This agreement made as of 29th Day of NOVEMBER, 2018, between Alviola Village
Central Elementary School Principal-MRS. MERLYN D. SANCHEZ First party and the second party
the contract worker/carpenter name PASCUAL M. PINO and JUNEL DE LOYOLA.
WHEREAS, the first party and the second party have an agreement to work on the
construction of tables of E-Classroom:
2. That the length of time estimated for the construction of the table mention above will
be opt on the availability of the materials purchased through the DCP Fund Batch 42.
3. That the first party should have sometimes an ocular supervision during
the time of work to see whether the second party follows the quality
and standards of the fabrication and installation.
5. That the second party should be in-charge of the whole finish output
assigned.
IN WITNESS WHEREOF the first party and the second party has set his
Hand as of the date first above written.