Vous êtes sur la page 1sur 3

*as of 12/17/2018.

Program is subject to change

Tuesday, January 29, 2019


Multi-Sector
9:40 AM - 11:55 AM - 2:40 PM -
TRACK 8:00 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 AM - 2:40 PM
3:15 PM
3:15 PM - 3:45 PM 3:50 PM - 4:20 PM 4:25 PM - 4:55 PM

Ultrasonic Applications Engineering Application of X-ray Backscatter Introduction to Advanced Onstream Corrosion Monitoring for
Chevron NDE Performance The Potential Role of Permanently Pulsed Eddy Current - Inspection Automated Radiography of In-service Non-instrusive Inspection (NII) of
Using Phased Array - Bruce Devices for Moisture Detection in Nondestructive Testing - Avinash Industrial Process Piping - Sam
Inspection / NDE - 1 Demonstration Qualification Testing - Installed NDT Sensors - John Nyholt,
Pellegrino, Sensor Networks, Inc. Insulation - George Williamson, BP
Basics and Uses - Ethan Williams,
Ripla, Lloyd's Register Central and Ternowchek, Mistras Group, Inc.
Piping - John Musgrave, Mistras Pressure Vessels - Jonathan Burns,
Michael Sens, Chevron (0377) John Nyholt Consulting, LLC (0002) Magnetec Inspection, Inc. (0134) Group. Inc. (0232) Mistras Group, Inc. (0233)
(0015) (0028) South America, Ltd. (0194) (0229)
NDE of In-service Equipment by UAV Sourced Integrity Information Inspection Coordination Standardization for Value vs Cost MI Quality Construction Quality Management
Robotic Inspection for Industrial Preview of API RP 588 Source
OPENING SESSSION / KEYNOTE SPEAKER: Break in Aerial Thermography and Phased Becomes Part of the O&G Digital Lunch in Break in Improvemnet of Source Inspection Assurance/Quality Control Process - and Functional Checkout - Luke
Inspection / NDE - 2 Exhibit Hall Array Ultrasonics - Fernando Lopez, Revolution - Patrick Saracco,
Assets - Brandon Tigges, Gecko Inspection - Peter Hunt, Peter Hunt
Exhibit Hall Consulting (0287)
Quality - Source Inspection Panel
Exhibit Hall Performance - Ysolda Rujano, PREGO Holley Baker, Mistras Group, Inc. Miller, Marathon Petroleum Company
John Reynolds Robotics, Inc. (0326)
Torngots (0119) Cyberhawk Innovations (0136) Energy Quality Consulting (0212) (0231) (0182)
Proposed Updates to ASME B31.3 Post Weld ASME Post Construction Standards - Practical CUI/CUF Assessment for Water Repellancy of Industrial Predicting Dissimilar Weld Metal
ASME Sec IX Reviewing Welding The Inspection of Thermal Insulation Corrosion Under Insulation - A Advances in Real Time Imaging for
Heat Treat and Minimum Temperature Past Present and Future - Clay Pressure Vessels and Piping Insulation - Saboura Rokhsari, Weld Failures Using Machine
AIM/Engineering Requirements - Phillip Prueter, The Equity Rodery, C&S Technology, LLC
Documents 101 - Grady Hatton, Pro-
Systems - Brian Shannon, HIS
and CUI - Ron King, National Proactive vs. Reactive Approach - CUI Inspection - Eric Neff, QSA
Rockvood Technical Insulations Learning Techniques - Martin
Engineering Group, Inc. (0263) Surve Technical Service, LLC (0070) Insulation Association (0020) Kara Boyer, PinnacleART (0243) Global, Inc. (0314)
(0309) Group, Inc. (0008) (0218) Gascon, Intertek (0127)

Downstream
9:40 AM - 11:55 AM - 2:40 PM -
TRACK 8:00 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 AM - 2:40 PM
3:15 PM
3:15 PM - 3:45 PM 3:50 PM - 4:20 PM 4:25 PM - 4:55 PM
Lunch in Break in
Inspector/technician Experience and the Solving the Mysteries of Critical Corrosion Under Insulation of Opportunities to Better Capture the In-Service Flange Raised Face
Exhibit Hall Exhibit Hall Potential MI Concerns with Clad and Weld
Dead-legs and Mixing Points; How to Need for Detailed Inspection Plans - Dana Check Valves - Chad Patschke, Chemical Plant Pressure Vessels - Value of Today's Advanced NDT Operating Small Pipe - Josh Yoakam, Inspection Utilizing TFM Phased
Inspection / NDE Manage - Latifa Alshebi, Orpic (0135) Baham, Becht Engineering Company, Inc. Ethos Mechanical Integrity Solutions
Save Time with using an Exchanger Bundle
HollyFrontier Companies (0075)
Overlaid Piping due to Fabrication Issues -
Andres Salazar, Worleyparsons Technologies - John Burke, INVISTA Inspection Decision Tree - James Cesarini, Mark Geisenhoff, Flint Hills Resources (0425) Array - Mark Schramm, Pro-Surve
(0306) (0042) Technical Services (0114)
(0061) (0318) Pro-Surve Technical Services (0115)

