Académique Documents
Professionnel Documents
Culture Documents
The ITC
ITC and
and its
its objectives
objectives (I)
(I)
Public company of the Canarian Government, attached to the Regional Ministry
of Industry, Trade and New Technologies
2004 budget: 14 M€
The
The Energy,
Energy, Water
Water &
& Bioengineering
Bioengineering Division
Division
Biotechnology
Biotechnology &
& Environmental
Environmental Technologies
Technologies –– R&D
R&D Lines
Lines and
and services
services
Production of microorganisms of industrial interest (focus: microalgae)
Open
Open sky
sky microalgae
microalgae production
production facility
facility and
and biomass
biomass process
process plant
plant
Renewable
Renewable Energies
Energies &
& Water
Water Technologies
Technologies
R
R&&DD Lines
Lines (I)
(I)
Electricity production by renewable energy sources
Water Technologies
Outdoor steady-state
efficiency test and
determination of the
pressure drop across
a collector (EN
12975-2)
Renewable
Renewable Energies
Energies &
& Water
Water Technologies
Technologies
Technical Services (II)
Software development services
Programming
of Control Systems
Renewable
Renewable Energies
Energies &
& Water
Water Technologies
Technologies
Developed Products (I)
Drinking water supply with stand alone systems
CONTEDES - Water desalination container (stand alone, grid connection not necessary)
DESSOL - Reverse osmosis desalination plant driven by a stand alone photovoltaic system
DESALPARQ - Modular reverse osmosis desalination plant driven by an off-grid wind farm
AEROGEDESA - Sea water desalination plant directly driven by a wind turbine
Integrated systems for electrical energy, water, cold and ice supply in isolated
areas
PUNTA JANDIA – Wind –diesel system for the production of electricity, water, cold and ice
in remote villages
MORENA CONTEDES - Hybrid system (wind-photovoltaic-diesel) easily transportable in container
for the supply of electrical energy, water, cold and ice
Pozo
Pozo Izquierdo
Izquierdo Facilities
Facilities
Location:
Location: Southeast
Southeast of
of Gran
Gran Canaria
Canaria Island
Island
An
An excellent
excellent combination
combination of
of wind,
wind, sun
sun and
and (sea)water
(sea)water
Pozo
Pozo Izquierdo
Izquierdo Facilities
Facilities Main building: 4000 m2
Workshop building (domes) and
laboratories: 1300 m2²
Climatological station:
40 m Tower with: Higro-Thermo-
Transmitter, Pluviometer, Barometric
Pressure sensor, Pyranometer, Shadow
Ring, UV Rays Sensor, Wind Direction
Sensor, Anemometers at 10, 20 y 40 m
Hydraulic grid:
4 sea water wells
Sea water underground piping: 500 m.
Drinking water undergr. piping: 500 m.
Brine piping: 500 m.
Reference distances:
Distance to Las Palmas de
Gran Canaria city: 35 km
Distance to the airport: 15 km
Distance to the industrial area of Arinaga: 5 km
ITC-
ITC- Pozo
Pozo Izquierdo:
Izquierdo: Distance to the tourist area
of Maspalomas: 10 km
The
The ideal
ideal place
place and
and the
the best
best
infrastructure
infrastructure to
to develop
develop and
and test
test
solar,
solar, wind
wind and
and water
water systems
systems
Our
Our current
current activity
activity (renewables
(renewables ++ water)
water)
Involvement in:
- 25 “own” projects
- 21 joint projects (most of them EC co-financed)
e.g. RES2H2
HELIOSAT3
ADIRA
SMADES
HYDROBUS
AQUAMAC
RENEWISLANDS
EL HIERRO 100% RES
- 15 services (excl. lab services)
e.g. CORVO
AFRICA projects
- lab. services and collector tests
Our
Our Partners
Partners
C an ar i
de
as
o
c n o l ó gi c
In
st
ut o T e it
Excellence
Excellence in
in the
the search
search for
for solutions
solutions to
to energy
energy and
and water
water
problems
problems of
of islands
islands and
and (remote
(remote regions
regions of)
of) developing
developing
countries
countries
Strong cooperation with insular regions of Europe (greek islands,
macaronesian islands) and with our neighbouring countries (West African
coast): Morocco, Mauritania, Senegal, Cape Verde, Tunisia.
Past
Past and
and on-going
on-going projects
projects
Elaboration of a feasibility study for the electrification and water supply
(using renewable energy systems) of 32 villages in the province of
Essaouira (Morocco) (finished 2000)
Installation of a MORENA unit (hybrid PV-wind-diesel system) for the
electrification of common areas of the village Ouassen (province of
Essaouira, Morocco) (in operation since 2001)
as
co
c n o l ó gi
In
st i
tu to T e