Vous êtes sur la page 1sur 37

COMPANY PROFILE

And
PROJECT PROPOSAL
PLTMG 52MW
Barge Mounted Power Plant
For
PT. INDOCEMENT TUNGGAL PRAKARSA, TBK
Tarjun , South Kalimantan

PT. JAYA ENERGY SENTOSA


1
Company Overview

PT. Jaya Energy Sentosa


committed to running the electricity business and other related fields , oriented to customer satisfaction, making it a driver of economic activity.

Company Name : PT. Jaya Energy Sentosa

CEO : Arif Darmawan

Location : Sahid Hotel Area, Jl. Sumatra No. 1 -15 Surabaya , East Java - Indonesia

Fields of service :
 Electrical installation service
 Fire-fighting installation service
 New regeneration energy company

2
Legal Data Of PT.JES

1)Deed Of Establishment Number 14 (24 Januari 2019 )

2)Certificate Of Domicile

3)Trade Lisence

4)NPWP

5)Certificate Of Company Registration

3
Work Experience s Team

4
Special Partner Of PT.JES

5
Strategic Partner Of PT JES

1) E&CO : Engineering LNG Plant, Gas Power Plant MAN Korea (MDT Korea) : Engine Maker
2) LTU : Electrical Engineering & Contruction
3) TMS : Maintenance Engine Power Plant TSP : Engineering Power Plant & OM
4) MAN Korea (MDT Korea) : Engine Maker in Germany
5) Yuil : Engineering & Contruction Offshore Plant, Ship Builder
6) Bokuk : Genset Maker & Engine Power Plant OM

6
Project Summary

Project Developer : PT. Jaya Energy Sentosa ( KORINA GROUP )

End User : Indocement Tarjun Plant

Location : South Kalimantan

Project / Business : B O O ( Built On Operation)


Scheme
Power Capacity : 52 MWe (3+1 Base, 18,700kW x 4 Units = 74,800kW)

Type of Plant : Barge Mounted Power Plant (BMPP)

Delivery Term : 17 month after contract

Generator Type : MAN 18V51/60 DF or Equivalent

Scope of Supply : LNG Sourcing / Transportation / Receiving Storage / Re-gas / Power Supply

7
PLTMG 50MW DF(LNG/MFO) ON BARGE

Indocement

Global Law Firm /


Power Purchase Agreement KPMG
LOCATION (20 Years more)

Sea Coast
LEGALITY
(Jetty) OSS

Investor(SPV / JES) LENDER /


Fuel KOEXIM / SBCL
PGN-LNG Owner’s Engineering FUND
LNG + MFO

EPC O&M
CONTRACT CONTRACT

1) Guarantee Non Black-out Power(≤ 20 Hours/Year) CONTRACTOR


Global / JV Local 2) Reasonable Power Cost (Target Price U$0.11/kwh
JV JES
Partner 3) Project Finance (Refinancing Available)
4) Shorter Term EPC.
5) Available Desalination(Potable) 180MT/Day (+U$1.5Mil)
Prepared by JES
WHY FLOATING POWER PLANT?
1) Fast supply of electricity to areas with limited infrastructure
2) Mobile asset, possible to relocate or trade
3) Does not required a large site scale
4) Less dependent of soil quality
5) Secure power supply in the event of an earthquake or floods
6) Long use without docking(Machine & auxiliary's life time guarantee 
30 years over) 
7) Solution for remote areas
8) Shorter EPC term

PROFITABLE OF GAS ENGINE POWER PLANT ON VESSEL?
1) Turn‐key solution
2) Mobility
3) Robust design and reliable technology(Korean mechanical technology and 
ship building technology)
4) Optimal matching at different loads
5) Compliance with strict environmental standards
6) Comprehensive maintenance and operational services
7) Easy recycling Heat / Cold Energy(Desalination / Cold Storage / Ice 
Manufacturing)
Location Information

Install Location

Bontang
Kalimantan

Tarjun, Kelumpang Hilir, Kabupaten Kota Baru, Kalimantan Selatan

LNG Source : Bontang Terminal


Transfer Method : Middle Scale LNGC

2
Project Status

 Indocement Tarjun Plant operating a cement plant in South Kalimantan, and


KORINA Group intends to build BMPP(Barge Mounted Power Plant) to supply
stable and economical power supply & Fresh Water to Indocement Tarjun Plant.

 BMPP is designed to use Duel Fuel Engine and it will takes 15month of
construction time to produce electricity to customer.

 LNG is planned to be supply from Bontang Terminal, and Mini LNGC will be used
to transport LNG from Bontang to BMPP.

