the photoelastic material. Photoelastic strain analysis equipment generally consists of the
following:
♦ A polarized source of light.
♦ A model made of a photoelastic material or the actual body covered in a photoelastic
coating.
♦ A polariscope to detect the refracted or reflected light.
The projector emits polarized light onto either the actual body (Figure F-8) or a model
of the actual body (Figure F-9). Models are made of a photoelastic material so the polarized
light travels through the model and the refracted light travels to the analyzer. Coatings applied
to the actual body consist of a layer of photoelastic material (paint or adhesive sheets) with a
reflective layer underneath. The incident light is diffracted through the photoelastic layer and
then reflected back through the photoelastic layer by the reflective layer.
The light traveling through the model or coating will only experience birefringence at
locations of stress. The greater the stress concentration, the more the two component waves
will be phase shifted.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-131
The two diffracted components of light emerging from either the model or the coating
are then bought together in a polariscope, which determines the relative phase shifts by
analyzing the interference “fringe” patterns created. An example of a fringe pattern is shown in
Figure F-10. Areas of high stress concentration are identified by thinner fringes, as stress
concentration decreases the fringes become wider.
F46.3 Application
Electrical resistance strain gauges are used for:
F-132
♦ Crack width measurement/monitoring in concrete structures.
♦ Small deflections in machines or structures.
Photoelastic strain gauges can be used in any components made of a homogeneous material,
such as a motor shaft.
Standards which reference electrical resistance strain gauges;
♦ ISO 4965:1979 Axial load fatigue testing machines - Dynamic force calibration - Strain
gauge technique.
♦ BS 6888:1988 Methods for calibration of bonded electrical resistance strain gauges.
Standards which reference photoelastic strain gauges;
♦ ASTM D4093-95(2005)e1 Standard Test Method for Photoelastic Measurements of
Birefringence and Residual Strains in Transparent or Translucent Plastic Materials.
♦ ASTM C978-04 Standard Test Method for Photoelastic Determination of Residual
Stress in a Transparent Glass Matrix Using a Polarizing Microscope and Optical
Retardation Compensation Procedures.
♦ ASTM C1279-05 Standard Test Method for Non-Destructive Photoelastic
Measurement of Edge and Surface Stresses in Annealed, Heat-Strengthened, and Fully
Tempered Flat Glass.
F46.5 Advantages
• Electrical resistance strain gauge:
− Relatively inexpensive.
− Overall fractional errors can be less than ± 10%.
− Possible to measure different types of strain, for example, shearing strain, poisson
strain and torsional strain.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-133
F46.6 Limitations
♦ Electrical resistance strain gauge
− Errors due to temperature fluctuations.
− A strain gauge only measures strain at one point. Multiple gauge arrangements are
required to analyze strain along different axes and to determine bending and
torsional strains.
F-134
Photoelastic strain gauge
Criteria Assessment
Limitations relating to asset condition If necessary, a model made of a photoelastic material
or a model with a photoelastic coating can be used to
analyze strain under different loading conditions
without loading the real object.
Limitations relating to asset size/ geometry No apparent limitations in principle but objects are
usually analyzed in a lab.
Continuous/ discrete Continuous real time recording of fringe patterns is
possible.
Destructive/ non-destructive Non-destructive.
Interruption to supply/ function Objects are usually analyzed in a laboratory
environment.
Technical Assessment parameters Stress and strain analysis.
suitability Integration with software tools None
Commercialization Commercially available equipment, e.g., GFP 1200
Grey-Field Polariscope.
Previous/ existing use of the tool Extensive in the manufacturing industry.
Used as a quality monitoring tool in the glass industry.
Limited use in the water industry.
Ease of validation Direct measurement.
Accuracy/reliability Quantitative
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication) An informed engineer is required to perform the tests
and analyze the results.
Technology required (level of tool sophistication) A polariscope and preferably the relevant software to
eliminate the need for manual fringe counting.
Documentation N/A
Availability of technical support N/A
Economic factors Cost per inspection Inexpensive.
Resource requirements One or two people.
F46.7 Bibliography
1. ISO 4965:1979 Axial load fatigue testing machines - Dynamic force calibration - Strain
gauge technique
2. BS 6888:1988 Methods for calibration of bonded electrical resistance strain gauges
3. ASTM D4093-95(2005)e1 Standard Test Method for Photoelastic Measurements of
Birefringence and Residual Strains in Transparent or Translucent Plastic Materials
4. ASTM C978-04 Standard Test Method for Photoelastic Determination of Residual Stress in
a Transparent Glass Matrix Using a Polarizing Microscope and Optical Retardation
Compensation Procedures
5. ASTM C1279-05 Standard Test Method for Non-Destructive Photoelastic Measurement of
Edge and Surface Stresses in Annealed, Heat-Strengthened, and Fully Tempered Flat Glass
6. Roylance, D. Experimental Strain Analysis, (accessed from
http://web.mit.edu/course/3/3.11/www/modules/expt.pdf), 2001
30H
7. Doyle, J.F. and Phillips, J.W. Manual on Experimental Stress Analysis, 5th Edition, Society
of Experimental Mechanics, Inc., 1989
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-135
F47.0 Methylene Chloride Gelation Assessment
F47.1 Overview
The methylene chloride (dichloromethane or methylene dichloride) test is a destructive
test used to give an indication of the degree of gelation in a PVC pipe.
A short section of chamfered pipe is immersed in a bath of methylene chloride for at
least 15 minutes and the chamfered surface then inspected for attack. The degree and location
of attack gives an indication of the degree of gelation around the pipe circumference.
F47.3 Application
Methylene chloride assessment is a qualitative method used to determine the gelation
level of PVC pipes. The test is used to identify areas in a pipe sample with the least gelation as
part of the fracture toughness testing.
♦ Standards which include this test are: BS 3505:1986, AS/NZS 1462.19:2006.
F47.5 Advantages
♦ Test gives an indication of the quality of the manufactured pipe.
F-136
F47.6 Limitations
♦ When used for condition assessment, requires a pipe section to be removed for testing.
♦ Test solution (methylene chloride) is toxic and should be handled by trained personnel
only.
♦ Test is broadly qualitative only.
F47.7 Bibliography
1. Dorn, R., Howsam, P., Hyde, R.A. and Jarvis, M.A. Water mains: Guidance on assessment
and inspection techniques, CIRIA Report 162, Construction Industry Research and
Information Association, London, England, 1996.
2. Randall-Smith, M., Russell, A. and Oliphant, R. Guidance manual for the structural
condition assessment of trunk mains, WRc, UK, 1992.
3. BS 3505:1986 Specification for unplasticized polyvinyl chloride (PVC-U) pressure pipes
for cold potable water.
4. AS/NZS 1462.19:2006 Methods of test for plastics pipes and fittings - C-ring test for
fracture toughness of PVC pipes.
5. ISO 9852 : 1995 Unplasticized Polyvinyl Chloride (PVCU) pipes – Dichloromethane
resistance at specified temperature (DCMT) – Test method.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-137
6. Fillot, L.A Hajji, P. UPVC Gelation level assessment Part 1: Comparison of different
techniques, Journal of Vinyl and Additive Technology, 2006.
F-138
F48.0 Motor Circuit Analysis
F48.1 Overview
Motor circuit analysis is a non-destructive low voltage method for testing electric motor
cables, connections, windings and rotors for developing faults, to reduce the likelihood of
electrical failure occurring during operation. The results are not a definite indication of
impending failure but need to be compared with previous tests to identify trends. The test can
also indicate motor efficiency losses over time. The additional running costs could be a factor
in any decision for remedial works or replacement.
F48.3 Application
Motor circuit analysis is applicable to all types of plant that contain electrical motors
and circuits.
F48.5 Advantages
♦ Motor circuit analysis allows for changes in electric motors and associated circuits to be
trended. Action can then be taken prior to reliability being affected. Identification of
efficiency loss can form part of the financial case for repair/ replacement.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-139
♦ All tests are conducted using portable hand held non-specialized equipment, which
enables assessment to be conducted by non electrical trained personnel. Motor circuit
analysis can be conducted without the need to disassemble the motor prior to analysis.
F48.6 Limitations
♦ During the assessment, the electrical motor must be electrically isolated.
F48.7 Bibliography
1. American Bureau of Shipping, Guidance Notes on Reliability Centred Maintenance, 16855
Northchase Drive, Houston, TX 77060 USA, July 2004,
http://www.aptgroup.com.au/elec_moto.htm.
31H
F-140
F49.0 Multi-sensor Pipe Inspection Robots
F49.1 Overview
Pipeline inspection is undertaken in a number of sectors using “intelligent pigs” (see
Intelligent Pig review) that travel with the product in the pipeline. These devices incorporate a
range of inspection technologies and are effective tools for inspections undertaken over long
distances, but are expensive and so their cost cannot be justified over short distances.
As an alternative, automated inspection of the inner surface of a pipe can be achieved
by a mobile robot. In this approach, a robot with multiple sensors is introduced into the pipe to
undertake a condition assessment using various non-destructive techniques.
The technology for these tools is still under development, but a number of systems have
been produced, though not fully commercialized. The robots being developed all incorporate
an array of non-destructive techniques that simultaneously assess pipeline condition. Research
has also focused on the automatic interpretation of the collected data.
To date, the development of these tools has generally concentrated on assessment
systems for sewers, but conceptually there is no reason why the approach could not be adopted
for water mains. Nevertheless, the information provided below pertains to the inspection of
sewers.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-141
♦ The KARO and PIRAT multi-sensor robotic development projects were aimed at
producing ‘smart’ sewer inspection vehicles equipped with several different sensor
devices. The robots were connected to a mobile control and surveillance unit by a cable.
One research focus of both projects was to develop methods for the automatic
interpretation of sensor data to identify and characterize pipe damage. KARO, an
inspection platform with exchangeable sensor modules, employed fuzzy logic to fuse
and interpret data from different types of sensors. In the PIRAT project, an expert
system analyzed laser images and ultrasonic data allowing classification of pipe
damage.
♦ The Sewer Scanner and Evaluation Technology (SSET) is a flexible non-destructive
evaluation data acquisition tool. At present, the prototype has a diameter of 130 mm
and a length of 850 mm and weighs 25 kg. In the prototype, higher quality information
on sewer condition is obtained through optical scanner and gyroscope technology.
SSET records a 360° image as it travels through the pipe. This allows the pipe
condition to be assessed after the inspection. This reduces the in-pipe time because the
operator is not required to locate and analyze defects during the inspection itself. The
interpretation system SSET implements fuzzy set theory and fuzzy logic techniques to
automatically identify, classify and rate pipe defects.
♦ SAM an interdisciplinary German research and development project on “Sewer Defect
Characterization by Multisensor Systems” involves the development and linkage of
different sensor systems. SAM includes a commercial CCTV system as well as a
number of sensors, including, microwave backscattering, hydro chemical, acoustic
impact, optical triangulation, geophysical and radioactive probes. The interpretation
system of SAM also implements fuzzy set theory and fuzzy logic techniques to
automatically identify, classify and rate pipe defects.
♦ The MAKRO robot is an autonomous sewer robot and its frame is flexible both
horizontally and vertically. The robot is equipped with a set of internal sensors, which
serve mainly to determine the robot's relative and absolute position within the pipe. The
robot's external sensors enable analysis of its environment and include obstacle
detection, collision avoidance, motion control, and landmark detection - a subtask of
self-localization.
♦ Pipe Rover is currently being developed in Hong Kong for assessment of pipes over
one meter in diameter. It is an underwater robot for inspection of water ducts, pipes and
foul water drains. It is especially suitable for offshore sewer outlets or power station
outfalls, where the pipes may terminate kilometres offshore and run deep in water. Pipe
Rover has two propulsion mechanisms. For flat-bottomed ducts with few obstructions;
tracks propel the robot, while for pipes, legs are used. The sensors include a color video
inspection camera with pan, tilt and lights, ultrasonic obstacle detection and
distance/depth/temperature/heading/pitch and roll information.
F49.3 Application
Intelligent inspection of sewer pipelines using multiple sensor robots to simultaneously
obtain a wide range of condition data.
F-142
− SSET was introduced to North American market in 1997; field trials covered 38.5
kms (126,612 ft) of sewer inspection in 13 participant cities. More recently, a 5.7km
(19,000 ft) sewer evaluation project for City of Atlanta and a project for Eastman
Chemical Company, Tennessee, have been completed.
− PIRAT has been tested in 5 km of sewers in Melbourne.
− SAM is currently being field-tested in several German cities.
♦ The evaluation of SSET is on-going. Work on KARO has stopped, though parts of it
are integrated into a new project SAM. PIRAT is unlikely to be commercialized.
♦ The external sensors available on MAKRO at the moment are very limited and
considerable development is still needed in this area before it would be usable for
automated pipeline inspection.
F49.5 Advantages
♦ Robots can be used to simultaneously gather large amounts of useful information about
a pipeline.
♦ Tools can be customized to gather data of specific interest for each asset type.
F49.6 Limitations
♦ The capital cost of inspections systems can be high due to the sensors incorporated in
them.
♦ Robots are not yet commercially available.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-143
Criteria Assessment
Documentation Use and development documented in the
literature.
Availability of technical support Limited.
Economic factors Cost per inspection High at present.
Resource requirements Robot and team to operate device.
F49.7 Bibliography
1. Burn, L.S., Eiswirth, M., DeSilva D. and Davis P., Condition Monitoring and its Role in
Asset Planning, Pipes Wagga Wagga 2001, Charles Sturt University, Wagga Wagga,
N.S.W, 2001.
2. Ratliff, A. An overview of current and developing technologies for pipe condition
assessment, Pipelines 2003, ASCE 2004.
F-144
F50.0 Oil Testing
F50.1 Overview
In many different types of equipment, oil is either used as a lubricant to reduce the rate
of wear and deterioration of internal moving components (e.g., in an air compressor, gearbox,
diesel/petrol engines), or used as a cooling medium to transfer heat (e.g., from the core and
coils contained in an electrical transformer).
Routine assessment of a sample of oil is a non-destructive method that can be used to
give an indication of the current condition of the plant. A number of tests are conducted on the
oil sample that can identify component wear, fatigue and corrosion. The analysis can also give
an indication of oil contamination and deterioration, which can indicate when oil should be
changed.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-145
aluminum, chromium, copper, lead, tin, nickel and also components of oil additives
such as boron, zinc, phosphorus and calcium.
♦ Kinematic viscosity assessment provides an indication of the deterioration of oil over
time as well as an indication of the contamination of the oil by fuel and other oils.
During the assessment, the oil’s resistance to flow under controlled pressure and
temperature is measured by forcing a sample to flow through a capillary viscometer.
The viscosity of the oil can be determined from the results obtained.
F50.2.2 Oil as a Heat Transfer/Insulating Medium
In transformers, oil is used primarily as a cooling medium to transfer heat from the core
and coils to the external radiator banks, while also forming part of the insulation system. Oil
filled transformers have the core and coil assembly placed in a tank filled with dielectric
cooling oil. The primary insulation system used in an oil-filled transformer is Kraft paper,
wood, porcelain and oil. In more modern transformers, paper that is chemically treated to
improve its tensile strength properties and resistance to decay caused by immersion in oil are
commonly used.
Over time, the insulating properties of the oil may deteriorate as a result of
contamination and the formation of moisture leading to transformer break down. In order to
determine the condition of the oil and the electrical insulating properties to reduce the likely
hood of transformer break down, the following laboratory based oil tests are commonly
undertaken.
♦ Sediment tests (ASTM D – 1698), to determine the properties of sediment that has
formed in the oil due to contamination and or deterioration over time. The analysis
involves taking a sample of the oil and using a centrifuge to separate the sediment from
the oil to enable assessment of the sediment properties.
♦ Karl Fisher titration test (ASTM D – 1744), can be used to determine the amount of
moisture in an oil sample by measuring the electrical current flow between two
electrodes immersed in the sample solution with the result reported as the amount of
water in parts per million.
♦ Dielectric strength tests are used to measure the insulating properties of electrical
insulating oils. The electrical insulating properties of oil can change due to the
deterioration as a result of contamination or oil breakdown. The test is conducted by
subjecting the sample to an electrical stress at a given temperature by passing a voltage
through the sample.
In addition to the laboratory assessments outlined above, a visual inspection conducted
at six monthly intervals of the transformer dehydrating breather silica gel crystals can also be
undertaken, to ensure the color of the crystals has not changed. If on inspection more than 50%
of the crystals have changed color, replacement is recommended due to the possibility of
moisture entering the unit during warming up/cooling down cycles and resulting in premature
insulation failure of the oil. Insulating oil decay is found to be the single greatest cause of
power transformer failure.
F50.3 Application
Oil testing methods are used to assess the properties of oil and can be used to determine
the condition of internal moving components in petrol/diesel engines, gearboxes and
transmissions, and also those types of plant that use oil as a heat transfer medium, such as
electrical transformers, to provide a effective method of determining the current condition and
rate of deterioration of plant equipment.
F-146
♦ ASTM D – 1698, ASTM D – 1744 and ISO/DIS 18436-4 reference different oil testing
methods.
F50.5 Advantages
♦ Oil testing can be undertaken as a part of a routine maintenance program to provide a
means of obtaining an early indication of plant failure.
♦ Oil testing can be used to optimize the frequency of oil changes in plant equipment,
preventing premature oil changes and indicating when an oil change is due.
F50.6 Limitations
♦ The majority of the assessments used in determining the type of contaminants and
particles present in oil samples are laboratory based assessments, and as a result require
trained technical staff to undertake these assessments and interpret test results.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-147
F50.7 Bibliography
1. American Bureau of Shipping, Guidance notes on Reliability Centred Maintenance, 16855
Northchase Drive, Houston, TX 77060 USA, July 2004.
2. ASTM D – 1698, Standard test method for sediment and soluble sludge in service aged
insulating oils.
3. ASTM D – 1744, Standard test method for determination of water in liquid petroleum
products by Karl Fischer reagents.
4. ISO/DIS 18436-4: Condition monitoring and diagnostics of machines - Requirements for
training and certification of personnel - Part 4: Field lubricant analysis. This document is a
Draft International Standard.
F-148
F51.0 On-Line Leak Detection Systems
F51.1 Overview
In the oil and gas sector it is common to have on-line leak detection systems for real
time monitoring of transmission pipelines. All such systems have the same underlying
principle; continuous on-line monitoring of flow parameters (flow and/or pressure) at the
upstream and downstream ends of a pipeline is used to determine if there are any hydraulic
anomalies.
