Vous êtes sur la page 1sur 35

CBR DESIGN TEST

Code sampel 10 X PUKULAN (Unsoaked) Weight of Mold + soil 12655 gram


Pekerjaan : Tesis Andi Retno Ari setiaji Weight of Mold 7245 gram
Lokasi : Ruas Jalan Lingkar Kudus Weight of Soil 5410 gram
KM. 48+150 Volume 3210.185 cm^3
Sample : TP. 1 Bulk Density gb 1.685 gram/cm^3
Tanah Timbunan (Padas) Dry Density gd 1.373 gram/cm^3

Strain Dial Load Perhitungan Water Conten A B


Reading Multiplayer
1 2 3 4(2X3) Number of can 25
A B A B Weight of can 6.5
0 0 0 5.8027 0 0 Weight of can + wet soil 56.2
0.0125 6 9 5.8027 34.82 52.22 Weight of can + dry soil 47
0.025 9 15 5.8027 52.22 87.04 Weight dry soil 40.5
0.050 18 26 5.8027 104.45 150.87 Weight of water 9.2
0.075 26 35 5.8027 150.87 203.09 Water Conten 22.72
0.100 34 44 5.8027 197.29 255.32 Average water conten 22.72
0.150 49 57 5.8027 284.33 330.75
0.200 61 68 5.8027 353.96 394.58
0.300 80 88 5.8027 464.22 510.64
0.400 95 103 5.8027 551.26 597.68
0.500 108 118 5.8027 626.69 684.72
Pres su re (p o u n d )

800
700
600
A
B
500
400
300
200
100
0
0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5
Penetration (inci)

CBR Value Rata-Rata CBR Value


A B
Penetration 0.1'' 6.45 7.75 7.10 %
Penetration 0.2'' 7.88 9.49 8.68 %
CBR DESIGN TEST
Code sampel 25 X PUKULAN (Unsoaked) Weight of Mold + soil 13615 gram
Pekerjaan : Tesis Andi Retno Ari setiaji Weight of Mold 7785 gram
Lokasi : Ruas Jalan Lingkar Kudus Weight of Soil 5830 gram
KM. 48+150 Volume 3210.185 cm^3
Sample : TP. 1 Bulk Density gb 1.816 gram/cm^3
Tanah Timbunan (Padas) Dry Density gd 1.505 gram/cm^3

Strain Dial Load Perhitungan Water Conten A B


Reading Multiplayer
1 2 3 4(2X3) Number of can 119
A B A B Weight of can 6.4
0 0 0 5.8027 0 0 Weight of can + wet soil 47.9
0.0125 9 12 5.8027 52.22 69.63 Weight of can + dry soil 40.8
0.025 16 20 5.8027 92.84 116.05 Weight dry soil 34.4
0.050 32 39 5.8027 185.69 226.31 Weight of water 7.1
0.075 52 59 5.8027 301.74 342.36 Water Conten 20.64
0.100 68 79 5.8027 394.58 458.41 Average water conten 20.64
0.150 97 108 5.8027 562.86 626.69
0.200 116 130 5.8027 673.11 754.35
0.300 147 172 5.8027 853.00 998.06
0.400 174 207 5.8027 1009.67 1201.16
0.500 200 238 5.8027 1160.54 1381.04
Pressu re (p o u n d )

1600

1400

1200

1000 B

800 A

600

400

200

0
0 0.05 0.1 Penetration
0.15 0.2(inch)
0.25 0.3 0.35 0.4 0.45 0.5

CBR Value Rata-Rata CBR Value


A B
Penetration 0.1'' 12.34 14.08 13.21 %
Penetration 0.2'' 14.94 17.26 16.10 %
CBR DESIGN TEST
Code sampel 56 X PUKULAN (Unsoaked) Weight of Mold + soil 13385 gram
Pekerjaan : Tesis Andi Retno Ari setiaji Weight of Mold 7270 gram
Lokasi : Ruas Jalan Lingkar Kudus Weight of Soil 6115 gram
KM. 48+150 Volume 3210.185 cm^3
Sample : TP. 1 Bulk Density gb 1.90 gram/cm^3
Dry Density gd 1.586 gram/cm^3

