Bill No.

2 - Compressor Foundation

Number Item Description Unit Quantity Rate Amount


=N= USD $ =N= USD $

BILL NO. 4 - JETTY

CLASS E: EARTHWORKS

Excavation for cuttings

E211
3
Top soil; maximum depth not exceeding 0.25 m m 105 3,550.00 21.52 372,750.00 2,259.09

Excavation for foundations

E322
Material other than topsoil, rock or artificial hard
material; maximum depth not exceeding 0.25-0.5 m m3 59 3,550.00 21.52 209,450.00 1,269.39

Excavation ancillaries

E521 Preparation of excavated surfaces; Topsoil m2 419 550.00 3.33 230,450.00 1,396.67

E522
Preparation of excavated surfaces; material other
than topsoil, rock or artificial hard material m2 550.00 3.33 0.00 0.00

E531 Disposal of excavated material; Topsoil m3 105 3,500.00 21.21 367,500.00 2,227.27

E532 Disposal of excavated material; material other than


topsoil, rock or artificial hard material m3 59 3,500.00 21.21 206,500.00 1,251.52

Filling

E617
3
To structures; Imported rock hardcore; 150 mm thick m 53 16,800.00 101.82 890,400.00 5,396.36

Filling Ancillaries

2
E723 Preparation of filled surfaces; Rock m 352 550.00 3.33 193,600.00 1,173.33

CLASS F: IN SITU CONCRETE

Provision of Concrete

F243 Designed mix; Grade: C20; 20mm aggregate m3 29 29,700.00 180.00 861,300.00 5,220.00

3
F263 Designed mix; Grade: C30; 20mm aggregate m 344 39,925.00 241.97 13,734,200.00 83,237.58

To Collection 17,066,150.00 103,431.21

4/1 =N= USD $


Bill No. 2 - Compressor Foundation

Number Item Description Unit Quantity Rate Amount


=N= USD $ =N= USD $

CLASS F: IN SITU CONCRETE

Placing of Concrete

F511
Mass; Blinding; Thickness: not exceeding 150 mm m3 29 12,500.00 75.76 362,500.00 2,196.97

F622 Reinforced; ground beam; Thickness: not exceeding


150-300 mm m3 67 15,500.00 93.94 1,038,500.00 6,293.94

F623 Reinforced; ground beam; Thickness: not exceeding


300-500 mm m3 24 15,500.00 93.94 372,000.00 2,254.55

F622 Reinforced; ground slab; Thickness: not exceeding


150-300 mm m3 197 15,500.00 93.94 3,053,500.00 18,506.06

F624
Reinforced; pile cap; Thickness: exceeding 500 mm m3 15 15,500.00 93.94 232,500.00 1,409.09

F680 Reinforced; kerb; Thickness: not exceeding 150-300


mm m3 41 15,500.00 93.94 635,500.00 3,851.52

CLASS G: CONCRETE ANCILLARIES

Formwork: rough finish

G114 Plane vertical; to pile caps; Width: not exceeding:


0.4-1.22 m m2 5 2,600.00 15.76 13,000.00 78.79

Formwork: fair finish

G213 Plane horizontal; to ground beam; Width: not


exceeding: 0.2-0.4 m m2 39 4,000.00 24.24 156,000.00 945.45

G214 Plane horizontal; to pile cap; Width: not exceeding:


0.4-1.22 m m2 13 4,000.00 24.24 52,000.00 315.15

G215 Plane horizontal; to pile cap; Width: exceeding: 1.22


m m2 4 4,000.00 24.24 16,000.00 96.97

G215 Plane horizontal; to ground slab; Width exceeding:


1.22 m m2 146 4,000.00 24.24 584,000.00 3,539.39

G243 Plane vertical; ground slab; Width: not exceeding:


0.2-0.4 m m2 156 4,000.00 24.24 624,000.00 3,781.82

G244 Plane vertical; pile cap; Width: not exceeding: 0.4-


1.22 m m2 63 4,000.00 24.24 252,000.00 1,527.27

G244 Plane vertical; ground beam; Width: not exceeding:


