B.5 Project Billboards/Signboard ea 1.00 1.00 4,992.26 4,992.26 1.00 1.00 - - 4,992.26 4,992.26 -
B.7 Occupational Safety and Health Program lot 1.00 1.00 13,718.03 13,718.03 1.00 1.00 - - 13,718.03 13,718.03 -
B.9 Mobilization/Demobilization l.s. 1.00 1.00 5,082.04 5,082.04 1.00 1.00 - - 5,082.04 5,082.04 -
801(1) Removal of Structures and Obstruction l.s. 1.00 1.00 9,833.14 9,833.14 1.00 1.00 - - 9,833.14 9,833.14 -
803(1)a Structure Excavation (Common Soil) cu.m. 18.75 18.75 177.78 3,333.37 18.75 18.75 - - 3,333.37 3,333.37 -
804(1)a Embankment from Structure Excavation cu.m. 10.00 10.00 166.89 1,668.90 10.00 10.00 - - 1,668.90 1,668.90 -
804(4) Gravel Fill cu.m. 1.00 1.00 878.43 878.43 1.00 1.00 - - 878.43 878.43 -
900(1) c4 Structural Concrete for Column (Class A, 28 days) cu.m. 2.56 2.56 6,453.12 16,519.98 2.56 2.56 - - 16,519.98 16,519.98 -
900(1) c6 Structural Concrete for Roof Beam (Class A, 28 days) cu.m. 2.86 2.86 6,453.12 18,455.92 2.86 2.86 - - 18,455.92 18,455.92 -
903(2) Formworks and Falseworks sq.m. 40.00 40.00 988.18 39,527.20 40.00 40.00 - - 39,527.20 39,527.20 -
1000(1) Soil Poisoning L 2.00 2.00 467.04 934.08 2.00 2.00 - - 934.08 934.08 -
1010(1) Frames (Jambs, Sill, Head, Transom and Mullions) set 1.00 1.00 2,945.37 2,945.37 1.00 1.00 - - 2,945.37 2,945.37 -
1010(2)b Wood Panel Door sq.m. 2.52 2.52 6,459.57 16,278.11 2.52 2.52 - - 16,278.11 16,278.11 -
1010(2)a Hollow Core Flush Door sq.m. 1.47 1.47 1,878.23 2,760.99 1.47 1.47 - - 2,760.99 2,760.99 -
1008(1)a Aluminum Glass Window (Sliding Type) sq.m. 6.60 6.60 3,471.37 22,911.04 6.60 6.60 - - 22,911.04 22,911.04 -
1004(2) Finishing Hardware l.s. 1.00 1.00 3,332.07 3,332.07 1.00 1.00 - - 3,332.07 3,332.07 -
1027(1) Cement Plaster Finish sq.m. 99.80 99.80 192.22 19,183.55 99.80 99.80 - - 19,183.55 19,183.55 -
1003(1)e1 Ceiling (Metal Frame, Prepainted Metal Panel) sq.m. 39.15 39.15 1,061.41 41,554.20 39.15 39.15 - - 41,554.20 41,554.20 -
1003(1)a1 Ceiling (4.5mm, Metal Frame, Fiber Cement Board) sq.m. 39.40 39.40 1,020.00 40,188.00 39.40 39.40 - - 40,188.00 40,188.00 -
1018(1) Glazed Tiles and Trims sq.m. 29.11 29.11 1,958.08 56,999.70 29.11 29.11 - - 56,999.70 56,999.70 -
1018(2) Unglazed Tiles sq.m. 7.65 7.65 1,632.04 12,485.10 7.65 7.65 - - 12,485.10 12,485.10 -
1032(1)a Painting Works (Masonry/Concrete Painting) sq.m. 99.80 99.80 319.64 31,900.07 99.80 99.80 - - 31,900.07 31,900.07 -
1032(1)b Painting Works (Wood Painting) sq.m. 39.40 39.40 247.96 9,769.62 39.40 39.40 - - 9,769.62 9,769.62 -
1032(1)c Painting Works (Metal Painting) sq.m. 10.00 10.00 239.70 2,397.00 10.00 10.00 - - 2,397.00 2,397.00 -