Strain Dial Load Perhitungan Water Conten A B


Reading Multiplayer
1 2 3 4(2X3) Number of can 147
A B A B Weight of can 6.4
0 0 0 5.8027 0 0 Weight of can + wet soil 42.8
0.0125 13 16 5.8027 75.44 92.84 Weight of can + dry soil 36.7
0.025 31 33 5.8027 179.88 191.49 Weight dry soil 30.3
0.050 64 67 5.8027 371.37 388.78 Weight of water 6.1
0.075 98 100 5.8027 568.66 580.27 Water Conten 20.13
0.100 127 132 5.8027 736.94 765.96 Average water conten 20.13
0.150 180 188 5.8027 1044.49 1090.91
0.200 220 229 5.8027 1276.59 1328.82
0.300 283 287 5.8027 1642.16 1665.37
0.400 327 335 5.8027 1897.48 1943.90
0.500 364 374 5.8027 2112.18 2170.21
P re s s u re ( p o u n d )

2500

2000 B
A
1500

1000

500

0
0 0.05 0.1 Penetration
0.15 0.2 0.25
(inch) 0.3 0.35 0.4 0.45 0.5

CBR Value Rata-Rata CBR Value


A B
Penetration 0.1'' 23.59 24.40 24.00 %
Penetration 0.2'' 28.25 29.26 28.75 %
11995
7245
4750
3210.185
1.480
1.134

25
1.596369 6.5
1.527096 56.2
1.394321 44.6
38.1
11.6
30.45

y = -1629,x2 + 2099,x
-1629 0.1 2099 193.61 6.453667
-1629 0.2 2099 354.64 7.880889

y = -1908,x2 + 2516,x
-1908 0.1 2516 232.52 7.750667
-1908 0.2 2516 426.88 9.486222
12970
7785
5185
3210.185
1.615
1.615

119
6.4
47.9
38.3
31.9
9.6
30.09

y = -3402,x2 + 4042,x
-3402 0.1 4042 370.18 12.33933
-3402 0.2 4042 672.32 14.94044

y = -3393,x2 + 4562,x
-3393 0.1 4562 422.27 14.07567
-3393 0.2 4562 776.68 17.25956
12610
7270
5340
3210.185
1.66
1.663

147
6.4
42.8
34.8
28.4
8
28.17

y = -7191,x2 + 7795,x
-7191 0.1 7795 707.59 23.58633
-7191 0.2 7795 1271.36 28.25244

y = -7388,x2 + 8060,x
-7388 0.1 8060 732.12 24.404
-7388 0.2 8060 1316.48 29.25511
CBR DESIGN TEST
Code sampel 10 X PUKULAN (Soaked) Weight of Mold + soil 13380 gram
Pekerjaan : Tesis Andi Retno Ari setiaji Weight of Mold 7245 gram
Lokasi : Ruas Jalan Lingkar Kudus Weight of Soil 6135 gram
KM. 48+150 Volume 3210.185 cm^3
Sample : TP. 1 W Density gb 1.91 gram/cm^3
Tanah Timbunan (Padas) Dry Density gd 1.377 gram/cm^3

Strain Dial Load Perhitungan Water Conten A B


Reading Multiplayer
1 2 3 4(2X3) Number of can 116 152
A B A B Weight of can 6.8 7.2
0 0 0 5.8027 0 0 Weight of can + wet soil 60.6 48.4
0.0125 1 3 5.8027 5.80 17.41 Weight of can + dry soil 45.3 37.1
0.025 3 7 5.8027 17.41 40.62 Weight dry soil 38.5 29.9
0.050 6 13 5.8027 34.82 75.44 Weight of water 15.3 11.3
0.075 9 16 5.8027 52.22 92.84 Water Conten 39.74 37.79
0.100 12 19 5.8027 69.63 110.25 Average water conten 38.77
0.150 16 29 5.8027 92.84 168.28
0.200 21 32 5.8027 121.86 185.69
0.300 32 42 5.8027 185.69 243.71
0.400 42 49 5.8027 243.71 284.33
0.500 48 55 5.8027 278.53 319.15
Pressu re (p oun d)

350

300

250 B
A
200

150

100

50

0
0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5
Penetration (inch)