Approaches range from simple comparison of “metered out” volumes with “metered
in” volumes, the monitoring of ‘rate of change’ in parameters of interest, and complex
computational pipeline monitoring.
Computational Pipeline Monitoring (CPM) uses an algorithmic approach to detect
hydraulic anomalies in pipeline operating parameters. The data from sensors is fed into a
computer model that can indicate if there is a new leak within the sensitivity of the algorithm.
The CPM system then provides an alarm and displays other related data to the pipeline
controllers to aid in decision-making.
F51.3 Application
Used as a technique for leak detection in the oil and gas industry by pipeline operators
to protect the public and the environment from consequences of a pipeline failure. There is the
potential to expand use into the water industry for the monitoring of transmission pipes.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-149
♦ Operational transients such as pump starts, line fills, valve closures, etc., may be
modeled as well, so that this automatic leak detection system can continue to work
during operational changes that occur in the normal day-to-day operation of the pipeline
system.
F51.5 Advantages
♦ Provides real time assessment of structural condition through detection of new leaks.
F51.6 Limitations
♦ Cost could be prohibitive in the water sector except where there are specific risk and
revenue drivers.
F-150
F52.0 PARMS-Planning
F52.1 Overview
The Pipeline Asset and Risk Management System (PARMS) is a suite of computer-
based models developed by CSIRO, designed to assist in the management of water supply
network assets. Two tools have been commercialized to date; PARMS-Planning and PARMS-
Priority. PARMS-Planning is designed to be used annually for long-term planning and
regulatory reporting, whereas PARMS-Priority is designed to be used on a regular basis to
allow determination of which assets to rehabilitate to meet the water utility’s strategies (see
PARMS-Priority review).
PARMS-Planning is a software tool that allows assessment of both short and long-term
repair and replacement strategies for water pipelines. The PARMS-Planning software can be
used to:
1. Forecast the expected annual number of failures.
2. Assess replacement based upon the predicted number of failures in any one year.
3. Calculate the cost implications of different management and operational scenarios.
PARMS-Planning assesses replacement needs based upon the predicted number of pipe
failures, in conjunction with the policy adopted by the water utility. The failure rates of each
pipe are estimated for each year in the forecast period. The product of the failure rate and the
length of the pipe give the number of failures for that pipe asset. The total number of failures in
the system in any one-year is given by the aggregate of failures for individual assets.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-151
interruptions, or the net present value of the future costs of the alternatives of maintenance or
replacement.
As noted, the analysis can be tailored to the strategy/policy of individual utilities, but in
general those assets that have multiple failures in any one-year are targeted for replacement
(the number of allowable failures per year depending upon customer preference).
F52.3 Application
PARMS-Planning is used to undertake long term strategic planning for water
distribution networks and model the impact that management strategies will have on
performance.
F52.5 Advantages
♦ The expected failure rate over time can be described for every individual asset in the
network.
♦ PARMS-Planning is able to assess replacement based upon the predicted number of
failures in any one year, and thus is able to include customer preferences for supply
interruptions.
♦ The software allows the modeling of modified asset management strategies that might
occur as a result of regulatory changes or business objective changes.
♦ A combination of graphical and tabular outputs provides users with a detailed
breakdown of network performance by pipe material, pipe age, failure type, etc.
♦ The system incorporates a simple GIS interface that allows network information to be
displayed in an incorporated GIS viewer.
F52.6 Limitations
♦ PARMS-Planning requires good quality asset data as well as failure history data in
order to develop the failure curves.
♦ The failure curve development is normally undertaken by consultants and is an
additional cost to the software package.
F-152
Table F-54. Summary PARMS Planning.
Criteria Assessment
Technical Assets covered Pipes, water pipeline infrastructure.
selection Granularity System and asset level.
Service area Potable
Technical Focus of analysis Long term asset management planning using
suitability asset failure curves developed from utility asset
data.
Scalability of tool/approach Better suited to medium to large authorities
where good asset data is available; a ‘light’
version is currently in development that could be
more suited to small utilities.
Commercialization Commercial software.
Previous/existing use of the tool Used by several large utilities in Australia .
Ease of validation Initial validation is provided in statistical analysis
of failure data and development of failure
curves.
Flexibility with regard to analysis (asset types) and Potable only. Subsystem to system level.
granularity (system, asset level)
Integration with other tools/GIS Integrates with most database systems and
requires standard GIS shape files for GIS
implementation.
Utility technical Asset management sophistication Aimed at higher level of asset management
capacity where good asset data is available.
In-house skills required Asset manager/engineer.
Technology required PC based tool. Windows based operating
system.
Documentation Research and development fully documented.
Data Requirements Good quality asset data and asset failure history
data is required.
Linking to asset data Linking to utility asset database is provided in
initial setup.
Availability of software and technical support Software available through CSIRO, as is
technical support.
Usability Simple user interface, once data is loaded.
F52.7 Bibliography
1. Burn, L. S., Tucker, S. N., Rahilly, M., Davis, P., Jarrett, R., and Po, M. Asset planning for
water reticulation systems - the PARMS model. Water Science and Technology: Water
Supply, 3(1-2), 55-62, 2003.
2. Burn, S., Ambrose, M. D., Moglia, M., and Tjandraatmadja, G. PARMS - An approach to
strategic management for urban water infrastructure. IWA Leading edge conference on
strategic asset management. San Francisco, 26-27 July, 2004.
3. Burn, S., Ambrose, M. D., Moglia, M., Tjandraatmadja, G., and Buckland, P. Management
strategies for urban water infrastructure. IWA World Water Congress. Marrakech,
Morocco, October, 2004.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-153
F53.0 PARMS-Priority
F53.1 Overview
The Pipeline Asset and Risk Management System (PARMS) is a suite of computer-
based models developed by CSIRO, designed to assist in the management of water supply
network assets. Two tools have been commercialized to date; PARMS-Planning and PARMS-
Priority. PARMS-Planning is designed to be used annually for long-term planning and
regulatory reporting (see PARMS-Planning review), whereas PARMS-Priority is designed to
be used on a regular basis to allow determination of which assets to rehabilitate to meet the
water utility’s strategies.
PARMS-Priority is a software tool that assists water authorities to make tactical
renewal and valve insertion decisions for water distribution pipes and networks. The PARMS-
Priority software can be used to:
♦ Prioritize between pipe assets targeted for potential renewal.
♦ Develop work packages for effective programming of pipe replacement.
♦ Evaluate pressure reduction scenarios.
♦ Analyze shut-off block reduction scenarios (inserting valves to reduce the number of
customers impacted by a failure).
♦ Facilitate information management of water pipe asset and failure information.
♦ Predict pipeline failures and costs for individual assets; including service levels.
F53.3 Application
PARMS-Priority is used to prioritize a water pipe renewal program by targeting high
risk assets.
F-154
F53.4 Practical Considerations
♦ PARMS-Priority is a commercial software package that has been used in several
authorities in Australia. It is a Windows based application with an easy to use GUI.
♦ As with PARMS-Planning, PARMS-Priority requires failure curves to be developed
through the analysis of the utility’s data. These curves are utilized in the forecasting of
network performance and provide the basis for the management modeling scenarios.
Generic failure curves are currently being developed by CSIRO.
F53.5 Advantages
♦ Failure predictions are based on rigorous analysis of the failure history of pipe groups.
♦ PARMS-Priority supports the user in identifying renewal clusters, and evaluating the
effects of pressure reduction and valve insertions.
♦ The risk calculation engine can be used to investigate user-specified scenarios and to
prioritize between different actions, which allows for proactive asset management.
♦ A query engine allows authorities to target specific areas of their network to review
performance. A combination of graphical and tabular outputs provides users with a
detailed breakdown of asset performance by pipe material, pipe age, failure type, etc.
♦ The system also incorporates a simple GIS interface that allows asset information to be
displayed in an incorporated GIS viewer.
F53.6 Limitations
♦ PARMS Priority requires good quality asset data to be available as well as failure
history data in order to develop the failure curves.
♦ The failure curve development is normally undertaken by expert consultants and is an
additional cost to the software package.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-155
Criteria Assessment
Utility technical Asset management sophistication Aimed at higher level of asset management
capacity where good asset data is available.
In-house skills required Asset manager/engineer.
Technology required PC based tool. Windows based operating
system.
Documentation Users standard asset classification system as
developed by WSSA Australia, but can be
tailored to other regional standards.
Data Requirements Good quality asset data and asset failure history
data is required.
Linking to asset data Linking to utility asset database is provided in
initial setup.
Availability of software and technical support Software available through CSIRO, as is
technical support.
Usability Simple user interface, once data is loaded.
F53.7 Bibliography
1. Moglia, M., Burn, S., Meddings, S. Decision support system for water pipeline renewal
prioritisation, ITcon Vol. 11, pp 237 – 256, 2006.
F-156
F54.0 Passive Acoustic Inspection of Pipes (Acoustic Emission)
F54.1 Overview
This technique is a non-destructive method used to detect the release of sound energy
when wires in pre-stressed concrete pipes fail.
During the manufacture of pre-stressed concrete pipes (also known as pre-stressed
cylinder concrete pipe or PCCPs) high strength steel cables (bundles of steel wires) are
wrapped under tension around a central core to apply a compressive stress to the concrete. As
the pipe degrades, the steel cables corrode. Eventually, wires will break releasing the stored
energy, the majority of which is released as sound. This sound propagates along the pipe via
the pipe wall and the water within the pipe.
As deterioration continues, the prestressing cable will continue to corrode and wires
will break releasing more energy in a series of discrete events; these can be detected by
hydrophones or other sensors.
F54.3 Application
Passive acoustic inspection is used to locate actively deteriorating sections of pre-
stressed concrete pipe.
F54.5 Advantages
♦ Actively deteriorating sections of pipe can be located without exhuming the pipe or
removing it from service; the rate of deterioration can be determined to prioritize
replacement.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-157
♦ Sensors can be left in place as a permanent means of monitoring asset condition.
♦ Technique can also detect sounds produces during cracking of the concrete.
♦ Inspection is not limited by heavy walled PCCP.
♦ Manhole access is not required.
F54.6 Limitations
♦ Accuracy of section location is affected by discontinuities in the pipeline between the
failure and the hydrophones.
♦ This technique does not quantify the amount of broken wires in the pipe.
F-158
F54.7 Bibliography
1. The pressure pipe inspection company homepage,
http://www.ppic.com/services/aet.asp, accessed 2006.
32H
3. Makar, J. M. ; Chagnon, N. Inspecting systems for leaks, pits, and corrosion, National
Research Council of Canada, Institute for Research in Construction, NRCC-42802
(downloaded from www.nrc.ca/irc/ircpubs), 1999.
3H
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-159
F55.0 Performance Testing of Rotating Machinery
F55.1 Overview
Performance testing of rotating machinery is a non-destructive method used to assess
whether equipment is operating as per the original specification or manufacturer’s data.
Performance tests are usually conducted in the manufacturer’s shop as part of ‘factory
acceptance testing’ and again on-site as part of ‘site acceptance testing’. Ideally performance
tests should also be carried out periodically to ensure that equipment continues to operate
satisfactorily. Periodic performance tests can reveal deterioration and inefficiencies in
equipment that can lead to significant savings on power bills and maintenance costs.
F55.2 Principles
To undertake a performance test, a rotating machine needs to be run under a range of
operating conditions. For example, the shaft speed or applied load can be altered to give a
range of test results. For each operating condition, data needs to be collected that can be used
to calculate parameters such as efficiency and load capacity. The data collected and parameters
calculated will depend on the particular type of rotating machinery under analysis. The test
results are compared to the specification or manufacturer’s data to determine if the equipment
is operating as required.
Performance testing of pumps is particularly common. For on-site pump testing, a
range of flow conditions can be tested by adjusting the position of a downstream valve to alter
the pump delivery head. Upstream and downstream calibrated pressure gages and a flow meter
are required for this testing. Typically, the flow rate, suction head, delivery head and motor’s
current are measured. The results can be plotted on top of the manufacturer’s pump curves to
show the difference between the actual operating performance and the design (or optimal)
operating performance. The manufacturer will typically guarantee that a pump will operate
within a particular range of the pump curve. Performance testing of pumps can help diagnose
pump problems such as cavitation, impeller damage and case damage. Noise, temperature and
vibrations may also be measured as part of the pump performance test.
F55.3 Application
Performance testing is applicable to all rotating machinery. Applications for the water
and wastewater industry include pumps, fans, motors, screw conveyors, air blowers,
compressors, mixers and centrifuges.
♦ ANSI/HI 1.6-2000 Centrifugal Pump Tests.
♦ ANSI/HI 2.6-2000 Vertical Pump Tests.
♦ ANSI/HI 12.1-12.6 (A128) Rotodynamic (Centrifugal) Slurry Pump Standard.
♦ ISO 9906:1999 Rotodynamic pumps - Hydraulic performance acceptance tests - Grades
1 and 2.
♦ ISO 13380:2002 Condition monitoring and diagnostics of machines - General
guidelines on using performance parameters.
F-160
F55.5 Advantages
♦ The performance of equipment can degrade significantly with time. Performance
testing can highlight inefficiencies and the need for the repair or replacement of
components, which can lead to cost savings.
F55.6 Limitations
♦ On-site performance tests can be limited by the equipment available to take
measurements. For example, a pump performance test is limited by the location of the
pressure gauge. If a pressure gauge cannot be located close to the pump then the
measurement will be affected by friction head losses in the pipe and fittings giving
unreliable results.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-161
F55.7 Bibliography
1. ANSI/HI 1.6 (M104) American National Standard for Centrifugal and Regenerative
Turbine Pump Tests.
2. ANSI/HI 2.6 (M108) Vertical Pump Tests.
3. ISO 9906:1999 Rotodynamic pumps - Hydraulic performance acceptance tests - Grades 1
and 2.
4. ISO 13380:2002 Condition monitoring and diagnostics of machines - General guidelines on
using performance parameters.
5. ANSI/HI 12.1-12.6 (A128) Rotodynamic (Centrifugal) Slurry Pump Standard.
F-162
F56.0 Phenolphthalein Indicator (Carbonation Testing)
F56.1 Overview
The phenolphthalein indicator test is a quick method used to indicate the presence of
free lime in cementituous materials.
Samples are removed from the structure being tested, such as a pipe section, and stained
with the indicator. Areas with low or no free lime content remain colorless, while areas with
free lime remaining turn pink.
A freshly exposed sample is required. For a pipe section, the sample must be extracted
(see Cut-Out Sampling and/or Core/Coupon Sampling reviews).
F56.3 Application
The phenolphthalein indicator test is used to detect the presence of free lime in
cementituous assets.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-163
For the purpose of indicating the presence of free lime phenolphthalein indicator is
simple to use and widely used for condition assessment.
♦ When conducting testing all dust created in exposing the surface to be tested should be
removed as this can give false readings. Where holes have been drilled into slabs of
material, the edges of the holes should be chipped at to expose a fresher surface prior to
testing.
♦ The boundary between free lime and carbonated material is blurred due to variations in
material structure. Repeatability in the tests is good; variation of ± 5mm has been found
(Campbell et al, 1991).
♦ The phenolphthalein test can be conducted on-site or in the lab and requires a freshly
exposed surface as carbonation begins immediately on exposure to air.
F56.5 Advantages
• Phenolphthalein indicator is readily available and easy to use. The test is cheap, fast and
simple to conduct. The test can be conducted in the field or in the lab.
F56.6 Limitations
♦ Test requires some damage to the asset being tested.
♦ Phenolphthalein indicator solution is flammable and appropriate precautions need to be
taken.
♦ Phenolphthalein indicator should not be ingested.
F-164
Criteria Assessment
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); Easy test to conduct by following simple procedure.
usability
Technology required (level of tool No sophisticated tools required to conduct test.
sophistication) Specialized tools may be required to obtain samples
depending on location and type.
Documentation No known standard test methods. Specific chemical
information can be obtained from MSDS,
CAS# 77-09-8.
Availability of technical support Knowledge of phenolphthalein is widespread and
easily obtainable.
Economic factors Cost per inspection Low cost.
Resource requirements Resources are required to obtain sample, e.g.,
exposing pipeline and removing sample.
F56.7 Bibliography
1. Dorn, R., Howsam, P., Hyde, R.A. and Jarvis, M.A Water mains: Guidance on assessment
and inspection techniques, CIRIA Report 162, Construction Industry Research and
Information Association, London, England, 1996.
2. Randall-Smith, M., Russell, A. and Oliphant, R., Guidance manual for the structural
condition assessment of trunk mains, WRc, UK, 1992.
3. Campbell, D., Strum, R. and Kosmatka, S., Detecting Carbonation, Concrete Technology
Today, Volume 12, Number 1, 1991.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-165
F57.0 Pipe Potential Surveys
F57.1 Overview
Pipe potential surveys are used to gain an understanding of the electrochemical
interaction between ferrous pipes and the surrounding soil. The pipe-to-soil potential is
measured using a voltmeter and a reference electrode. If electrical connection to the asset can
be made above ground, for example connection to a valve, this does not require exhumation of
the pipe.
The pipe-to-soil potential measured during testing is useful for identifying areas of for
further analysis, including areas where coatings have deteriorated or been damaged. However,
some practitioners consider the application is limited for coal tar enamel coatings due to the
high number of defects generally found in these coatings.
F57.3 Application
Pipe potential surveys measure the voltage between ferrous pipes and the surrounding
soil. The technique is most applicable to continuously welded steel pipes, which have good
quality external coatings. The voltage can either be the result of an applied current, in the case
of DCVG testing, or electrochemical corrosion cells.
Other techniques are also available which rely on similar techniques, including the
Pearson Survey, the Current Attenuation Survey and the Close Interval Potential Survey. The
Pearson Survey and the Current Attenuation Survey are used to assess the condition of pipe
external linings. The Close Interval Potential Survey is used to determine the level of cathodic
protection throughout a pipeline.
♦ BS 7361 refers to some of these techniques.
F-166
F57.4 Practical Considerations
♦ For the DCVG technique to work, the main has to be electrically continuous. This is
usually the case with steel pipes joined by welding, where the condition of the external
coating is critical for the satisfactory long term performance of the main.