Case Studies: Soda Ash Related Establishing Integrity Operating Failure of Methanol Reformer Outlet Failure Analysis of Radiant Section Caustic SCC of Gr. T22 (2-1/4Cr) API RP 932-B Hydroprocessing Unit Managing Ammonium Bisulfide
Case Study: Sigma-Phase Embrittlement of a Experience with 800HT Coker
Wash Piping Failures in Windows (IOWs) for Refinery Fired Pigtails - Muhammad Bilal, Saudi Tube in Ethane Cracking Heater - Superheater Tube Welds - Sri REAC Systems, 3rd Edition Update - Corrosion and IOW Implementation -
Corrosion / Metallurgy Hydrotreaters - James McVay,
Fired Heater’s Convection Coils - Benjamin
Heaters - Tim Hill, Quest Integrity
Furnace Tubes - Nathaniel Griffen,
Jim Edmondson, Becht Engineering Michael Cayard, Flint Hills
Bryant, Celanese Corporation (0017) International Petrochemical Muhammad Diab, Yanpet/SABIC Chimbli, Stress Engineering Phillips 66 (0288)
OPENING SESSSION / KEYNOTE SPEAKER: Andeavor (0163) (0344) Company (0289) (0292) Services, Inc. (0328) Company, Inc. (0078) Resources, LLC (0068)
Break in
John Reynolds Exhibit Hall FFS Case Study: Evaluation of Crack-like Remaining Life Assessment of Heater Tubes FFS: Discussion of the Cracking Assessment Process Piping Vibration Making Sense of Piping Vibration
Fitness-for-Service: The Fire Damage Case Study: Hydrochloric Acid Corrosion Vibration Integrity Management –
Flaws at Ring Joint Grooves - Melanie Using MPC Omega Method - Sudharsanan Input Parameters and Related Estimation Using 3-D Laser Scanning for FFS Assessment Process and Lessons Learned - Damage Mechanism and FFS Assessment Assessment and Mitigation - Scot Measurements - Rob Swindell, Wood
AIM / Engineering Sarzynski, Wiss Janney Elstner Associates, Soundararajan, Abudhabi National Oil Methods - Daniel Ayewah, Stress Finite Element Models - Michael
New Tools to Avoid Fatigue Failure -
McNeill, Stress Engineering (0338)
Gyorgy Szasz, Stress Engineering Services, for a Heat Exchanger - Yasser Moaafa, Saudi
Inc. (0162) Company-Refining(0264) Engineering Services, Inc. (0340) Michael Cyca, Wood (0337)
Cifuentes, TXF Ingenieria (0193) Inc. (0302) Aramco (0104) Services, Inc. (0203)
RBI / HTHA HTHA Advanced Vulnerability
Advanced Complementary HTHA
HTHA PANEL
How People, Processes and
Interaction of RBI, IOWs and CCDs in
(AIM / Engineering Subtrack) Inspection and New API 941 NDE Incipient Hydrogen Damage in a 1Cr How Risk-Based Inspection Ruined Technology provide RBI Program
Assessments, Inspections, and FFS including Mechanical Integrity Programs -
Guidance - Joseph Krynicki, Reformer Reactor - Clay White, My Life - Brent Ray, Marathon Success - Monica Hernandez,
Approach - Arthur Jensen, PBF 0228 ("On-Stream Acoustic Emission Monitoring for Instantaneous Detection of HTHA Cracking") Juergen Deininger, TUEV SUED
ExxonMobil Research and Phillips 66 (0400) Petroleum Company (0003) Lloyd;s Register Energy Canada, Ltd.
Energy (0363) 0022 ("Recent NDE Developments and FFS status from E2G HTHA JIP") Industry Services, GmbH (0171)
Engineering Company (0031) (0144)

Midstream
9:40 AM - 11:55 AM - 2:40 PM -
TRACK 8:00 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 AM - 2:40 PM
3:15 PM
3:15 PM - 3:45 PM 3:50 PM - 4:20 PM 4:25 PM - 4:55 PM

Mobile Reporting and Tracking for Real-Time Distributed Monitoring & Using Satellite-Based Hyperspectral Imagery
The Digital "Pig & Dig": What? Why? A Practicum on Pressure Testing - Full-Scale Testing to Develop a
Improved Pipeline Integrity Measurement for Pipeline Asset for Pipeline Integrity, Leak Detection and Panel: Midstream is Becoming Mainstream: Technology and Innovation in
Inspection / NDE Management, Rana Ghosh, Intertek
And How?, Paul Muir, Mobideo TBD Compilation of Best Practices - Sheri
Integrity - Tara Merry, Baker Highes,
Pipeline Leak Rate Estimation Tool - Compliance - Peter Weaver, Orbital Sidekick the Midstream Sector
(0155) Baucom, RCP, Inc. (0158) Sanjay Tiku, BMT Canada, Ltd. (0348) (0133)
OPENING SESSSION / KEYNOTE SPEAKER: Break in (0080) Lunch in a GE Company (0331) Break in
John Reynolds Exhibit Hall Rectifier Selection: "What's Right for Exhibit Hall Exhibit Hall Interpreting Internal Corrosion The Mechanical Aspects of Internal
Alternating Current Interference on Lessons Learned Hard Spots Mechanical Integrity Evaluation for Gas Internal Corrosion Monitoring
your Application" - Don Olson, IRT Pipelines Capacity Augmentation - Anil Coupon Data – What does it Mean? - Corrosion Monitoring - Jerry Brown,
Corrosion / Metallurgy Integrated Rectifier Technologies,
Pipelines - Anthony Ashiofu, Jr., TBD Failures - Nigel Strike, Boardwalk Kumar Bhat, Vedanta Limited Cairn Oil &
TBD
Jane Brown, Brown Corrosion
Methods - Lance Witt, Integrity
Brown Corrosion Services, Inc.
RK&K (0405) Pipeline Partners, LP (0404) Gas (0169) Measurement and Control (0411)
Inc. (0043) Services, Inc. (0410) (0413)

