causes of Traffic in Porac Phase 2: Preparation Planning Step 4: Set an appointment to talk Step 1: Determine the causes and have a permission to the and possible solutions of the Municipality regarding road widening traffic in Porac for some areas..
Step 5: Plan out the things and
location that you want to do Step 2: Identify where do the regarding the road widening for some traffic starts and usually begin areas in Porac.. on its specific time. Step 6: Decide the time interval and how long would it takes if it is already approved and canvass the materials needed. Step 3: Know the most affected areas cause of traffic in Porac and 8. Decide and canvass the materials finalize the gathered data and needed. Step 7: Look for a professional information. engineer to help and to guide in performing and implementing this project.
Test Results
Phase 3: Finalizing, Evaluation and Validation
Step 11: Come up a time
Step 10: Do and start the road schedule of light and heavy widening for some areas in vehicles whenever they will Porac. passed by the road.