Method of Statement
for
Metallic Piping Spool Handling
DOC. NO. : IONE-AA00-MS-PI-0009
KARBALA REFINERY PROJECT Rev. 0 Page 1/10
Ref. FEED DOC. No. : N/A
Method of Statement
For
Joint Venture of Hyundai Engineering & Construction Co., Ltd., GS Engineering & Construction Co., Ltd., SK Engineering
& Construction Co., Ltd., and Hyundai Engineering Co., Ltd.,
Note :
a) Revision bar(vertical line) shall be placed in the right hand margin to indicate where the changes has been made
b) PRPD = Prepared by, CHKD = Checked by, REVD = Reviewed by, APPRD = Approved by, CONFD = Confirmed by
METHOD STATEMENT
Method of Statement
for
Metallic Piping Spool Handling
DOC. NO. : IONE-AA00-MS-PI-0009
KARBALA REFINERY PROJECT Rev. 0 Page 2/10
Ref. FEED DOC. No. : N/A
REVISION HISTORY
TABLE OF CONTENTS
1. PURPOSE
2. SCOPE
3. DEFINITIONS
4. REFERENCES
5. RESPONSIBILITY
7. HSE REQUIREMENTS
8. ATTACHMENT
METHOD STATEMENT
Method of Statement
for
Metallic Piping Spool Handling
DOC. NO. : IONE-AA00-MS-PI-0009
KARBALA REFINERY PROJECT Rev. 0 Page 4/10
Ref. FEED DOC. No. : N/A
1. PURPOSE
The purpose of this procedure is to provide minimum requirements and methods for
metallic piping spool handling in accordance with IFC drawings, codes and related
specifications and with safety requirements.
It is to guide and take precautionary measures and to safeguard traffic within the area of
work and possible environment impact.
2. SCOPE
This method statement is provided to describe the instruction for general requirements
of metallic piping prefabricated spool handling at the piping shop of construction site in
Karbala Refinery Project.
3. DEFINITIONS
EMPLOYER : STATE EMPLOYER FOR OIL PROJECTS (SCOP)
CONTRACTOR : HDGSK JVD
PROJECT : KARBALA REFINERY PROJECT
HSE : Health Safety & Environment
QA/QC : Quality Assurance/Quality Control
PPE : Personal Protective Equipment
4. REFERENCES
4.1. EMPLOYER Documents
5. RESPONSIBILITY
Piping Fabrication Shop Engineer shall be responsible for the selection and
preparation of the isometric drawings/ spool drawings for shop fabrication. He
shall be also responsible for selecting the material required for piping shop
fabrication.
QA/QC Manager shall be responsible for all quality control and documentation
to be done during piping shop fabrication and monitoring surveillance and
inspections to confirm compliance to project specifications.
Special care shall be taken to protect flange faces during its handling and
transportation. For protection plastic cap, plywood, etc. shall be used.
A nylon sling or stainless steel (alloy) wire slings shall be used for
lifting.
Lifting lugs shall be visually inspected for cracks, deformation, and/or any
damage before use.
Lined and coated piping spools shall be lifted with wide fabric or rubber
covered slings and padding shall be used to prevent damage to lining or
coating.
When the spools are moved to storage yard, spool controller shall record and
maintain all the information such as spool location. Storage spool location
map shall be prepared.
Storage yard shall be organized to maintain and handle all the fabricated
spools with proper handling equipment (Hydraulic crane, Folk lift & Vehicles).
All piping spools must be securely fastened to the bed of trailer during
shipment to fabrication shop, field storage.
Both ends of piping spool shall be covered by plastic cap or canvas properly
until completion of field erection to avoid any contaminants from foreign
materials, debris and dust and etc.
7. HSE REQUIREMENTS
7.2. Heatstroke
It is important that the symptoms of heat stress are identified at an early stage to
enable simple treatment. Symptom: Overheating, Felling hot and uncomfortable
and Tiredness. At this stage treatment is that increase fluid intake and rest for a
short period in shade as well as Try to get more air movement. The following
symptoms can lead to more serious problems and treatment shall be obtained;
dizziness, headache, dry skin, increased heartbeat, nausea , chest pain,
cramps, breathing difficulty, diarrhea, general weakness, pale complexion,
confusion.
Precautions: Plentiful supplies of cool fresh drinking water shall be available
and employees shall be advised to increase their fluid intake early in the day,
before they start to loose fluids. Employees shall be advised to avoid caffeine
and other diuretic drinks both the night before work and during the day.
Employees shall be advised to wear only loose fitting clothing and to avoid
layering their clothes. Electrolyte solutions shall be provided where and when
deemed necessary. Employees shall be encouraged to wear sunscreen creams
and to cover their necks and face from the sun.
METHOD STATEMENT
Method of Statement
for
Metallic Piping Spool Handling
DOC. NO. : IONE-AA00-MS-PI-0009
KARBALA REFINERY PROJECT Rev. 0 Page 8/10
Ref. FEED DOC. No. : N/A
Safety glasses, Grinding and cutting – Impact resistant face shield, Welding and
cutting – Welding helmets or visors, Maintenance/commissioning of batteries –
safety glasses and Acid resistant visors are mandatory at all times on the
worksite; Care shall be taken of all eye protection issued. Lost or damaged
equipment shall be replaced. A charge shall be levied if the equipment is lost or
damaged due to negligence. Damaged eye protection can be replaced,
damaged eyes cannot.
7.4. Electricity
Where there is excessive noise, above 85dBA, hearing protection shall be worn.
The type of operations where this is likely to occur is grinding, chipping, use of
pneumatic tools, cutting with a disc cutter。
In fabrication shop only rigger could direct to lift spools. All operators of lifting
appliances shall have the relevant valid licenses. The manufacturer’s
specifications and limitations applicable to the operation of any crane or derrick
shall be complied with. Lifting plans shall be compiled for every critical lift, if any.
A person shall be designated for all lifting operations, it is in accordance with
sufficient knowledge and experience of the type of work being undertaken to be
able to access the requirements for equipment and the precautions to be taken.
Cranes shall be inspected prior to use and any defects shall be repaired. All
moving parts of any lifting equipment shall be adequately guarded. Accessible
areas within the swing radius shall be effectively barricaded to prevent persons
METHOD STATEMENT
Method of Statement
for
Metallic Piping Spool Handling
DOC. NO. : IONE-AA00-MS-PI-0009
KARBALA REFINERY PROJECT Rev. 0 Page 9/10
Ref. FEED DOC. No. : N/A
from being crushed or struck by the crane. A fire extinguisher shall be readily
available on every lifting appliance. Where it is difficult for the operator to
maintain the required distance a person shall be nominated to observe the
clearance and to give warning of any encroachment. Damaged equipment shall
not be used. Slings shall not be shortened by knots or other improvised devices.
Slings and hoist ropes shall not be kinked nor twisted around each other.
Equipment shall not be used above their rated capacity. The hook shall be
brought over the load in a manner to prevent swinging.
The sharp edges of loads shall be padded to protect the sling. Loads shall not be
dragged; they shall be lifted vertically only. Persons shall not ride the load or the
hook employees shall take care to ensure that their fingers and hands are kept
clear of the slings and load nip points during lifting. Gloves shall be worn when
handling wire rope. The crane operator shall not leave the controls while the load
is suspended
8. ATTACHMENT