: SLV – 01
PRODUCT : PIPELINE CONSTRUCTION
Job No. : TRAINING
PT. SLV METROPOLITAN INDONESIA GUIDANCE
KOMPLEKS METRO CILEGON A.1 No.9-10 Cilegon Banten 42411, Indonesia Tel : (62 254) 8481 815
Page : 1 of 3
PROJECT : FOR TRAINING GUIDANCE ONLY PREPARED DATE CHECKED DATE APPROVED DATE REV
OP DESCRIPTION OF PROJECT WELDING INSPECTION ACCEPTANCE CRITERIA SLV CLIENT ACTION & MDR
No INSPECTION ACTIVITY PROCEDURE FREQUENCY
1 SAFETY ( JSA ) Safety Manual Daily Ensure ALL employees are W WS Tailgate Safety 1
wearing proper PPE for the
relevant tasks at hand Appropriate P.P.E
Complete & Sign JSA
2 VERIFY WELDING Project Welding Manual As Needed Applicable Weld Procedure H R/A Determine proper weld
PROCEDURE procedure & notify welders
Correct WPS and PQR for
Weld
Verify WPS applies to
essential variables
Welder Foreman Report
3 VERIFY QUALIFIED Operator Specification Prior to Welder Qualification Log H R/A Verify welders qualified to
WELDERS Welding
procedure per Welder
Verify Operator Qualification Log
Change of Qualification
Welder and/or Requirements (as Welder Foreman Report
Procedure applicable)
Field Verification Report or
similar (as needed)
4 PIPE INSPECTION Internal Specification Each Pipe Pipe clearly identified and I -- Check configuration of each
Identification and free from rusting and debris joint
Joint condition
No record
5 BEVEL PREPARATION Weld Procedures Each Joint Clean bevel as per Welding M - Buffing bevel
Procedures
No record
ACTIONS H = HOLD I = INSPECT M = MONITOR W = 100% WITNESS WS = RANDOM CHECK R = REVIEW R/A = REVIEW AND APPROVE A/S = APPROVE AND SUBMIT
RESPONSIBILITY QA = QUALITY ASSURANCE QC = QUALITY CONTROL MM = MANUFACTURING MGR SV = SUPERVISOR ST = STORES PM = PROJECT MGR SC = SUBCONTRACTOR
INSPECTION AND TEST PLAN DOC No. : SLV – 01
PRODUCT : PIPELINE CONSTRUCTION
Job No. : TRAINING
PT. SLV METROPOLITAN INDONESIA GUIDANCE
KOMPLEKS METRO CILEGON A.1 No.9-10 Cilegon Banten 42411, Indonesia Tel : (62 254) 8481 815
Page : 2 of 3
PROJECT : FOR TRAINING GUIDANCE ONLY PREPARED DATE CHECKED DATE APPROVED DATE REV
OP DESCRIPTION OF PROJECT WELDING INSPECTION ACCEPTANCE CRITERIA SLV CLIENT ACTION & MDR
No INSPECTION ACTIVITY PROCEDURE FREQUENCY
7 FIT-UP PROCESS Weld Procedures Each Joint Root Gap W - Appropriate use of line up
clamp
Root Face
Fit-up Record
High-low
Weld Procedures
6 PRE HEATING Weld Procedures Each Joint Minimum as specified and I WS Pre heat bevel
verified by temp stick or
equivalent PWHT Record
Temp stick
8 INTER-PASS TEMPERATURE Weld Procedures Each Joint Minimum as specified and I - Temp stick
verified by temp stick or
equivalent PWHT Record
10 WELDING PARAMETERS Weld Procedures As Needed Range is amps per WS - Multi meter
(AMP, VOLT, e.t.c) WPS/PQR
11 VISUAL INSPECTION Weld Procedures Each joint Welding Standard Reff W WS Visual Insp Report
ACTIONS H = HOLD I = INSPECT M = MONITOR W = 100% WITNESS WS = RANDOM CHECK R = REVIEW R/A = REVIEW AND APPROVE A/S = APPROVE AND SUBMIT
RESPONSIBILITY QA = QUALITY ASSURANCE QC = QUALITY CONTROL MM = MANUFACTURING MGR SV = SUPERVISOR ST = STORES PM = PROJECT MGR SC = SUBCONTRACTOR
INSPECTION AND TEST PLAN DOC No. : SLV – 01
PRODUCT : PIPELINE CONSTRUCTION
Job No. : TRAINING
PT. SLV METROPOLITAN INDONESIA GUIDANCE
KOMPLEKS METRO CILEGON A.1 No.9-10 Cilegon Banten 42411, Indonesia Tel : (62 254) 8481 815
Page : 3 of 3
PROJECT : FOR TRAINING GUIDANCE ONLY PREPARED DATE CHECKED DATE APPROVED DATE REV
OP DESCRIPTION OF PROJECT WELDING INSPECTION ACCEPTANCE CRITERIA SLV CLIENT ACTION & MDR
No INSPECTION ACTIVITY PROCEDURE FREQUENCY
13 REPAIR OF DEFECTS Repair Procedure As Needed Welding Inspector approval M -
Visual Inspection Report
( CRACKS, ARC STRIKES )
NDE Report
Specific procedure for repairing
14 FIELD TRANSITIONS Internal Specification As Needed Customer Specification M - Visual and NDE Inspection
NDE report
15 WELD ACCEPTANCE Weld Procedures & NDE Each Weld API 1104 -- X
Visual and NDE Inspection
Procedure
B31.8
Welding Insp Report
NDE Procedures
16 CHECK CONSUMABLES AND Operator Specification Daily Proper consumable X X Equipment Maintenance Record
WELDING EQUIPMENT storage
Welding equipment
in proper condition
ACTIONS H = HOLD I = INSPECT M = MONITOR W = 100% WITNESS WS = RANDOM CHECK R = REVIEW R/A = REVIEW AND APPROVE A/S = APPROVE AND SUBMIT
RESPONSIBILITY QA = QUALITY ASSURANCE QC = QUALITY CONTROL MM = MANUFACTURING MGR SV = SUPERVISOR ST = STORES PM = PROJECT MGR SC = SUBCONTRACTOR