Vous êtes sur la page 1sur 1

Installation Programme Schedule 6th April at Hotel SP Grand days

4.00-5.45 pm Orientation Program for CWC Members


5.45-6.00 Pm Registration
6.00-6.05 Pm Welcome address by Mr. K.S.Ajithan
Imm. Past President – ISHRAE –Trivandrum chapter
6.05-6.25 Pm Installation of Chapter Working Committee
by Mr. A Madhukar R D south -1-ISHRAE

President: Mr.KRISHNAKUMAR.R
President Elect: Mr. M. Noushad Hussain
Secretary: Mr. Arun S.B
Treasurer: Mr. U.Dharanipathy

CWC Members:
Mr. Madhusoodanan Pillai.B
Mr. Unnikrishnan.J
Mr.Asok Ayyappan
Mr. B R Prasannalal
Mr. C V Jackson
Mr. P P Baburaj
Mr. Prakash A
Mr. Sooraj M.s.
Mr. Manoj Gopalkrishnan
Mr. Chinthireddy Bharath reddy
Mr. Saji N
Mr. Ranjit Divakaran
Mr. RajagiriNadhan DM
6.25-6.45 Pm Presidential Address By Mr.Subramaniam.C
IPP IHSHRAE HQ
6.45-6.50 Pm Address by the Incoming President
Mr.R.KrishnaKumar
6.50-8.50 Pm DL Talk on Design, Service, Installation & Trouble Shooting of
VRF Systems
By Mr. A Madhukar
R D south -1-ISHRAE
8.50-8.55 Pm Vote of Thanks
8.55-9.30 Pm Dinner.

Vous aimerez peut-être aussi