Upstream
9:40 AM - 11:55 AM - 2:40 PM -
TRACK 8:00 AM 0 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 AM - 2:40 PM
3:15 PM
3:15 PM - 3:45 PM 3:50 PM - 4:20 PM 4:25 PM - 4:55 PM

CLASS and CAIP Oil Tanker Survey Planar Array Tool for Volumetric Surface
Popular O&G Inspections Using Subsea Inspection with Game In-Line Inspection of Shut-In Advances in Phased Array Inspection Identification of Base Metal Cracking Advances in Nondestructive Assessment of
Using Drones and Software - Patrick Defect Detection and Measurement - Stanley
Inspection / NDE PAUT and TFM - Dillon Smith, M2M Changing MEC Technology - Andreas
Saracco, Cyberhawk Innovations
Pipelines - Ali Al-Asfour, Kuweit Oil TBD of API 620 LNG Tanks - Chris in Stainless Steel Lined High Botten, Stanley F. Botton NDT Consultants
Used Oilfield Coiled Tubing - Roderic
NDT, Inc. (0047) Boenisch, Innospection, Ltd. (0054) Company (0138) Magruder, Olympus NDT (0246) Temperature Reactors - (0431) Stanley, NDE Information Consultants (0293)
(0137) (0286)

Unexpected SCC Failures on High Erosion and Sand Management in Mitigation & Control Strategy for
OPENING SESSSION / KEYNOTE SPEAKER: Break in Erosion in Bypass of Level Control Lunch in
Gathering System Integrity CRA Metal Cladding with High Velocity Break in
Pressure 316SS Offshore Block the Unconventional Business - Juan Organic Acid Corrosion - Afizza
Corrosion / Metallurgy John Reynolds Exhibit Hall Valves - Riza Khan, In-Corr-Tech, Ltd. Gonzalez, Shell Upstream Americas
Valve in Gas Plants - Hatam Mehraz, Exhibit Hall Izzma Mustapa, PETRONAS Carigali
Evaluation - Christopher Perez, Thermal Spray in Upstream Static Equipment Exhibit Hall TBD TBD TBD
Saudi Aramco (0032) ShellSEPCO (0428) - Iain Hall, Integrated Global Solutions (0427)
(0350) Unconventionals (0417) Sdn Bhd (0038)

AIM / Engineering
*as of 12/17/2018. Program is subject to change

Wednesday, January 30, 2019


Multi-Sector
9:40 AM - 11:55 AM - 2:40 PM -
TRACK 8:00 AM - 8:30 AM 8:35 AM - 9:05 AM 9:10 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 AM - 2:40 PM
3:15 PM
3:15 PM - 3:45 PM 3:50 PM - 4:20 PM 4:25 PM - 4:55 PM