♦ To measure the pipe-to-soil potential, a fine insulated trailing wire is connected to the
pipeline, preferably at an accessible point such as a valve or air valve. The other end is
connected to a voltmeter and then the copper/copper sulfate electrode(s). When in
contact with the ground, the electrodes complete the electrical circuit and allow the
pipe-to-soil potential to be read from the voltmeter.
♦ Pipe potential readings are taken periodically along the pipeline. At any distance, a
constant reading provides some confidence in the results. In contrast, a wildly varying
voltage could indicate the presence of stray current or interference from other pipes.
♦ Water mains coated with coal tar enamel (the default coating in many areas up until the
1980/90’s) will invariably find numerous coating defects, and in some cases continuous
defects where the coating has split due to soil stresses.
F57.5 Advantages
♦ The techniques are non-destructive and can be successful in locating corrosion
hotspots.
♦ Technique may not require a pipe to be exhumed for examination and pipelines can
remain in service.
♦ Locates areas of likely corrosion and indicated if more invasive assessment is required.
F57.6 Limitations
♦ Varying moisture contents in soils over the year will cause variation in results.
♦ Techniques may miss very small isolated areas of corrosion.
♦ Results are affected by the presence of stray currents.
♦ The more advanced techniques require highly specialized equipment and trained
personnel.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-167
Criteria Assessment
potential.
Integration with software tools Stand alone.
Commercialization of tool Tools are fully commercialized.
Previous/existing use of the tool in sector Pipe potential surveys are widely used in the gas
industry and to a lesser extent in the water
industry.
Accuracy/reliability Quantitative; techniques are considered to be
reliable.
Ease of validation of results Results can be validated by exposing of pipe.
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); Operators require training; specialized training is
usability required where electrical currents/potential is
applied to pipes.
Technology required (level of tool sophistication) Pipe-to-soil technique requires specialized
though widely available equipment. Other
techniques require specialized equipment and
training of personnel.
Documentation BS 7361.
Availability of technical support From service providers.
Economic factors Cost per inspection Depends on technique used.
Resource requirements Depends on technique used.
F57.7 Bibliography
1. Klechka, E. (2004) Corrosion Protection for Offshore Pipelines, Coatings for Corrosion
Protection, Colorado School of Mines; Accessed November 2006 at:
http://www.mines.edu/outreach/cont_ed/coatings1b.htm.
34H
F-168
F58.0 PiReP/PiReM
F58.1 Overview
The Pipe Rehabilitation Planning System (PiREP) software is a decision support tool
for the management of rehabilitation planning in water supply systems. The software currently
consists of two modules, supporting both long-term strategic rehabilitation management and
mid-term rehabilitation planning.
Strategic planning is undertaken by estimating the annual rehabilitation rates, based on
analysis of failure data for groups of pipes and other operational and environmental parameters.
Mid-term planning is facilitated using a subjective (weighted) risk ranking approach that
provides a priority list of assets.
Pipe Rehabilitation Management (PiReM) is currently under development and is an
enhanced version of the PiReP software.
F58.3 Application
♦ The software is designed for the long-term and medium-term rehabilitation planning of
water supply networks.
F58.5 Advantages
♦ The software allows detailed scenario analysis to be undertaken, which permits
authorities to see the results of modifying rehabilitation rates. This allows the financial
needs for long-term rehabilitation to be estimated.
♦ The mid-term rehabilitation module provides a priority list of assets that can be used to
guide annual planning for a future period of five years.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-169
F58.6 Limitations
♦ Non commercial software that has only had limited use in Europe.
♦ Requires several years of network failure data. Consequently, the software is not well
suited for small authorities or authorities with only limited data.
F58.7 Bibliography
1. Kainz, H., Gangl, G., and Fischer, W. PiReM – Pipe Rehabilitation Management: Decision
Support System for the rehabilitation management of water supply systems, Graz
University of Technology. Website accessed November 2006 at:
http://www.sww.tugraz.at/sww/Projekte/pirem/Offizielle_Beschreibung_PiReM_englisch_
36H
neu_2005.08.01.pdf.
F-170
F59.0 Pit Depth Measurement
F59.1 Overview of Inspection Tool
Pit depth measurement is a manual technique used to infer corrosion rates of ferrous
materials.
Samples are sand blasted and inspected for pitting; the depth of pits are measured using
a pointed micrometer or needle-point depth gauge. The corrosion rate is then estimated, with
care taken not to underestimate results due to corrosion products remaining in the pits (Dorn et
al., 1996). Pit depth measurements can be undertaken as a non-destructive technique in the
field, or a pipe section can be removed for testing in a laboratory.
F59.3 Application
Pit depth measurement is relevant only to ferrous materials. Pit depth measurement can
be carried out on site and in the laboratory. More advanced pit depth measurements and those
for small pits require laboratory facilities.
♦ No standards or other documentation found on pit depth measurement, however ASME
B31G-1991 relates to determining the remaining strength of corroded pipelines.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-171
♦ Attention is required to ensure that all corrosion products are removed prior to pit depth
measurement. Corrosion of cast iron results in graphitization which retains the shape of
the pipe disguising locations of corrosion.
♦ Manual measurement in other pipeline sectors has been generally superseded by other
techniques. However, the approach is still used in the water sector.
F59.5 Advantages
♦ Simple technique for field measurements giving accurate results.
F59.6 Limitations
♦ Without knowledge of original pipe wall thickness, pit depth measurement cannot be
used to estimate remaining life of the pipe.
♦ Pit depth will be underestimated if the depth of general corrosion surrounding the pit
measured is unknown and so underestimate the actual corrosion rate.
♦ Coatings will limit the accuracy of corrosion rate estimations, as pitting will only begin
after failure of this coating.
♦ Manual pit depth measurement is time consuming.
Table F-61. Summary Pit Depth Measurement.
Criteria Assessment
Technical Assets covered Buried assets.
selection Material type Ferrous materials only.
Service Area Potable and wastewater.
Access requirements Pipes must be extracted for lab measurements,
field measurements can be preformed in situ.
Limitations relating to asset condition Any coating and/or corrosion products on the
asset need to be removed prior to
measurements.
Limitations relating to asset size/geometry No restriction due to size of asset.
Continuous/discrete Results are discreet.
Destructive/non destructive Field measurements are non-destructive. Lab
based measurements require sections to be cut
from pipe.
Interruption to supply/function No interruption to supply when done in situ.
Technical Assessment parameters Pit depth only.
suitability Integration with software tools Results need to be used in conjunction with
other data to obtain useful information.
Commercialization of tool Equipment is widely available.
Previous/existing use of the tool in sector Wide use in the sector.
Accuracy/reliability Measurement accuracy is high.
Ease of validation of results Direct measurement.
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); usability Some training is required for field level
measurements. Lab level measurements require
specialists.
Technology required (level of tool sophistication) Low level technological sophistication required
from field level measurements. For lab level
measurements specialist equipment is required.
Documentation No standards or other documentation found on
pit depth measurement, however ASME B31G-
F-172
Criteria Assessment
1991 relates to Determining the Remaining
Strength of Corroded Pipelines.
Availability of technical support N/A
Economic factors Cost per inspection Can be expensive due to man hours required
Resource requirements Resources are required to obtain sample, e.g.
exposing pipeline, sandblasting asset surface.
Removal of sample may be required.
F59.7 Bibliography
1. Dorn, R., Howsam, P., Hyde, R.A. and Jarvis, M.A Water mains: Guidance on assessment
and inspection techniques, CIRIA Report 162, Construction Industry Research and
Information Association, London, England, 1996.
2. Randall-Smith, M., Russell, A. and Oliphant, R. Guidance manual for the structural
condition assessment of trunk mains, WRc, UK, 1992.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-173
F60.0 Process Control Systems (Integrated)
F60.1 Overview of Tool
An overall Distributed Control System (DCS) network monitors/controls assets and
provides preventative maintenance data. PLCs and PCs servers are typically connected on an
Ethernet ring with all field equipment by a Field bus network.
F60.3 Application
Motor control centers starters (and connected equipment), variable frequency drives,
instruments and any other plant items that can be connected to the Field bus network.
♦ ISO 13374-1:2003; establishes general guidelines for software specifications related to
data processing, communication, and presentation of machine condition monitoring and
diagnostic information.
F60.5 Advantages
♦ Automatic records can be kept and trends observed.
♦ Fieldbus technologies offer some savings in wiring and cross connections costs and
reduced commissioning costs. Field devices can be tested, commissioned and
configured on-line through the network. Checking device parameters can also be done
through the DCS system on-line.
F60.6 Limitations
♦ Not readily applied to existing plant as requires substantial infrastructure changes and
associated costs. Ideal for green field sites or where major new plant is being installed.
F-174
Table F-62. Summary Process Control Systems (Integrated).
Criteria Assessment
Technical Assets covered All ‘intelligent’ devices.
selection Material type N/A
Service area Potable and wastewater.
Access requirements Field bus network is required with component
parts connected to it.
Limitations relating to asset condition None.
Limitations relating to asset size/geometry None.
Continuous/discrete Continuous.
Destructive/non destructive Non-destructive gathers data from on board
memory device.
Interruption to supply/function On-line.
Technical Assessment parameters Current / historical status of component. Status
suitability and condition (faults/healthy), number of trips.
Integration with software tools Required to be part of a filed bus system.
Commercialization of tool Fully developed and off the shelf.
Previous/existing use of the tool in sector Becoming widespread.
Accuracy/reliability Quantitative.
Ease of validation of results Depends on application, if for example current
drawn by starter, then this can be validated by
clamp on ammeters.
Utility technical Asset management sophistication required Aimed at a higher level of sophistication.
capacity Skills required (level of tool sophistication); usability Once set up an operator can view condition
status data.
Technology required (level of tool sophistication) Field bus network.
Documentation Tool is documented. Standard ISO 13374.
Availability of technical support Yes by supplier of fieldbus technology.
Economic factors Cost per inspection N/A
Resource requirements Overall control system can automatically
produce reports.
F60.7 Bibliography
1. ISO 13374-1:2003 : Condition monitoring and diagnostics of machines - Data processing,
communication and presentation - Part 1: General guidelines.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-175
F61.0 Pull-off Adhesion Testing
F61.1 Overview of Tool
Pull-off adhesion testing measures the adhesive strength of applied coatings to metal,
concrete, masonry, plastic and wood. The strength of epoxies, mortars, plasters, bituminous
coats, paint finishes and metal coatings can be measured. The surface strength of concrete and
other materials can also be tested directly.
The mechanical tensile strength is tested by applying a perpendicular force, either to
destruction or until the applied force reaches a prescribed value. For this reason the test may be
fully non-destructive in certain situations. However, the review below assumes that testing
continues until coating failure.
F61.3 Application
Pull-off adhesion testing can be used to test the surface strength of any asset. This
primarily applies to assets to which coatings have been applied, but the surface strength of
materials such a concrete can also be tested.
F-176
♦ ASTM C4541, ASTM D4541, BS 1881 Part 207 and ISO 4624 (EN 24624) all define
the method and procedures for carrying out pull-off adhesion testing of paints,
varnishes and other coatings.
F61.5 Advantages
♦ Pull-off testing can be conducted on a wide variety of substrates and coatings.
♦ Testing is not limited to flat surfaces; curved surfaces such as pipes can be readily
tested.
♦ For concrete coatings, there is no need to embed the sample in the concrete substrate
first.
♦ Self-aligning dolly systems enable force to be consistently distributed over the test area,
preventing earlier failure.
F61.6 Limitations
♦ Measurements are limited by the strength of adhesion bonds between the loading
fixture and the specimen surface or the cohesive strengths of the adhesive, coating
layers, and substrate.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-177
♦ This test can be destructive and spot repairs may be necessary.
♦ If the dollies are not cleaned sufficiently, ‘glue failure’ can occur during testing,
resulting in an inaccurate. Self-leveling pull testing devices can produce far too low-test
results if the pull stress is not 100% evenly distributed throughout the pulled coating. If
not, the area where the stress is concentrated will fracture long before maximum stress
has been reached elsewhere resulting in low readings.
F-178
Criteria Assessment
Technology required (level of tool sophistication) Low level of technological sophistication is needed for
hand held, manual tools. For digital tools the stress
increase rate can be controlled automatically by
computer.
Documentation ASTM D4541, ACI 503-30 USA, ISO 4624 (EN
24624) and BS 1881 Part 207.
Availability of technical support Technical support widely available from distributors.
Economic factors Cost per inspection Low cost per inspection.
Resource requirements One operator required. Pneumatic or mains powered.
Resources required can also depend on asset being
inspected. Buried assets need to be exposed.
F61.7 Bibliography
1. ASTM D4541 Standard Test Method for Pull-Off Strength of Coatings Using Portable
Adhesion Testers.
2. ASTM C4541 Pull-Off Strength of Coatings Using Portable Adhesion Testers.
3. ISO 4624 (EN 24624) Paints and varnishes -- Pull-off test for adhesion.
4. BS 1881 Part 207 Testing Concrete Part 207: Recommendations for the Assessment of
Concrete Strength by Near-to- Surface Tests.
5. DFD Instruments, http://www.dfdinstruments.co.uk/topics/Study5-ASTM-D4541.htm,
37H
accessed 2006.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-179
F62.0 Radiographic Testing
F62.1 Overview
Radiography is the use of radiation to obtain a picture (radiograph) of an object. The
intensity of radiation transmitted through the object is recorded, using a photosensitive film or
digital recorder. The process is very similar to x-ray radiography in a hospital; possible
imperfections are indicated as density changes on the film in the same manner as a medical X
ray shows broken bones.
Radiography is a non-destructive technique that has been used to examine ferrous,
cementituous, and plastic pipes (though not GRP). The radiograph shows variations in material
and structure, including changes in density (such as associated with corrosion products),
inclusion of material ingredients (for plastic pipes), and changes in thickness. It can also be
used for inspection of valves.
F-180
♦ For cementituous materials, radiography can be used to check for voids. The condition
of reinforcement in pre-stressed concrete pipe has also been examined using these
techniques.
♦ For plastic materials, the radiograph can detect inclusions or manufacturing voids; X-
ray analysis has been used to determine the distribution of lead stabilizers in PVC-U
pipes.
Gamma radiography has also been used to check welds in pipelines that carry natural
gas or oil. Special film is taped over the weld around the outside of the pipe. A machine carries
a shielded radioactive source down the inside of the pipe to the position of the weld. The
radioactive source is then remotely exposed and a radiographic image of the weld produced on
the film. This film is then developed and examined for signs of flaws in the weld.
F62.3 Application
In the water sector, the techniques have been used to examine the condition of pipes
and valves in situ. In process industries, radiography has been proven to be very useful in
detecting different kinds of internal deposits in pipes.
F62.5 Advantages
♦ The technique can be applied to most materials in situ. It is a non-destructive inspection
technique, and details of the material structure can be obtained.
F62.6 Limitations
♦ The technique is expensive and there are OH&S issues associated with its use. It
examines only a small area of pipe.
♦ Large diameter mains (> 15”) must be drained down.
♦ Exposing drinking water to ionizing radiation is not approved or sanctioned by any
utility, water industry association, or governmental agency in the United States.
♦ Experience is required to interpret the radiographs produced.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-181
Table F-64. Radiographic Testing.
Criteria Assessment
Technical Assets covered Pipes, valves.
selection Material type Ferrous, cementituous, plastics (not GRP)
Service area Potable.
Access requirements Both sides of the asset must be accessible.
Limitations relating to asset condition None.
Limitations relating to asset size/geometry None.
Continuous/discrete Discrete; small sections only.
Destructive/non destructive Non-destructive.
Interruption to supply/function Generally would require the asset to be off-line,
as water absorbs the radiation.
Technical Assessment parameters Changes in material structure, including
suitability inclusions, corrosion, voids, and thickness
changes.
Integration with software tools Stand alone tool; images need manual
interpretation.
Commercialization of tool Tool and service commercially available.
Previous/existing use of the tool in sector Limited or no use in the United States water
sector; use reported in the United Kingdom water
sector.
Accuracy/reliability Semi-quantitative.
Ease of validation of results Images can be calibrated; interpretation is a
skilled task.
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); High level of skill due to health and safety issues;
usability would require specialized contractor to
undertake.
Technology required (level of tool sophistication) Independent of technology.
Documentation Standards for use are available; documentation
also available.
Availability of technical support N/A; would require specialized contractor to
undertake.
Economic factors Cost per inspection High.
Resource requirements Requires specialist contractor.
F62.7 Bibliography
1. Dorn, R., Howsam, P., Hyde, R.A. and Jarvis, M.A. Water mains: Guidance on assessment
and inspection techniques, CIRIA Report 162, Construction Industry Research and
Information Association, London, England, 1996.
2. Randall-Smith, M., Russell, A. and Oliphant, R. Guidance manual for the structural
condition assessment of trunk mains, WRc, UK, 1992.
3. IAEA Development of protocols for corrosion and deposits evaluation in pipes by
radiography, Industrial Applications and Chemistry Section, International Atomic Energy
Agency,Vienna, Austria, 2005.
F-182
F63.0 Remote Field Eddy Current (RFEC and RFEC/TC Tools)
F63.1 Overview
The Remote Field Eddy Current (RFEC) inspection technique is a non-destructive
method that uses low frequency AC and through-wall transmission to inspect ferrous pipes and
tubes from inside the pipe. The through-wall nature of the technique allows external and
internal defects to be detected with approximately equal sensitivity.
RFEC probes have been successfully adapted for inspection of cast iron and steel water
mains, as well as pre-stressed concrete cylinder pipes (also know as PCCPs).
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-183
broken pre-stressing wires. Wire breaks interrupt the flow of energy, changing the measured
field and allowing for detection of broken wires.
F63.3 Application
The RFEC method was developed for the inspection of carbon steel components such
as process heat exchangers, tanks and boiler tubes.
It allows for the inspection of pipes and tubes from the inside to check for problems
around the entire circumference and over the entire length.
RFEC probes have been successfully adapted for inspection of cast iron and steel water
mains. A modified version of the tool is used for pre-stressed concrete cylinder pipes (also
know as PCCPs) inspection.
F63.5 Advantages
♦ RFEC tools are available to suit a range of pipe sizes 150 mm upwards. The smaller
sizes may be launched through modified fire hydrants. The probes can be used in wet or
dry conditions.
♦ Probes with circumferential array of detectors are capable of examining 100% of the
pipe. Some tools operate through internal cement linings (up to 25 mm), though with a
reduction in sensitivity and resolution.