CBR Value Rata-Rata CBR Value


A B
Penetration 0.1'' 2.21 3.68 2.95 %
Penetration 0.2'' 2.83 4.47 3.65 %
CBR DESIGN TEST
Code sampel 25 X PUKULAN (Soaked) Weight of Mold + soil 14280 gram
Pekerjaan : Tesis Andi Retno Ari setiaji Weight of Mold 7785 gram
Lokasi : Ruas Jalan Lingkar Kudus Weight of Soil 6495 gram
KM. 48+150 Volume 3210.185 cm^3
Sample : TP. 1 Bulk Density gb 2.02 gram/cm^3
Tanah Timbunan (Padas) Dry Density gd 1.500 gram/cm^3

Strain Dial Load Perhitungan Water Conten A B


Reading Multiplayer
1 2 3 4(2X3) Number of can 145 114
A B A B Weight of can 7.7 4
0 0 0 5.8027 0 0 Weight of can + wet soil 57.9 52.3
0.0125 3 5 5.8027 17.41 29.01 Weight of can + dry soil 44.3 40.4
0.025 5 12 5.8027 29.01 69.63 Weight dry soil 36.6 36.4
0.050 12 28 5.8027 69.63 162.48 Weight of water 13.6 1190
0.075 24 43 5.8027 139.26 249.52 Water Conten 37.16 32.69
0.100 37 56 5.8027 214.70 324.95 Average water conten 34.93
0.150 58 77 5.8027 336.56 446.81
0.200 72 94 5.8027 417.79 545.45
0.300 93 124 5.8027 539.65 719.53
0.400 122 144 5.8027 707.93 835.59
0.500 134 158 5.8027 777.56 916.83
Pressu re (p o u n d )

1000
900
800 B
700
A
600
500
400
300
200
100
0
0 0.05 0.1 Penetration
0.15 0.2 (inch)
0.25 0.3 0.35 0.4 0.45 0.5

CBR Value Rata-Rata CBR Value


A B
Penetration 0.1'' 7.04 10.22 8.63 %
Penetration 0.2'' 8.60 12.23 10.41 %
CBR DESIGN TEST
Code sampel 56 X PUKULAN (Soaked) Weight of Mold + soil 13770 gram
Pekerjaan : Tesis Andi Retno Ari setiaji Weight of Mold 7270 gram
Lokasi : Ruas Jalan Lingkar Kudus Weight of Soil 6500 gram
KM. 48+150 Volume 3210.185 cm^3
Sample : TP. 1 Bulk Density gb 2.02 gram/cm^3
Tanah Timbunan (Padas) Dry Density gd 1.575 gram/cm^3

Strain Dial Load Perhitungan Water Conten A B


Reading Multiplayer
1 2 3 4(2X3) Number of can 237 186
A B A B Weight of can 4.2 6.7
0 0 0 5.8027 0 0 Weight of can + wet soil 71.2 57
0.0125 13.6 9 5.8027 78.92 52.22 Weight of can + dry soil 55.8 46.2
0.025 22.1 20.7 5.8027 128.24 120.12 Weight dry soil 51.6 39.5
0.050 37.4 51.3 5.8027 217.02 297.68 Weight of water 15.4 10.8
0.075 47.6 81 5.8027 276.21 470.02 Water Conten 29.84 27.34
0.100 66.3 108.9 5.8027 384.72 631.91 Average water conten 28.59
0.150 90.1 146.7 5.8027 522.82 851.26
0.200 115.6 178.2 5.8027 670.79 1034.04
0.300 129.2 214.2 5.8027 749.71 1242.94
0.400 158.1 230.4 5.8027 917.41 1336.94
0.500 175.1 238.5 5.8027 1016.05 1383.94
Pressu re (p o u n d )

1600

1400
B
1200

1000 A

800

600

400

200

0
0 0.05 0.1 Penetration
0.15 0.2(inch)
0.25 0.3 0.35 0.4 0.45 0.5

CBR Value Rata-Rata CBR Value


A B
Penetration 0.1'' 12.04 19.47 15.76 %
Penetration 0.2'' 14.52 22.40 18.46 %
1.58208
1.534257
1.392807

y = -251,9x2 + 687,3x
-251.9 0.1 687.3 66.211 2.207033
-251.9 0.2 687.3 127.384 2.830756

y = -998,8x2 + 1205,x
-998.8 0.1 1205 110.512 3.683733
-998.8 0.2 1205 201.048 4.467733