1013(2)a2 Fabricated Metal Roofing Accessory (gauge 26, Flashing) m 14.96 14.96 295.89 4,426.51 14.96 14.96 - - 4,426.51 4,426.51 -
1013(2)b1 Fabricated Metal Roofing Accessory (Gutter) m 22.50 22.50 434.80 9,783.00 22.50 22.50 - - 9,783.00 9,783.00 -
1047(2)b Structural Steel (Purlins) kg 519.19 519.19 86.94 45,138.37 519.19 519.19 - - 45,138.37 45,138.37 -
1047(2)a Structural Steel (Trusses) kg 540.56 540.56 93.39 50,482.89 540.56 540.56 - - 50,482.89 50,482.89 -
1047(6) Structural Steel (Steel Plates) kg 21.20 21.20 87.99 1,865.38 21.20 21.20 - - 1,865.38 1,865.38 -
1047(7)b Structural Steel (Sag Rod) kg 92.00 92.00 69.31 6,376.52 92.00 92.00 - - 6,376.52 6,376.52 -
1047(4) Structural Steel (Cross Bracing) kg 119.93 119.93 73.15 8,772.87 119.93 119.93 - - 8,772.87 8,772.87 -
1047(3)c Structural Steel (Turn Buckle) pcs. 2.00 2.00 238.45 476.90 2.00 2.00 - - 476.90 476.90 -
1001(8) Sewer Line Works l.s. 1.00 1.00 11,839.61 11,839.61 1.00 1.00 - - 11,839.61 11,839.61 -
1002(24) Cold Waterline Works l.s. 1.00 1.00 9,548.23 9,548.23 1.00 1.00 - - 9,548.23 9,548.23 -
1002(4) Plumbing Fixtures l.s. 1.00 1.00 22,726.13 22,726.13 1.00 1.00 - - 22,726.13 22,726.13 -
1001(9) Storm Drainage and Downspout l.s. 1.00 1.00 17,713.94 17,713.94 1.00 1.00 - - 17,713.94 17,713.94 -
1100(10) Conduit, Boxes, and Fittings l.s. 1.00 1.00 8,926.21 8,926.21 1.00 1.00 - - 8,926.21 8,926.21 -
1101(33) Wires and Wiring Devices l.s. 1.00 1.00 18,518.30 18,518.30 1.00 1.00 - - 18,518.30 18,518.30 -
1102(1) Panel Boards w/ Main & Branch Breaker l.s. 1.00 1.00 7,295.63 7,295.63 1.00 1.00 - - 7,295.63 7,295.63 -
1103(1) Lighting Fixtures l.s. 1.00 1.00 7,893.22 7,893.22 1.00 1.00 - - 7,893.22 7,893.22 -
B.5 Project Billboards/Signboard ea 1.00 1.00 4,218.90 4,218.90 1.00 1.00 - - 4,218.90 4,218.90 -
B.7(2) Occupational Safety and Health Program l.s. 1.00 1.00 13,718.03 13,718.03 1.00 1.00 - - 13,718.03 13,718.03 -
B.9 Mobilization/Demobilization l.s. 1.00 1.00 11,125.19 11,125.19 1.00 1.00 - - 11,125.19 11,125.19 -
801(1) Removal of Structures and Obstruction MH/unit 181.27 181.27 218.19 39,551.30 181.27 181.27 - - 39,551.30 39,551.30 -
803(1)a Structure Excavation (Common Soil) cu.m. 6.00 6.00 177.06 1,062.36 6.00 6.00 - - 1,062.36 1,062.36 -
804(1)a Embankment from Structure Excavation cu.m. 6.00 6.00 166.21 997.26 6.00 6.00 - - 997.26 997.26 -
903(2) Formworks and Falseworks sq.m. 107.20 107.20 984.16 105,501.95 107.20 107.20 - - 105,501.95 105,501.95 -