♦ The RFEC/TC tool is able detect and resolve multiple regions of broken wires at
different axial locations along the pipe.
F63.6 Limitations
♦ Pipe requires internal cleaning prior to inspection. If water is used to propel the tool, it
is necessary to discharge the water to the environment.
♦ There is variability in the success of flaw detection and location by probes supplied by
different companies.
♦ Although capable of giving a good estimate of where the wire break occurs along the
length of the pipe, the technique can give no information at this time as to the
circumferential position of the broken wires.
F-184
Table F-65. Summary Remote Field Eddy Current.
Criteria Assessment
Technical Assets covered Pipes, water and Wastewater pipeline
selection infrastructure, tubes.
Material type Iron and steel pipes, PCCPs.
Service Area Potable and wastewater.
Access requirements Tool only for use within pipe (internal use). Tool
access requires cut-ins at regular intervals (100 m
to 500 m, depending on cable length, pipe
alignment). Some adapted for launching through
hydrants.
Limitations relating to asset condition No limitations relating to asset condition provided
direct contact with the pipe wall is available.
Limitations relating to asset size/geometry Asset must be of sufficient size to accommodate
wheeled carriage. Devices to suit 150 mm internal
diameter have been produced. These can
negotiate bends up to 15º radius. Tools are tailored
to specific internal pipe diameters, ±5%.
Continuous/discrete Continuous readings stored in computer memory in
real time and space.
Destructive/non destructive Non-destructive.
Interruption to supply/function Tool application requires pipe to be off-line.
Technical Assessment parameters Internal and external defects such as cracks, pits or
suitability wall thinning.
Integration with software tools Computerized software is available for signal
interpretation.
Commercialization of tool Commercialized, availability through specialized
companies.
Previous/existing use of the tool in sector Commercial use of the tools reported in literature
and trade journals. AwwaRF reports available on
tool sensitivity.
Accuracy/reliability Quantitative assessment; but varied sensitivity to
defects.
Ease of validation of results Calibration of tool against reference samples
required. Validation possible only by comparison
with manual/direct measurements.
Utility technical Asset management sophistication Generic approach.
capacity Skills required (level of tool sophistication); Professional skills required to interpret output data.
usability Tool operation typically by a third party.
Technology required (level of tool sophistication) Specialized equipment and dedicated computer
software.
Documentation Tool principles and description of reports generated
by tool will be available.
Availability of technical support Tool operation typically by a third party.
Economic factors Cost per inspection Greater than US$5,000 per site, plus civil costs.
Resource requirements Typically two-person crew.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-185
F63.7 Bibliography
1. Birring, A.S. Selection of NDT techniques for inspection of heat exchanger tubing. Proced.
Petroleum Industry Inspection Conference, Texas, USA. June 1999.
2. Burn, L.S., Eiswirth, M., DeSilva D. and Davis P., Condition Monitoring and its Role in
Asset Planning, Pipes Wagga Wagga 2001, Charles Sturt University, Wagga Wagga,
N.S.W., 2001.
3. Dingus, M., Haven, J. and Austin, R. Nondestructive None Invasive Assessment of
Underground Pipes, AwwaRF, USA, 2002.
4. Makar, J. M. ; Chagnon, N. Inspecting systems for leaks, pits, and corrosion, National
Research Council of Canada, Institute for Research in Construction, NRCC-42802
(downloaded from www.nrc.ca/irc/ircpubs), 1999.
38H
6. Lillie, K., Reed, C. and Rodgers, M. A. R., 2004, Workshop on Condition Assessment
Inspection Devices for Water Transmission Mains, AwwaRF, USA, 2004.
F-186
F64.0 Schmidt Hammer
F64.1 Overview
The Schmidt hammer is a simple hand held device that allows non-destructive
assessment of materials such as brick and concrete. The tool gives an inferred measure of
compressive strength by an assessment of surface hardness.
The hammer consists of a spring loaded mass that is fired at the sample and rebounds,
thereby measuring the ‘rebound number’ for the material. A calibration chart is then used to
give an indication of compressive strength. Digital versions of the tool give direct readouts of
compressive strength.
F64.3 Application
The Schmidt hammer is used to test the strength and quality of concrete and brick
assets, both civil and pipeline, and is used in a number of international standards:
• ASTM C 805-97, Svensk Standard SS 13 72 37, Svensk Standard SS 13 72 50, Svensk
Standard SS 13 72 52, BS 1881: Part 202.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-187
♦ Depending on the angle of the Schmidt hammer to the vertical during testing,
corrections may need to be made for this angle.
F64.5 Advantages
• The Schmidt hammer is a quick means of assessing compressive strength of
cementituous or rock like materials, and can provide valuable comparative data
between different parts of a sample, or between different samples (Dorn et al., 1996).
F64.6 Limitations
♦ The accuracy of the technique is relatively low for prediction of compressive strength,
between ± 15-20% in well controlled conditions (Feldman, 1977).
♦ The results are also very dependant on surface conditions (Dorn et al., 1996) and results
can be affected by the smoothness of surface, geometry of sample, moisture content,
type of cement and aggregate and the extent of surface carbonation (Feldman, 1977).
♦ The results obtained are for localized areas of the asset due to the heterogeneous nature
of cementituous materials (Randall-Smith et al, 1992).
F-188
Criteria Assessment
by reading calibration curves. Digital versions
calculate compressive strength.
Documentation ASTM C 805-97, Svensk Standard SS 13 72 37,
Svensk Standard SS 13 72 50, Svensk
Standard SS 13 72 52, BS 1881: Part 202.
Availability of technical support Technical support available from retailers and
from Internet.
Economic factors Cost per inspection Low cost per inspection.
Resource requirements Resources required depend on assets being
inspected.
F64.7 Bibliography
1. ASTM C805-02 Standard Test Method for Rebound Number of Hardened Concrete.
2. BS EN 12504-2:2001 Testing concrete in structures. Non-destructive testing.
Determination of rebound number.
3. Dorn, R., Howsam, P., Hyde, R.A. and Jarvis, M.A. Water mains: Guidance on assessment
and inspection techniques, CIRIA Report 162, Construction Industry Research and
Information Association, London, England, 1996.
4. Feldman, R.F., CBD-187 Non-destructive testing of concrete, Canadian Building Digest,
http://irc.nrc-cnrc.gc.ca/pubs/cbd/cbd187_e.html , accessed 2005.
40H
7. Randall-Smith, M., Russell, A. and Oliphant, R. Guidance manual for the structural
condition assessment of trunk mains, WRc, UK, 1992.
8. SIS; Svensk Standard SS 13 72 37. "Betongprovning-Hårdnad betong-Studsvärde,"
(Concrete testing - Hardened concrete - Rebound number, in Swedish).
9. SIS; Svensk Standard SS 13 72 50. "Betongprovning-Hårdnad betong- Tryckhållfasthet
skattad med ledning av studsvärden," (Concrete testing - Hardened concrete - Compressive
strength from rebound number, in Swedish).
10. SIS; Svensk Standard SS 13 72 52. "Betongprovning-Hårdnad betong- Tryckhållfasthet,
skattad med ledning av studsvärden och ljudhastighetsvärden," (Concrete testing -
Hardened concrete - Compressive strength, rated from rebound and sound velocity values,
in Swedish) .
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-189
F65.0 SCRAPS (Sewer Cataloging, Retrieval and Prioritization System)
F65.1 Overview
The Sewer Cataloguing, Retrieval and Prioritization System (SCRAPS) is an expert
system that targets the inspection of critical areas of the sewer network.
The knowledge base of this expert system was assembled with input from a national
group of experts, drawn from both the public and private sectors. Input from the experts was
used to develop the system’s logic, which assesses the overall need to inspect a sewer based on
the pipe’s consequence and likelihood of failure. The inference engine is based on Bayesian
belief network theory, which allows the uncertainty in the experts’ beliefs to be propagated
through the system. The tool was developed with a rapid prototype application process. The
validation of the tool showed it is effective at mimicking the knowledge of experts.
F65.3 Application
The software is designed to facilitate the management of sewerage networks by
prioritizing CCTV inspections.
F-190
♦ The tool is also usable by utilities that have collected considerable data and performed
condition assessments. In this case, the tool allows prioritization of repair of the sewers
with the highest risk of failure according to the consequences of failure.
♦ The tool may provide insight in to the factors that have had greatest influence on the
current condition.
F65.5 Advantages
♦ SCRAPS can assist small to medium sized utilities develop a strategy to gather
information about their systems by prioritizing their inspection process.
♦ The tool targets critical areas of the sewer system first, thereby reducing the potential
cost for emergency repair and delaying unnecessary inspections.
♦ The tool’s logic is based on the industry paradigm of consequence of failure and
likelihood of failure and extensive input from numerous regional-based experts.
♦ The tool has the advantage of containing the heuristics and understanding of failure and
impact relationships of many experts.
F65.6 Limitations
♦ Large authorities may require more sophisticated approaches.
Table F-67. Summary SCRAPS (Sewer Cataloging, Retrieval and Prioritization System).
Criteria Assessment
Technical Assets covered Sewer networks.
selection Granularity System level.
Service Area Wastewater.
Technical Focus of analysis Expert system that prioritizes sewer inspections.
suitability Scalability of tool/approach Aimed at small utilities that may not have
sufficient system data to search effectively for
potential failures.
Commercialization Commercial system available from WERF.
Previous/existing use of the tool Has been used in the United States.
Ease of validation Validation is possible through comparison with
independent assessments.
Flexibility with regard to analysis (asset types) and Wastewater; system level only.
granularity (system, asset level)
Integration with other tools/GIS None.
Utility technical Asset management sophistication Aimed at level of asset management where
capacity standard asset data is available.
In-house skills required Asset manager.
Technology required PC based tool. Windows based operating
system.
Documentation Detailed report available from WERF.
Data Requirements Targets critical assets and requires information
on them.
Linking to asset data Through database.
Availability of software and technical support Limited support available.
Usability Windows based software.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-191
F65.7 Bibliography
1. Hahn, M.A., Palmer R.N., Merrill, M.,S. and Lukas, A.B. Sewer inspection prioritization
with a regional expert system. Proc. of the ASCE’s 2000 Joint Conference on Water
Resources Engineering and Water Resources Planning and Management, Minneapolis,
MN, August, 2000.
F-192
F66.0 Slow Crack Growth Resistance of PE Pipes
F66.1 Overview
The Notched Tensile Test is a destructive test that can be used to quantify the resistance
to slow crack growth of a PE pipe material.
The test involves deliberately introducing a razor notch onto a test coupon, which is
then subjected to a pre-defined tensile stress. The time to failure is recorded, which correlates
with the resistance to slow crack growth exhibited by a particular pipe material
Traditionally used to assess performance of new PE materials, this test has also been
used to measure slow crack growth resistance of pipes currently in-service.
F66.3 Application
This test is applicable to PE pipe materials only.
• This test method applies to PE pipes and is described by the American Standard ASTM
F 1473. The American standard ASTM D 3350 specifies a test temperature of 80°C and
a stress of 2.4 MPa. ISO 16241: 2005 also references this test method.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-193
♦ Results from the notched tensile test correlate well with the potential for slow crack
growth failure under normal operating loads. In general, longer failure times correspond
to lower average slow crack growth failure rates in the field. However, the test does not
relate to PE pipe failures that occur under the influence of external factors such as poor
pipe installation practice and third party damage during adjacent excavation.
F66.5 Advantages
♦ The test method should be relatively low cost.
♦ A single coupon test will indicate the resistance to slow crack growth of the pipe under
inspection.
♦ With appropriate expertise, comparisons can then be made with previous literature
studies in which notched tensile test results were compared with slow crack growth
field failures in PE pipes.
F66.6 Limitations
♦ The test method is destructive and coupon samples require careful razor notching.
♦ Test results require comparison with previous studies in the literature to be meaningful.
♦ Tests conducted on new PE materials can result in impractically long test times.
F-194
Criteria Assessment
Documentation Test method is fully documented in ASTM F 1473.
Threshold values for test times distinguishing different
PE materials classes are covered in ASTM D 3350.
Journal papers quoting typical results for different PE
pipe materials in use are available in the literature.
Availability of technical support University or research organizations can offer support
in the use of and interpretation of test results.
Economic factors Cost per inspection Specialist test, so relatively expensive
Resource requirements Laboratory based test.
F66.7 Bibliography
1. ISO 16241: 2005, Notch tensile test to measure the resistance to slow crack growth of
polyethylene materials for pipe and fitting products.
2. ASTM F1473, Standard test method for the notch tensile test to measure the resistance to
slow crack growth of polyethylene pipes and resins.
3. ASTM D 3350, Standard specification for polyethylene plastic pipe and fitting materials.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-195
F67.0 Smart Digital Sewer Pipe Diagnostic System (VTT)
F67.1 Overview
The Smart Digital Diagnostics System for Sewer Pipes is currently being developed. It
is intended to be a new diagnostics system able to interpret digital image data according to
future CEN standard (Visual Inspection Coding System).
When completed, the system will measure and analyze the condition of a sewer pipe
and will support network wide regular condition monitoring and proactive maintenance.
F67.3 Application
When developed, the system will provide automated analysis of defects in sewer
pipelines.
♦ It is intended to interpret digital image data according to a future CEN standard (Visual
Inspection Coding System).
F67.5 Advantages
♦ Enables advanced and automatic analysis of sewer pipelines for defects rather than the
manual analysis required with traditional CCTV data. This has the potential in the long
term to reduce the costs associated with sewer inspection.
F67.6 Limitations
♦ The technique is in its development stages and has only been trialed in a number of
European cities.
F-196
♦ The system requires a highly specialized scanner unit.
Table F-69. Summary Smart Digital Sewer Pipe Diagnostic System (VTT).
Criteria Assessment
Technical Assets covered Sewer pipelines.
selection Material type Any material.
Service area Wastewater.
Access requirements Scanner unit is inserted through manhole
access point.
Limitations relating to asset condition Assets in very poor condition may cause the
scanner to get stuck.
Limitations relating to asset size/geometry Scanner unit needs to be inserted into pipeline,
so very small diameter pipes are not suitable,
although the vast majority of sewer pipes will be
covered.
Continuous/discrete Scanner records continuous data along pie
length.
Destructive/non destructive Non-destructive inspection technique.
Interruption to supply/function No interruption to sewer is needed.
Technical Assessment parameters Records high quality digital images with 1mm
suitability accuracy that covers the entire circumference of
the pipe wall.
Integration with software tools Requires specialized software to interpret
results.
Commercialization of tool Non commercial product that is still under
development.
Previous/existing use of the tool in sector Has been trialed in several European cities only.
Accuracy/reliability Quantitative and qualitative.
Ease of validation of results Validation is possible through visual inspection.
Utility technical Asset management sophistication required A high level of sophistication is required using
capacity specialized equipment and software.
Skills required (level of tool sophistication); usability Skilled operator required.
Technology required (level of tool sophistication) Specialized scanner unit is required and
dedicated software to interpret results.
Documentation Technique still in development.
Availability of technical support Technique still in development.
Economic factors Cost per inspection Initial purchase costs are high.
Resource requirements Skilled operator and equipment is required.
F67.7 Bibliography
1. Welsh School of Architecture (Data Unknown) Case Study: Digital diagnostics system
for sewer pipes. Accessed November 2006 at:
http://www.cardiff.ac.uk/archi/programmes/cost8/case/watersewerage/finland-
43H
sewer.pdf.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-197
F68.0 Smoke Testing
F68.1 Overview
Smoke testing is used to identify faulty or illegal connections to gravity sewer and
storm water systems.
Fans are used to force artificial smoke into the sewer at one or more manholes. The
smoke will then either escape the system at house vent pipes, defective or illegal connections
and other problem areas, allowing them to be identified.
F68.3 Application
Smoke testing is used to locate illegal or faulty connections to gravity sewer and storm
water systems, but can also indicate defective connections buried manholes.
F68.5 Advantages
♦ Smoke test systems are inexpensive and provide a fast method for locating illegal and
faulty connections.
F68.6 Limitations
♦ May cause alarm to residents.
F-198
Table F-70. Summary Smoke Testing.
Criteria Assessment
Technical Assets covered Gravity sewer and storm water.
selection Material type Any.
Service area Wastewater.
Access requirements Manhole or similar access to sewer pipes
required.
Limitations relating to asset condition Not restrictions due to asset condition.
Limitations relating to asset size/geometry No restriction due to size of asset.
Continuous/discrete N/A
Destructive/non destructive Testing is Non-destructive.
Interruption to supply/function Inspection can be undertaken while asset is on-
line.
Technical Assessment parameters Test indicates connections to sewer pipeline.
suitability Integration with software tools Stand alone tool for detecting locations of
inflow.
Commercialization of tool Equipment is available from a number of
commercial suppliers.
Previous/existing use of the tool in sector Used in the United States.
Accuracy/reliability Qualitative indication.
Ease of validation of results Results can be validated by visual or other
inspection methods.
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); usability Low level of operator skill required.
Technology required (level of tool sophistication) Specialized equipment required to introduced
smoke to assets.
Documentation No standards were found on this technique.
Availability of technical support Information on testing can be obtained from
equipment suppliers.
Economic factors Cost per inspection Low cost.
Resource requirements Test requires a number of personnel for each
test to locate smoke escape points.
F68.7 Bibliography
1. Hurley, L. Smoke Testing Our Sewer Systems, Pipes Wagga Wagga 2005, Charles Sturt
University, Wagga Wagga, N.S.W., October 17-20, 2005.
2. Ratliff, A. An overview of current and developing technologies for pipe condition
assessment, Pipelines 2003, ASCE 2004.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-199
F69.0 Soil Characterization
F69.1 Overview
Soil characterization involves analyzing soil parameters relevant to the deterioration of
buried assets. Such parameters include pH, sulfide concentrations, moisture content, electrical
conductivity (salinity), shrink-swell capacity and redox potential. Soil characteristics interact
with buried assets of all material types.
Characterization of soil parameters relevant to buried assets allows suitable material
types to be chosen and effective preventative measures to be taken to minimize degradation of
the asset. Soil characterization can also be used with pipe specific information to predict the
working life of the pipe.