Corrosion Blisters and Blooms Nondestructive - Base Asset Management Reliability of Nondestructive Testing 6 Baseline Heat Exchanger Handheld Analyzer for Carbon, CE Effects of Weld Type Variation on Phased Array Assisted Analysis Omnidirectional Magnostrictive Transducer Inspection of Heat Recovery Steam
Detection and Sizing of Stress Eddy Current Array vs Penetrant Testing for Automated Guided Wave Monitoring -
Evaluation - Pulse Eddy Current Techniques for High Pressure LDPE Data for Fitness for Service inspections to Reduce Costs and Determination in Pipeline, Refinery TFM Image Techniques - Emilie Software for Weld Inspections - for Guided Wave Testing of Large Shells - Generators Using Nondestructive
Inspection / NDE - 1 Corrosion Cracking - John Ferguson,
Testing - Timothy Rush, Mistras
Inspecting Stainless Steel - James Bittner,
Equipment - Myles Parr, Structural Integrity Assessments - Morteza Jafari, ABSG Unscheduled Downtime - Timothy Materials - Don Sackett, SciAps, Inc. Peloquin, Olympus Scientific Nicholas Bublitz, VeryPhase, Inc. Sergey Vinogradov, Southwest Research Testing - Shawn Gowatski, TesTex,
Thomas Vogt, Guided Ultrasonics,
Mistras Group, Inc. (0234) Olympus Corporation of the Americas (0237) Ltd. (0312)
Group, Inc. (0235) Associates (0238) Consulting, Inc. (0249) Rush, Mistras Group, Inc. (0224) (0385) Solutions Americas (0273) (0274) Institute (0282) Inc. (0301)
The Three Key Pieces of an Integrity Inspection Careers - Where to Begin Development of a Pipeline Developing and Sustaining Future Proactive Systematic Approach to
Continuing Education for Inspectors - Inspector Training Post Certification: Benefits of DDA X-ray for Corrosion Alignining Fitness for Service for
Management System - Gerrit RBI Best Practices Mark Harmody, API and ICP - A Guide to Involvement - Break in Lunch in and Where to go to Next - Kimberly Construction Inspector Career Mechanical Integrity Break in Identify and Prioritize Structural
Inspection / NDE - 2 Buchheim, Becht Engineering The Equity Engineering Group (0118) Terry McLane, HollyFrontier (0126) Exhibit Hall
Randall Stremmel, RPS Welding Cultivate & Grow Inspection Leaders, TBD
Exhibit Hall Meszaros, Codes and Standards Roadmap - Ritch Rappel, Rappel Specialists/Leaders - Kareem Khali, Exhibit Hall
Damage Mechanisms - Brian Fiber Reinforced Polymers - Geoff
Infrastructure - Tom Kline, Structural
Consultants (0062) Tony Medina, PinnacleART (0215) Anderson, Acuren (0389) Clarkson, UTComp, Inc. (0168)
Company, Inc. (0393) Training Institute (0343) Inspections, Ltd. (0165) Yansab (SABIC) (0304) Technologies (0023)
Asset Integrity Management – Turnaround Management - Maximizing MI Increasing Uptime in Plant Reliability Benefits of Implementing an Improved Thickness Survey Data
Next Generation Asset Performance The Role of Emerging Technology in Driving Realizing the Full Potential of an Continuous Monitoring of Assets - Installed Sensors and Cloud Software for
Training and Experience or Program Value During Shutdowns - John by Deploying Asset Monitoring Appropriate Data Management Management Using Connected, Cloud
AIM/Engineering Techniques? - Peter Millar, MMD
Management - David Drerup, Shutdown/Turnaroung/Outage (STO)
Bailey, Innovatice Inspection Solutions
TBD
Solutions - Artuto Nunez, Mistras
TBD Integrity Data Management System -
System - Natalie Mc Intosh, Lloyd;s Enabled Instruments - Dianne Hillhouse,
Mike Wechsler, Mistras Group, Inc. Continuous Monitoring and Analytics - Tara
Operational Sustainability, LLC (0087) Success - Paul Muir, Mobideo (0132) Stephen Flory, PinnacleART (0179) (0225) Merry, Baker Hughes, a GE Company (0330)
Equipment and Service (0024) (0185) Group, Inc. (0230) Register (0196) Olympus Corporation of the Americas (0220)

Downstream
9:40 AM - 11:55 AM - 2:40 PM -
TRACK 8:00 AM - 8:30 AM 8:35 AM - 9:05 AM 9:10 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 AM - 2:40 PM
3:15 PM
3:15 PM - 3:45 PM 3:50 PM - 4:20 PM 4:25 PM - 4:55 PM

Continuous Thickness Monitoring in Development of a Wall-Sticking Drone Process Heater Tube Temperature Phased Array Detection and Field Practice of Magnetic Flux Long Range Wireless UT Sensor Contact Point Corrosion detection using
High Temperature (400 degF) Phase Array The Value of a Baseline Inspection: CML Optimization / Allocation - Grady Comprehensive Refining Piping CML Carburization Inspections for Radiant Tubes
High-Temperature Service - Tim for Non-Destructive Ultrasonic Monitoring: Best Practices - Frank Metallurgical Analysis of Creep Leakage Methodology- Some Pitfalls - Adoption: Corrosion Monitoring & Guided Current Testing (GCT) - Paul Nash,
Inspection / NDE Stevenson, Ionix Advanced
Ultrasonic Examinations in Lieu of
Testing - Rami Mattar, Amerapex
Fired Heater Coils - Tim Haugen,
Liu, Code Inspection RI Techniques
Hatton, Pro-Surve Technical Services, Optimization Review Process - James
Fatigue Cracking - Terry Haigler,
within Ethylene Cracking Furnaces - Wichit
Roderic Stanley, NDE Information Inspection - Steve Strachan, Sensor Caron Steel Inspection subsiduary of Versa
Radiography - David Bajula, Acuren (0388) Quest Integrity (0099) LLC (0071) McVay, Andeavor (0105) Yokyongpraserd, SCG Chemicals, Ltd. (0187)
Technologies (0201) (0055) (0025) Intertek (0145) Consultants (0093) Networks, Inc. (0101) Integrity (0317)