1010(1) Frames (Jambs, Sill, Head, Transom and Mullions) set 6.00 6.00 2,933.39 17,600.34 6.00 6.00 - - 17,600.34 17,600.34 -
1010(2)a Wooden Door - Flush sq.m. 8.61 8.61 2,960.43 25,489.30 8.61 8.61 - - 25,489.30 25,489.30 -
1005(1) Casement Steel Window sq.m. 10.33 10.33 3,457.26 35,713.49 10.33 10.33 - - 35,713.49 35,713.49 -
1027(1) Cement Plaster Finish sq.m. 302.25 302.25 192.70 58,243.57 302.25 302.25 - - 58,243.57 58,243.57 -
1003(1)a1 Ceiling (Metal Frame, Prepainted Metal Panel) sq.m. 57.16 57.16 914.88 52,294.54 57.16 57.16 - - 52,294.54 52,294.54 -
1003(1)a1 Ceiling (4.5mm, Metal Frame, Fiber Cement Board) sq.m. 106.91 106.91 1,015.86 108,605.59 106.91 106.91 - - 108,605.59 108,605.59 -
1018(1) Glazed Tiles and Trims sq.m. 27.94 27.94 1,951.41 54,522.39 27.94 27.94 - - 54,522.39 54,522.39 -
1018(2) Unglazed Tiles sq.m. 14.79 14.79 1,626.69 24,058.74 14.79 14.79 - - 24,058.74 24,058.74 -
1032(1)a Painting Works (Masonry/Concrete Painting) sq.m. 236.67 236.67 318.34 75,341.52 236.67 236.67 - - 75,341.52 75,341.52 -
1032(1)b Painting Works (Wood Painting) sq.m. 106.91 106.91 246.95 26,401.42 106.91 106.91 - - 26,401.42 26,401.42 -
1014(1)b1 Metral Roofing-Prepainted Long Span sq.m. 181.27 181.27 650.63 117,939.70 181.27 181.27 - - 117,939.70 117,939.70 -
1013(2)a1 Fabricated Metal Roofing Accessory (Ridge/Hip Roll) m 53.32 53.32 294.69 15,712.87 53.32 53.32 - - 15,712.87 15,712.87 -
1047(2)b Structural Steel (Purlins) kg 1,044.19 1,044.19 86.59 90,416.41 1,044.19 1,044.19 - - 90,416.41 90,416.41 -
1047(2)a Structural Steel (Trusses) kg 3,321.20 3,321.20 93.01 308,904.81 3,321.20 3,321.20 - - 308,904.81 308,904.81 -
1047(6) Structural Steel (Steel Plates) kg 4.71 4.71 87.64 412.78 4.71 4.71 - - 412.78 412.78 -
1047(7)b Structural Steel (Sag Rod) kg 52.00 52.00 69.03 3,589.56 52.00 52.00 - - 3,589.56 3,589.56 -
1047(4) Structural Steel (Cross Bracing) kg 45.33 45.33 72.85 3,302.29 45.33 45.33 - - 3,302.29 3,302.29 -
1047(3)c Structural Steel (Turn Buckle) pcs. 20.00 20.00 237.48 4,749.60 20.00 20.00 - - 4,749.60 4,749.60 -
1001(8) Sewer Line Works l.s. 1.00 1.00 9,109.67 9,109.67 1.00 1.00 - - 9,109.67 9,109.67 -
1002(24) Cold Waterline Works l.s. 1.00 1.00 9,509.41 9,509.41 1.00 1.00 - - 9,509.41 9,509.41 -
1002(4) Sanitary/Plumbing Fixtures l.s. 1.00 1.00 20,730.82 20,730.82 1.00 1.00 - - 20,730.82 20,730.82 -
1101(33) Wires and Wiring Devices l.s. 1.00 1.00 28,094.22 28,094.22 1.00 1.00 - - 28,094.22 28,094.22 -
1102(1) Panel Boards w/ Main & Branch Breaker l.s. 1.00 1.00 7,265.98 7,265.98 1.00 1.00 - - 7,265.98 7,265.98 -
1103(1) Lighting Fixtures l.s. 1.00 1.00 10,223.98 10,223.98 1.00 1.00 - - 10,223.98 10,223.98 -
