Académique Documents
Professionnel Documents
Culture Documents
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT
Unit Cost Amount Unit Cost
Internal Wall
150mm thick n/a m²
100mm thick 2,248.00 m² 1,350.00 3,034,800.00 included
IFF-2 300 x 300mm Ceramic Tiles; campana bone 748.00 m² 1,265.00 946,220.00 600.00
IFF-3 200 x 200mm Ceramic Tile, Matte Finish 124.00 m² 2,156.25 267,375.00 600.00
Page 1 of 86
Project : AHC HONRADEZ
Location : Honradez St., Cor JP Rizal Avenue, Makati City
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT
Unit Cost Amount Unit Cost
Sub-Total : Floor Finishes, PhP
IWF-3 Ceramaic wall tile; unit toilets 792.00 m² 1,265.00 1,001,880.00 600.00
Smooth, plain cement plaster, semi-gloss acrylic latex paint finish 1,610.00 m² 800.00 1,288,000.00 included
Clay plaster rub concrete wall finish in quality water repellant type 722.81 m² 850.00 614,388.50 included
Page 2 of 86
Project : AHC HONRADEZ
Location : Honradez St., Cor JP Rizal Avenue, Makati City
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT
Unit Cost Amount Unit Cost
Page 3 of 86
Project : AHC HONRADEZ
Location : Honradez St., Cor JP Rizal Avenue, Makati City
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT
Unit Cost Amount Unit Cost
GRAND TOTAL - ARCHITECTURAL WORK, PhP
Page 4 of 86
ARCHITECTURAL WORKS
OTHERS
Amount Total Unit Cost Total Amount
4,845,505.50
Page 5 of 86
ARCHITECTURAL WORKS
OTHERS
Amount Total Unit Cost Total Amount
4,192,555.00
5,210,380.00
Included
1,783,650.00
1,408,513.00
Page 6 of 86
ARCHITECTURAL WORKS
OTHERS
Amount Total Unit Cost Total Amount
387,000.00
included 8,800.00 -
49,598.78
2,774,590.28
392,000.00
Page 7 of 86
ARCHITECTURAL WORKS
OTHERS
Amount Total Unit Cost Total Amount
21,043,792.56
Page 8 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
ITEM DESCRIPTION
1.0 MOBILIZATION
Page 9 of 86
Total Amount
80,000.00
7,141,969.10
7,221,969.10
Page 10 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT Total Unit Cost
Unit Cost Unit Cost
1.0 PRELIMINARIES
I. THE SITE
Project Location
NATIONAL HIGHWAY, GAMU, ISABELA
Site Visit
The General Contractor shall be responsible for ensuring that they are
properly authorized to cross the roads and adjacent properties and must
give all notices, pay all fees and reinstate and make good at their own
cost all damage caused to such roads and adjacent properties however
the damage occurs.
Page 11 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT Total Unit Cost
Unit Cost Unit Cost
The Contractor shall be solely responsible for the safety and stability of
any adjoining structures and buildings and allow for any shoring and
strutting required. Such shoring shall be positioned or altered and
adopted from time to time so at to maintain adequate working space for
construction operations.
Existing Mains/Services/Utilities
The Contractor shall exercise the greatest care during the process of the
Works to avoid damage to or interference with any public utility and
communication services within the limits of or within the immediate vicinity
of the Site and shall be solely responsible for making good any damage
caused by him or his agents directly or arising indirectly from anything
done or omitted to be done and pay all costs and charges therewith. The
Contractor shall carry out all temporary works necessary to adequately
support and protect such services.
Conditions of Contract
Page 12 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT Total Unit Cost
Unit Cost Unit Cost
The Contractor shall allow for complying with the obligations, liabilities
and services described in the General Conditions of Contract.
Generally
Dimensions/Ordering Materials
The Contractor shall provide evidence that the orders have been placed
with sub-contractors and/or suppliers within one week of request of the
Project Manager.
Page 13 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT Total Unit Cost
Unit Cost Unit Cost
Setting Out
The Contractor shall allow for providing, all instruments and labor
requested by the Project Manager for the purpose of checking the levels
and setting out.
In the event of any works varying from its correct position by more than
the permitted tolerances mentioned in the Contract Specification, the
Project Manager may consider it necessary, require the Contractor at the
Contractor's expense to rectify and make good the error. No extension of
time will be granted for these works.
Generally
The Contractor shall accept responsibility for co-ordination, supervision
and administration of The Works, including all subcontracts, arrange and
monitor a programme with each sub-contractor, Nominated Sub-
contractor, Nominated Supplier, Statutory Authority and obtain and supply
information necessary for co-ordination of The Works.
