Vous êtes sur la page 1sur 8

PROJECT: Roofing

LOCATION: Piat, Cagayan


OWNER: Wilbert

ESTIMATED COST OF PROPOSED WORK


Name and Description (Materials) Quantity Unit Unit Cost Total Cost (Pesos)
ROOFING
1. Panel & Bended
Tilespan 0.40mm thk-brown 185.00 ln.m. 295.00
0.40 Spanish Gutter 22.00 pcs 480.00
0.40 Fascia Cover 22.00 pcs 400.00
0.40 ridge Cap 11.00 pcs 480.00
0.40 valley gutter 11.00 pcs 400.00

2. Miscellaneous Hardware
teckscrew 1,500.00 pcs. 2.00
Blind Rivets 5/32" x 3/4" 3.00 boxes 350.00
Sealant 4.00 tubes 180.00
Material Cost P
Delivery

TOTAL COST (vat exclusive)


NOTE: price is subject to change without prior notice

Prepared By:

FLOR DANN M. FERNANDO


Licensed Civil Engineer
Total Cost (Pesos)

54,575.00
10,560.00
8,800.00
5,280.00
4,400.00

3,000.00
1,050.00
720.00
88,385.00
3,000.00

91,385.00
9 pcs 5.4 m 48.6
2 pcs 5.07 m 10.14
3 pcs 3.97 m 11.91
4 pcs 2.88 m 11.52
3 pcs 1.78 m 5.34
3 pcs 2.78 m 8.34
4 pcs 2.5 m 10
4 pcs 2m 8
4 pcs 1.1 m 4.4
2 pcs 5.4 m 10.8
3 pcs 4.34 m 13.02
3 pcs 3.28 m 9.84
3 pcs 2.22 m 6.66
3 pcs 1.16 m 3.48
3 pcs 4.35 m 13.05
2 pcs 3.28 m 6.56
2 pcs 2.22 m 4.44
2 pcs 1.16 m 2.32
2 pcs 2.73 m 5.46
2 pcs 2.44 m 4.88
2 pcs 1.5 m 3
1 pcs 5.03 m 5.03
1 pcs 2.91 m 2.91
209.7
5.25
PROJECT: Trusses and Roofing Installation
LOCATION: Jurisdiction, Camalaniugan, Cagayan
OWNER:

ESTIMATED COST OF PROPOSED WORK


Name and Description (Materials) Quantity Unit Unit Cost Total Cost (Pesos)

1. Panel & Bended


Tilespan 0.40mm thk-brown 152.00 ln.m. 295.00
0.40 Spanish Gutter 18.00 pcs 520.00
0.40 Fascia Cover 18.00 pcs 400.00
0.40 ridge Cap 15.00 pcs 500.00
0.40 valley gutter 3.00 pcs 480.00
2. Trusses
1 1/2"x1 /2"x4.5mm angle bars 45.00 pcs 1,050.00
2x3x1.2mm c-purlins 56.00 pcs 565.00
metal primer 4.00 gals 785.00
Paintbrush 2.00 pcs 480.00
2. Miscellaneous Hardware
teckscrew 1,500.00 pcs. 2.00
Blind Rivets 1/8" x 3/4" 6.00 boxes 350.00
Welding Rod 4.00 boxes 250.00
Sealant 6.00 tubes 180.00
Material Cost P
Labor Cost (includes hauling)
Mobilization/Delivery Fee

TOTAL COST (vat exclusive)


NOTE: price is subject to change without prior notice

Prepared By:

FLOR DANN M. FERNANDO


Licensed Civil Engineer
Total Cost (Pesos)

44,840.00
9,360.00
7,200.00
7,500.00
1,440.00

47,250.00
31,640.00
3,140.00
960.00

3,000.00
2,100.00
1,000.00
1,080.00
160,510.00
64,204.00
6,000.00

230,714.00
PROJECT: Trusses and Roofing Installation
LOCATION: San Pablo, Isabela
OWNER:

ESTIMATED COST OF PROPOSED WORK


Name and Description (Materials) Quantity Unit Unit Cost Total Cost (Pesos)

1. Panel & Bended


Ribtype 0.50 mm thk 288.00 ln.m. 330.00
Boxtype Gutter 14.00 pcs 580.00
box end flashing 27.00 pcs 580.00
Fascia Cover 18.00 pcs 480.00
ridge roll 8.00 pcs 550.00
Insulation 6.00 rolls 3,500.00
2. Trusses (7 pcs)
2 1/2"x2 1 /2"x6.0mm angle bars 56.00 pcs 1,781.00
2"x2"x5mm angle bars 49.00 pcs 1,519.00
1x1 angle bar 15.00 pcs 485.00
flat bar 10.00 pcs 195.00
2x4x1.5mm c-purlins 88.00 pcs 750.00
sagrods 18.00 pcs 189.00
metal primer 6.00 gals 520.00
Paintbrush 2.00 pcs 80.00
3. Miscellaneous Hardware
teckscrew 2,400.00 pcs. 2.00
Blind Rivets 1/8" x 3/4" 6.00 boxes 350.00
drill bit 3.00 pcs 180.00
cutting disc 50.00 pcs 25.00
Welding Rod 10.00 boxes 250.00
Sealant 6.00 tubes 180.00

Material Cost P
Labor Cost
Mobilization/Delivery Fee

TOTAL COST (vat exclusive)


NOTE: price is subject to change without prior notice

Prepared By:

FLOR DANN M. FERNANDO


Licensed Civil Engineer
Total Cost (Pesos)

95,040.00
8,120.00
15,660.00
8,640.00
4,400.00
21,000.00

99,736.00
74,431.00
7,275.00
1,950.00
66,000.00
3,402.00
3,120.00
160.00

4,800.00
2,100.00
540.00
1,250.00
2,500.00
1,080.00

421,204.00
120,000.00
5,000.00

546,204.00