=
1.585651
1.505389
1.373301

2 1.7 3.4
3 1.7 5.1
7 1.7 11.9
14 1.7 23.8
22 1.7 37.4
34 1.7 57.8
42 1.7 71.4
55 1.7 93.5
72 1.7 122.4
79 1.7 134.3

y = -1763x2 + 2287,x
-1763 0.1 2287 211.07 7.035667
-1763 0.2 2287 386.88 8.597333

y = -3135,x2 + 3378,x
-3135 0.1 3378 306.45 10.215
-3135 0.2 3378 550.2 12.22667
8 10 1.7 0.9 13.6 9
13 23 1.7 0.9 22.1 20.7
22 57 1.7 0.9 37.4 51.3
28 90 1.7 0.9 47.6 81
39 121 1.7 0.9 66.3 108.9
53 163 1.7 0.9 90.1 146.7
68 198 1.7 0.9 115.6 178.2
76 238 1.7 0.9 129.2 214.2
93 256 1.7 0.9 158.1 230.4
103 265 1.7 0.9 175.1 238.5

y = -3452x2 + 3958,x

-3452 0.1 3958 361.28 12.04267


-3452 0.2 3958 653.52 14.52267

y = -8002,x2 + 6641,x
-8002 0.1 6641 584.08 19.46933
-8002 0.2 6641 1008.12 22.40267
STANDARD PROCTOR

Pekerjaan : Tesis Andi Retno Ari setiaji


Lokasi : Ruas Jalan Lingkar Kudus
KM. 48+150
Sample : TP. 1 Tesis Andi Retno Ari Setiaji
Tanah Timbunan (Padas)

Specific Gravity : 2.6927


Density (Kepadatan)
Test No 1 2 3 4 5
Tambahan air (cc) 150 250 350 450 550
Berat proctor + tanah padat (gr) 5830 5943 6164 6063 6010
Berat proctor (gr) 4263 4263 4263 4263 4263
Berat tanah padat (gr) 1567 1680 1901 1800 1747
Volume proctor (cm3) 955.56 955.56 955.56 955.56 955.56
Berat isi basah (gr/cm3) 1.64 1.76 1.99 1.88 1.83
Berat isi kering (gr/cm3) 1.44 1.47 1.60 1.44 1.37
Angka pori (e) 0.86 0.83 0.69 0.87 0.97
Porositas (n) 46.38 45.27 40.71 46.66 49.20

Water Content
Test No. 1 2 3 4 5
No. Cawan 90 196 137 110 118
Berat cawan + tanah basah (gr) 46.40 50.10 53.20 73.50 77.50
Berat cawan + tanah kering (gr) 41.80 42.90 43.80 57.80 59.60
Berat air (gr) 4.60 7.20 9.40 15.70 17.90
Berat cawan (gr) 7.90 5.60 5.60 7.40 6.40
Berat tanah kering (gr) 33.90 37.30 38.20 50.40 53.20
Kadar air (%) 13.57 19.30 24.61 31.15 33.65

2.2 Grafik Standard Proctor


Berat Isi Kering (gr/cm3)

2.1

1.9

1.8
ZAV Line
1.7

gd max.
1.6

1.5

1.4
w opt.
1.3

1.2
Kadar Air (%)
10 12 14 16 18 20 22 24 26 28 30 32 34

Berat Isi Kering : 1.552 gr/cm3


Kadar Air Optimum : 22.5 %
GRAFIK
kdr air gd

13.6 1.44
19.3 1.47
24.6 1.60
31.2 1.44
33.6 1.37

BD = 2.6927

ZAV Line

13.6 1.97
19.3 1.77
24.6 1.62
31.2 1.46
33.6 1.41

w Optimum
22.5 0.8
22.5 1.552

gd Maksimum

0 1.552
22.5 1.552
CALIFORNIA BEARING RATIO (CBR)
AASHTO T 193

Pekerjaan : Tesis Andi Retno Ari setiaji


Lokasi : Ruas Jalan Lingkar Kudus
KM. 48+150
Sample : TP. 1
Tanah Timbunan (Padas)
Kondisi : Tanpa Rendaman (Unsoaked)

GRAFIK STANDART PROCTOR CBR DESIGN

2.2 2.2
KEPADATAN (gr/cm3)