Page 14 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT Total Unit Cost
Unit Cost Unit Cost
Overtime
The Contractor shall at their own expense supply all necessary additional
labor at night and overtime work as may be necessary to complete The
Works in accordance with the Construction Period.
Site Meetings
The Project Manager will hold regular weekly site meetings to review
matters arising from the administration of the Contract.
The Contractor shall submit to the Project Manager and other Consultants
before each meeting an agenda listing site problems, variations or extra
works instructed by the Project
Managed the progress of The Works and any other matters for
discussion during the meeting
Programme of Work/Progress
Page 15 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT Total Unit Cost
Unit Cost Unit Cost
The programme for the Works must show the intended construction
method, sequence, stages and order of proceeding with The Works and
include for all:
a. Planning and mobilization by the Contractor
Page 16 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT Total Unit Cost
Unit Cost Unit Cost
The Contractor shall provide full size models/mock-ups of the principal
features or details and shall erect them at the correct height for the
approval of the Project Manager if so required by the Contract
Specifications.
Tests
The Contractor shall allow for all tests that may be required by the
Contract Specifications including all costs associated with the carrying out
of the tests, whether the test is successful or not no extension of time or
loss and expense to be considered. The Contractor shall submit a copy of
each test certificate to the Project Manager as soon as is practicable and
retain copies of all such certificates on The Site.
Quality of Products
Compliance of Products
The Contractor shall check all delivery tickets, labels, identification marks
and, where appropriate, the products themselves to ensure that all
products comply with the project documents. In particular, the contractor
shall check the following:
a. the sources, types, qualities, finishes and colors are correct and match
to approved sample
b. All accessories and fixing are complete.
c. Sizes and dimensions are correct.
d. Quantities are correct
e. Products are clean and undamaged.
f. Products, which have limited shelf life, are not out of date.
Protection of Products
Protect all the products from distortion or any type of physical damage,
keep clean and free from contamination.
Quality of Workmanship
The Contractor shall ensure that all operatives are appropriately skilled
and experience for the type and quality of work that they are undertaking
and take all necessary precautions to prevent damage to The Works from
sun, rain and other hazards.
VIII. SAFETY
Page 17 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT Total Unit Cost
Unit Cost Unit Cost
The Contractor is responsible for the safety of all persons engaged in the
execution of The Works and take precaution necessary to protect the
public from injury or death during the course of The Works.
The Contractor shall provide all temporary signage, warning tapes, flags,
signals and marking and during the hours of darkness such lights, as the
Project Manager or any Statutory Authority may require for the safety of
site personnel, the public or aircraft. Remove at Taking Over and make
good all affected locations.
IX. SECURITY
The Contractor will be solely responsible for safeguarding The Works. The
employment of Security Guard will not be considered as relieving the
Contractor's responsibility for safeguarding the Works, materials, fittings,
plant, etc. against losses or damage.
The Contractor shall ensure that gates are fitted at all entrances and will
be closed and locked during all non-working hours. Every entrance may
have a watchman/ or guard on duty at all times during which the entrance
is open.
The Contractor shall make provision for protecting all work from damage,
weather, etc. and provide casing or covering for the protection of any work
requiring it throughout the Contract Period. Where work is of an especially
vulnerable nature or is exposed to abnormal risks, the Contractor shall
provide special protection to ensure that damage does not occur. Any
damage arising in this context shall be made good at the Contractor's own
expense.
X. TEMPORARY WORKS
Page 18 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT Total Unit Cost
Unit Cost Unit Cost
The Contractor shall inform the Project Manager of the intended sitting of
all spoil heaps, Temporary Works, etc. and obtain his approval prior to
their positioning.
The Contractor shall pay all fees and other charges levied in connection
with all Temporary Works
The Contractor is to provide and erect field offices, toilets workshops, and
storage sheds as they may require and maintain them and keep them in
good order to the satisfaction of the Project Manager.
The Contractor shall pay all fees and charges for the supply, meter,
temporary wiring and connections.
The Contractor shall provide all artificial lighting and electric power for The
Works, including that required by all contractors and subcontractors.
The Contractor shall provide clean, fresh water for The Works including
that required by all sub-contractors and temporary arrangements for
storage and distribution around the site.
The Contractor shall provide fire extinguishers, sand buckets and other
adequate and efficient fire fighting equipment. In particular, an adequate
water supply shall be installed to the highest point of the house at all Page 19 of 86
times with sufficient hoses and pressure to reach all parts of The Works.