Compressor Inter-cooler tube Failures by Microbial Corrosion: Post- RCA of Tube Failure in Waste Heat Corrosion Studies – Pitfalls and Some Plant and Circuit Wide CCD/IOW Union Oil Romeoville 1984 Amine Heat Treating - A Journey through  Elimination of Backing Gas in Using Advanced Analysis to Reduce ASME Section IX Welding - Process, Review of Recent HF Alkylation Localized Corrosion Inspection
Corrosion / Metallurgy Micro-Biologically Induced Corrosion - Procedure and Performance - James Harris,
Construction Damage and Mitigation - Boiler - Hassan AlHammad, Kemya (a Good Practices - James McVay, Implementation Process - Brian Jack, Absorber Failure Revisited - Gerrit Time and Temperature - Andrew Austenitic Stainless Steel Welds - Hydrogen Bakeout Times - Scott Piping Failures at HollyFrontier - Locations for HF Alkylation Unit in
Muhammad Bilal, Saudi International Marathon Petroleum Corporation (0021)
William (Bill) Schaal, Gilbane (0290) SABIC & ExxonMobil JV) (0255) Andeavor (0107) E2G (0122) Buchheim, Becht Engineering Bohm, Fulcrum Reliability (0097) Charles Patrick, ALS Maverick Bouse, WJE Associates (0151) Terry McLane, HollyFrontier (0374) Refinery - Huang Lin, Lloyd's Register
Petrochemical Company (0294)
Company, Inc. (0391) Testing Laboratories, Inc. (0019) Energy Associates (0396)
Break in Lunch in Break in
Eight Pillars of Mechanical Integrity - Mechanical Integrity Program Development Integrity Maps for a Refinery - Steven Exhibit Hall Automating Time/Condition-based Inspection
Exhibit Hall MI Fundamentals: Roadmap to Q1 Achieving Mechanical Integrity: A Evaluating the Damage Tolerance of Coke
Exhibit Hall MPT - Where Are We Heading With API 934F Using Mechanical Integrity Improvements in Save Time with an Established Exchanger
Steven Bolinger, Becht Engineering for New Construction - Matthew Caserta, Bolinger, Becht Engineering Strategy Development - Vipin Nair, GE Digital Performance - William Minter, Holistic Approach - Gregory Weber, Drum Support Skirt Designs - Seetha and API 579 - Gerrit Buchheim, Becht Planning a Successful Turnaround - Wilfredo Bundle Inspection Decision Tree - James
AIM / Engineering Company, Inc. Becht Engineering Company, Inc. Company, Inc. and Scott White, Flint Hills Resources
Panel Discussion: Big Data and You
PinnacleART Fidelis Associates Kummari, The Equity Engineering Group, Inc. Engineering Company, Inc. Rivera, GE Digital Cesarini, Pro-Surve Technical Services, LLC
(0359) (0204) (0360) (0426) (0174) (0327) (0149) (0392) (0313) (0113)

Methodology: Owner User Methodology: Qualitative RBI


Methodology: RBI Model for Creep Methodology: Objective Comparison Methodology: Case Study: Steam Methodology: Risk-based Inspection Equipment: Risk-Based Inspection Equipment: Fired Heater Risk-Based Equipment: Using Actual Pop Test
Modification of API-581 Levels of Approach For Heat Exchanger Equipment: Benefits & Limitations of Equipment: Enhanced RBI for Equipment: Evergreening an RBI-
RBI / HTHA Inspection Effectiveness Procedures -
Based on Larson Miller Parameters - of Two RBI Methodologies and System Risk Mitigation using RBI - applied to Russian Refineries - Karina
Damages Mitigation - Ahmad Raza using RBI on ASTs - John Britton,
Methodology for Bundles, Tanks and
Exchanger Bundles - Ricardo Based Inspection Program - Ben
Inspection Methodology - Phil Henry, Results to Determine PRD Risk -
(AIM / Engineering Subtrack) Panos Topalis, DNV/GL and Lynne Results - Clay White, Phillips 66 Robert Sladek, Asset Optimization Allogulova, ZAO "GIAP-DIS Center" Furnace Tubes - Lynne Kaley, Trinity The Equity Engineering Group, Inc. Hassan (Shervin) Sadeghi, Lloyd;s
Mark Vining, Mistras Group, Inc. Khan Rana, Dalhouse University DNV GL (0091) Gonzalez, TOTAL SA (0069) Charlton, Valero Three Rivers (0315)
Kaley, Trinity Bridge, LLC (0283) (0397) Consultants (0241) (0103) Bridge, LLC (0285) (0299) Register (0153)
(0072) (0161)

Midstream
9:40 AM - 11:55 AM - 2:40 PM -
TRACK 8:00 AM - 8:30 AM 8:35 AM - 9:05 AM 9:10 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 AM - 2:40 PM
3:15 PM
3:15 PM - 3:45 PM 3:50 PM - 4:20 PM 4:25 PM - 4:55 PM

Pipeline Dent Integrity Management Remote Detection of Stress In-line Screening of Small Diameter Improvements in Crack Depth Sizing A Proven Methodology for Integrity
Understanding Crack ILI Performance Deformation Program Performance Pipelines Using Free-floating Smart Effect of Pipeline Deposits on MFL Guided Waves for Structural Health Use of Drones to Inspect Aerial Improving Safety Through
NDE Performance for Pipeline Guide Development - API RP1183, Magnetization to Inspect and Map and Benefits for Integrity Assessment of Facilities Piping -
Inspection / NDE Operators, Stuart Saulters, API (0139)
Using In-the-Ditch NDE - Steven Bott, Evaluation -Syed Haider, Enbridge
Mark Piazza, Colonial Pipeline Pipelines - Paul Jarram, Speir Hunter Sensors - John can Pol, Ingu Management - Ryan Sikes, NDT
Sizing Accuracy of Pinholes - Joel Monitoring of Pipeline - Sang Kim,
Juan Carlos Ruiz-Rico, DNV GL
Pipeline Crossings - David Hunter, Technology and Innovation - Jason
Enbridge Liquids Pipelines (0362) Liquids Pipeline (0384) Solutions, Inc. (0265) Falk, Desjardins Integrity, Ltd. (0324) Guides Wave Analysis, LLC (0205) Pond & Company (0352) Forte, Insitu (0079)
Break in Company (0345) Limited (0039) Lunch in Global, LLC (0319) Break in (0074)