B.5 Project Billboards/Signboard ea 1.00 1.00 5,396.51 5,396.51 1.00 1.00 - - 5,396.51 5,396.51 -
B.7 Occupational Safety and Health Program lot 1.00 1.00 13,718.03 13,718.03 1.00 1.00 - - 13,718.03 13,718.03 -
B.9 Mobilization/Demobilization l.s. 1.00 1.00 27,883.82 27,883.82 1.00 1.00 - - 27,883.82 27,883.82 -
801(1) Removal of Structures and Obstruction l.s. 1.00 1.00 59,085.73 59,085.73 1.00 1.00 - - 59,085.73 59,085.73 -
803(1)a Structure Excavation (Common Soil) cu.m. 64.02 64.02 177.78 11,381.47 64.02 64.02 - - 11,381.47 11,381.47 -
804(1)a Embankment from Structure Excavation cu.m. 56.00 56.00 166.89 9,345.84 56.00 56.00 - - 9,345.84 9,345.84 -
804(4) Gravel Fill cu.m. 5.00 5.00 878.44 4,392.20 5.00 5.00 - - 4,392.20 4,392.20 -
900(1) c4 Structural Concrete for Column (Class A, 28 days) cu.m. 11.10 11.10 6,465.06 71,762.16 11.10 11.10 - - 71,762.16 71,762.16 -
900(1) c6 Structural Concrete for Roof Beam (Class A, 28 days) cu.m. 11.10 10.02 6,465.06 71,762.16 10.02 10.02 - - 64,779.90 64,779.90 -
903(2) Formworks and Falseworks sq.m. 110.00 110.00 988.18 108,699.80 110.00 110.00 - - 108,699.80 108,699.80 -
1000(1) Soil Poisoning L 5.00 5.00 467.03 2,335.15 5.00 5.00 - - 2,335.15 2,335.15 -
1010(1) Frames (Jambs, Sill, Head, Transom and Mullions) set 8.00 8.00 2,945.36 23,562.88 8.00 8.00 - - 23,562.88 23,562.88 -
1010(2)b Wood Panel Door sq.m. 11.86 11.86 6,459.57 76,610.50 11.86 11.86 - - 76,610.50 76,610.50 -
1010(2)a Hollow Core Flush Door sq.m. 9.14 9.14 1,878.23 17,167.02 9.14 9.14 - - 17,167.02 17,167.02 -
1008(1)a Aluminum Glass Window (Sliding Type) sq.m. 48.50 44.72 3,471.37 168,361.44 44.72 44.72 - - 155,239.66 155,239.66 -
1004(1) Finishing Hardware l.s. 1.00 1.00 20,147.40 20,147.40 1.00 1.00 - - 20,147.40 20,147.40 -
1021(1)c Plain Cement Finish with floor hardener sq.m. 304.28 304.28 349.20 106,254.57 304.28 304.28 - - 106,254.57 106,254.57 -
1027(1) Cement Plaster Finish sq.m. 650.00 650.00 192.64 125,216.00 650.00 650.00 - - 125,216.00 125,216.00 -
1003(1)e2 Ceiling (Metal Frame, Prepainted Metal Panel) sq.m. 162.50 162.50 1,061.41 172,479.12 162.50 162.50 - - 172,479.12 172,479.12 -
1003(1)a1 Ceiling (4.5mm, Metal Frame, Fiber Cement Board) sq.m. 335.50 335.50 1,020.00 342,210.00 335.50 335.50 - - 342,210.00 342,210.00 -
1038(1) Relective Insulation sq.m. 514.00 514.00 235.27 120,928.78 514.00 514.00 - - 120,928.78 120,928.78 -
1018(1) Glazed Tiles and Trims sq.m. 248.00 236.50 1,958.52 485,712.96 236.50 236.50 - - 463,189.98 463,189.98 -