F-200
♦ Shrink/swell capacity (soil moisture reactivity); Clay soils change volume depending
on their water content. Clay particles absorb moisture into their crystal lattice causing
them to swell. As the moisture content of the soils reduces due to uptake by plant root
systems, percolation through soil matrix and evaporation, the soil will shrink. Assets
within soils with high shrink/swell capacities are known to have an increased failure
rate, due to the stresses imparted by the soil during the shrink/swell cycle. The basic
properties that characterize shrink/swell capacity are plasticity index, fraction of fine
particles and the mineralogy of the particles. The mineralogy of the particles may be
related to the geologic origin of the soil deposit. Alternatively, direct mineralogical
measurements may be carried out to characterize the soil fractions.
♦ Buffering capacity; Clay soils and soils high in organic matter have high buffering
capacity while sandy soils and soils low in organic matter have low buffering capacity
(Agri-facts, 2005). A soil’s buffering capacity is the degree to which it is able to resist
changes in pH; in particular acidification. The affects of pH are covered above.
♦ Linear polarization resistance; LPR can been used to predict the corrosion rate of
buried ferrous assets; high LPR indicates low corrosion rates. The empirical
relationship between LPR and corrosion rate has been investigated on a number of
occasions, and some doubt has been expressed as to the reliability of the technique
(Heathcote and Nicholas, 1998). (see review on Linear Polarization Resistance)
♦ Contaminants; soil contaminants such as organic compounds can have negative affects
on polymeric materials. Organic compounds such as petrol can migrate through the
polymeric pipes both impacting water quality and remaining in the polymer matrix
causing it to swell and lose strength. Highly levels of acidic continents can also cause
environment stress cracking of polymers dramatically reducing lifetime.
♦ Soil compaction: The susceptibility of the trench filling and the surrounding sediments
for compaction.
These parameters often cannot be used in isolation because of the range of factors
involved in chemical and electrochemical processes that cause corrosion, deterioration and
stress failure (Dorn, 1996). As such, results are often incorporated into scoring systems used to
classify a soil’s potential for corrosion or other mechanisms of deterioration.
F69.3 Application
Soil characterization tests conducted on samples taken at relevant locations can be used
to give an insight into the environment of buried assets without disturbing the asset.
Characterization conducted prior to installation of buried assets can be used to
determine appropriate material type to be used and also establish if any protection measures
need to be included, such as cathodic protection.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-201
F69.5 Advantages
♦ Samples can be obtained without exposing buried assets.
♦ Characterization can be focused on parameters of interest such as those linked to
corrosion.
♦ Characterization at failure locations can be used to give an indication of the process
involved in failure.
♦ Characterization prior to installation can be used to choose appropriate asset materials
and/or protection.
F69.6 Limitations
♦ As samples are small, tests only give parameters for a small area, which may or may
not be representative of the area of interest.
♦ Analyzes often needs to be conducted in a lab and can be expensive.
♦ Correlation between measured parameters and desired result is not always reliable.
♦ Moisture content of soil sample may not be that seen at the asset location due to
variations in factors such as compaction.
F-202
Criteria Assessment
Economic factors Cost per inspection Cost depends on number and type parameters
being tested.
Resource requirements Resources required is dependant on testing
being conducted.
F69.7 Bibliography
1. Agri-facts: Practical Information for Alberta’s Agriculture Industry,
http://www1.agric.gov.ab.ca/$department/deptdocs.nsf/all/agdex3684/$file/534-
4H
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-203
F70.0 Soil Corrosivity
F70.1 Overview
The predominant deterioration mechanism for ferrous pipes is electro-chemical
corrosion. Soil corrosivity tests use one or more soil characteristics to predict the likely rate of
corrosion.
A soil’s corrosivity to ferrous pipe materials can be assessed in different ways; some
methods predict only that corrosion is likely, while others predict a likely rate of corrosion.
F70.3 Application
Soil corrosivity gives an indication of the likelihood that corrosion will occur. It can
generally be used to qualitatively rank soil types, such as on a scale from non-corrosive
through to very corrosive. Soil corrosivity tests are relevant for buried ferrous assets. Soils can
be categorized into broad corrosivity categories that identify areas where corrosion potential is
highest.
F-204
F70.5 Advantages
♦ Techniques used in predicting soil corrosivity can be conducted prior to laying pipe
allowing appropriate corrosion control measures to be undertaken. Categorization of
soil types into corrosivity classes can be useful in focusing attention on assets where
more detailed monitoring and inspection of buried ferrous assets may be justified.
♦ Outputs from soil corrosivity tests can be linked to soil layers within a geographic
information system, in order to provide a spatial overview of likely areas of high
corrosivity.
F70.6 Limitations
♦ Most techniques only indicate the corrosion rate qualitatively.
♦ Corrosion rate does not allow the condition of an asset to be assed on the rate of its
degradation.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-205
F70.7 Bibliography
1. Heathcote, M. and Nicholas, D. Life Assessment of Large Cast Iron Watermains, Urban
Water Research Association of Australia, Research Report No 146, 1998.
2. Najjaran, H., Sadiq, R. and Rajani, B. Fuzzy Expert System to Assess Corrosion of Cast/
Ductile Iron Pipes from Backfill Properties, Computer–Aided Civil and Infrastructure
Engineering, 21, pp. 67-77, 2006.
3. Sadiq, R., Rajani, B. and Kleiner, Y. Fuzzy-Based Method to Evaluate Soil Corrosivity for
Prediction of Water Main Deterioration, Journal of Infrastructure Systems, 10, 4, pp. 149 –
156, 2004.
F-206
F71.0 Soil (Electrical) Resistivity
F71.1 Overview of Inspection Tool
The predominant deterioration mechanism for ferrous pipes is electro-chemical
corrosion. Soils with low resistivity are more likely to have high corrosion rates, while high
resistivities are likely to indicate low corrosion rates. As such, measuring soil resistivity gives
an indication of the rate at which corrosion will occur. Soil resistivity can be measured in situ
or in the lab using a number of techniques.
F71.3 Application
Soil resistivity is an environmental indicator of the corrosivity of soils. In conjunction
with other environmental information, the corrosion rate of materials in the soil can be
estimated. Reference standards include:
♦ AS 1289.4.4.1 -1997: Determination of the electrical resistivity of soil.
♦ ASTM G187-05 Standard Test Method for Measurement of Soil Resistivity Using the
Two-Electrode Soil Box Method.
♦ ASTM G57-95a(2001) Standard Test Method for Field Measurement of Soil Resistivity
Using the Wenner Four-Electrode Method.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-207
♦ Measurements should be taken to the side of the line of the pipe, to avoid the pipe from
being included in the conduction path.
♦ Due to differences in the degree of compaction, the results obtained in the laboratory
tend to be lower than the corresponding values measured in situ.
♦ Soil resistivity should not be measured on soil at below-freezing temperatures.
F71.5 Advantages
♦ Low cost technique.
♦ Gives an indication of soil corrosion potential.
♦ Widely used technique.
F71.6 Limitations
♦ Soil resistivity is only indicative of corrosion rate for buried ferrous assets; further
detailed analysis is required to actually determine corrosion rate and asset condition.
F-208
F71.7 Bibliography
1. Dorn, R., Howsam, P., Hyde, R.A. and Jarvis, M.A. Water mains: Guidance on assessment
and inspection techniques, CIRIA Report 162, Construction Industry Research and
Information Association, London, England, 1996.
2. Lillie, K., Reed, C. and Rodgers, M. A. R., 2004, Workshop on Condition Assessment
Inspection Devices for Water Transmission Mains, AwwaRF, USA, 2004.
3. Najjaran, H., Sadiq, R. and Rajani, B. Fuzzy Expert System to Assess Corrosion of
Cast/Ductile Iron Pipes from Backfill Properties, Computer-Aided Civil and Infrastructure
Engineering, 21, pp 67-77, 2006.
4. Randall-Smith, M., Russell, A. and Oliphant, R., Guidance manual for the structural
condition assessment of trunk mains, WRc, UK, 1992.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-209
F72.0 Thermographic Testing
F72.1 Overview
Thermographic testing uses infrared (IR) imagery to locate defects and potential
failures in electrical equipment by scanning for thermal abnormalities. As IR energy is emitted
from objects due to their thermal properties, thermographic testing enables the early detection
of electrical problems that are associated with a thermal signal, such as overheating. This non-
destructive test allows for the early identification and repair of defects before they potentially
cause unscheduled power losses, equipment damage, or even catastrophic equipment failures.
F72.3 Application
Thermographic testing is an effective method of locating problems in all electrical
equipment that carries a current. Thermographic testing is potentially applicable to the
following: Substations, Switchgear, Motor Control Centers, Motors, Bearings, Transformers,
Circuit Breakers, Cables, Terminators, Bus Bars, Bus Plugs, Overhead Distribution Lines,
Starters Contactors, Transmission Lines, Power Panels, Lighting Panels, High Voltage
Equipment, Switches, Controls and Low Voltage Equipment. IR can also be used for roads and
roofs.
♦ ASTM-E1934-99a and ISO/DIS 18436-8 are applicable to thermographic testing.
ISO/DIS 18436-8 is a Draft International Standard (DIS) with no specific standard for
this test method.
F72.5 Advantages
♦ Thermographic testing allows rapid scanning of equipment and can be used at a
distance, meaning that no direct contact or intrusion is required.
♦ The results are reliable, can be recorded in different formats and sensors can be
sensitive to 0.1 °C.
F-210
F72.6 Limitations
♦ A temperature difference is required to identify electrical faults. Some operator
experience is necessary as sensitivity and resolution can be reduced with distance to
object and angle of view.
♦ As most thermographic testing is performed on "live front" energized equipment
precautions must be taken to ensure no direct contact with live parts.
F72.7 Bibliography
1. ISO/DIS 18436-8: Condition monitoring and diagnostics of machines - Requirements for
training and certification of personnel - Part 8: Thermography (Under Development).
2. ASTM-E1934-99a (2005) Standard Guide for Examining Electrical and Mechanical
Equipment with Infrared Thermography.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-211
F73.0 Transformer Circuit Protection Coordination and Protection Relays
F73.1 Overview of Tool
Transformer circuit protection coordination and protection relays are designed to
prevent damage to valuable electrical equipment from short circuits or other faults.
Coordination of protection relays aims to minimize disruption to network operations by
ensuring that only equipment impacted by the fault is isolated and shutdown.
This review outlines the testing and analysis of electrical protection systems that should
be undertaken to ensure adequate protection and the reliable performance of protection relays.
This type of protective device co-ordination review should be done as part of any
comprehensive maintenance program at least every five years.
F73.3 Application
Analysis of circuit protection coordination and protection relays can be applied to the
following: LV switchboards, HV switchgear, transformers and cabling. Relevant standards
include:
♦ AS/NZ 3000 wiring rules. Various standards for equipment types (fuses, breakers,
MCCBs, etc.).
♦ AS 3851-1991: The calculation of short-circuit currents in three-phase alternating
current systems.
♦ AS 3865-1991: Calculation of the effects of short-circuit currents.
♦ IEC 60865- Short-circuit currents - calculation of effects.
♦ IEC 60909- Short-circuit currents in three-phase alternating current systems.
F-212
♦ The analysis of relay protection and coordination requires an experienced and specialist
engineer. There are a number of companies that specialize in providing the expertise to
design and test electrical protection systems.
F73.5 Advantages
♦ The design and testing of electrical protection systems is critical in preventing damage
to important and expensive electrical equipment.
♦ If adequate information is available there is the potential for non-invasive desktop study
of electrical protection systems.
F73.6 Limitations
♦ If data on the electrical protection system is lacking, a desktop analysis is not possible.
Therefore, direct access to components may required, which in some cases will result in
power shutdowns. Plant has to be off-line to enable the tripping of breakers.
Table F-75. Summary Transformer Circuit Protection Coordination and Protection Relays.
Criteria Assessment
Technical Assets covered Electrical protection systems; fuses, overload
selection units, CTS, protection relays.
Material type N/A
Service area Potable and wastewater.
Access requirements Access to HV authorized areas.
Limitations relating to asset condition None.
Limitations relating to asset size/geometry None.
Continuous/discrete Gives time co-ordination with other devices for
fault currents.
Destructive/non destructive Non-destructive.
Interruption to supply/function For testing of equipment reaction it is necessary
to trip feeder units with resultant power outages.
Technical Assessment parameters Time for protection system to react and its
suitability interaction with other protection devices.
Integration with software tools Stand alone.
Commercialization of tool Fully developed.
Previous/existing use of the tool in sector Standard industry practice.
Accuracy/reliability Within tolerances of supplied equipment e.g.,
tripping times may have a 10% margin.
Ease of validation of results Direct measurement.
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); usability Requires experienced and qualified engineer.
Technology required (level of tool sophistication) N/A
Documentation Standard design in accordance with AS/NZ
3000; AS 3851-1991: AS 3865-1991 ; IEC
60865 ; IEC 60909.
Availability of technical support N/A
Economic factors Cost per inspection N/A
Resource requirements Site survey and offsite desktop study.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-213
F73.7 Bibliography
1. AS/NZS 3000:2000 Electrical installations (known as the Australian/New Zealand Wiring
Rules).
2. AS 3851-1991 : The calculation of short-circuit currents in three-phase alternating current
systems.
3. AS 3865-1991 : Calculation of the effects of short-circuit currents.
4. IEC 60865- Short-circuit currents - Calculation of effects - Part 1: Definitions and
calculation methods.
5. IEC 60909- Short-circuit currents in three-phase AC systems - Part 3: Currents during two
separate simultaneous line-to-earth short circuits and partial short-circuit currents flowing
through earth.
6. Thorp, J.S. The Protection System in Bulk Power Networks, Power System Engineering
Research Centre, 2003.
F-214
F74.0 Transient Earth Voltage (TEV)
F74.1 Overview of Tool
The detection of transient earth voltage (TEV) is an indicator of partial discharge. In
general terms, partial discharge is a minute electrical pulse or discharge occurring in a gas
filled void or on a dielectric surface of a solid or liquid insulation system. This can occur upon
insulation breakdown due to aging, damage or contamination. The pulse or discharge only
partially bridges the gap between the phase to ground insulation. This is an early indicator of
insulation failure. Emissions from a partial discharge are electromagnetic, radio up to 80 MHz,
light, heat, acoustic ultrasonic and gases.
F74.3 Application
TEV can be used to inspect HV switchgear, transformer cable boxes and tappings for
the detection of electrical insulation breakdown.
F74.5 Advantages
♦ TEV is non-destructive and components are monitored while in normal operation.
♦ This method is easy to use and provides instantaneous information. It is a compact and
user-friendly tool that is also very durable.
♦ There is no requirement to expose electrical live parts. No requirement for directs
contact.
F74.6 Limitations
♦ Detects discharges to earth through voids or insulation breakdown. It does not detect
discharge between phases or into air. It therefore cannot, on its own, be used for all HV
switchgear or fault applications.
♦ It is best used in a device that uses a combination of ultrasound and electromagnetic
detection.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-215
Table F-76. Summary Transient Earth Voltage (TEV).
Criteria Assessment
Technical Assets covered HV switchgear, transformer cable boxes and
selection tapping selector switches.
Material type Electrical insulation.
Service area Potable and wastewater.
Access requirements HV authorized person usually required to
access plant areas.
Limitations relating to asset condition None.
Limitations relating to asset size/geometry None.
Continuous/discrete Continuous during test.
Destructive/non destructive Non-destructive.
Interruption to supply/function On-line
Technical Assessment parameters Electrical discharge to earth.
suitability Integration with software tools Stand alone.
Commercialization of tool Commercialized, can be used off the shelf.
Previous/existing use of the tool in sector Industry standard practice.
Accuracy/reliability Validity confirmed on insulation testing of unit
(requires power down) and physical inspection.
Is an indicative tool.
Ease of validation of results Direct measurement.
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); usability Field service engineer, HV authorized.
Technology required (level of tool sophistication) None is a stand alone portable tool.
Documentation Is well documented.
Availability of technical support N/A
F74.7 Bibliography
1. EA technology, http://www.eatechnology.com, accessed 2006.
45H
F-216
F75.0 Ultrasonic Emission Inspection
F75.1 Overview of Tool
The use of audible sound has long been part of the information gathering process to
diagnose the operating condition of plant and machinery.
Audible sounds generated by individual bearings, electrical arcing, or leaks are difficult
to differentiate in a noisy environment where components operate within close proximity of
one another. Machinery also generates sound above the range of normal human hearing in the
ultrasound region. Due to the properties of ultrasound, the sounds made by individual parts can
be differentiated. Any physical changes in equipment will produce resultant sound changes.
Theses sound changes will often first appear within the ultrasound spectrum before the audible
spectrum, giving the opportunity for early diagnosis.
Ultrasonic emission inspection is a non-destructive method for maintenance
diagnostics, safety, and quality control.
F75.3 Application
Ultrasonic emission inspection can be used to inspect plant mechanical defects within
motor bearings and gearing. Electrical faults that involve arcing, tracking over insulation
(partial discharge) or air discharge (corona) can also be detected. Acoustic ultrasonic can also
be used to check steam trap performance and to find air leaks.
♦ Ultrasonic emission inspection is referenced in ISO-10375 - Non-Destructive Testing -
Ultrasonic Inspection - Characterization of Search Unit and Sound Field.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-217
maintenance inspections, for identification of failed components when a problem is
suspected, and for confirmation of repairs.
♦ This method cannot be used in isolation for all HV switchgear applications. Inspection
of HV switchgear is best carried out with in conjunction with transient earth voltage
inspection (see transient earth voltage review). HV authorized personnel only to
undertake testing of HV electrical equipment.
F75.5 Advantages
♦ Ultrasonic emission inspection is non-destructive and components are monitored while
in normal operation.
♦ There is no requirement to expose electrical live parts or for direct contact. This method
is easy to use and provides instantaneous information.
♦ This inspection method can be used in hazardous areas with suitably rated detectors.
F75.6 Limitations
♦ Ultrasonic's will show problems with air switches, insulators and bushings in outdoor
structures only where direct air passage is available, for example, through the skin of
the cable box.
♦ It cannot, on its own, be used for all HV switchgear applications. Inspection of HV
switchgear is best carried out with in conjunction with transient earth voltage inspection
(see Transient Earth Voltage Review).
F-218
Criteria Assessment
Economic factors Cost per inspection Relatively low cost
Resources required One operator needing only time required to access
plant item and listen.
F75.7 Bibliography
1. ISO-10375 - Non-Destructive Testing - Ultrasonic Inspection - Characterisation of Search
Unit and Sound Field.
