Académique Documents
Professionnel Documents
Culture Documents
: 1187-SP-50-52 (2)
Engineering and
Construction Company DOCUMENT CODE PAGE 1 OF 4
1. INTRODUCTION
This Project specification is an addendum to the NIOEC Standard Specification NIOEC-SP-
50-52 (0) and is issued for Basic Design Phase of Gurreh- Jask Pipeline and Facilities project.
The following annotation, as specified hereunder, have been used to indicate the type of
change made to the equivalent clause of NIOEC Specification.
Substitution: The clause in NIOEC Specification shall be deleted and replaced by the new
clause in this Job Specification.
Deletion: The clause in NIOEC Specification shall be deleted without any replacement.
Addition: The new clause with the new number shall be added to the relevant section of
NIOEC Specification.
The clause or section numbering of mentioned NIOEC Specification has been used
throughout this Job Specification.
The clauses which are not mentioned in the following amendments shall be considered
unaltered.
This Job Specification is based on relevant NIOEC Specification (NIOEC-SP-50-52) with the
following modifications:
4.1.3 Ball valves shall be of the "trunnion" type. However, "floating" type ball valves, if
manually operated, are acceptable in the following cases only (actuated valves must be
trunnion mounted exclusively, whichever their size or pressure class):
• Pressure class 150: Diameters up to 6 inches
• Pressure class 300: Diameters up to 4 inches
• Pressure classes 600, 900, and 1500: Diameters up to 1 ½ inches (included)
3. ATTACHMENT
NIOEC-SP-50-52(0) NIOEC Specification for Pipeline Valves