1018(2) Unglazed Tiles sq.m. 12.00 12.00 1,632.47 19,589.64 12.00 12.00 - - 19,589.64 19,589.64 -
1032(1)a Painting Works (Masonry/Concrete Painting) sq.m. 728.00 728.00 319.64 232,697.92 728.00 728.00 - - 232,697.92 232,697.92 -
1032(1)b Painting Works (Wood Painting) sq.m. 335.50 335.50 247.96 83,190.58 335.50 335.50 - - 83,190.58 83,190.58 -
1032(1)c Painting Works (Metal Painting) sq.m. 20.00 20.00 239.70 4,794.00 20.00 20.00 - - 4,794.00 4,794.00 -
1013(2)a2 Fabricated Metal Roofing Accessory (gauge 26, Flashing) m 48.60 48.60 295.89 14,380.25 48.60 48.60 - - 14,380.25 14,380.25 -
1013(2)b1 Fabricated Metal Roofing Accessory (Gutter) m 110.00 110.00 434.80 47,828.00 110.00 110.00 - - 47,828.00 47,828.00 -
1047(2)b Structural Steel (Purlins) kg 3,266.00 3,266.00 86.94 283,946.04 3,266.00 3,266.00 - - 283,946.04 283,946.04 -
1047(2)a Structural Steel (Trusses) kg 2,231.21 2,231.21 93.39 208,372.70 2,231.21 2,231.21 - - 208,372.70 208,372.70 -
1047(6) Structural Steel (Steel Plates) kg 60.00 60.00 87.99 5,279.40 60.00 60.00 - - 5,279.40 5,279.40 -
1047(7)b Structural Steel (Sag Rod) kg 45.00 45.00 69.31 3,118.95 45.00 45.00 - - 3,118.95 3,118.95 -
1047(4) Structural Steel (Cross Bracing) kg 250.00 250.00 73.15 18,287.50 250.00 250.00 - - 18,287.50 18,287.50 -
1047(3)c Structural Steel (Turn Buckle) pcs. 20.00 20.00 238.45 4,769.00 20.00 20.00 - - 4,769.00 4,769.00 -
1001(8) Sewer Line Works l.s. 1.00 1.00 11,839.61 11,839.61 1.00 1.00 - - 11,839.61 11,839.61 -
1002(24) Cold Waterline Works l.s. 1.00 1.00 9,548.23 9,548.23 1.00 1.00 - - 9,548.23 9,548.23 -
1002(4) Plumbing Fixtures l.s. 1.00 1.00 47,303.26 47,303.26 1.00 1.00 - - 47,303.26 47,303.26 -
1001(9) Storm Drainage and Downspout l.s. 1.00 1.00 48,279.17 48,279.17 1.00 1.00 - - 48,279.17 48,279.17 -
1100(10) Conduit, Boxes, and Fittings l.s. 1.00 1.00 31,028.61 31,028.61 1.00 1.00 - - 31,028.61 31,028.61 -
1101(33) Wires and Wiring Devices l.s. 1.00 1.00 86,672.50 86,672.50 1.00 1.00 - - 86,672.50 86,672.50 -
1102(1) Panel Boards w/ Main & Branch Breaker l.s. 1.00 1.00 18,625.53 18,625.53 1.00 1.00 - - 18,625.53 18,625.53 -
1103(1) Lighting Fixtures l.s. 1.00 1.00 35,703.09 35,703.09 1.00 1.00 - - 35,703.09 35,703.09 -
B.7 Occupational Safety and Health Program lot 1.00 1.00 13,718.03 13,718.03 1.00 1.00 - - 13,718.03 13,718.03 -
B.9 Mobilization/Demobilization l.s. 1.00 1.00 9,513.05 9,513.05 1.00 1.00 - - 9,513.05 9,513.05 -
801(1) Removal of Structures and Obstruction l.s. 1.00 1.00 3,126.09 3,126.09 1.00 1.00 - - 3,126.09 3,126.09 -
803(1)a Structure Excavation (Common Soil) cu.m. 14.83 14.83 177.78 2,636.47 14.83 14.83 - - 2,636.47 2,636.47 -