Pipeline and Tank Floor Inspection The Unique Inspection Requirements Exhibit Hall The Next Generation CP for Double Exhibit Hall Exhibit Hall
The Inspection of Vented, Fiberglass Use of Corrosion Coupons and ER Approaching API 653 Tank Internal Seismic Loading of Aboveground Storage Lining for Fuel Grade Ehtanol: Why Tank tales: Storage Tank Failure and Current Corrosion Protection not
with Game Changing MEC of Bolted CHIME Tanks - John Bottom Tanks has Arrived- Louis Inspections as Business Opportunities - Tanks: Design and Fitness-For-Service
Corrosion / Metallurgy Technology - Andreas Boenisch, Cornell, H.I.R. Technical Services
Storage Tanks - John Cornell, H.I.R.
Koszewski, US Tank Protectors, Inc.
Probes for AST's - Louis Koszewski,
Lennar Perez, CITGO Petroleum Corporation Considerations - Phillip Prueter, The Equity
Has it Been So Challenging? - David Damage Investigations - Ana Benz, working?, VCI can help! - Kelly Baker, Panel: Robotics in Tank Inspections
Technical Services (0129) US Tank Protectors (0178) (0399) Engineering Group (0148) Cushman, West Virginia Paint (0433) IRISNDT (0029) Zerust Oil & Gas (0046)
Innospection, Ltd. (0053) (0128) (0177)

Upstream
9:40 AM - 11:55 AM - 2:40 PM -
TRACK 8:00 AM - 8:30 AM 8:35 AM - 9:05 AM 9:10 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 AM - 2:40 PM
3:15 PM
3:15 PM - 3:45 PM 3:50 PM - 4:20 PM 4:25 PM - 4:55 PM
Break in Exhibit
New Advances in Contact Point Advances in PIpeline Leak Detection - Field Evaluation of Eddy Current Hall
Inspection / NDE Corrosion Technology - Brian Ronnie Little, SPL Leak Detection Probe - David Brown, Vir Systems In
Beresford, VIR Inspection, LLC (0368) (0370) (0415)
Lunch in Exhibit Break in Exhibit
Hall Hall
Maintaining Aging Infrastructures in Insights from Scale Deployment of Control Measures During Project for Assessing Performance of a Corrosion Moving from Conformance to Improving Quality in Offshore
Monitoring of Structural Integrity of Offshore SURF RBI - Cost Effective Solutions Asset Integrity Management best Inspection Process: The "What",
Upsream Operations - A Continuum Non-Intrusive Inspection Across Dead Leg Inspection Management Minimizing Dead Leg in Piping - Control Program & Data Analytics - Jamie Improvement: A Case for Quality Projects: Adding Value Through
AIM / Engineering of Approaches - Travis Harrington, Upstream Assets - Geroge
Structures in Cold Regions - Arpit Dev, OMCI
Systems - Eric Onya, SNEPCo (0320) Barzan Saleh, Kuwait Oil Company
to Mitigate Identified Risks - Eric practices - Tony Poulassichidis, "When", "Who" and "How" - Tony
Davidson, Lloyd;sRegister Energy Americas, Management - Joey Poret, Chevron Inspection - Joey Poret, Chevron
Rig Technical and Support Services (0311) Allen, DNV GL (0057) Anadarko (0063) Poulassichidis, Anadarko (0064)
Anadarko (0005) Williamson, BP (0030) (0041) Inc. (0077) Corporation (0085) Corporation (0086)
*as of 12/17/2018. Program is subject to change

Thursday, January 31, 2019


Multi-Sector
9:40 AM - 11:55 AM -
TRACK 8:00 AM - 8:30 AM 8:35 AM - 9:05 AM 9:10 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 AM - 2:40 PM