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT Total Unit Cost
The Contractor shall provide fire extinguishers, sand buckets and other Unit Cost Unit Cost
adequate and efficient fire fighting equipment. In particular, an adequate
water supply shall be installed to the highest point of the house at all
times with sufficient hoses and pressure to reach all parts of The Works.
The Contractor shall provide all temporary plant, equipment, tools and
vehicles necessary for the proper execution of The Works. The contractor
shall be responsible for securing insurance for his equipment.
Shoring, propping, strutting, etc., whether for the support of new work
under construction or existing buildings, shall be the Contractor's sole
responsibility and shall be designed by the Contractor to the satisfaction
of the Project Manager or body having jurisdiction over The Works. The
Contractor will be responsible for its safety throughout the Contract
Period, and no indication of approval or disapproval of such shoring,
propping, strutting, etc., by the Project Manager shall be interpreted as in
any way reducing the Contractor's responsibility.
The Contractor shall provide and maintain all necessary hoarding, gates
fans, planked footways, guard rails, gantries, warning lights and notices
for the proper execution of The Works, the security of The Site, the
protection of the public and the occupants of any adjoining premises. The
Contractor shall alter, adapt, repaint, maintain and replace such
temporary works, from time to time, as requested by the Project Manager.
Clear away on Taking Over.
Page 20 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT Total Unit Cost
Unit Cost Unit Cost
The Contractor will be responsible for the prompt removal of rubbish,
disused shoring, crates etc. During the progress of the works regardless
of the source. The Contractor is also to comply with any order from the
Project Manager in connection with the removal of rubbish or cleaning the
Site, if the Contractor fails to comply with such an order the Project
Manager may employ others to carry this work and all charges in
connection with this will be borne by and recovered from the Contractor
by Owner, as a debt or may be deducted by the Owner from any monies
due or to become due to the Contractor under the Contract.
Prior to Taking Over, the Contractor shall clean The Works thoroughly
inside and out to the satisfaction of the Project Manager.
The Contractor shall leave The Works secure with all accesses locked.
Account for and adequately label all keys and hand over to Owner with
itemized schedule, retaining duplicate schedule signed by Owner as a
receipt.
The Contractor shall list and handover to the Owner al spare parts, tools,
"attic stock", etc. required in the Contract Documents.
The Contractor shall be responsible for the production of all parts of the
operation and maintenance manuals. They shall be a comprehensive
information source and guide for the Owner and end users providing a
complete understanding of the development and its system and enabling
it to be
The operated
following and maintained
information must beefficiently
submittedand safely.
to the Owner by the
Contractor:
a. Description of the building
b. Details of all consultants and designers
c. Copies of all consents, approvals and licenses obtained
Page 21 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT Total Unit Cost
Unit Cost Unit Cost
f. Copies of all guarantees, warranties and maintenance agreements
offered by by the sub-contractors suppliers and manufacturers.
g. Copies of all test certificates and reports as required by the Project
Manager.
Contractors shall Bid for these items and if Owner finds these cost
favorable to them, it will be included in their Contract Package.
Supplier of these itemes will be pre-qualified by CPM
The Works shall include, but not limited to all materials, labor, plant and
equipment, together with all temporary works, the securing of all
necessary permits and approvals including all applications and notices, all
liaison and co-ordination to complete the Works.
Permits
The Contractor shall allow costs for obtaining all necessary permits
(receipted and unreceipted), including all related permits prior to release
of such; Legwork and assistance in securing permits
Page 22 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT Total Unit Cost
Unit Cost Unit Cost
The Contractor shall pay all the necessary taxes, duty, levies,tariffs etc.
No claims for extras will be entertained should any materials and goods
subequently banned from import, or subject to restrictions or quotes; or
increase in duties and taxes during the currency of the nominated sub-
contract.