804(1)a Embankment from Structure Excavation cu.m. 8.60 8.60 166.89 1,435.25 8.60 8.60 - - 1,435.25 1,435.25 -
804(4) Gravel Fill cu.m. 13.56 13.56 878.44 11,911.64 13.56 13.56 - - 11,911.64 11,911.64 -
900(1) c4 Structural Concrete for Column (Class A, 28 days) cu.m. 4.68 4.68 6,453.12 30,200.60 4.68 4.68 - - 30,200.60 30,200.60 -
900(1) c6 Structural Concrete for Beams/Girders(Class A, 28 days) cu.m. 4.97 4.97 6,453.12 32,072.00 4.97 4.97 - - 32,072.00 32,072.00 -
903(2) Formworks and Falseworks sq.m. 65.59 65.59 988.18 64,814.72 65.59 65.59 - - 64,814.72 64,814.72 -
1010(1) Frames (Jambs, Sill, Head, Transom and Mullions) set 4.00 4.00 2,945.36 11,781.44 4.00 4.00 - - 11,781.44 11,781.44 -
1010(2)b Wood Panel Door sq.m. 9.03 9.03 6,459.57 58,329.91 9.03 9.03 - - 58,329.91 58,329.91 -
1005(5) Steel Window sq.m. 5.00 5.00 9,525.66 47,628.30 5.00 5.00 - - 47,628.30 47,628.30 -
1004(2) Finishing Hardware set 1.00 1.00 11,546.01 11,546.01 1.00 1.00 - - 11,546.01 11,546.01 -
1027(1) Cement Plaster Finish sq.m. 5.74 5.74 192.22 1,103.34 5.74 5.74 - - 1,103.34 1,103.34 -
1003(1)e2 Ceiling (Metal Frame, Prepainted Metal Panel) sq.m. 50.13 50.13 1,061.41 53,208.48 50.13 50.13 - - 53,208.48 53,208.48 -
1003(1)a1 Ceiling (4.5mm, Metal Frame, Fiber Cement Board) sq.m. 84.28 84.28 1,020.00 85,965.60 84.28 84.28 - - 85,965.60 85,965.60 -
1038(1) Reflective Insulation sq.m. 162.75 162.75 451.68 73,510.92 162.75 162.75 - - 73,510.92 73,510.92 -
1032(1)a Painting Works (Masonry/Concrete Painting) sq.m. 319.30 319.30 319.64 102,061.05 319.30 319.30 - - 102,061.05 102,061.05 -
1032(1)b Painting Works (Wood Painting) sq.m. 84.28 84.28 247.96 20,898.06 84.28 84.28 - - 20,898.06 20,898.06 -
1013(2)a1 Fabricated Metal Roofing Accessory (Ridge/Hip Roll) m 18.97 18.97 295.89 5,613.03 18.97 18.97 - - 5,613.03 5,613.03 -
1013(2)a2 Fabricated Metal Roofing Accessory (Flashing) m 17.12 17.12 295.89 5,065.63 17.12 17.12 - - 5,065.63 5,065.63 -
1013(2)b1 Fabricated Metal Roofing Accessory (Gutter) m 37.94 37.94 434.80 16,496.31 37.94 37.94 - - 16,496.31 16,496.31 -
1047(2)b Structural Steel (Purlins) kg 1,275.70 1,275.70 86.94 110,909.35 1,275.70 1,275.70 - - 110,909.35 110,909.35 -
1047(2)a Structural Steel (Trusses) kg 1,410.00 1,410.00 93.39 131,679.90 1,410.00 1,410.00 - - 131,679.90 131,679.90 -
1047(6) Structural Steel (Steel Plates) kg 84.92 84.92 87.99 7,472.11 84.92 84.92 - - 7,472.11 7,472.11 -
1047(7)b Structural Steel (Sag Rod) kg 34.54 34.54 69.31 2,393.96 34.54 34.54 - - 2,393.96 2,393.96 -