2. CTRL, http://www.ctrlsys.com/library/faq/faq_ut.php, accessed 2006.
46H
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-219
F76.0 Ultrasonic Measurements; Continuous (Guided Wave)
F76.1 Overview
Ultrasonic inspection is a non-destructive test conducted by sending high frequency
sound into an asset and evaluating any echoes detected. Ultrasonic examination procedures are
widely used for thickness measurement, corrosion monitoring, delamination checks and flaw
detection in welds, forgings, castings and pipes.
In the material, the ultrasonic pulses travel in straight lines, until they hit an interface
between two different materials (steel and air for example), or a flaw, when most of the energy
of the vibration will be reflected. A small amount of the energy is reflected back to the probe,
where it is detected.
This section applies to continuous techniques used for the rapid screening of pipes for
corrosion/erosion. Discrete ultrasonic inspection techniques are considered in a separate
section (see Ultrasonic Measurements; Discrete).
F76.3 Application
Continuous ultrasonic measurement is used to obtain an understanding of corrosion
along a pipeline, above and below ground pipes can be assed. This technique is suitable for use
on pipe diameters above 50mm (2.0") and on wall thicknesses up to 40mm (1.6").
F-220
• ASTM E1816-96(2002); Standard Practice for Ultrasonic Examinations Using
Electromagnetic Acoustic Transducer (EMAT) Techniques.
F76.5 Advantages
• The principal advantage of this technique is that it provides 100% initial screening
coverage, and only requires local access to the pipe surface (i.e. exposure of small
section of buried pipe or removal of a small amount of insulation) at those positions
where the transducer array is to be attached.
F76.6 Limitations
♦ Continuous ultrasonic measurement is more expensive than discrete ultrasonic
measurements. While the technique is equally sensitive to internal and external
corrosion, it cannot distinguish between them.
♦ Only very limited pipe lengths can be inspected when the pipe is heavily coated in a
very alternative material such as fresh bitumen. Surface deposits such as scale and
corrosion products also limit the length pipe which can be inspected.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-221
Criteria Assessment
Ease of validation of results Validation possible only by comparison with
manual /direct measurements.
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); Professional skills to interpret output data. Tool
useability operation typically by a trained technician.
Technology required (level of tool sophistication) Specialized equipment and dedicated computer
software.
Documentation Tool principles and description of reports
generated by tool will be available.
Availability of technical support Service provided by special operator.
Economic factors Cost per inspection Variable. Staff time will be the highest cost.
Equipment cost US$1,000-10,000.
Resource requirements Typically one person.
F76.7 Bibliography
1. Lowe M.J.S., Alleyne D.N., Cawley P., Defect detection in pipes using guided waves,
Ultrasonics Vol. 36, p147-154, Elsevier Science, 1998.
2. Wassink, C.H.P., Robers M.A., de Raad J.A, and Bouma T. (2000) Condition Monitoring
of Inaccessible Piping, 15th World Conference on Nondestructive Testing, Roma (Italy)
15-21 October 2000. Accessible at:
http://www.ndt.net/article/wcndt00/papers/idn075/idn075.htm.
48H
F-222
F77.0 Ultrasonic Measurements; Discrete
F77.1 Overview
Ultrasonic inspection is a non-destructive test conducted by sending high frequency
sound into an asset and evaluating any echoes detected. Ultrasonic examination procedures are
widely used for thickness measurement, corrosion monitoring, delamination checks and flaw
detection in welds, forgings, castings and ferrous pipes.
An ultrasonic flaw detector has an oscillator circuit that sends electrical pulses to a
probe. The transducer in the probe produces ultrasonic vibrations when it receives the electrical
pulse. A range of vibration frequencies can be chosen between 1 MHz and 15 MHz depending
on the specific application. For example, typical frequencies used in weld examination are
between 2 MHz and 5 MHz.
The ultrasonic vibrations leave the probe and are conducted into the material to be
tested by a couplant, usually grease, oil, water, paste or gelatin.
In the material, the ultrasonic pulses travel in straight lines, until they hit an interface
between two different materials (steel and air for example), or a flaw, when most of the energy
of the vibration will be reflected. A small amount of the energy is reflected back to the probe,
where it vibrates the piezoelectric crystal, generating an electric current. This current returns to
the flaw detector, where it is amplified, rectified, filtered and displayed.
This section applies to discrete techniques used for screening of pipes for
corrosion/erosion at discrete locations. Continuous ultrasonic inspection techniques are
considered in a separate section.
Figure F-12. Simple Set-Up Using the Pulse-Echo Principle and a Twin Crystal Probe.
(Reprinted with permission from: Drury, J., 1996)
Figure F-13 shows a more complicated situation where the ultrasonic signal passes
through three materials the cement lining, pipe wall and corrosion products respectively. Four
echo signals are generated in this case, at the air-cement lining, cement lining-pipe wall, pipe
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-223
wall corrosion products and corrosion products-air interfaces. It should be noted that the
situation below is a schematic only, the transducer and detector both need to be in contact with
the surface of the asset being inspected. Also field experience indicates that ultrasonic
techniques are unable to detect flaws in cement mortar linings.
Figure F-13. Multiple Interfaces on Cement-Lined Water Pipe Create Multiple Ultrasonic Reflections
(Shown with a Probe Located Internally).
Wall thickness measurements are performed using a conventional flaw detector and a
compression wave probe, which sends longitudinal waves into the component at normal
incidence to the surface. Signals are displayed on the flaw detector screen in the form of an A-
scan, in which the horizontal axis represents time and the vertical axis represents signal
amplitude. When a 0° compression probe is being used, the horizontal axis is equivalent to the
depth of the discontinuity (flaw or other interface) from the scanning surface.
The use of an A-scan display allows the operator to distinguish more easily between
signals originating from embedded plate flaws and the nominal back wall response. Also, the
dynamics of the back wall echo can be observed on the A-scan display to detect the presence of
pitting.
Conventional twin-crystal 0° compression probes are generally used to detect hidden
corrosion. However, where pitted surfaces are being assessed for remaining thickness, pencil
probes are used. These have a pointed tip which is designed to fit into the pits, so that the
remaining thickness can be measured where pitting is at its most severe.
F77.3 Application
Use for thickness measurement, corrosion monitoring, delamination checks and flaw
detection in welds, forgings, castings and ferrous pipes.
• ASTM E1816-96(2002); Standard Practice for Ultrasonic Examinations Using
Electromagnetic Acoustic Transducer (EMAT) Techniques.
F-224
larger in area than the beam at that range. These characteristics are not found in
corroded pipes.
♦ An eroded pipe surface with a gradual gradient over most of the length of the eroded
area is a reasonable reflector (the surfaces are nearly parallel and relatively smooth). An
ultrasonic probe placed anywhere in the eroded region is therefore likely to give a
reasonable echo amplitude. Reasonable measurement accuracy can be expected as long
as the beam circumference is smaller than the eroded area. Drury (1996) showed that in
most cases corrosion measurements are accurate to within 0.5mm. If, however, the
erosion is uneven and with corrosion pits the accuracy is limited. Corrosion pits can
have a variety of shapes, but may be generalized into two forms, lake type and cone
type (Drury, 1996).
♦ In lake type pitting the major part of the reflecting target is relatively parallel to the
scanning surface and will give adequate echo amplitude, provided the ultrasonic probe
is placed over the "flat" region.
♦ Cone type pits are the most difficult to detect as the major reflecting surfaces are not
favorably orientated, the surfaces are rough and often ridged, and the target area is often
small in relation to the beam cross section. The latter is true particularly of the base of
the pit. For this reason cone type pits are the least likely to be detected and have the
greatest inherent inaccuracy in their measurement.
♦ The likelihood of detecting corrosion pitting using the ultrasonic method is dependent
on many factors. Until recently, it was common practice to use spot checks on a grid
pattern. Area scanning is however now preferred and can be applied manually using
contact scanning or via automated scanning.
♦ As noted above, the reflecting surface that is offered by typical corrosion pitting is
often poor for ultrasonic purposes and the operator needs to be able to see the character
of the signal to avoid errors. For this reason simple digital thickness meters are not
suitable for corrosion detection. Equipment with an A-Scan presentation is preferred
and this can be complimented by B-Scan (through wall view) and C-Scan (plan view
image) facilities.
♦ The curved outer surface of pipe causes the incident ultrasonic beam to diverge. The
effect becomes more severe as the diameter of the pipe decreases. The effect is
overcome by making the circumferential dimension of the beam focus on the surface of
the test material small compared with the diameter of the pipe being inspected. For this
reason, probes with small beam focus are more suited for small diameter pipe.
F77.5 Advantages
♦ Probes are available in a wide range of sizes, measurement accuracies and costs.
♦ Simple to use. User manuals supplied with instruments sufficient for operator training.
♦ The external units can be used without supply interruption.
♦ Wall thickness reductions detected with a reasonable degree of accuracy.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-225
F77.6 Limitations
♦ Inspection requires pipe cleaning prior to inspection to remove material, which would
affect the readings. For internal inspection, the pipe has to be off-line and dry as
inspection units are generally not waterproof.
♦ If the pipe is inspected from the inside, care needs to be taken because the surface of the
specimen (concave rather than convex) will make the beam converge rather than
diverge.
F-226
F77.7 Bibliography
1. Drury, J.C. Corrosion monitoring and thickness measurements – what are we wrong?, IIR
Bulk Liquid Storage Tank Conference London 22nd /23rd January 1996, accessed at:
http://www.silverwinguk.com/en/technical%20pdfs/ultrasonics_corrosion_pitting.pdf.
49H
2. Saka, M. and Salam Akanda, M. A. Ultrasonic Measurement of the Crack Depth and the
Crack Opening Stress Intensity Factor under a No Load Condition, Journal of
Nondestructive Evaluation, Vol. 23, No. 2, pp 49-63, 2004.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-227
F78.0 UtilNets
F78.1 Overview
UtilNets is a prototype software-based decision-support system intended to help
manage the preventative maintenance of water distribution assets. It performs current condition
assessments and reliability-based life predictions for pipes, and analyzes the consequences of
maintenance decisions.
UtilNets uses a GIS-based user interface, and results are presented as thematic maps
and tables. The tool provides a forecast on the aggregate structural, hydraulic, water quality,
and service reliability of the network, together with an assessment of the required rehabilitation
expenditures. It also provides support to rehabilitation planning by ranking each pipe segment
in the whole network on a basis of its need for rehabilitation.
Currently, the software is in a prototype phase and can only be used in the assessment
of cast-iron water mains.
F78.3 Application
The software is designed to facilitate maintenance management of water distribution
assets. A prototype of UtilNets has been implemented for cast-iron water pipes, but is
extendable to other pipe materials
F-228
where data is incomplete. Probability curves are provided to assist the Default Manager
where applicable.
♦ A data dictionary has also been prepared as part of UtilNets to assist users. The data
dictionary sets out the way in which data is held, by both type and units.
F78.5 Advantages
♦ A data dictionary has been prepared as part of UtilNets to assist the user in setting up
the system.
♦ The software comes with an import manager which can be used to import data into the
UtilNets database from a number of sources such as Oracle and Access databases, text
files and Excel.
♦ The software provides defaults that allow analysis when there are data gaps.
F78.6 Limitations
♦ UtilNets in its current prototype form is rigid, complex and requires large amounts of
data that may be unaffordable to collect and to enter on to the system. For this reason
more utilities are being involved from across Europe to help the developers in
designing the commercially available version of UtilNets.
♦ Currently only grey and ductile cast-iron water mains can be assessed.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-229
F78.7 Bibliography
1. Hadzilacos, T.; Kalles, D.; Preston, N.; Melbourne, P.; Camarinopoulos, L.; Eimermacher,
M.; Kallidromitis, V.; Frondistou-Yannas, S.; and Saegrov, S. UtilNets: a water mains
rehabilitation decision-support system, Computer, Environment and Urban Systems,
Volume: 24, Issue: 3, pp. 215-232, 2000.
F-230
F79.0 Valve Exercising
F79.1 Overview
The operation of valves is critical to the function of a water distribution system. In the
event of a pipe failure, valves are used to minimize the impact and to allow repair work to be
carried out. Boundary valves can also be operated in an emergency to rezone areas. As such,
valve locations should be known and operation checked intermittently, although the impact of
the disturbed flow must be considered before doing this (change in flow conditions can disturb
sediments and cause discoloration events).
Valve exercising is a non-destructive test used to ensure the function of valves by
moving them through their full range of motion. Periodic operation gives a measure of
operability, which in turn can be used as an indicator of condition. A valve exercising program
is thereby used as a means of identifying faulty or broken valves needing replacement.
F79.3 Application
Valve exercising is conducted in order to maintain an up-to-date record of valve
condition, schedule repair work as required and to extend valve life through preventative
maintenance. The following documents provide guidance on valve exercising:
♦ ANSI/AWWA G200-04, Distribution Systems Operation and Management, American
Water Works Association
♦ AWWA Manual M44 Distribution Valves, American Water Works Association
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-231
♦ The torque used to operate a valve should be the lowest required. This torque should be
maintained throughout as too much torque on closing will mean significantly more
torque will be required to reopen the valve. Too much torque can also force the valve
and a higher percentage of broken valves will result.
F79.5 Advantages
♦ Valve exercising can increase the lifetime of a valve, removing build-up on the action
that can prevent operation.
♦ Allows valves requiring repair to be identified.
F79.6 Limitations
♦ Cost of introducing the program may seem prohibitive to some authorities.
♦ Changed flow conditions could result in disturbance of sediments and discoloration
events.
F-232
F79.7 Bibliography
1. Blakely, D. Why bother with a valve exercising program, On Tap Magazine, National
Drinking Water Clearinghouse, 2004. Accessed October 2006 at:
http://www.nesc.wvu.edu/ndwc/articles/OT/WI04/valve.html.
50H
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-233
F80.0 Vibration Analysis
F80.1 Overview of Tool
Vibration analysis is used to monitor the condition of assets and for fault diagnosis.
Vibration is typically measured using hand-held (can be permanently positioned)
accelerometers placed on the equipment at key measurement points, with portable data
collectors and software for vibration analysis. Vibration analysis is commonly used on large
items of rotating equipment, such as turbines, centrifugal pumps, motors, gearboxes etc.
F80.3 Application
Vibration analysis can be used on any vibrating machinery, but is most commonly used
on machinery with rotating parts such as gearboxes, drive shafts, motor bearings, rotors in
electric motors, pumps and fans.
The ISO 10816-1:1995 and BS ISO 18436-2:2003: reference vibration analysis.
BS ISO 18436-2:2003 specifies the general training requirements for personnel who
perform condition monitoring and diagnostics on assets using vibration analysis. Certification
to this standard will provide recognition of the qualifications and competence of individuals to
perform machinery vibration measurements and analysis using portable and permanently
installed sensors and equipment. However, ISO certification is only necessary if a utility is ISO
certified; the Vibration Institute provides various levels of certification from technician to
expert and is generally used by most industries in the United States.
F-234
♦ Vibration analysis should be used as part of routine assessment to allow for developing
trends in the equipment to be identified. Vibration analysis assessments are often
carried out on a monthly basis.
♦ Vibration can be measured using a number of different types of transducers;
accelerometers, velocity transducers and displacement transducers. Accelerometers are
the most common and versatile transducers in use and the only type capable of
measuring high frequency vibration such as that produced by bearing and gear
problems. However, accelerometers have reduced accuracy at low frequencies.
♦ Repeatability is key to worthwhile comparisons. If the plant is operated at different
speeds, the frequencies generated and their amplitude may be changed. The plant must
therefore be operated in the same manner and the same load as previous samples.
During a sample the load and speed must remain constant.
♦ Block/washers are normally installed on equipment to provide a stable source for the
vibration probe and to provide repeatability of results.
F80.5 Advantages
♦ Vibration analysis is non-destructive. Portable measuring devices can be used. Assets
can remain on-line subject to repeatability issues noted above.
F80.6 Limitations
♦ Must form part of a monitoring program to allow comparison with previous results.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-235
Criteria Assessment
Utility technical Asset management sophistication required Generic approach.
capacity Skills required (level of tool sophistication); Requires training.
usability
Technology required (level of tool sophistication) Standard PC.
Documentation Well documented. ISO 10816; ISO 18436.
Availability of technical support Widely available.
Economic factors Cost per inspection No information.
Resource requirements One person no more than a few minutes per
load once test points are established.
F80.7 Bibliography
1. ISO 10816-1:1995: Mechanical vibration—Evaluation of machine vibration by
measurements on non-rotating parts—Part 1: General guidelines.
2. BS ISO 18436-2:2003: Condition monitoring and diagnostics of machines—Requirements
for training and certification of personnel.
3. Vibration School.com, http://www.vibrationschool.com/index.htm, accessed 2006.
51H
F-236
F81.0 Visual Inspection (Pipes)
F81.1 Overview
Visual inspection is a low-tech inspection method of structural condition assessment
that requires no specialized equipment and can provide a great deal of useful information about
buried assets.
Visual inspection can be carried out as an opportunistic approach to condition
assessment when assets are unearthed for operational reasons. Visual inspection is also
undertaken as a precursor to other condition assessment techniques.
After exposing the asset, visual observations should be recorded using written
descriptions, photography and/or video recordings. Exposing buried assets also allows the
quality and condition of back fill to be assessed.
F81.3 Application
This technique is used commonly onsite and should be undertaken whenever a pipe is
exposed and as a precursor to other condition assessment techniques.
F81.5 Advantages
♦ Physical observation can be conducted when the asset is exposed for other reasons
enabling useful information to be obtained at minimal cost.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-237
♦ The technique is simple and requires no specialized equipment, although a camera and
welding hammer can be useful. When undertaken as an opportunistic inspection it is
low cost. Results can be used to indicate any further tests which might be useful.
F81.6 Limitations
♦ Results are qualitative only; depending on operator experience and detail included in
inspection reports. Results are also limited to the section observed.
F81.7 Bibliography
1. Dingus, M., Haven, J. and Austin, R. Non-destructive None Invasive Assessment of
Underground Pipes, AwwaRF, USA, 2002.
2. Dorn, R., Howsam, P., Hyde, R.A. and Jarvis, M.A. Water mains: Guidance on assessment
and inspection techniques, CIRIA Report 162, Construction Industry Research and
Information Association, London, England, 1996.
3. Rajani, B.; Kleiner, Y. Non-destructive inspection techniques to determine structural
distress indicators in water mains, National Research Council of Canada, Institute for
Research in Construction, NRCC-47068, 2004, (downloaded from
www.nrc.ca/irc/ircpubs).
