Vous êtes sur la page 1sur 28

PERHITUNGAN STRUKTUR

MASJID PT. SUNSTAR ENGINEERING INDONESIA

5. Plat Lantai 12 cm

Thickness plat = 12 cm
Mu max (derived fr SAP2000)= 1.518 tm

As = Mu -----------------> As =
0.8 x sa x 0.9 x d Mu =
sa =
151800 kgcm d=
0.80 x 4000 x 0.90 x 10

As = 5.27 cm2

Used bar:
D8-150 double layer 6.70 cm2 > As =

M8 = 3.45 cm2
M10 = 5.33 cm2
6.00 1.88 cm2
8.00 3.35 cm2
10.00 5.23 cm2
12.00 7.54 cm2
13.00 8.84 cm2
16.00 13.40 cm2
19.00 18.89 cm2
22.00 25.33 cm2
Doc. No.:

Rev. 0

Rev. Date : 02/08/2019

Bar Required
Momen derived from program SAP2000
fy steel (yield strength)
thickness concrete - concrete cover

5.27 cm2
so Construction is "OK"
PERHITUNGAN STRUKTUR

MASJID PT. SUNSTAR ENGINEERING INDONESIA

6. Plat Tangga 12 cm

Thickness plat = 12 cm
Mu max (derived fr SAP2000)= 1.518 tm

As = Mu -----------------> As =
0.8 x sa x 0.9 x d Mu =
sa =
151800 kgcm d=
0.80 x 4000 x 0.90 x 10

As = 5.27 cm2

Used bar:
D8 - 150 double layer 6.90 cm2 > As =

M8 = 3.45 cm2
M10 = 5.33 cm2
6.00 1.88 cm2
8.00 3.35 cm2
10.00 5.23 cm2
12.00 7.54 cm2
13.00 8.84 cm2
16.00 13.40 cm2
19.00 18.89 cm2
22.00 25.33 cm2
Doc. No.:

Rev. 0

Rev. Date : 02/08/2019

Bar Required
Momen derived from program SAP2000
fy steel (yield strength)
thickness concrete - concrete cover

5.27 cm2
so Construction is "OK"
PERHITUNGAN STRUKTUR

RUMAH INDEKOST 2 LANTAI YOGYAKARTA

13. Plat Atap 10 cm

Thickness plat = 10 cm
Mu max (derived fr SAP2000)= 1.3 tm

As = Mu -----------------> As =
0.8 x sa x 0.9 x d Mu =
sa =
130000 kgcm d=
0.80 x 4000 x 0.90 x 8

As = 5.65 cm2

Used bar:
M8 dobel 6.90 cm2 > As =

M8 = 3.45 cm2
M10 = 5.33 cm2
6.00 1.88 cm2
8.00 3.35 cm2
10.00 5.23 cm2
12.00 7.54 cm2
13.00 8.84 cm2
16.00 13.40 cm2
19.00 18.89 cm2
22.00 25.33 cm2
Doc. No.:

Rev. 0

Rev. Date : 19/05/2019

Bar Required
Momen derived from program SAP2000
fy steel (yield strength)
thickness concrete - concrete cover

5.65 cm2
so Construction is "OK"
STRUCTURAL CALCULATION
PROJECT: UT SANGA-SANGA

Slab Calculation
1. Subgrade CBR Calculation

According to the table relationship Mudulus subgrade CBR above, to CBR 60%, then the value of k = 580 psi or = 16054344,73 kg / m3. Rigid pavement
form of spring with ground reaction modulus value of at KV = 16054344,73 kg / m3

KV = 16054345 kg/m3 x 0.25 m x 0.25 m =


2. Input Joint Spring Support = KNM
3. Input Data Profil Slab Concrete 25cm
4. Input Load 1,75 Ton/m2 = 1750 kg/m2
5. Result Moment from program SAP2000
6. Bar Calculation
Thickness plat = 12 cm
Mu max (derived fr SAP2000)= 1.3 tm

As = Mu -----------------> As =
0.8 x sa x 0.9 x d Mu =
sa =
130000 kgcm d=
0.80 x 4000 x 0.90 x 10

As = 4.52 cm2

Used bar:
D10 dobel 10.47 cm2 > As =

M8 = 3.45 cm2
M10 = 5.33 cm2
6.00 1.88 cm2
8.00 3.35 cm2
10.00 5.23 cm2
12.00 7.54 cm2
13.00 8.84 cm2
16.00 13.40 cm2
19.00 18.89 cm2
22.00 25.33 cm2
UCTURAL CALCULATION
PROJECT: UT SANGA-SANGA

e, to CBR 60%, then the value of k = 580 psi or = 16054344,73 kg / m3. Rigid pavement pedestal plate structure in the
054344,73 kg / m3

1,003,396.55 kg/m
10,033.97 KNm
Bar Required
Momen derived from program SAP2000
fy steel (yield strength)
thickness concrete - concrete cover

4.52 cm2
so Construction is "OK"
STRUCTURAL CALCULATION
PROJECT: UT SANGA-SANGA

Slab Calculation
1. Subgrade CBR Calculation

According to the table relationship Mudulus subgrade CBR above, to CBR 60%, then the value of k = 580 psi or = 16054344,73 kg / m3. Rigid pavement
form of spring with ground reaction modulus value of at KV = 16054344,73 kg / m3

KV = 16054345 kg/m3 x 0.25 m x 0.25 m =


2. Input Joint Spring Support = KNM
3. Input Data Profil Slab Concrete 25cm
4. Input Load 1,75 Ton/m2 = 1750 kg/m2
5. Result Moment from program SAP2000
6. Bar Calculation
Thickness plat = 10 cm
Mu max (derived fr SAP2000)= 1.3 tm

As = Mu -----------------> As =
0.8 x sa x 0.9 x d Mu =
sa =
130000 kgcm d=
0.80 x 4000 x 0.90 x 8

As = 5.65 cm2

Used bar:
M8 dobel 6.90 cm2 > As =

M8 = 3.45 cm2
M10 = 5.33 cm2
6.00 1.88 cm2
8.00 3.35 cm2
10.00 5.23 cm2
12.00 7.54 cm2
13.00 8.84 cm2
16.00 13.40 cm2
19.00 18.89 cm2
22.00 25.33 cm2
UCTURAL CALCULATION
PROJECT: UT SANGA-SANGA

e, to CBR 60%, then the value of k = 580 psi or = 16054344,73 kg / m3. Rigid pavement pedestal plate structure in the
054344,73 kg / m3

1,003,396.55 kg/m
10,033.97 KNm
Bar Required
Momen derived from program SAP2000
fy steel (yield strength)
thickness concrete - concrete cover

5.65 cm2
so Construction is "OK"