1047(4) Structural Steel (Cross Bracing) kg 181.35 181.35 73.15 13,265.75 181.35 181.35 - - 13,265.75 13,265.75 -
1047(3)c Structural Steel (Turn Buckle) pcs. 8.00 8.00 238.45 1,907.60 8.00 8.00 - - 1,907.60 1,907.60 -
1100(10) Conduit, Boxes, and Fittings (Conduit works/Tough-in) l.s. 1.00 1.00 18,012.50 18,012.50 1.00 1.00 - - 18,012.50 18,012.50 -
1101 Wires and Wiring Devices l.s. 1.00 1.00 46,570.37 46,570.37 1.00 1.00 - - 46,570.37 46,570.37 -
1102 Panel Boards w/ Main & Branch Breaker l.s. 1.00 1.00 5,938.89 5,938.89 1.00 1.00 - - 5,938.89 5,938.89 -
1103(1) Lighting Fixtures l.s. 1.00 1.00 21,358.06 21,358.06 1.00 1.00 - - 21,358.06 21,358.06 -
B.5 Project Billboards/Signboard ea 1.00 1.00 4,562.25 4,562.25 1.00 1.00 - - 4,562.25 4,562.25 -
B.7 Occupational Safety and Health Program lot 1.00 1.00 13,718.03 13,718.03 1.00 1.00 - - 13,718.03 13,718.03 -
B.9 Mobilization/Demobilization l.s. 1.00 1.00 18,127.73 18,127.73 1.00 1.00 - - 18,127.73 18,127.73 -
801(1) Removal of Structures and Obstruction l.s. 1.00 1.00 85,349.81 85,349.81 1.00 1.00 - - 85,349.81 85,349.81 -
803(1)a Structure Excavation (Common Soil) cu.m. 35.82 35.82 178.50 6,393.87 35.82 35.82 - - 6,393.87 6,393.87 -
804(1)a Embankment from Structure Excavation cu.m. 25.26 25.26 167.57 4,232.81 25.26 25.26 - - 4,232.81 4,232.81 -
804(4) Gravel Fill cu.m. 7.05 7.05 882.01 6,218.17 7.05 7.05 - - 6,218.17 6,218.17 -
900(1) c4 Structural Concrete for Column (Class A, 28 days) cu.m. 4.28 4.28 6,453.12 27,619.35 4.28 4.28 - - 27,619.35 27,619.35 -
900(1) c6 Structural Concrete for Beams/Girders(Class A, 28 days) cu.m. 5.10 5.10 6,453.12 32,910.91 5.10 5.10 - - 32,910.91 32,910.91 -
903(2) Formworks and Falseworks sq.m. 150.23 150.23 992.19 149,056.70 150.23 150.23 - - 149,056.70 149,056.70 -
1010(1) Frames (Jambs, Sill, Head, Transom and Mullions) set 8.00 8.00 2,957.34 23,658.72 8.00 8.00 - - 23,658.72 23,658.72 -
1010(2)b Wood Panel Door sq.m. 5.56 5.56 6,485.83 36,061.21 5.56 5.56 - - 36,061.21 36,061.21 -
1010(2)a Hollow Core Flush Door sq.m. 11.34 11.34 1,885.86 21,385.65 11.34 11.34 - - 21,385.65 21,385.65 -
1004(2) Finishing Hardware pcs. 17.00 17.00 2,178.54 37,035.18 17.00 17.00 - - 37,035.18 37,035.18 -
1027(1) Cement Plaster Finish sq.m. 510.00 510.00 193.00 98,430.00 510.00 510.00 - - 98,430.00 98,430.00 -
1003(1)e2 Ceiling (Metal Frame, Prepainted Metal Panel) sq.m. 74.86 74.86 1,065.72 79,779.79 74.86 74.86 - - 79,779.79 79,779.79 -
1003(1)a1 Ceiling (4.5mm, Metal Frame, Fiber Cement Board) sq.m. 154.00 154.00 1,024.15 157,719.10 154.00 154.00 - - 157,719.10 157,719.10 -