a. ___________________________
b. ___________________________
TOTAL, PhP
Page 23 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT Total Unit Cost
Unit Cost Unit Cost
Page 24 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT Total Unit Cost
Unit Cost Unit Cost
Page 25 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
MATERIALS OTHERS
ITEM DESCRIPTION QTY UNIT Total Unit Cost
Unit Cost Unit Cost
TOTAL, PhP
Page 26 of 86
Total Amount
Page 27 of 86
Total Amount
Page 28 of 86
Total Amount
Page 29 of 86
Total Amount
Page 30 of 86
Total Amount
Page 31 of 86
Total Amount
Page 32 of 86
Total Amount
Page 33 of 86
Total Amount
Page 34 of 86
Total Amount
Page 35 of 86
Total Amount
Page 36 of 86
Total Amount
Page 37 of 86
Total Amount
Page 38 of 86
Total Amount
300,000.00
Page 39 of 86
Total Amount
Page 40 of 86
Total Amount
Page 41 of 86
Total Amount
Page 42 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
UNIT COST
ITEM DESCRIPTION QTY UNIT
Materials
2.0 CIVIL & STRUCTURAL WORKS
Trimming Works
Horizontal/Vertical trimming - m² -
Vapor barrier - m² -
Soil Poisoning - m² -
Concreting Works
Pedestal Footing 33.00 m³ 4,200.00
To Column Pedestal 14.26 m³ 4,200.00
Grade Beams 13.00 m³ 4,200.00
Slabs on Fill 106.92 m³ 4,200.00
Page 43 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
UNIT COST
ITEM DESCRIPTION QTY UNIT
Materials
Grade 60 for 20mmØ and smaller, and Grade 75 for 25mmØ and larger
Pedestal Footing
16 mm diameter 358.40 kgs 42.00
GI Tie Wire #16 20.00 kgs 80.00
Pedestals
20 mm diameter 220.00 kgs 42.00
16 mm diameter 358.40 kgs 42.00
GI Tie Wire #16 20.00 kgs 80.00
Grade Beams
16 mm diameter 179.20 kgs 42.00
10 mm diameter 79.36 kgs 42.00
GI Tie Wire #16 25.00 kgs 80.00
Slab on Grade
10 mm diameter 562.34 kgs 42.00
GI Tie Wire #16 30.00 kgs 80.00
Concreting Works
Supply and Placing of ready mix concrete, 3000 psi;
as shown on general notes and specifications
To Column - m³ 4,200.00
To Suspended Slabs - m³ 4,200.00
To Beams - m³ 4,200.00
Page 44 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
UNIT COST
ITEM DESCRIPTION QTY UNIT
Materials
To Column
20 mm diameter - kgs 51.00
16 mm diameter - kgs 51.00
12 mm diameter - kgs 51.00
10 mm diameter - kgs 51.00
To Suspended Slabs
12 mm diameter - kgs 51.00
10 mm diameter - kgs 51.00
To Beam
20 mm diameter - kgs 51.00
16 mm diameter - kgs 51.00
12 mm diameter - kgs 51.00
10 mm diameter - kgs 51.00
Page 45 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
UNIT COST
ITEM DESCRIPTION QTY UNIT
Materials
Purlins - LC - 150x65x20x2.00mm 120.00 pcs 1,050.00
Anchor Rods - 25mmø x 300mmL 96.00 pcs 1,150.00
Base Plates 847.80 lot 65.00
Prepainted longspan roofing with 10mm thick insulation 684.00 m² 420.00
Prepainted box type gutter,flashing & roofing accessories 1.00 lot 21,000.00
Page 46 of 86
CIVIL & STRUCTURAL WORKS
UNIT COST SUBTOTAL
Total Unit Cost Total Amount
Labor Materials Labor
- - - -
- - - -
- - - -
300.00 - - -
300.00 43,200.00 28,800.00 72,000.00
300.00 45,900.00 30,600.00 76,500.00
300.00 4,500.00 3,000.00 7,500.00
156,000.00
Page 47 of 86
CIVIL & STRUCTURAL WORKS
UNIT COST SUBTOTAL
Total Unit Cost Total Amount
Labor Materials Labor
- - - -
-
###
2,100.00 - - -
2,100.00 - - -
2,100.00 - - -
Page 48 of 86
CIVIL & STRUCTURAL WORKS
UNIT COST SUBTOTAL
Total Unit Cost Total Amount
Labor Materials Labor
-
225.00 - - -
225.00 - - -
225.00 - - -
-
25.50 - - -
25.50 - - -
25.50 - - -
25.50 - - -
25.50 - - -
25.50 - - -
25.50 - - -
25.50 - - -
25.50 - - -
25.50 - - -
-
Page 49 of 86
CIVIL & STRUCTURAL WORKS
UNIT COST SUBTOTAL
Total Unit Cost Total Amount
Labor Materials Labor
525.00 126,000.00 63,000.00 189,000.00
575.00 110,400.00 55,200.00 165,600.00
32.50 55,107.00 27,553.50 82,660.50
210.00 287,280.00 143,640.00 430,920.00
10,500.00 21,000.00 10,500.00 31,500.00
5,519,718.00
###
###
Page 50 of 86
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
ITEM DESCRIPTION QTY UNIT
Internal Wall
150mm thick 75.00 m²
100mm thick 60.00 m²
CF-01 12mm thick gypsum board on metal framing in flat latex paint finish 239.00 m²
CF-02 10mm thick moisture resistant gypsum board on metal framing in flat latex paint finish 26.00 m²
Supply and installtion of Tubular steel handrails & trellis ;including epoxy paint finish or approve
58.00 lm
equal
Wood Doors
Supply and installation of Solid Core Flush Swing Door, 44 mm thick, with K.D.