52H
F-238
F82.0 WARP
F82.1 Overview
WARP is a software-based decision support tool that helps to model the deterioration
rates of water mains and subsequently plan their renewal. To achieve this, WARP provides a
number of functions, including the analysis of water main breakage patterns, short-term
operational forecasting and long-term renewal planning.
Static factors affecting pipe failure rates (e.g., pipe material, diameter, soil) are
considered through the grouping of water mains into relatively homogeneous groups.
Historical failure patterns are assumed to govern the future behavior of the water mains. Based
on this assumption, and with the appropriate economic and cost data, the future impact of
various operational strategies can be computed.
The analysis of water main breakage patterns is undertaken in WARP accounting for
time-dependent factors such as temperature, soil moisture (rainfall deficit), main replacement
rates and cathodic protection strategies. The influence of each of these factors on pipe failure
rate is quantified to identify the background deterioration rates of buried water mains.
The impact of various operational strategies on future failure rates can also be
predicted.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-239
Once the analysis identifies all the parameters and coefficients governing the breakage
rates in the water mains, expected future breakage rates can be forecasted. With the appropriate
economic data, such as costs of breakage consequences, pipe replacement and cathodic
protection, long-term planning can then be undertaken.
WARP can perform some rudimentary optimizations as well as calculate the life-cycle
costs of any user-defined strategy, which may include combinations of cathodic protection and
pipe replacement over several years.
F82.3 Application
The software is designed to facilitate rehabilitation planning and maintenance
management of water distribution assets.
F82.5 Advantages
♦ WARP integrates a number of tools into a decision support tool-box; the tools are based
on published research.
♦ The analysis of both steady and dynamic influences on the pipe failure rate are
considered, which will allow utilities to understand the background level of network
deterioration without the influence of annual variations associated with dynamic factors
beyond the utility’s control.
♦ The tool allows various operational strategies to be considered to determine their
relative effectiveness.
F82.6 Limitations
♦ Use of tool to date has been limited to the development projects.
♦ Data requirements are high.
♦ Analysis is based on the assessment of asset cohorts. It is thus macro model that
estimates a broad range of lengths of water mains to be rehabilitated or replaced each
year. The model does not predict specific water mains that should be rehabilitated or
replaced each year.
F-240
Table F-84. Summary WARP.
Criteria Assessment
Technical Assets covered Pipes, water pipeline infrastructure
selection Granularity System and asset cohorts.
Service Area Potable.
Technical Focus of analysis Long-term asset management planning using
suitability asset failure curves developed from utility asset
data.
Scalability of tool/approach Better suited to medium to large authorities
where good asset data is available.
Commercialization Commercial software released in 2006.
Previous/existing use of the tool Developed through in kind support from utilities
in the United States and Canada .
Ease of validation Initial validation is provided in statistical analysis
of failure data and development of failure
curves.
Flexibility with regard to analysis (asset types) and Potable; designed for system level, but does
granularity (system, asset level) allow assessment at sub network level.
Integration with other tools/GIS None.
Utility technical Asset management sophistication Aimed at higher level of asset management
capacity where good asset data is available.
In-house skills required Asset manager/engineer.
Technology required PC based tool. Windows based operating
system.
Documentation Research and development fully documented.
Data Requirements Good quality asset data and asset failure history
data is required.
Linking to asset data None; cohort level analysis.
Availability of software and technical support Software available through NRC.
Usability Simple user interface.
F82.7 Bibliography
1. Kleiner, Y.; Rajani, B. Modeling the deterioration of water mains and planning their
renewal, National Research Council of Canada, Institute for Research in Construction,
NRCC-46119, 2002 (downloaded from www.nrc.ca/irc/ircpubs).
53H
2. Rajani, B.B.; Kleiner, Y. WARP - water mains renewal planner, National Research Council
of Canada, Institute for Research in Construction, NRCC-44680, 2001 (downloaded from
www.nrc.ca/irc/ircpubs).
54H
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-241
F83.0 WRc Sewer Rehabilitation Manual
F83.1 Overview
The WRc Sewer Rehabilitation Manual (SRM) is a framework for assessing the
condition and performance of sewerage networks. The SRM sets out a strategy that
concentrates appropriate investigations on those parts of the system where problems are most
severe with the aim of producing:
♦ Significant cost savings in necessary rehabilitation works.
♦ The ability to limit future rehabilitation costs as the network gets older.
♦ The means of quantifying and justifying the financial requirements for future upgrading
programs.
The approach was developed principally to meet the sewerage rehabilitation needs of
the United Kingdom water sector. However, it has since been applied in a number of other
countries. While it had an initial focus on the United Kingdom, some minor amendments were
made to bring the SRM approach into line with the European Standard, Drain and Sewer
Systems Outside Buildings: Part 5 Rehabilitation.
F-242
Without first inspecting the sewers it is not possible to fully assess the risk of failure.
Three possible approaches are described in the SRM to address this paradox:
1. Consider only the consequences of failure. Since the assessment of the consequences
of failure does not generally depend on the condition, consequence can be used as a
basis for identifying potentially high risk sewers. A method of identifying those sewers
(termed critical sewers) with a high consequence of collapse is a central feature of the
SRM. The consequences include direct costs to the utility as well as social costs (e.g.,
traffic disruption).
2. Consider available information known to affect the likelihood of failure. This
approach allows the selection of those sewers where other factors would suggest that
the likelihood of failure is high (e.g., shallow depth).
3. Consider consequences together with the available information known to affect
the likelihood of failure. This approach allows the selection of sewers with high
failure risk, whether this is due to the high consequences failure, a high likelihood of
failure, or a combination of both.
When considering which sewers to inspect, the principle aim is to select a group such
that the total costs of failure over time would be significantly higher than the costs of
inspection and subsequent pro-active rehabilitation before failure. In some countries,
legislation requires inspection of certain sewers. If this is the case, this requirement will
override any other consideration.
After CCTV inspection, each sewer length inspected is assigned into one of five grades
as set out in Table F-85. Two methods of assessing the internal condition grade are available:
♦ A computerized scoring system based on defect codes.
♦ A manual method.
Grade Implication
5 Collapsed or collapse imminent.
4 Collapse likely in foreseeable future.
3 Collapse unlikely in near future but further deterioration likely.
2 Minimal collapse likelihood in short term but potential for
further deterioration.
1 Acceptable structural condition.
Once the internal condition grade has been allocated, various other factors are used to
make an assessment of the likelihood of structural failure (collapse) of the sewer or further
deterioration. To this end, a structural performance grade (SPG) is allocated based on the
internal structural condition grade and other information such as surcharge potential and soil
type.
Since an internal structural condition of (say) 3 (collapse unlikely in near future but further
deterioration likely) can represent low or high risk depending on the specific asset’s context,
it is the SPG that is of most interest to the asset manager.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-243
F83.3 Application
The SRM provides guidelines and procedures to assist in the planning and design of
works to improve the performance of existing sewer systems and in the strategic planning of
operations and maintenance work.
at http://www.wrcplc.co.uk/srm/.
56H
♦ The manual has been widely adopted in the United Kingdom and is also used in other
countries.
♦ While the scope of the manual is focused on wider service issues, structural condition is
a major focus of the SRM approach and is assessed through the collection and
interpretation of CCTV and other data.
F83.5 Advantages
♦ The WRc framework is a generic approach built on a well established engineering
framework. As such it provides a practical means of collecting information to better
understand the condition and performance of sewerage networks.
♦ The WRc approach can be used to obtain both an understanding of present condition
and the interventions required to address service issues in sewerage networks.
F83.6 Limitations
♦ The overall approach has been designed in light of European practices; United States
approaches may differ from those adopted.
♦ The approach presupposes there are issues within the drainage area. Drainage areas that
do not have hydraulic, environmental, structural or operational problems are outside the
applicability of the SRM and do not warrant investigation in the manner described in
the Manual. As such, the scope of the SRM does not cover drainage areas where there
are no service issues.
F-244
Table F-86. Summary WRc Sewer Rehabilitation Manual.
Criteria Assessment
Technical Assets covered Sewerage networks.
selection Granularity Drainage area to sewer level.
Service Area Wastewater
Technical Focus of analysis Cost effective management of sewerage assets;
suitability resolution of service problems in drainage
areas.
Scalability of tool/approach Scaleable; framework can be tailored to meet
the demands of any size company.
Commercialization Framework available as a manual.
Previous/existing use of the tool Has been widely used in the United Kingdom
water sector.
Ease of validation Validity of results depends on data collection
and interpretation.
Flexibility with analysis (asset types) and Wastewater; asset to system level.
granularity (system, asset level)
Integration with other tools/GIS N/A
Utility technical Asset management sophistication Generic approach.
capacity In-house skills required Professional engineering skills required for
development of assessment program.
Contractors usually used to inspect pipes
Technology required Depends on CCTV inspection tool used.
Documentation Approach documented in a Manual that has
been kept current and up to date.
Data Requirements High; requires data on drainage area and
environment, but the program can be tailored in
terms of affordability issues.
Linking to asset data N/A
Availability of software and technical support Not supported by software. Technical support is
not available except on a consultancy basis.
Usability N/A
F83.7 Bibliography
1. WRc (2001) Sewerage Rehabilitation Manual – 4th Edition, Water Research Council
(WRc), Accessed October 2006 (Limited content version):
http://www.wrcplc.co.uk/srm/.
57H
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-245
F84.0 WRc Trunk Main Structural Condition Assessment Approach
F84.1 Overview
The WRc Trunk Main Structural Condition Assessment approach is a framework for
assessing the structural condition of large diameter pressure pipes. It can be applied to the
range of pipe materials used in the bulk transmission of potable water; that is, ferrous,
cementitious, and plastics. The approach also covers the condition assessment of valves.
The overall approach is broken down into a number of logical steps:
♦ Initial Data Gathering: Define the purpose of the study, and review currently available
(including opportunistic) data.
♦ Subdivision of system under study into categories on the basis of physical pipeline
features and environmental factors.
♦ Inspection of pipes in the categories of importance, with due consideration given to
factors such as the strategic importance of the pipe, the consequence of pipe failure and
known problem pipes/areas.
♦ Analysis and interpretation of data.
F84.3 Application
A framework approach to the condition assessment of large diameter transmission
pipes.
F-246
F84.4 Practical Considerations
♦ The WRc approach to condition assessment is detailed in a published manual
obtainable from WRc (http://www.webookshop.com/index.asp).
58H
♦ In practice, the WRc approach has often been applied to the assessment of cast iron
pipes. For these pipes, measurement of condition is often made by shot blasting the
pipe, measuring external pit depths by manual means (e.g., using a welding gauge), and
use of ultrasonic sensors to assess the level of internal pitting. Remaining life is then
calculated through simplifying assumptions, namely that:
1. Corrosion is assumed to be initiated as soon as the pipe is brought into service;
2. The internal and external corrosion rates do not change with time;
3. The deepest external pit measured is coincident with the calculated deepest internal
pit, that is, maximum thinning of the wall, based on measured values, is assumed;
4. The ‘failure’ of the pipe is taken to occur as soon as corrosion penetrates the wall,
so called through-wall corrosion.
F84.5 Advantages
♦ The WRc framework is a generic approach built on a well-established engineering
framework. As such it provides a practical means of collecting information to better
understand the condition of large diameter pipes.
♦ The WRc approach can be used to obtain both an understanding of present condition
and, with the application of appropriate simplifications, the change in condition into the
future.
F84.6 Limitations
♦ Having been first published in 1992, the approach could be considered somewhat dated,
especially with regard to the use of discrete sampling techniques. However, in practice
the underlying principles are still valid and pragmatic in many situations, especially for
utilities with little information regarding their transmission pipe network.
♦ The main limitation of the approach is that generalized conclusions are made about
pipeline systems from measurements made at a limited number of discrete points.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-247
♦ The WRc Manual notes that the confidence levels of the asset life predictions are low
and should be interpreted accordingly. In particular, predictions of asset life expectancy
do not indicate the time to next failure.
Table F-87. Summary WRc Trunk Main Structural Condition Assessment Approach.
Criteria Assessment
Technical Assets covered Trunk mains; pipes and valves.
selection Granularity Pipelines or networks of pipes.
Service Area Potable.
Technical Focus of analysis Current structural condition and remaining life
suitability Scalability of tool/approach Scaleable; inspection program can be tailored to
meet the demands of any size company.
Commercialization Framework available as a manual.
Previous/existing use of the tool Has been widely used in the United Kingdom
water sector.
Ease of validation Results of discrete sampling procedures are
uncertain.
Flexibility with regard to analysis (asset types) and Mainly potable, but applicable to force sewer
granularity (system, asset level) mains; asset to system level.
Integration with other tools/GIS N/A
Utility technical Asset management sophistication Generic approach.
capacity In-house skills required Professional engineering skills required for
development of assessment program.
Contractors usually used to inspect pipes.
Technology required Depends on inspection tool used.
Documentation Approach documented in a manual, though this
is somewhat out of date, the underlying
principles still apply.
Data requirements Moderate; requires data on pipeline and
environment, but the program can be tailored in
terms of affordability issues.
Linking to asset data N/A
Availability of software and technical support Not supported by software. Technical support is
not available except on a consultancy basis.
Usability N/A
F84.7 Bibliography
1. Randall-Smith, M., Russell, A. and Oliphant, R. Guidance manual for the structural
condition assessment of trunk mains, WRc, United Kingdom, 1992.
F-248
F85.0 Volumetric X-Ray or Radiographic Testing
F85.1 Overview of Tool
Volumetric X-Ray or radiographic testing is a non-destructive method used for
checking the integrity of metal assets such as welded pipe joints and plant components.
The technique is based on the transmission of X-rays onto to an object, with the
resultant radiation signal being used to produce an image. Volumetric X-ray testing uses
multiple X-ray images taken from different angles to enable reconstruction of any horizontal or
vertical X-ray image plane. This capability enables the viewing of additional information that
may be hidden by obstructing details in the testing region of interest (Berger and Schulte,
2002). This can assist in providing additional information for the detection and characterization
of discontinuities, such as hollow spaces or foreign material, in all kinds of structures,
including welds, castings, electronic devices and electromechanical assemblies.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-249
location of pores and inclusions in the weld bead can be reconstructed along the direction of
the weld and through the center of the pore. By combining this with the capability for
dimensional measurement, the quality of the weld can be assessed and repair decisions such as
from which side of the weld to start can be made.
F85.3 Application
X-ray tomosynthetic imaging (imaging by sections or sectioning) can be used on a wide
variety of assets including castings, electronic devices and electromechanical assemblies;
however the most practical application for the water industry is weld testing. The following
standards reference this test method:
♦ ASME Code 31.1 and B31.3 standards are applicable for pressure vessels.
♦ AS 3507.1—2003 Non-destructive testing Part 1: Guide to radiography for ferrous
castings.
Tomography (imaging by sections or sectioning) is defined in ASTM E-1316 (1999).
F85.5 Advantages
♦ Use of a digital flat panel provides high sensitivity, fast response and good resolution.
Images of any region of an asset can be obtained quickly and with little effort with
volumetric X-ray systems. The viewer can look behind obstructing details that may
hide the region of interest.
♦ Reconstructed viewing of any horizontal or vertical X-ray image plane is achievable
along with the ability to scan through selected horizontal or vertical image regions as
well as a precision measurement capability. Volumetric X-ray imaging in conjunction
with methods such as tomosynthesis or computed tomography can provide the
additional information often needed for critical non-destructive testing applications.
♦ Volumetric X-ray imaging’s real-time radioscopic capability means that an immediate
response is given during testing. The operator can view the usual two dimensional X-
ray image and decide if more information is needed to complete the test. If that is the
F-250
case, additional images can be taken while the asset to be tested is in place to provide
the volumetric images needed.
F85.6 Limitations
♦ Volumetric X-ray imaging is relatively time consuming and expensive. There are also
significant occupational safety hazards associated with the use of X-ray imagery due to
the potential for radiation accidents. The staff operating the equipment need to be fully
trained in safe operating procedures and monitored for radiation exposure.
♦ The accurate development and interpretation of volumetric X-ray testing to identify
asset defects requires significant operator experience and expertise.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets F-251
F85.7 Bibliography
1. AS 3507.1 (2003) Non-destructive testing Part 1: Guide to radiography for ferrous castings.
2. ASTM E-1316 (1999), Standard Terminology for Nondestructive Examinations.
3. Berger and Schulte Volumetric X-Ray Testing, Back to Basics Archive (Available at:
http://www.asnt.org/publications/materialseval/basicsarchive.htm), The American Society
59H
F-252
GLOSSARY OF TERMS
Assessment Putting the inspection and other data into context and making a judgment as to the
condition of the system or asset.
Asset A physical component of a facility that has value, enables services to be provided and has
an economic life of greater than 12 months.
Asset Failure When as asset is no longer providing the service or function for which it is
intended.
Asset Observation All information that relates to assets, their environment and operation.
Inspection To collect asset observations relating to condition and performance of a given asset.
Maintenance All actions necessary for retaining an asset as near as practicable to its original
condition, excluding renewal.
Monitoring The repeated observations over time of some aspect of an asset especially to detect
and give warning of change.
Renewal Works to rehabilitate or replace existing assets with assets of equivalent capacity or
performance capability.
Replacement Provide a new asset in place of an existing asset that has reached the end of its
useful life, so as to provide a similar function or level of service.
Reticulation Wastewater collection system, more commonly used outside the United States.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets G-1
Risk A measure of the combination of the consequence of an event occurring and the probability
or likelihood of the event occurring. Often defined mathematically as the product of the
probability and consequence of failure.
Structural Condition The state of an asset at a particular time as it pertains to the degree of
physical deterioration and/or propensity for failure.
Tool An instrument, device or software package used to collect or interpret asset observations.
G-2
REFERENCES
Aitken, K. and Davis, C. Performance Monitoring in the Water Industry, OzWater 2001,
Proceedings AWA 19th Convention, Canberra, April 2001.
ABS Guide for Surveys Using Risk-Based Inspection for the Offshore Industry, American Bureau
of Shipping, December 2003.
ABS (2004) Guidance Notes on Reliability-Centered Maintenance, American Bureau of
Shipping, July 2004.
ASCE Sanitary Sewer Overflow Solutions American Society of Civil Engineers, EPA
Cooperative Agreement CP-828955-01-0, April 2004.
