Académique Documents
Professionnel Documents
Culture Documents
maximum output.
HYBRID 6
www.windenergy.com
40 100 200 400 540 700
monthly energy (kWh/month)
HYBRID 6 www.windenergy.com
WIND SOLAR
MONTHLY WIND ENERGY (KWH)1 MONTHLY SOLAR ENERGY (KWH)2
1000
ZONE 1 2 3 4 5 6
Monthly Energy
600
400
200
0
m/s 0 2 3 4 5 6 7 8 9 10
mph 4 6 8 10 12 14 16 18 20 22
Average Annual Wind Speed
Cut-in Wind Speed 3.5 m/s (8 mph) Tower Options* Ground Clearance
Rated Wind Speed 13 m/s (29 mph) 45-19 1.22 m (4 ft)
600 600
KWH/MONTH
KWH/MONTH
400 400
200 200
0 0
MAR JUN SEPT DEC MAR JUN SEPT DEC
1
Estimated data. Local conditions may affect performance. Data measured and compiled 3
Estimate for sample sites only. Specific production will depend on site selection
by USDA-ARS Research Lab, Bushland, TX. and other factors and may vary considerably from these samples.
2
Estimate, assuming 35% increase over fixed panels. Local conditions may affect performance. Design and specifications are subject to change without notice. Skystream
Hybrid 6 is a trademark of Southwest Windpower. PATENT PENDING.