Remote Acoustic Emission Instrumented Indentation Tests to Review of Applications Using Improving Inspection Reliability With Handheld Analyzers for Carbon, CE
Using Autonomous Drones for Review of Several New Improvements to Full Benefits of DDA X-Ray for Corrosion
Monitoring of Critical Fixed Measure Tensile Properties in Field - Updated FMC/TFM Methods - Advanced Nondestructive Testing Determination in Pipeline, Refinery
Inspection / NDE - 1 Equipment - Steven Garcia, Dongseong Ro, Frontics America
Ultrasonic Inspection of Flare Stacks - TBD Matrix Capture of Total Focusing Method -
Dominique Braconnier, The Phased Techniques - Shannon Matthewson, Materials - Don Sackett, SciAps, Inc.
Damage Mechanisms - Brian
Jamie Branch, Apellix (0117) Alan Caulder, Advanced OEM Solutions (0323) Anderson, Acuren (0389)
Ameriscan, LLC (0206) (0222) Array Company (0325) Wood (0336) (0385)
Baseline Heat Exchanger Inspections Mobile/Digital Inspection and Testing Pressure Safety Valve Integrity The Value of Using Dimensional Technologies
The DOW Chemical Robotic Platform Moving Ultrasonic Data Without Integrity Management With Pressure
to Reduce Costs and Unscheduled Break in for Mechanical Integrity Programs - Management Using Risk and Lunch in Dummy Leg Failure Lessons Learned for Digitalization of the Physical Asset - The Ultimate Safety Moment - David
Inspection / NDE - 2 Initiative - Twain Pigott, The Dow
Downtime - Timothy Rush, Mistras
Cabling - Mike Wechsler, Mistras
Exhibit Hall Russ Davis, Mistras Group, Inc.
Relief Valves at KOC - Arnab Gupta,
Reliability Method - Steve Matthews, Exhibit Hall - Randal Batiste, Saudi Aramco (0267) Matthew Craig, Becht Engineering Company, Bajula, Acuren (0387)
Chemical Company (0303) Group, Inc. (0226) Kuwait Oil Company (0269) Inc. (0394)
Group, Inc. (0224) (0227) Petrofac (0295)
Fitness for Service (FFS) Fitness for Service (FFS) Developments in Developing and Sustaining Future Existing Concrete Ringwall Discontinuous Stiffening Ring Repairs to Terminology Standardization in the Energy
Introduction to a Proposed Rewrite of API-579 Success Through Data Implementation Quantifying Infrared Temperature
Reevaluating Minimum Distance to a Fatigue Screening Criteria for Piping Mechanical Integrity Foundation Assessments - Kurt Enhance Resistance to Buckling - Melanie Industry and Corporate Guidance - John
AIM/Engineering Structural Discontinuity - Scott
Part 3 Procedures - Seetha Kummari, The
Vibration Assessments - Michael Bifano, The Specialists/Leaders - Clay Rodery,
Changes - Larry Green, Williams Company
Tyler, Wiss Jenney Elstner Sarzynski, Wiss Jenney Elstner Associates, Bringas, Codes and Standards Training
Corrections From Art to Science -
Equity Engineering Group, Inc. (0166) (0332) Nagy Wassef, Quest Integrity (0357)
Bouse, WJE Associates (0152) Equity Engineering Group, Inc. (0214) C&S Technology, LLC (0308) Associates (0159) Inc. (0160) Institute (CAST) (0305)

Downstream
9:40 AM - 11:55 AM -
TRACK 8:00 AM - 8:30 AM 8:35 AM - 9:05 AM 9:10 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 AM - 2:40 PM

Discussing Structural Tmin for Latest Advancements in PMI by XRF Digitalization and Standardization of Unmanned Data Management – Common Errors when Conducting Cracking Case Study: FFS Program P91 Case Study: Wall Loss Due to Flow
Components of a Modern PMI A105/A106 QA QC and Metallurgical
Piping: Update to API 574, Table 6 - & LIBS Handheld Analyzers - Mark Visual Inspection Data for Business Inspections and Beyond - Danny and Bulging Inspections of Coke Drums - Operating in the Creep Rande - Lange Accelerated Corrosion - Lange
Inspection / NDE Kraig Shipley, The Equity Lessard, ThermoFisher Scientific
Program - Michael Hull, Olympus
Intelligence - Ross Boyd, TruQC, LLC Landry, Premium Inspection & Mahmod Samman, Houston Engineering Kimball, Stress Engineering Services, Kimball, Stress Engineering Services,
Considerations - Puneet Saggar,
(0358) Solutions, LLC (0200) Lloyd's Register (0176)
Engineering Group, Inc. (0280) (0346) (0353) Testing Group (0367) Inc. (0208) Inc. (0209)
Corrosion / Metallurgy Lessons Learned from New Stainless Case Studies Demonstrating
FMR Replication Techniques for A105/A106 Metallurgical and Brittle Damage Mechanisms in old Mn-Mo Alkaline Carbonate Stress Corrosion IOW as Support to RBI Program - Jean
Steel Fabrication - Krista Classification Of Corrosion Failures - Corrosion concerns (Design and
TBD Damage Mechanisms - Luis Ganhao Fracture Considerations - Puneet Vessels - David Moore, Becht Cracking - A Case Study - Mike Fuenmayor, Integrated Assessment
Heidersbach, Stress Engineering Gerald Hunt, Scientific Testing (0198) Material Selection) - Youyu Lu,
Birrento, Andeavor (0164) Saggar, Lloyd's Register (0156) Engineering Company, Inc. (0143) Schmidt, CHS, Inc. (0183) Services(0100)
Services, Inc. (0429) Lloyd's Register (0124)
Break in Lunch in
Performance-Based Assessment of an Investigating the Root Cause of a Exhibit Hall Lessons Learned in Piping Exhibit Hall Optimizing Pressure Relief Valve Common Pitfalls of a PRV Reliability
ASME B&PV Code VIII-2: Background, Simplified Fracture Mechanics for ASME B31.3 Piping Spring Hanger Pipe Support Inspection and The Connection Between ASME VII, Division 1
Incinerator Stack Using Field Measurements -
Initiatives and Cost Savings - James Heater Convection Tube Leak - Arthur Using a Minimum Allowable Temperature Method - Kraig Maintenance - Chuck Thornton, Versa Troubleshooting and Design - Inspection Intervals - Nancy Faulk, Program - Chad Patschke, Ethos and an API 510 Inspection Program - Marvin
AIM / Engineering Sowinski, The Equity Engineering Group, Inc.
Kenny Farrow, Stress Engineering Services,
Jensen, PBF Energy Shipley, The Equity Engineering Group, Inc. Integrity Group108 Charles (Chuck) Becht, Becht Siemens Mechanical Integrity Solutions, LLC Coats, Hellier/Codewest
Canada (0281)
(0298) (0375) (0300) Engineering Company, Inc. (0421) (0180) (0366) (0279)
(0354)

