Siemens Energy Oil & Gas

Oil & Power Business Forum


SOFIA 11.05.2012

Page 1
Industrial Gas Turbines for CHP - Portfolio

Industrial Gas Turbines


Type Power Output (MWe)
0 5 10 15 20 25 30 35 40 45 50

SGT-100 5

SGT-200 7

SGT-300 8

SGT-400 13

SGT-500 19

SGT-600 25

SGT-700 31

SGT-750 36

SGT-800 47
Page 2
SGT-750 Core Engine
Main Components

2 Stage Air Cooled 2 Stage Uncooled


13 Stage Compressor 8 Can Combustors Compressor Turbine Power Turbine

er Tu rbine
Pow
Performance
Ge nerator
Shaft Electrical Gas
Power, 36 481 35 459 kW
Efficiency 40.1 39,0 %
Page 3temp
Exhaust 465 oC
Industrial Gas Turbine SGT-800

Service introduction year 1999

Units sold to date 166


thereof dual fuel 28 units

Total fleet hours > 1 700 000

Lead package hours > 85 000

Fleet availability 97.9%


Fleet reliability 99.8%
Start reliability 97.6%

MTBF 4.796 h

Page 4
SGT-800 Industrial Gas Turbine
Fleet Experience and worldwide Sales

Latin America
> 166 units sold Africa 6
8
USA
9
Russia
Germany
44
14

Iran/Iraq/Turkey
16

EU (without
Germany)
Australia
27
17
Thailand/
South Corea
Page 5 25
SGT-800 Industrial Gas Turbine
Fleet Experience and worldwide Sales

60 55

35 49
50

40

30 26

26
105 20
12
14

10 6
4

Combined Cycle Cogen Simple Cycle 0


Utility P%P Petro- MMM O&G IPP Others
Chemical Refineries (Cement,
Automotive)

Utilities Oil & gas Chemicals


Page 6
SGT-800 Industrial Gas Turbine
Fleet Experience and worldwide Sales

60 55

35 49
50

40

30 26

26
105 20
12
14

10 6
4

Combined Cycle Cogen Simple Cycle 0


Utility P%P Petro- MMM O&G IPP Others
Chemical Refineries (Cement,
Automotive)

Metals & Mining Pulp & Paper Others


Page 7
EXTENDED SCOPE PRODUCTS
GT extended Scope of Supply

COGEN POWER TRAIN

POWER ISLAND EPC

Page 8
Power Train

Main Items Power Train


Gas Turbine(s) incl. Auxiliaries x
Steam Turbine incl. Auxiliaries x
Technical Field Advisors for Installation and
Commissioning x
Design Services Power Train
Thermal Cycle Optimization x
Power Train Gross output x
Options Power Train
Gas Receiving Station x
Gas Fuel Compressor x
Liquid fuel forwarding System x
Step-up transformers x
LV Switchgear x
MV Switchgear x
Black Start diesel generating set x
Foundation Design x
*

A perfect match, higher performance


Page 9
Cogen

Main Items Cogen


Gas Turbine(s) incl. Auxiliaries x
HRSG or WHRU x
Technical Field Advisors for Installation and
Commissioning x
Design Services Cogen
Optimization of GT, HRSG and Control. System x
Electrical and efficiency x
Steam / Heat x
Options Cogen
Gas Receiving Station x
Gas Fuel Compressor x
Liquid fuel forwarding System x
Step-up transformers x
LV Switchgear x
MV Switchgear x
Black Start diesel generating set x
Foundation Design x
*)

Excellent combination for efficient energy use


Page 10
POWER ISLAND
Power Island
Main Items Power Island
Gas Turbine(s) incl. Auxiliaries x
Steam Turbine incl. Auxiliaries x
HRSG x
Condenser incl. air removal systems x
DCS System x
Boiler feed pumps x
Condensate Pumps x
Critical Valves x
Technical Field Advisors for Installation and
Commissioning x
Design Services Power Island
Thermal Cycle Optimization x
System Integration x
Optimized Operability x
Performance Wrap around x
Options Power Island
Gas Receiving Station x
Gas Fuel Compressor x
Liquid fuel forwarding System x
Step-up transformers x
LV Switchgear x
MV Switchgear x
Black Start diesel generating set x
Foundation Design x
*)