3
LNG Transportation Scenario
√ LNG Supply Route
Bontang
Route Bontang – Sulawesi – Bali – BMPP ‐ Bontang
LNG Loading Spot : Bontang, East Kalimantan

Storage Capacity 15,000 m3 (7,500 m3 x 2 EA )

Indocement Bima
√ Operating Condition
Plant-BMPP
Vessel Speed NCR Base , abt. 15 Kn

Total Abt. 2,600 km Means of Transport LNG Carrier (PGN)

√ Round Trip
Distance Abt. 2,600 km 
(Bontang – Sulawesi – Bali – BMPP – Bontang)
Loading‐Unloading 1 day

Sea Days 21 days, one‐way trip, 10% sea margin

Voyage Days 3 days

Vessel Quantity One Vessel

Cargo Tank Cap. abt. 174,000 m3

4
LNG Property

The performance of the generator according to the MN applied in the above table. Need to be confirmed by generator supplier.

5
Generator Specification (1/3)

6
Generator Specification (2/3)
Planning Data – Gas Mode

7
Generator Specification (3/3)
Planning Data – Liquid Mode

8
Fuel Analysis (1/2)
Gas Consumption

9
Fuel Analysis (2/2)
Pilot Oil Consumption

10
BMPP Layout (1/3)
General Arrangement Concept

Principal Dimension
LOA : approx. 130m
Breadth (MLD.) : approx. 37m
Depth (MLD.) : approx. 9m
Operating Draught (MLD.) : 6m

Fuel Storage & Supply Part Generating Part Control Part

11
BMPP Layout (2/3)
General Arrangement Concept Principal Dimension
LOA : approx. 130m
Breadth (MLD.) : approx. 37m
Depth (MLD.) : approx. 9m
Operating Draught (MLD.) : 6m

Main Deck Plan Midship Section

12
BMPP Layout (3/3)
Generating Factory Concept

13
Fuel Gas Supply Concept (1/3)
LNG Fuel Tank – Type C Cylindrical (15,000㎥)
Technical Specification
Applied Code BKI

Gross Volume (㎥) Abt. 7,500 / set

Net Volume (㎥) Abt. 6,750 / set

Quantity Two

Design Pressure (barg) 3

Fluid LNG

Temperature (℃) -162

Insulation Type PUF

Insulation Thickness (mm) 320

PWHT N/A

Main Material 9% Ni

14
Fuel Gas Supply Concept (2/3)
General Drawing

15
Fuel Gas Supply Concept (3/3)
Process Flow

16
Fuel Gas Supply System
FGSS Control & Safety System

17
Master Schedule

18
10 Proposal for Electric Power & Water of Islands of Indonesia

Fresh Water Generator


10 Proposal for Electric Power & Water of Islands of Indonesia

Electric Power and Water Shortage of Islands

1) Most of the islands of Indonesia have been suffered from shortage of the electric power and fresh
water in the present as well as in the near future.
2) The population of the islands will be continuously increased. So, the electric power and fresh water will
be valuable more and more.

- Ours Proposal can sufficiently supply the electric power and the fresh water
for more than five thousand families and any facilities in the island.
- Fresh water generator would be highly helpful to economically produce
the fresh water without any additional heat source from sea water.
10 Proposal for Electric Power & Water of Islands of Indonesia

Low salinity guaranteed

• Constant supply of fresh water with


salinity below 2 ppm. (1.5 ppm for V
SP unit)

• You can bunker less water.

• High quality technical water prolong


s the lifetime of equipment onboard.

• No corrosion problems, also reduces


maintenance requirements.
10 Proposal for Electric Power & Water of Islands of Indonesia

Fresh Water Generator

• More than 18.000 Freshwater generators in service

• 200 MT /day based on 50MW operation

Based on ships over 2000dwt


Alfa Laval: Nirex, Atlas
Other solutions: Bunker Water, Competing Products
10 Proposal for Electric Power & Water of Islands of Indonesia
Working principle
1. Ready for operation
2. Sea water, cooling, vacuum and feed
3. Heating
4. Evaporation, separation
5. Condensation and freshwater extraction
10 Proposal for Electric Power & Water of Islands of Indonesia

System Flow Chart


Make up water

L.T H.T
Expansion Expansion
tank tank

Electricity Exhaust gas


Exhaust gas Water Water boiler &
silencer

Grid
L.T Cooling water

Electricity Hot L.O


DF Engine
L.T Cooling water
L.T
Cold L.O L.O cooler & filter Radiator

Fresh Water generator


H.T Cooling water

H.F.O feed H.F.O


pump booster Fresh Water
module Starting Air

Heavy Fresh Water tank


Fuel oil

L.O separator
H.F.O
H.F.O separator
service tank Sludge
Air tank

Sludge

Sea Water
Sludge tank
Drinking Tap Water In Plant
H.F.O supply H.F.O
pump settling tank Water Using
10 Proposal for Electric Power & Water of Islands of Indonesia

Component of Freshwater Generators


THANK YOU