Kepadatan (gr/cm3)
2.1 2.1

2 2

1.9 1.9

1.8 1.8
ZAV line

1.7 1.7

1.6 gd max 1.6 gd max

95 %gd max 95 %gd max


1.5 1.5

1.4 1.4
w.optimum

1.3 1.3

1.2 1.2
10 15 20 25 30 35 0 6 12 18 24 30
KADAR AIR (%) CBR (%)

Berat Jenis : 2.6927


Kepadatan Maks ( gd max ) : 1.5520 gr/cm3
95 % Kepadatan Maks ( 95 % gd max ) : 1.4744 gr/cm3
Kadar Air Optimum : 22.500 %
CBR 100 % gd max : 20.000 %
CBR 95 % gd max : 13.900 %
gd maks CBR 100 %

0 1.552 20 0.8
20 1.552 20 1.552

95 % gd maks CBR 95 %

0 1.4744 13.9 0.8


13.9 1.4744 13.9 1.4744

CBR gd Maks.

24.00 1.5857
13.21 1.5054
7.10 1.3733

gd Maks. CBR Design 95 % gd Maks

0 1.552 0 1.4744
22.5 1.552 22.5 1.4744

W Optimum CBR

22.5 0.8
22.5 1.552
LABORATORIUM MEKANIKA TANAH
FAKULTAS TEKNIK JURUSAN SIPIL
UNIVERSITAS DIPONEGORO

STANDARD PROCTOR
0

Specific Gravity : 2.6927


Density (Kepadatan)
Test No 1 2 3 4 5
Tambahan air (cc) 150 250 350 450 550
Berat proctor + tanah padat (gr) 5830 5943 6164 6063 6010
Berat proctor (gr) 4263 4263 4263 4263 4263
Berat tanah padat (gr) 1567 1680 1901 1800 1747
Volume proctor (cm3) 955.56 955.56 955.56 955.56 955.56
Berat isi basah (gr/cm3) 1.640 1.758 1.989 1.884 1.828
Berat isi kering (gr/cm3) 1.444 1.474 1.597 1.436 1.368
Angka pori (e) 0.865 0.827 0.687 0.875 0.968
Porositas (n) 46.375 45.271 40.708 46.659 49.197

Water Content
Test No. 1 2 3 4 5
No. Cawan 90 196 137 110 118
Berat cawan + tanah basah (gr) 46.40 50.10 53.20 73.50 77.50
Berat cawan + tanah kering (gr) 41.80 42.90 43.80 57.80 59.60
Berat air (gr) 4.60 7.20 9.40 15.70 17.90
Berat cawan (gr) 7.90 5.60 5.60 7.40 6.40
Berat tanah kering (gr) 33.90 37.30 38.20 50.40 53.20
Kadar air (%) 13.57 19.30 24.61 31.15 33.65

2.1 Grafik Standard Proctor


Berat Isi Kering (gr/cm3)

1.9

1.8

ZAV Line
1.7

gd max.
1.6

1.5

1.4
w opt.
1.3

1.2
Kadar Air (%)
10 12 14 16 18 20 22 24 26 28 30 32 34

Berat Isi Kering : 1.552 gr/cm3


Kadar Air Optimum : 22.5 %
GRAFIK
kdr air gd

13.6 1.44
19.3 1.47
24.6 1.60
31.2 1.44
33.6 1.37

BD = 2.6927

ZAV Line

13.6 1.97
19.3 1.77
24.6 1.62
31.2 1.46
33.6 1.41

w Optimum
22.5 0.8
22.5 1.552

gd Maksimum

0 1.552
22.5 1.552
CALIFORNIA BEARING RATIO (CBR)
AASHTO T 193

Pekerjaan : Tesis Andi Retno Ari setiaji


Lokasi : Ruas Jalan Lingkar Kudus
KM. 48+150
Sample : TP. 1
Tanah Timbunan (Padas)
Kondisi : Rendaman (Soaked)

GRAFIK STANDART PROCTOR CBR DESIGN

2.2 2.2
KEPADATAN (gr/cm3)

Kepadatan (gr/cm3)

2.1 2.1

2 2

1.9 1.9

1.8 1.8
ZAV line

1.7 1.7

1.6 gd max 1.6 gd max

95 %gd max 95 %gd max


1.5 1.5

1.4 1.4
w.optimum

1.3 1.3

1.2 1.2
10 15 20 25 30 35 0 4 8 12 16 20
KADAR AIR (%) CBR (%)

