Issued by : Switchgear Contracts Division, LARSEN & TOUBRO LIMITED, Powai Works, Mumbai 400 072

January-March 1999

Prospect / Retrospect
Intelligent Changeover
Continuous, uninterrupted power such cases, the affected incomer users. To attempt standardisation
supply is demanded by all process is switched off and under healthy of such logic and benefit entire
plants. To meet this demand, bus conditions, the load is user sector with good engineering
different schemes are adopted by transferred to the other practices, L&T has incorporated a
consultants and end users. These bus/incoming source. comprehensive auto-changeover
schemes essentially need two or logic with the facility of manual
more sources of supply to the Since in this case monitoring of paralleling in the Advanced
busbar system. One of the simple conditions/parameters is carried Feedervision relays of the
schemes commonly followed by out by relays and interlocks Supervision Series.
the users is manual changeover of /permissives are connected
supply from one source to the electrically, the changeover takes Apart from brining advantages of a
other by switching OFF-ON place in a few seconds. Electrical vast experience in this field, the
desired switches/circuit breakers. control circuit is normally package offers economy in terms
This manual changeover demands developed considering various of space, lesser component count,
continuous attentive manning of interlocks and safety features. So lesser engineering and testing
substation and yet interruption of operations are more reliable and time. The operations are simplified
supply for at least some minutes is independent of operator's skills. due to user friendly features of the
inevitable. In this scheme, safety Chances of error get eliminated. system.
and fool proofness is incorporated
by adding mechanical interlock While conceiving such interlocked In this issue of L&T Current
between the switches/circuit schemes, different variations are Trends, we bring you a curtain
breaker. followed by users. Depending on raiser on this subject. Though logic
In case where interruption of previous experience, probable covered here is mainly discussing
supply is very critical, and time conditions are added for more a typical two incomer and one
delay needs to be brought down to reliable and safe operations. Good buscoupler scheme, the same can
a few seconds, automatic engineering practices followed by be extended to three incomers and
changeover of supply to the some consultants/end users are two buscouplers or two incomers
affected bus is implemented. In not incorporated by many other without a bus sectionaliser.
FEATURE