solid Narra frame door jambs and header on wood grain both faces ; Single-
Leafed swing door. , including hardware, sealants, backer rods, and all necessary
fixing accessories:
Hardwares
Hinges 4.00 nos
Lockset 1.00 nos
Double leafted, sliding type glass door on powder coated woodgrain frame
finish,with 3 fixed with sensor 9mm thick glass panel
Hardwares
Hinges nos
Lockset nos
Frameless sliding door Double leafted sliding type glass door with 2 fixed glass on
right side;9mm thick glass panel
Hardwares
Hinges nos
Lockset nos
Frameless sliding door four leafted sliding type glass door with fixed glass on
both side;9mm thick glass panel
Hardwares
Hinges nos
Lockset nos
Supply and installation of Core Flush Swing Door, 44 mm thick, with K.D. solid
Narra frame door jambs and header on wood grain both faces ; Single-Leafed
swing door. , including hardware, sealants, backer rods, and all necessary fixing
accessories:
Hardwares
Hinges 4.00 nos
Lockset 1.00 nos
Solid core flush swing door;Metal fire exit metal fire exit door on metal door jamb
Hardwares
Hinges 4.00 nos
Lockset 1.00 nos
Solid core flush swing type door;44mm thk on ribbon grain both faces
Hardwares
Hinges 4.00 nos
Lockset 1.00 nos
Flush hallow core swing type both ways with 9mm thk. Tempered clear glass
D08 900 x 2100 mm; overall size 1.00 set/s
Hardwares
Hinges 4.00 nos
Lockset 1.00 nos
Flush hallow core (authomatic roll up door)with 44mm thk. Dood finish
Hardwares
Hinges 4.00 nos
Lockset 1.00 nos
Flush hallow core swing type both ways 44mm thk.6mm thk marine on inner
face,6mm thk. Ribbon grain plywood on outer
Hardwares
Hinges 4.00 nos
Lockset 1.00 nos
Hardwares
Hinges 4.00 nos
Lockset 1.00 nos
Flush hallow core swing type both ways 44mm thk.6mm thk marine on inner
face,6mm thk. Ribbon grain plywood on outer
Hardwares
Hinges 4.00 nos
Lockset 1.00 nos
Windows
Supply and installation of 9mm thick tempered clear fixed glass in powder-coated aluminum
framed sliding glass windows including hardware, sealants, backer rods, and all necessary
fixing accessories:
Supply and installation of awning type with fixed window including hardware,
sealants, backer rods, and all necessary fixing accessories:
Supply and installation of 8"x8"x4" thk glass blocks window including hardware,
sealants, backer rods, and all necessary fixing accessories:
Supply and installation of single leaf double swing steel frame pedestian gate
Other Items
Allow for Any other items for which the Contractor requires
payment or other items not found in proposal breakdown.
(Bidder to specify)
a. ____________________________________
b. ____________________________________
c. ____________________________________
Sub-Total : Glass and Aluminum Doors and Windows, PhP
921,430.00
1,367,158.00
1,028,640.00
850.00 210.00 203,150.00 50,190.00 253,340.00
368,180.00
714,710.00
27,520.00
34,452.00
6,484,547.93
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
MATERIAL
ITEM DESCRIPTION QTY UNIT
COST
m
m
m²
Other Items
Allow for Any other items for which the Contractor requires
payment or other items not found in proposal breakdown.
a. _____________________________
b. _____________________________
c. _____________________________
Vent Cap
150mm diameter (6") pcs
Other Items
Allow for Any other items for which the Contractor requires
payment or other items not found in proposal breakdown.
a. _____________________________
b. _____________________________
c. _____________________________
unit
unit
unit
unit
Other Items
Allow for Any other items for which the Contractor requires
payment or other items not found in proposal breakdown.
a. _____________________________
b. _____________________________
c. _____________________________
unit
unit
Other Items
Allow for Any other items for which the Contractor requires
payment or other items not found in proposal breakdown.
a. _____________________________
b. _____________________________
c. _____________________________
-
-
-
-
-
Project : PROPOSED OPEN COURT @ the CATHEDRAL
Location : NATIONAL HIGHWAY, GAMU, ISABELA
BILL OF QUANTITES
Item DESCRIPTION Qty Unit
Supply & Installation of 200kVA Standby Generator Set with Complete Accessories
5.9 lot
(Please Breakdown the necessary accessories to complete the system)
Other Items
Allow for Any other items for which the Contractor requires
payment or other items not found in proposal breakdown.