Berat Jenis : 2.6927


Kepadatan Maks ( gd max ) : 1.5520 gr/cm3
95 % Kepadatan Maks ( 95 % gd max ) : 1.4744 gr/cm3
Kadar Air Optimum : 22.500 %
CBR 100 % gd max : 13.500 %
CBR 95 % gd max : 8.400 %
gd maks CBR 100 %

0 1.552 13.5 0.8


13.5 1.552 13.5 1.552

95 % gd maks CBR 95 %

0 1.4744 8.4 0.8


8.4 1.4744 8.4 1.4744

CBR gd Maks.

15.76 1.5746
8.63 1.4995
2.95 1.3772

gd Maks. CBR Design 95 % gd Maks

0 1.552 0 1.4744
22.5 1.552 22.5 1.4744

W Optimum CBR

22.5 0.8
22.5 1.552
REKAPITULASI HASIL PEMERIKSAAN

Pekerjaan : Tesis Andi Retno Ari setiaji

Lokasi : Ruas Jalan Lingkar Kudus

KM. 48+150

Sample : TP. 1

Tanah Timbunan (Padas)

URAIAN PEMERIKSAAN HASIL


SPESIFIKASI
PEMERIKSAAN

KEPADATAN W. Optimum 22.50 %

STANDART / 95 % g D maks 1.4744 gr/cm3

MODIFIED 100 % g D maks 1.5520 gr/cm3

95 % g D maks 13.90 %
CBR Unsoaked
100 % g D maks 20.00 %

95 % g D maks 8.40 %
CBR Soaked
100 % g D maks 13.50 %

LL NON PI %
ATTERBERG LIMIT PL NON PI %

PI NON PI %

Swelling Potensial 2.38 %


PEMERIKSAAN SPECIFIC GRAVITY (GS)

Pekerjaan : Tesis Andi Retno Ari setiaji


Lokasi : Ruas Jalan Lingkar Kudus
KM. 48+150
Sample : TP. 1
Tanah Timbunan (Padas)