Siemens gives overall Plant Guarantee


Page 11
Power Island Example: Diamantina – Australia

2 x SCC-800-2 + 1C

4 GT
4 HRSG
2 DT
DCS
civil works

~ 260 Mio. EUR


order volume

Page 12
Solution Project: Diamantina – Australia

Siemens SIT (Finspång) Siemens Local EPC Contractor

 GT incl. generator  Electrical equipment  Civil works


 ST incl. Generator  Switchyard  Erection
 HRSG  BoP controls-equipment  Fuel supply
 Part of BOP  Documentation  Cooling systems
(FW System  Training  Water treatment /
 Plant control system systems
 Supervision of erection  Tanks
 Commissioning  Fire protection /
 Documentation fighting
 Training  BOP piping / valves
 Documentation
 Training

45-55 % 5-10 % 35-40 %


Page 13
COGEN
EPC
Main Items EPC
Gas Turbine(s) incl. Auxiliaries x
Steam Turbine incl. Auxiliaries x
HRSG or WHRU x
Condenser incl. air removal systems x
DCS System x
Plant DCS System x
Boiler feed pumps x
Condensate Pumps x
Critical Valves x
Building/structures x
Plant Cooling System x
Water Treatment x
Raw Water System x
Waste Water System x
Technical Field Advisors for Installation and
Commissioning x
Design Services EPC
Thermal Cycle Optimization x
System Integration x
Optimized Operability x
EPC Services x
Total EPC plant guarantees x
Options EPC
Several x
*)

The ultimate Power of Best Practice


Page 14
Standard Reference Plant
SCC-800 2x1

110m x 110m foot-print

GT

HRSG

GT
HRSG

E&C

Cooling tower ST

Main tranformers

Make-up water Gas receiving

Raw water tank


Water treatment plant

Page 15
SGT-800 Industrial Gas Turbine
Combined Cycle

Steam Turbine (condensing)


11.6 % losses
17.2 %
520 deg C electricity
2-pressure HRSG

31 deg C
31 deg C 15 deg C
Gas Turbine

37.1 %
electricity
34.1 %
27 deg C losses
100 % fuel

Total electrical efficiency 54.3% in condensing mode


If DH/Process steam is used fuel efficiency > 90% possible
Page 16
SGT-800 Industrial Gas Turbine
Excellent combined Cycle Part Load Efficiency

Condensing operation Natural gas fuel = LHV 46798 kJ/kg

Non - reheat, 1 x SGT-800 Altitude (sea level) = 1,013 bar

Relative humidity = 60 %

Part Load Performance Combined Cycle

60

55

50
Efficiency, %

45

40

35
50 60 70 80 90 100
Base Load Power, %

Page 17
Combined Cycle Power Generation and Cogeneration
Solutions for SCC-800 2x1 (ISO Conditions)

Introduction
Solution SCC-800 2x1 SCC-800 2x1 SCC-800 2x1 SCC-800 2x1
Performance C CE CE CE
Performance 2P Cooling 2P 2P 2P
Cogeneration
Tower Cooling Tower Cooling Tower Cooling Tower
Applications Net power output 135 MWe 109.8 MWe 113.08 MWe 115.14 MWe

Experience

Process steam
Plant
Configurations
generation 20 bara /317 ºC 12 bara / 273ºC 8 bara / 243ºC
Business
Concepts
pressure/temperatur 100.15 t/h 98.71 t/h 97.78 t/h
e
Life Cycle
Costs
Net electrical 54,3% 43.98% 45.29% 46.12%
Standard &
Adaptation efficiency