1038(1) Reflective Insulation sq.m. 221.71 221.71 236.23 52,374.55 221.71 221.71 - - 52,374.55 52,374.55 -
1018(1) Glazed Tiles and Trims sq.m. 143.36 143.36 1,966.04 281,851.49 143.36 143.36 - - 281,851.49 281,851.49 -
1018(2) Unglazed Tiles sq.m. 20.13 20.13 1,638.67 32,986.42 20.13 20.13 - - 32,986.42 32,986.42 -
1032(1)a Painting Works (Masonry/Concrete Painting) sq.m. 510.00 510.00 320.94 163,679.40 510.00 510.00 - - 163,679.40 163,679.40 -
1032(1)b Painting Works (Wood Painting) sq.m. 156.00 156.00 248.97 38,839.32 156.00 156.00 - - 38,839.32 38,839.32 -
1032(1)c Painting Works (Metal Painting) sq.m. 125.32 125.32 240.67 30,160.76 125.32 125.32 - - 30,160.76 30,160.76 -
1013(2)a1 Fabricated Metal Roofing Accessory (Ridge/Hip Roll) m 16.00 16.00 297.09 4,753.44 16.00 16.00 - - 4,753.44 4,753.44 -
1013(2)a2 Fabricated Metal Roofing Accessory (Flashing) m 28.00 28.00 297.09 8,318.52 28.00 28.00 - - 8,318.52 8,318.52 -
1013(2)b1 Fabricated Metal Roofing Accessory (Gutter) m 32.00 32.00 436.57 13,970.24 32.00 32.00 - - 13,970.24 13,970.24 -
1047(2)b Structural Steel (Purlins) kg 1,669.57 1,669.57 87.29 145,736.76 1,669.57 1,669.57 - - 145,736.76 145,736.76 -
1047(2)a Structural Steel (Trusses) kg 2,707.90 2,707.90 93.77 253,919.78 2,707.90 2,707.90 - - 253,919.78 253,919.78 -
1047(6) Structural Steel (Steel Plates) kg 60.84 60.84 88.35 5,375.21 60.84 60.84 - - 5,375.21 5,375.21 -
1047(7)b Structural Steel (Sag Rod) kg 68.50 68.50 69.60 4,767.60 68.50 68.50 - - 4,767.60 4,767.60 -
1047(4) Structural Steel (Cross Bracing) kg 91.38 91.38 73.45 6,711.86 91.38 91.38 - - 6,711.86 6,711.86 -
1047(3)c Structural Steel (Turn Buckle) pcs. 8.00 8.00 239.42 1,915.36 8.00 8.00 - - 1,915.36 1,915.36 -
1001(8) Sewer Line Works l.s. 1.00 1.00 11,510.38 11,510.38 1.00 1.00 - - 11,510.38 11,510.38 -
1002(24) Cold Waterline Works l.s. 1.00 1.00 2,597.61 2,597.61 1.00 1.00 - - 2,597.61 2,597.61 -
1002(4) Plumbing Fixtures l.s. 1.00 1.00 36,777.28 36,777.28 1.00 1.00 - - 36,777.28 36,777.28 -
1001(9) Storm Drainage and Downspout l.s. 1.00 1.00 9,951.59 9,951.59 1.00 1.00 - - 9,951.59 9,951.59 -
1100(10) Conduit, Boxes, and Fittings l.s. 1.00 1.00 20,158.54 20,158.54 1.00 1.00 - - 20,158.54 20,158.54 -
1101(33) Wires and Wiring Devices l.s. 1.00 1.00 13,568.19 13,568.19 1.00 1.00 - - 13,568.19 13,568.19 -
1102(1) Panel Boards w/ Main & Branch Breaker l.s. 1.00 1.00 6,158.89 6,158.89 1.00 1.00 - - 6,158.89 6,158.89 -
1103(1) Lighting Fixtures l.s. 1.00 1.00 29,833.90 29,833.90 1.00 1.00 - - 29,833.90 29,833.90 -
LORNA T. RICARDO
OIC-District Engineer