Can you Manage RBI Records real- IOW's: Why You Need Them & How to IOWs - Implementation Experience
Utilizing RBI to Evaluate Feed and Non-Intrusive NDT and Customized
RBI / HTHA time during a Turnaround?
Other Operational Changes - Clay RBI Solutions - Siddarth Sanhavi,
Justify Within Your Organization - and Lessons Learned - Vishal Lagad,
TBD TBD TBD TBD
(AIM / Engineering Subtrack) Absolutely! - Guy Bogar, TGR Phil Garcia, PinnacleART Lloyd's Register
White, Phillips 66 (0398) PinnacleART (0329)
Industrial Services (0108) (0130) (0172)

Midstream
9:40 AM - 11:55 AM -
TRACK 8:00 AM - 8:30 AM 8:35 AM - 9:05 AM 9:10 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 AM - 2:40 PM

Corrosion Under Insulation in Improved Methods for Estimating Suitability for Service: Undocumented
Engineering Analysis of Backfilling Practices Reverse Engineering for OSHA Compliance Managing Corrosion in Slug Catchers - Capturing Best Practices for Third Party
Pipelines. A Case Study - Bernardo Fatigue Life of ERW Pipelines - Aaron Pressure Vessels and State Specials - Daniel Advances in Leak Detection - Ronnie Little,
Inspection / NDE Cuervo, G2 Integrated Services
for Pipeline Maintenance Activities - Aaron
Dinovitzer, BMT Fleet Technology,
when Design Documentation is Missing -
Schdine, Applied Technical Services, Inc.
Mandar Kulkami, Stress Engineering TBD Inspections of Facilities Construction - Andy
SPL Leak Detection
Dinovitzer, BMT Fleet Technology, Ltd. (0347) Brian M (0271) Services, Inc. (0333) Duncan, Enbridge (0173)
(0210) Ltd. (0310)
Break in Lunch in
Exhibit Hall Exhibit Hall
Methods for Mitigating Corrosion - DNA Testing, What is it and How Can Corrosion Control of Rural Codes & Standards Review of Elextrically Dead Legs - Prioritization, Remedies and
Corrosion / Metallurgy Lance Witt, Integrity Measurement & it Help? - Tom Pickthall, EnhanceCo, Gatherings - Drew Hevle, Linder Resistive Pipeline Coatings - Bob Buchanan, Failures - Jerry Brown, Brown Corrosion TBD TBD TBD TBD
Control (0412) Inc. (0207) Morgan (0407) Seal for Life Industries (0408) Services, Inc. (0409)

Upstream
9:40 AM - 11:55 AM -
TRACK 8:00 AM - 8:30 AM 8:35 AM - 9:05 AM 9:10 AM - 9:40 AM
10:15 AM
10:15 AM - 10:45 AM 10:50 AM - 11:20 AM 11:25 AM - 11:55 AM
1:00 PM
1:00 PM - 1:30 PM 1:35 PM - 2:05 PM 2:10 AM - 2:40 PM

Evolving a Proactive Corrosion Management An Inspired Approach to Inspection Offshore Well Casing Repair & Remediation Update of API 12 Series Tank Specification
Ensuring Piping Integrity for Oil & Gas Asset Pipeline Metal Loss Evaluations per API 579-
System to Drive Inspection - Kenechi Methodology for Upstream Production Tanks - Alternatives - Chanat Sirisoonthorn, Chevron and Inspection Documents - George QA/QC – Cost versus Value - Holley Aging Asset Optimisation - Hossam Aboegla,
AIM / Engineering Ojemeni, Shell Petroleum Development Elizabeth Brueckner, G.K. Hills Consulting, Thailand Exploration and Production, Ltd.
Performance Management - Haitham
Morovich, Tank and Environmental Baker, Mistras Group, Inc. (0221) Lloyd's Register Energy (0296)
1/ASME FFS-1 Fitness-For-Service Rules -
AlKanderi, Kuwait Oil Company (0123) Kraig Shipley, The Equity Engineering Group,
Company (0094) Ltd. (0120) (0121) Technologies, Inc. (0181)
Inc. (0278)

Vous aimerez peut-être aussi