Commissioning checklist
COPYRIGHT
All Rights reserved.
No part of this publication may be copied or
published by means of printing, photocopying,
microfilm or otherwise without prior written consent
of
• GEA Grasso GmbH
or
• GEA Grasso GmbH Halle,
herein after called Grasso. This restriction also
applies to the corresponding drawings and diagrams.
LEGAL NOTICE
This documentation has been written in all
conscience. Grasso takes no responsibility for any
errors occurring in this publication nor for their
consequences.
Warning! Caution!
Important!
Hint!
PREFACE
GENERAL INFORMATION
Hint!
Before commissioning the unit and
putting it into service, carefully read the
operating manual of the liquid chiller of
the Ingenium series as well as the user
handbook of the Grasso System Control
and proceed in accordance with the
instructions given in them. The
instructions in the "Safety Instructions
Refrigerant Ammonia" brochure must be
followed.
TABLE OF CONTENTS
1 Checklist.................................................................................................................................................. 6
2 Measurement sheet ............................................................................................................................... 9
2.1 Operating parameters of refrigerant circuit ............................................................................ 9
1 CHECKLIST
Check installation
(see Operating Manual, Chapter 2 Commissioning / Operation,
Sections 1.3-1.7)
— Spring elements (optional)
— Water piping, (for installation on spring elements,
connection must be made using compensators; Installation
of dirt filter)
— Arrangement of set point temperature probe or flow
controller; (see Operating Manual, Chapter 2
Commissioning / Operation, Section 1.4 Cooling agent
system)
— Connection of the liquid-cooled cylinder covers (optional;
see Operating Manual, Chapter 2 Commissioning /
Operation, Section 1.8 Connection of liquid-cooled cylinder
covers)
— Safety valve connection (blow-off line)
— Check the valve positions
— Electrical connections
Leak-tightness test
(see Operating Manual, Chapter 2 Commissioning / Operation,
Section 2.3 Leak-tightness test)
— Only necessary if protective gas filling is leaking
System evacuation
(see Operating Manual, Chapter 2 Commissioning / Operation,
Section 2.4 System evacuation)
— Refrigerant circuit incl. refrigerant filling tube
Initial startup
(see Operating Manual, Chapter 2 Commissioning / Operation,
Sections 3.1 to 3.5 and GSC User Handbook)
— Check external locking mechanisms
— Voltage connection
— Release emergency stop button and acknowledge on
display with ACK button
— Select the control variable in Operating modes menu:
Cooling agent inlet/ outlet, heating agent inlet/ outlet
— Input of the setpoint temperature in accordance with the
project value
— Switch to "MANUAL" mode
— Switch "Compressor on"
— Increase output
— Check the refrigerant filling, top up with last refrigerant if
necessary
Chiller shut-down
(see Operating Manual, Chapter 2 Commissioning / Operation,
Section 3.6 Chiller shut-down)
— Switch to "MANUAL" mode
— Switch "Reduce output"
— Switch "Compressor off"
— Close stop valves if necessary
Automatic drive
(see Operating Manual, Chapter 2 Commissioning / Operation,
Section 3.7 Automatic mode)
Check the prerequisites:
— There is an enable signal from the Central I&C
— Switch-on conditions for compressor fulfilled
— There are no queued faults
— Required output (actual value > setpoint)
Switching sequence:
— Select automatic mode
— Drive to project values, to steady state if possible, check tk2
- to< 5K or tc- tW2 < 3K
— Read operating parameters in steady state with Servicelab
after approx. 20min.
2 MEASUREMENT SHEET
User
Operating hours OH
Rating class %
Tsuc-t0 overheating K
tC liquefaction temperature °C
Remarks