Nomor Contoh 1

Nomor Picnometer L

Berat Picnometer + Contoh (gr) W2 50.60

Berat Picnometer (gr) W1 30.60

Berat Contoh (gr) Wt = W2 - W1 20.00

Koefisien Temperatur to C k 0.9963

Brt Pic + Air + Contoh to C W3 93.14

Brt Pic + Air 25o C W4 80.60

W5 = W2 - W1 + W4 100.60

I s i C o n t o h W5 - W3
W5 - W3 7.46

Wt
BeratJenis k 2.6710
W5 - W3

Berat Jenis Rata-Rata 2.6710


DAFTAR KALIBRASI PICNOMETER
NO.PICN T1 A B C T1
A 0.9963 23.8 73.5 49.7 28 25 0.9969
E 0.9965 31.4 81.5 50.1 27 25.5 0.9968
F 0.9965 29 79.2 50.2 27 26 0.9967
G 0.9961 22.4 72.9 50.5 28.5 26.5 0.9966
H 0.9964 28.1 78.2 50.1 27.5 27 0.9965
I 0.9964 23.7 74.5 50.8 27.5 27.5 0.9964
K 0.9964 27.4 77.8 50.4 27.5 28 0.9963
L 0.9964 30.6 80.6 50 27.5 28.5 0.9961
M 0.9964 28.7 78.7 50 27.5 29 0.996
P 0.9963 33.8 84.1 50.3 28 29.5 0.9958
Q 0.9964 32.6 82.1 49.5 27.5 30 0.9957
R 0.9965 29 79.2 50.2 27 30.5 0.9956
T 0.9965 28.3 78.3 50 27 31 0.9955
U 0.9965 24.5 74.3 49.8 27 31.5 0.9954
X 0.9965 27.2 77.1 49.9 27 32 0.9952
Y 0.9965 30.9 81.3 50.4 27 32.5 0.995
Z 0.9963 30.8 81.2 50.4 28 33 0.9948
1 0.9961 32.6 82.7 50.1 28.5 33.5 0.9947
2 0.9964 30.4 80.2 49.8 27.5 34 0.9945
3 0.9965 30.6 80.7 50.1 27 34.5 0.9945
4 0.9964 27.7 77.8 50.1 27.5
5 0.9963 26.6 75.9 49.3 28
6 0.9964 31.5 81.5 50 28
7 0.9963 26.5 76.4 49.9 28 Tidak Ada
8 0.9964 30.5 80.5 50 27.5
9 0.9964 21.3 71 49.7 27.5
10 0.9964 29.1 79.2 50.1 27.5
11 0.9965 30.3 80.2 49.9 27
12 0.9963 24.3 74.6 50.3 28 Tidak ada
13 0.9964 21.9 69.1 47.2 27.5
14 0.9964 28 77.9 49.9 27.5
15 0.9964 30 80.4 50.4 27.5
16 0.9961 32.6 82.8 50.2 28.5 Tidak Ada
17 0.9965 25.1 77.2 52.1 27
18 0.9965 24.2 74.7 50.5 27
19 0.9965 29.5 79.8 50.3 27
20 0.9963 28.3 78.1 49.8 28
21 0.9963 23 74.8 51.8 28 Tidak Ada
22 0.9961 31.1 80.8 49.7 28.5 Tidak Ada
23 0.9963 20.7 70.3 49.6 28 Tidak Ada
24 0.9964 32.5 82 49.5 27.5
25 0.9964 28.1 78.1 50 27.5 Tidak Ada
26 0.9963 28.4 78.6 50.2 28
27 0.9964 30.2 79.6 49.4 27.5 Tidak Ada
28 0.9964 20.8 71.1 50.3 27.5
31 0.9964 34.7 86.2 51.5 27.5
Tidak Ada

Tidak ada

Tidak ada

Tidak ada
LIQUID AND PLASTIC LIMIT TEST

PROYEK : Tesis Andi Retno Ari setiaji


LOKASI : Ruas Jalan Lingkar Kudus
KM. 48+150
SAMPLE : TP. 1
Tanah Timbunan (Padas)

LIQUID LIMIT DETERMINATION


NO. OF BLOWS
Can no
Wt. of wet soil + can gr
Wt. of dry soil + can gr
Wt. of can gr NON PI
Wt. of dry soil gr
Wt. of moisture gr
Water Content ( w ) (%)

Atterberg Limit
Water Content %

50
48
46
44 Flow index fi
Liquid Limit =
42
Plastic Limit =
40 Plastisity Index =
38
36
34
32
30
10 100
No. of Blows

PLASTIC LIMIT DETERMINATION


Can no
Wt. of wet soil + can gr
Wt. of dry soil + can gr
Wt. of can gr NON PI
Wt. of dry soil gr
Wt. of moisture gr
Water Content ( w ) %
SWELLING MASA PERENDAMAN
CBR DESIGN TEST

Pekerjaan : Tesis Andi Retno Ari setiaji

Lokasi : Ruas Jalan Lingkar Kudus

KM. 48+150

Sample : TP. 1

Tanah Timbunan (Padas)

A. 10 X Pukulan (Soaked)
f (Dameter) Mould H (Tinggi) Mould Besarnya Swelling Swelling Potensial
Hari Ke-
cm cm cm %

1 15.20 17.70 0.23 1.27

2 15.20 17.70 0.26 1.45

3 15.20 17.70 0.30 1.68

B. 25 X Pukulan (Soaked)
f (Dameter) Mould H (Tinggi) Mould Besarnya Swelling Swelling Potensial
Hari Ke-
cm cm cm %

1 15.20 17.70 0.08 0.45

2 15.20 17.70 0.15 0.82

3 15.20 17.70 0.26 1.45

C. 56 X Pukulan (Soaked)
f (Dameter) Mould H (Tinggi) Mould Besarnya Swelling Swelling Potensial
Hari Ke-
cm cm cm %

1 15.20 17.70 0.31 1.73

2 15.20 17.70 0.37 2.08

3 15.20 17.70 0.42 2.38


0.001 225 0.225 1 225

0.001 257 0.257 1 257

0.001 298 0.298 1 298

0.001 80 0.08 1 80

0.001 145 0.145 1 145

0.001 257 0.257 1 257

0.001 307 0.307 1 307

0.001 368 0.368 1 368

0.001 421 0.421 1 421

Vous aimerez peut-être aussi