PLANT DETAILS:
Capacity of plant : 2*25 MW
Boiler capacity : 2*135TPH
Boiler Make : Isjec John Thampson
Type of Boiler : Travelling grate boiler
Boiler design pr and temp : 109 ata, 545±5 ºc
Turbine Make : Siemens Steam Turbine
Turbine design pr and temp : 105 ata, 530±5 ºc
PLANT DETAILS:
Capacity of plant : 2*35 MW
Boiler capacity : 2*150 TPH
Boiler Make : Thermax
Type of Boiler : IR CFBC boiler
Boiler design pr and temp : 100 ksc, 515±5 ºc
Turbine Make : Siemens Steam Turbine
Turbine design pr and temp : 90 ksc, 510±5 ºc
No of Stages : 22 Stages
Monitoring the operation of Thermal power plant through DCS and field operations.
To attend cold and hot Startup and Shutdown activities both in field and in desk
during emergencies.
Daily report preparation on fuel consumption, total power production and plant
efficiency.
Certification
Boiler 2nd class certificate – TAMILNADU
Educational Qualification
Completed BE Mechanical Engineering in University College of Engineering
Villupuram in year of 2014 with 70.1%
SSLC at Nadar Mahamai Higher secondary school in year of 2008 with 94.4%
“Improve plant heat rate in Thermal Power plant” in 1*25MW Ramco Cements LTD,
RRNagar
Project detail
PRDS steam pressure and temperature require for the plant is 15kg/cm² and 300°c. For
that desire pressure and temperature main steam pressure and temperature
respectively reduce from 88 kg/cm² and 530°c to 15kg/cm² and 300°c. The require
pressure and temperature for PRDS motive steam get from turbine 1st extraction above
12 MW. Above 12 MW PRDS steam taken from main steam line is cutoff and taken from
turbine 1st extraction. This method avoid attemperation of main steam temperature
from 530°c to 300°c .This improve plant heat rate by 2 kcal/kwh