The works of this schedule comprises of the supply of all manpower, electric power for
technology, transportation of sludge, spares, repairs and replacement as required and
any other requirements for the smooth functioning of the Sewage treatment plant with
4 years O & M period from the date of successful commissioning as shown in table
below :
Note: The conditions as laid down in the Volume II (B), Schedule 1, O & M
Services shall also be considered by the bidder at the time of bidding and same
shall be applicable during the O & M contract for releasing payments
SIGNATURE
NAME AND DESIGNATION
COMPANY
DATE
PART C/1
The works of this schedule comprises of the supply of all manpower, electric power for
technology, transportation of sludge, spares, repairs and replacement as required and any other
requirements for the smooth functioning of the Sewage treatment plant with 4 years O & M
period during the First year from the date of successful commissioning as shown in table O & M-
1 below:
Note:
1. The cost of damages to the system shall not be included in the O&M–1 as it is
already covered under ‘Defects Liability Period”.
2. Total price for O & M for 1st year in part C/1 shall be lines with rates quoted for
1st year in Part C
PART C/2
The works of this schedule comprises of the supply of all manpower, electric power for
technology, transportation of sludge, spares, repairs and replacement as required and any other
requirements for the smooth functioning of the Sewage treatment plant with 4 years O & M
period during the Second year from the date of successful commissioning as shown in table O &
M-2 below:
Item Quoted
Description
no. Price (Rs)
1 Fixed Charges:
It may include manpower charges (as per Part-D), admin charges,
non-technical power cost and any other charges if required.
Note:
1. The cost of damages to the system shall not be included in the O&M–2 as it is
already covered under ‘Defects Liability Period”.
2. Total price for O & M for 2nd year in part C/2 shall be lines with rates quoted for
2nd year in Part C
PART C/3
The works of this schedule comprises of the supply of all manpower, electric power for
technology, transportation of sludge, spares, repairs and replacement as required and any other
requirements for the smooth functioning of the Sewage treatment plant with 4 years O & M
period during the Third year from the date of successful commissioning as shown in table O &
M-3 below:
Item Quoted
Description
no. Price (Rs)
1 Fixed Charges:
It may include manpower charges (as per Part-D), admin charges,
non-technical power cost and any other charges if required.
The works of this schedule comprises of the supply of all manpower, electric power for
technology, transportation of sludge, spares, repairs and replacement as required and any other
requirements for the smooth functioning of the Sewage treatment plant o with 4 years O & M
period during the Fourth year from the date of successful commissioning as shown in table O &
M- 4 below:
TABLE O & M- 4
Item Quoted
Description
no. Price (Rs)
1 Fixed Charges:
It may include manpower charges (as per Part-D), admin charges,
non-technical power cost and any other charges if required.
PART D
Manpower During Operation And Maintenance For Proposed STP In The Contract
Use Separate Sheet for each STP
1 Plant Manager 1
2 Shift In-charge 2
3 Electrician 1
4 Mechanic 1
5 Operator 2
6 Chemist 1
7 Security Staff 2
Add other than above
8 --
(if any)
Total 10
FUNCTION
(To
Electrical Energy Usage per Unit Volume of Raw Sewage(For detail refer Volume III claus
The Bidder guarantees that electrical energy usage of various components of the Works will not exceed
Total
Power
Efficiency Operati
Item Equipment Workin Motor Motor Cons
of B kW for ng
g units Efficien Rating umpti
No Name (Nos.)
Equipmen operation
cy (%) (kW)
hours
on
t (%) (h/day)
(kWh/
day)
Mechanical
1. Fine Screen
2. Belt Conveyor
Grit
3. Mechanism
Grit Classifier
4. Mechanism
Organic
5. Return Pump
Anoxic /
6. Anaerobic
Tank Mixer
Process Air
7. Blower
Secondary
8. Clarifier
mechanism
Pump :
Thickener
9. Feed / RAS /
WAS / Internal
recirculation
Clarifier
10. Mechanism
Filter Feed
11. Pumps
Backwash
12. Pumps
Air Scour
13. Blowers
Gravity Sludge
14. Thickener
Thickener
15. Dilution water
Pumps
Digester Feed
16. Pumps
Sludge
17.
Digester
mixers
Thickened
Sludge Sump
19. Mixers /
Blowers
Centrifuge
20. Feed Pumps
Centrifuge with
21. VFD
Supernatant /
Centrate
22. Recirculation
pump(s)
Polyelectrolyte
23. (PE) Tank
Agitator (s)
Polyelectrolyte
24. (PE) dosing
pump (s)
Coagulant
25. Tank
Agitator(s)
Coagulant
26. dosing
pump(s)
Chlorine
27. Booster
pump(s)
NaOH
28. recirculating
Pump(s)
Service Water
29. pumps
Lighting &
31. Ventilation/ Air
conditioner
Loads
Motorised
32. Gates/ Valves
Total
Note: Format given above is indicative only. Bidder shall incorporate all the equipment (required
for successful operation of plant) as per selected process in Power consumption Statement and
accordingly arrive on guaranteed power consumption.
Chlorine Usage per Unit Volume of Plant Effluent (For detail refer Volume III
clause 1.2.1)
Dewatering Polymer Usage per Unit Volume of Plant Effluent for Biological
Sludge (For detail refer Volume III clause 1.2.2)
Coagulant/ Other Chemical Usage per Unit Volume of Plant Effluent (if
required)
As mentioned in Tender
Plant Name Proposed Land
Notice
Requirement for each
As mentioned in Tender STPs in the Contract
Plant Capacity (cum/day)
Notice (m2)
Total Area