0.4-1.22 m m2 565 4,000.00 24.24 2,260,000.00 13,696.97

G244 Plane vertical; kerb; Width: not exceeding: 0.4-1.22


m m2 273 4,000.00 24.24 1,092,000.00 6,618.18

To Collection 10,743,500.00 65,112.12

4/2 =N= USD $


Bill No. 2 - Compressor Foundation

Number Item Description Unit Quantity Rate Amount


=N= USD $ =N= USD $

CLASS G: CONCRETE ANCILLARIES

Reinforcement

G525 Deformed high yield steel bars to BS 4449; Nominal


size: 20mm diameter t 14.33 275,000.00 1,666.67 3,940,750.00 23,883.33

G525 Deformed high yield steel bars to BS 4449; Nominal


size: 12mm diameter t 4.78 275,000.00 1,666.67 1,314,500.00 7,966.67

G525 Deformed high yield steel bars to BS 4449; Nominal


size: 10mm diameter t 9.56 275,000.00 1,666.67 2,629,000.00 15,933.33

Joints

G641.1 Formed surface with filler; Average width: not


exceeding 0.5 m; in compressible filler board 725
mm high lipped at exposed edges with 120 x 35 mm
bitumastic sealant m2 2 4,000.00 24.24 8,000.00 48.48

Concrete accessories

G812 Finishing of top surfaces; steel trowel m2 685 500.00 3.03 342,500.00 2,075.76

G841 Grouting under plates; Area: not exceeding 0.1 m2;


in approved Non shrinkage material nr 92 12,800.00 77.58 1,177,600.00 7,136.97

CLASS N: MISCELLANEOUS METALWORK

N240 Handrails; Height: 1 m; As per drawing details m 81 16,800.00 101.82 1,360,800.00 8,247.27

CLASS P: PILES

Preformed concrete piles as per specification and


drawing SWJ-ARP-SAGEN-S24-00026-001 sheet 1
of 1

Commencing Surface to be Original Surface of bed


of the Creek

P351 Cross-sectional area: not exceeding 0.15-0.25 m2;


Number of piles length 18 m long; 450 mm
diameter; Type 2; mild steel driving heads and shoes;
finished with three coats epoxy paint nr 18 729,000.00 4,418.18 13,122,000.00 79,527.27

P361 Cross-sectional area: not exceeding 0.25-0.5 m2;


Number of piles length 15 m long; 600 mm
diameter; Type 1; mild steel driving heads and shoes;
finished with three coats epoxy paint nr 6 1,014,600.00 6,149.09 6,087,600.00 36,894.55

To Collection 26,042,000.00 157,830.30

4/3 =N= USD $


Bill No. 2 - Compressor Foundation

Number Item Description Unit Quantity Rate Amount


=N= USD $ =N= USD $

CLASS P: PILES

Preformed concrete piles as per specification and


drawing SWJ-ARP-SAGEN-S24-00026-001 sheet 1
of 1

Commencing Surface to be 1 m below original


Surface

P351 Cross-sectional area: not exceeding 0.15-0.25 m2;


Number of piles length 18 m long; 450 mm
diameter; Type 2; mild steel driving heads and shoes;
finished with three coats epoxy paint nr 2 729,000.00 4,418.18 1,458,000.00 8,836.36

P332 Depth driven m 16 12,500.00 75.76 200,000.00 1,212.12

CLASS Q: PILING ANCILLARIES

Preformed concrete piles

Q375 Cut off surplus lenghts; 0.15-0.25 m2 m 20 6,500.00 39.39 130,000.00 787.88

Q376 Cut off surplus lenghts; 0.25-0.5 m2 m 6 8,500.00 51.52 51,000.00 309.09

Q383 Preparing heads; 0.15-0.25 m2 nr 20 3,500.00 21.21 70,000.00 424.24

Q386 Preparing heads; 0.25-0.5 m2 nr 6 4,500.00 27.27 27,000.00 163.64

Q700 Obstructions h 25 45,000.00 272.73 1,125,000.00 6,818.18

Fenders

Supply and install 63kg MLS fender bars 1000 mm


diameter x 1500 mm long SEA GUARD FENDER;
complete with 2 No. M30 bolts; including bolting to
concrete wall nr 3 385,000.00 2,333.33 1,155,000.00 7,000.00

Ground Anchor

Supply ands install heavy duty steel ground anchor to


Engineer's details; complete with holding bolts, etc nr 3 450,000.00 2,727.27 1,350,000.00 8,181.82

To Collection 5,566,000.00 33,733.33

4/4 =N= USD $


Bill No. 2 - Compressor Foundation

Number Item Description Unit Quantity Rate Amount


=N= USD $ =N= USD $

COLLECTION

PAGE NO. =N= USD $

Carried forward from Page 4/1 17,066,150.00 103,431.21

Carried forward from Page 4/2 10,743,500.00 65,112.12

Carried forward from Page 4/3 26,042,000.00 157,830.30

Carried forward from Page 4/4 5,566,000.00 33,733.33

TOTAL JETTY 59,417,650.00 360,106.97


Part Summary Total Carried forward to Grand
Summary

4/5 =N= USD $