(Bidder to specify)
a. ____________________________________
b. ____________________________________
c. ____________________________________
BILL OF QUANTITES
MATERIAL
ITEM DESCRIPTION QTY UNIT
COST
Gate valve
20mm diameter 8.00 pcs 600.00
25mm diameter 3.00 pcs 800.00
Check valve
32mm diameter (1") 2.00 pcs 1,400.00
Float valve
50mm diameter (2") 1.00 pcs 450.00
Water meter
20mm diameter (1/2") 1.00 pcs 12,000.00
Tapping to existing utilities, as per actual site condition 1.00 item 5,000.00
Other Items
Allow for Any other items for which the Contractor requires
payment or other items not found in proposal breakdown.
a. _____________________________
b. _____________________________
c. _____________________________
Floor cleanout
100mm diameter (4") 8.00 pcs 190.00
Floor drain
50mm diameter (2") 10.00 pcs 170.00
Shower drain
50mm diameter (2") 6.00 pcs 170.00
Tapping to existing utilities, as per actual site condition 1.00 item 12,000.00
Other Items
Allow for Any other items for which the Contractor requires
payment or other items not found in proposal breakdown.
a. _____________________________
b. _____________________________
c. _____________________________
Floor cleanout
100mm diameter (4") 3.00 pcs 545.00
150mm diameter (6") 3.00 pcs 645.00
Floor drain
50mm diameter (2") 6.00 pcs 325.00
Trench drain
150mm diameter (6") 80.00 pcs 425.00
Tapping to existing utilities, as per actual site condition 1.00 item 12,000.00
Other Items
Allow for Any other items for which the Contractor requires
payment or other items not found in proposal breakdown.
a. _____________________________
b. _____________________________
c. _____________________________
Other Items
Allow for Any other items for which the Contractor requires
payment or other items not found in proposal breakdown.
a. _____________________________
b. _____________________________
c. _____________________________
6.0 EQUIPMENT
Transfer Pump, centrifugal pump, electric driven, 50 GPM 1.00 unit 15,000.00
capacity, 185 ft TDH, 3,550 RPM, 7.5 HP, 230V/1Ph/60Hz
Drainage Sump Pump, submersible type, electric driven, 200 GPM 1.00 unit 45,000.00
capacity, 50 ft TDH, 3,550 RPM, 5 HP, 230V/1Ph/60Hz
Electric Water Heater, single point, approx. 3.5 kW capacity 6.00 unit 7,500.00
Other Items
Allow for Any other items for which the Contractor requires
payment or other items not found in proposal breakdown.
a. _____________________________
b. _____________________________
c. _____________________________
137,020.00
117,962.00
381,378.50
3,825.00 16,575.00 99,450.00
1,186.50 5,141.50 30,849.00
2,025.00 8,775.00 52,650.00
2,250.00 9,750.00 9,750.00
226,499.00
13,500.00 58,500.00
78,000.00
940,859.50
Project : PROPOSED TWO STOREY RESIDENCE
Location : LOT 23 BLK 43 PCS -04-029576,RIVERA RESIDENTIAL & GOLF ESTATE,BARANGAY LUKSUHIN,SILANG CAVITE
BILL OF QUANTITES
MATERIAL
ITEM DESCRIPTION QTY UNIT
COST
Check valve
50mm diameter pcs
100mm diameter pcs
150mm diameter pcs
Supervisory Switch
tap to 100mm diameter pcs
Sight glass
25mm diameter pcs
Victaulic Coupling
150mm diameter pcs
Other Items
Allow for Any other items for which the Contractor requires
payment or other items not found in proposal breakdown.
a. _____________________________
b. _____________________________
c. _____________________________
3.0 EQUIPMENT
Other Items
Allow for Any other items for which the Contractor requires
payment or other items not found in proposal breakdown.
a. _____________________________
b. _____________________________
c. _____________________________
B
a
r
e
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###