ASCE, Report Card for America’s Infrastructure, American Society of Civil Engineers, 2005.
(http://www.asce.org/reportcard/2005/index2005.cfm, accessed June 2007)
AWWA Reinvesting in Drinking Water Infrastructure, American Water Works Association,
Washington, D.C., 2001.
AwwaRF. Water Treatment Plant Infrastructure Asset Management: Users Manual, prepared by
L. Elliot et al., AWWA Research Foundation and American Water Works Association, 2001.
Auditor General, Overview of the Water Industry in Scotland. Prepared for the Auditor General
for Scotland, October 2005, downloaded from:
http://www.audit-scotland.gov.uk/publications/pdf/2005/05pf07ag.rtf
BSI PAS 55 Part 1: Specification for the Optimized Management of Physical Infrastructure
Assets, BSI, UK, 2004.
Backlund, F. (2003) Managing the Introduction of Reliability-Centred-Maintenance, RCM,
Doctoral Thesis no. 7, Division of Quality and Environmental Management, Luleå University of
Technology, Sweden.
Burn, S., Ambrose, M., Moglia, M., Tjandraatmadja, G., and Buckland, P. PARMS -
Management Strategies for Urban Water Infrastructure, IWA World Water Congress,
Marrakech, Morrocco, 2004.
Buckland, P. Risk based economic life cycle management of infrastructure assets and its
regulatory implications. In Proc. International Conference of Maintenance Societies,
Wollongong, Australia, May 2000.
Davis, P, Moglia, M., Burn, S., and Farlie, M Estimating failure probability from condition
assessment of critical cast iron water mains, Proc. 6TH National conference Australasian Society
of Trenchless Technology, 27-29 September, Melbourne, Australia, 2004.
De Sitter, W.R. Costs for Service Life Optimization: The Law of Fives, Durability of Concrete
Structures, Workshop Report, Ed. Steen Rostam, 18-20 May, Copenhagen, Denmark, 131-134,
1984.
Dorn, R., Howsam, P., Hyde, R.A., and Jarvis, M.G. Water mains: Guidance on assessment and
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets R-1
inspection techniques, CIRIA Report 162, Construction Industry Research and Information
Association, London, England, 1996.
GASB Basic Financial Statements – and Management’s Discussion and Analysis – for State and
Local Governments, Government Accounting Standards Board, June 1999.
(http://www.gasb.org/tech/index.html)
Hydro One Hydro One Networks Applications to the Ontario Energy Board, RP–2005-0020/EB-
2005-0378, Exhibit D1, 2005.
IPWEA International Infrastructure Management Manual, Australia/NZ Edition, 2006.
Moubray, J. The case against streamlined RCM. Proceedings of EuroMaintenance 2002,
Helsinki, Finland, pp. 7 -18, 2002.
Moubray J.M. Reliability Centered Maintenance, Butterworth - Heinemann, Oxford, 1997.
Newton, L.A. and Vanier, D.J. MIIP Report: The State of Canadian Sewers – Analysis of Asset
Inventory and Condition, B-5123.11, National Research Council of Canada, 2006.
NGSMI An Integrated Approach to Assessment and Evaluation of Municipal Road, Sewer and
Water Networks, National Guide to Sustainable Municipal Infrastructure, November 2003 (from
www.infraguide.ca).
NGSMI Assessment and Evaluation of Storm and Wastewater Collection Systems, The National
Guide to Sustainable Municipal Infrastructure, July 2004, (from www.infraguide.ca).
Nowlan F.S. and Heap, H. Reliability Centred Maintenance, National Technical Information
Service, U.S. Department of Commerce, Springfield, /VA, 1978.
Ofgem, Asset Risk Management Survey, Survey Guide, Ofgem, 20:2002.
Ofwat, PR99 Information Requirement H, Asset Inventory and System Performance Submission;
Reporting Requirements and Definitions, Ofwat, U.K., August 1998.
Rahman, S. and Vanier, D.J. An Evaluation of Condition Assessment Protocols for Sewer
Management, Municipal Infrastructure Investment Planning (MIIP) Report B-5123.6:, CNRC,
July 2004.
Rast, J.C., Drivers for Asset Management in the United States, Ozwater 2003, Proceedings AWA
20th Convention, Perth, April 2003.
SAE JA1011 Evaluation Criteria for Reliability-Centered Maintenance (RCM) Processes, SAE
Standards, August 1999.
Shaw, R. Strategic Asset Management in the Water Industry, OzWater 2001, Proceedings AWA
19th Convention, Canberra, April 2001.
Turner, S. PM Optimization Case Studies at Two Coal Mines, (undated), Downloaded from
Http://Www.Reliabilityweb.Com, 2006.
U.S. DoT Asset Management Primer, U.S. Department of Transportation, Federal Highway
Administration, Office of Asset Management, December 1999.
U.S. EPA (2002a) SSO Fact Sheet—Asset Management for Sewer Collection Systems, Office of
Wastewater Management, 833-F-02-001, April 2002.
R-2
U.S. EPA (2002b) The Clean Water and Drinking Water Infrastructure Gap Analysis, United
States Environmental Protection Agency, Office of Water (4606M), EPA-816-R-02-020,
September 2002.
U.S. EPA (2005) White Paper on Improvement of Structural Integrity Monitoring for Drinking
Water Mains, EPA/600/R-05/038, March 2005.
Vanier, D.J. Asset Management 101: A Primer, Innovations in Urban Infrastructure Seminar of
the APWA International Public Works Congress, Louisville, KY, 2000, 1-14.
Vanier, D.J. Asset management: "A" to "Z", APWA International Public Works Congress,
Philadelphia, PA, September, 2001.
Vanier, D.J. and Rahman, S. A Primer on Municipal Infrastructure Asset Management,
Municipal Infrastructure Investment Planning (MIIP) Report: B-5123.3, CNRC, May 2004.
Water Infrastructure Network Clean & Safe Water for the 21st Century. Water Infrastructure
Network, USA, 2000
Zhao, J.Q. Trunk Sewers in Canada, Proceedings of the APWA International Public Works
Congress – Innovations in Urban Infrastructure, Las Vegas, NV, pp. 75-89, 1998.
Condition Assessment Strategies and Protocols for Water and Wastewater Utility Assets R-3
R-4
WASTEWATER UTILITY Sunnyvale, City of Des Moines, City of New York
Union Sanitary District Iowa City New York City Department of
Alabama West Valley Sanitation District Environmental Protection
Montgomery Water Works &
Kansas
Colorado Johnson County Unified North Carolina
Sanitary Sewer Board
Aurora, City of Wastewater Districts Charlotte/Mecklenburg
Alaska Boulder, City of Unified Government of Utilities
Anchorage Water & Wyandotte County/ Durham, City of
Greeley, City of
Wastewater Utility Kansas City, City of Metropolitan Sewerage
Littleton/Englewood Water
Arizona District of Buncombe County
Pollution Control Plant Kentucky
Glendale, City of, Orange Water & Sewer
Metro Wastewater Louisville & Jefferson County
Utilities Department Authority
Reclamation District, Denver Metropolitan Sewer District
Mesa, City of Sanitation District No. 1 Ohio
Peoria, City of Connecticut Akron, City of
Phoenix Water Services Dept.
Greater New Haven WPCA Louisiana Butler County Department of
Stamford, City of Sewerage & Water Board Environmental Services
Pima County Wastewater
of New Orleans
Management District of Columbia Columbus, City of
Safford, City of District of Columbia Water & Maine Metropolitan Sewer District of
Sewer Authority Bangor, City of Greater Cincinnati
Arkansas
Portland Water District Northeast Ohio Regional
Little Rock Wastewater Utility Florida Sewer District
C a l i f o rn i a Broward, County of Maryland
Summit, County of
Central Contra Costa Fort Lauderdale, City of Anne Arundel County Bureau
Sanitary District of Utility Operations Oklahoma
Miami-Dade Water &
Howard County Department Oklahoma City Water &
Corona, City of Sewer Authority
of Public Works Wastewater Utility
Crestline Sanitation District Orange County Utilities Department
Department Washington Suburban
Delta Diablo Tulsa, City of
Sanitary Commission
Sanitation District Reedy Creek Improvement
Dublin San Ramon Services District Massachusetts O re g o n
District Seminole County Boston Water & Sewer Albany, City of
East Bay Dischargers Environmental Services Commission Clean Water Services
Authority St. Petersburg, City of Massachusetts Water Eugene, City of
East Bay Municipal Tallahassee, City of Resources Authority (MWRA) Gresham, City of
Utility District Tampa, City of Upper Blackstone Water Portland, City of
Eastern Municipal Water District Toho Water Authority Pollution Abatement District Bureau of Environmental
El Dorado Irrigation District Services
West Palm Beach, City of Michigan
Fairfield-Suisun Sewer District Water Environment Services
Georgia Ann Arbor, City of
Fresno Department of Public Atlanta Department of Detroit, City of Pennsylvania
Utilities Watershed Management Holland Board of Hemlock Municipal Sewer
Inland Empire Utilities Agency Public Works Cooperative (HMSC)
Augusta, City of
Irvine Ranch Water District Saginaw, City of Philadelphia, City of
Clayton County Water
Las Virgenes Municipal Authority Wayne County Department of University Area Joint Authority
Water District Cobb County Water System Environment South Carolina
Livermore, City of Columbus Water Works Wyoming, City of Charleston Water System
Los Angeles, City of Fulton County Mount Pleasant Waterworks &
Minnesota
Los Angeles County, Gwinnett County Department Sewer Commission
Rochester, City of
Sanitation Districts of of Public Utilities S p a rtanburg Water
Western Lake Superior
Napa Sanitation District Savannah, City of Sanitary District Tennessee
Orange County Sanitation
District Hawaii Missouri Cleveland, City of
Palo Alto, City of Honolulu, City & County of Independence, City of Knoxville Utilities Board
Riverside, City of Kansas City Missouri Water Murfreesboro Water & Sewer
Idaho Department
Sacramento Regional County Services Department
Boise, City of Nashville Metro Water
Sanitation District Little Blue Valley Sewer District
Illinois Services
San Diego Metropolitan Metropolitan St. Louis
Wastewater Department, American Bottoms Sewer District Texas
City of Wastewater Treatment Plant Austin, City of
Nebraska
San Francisco, Greater Peoria Dallas Water Utilities
Lincoln Wastewater System
City & County of Sanitary District Denton, City of
San Jose, City of Kankakee River Metropolitan Nevada El Paso Water Utilities
Santa Barbara, City of Agency Henderson, City of
Fort Worth, City of
Santa Cruz, City of Metropolitan Water Las Vegas, City of
Houston, City of
Reclamation District of Reno, City of
Santa Rosa, City of San Antonio Water System
Greater Chicago
South Bayside System New Jersey Trinity River Authority
Wheaton Sanitary District
Authority Bergen County Utilities
Utah
South Coast Water District Iowa Authority
Salt Lake City Corporation
South Orange County Ames, City of Ocean County Utilities Authority
Wastewater Authority Cedar Rapids Wastewater Passaic Valley Sewerage Vi rg i n i a
Stege Sanitary District Facility Commissioners Alexandria Sanitation Authority
Arlington, County of Sacramento, County of Black & Veatch Monteco Corporation
Fairfax County San Francisco, City & County of Blue Water Technologies, Inc. MPR Engineering
Hampton Roads Sanitation Santa Rosa, City of Boyle Engineering Corporation, Inc.
District Sunnyvale, City of Corporation MWH
Hanover, County of Colorado Brown & Caldwell NewFields Water Resources,
Henrico, County of Burgess & Niple, Ltd. LLC
Aurora, City of
Hopewell Regional Burns & McDonnell O’Brien & Gere Engineers Inc.
Boulder, City of
Wastewater Treatment CABE Associates Inc. Odor & Corrosion Technology
Facility
Georgia Consultants Inc.
The Cadmus Group
Griffin, City of Original Engineering
Loudoun County Sanitation Camp Dresser & McKee Inc.
Authority Iowa Carollo Engineers Inc.
Consultants, Ltd.
Lynchburg Regional WWTP Cedar Rapids Wastewater Oscar Larson & Associates
Carpenter Environmental
Facility Parametrix Inc.
Prince William County Associates Inc.
Service Authority Des Moines, City of Parsons
CDS Technologies Inc.
Richmond, City of Kansas CET Engineering Services Post, Buckley, Schuh & Jernigan
Rivanna Water & Sewer Overland Park, City of Chemtrac Systems Inc. Praxair, Inc.
Authority Kentucky CH2M HILL Ring Industrial Group
Wa s h i n g t o n Louisville & Jefferson County CRA Infrastructure & RMC Water & Environment
Everett, City of Metropolitan Sewer District Engineering Ross & Associates Ltd.
Maine CONTECH Stormwater Rothberg, Tamburini &
King County Department of
Portland Water District Solutions Windsor, Inc.
Natural Resources
Seattle Public Utilities
North Carolina D&B/Guarino Engineers, LLC SAIC
Charlotte, City of, Damon S. Williams Savin Engineers
Sunnyside, Port of
Stormwater Services Associates, LLC Siemens Water Technologies
Yakima, City of
Pennsylvania Earth Tech Inc. Stantec Consulting Inc.
Wisconsin Philadelphia, City of Ecovation Stearns & Wheler, LLC
Green Bay Metro
Tennessee EMA Inc. Stone Environmental Inc.
Sewerage District
Chattanooga Stormwater Environmental Operating Stratus Consulting Inc.
Kenosha Water Utility Solutions, Inc.
Management Synagro Technologies Inc.
Madison Metropolitan Environ/The ADVENT Group,
Texas Tetra Tech Inc.
Sewerage District Inc.
Harris County Flood Control Trojan Technologies Inc.
Milwaukee Metropolitan Fay, Spofford, & Thorndike Inc.
Sewerage District District, Texas Trussell Technologies, Inc.
Freese & Nichols Inc. URS Corporation
Racine, City of Washington ftn Associates Inc.
Bellevue Utilities Department Wade-Trim Inc.
Sheboygan Regional Gannett Fleming Inc.
Wastewater Treatment Seattle Public Utilities Westin Engineering Inc.
Garden & Associates, Ltd. Weston Solutions Inc.
Wausau Water Works
Geosyntec Consultants Woodard & Curran
STATE
Australia GHD Zenon Environmental Inc./GE
ACTEW (Ecowise) Arkansas Department of Golder Associates Ltd. Water Process Technology
South Australian Water Environmental Quality Greeley and Hansen LLC Zoeller Pump Company
Corporation Connecticut Department of Hazen & Sawyer, P.C.
Sydney Water Corporation Environmental Protection HDR Engineering Inc. INDUSTRY
Water Corporation of Kansas Department of Health HNTB Corporation
Western Australia & Environment Hydromantis Inc. American Electric Power
Kentucky Department of American Water
Canada HydroQual Inc.
Environmental Protection ChevronTexaco Energy
Lethbridge, City of Infilco Degremont Inc.
New England Interstate Research & Technology
Regina, City of, Jacobson Satchell Consultants,
Water Pollution Control Company
Saskatchewan Inc.
Commission (NEIWPCC) The Coca-Cola Company
Toronto, City of, Ontario Jacques Whitford NAWE, Inc.
Ohio River Valley Sanitation Dow Chemical Company
Winnipeg, City of, Manitoba Commission Jason Consultants LLC Inc.
Jordan, Jones, & Goulding Inc. DuPont Company
New Zealand Urban Drainage & Flood
KCI Technologies Inc. Eastman Chemical Company
Watercare Services Limited Control District, CO
Kelly & Weaver, P.C. Eli Lilly & Company
United Kingdom Merck & Company Inc.
CORPORATE Kennedy/Jenks Consultants
United Utilities North West KMK Consultants Premier Chemicals LLC
(UUNW) ADS Environmental Services Komline Sanderson Procter & Gamble Company
Advanced Data Mining Engineering Corporation Thames Water Utilities
International Larry Walker Associates Severn Trent Services Inc.
STORMWATER UTILITY
Alan Plummer & Associates Limno-Tech Inc. Suez Environnment
Alpine Technology Inc. The Low Impact Development
California United Water Services LLC
Fresno Metropolitan Flood Aqua-Aerobic Systems Inc. Center Inc.
Control District Aquateam–Norwegian Water Malcolm Pirnie Inc.
Los Angeles, City of, Technology Centre A/S Material Matters
Department of Public Works ARCADIS McKim & Creed
Monterey, City of Associated Engineering Metcalf & Eddy Inc. Note: List as of 10/31/07
WERF Board of Directors
Chair Mary E. Buzby, Ph.D. Alfonso R. Lopez, P.E. Rebecca F. West
Vernon D. Lucy Merck & Company Inc. New York City Spartanburg Water
Infilco Degremont Inc. Department of
Mohamed F. Dahab, Ph.D. Executive Director
Environmental Protection
Vice-Chair University of Nebraska, Glenn Reinhardt
Dennis M. Diemer, P.E. Lincoln Peter J. Ruffier
East Bay Municipal Utility City of Eugene
Charles N. Haas, Ph.D.
District Drexel University Murli Tolaney, P.E., DEE
Secretary MWH
Robert W. Hite, J.D.
William J. Bertera Metro Wastewater R. Rhodes Trussell, Ph.D.
Water Environment Reclamation District Trussell Technologies Inc.
Federation
Jerry N. Johnson Alan H. Vi c o ry, Jr., P.E., DEE
Tre a s u re r District of Columbia Water Ohio River Valley Water
James M. Tarpy, J.D. & Sewer Authority Sanitation Commission
Metro Water Services
________________________________________________________________________________________________
Name Title
________________________________________________________________________________________________
Organization
________________________________________________________________________________________________
Address
________________________________________________________________________________________________
City State Zip Code Country
________________________________________________________________________________________________
Phone Fax Email
Postage &
Method of Payment: (All orders must be prepaid.) Handling
VA Residents Add
q C h e ck or Money Order Enclosed 4.5% Sales Tax
q Visa q Mastercard q A m e rican Express Canadian Residents
Add 7% GST
______________________________________________________
Account No. Exp. Date
TOTAL
______________________________________________________
Signature
Co-published by
IWA Publishing
Alliance House, 12 Caxton Street
London SW1H 0QS
United Kingdom
Phone: +44 (0)20 7654 5500
Fax: +44 (0)20 7654 5555
Email: publications@iwap.co.uk
Web: www.iwapublishing.com
IWAP ISBN: 1-84339-785-4
Oct 07