Integrated Protection & Control Systems


For Process Plants – Part V
- R. S. Mahajan, Assistant General Manager

Normally, at distribution voltage VT circuit to carry out this relay with a time delay is provided
(6.6 kV) and low voltage (415V) operation. on the busbar.
levels, switchgear has two or more
bussections, for reliable Under voltage on line side or bus After the closing of buscoupler and
operations. This arrangement side is sensed by the line VT revival of healthy voltage, the
ensures availability of supply to circuit and it initiates tripping of the essential drives in a process plant
the critical drives/feeders even if respective incomer and auto must start automatically without
the incomer on that bus is not closure of the buscoupler. the need to do so intentionally
feeding them. from a control room. For this
To prevent false undervoltage purpose, a re-acceleration scheme
The normal sequence of events in alarm/signal being generated by is added in the starter circuit of
such cases is as follows: - the blowing of fuse in the VT such drives. To prevent all such
circuit, healthiness of the VT fuses drives from starting
In healthy condition, the respective (both primary and secondary) simultaneously, time grading is
incomer is ON and feeds the bus needs to be monitored. done in groups, so that the
section connected to it. Conventional relays are connected changeover bus dip is controlled.
only across the secondary fuses of This is only one part of the events.
In case there is sustained under the VT circuit. With the availability
voltage (about 75%) on the line of fuse monitoring MCCBs (which However auto changeover is not
side (for about 2 - 2.5 sec.), the can withstand upto 50kA), the desirable in all circumstances.
incomer trips. This tripping is primary and secondary fuses in Instances when auto changeover
initiated by the line VT circuit. In the VT circuits can be replaced is stalled or delayed are as
this case, incomer tripping is not with such MCCBs. (e.g. L&T's follows:
carried out by the lockout relay. MCCB type DF) and the
healthiness of line or bus VT 1) At distribution voltage level, the
When the bus voltage is down to circuit can also be monitored for time delays for sensing
20% and if the other bus section is initiating the auto changeover. sustained undervoltage are
healthy, (having a voltage above shorter compared to the delays
80%), the buscoupler closes and In the above-mentioned sequence, on low voltage level. This
the supply on the affected bus is tripping of the incomer (due to facilitates changeover first at
restored. This sequence is true for undervoltage) is unplanned and distribution voltage without
either of the incomers on both restoration of supply occurs only tripping incomer of low voltage
sides of buscoupler. Bus VT circuit after a break. This necessitates switchgear.
carries out this sequence. Closing tripping of larger motors 2) In the event incomer trips on
permissive of buscoupler checks (controlled by circuit breakers) on operation of a protection relay
healthiness of the lockout relay of undervoltage of the bus, so that (say overcurrent or earthfault),
the open incomer. back emf of these motors does not the lockout relay on respective
In a two incomer and a buscoupler delay residual voltage reaching no incomer prevents the
scheme, each incomer has a line volt level on the busbar. For this buscoupler from closing and
VT circuit and each bus has a bus purpose, a separate undervoltage feeding the faulty bus.
3. Intentional opening/tripping of bus. However, for momentary voltage, power factor and energy.
the incomer is distinguished by paralleling and planned outage, For Buscoupler, normally it is only
a memory contact (lost motion the close command may be given current that is measured and
device contact in conventional from the control room or from the displayed. For remote metering,
schemes) and it also prevents switchgear. transducers are used.
closing of buscoupler.
When wired with conventional Annunciation and Indication:
4. In the event that both incomers electromechanical devices, all Apart from feeder status, lamps
on the two bus sections these logical requirements and annunciators are used for
experience simultaneous demand extensive wiring between various alarms and faults. For this
undervoltage on their line side, the Incomers and Buscoupler purpose, auxiliary circuit needs
none trips and the system circuits, in addition to a large some auxiliary relays, specially to
hangs on till the time any one number of auxiliary contactors and announce transformer faults and
or both supplies restore. timers. Electrical antipumping alarms.
feature is desired in both incomers
The above auto changeover and buscouplers. Single line diagram and panel
sequence covers situation of layout
undervoltage on the line side and Protection A typical single line diagram with
interruption in the bus supply. all these requirements is shown in
There can be a requirement for Normally on distribution voltage Fig. 1. For simplicity, only
maintenance to take outage on (6.6/11kV) and low voltage (415V), 2:Incomers and 1:Buscoupler are
any one of the Incomers are provided with the shown.
transformers/incomer circuit following protections:
breakers. In this event, it is desired
51 - Inverse overcurrent A typical switchboard layout for
to feed the respective bus from the
other healthy bus - obviously (2 elements) 3200A ACBs, using conventional
without interruption of the supply.
This situation is "Planned outage 51N - Earth fault
of the desired circuit breaker' and
it necessitates paralleling both the 50 - Highset overcurrent
incomers - momentarily - and then
tripping the desired circuit breaker. 64S - Standby earthfault
As a prerequisite, obviously
synchronization of the supplies 64R - Restricted earthfault
needs to be checked before
There is a lockout relay (86) for all
paralleling the sources. Normally,
these protective functions.
using line side supply, check
synchronization function is added
To monitor voltage on line and bus
on to the bus-coupler.
side, undervoltage (27u) and no-
volt relays (27n) with timers (2) are
In most of the cases, "close" provided in the line VT and Bus VT
permissive is given to the circuit modules. Trip circuit healthiness
breakers only from the control (95) is monitored using a separate
room, when they are in service relay.
position. In case the control logic Buscoupler have normally 51, 51N
is desired to be tested, the circuit protections with lockout relay (86)
breakers need to be drawn in test and trip circuit supervision (95). electromechanical relays is
position (out of service position) shown in Fig. 2. It is clear that
and then the operation can be Metering dummy panels are to be
tested, without affecting other added to accommodate meters /
circuit breakers, which are in For Incomers, metering relays in the switchboard.
service position and feeding the requirement includes current, Additional relays / timers are to be
Considered for " Autochangeover specific application in mind, a Fig.4, it is obvious that Integrated
occurred " and "Autochangeover sophisticated and powerful Protection Controllers simplify the
Failed" annunciations whenever controller in the form of Advanced switchboard layout and wiring. In
desired. Feedervision is developed addition, they also reduce
incorporating the complex engineering, commissioning,
Using Integrated Protection Autochangeover logic of Incomers testing and trouble shooting time.
Controllers: and Buscouplers mentioned
L&T has introduced a concept of above. Its software is developed Capability to record fault history
Integrated Protection Controller, such that in addition to current and facilitates fault analysis.
combining protection and control voltage inputs, digital inputs/status
with metering and indication in inputs are taken by the relay as Conclusion
Supervision series relays. These hard wired signals and the entire
integrated protection controllers logical operation is carried out by In today's context, cost of space
have been developed for total software similar to a PLC. It not and interruption in production are
flexibility in protection and control only eliminates large number of very important issues. An
of feeders and motors. Keeping function specific devices and Integrated Protection Controller,
auxiliaries but also offers the offering a comprehensive package
benefit of a foolproof logic and and occupying less space, offers a
standardisation to the user. L&T's economical solution in terms of :-
experience, merged with
- reduced time for system
internationally acclaimed good
engineering practices followed by design, commissioning and
leading consultants in the world is trouble shooting
incorporated in this software. - lesser number of failures and
The single line diagram giving a lower downtime
comprehensive list of functions - saving in space.
carried out by the respective
Advanced Feedervision relays is In addition, features of
shown in Fig. 3. Switchboard microprocessor based relays viz.
layout with Advanced Feedervision Self diagnostic feature, data
Relays incorporated is shown in logging, fault history add further
Fig. 4. Comparing Fig. 2 with value to the package.

For further details on this subject, please contact:


Switchgear Contracts Division, Larsen & Toubro Limited, Saki-Vihar road, P. O. Box 8901, Powai, Mumbai 400 072
Fax: 022-8581024 e-mail : nk-swtc@pgriii.ltindia.com

Edited, printed and published by S. R. Talwar for Larsen & Toubro Limited from L&T House, Narottam Morarji Marg, Ballard Estate, Mumbai
400 001 and Printed at Uma Offset, 359, A to Z Industrial Estate, Lower Parel, Mumbai 400 013. Associate Editor: Luis S. R. Vas