Net fuel efficiency 54,3% >90% >90% >90%

Page 18
Miskolc Hungary
Important Dates

Effective Contract date December 23, 2005

Main building December, 2006

Commissioning June, 2007

Trial run October, 2007

PAC November, 2007

Power 40 MWel.; DH 35MWth.; 88% efficiency

Page 19
Miskolc Hungary
CAD-View for building Permit

Page 20
Miskolc
May 2006

Page 21
Miskolc
May 2007

Page 22
Miskolc
April 2007

Page 23
Miskolc
April 2007

Miskolc April - 07

Page 24
Miskolc
June 2007

Page 25
Miskolc
July 2007

Page 26
Miskolc
July 2007

Page 27
Miskolc
July 2007

Page 28
Miskolc
September 2007

Page 29
Miskolc
Main Entrance – November 2007

Page 30
Miskolc
Inauguration – December 2011

Page 31
Plovdiv, Bulgaria
Important Dates

Effective contract date January 08, 2010

Start of construction June 17, 2010

ST on foundation April 11, 2011

GT on foundation May 09, 2011

Trial run November, 2011

PAC December, 2011

Power 49,9 MWel.; DH up to 54,2 MWth.


Efficiency: >80 % in annual average
Scope split: 68% SIT – 32% SBG
15y LTSA signed
Page 32
Site Plovdiv, Bulgaria
July 2010

Page 33
Mass excavation for the foundations
Site Plovdiv, Bulgaria
Excavation Works – July 2010

Making canals for sewage pipe and pipe


for rain water under the foundations

Page 34
Site Plovdiv, Bulgaria
DH Pipe Work started – February/March 2011

First delivery of pipes for DH line

Making insulation over the welds of DH pipes


Page 35
Site Plovdiv, Bulgaria
Reinforcement Works – August 2010

View from the left corner of the site

Page 36
Inspection of the plinths of columns
Site Plovdiv, Bulgaria
Reinforcement Works – August 2010

Start of the reinforcement of the


foundation of gas turbine

Unpacking anchor bolts for boiler

Foundation prepared for


casting concrete of ST

Page 37
Site Plovdiv, Bulgaria
Steel Structure

View of the erected steel structure from the


South East corner of the site

Steel column delivered on site


Page 38
Site Plovdiv, Bulgaria
Form Work – December 2010

View of the started formwork for the reinforced


concrete plate at level +10.00

Reinforcement and formwork and sewage


pipes of shafts in the fire fighting building
Page 39
Site Plovdiv, Bulgaria
Building Works

Brick walls

Steel structure of
Page 40 the ST building
Site Plovdiv, Bulgaria
Boiler Assembly Preparation

Sliding beams of Alborg in the boiler area

Preparation works of Alborg for


Page 41
assembly works of the boiler
Site Plovdiv, Bulgaria
Battery Room, Transformer

Assembly of supports for the


batteries in the battery room

Mounting the transformer


Page 42
Site Plovdiv, Bulgaria
Site Views – April 2011

Boiler assembly

View from East side over the


Page 43
steel structure of the GT building
Site Plovdiv, Bulgaria
Delivery of Generator – April 18, 2011

View from the South-East corner


of the building site

Unloading Generator from trailer


Page 44
and positioning it onto sliding system
Site Plovdiv, Bulgaria
Delivery of Gas Turbine – May 2011

Positioning Turbine Skid onto sliding system

Page 45 Lifting of Gearbox


Site Plovdiv, Bulgaria
Delivery of Gas Turbine – May 2011

Generator Cooler is lifted

Turbine skid starts sliding into Hall

Page 46
Site Plovdiv, Bulgaria
DH Connection; Air Coolers – May 2011

Installation of the air coolers – view from the roof

Connection point of DH pipes.


The hydro tests were successful and
the pipes are ready for insulation and
back filling.
Page 47
Site Plovdiv, Bulgaria
Switch Yard Preparation – June 2011

Installing the steel supports for the


heads of the 3 HV cables in the area
of the switch yard

Excavation works for pulling el. cables


Page 48 110kV on the road near the switch yard
Site Plovdiv, Bulgaria
Site Views – July 2011

View from South-East corner over


the steel structure of GT

View from North-East corner over


the steel structure of GT building

Page 49
Site Plovdiv, Bulgaria
Hand Over – December 2011

Page 50
Siemens Energy Oil & Gas
Thanks for your attention!