K= 0.197*(Mr / Mo) + 0.064*(Ar / Ao) + 0.088*(Cr / Co) + 0.313*(Tr / To) + 0.083*(Mr / Mo) + 0.128*(Mr / Mo) + 0.127*(Ir / Io)
I.U. I.U.
COEF.
MONOMIO SIMBOLO ELEMENTO REPRESENTATIVO INDICE % NOIVIEMBRE - FEBRERO-
INCIDENCIA
2011 2013
1.000 k=
(k - 1) =
I.U.
COEF. I.U.
MONOMIO SIMBOLO ELEMENTO REPRESENTATIVO INDICE % NOIVIEMBRE -
INCIDENCIA MARZO-2013
2011
I.U.
COEF. I.U. ABRIL-
MONOMIO SIMBOLO ELEMENTO REPRESENTATIVO INDICE % NOIVIEMBRE -
INCIDENCIA 2013
2011
1.000 k=
(k - 1) =
O ALTO, BUENOS DE PARCO CHACAPUNCO Y SAN PABLO DE OCCO - ANCHONGA"
K
FEBRERO
-2013
0.20717
0.06496
0.08800
0.31789
0.08154
0.12327
0.13075
1.01359
0.01359
K
ABRIL -2013
0.20717
0.06484
0.08800
0.32270
0.08207
0.12413
0.13194
1.02085
0.02085
K
MAYO -2013
0.20717
0.06589
0.08800
0.32300
0.08220
0.12446
0.13227
1.02299
0.02299
REINTEGRO POR REAJUSTE
(CONTROL DE VALORIZACIONES Y REAJUSTES)
CONTRATO PRINCIPAL
OBRA
:“CONSTRUCCIÓN DE CAMINO VECINAL HORNOBAMBA- BUENOS AIRES-PALCA, DISTRITO DE PALCA-HUANCAVELICA”.
K = 0.320*(Ir / Io) + 0.396*(Mr / Mo) + 0.080*(Dr / Do) + 0.065*(Ar / Ao) + 0.139*(Mr / Mo)
VALORIZACION REINTEGRO REINTEGRO DEDUCCION REINTEGRO
No. MES K-1 BRUTO NETO
PROGRAM. EJECUTADO PROGRAM. EJECUTADO AUTORIZADO EFECTIVO MATER. AUTORIZADO
3.00 Nov-18 549,128.68 0.020 0.00 10,982.57 10,982.57 0.00 0.00 10,982.57
4.00 Dec-18 557,891.06 0.020 0.00 11,157.82 11,157.82 0.00 0.00 11,157.82
5.00 ene-19 441,754.22 0.018 0.00 7,951.58 7,951.58 0.00 0.00 7,951.58
6.00 Feb-19 40,663.59 0.018 0.00 731.94 731.94 0.00 0.00 731.94
FORMULA :
De = A * V / C * ( K / Ka - 1 )
DONDE :
De : Deducción del Reajuste generado por el Adelanto en Efectivo
A : Monto del Adelanto Otorgado en Efectivo
V : Monto de la Valorización Mensual
C : Saldo del Contrato por Valorizar a la fecha del Adelanto
K : Coeficiente de Reajuste obtenido por la Aplicación de la Fórmula Polinomica
Ka: Coeficiente de Reajuste correspondiente al mes en que se canceló el Adelanto
DATOS
Adelanto Nº 01
A: S/. 478,214.06
C: S/. 2,391,070.30
VALORIZACION
V
Nº MES COMPONENTES
1 Jun-14 FORMULA 01: AREA PEDAGOGICA Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
TOTALES Err:509
VALORIZACION
V
Nº MES COMPONENTES
2 Jul-14 FORMULA 01: AREA ADMINISTRATIVA - PEDAGOGICA Err:509
FORMULA 02: AREA PEDAGOGICA Err:509
FORMULA 03: SERVICIO HIGIENICO Err:509
FORMULA 04: TANQUE CISTERNA Y ELEVADO Err:509
FORMULA 05: TANQUE SEPTICO Y POZO PERCOLADOR Err:509
FORMULA 06: LOSA DEPORTIVA Err:509
FORMULA 07: OBRAS EXTERIORES Err:509
FORMULA 08: CERCO PERIMETRICO Err:509
FORMULA 09: EQUIPAMIENTO Y CAPACITACION Err:509
TOTALES Err:509
EAJUSTE QUE NO CORRESPONDE POR
ECTIVO
REZ ALDERETE
/ C * ( K / Ka - 1 )
de la Fórmula Polinomica
que se canceló el Adelanto
A*V/C K Ka DEDUCCION
0.00 1.003 Err:509
0.00 0.997 Err:509
0.00 1.000 Err:509
0.00 0.995 Err:509
0.00 1.001 Err:509
0.00 1.007 Err:509
0.00 1.024 Err:509
0.00 1.006 Err:509
0.00 1.024 Err:509
OBRA
: "MEJORAMIENTO DEL SERVICIO DE EDUCACIÓN PRIMARIA EN LA I.E. N° 36780 DEL CENTRO POBLADO DE CCOCHAMARCA, DISTRITO DE
ANDABAMBA – ACOBAMBA - HUANCAVELICA"
NSUAL
Nov-14 Dec-14 Jan-15 SUB TOTAL
731.94 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
NSUAL
Nov-14 Dec-14 Jan-15 SUB TOTAL
0.000 0.000 0.000 Err:509
0.00 0.00 0.00 Err:509
D.S. Nº 017-79-VC
donde :
Valorizacion Monto c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado
Nº Mes Valoriz. (S/.) material (SIN IGV) Dec-00 Sep-00 Adel.Otorg. x Imo/Ima
a b c d e f g=cxf/e
2.00 January-01 243 353.23 0.023 29 026.86 0.00 0.00 175.25 #DIV/0!
3.00 ### 19 436.68 0.023 29 026.86 0.00 0.00 175.25 #DIV/0!
TOTAL
Valorizacion Monto c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado
Nº Mes Valoriz. (S/.) material (SIN IGV) Dec-00 Sep-00 Adel.Otorg. x Imo/Ima
a b c d e f g=cxf/e
2.00 January-01 243 353.23 0.083 15 824.78 0.00 0.00 286.68 #DIV/0!
3.00 ### 19 436.68 0.083 15 824.78 286.03 286.03 286.68 15 860.74
TOTAL
Valorizacion Monto c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado
Nº Mes Valoriz. (S/.) material (SIN IGV) Dec-00 Sep-00 Adel.Otorg. x Imo/Ima
a b c d e f g=cxf/e
2.00 January-01 243 353.23 0.004 14 136.78 0.00 0.00 229.97 #DIV/0!
### 19 436.68 0.004 14 136.78 232.28 232.28 229.97 13 996.19
TOTAL
Valorizacion Monto c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado
Nº Mes Valoriz. (S/.) material (SIN IGV) Dec-00 Sep-00 Adel.Otorg. x Imo/Ima
a b c d e f g=cxf/e
2.00 January-01 243 353.23 0.088 20 847.58 351.70 351.70 349.81 20 735.55
### 19 436.68 0.088 20 847.58 351.70 351.70 349.81 20 735.55
TOTAL
Valorizacion Monto c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado
Nº Mes Valoriz. (S/.) material (SIN IGV) Dec-00 Sep-00 Adel.Otorg. x Imo/Ima
a b c d e f g=cxf/e
2.00 January-01 243 353.23 0.254 12 396.37 339.07 339.07 339.07 12 396.37
### 19 436.68 0.254 12 396.37 339.07 339.07 339.07 12 396.37
TOTAL