PROJECT PROPOSAL
PLTMG 52MW
Barge Mounted Power Plant
For
PT. INDOCEMENT TUNGGAL PRAKARSA, TBK
Tarjun , South Kalimantan
Location : Sahid Hotel Area, Jl. Sumatra No. 1 -15 Surabaya , East Java - Indonesia
Fields of service :
Electrical installation service
Fire-fighting installation service
New regeneration energy company
2
Legal Data Of PT.JES
2)Certificate Of Domicile
3)Trade Lisence
4)NPWP
3
Work Experience s Team
4
Special Partner Of PT.JES
5
Strategic Partner Of PT JES
1) E&CO : Engineering LNG Plant, Gas Power Plant MAN Korea (MDT Korea) : Engine Maker
2) LTU : Electrical Engineering & Contruction
3) TMS : Maintenance Engine Power Plant TSP : Engineering Power Plant & OM
4) MAN Korea (MDT Korea) : Engine Maker in Germany
5) Yuil : Engineering & Contruction Offshore Plant, Ship Builder
6) Bokuk : Genset Maker & Engine Power Plant OM
6
Project Summary
Scope of Supply : LNG Sourcing / Transportation / Receiving Storage / Re-gas / Power Supply
7
PLTMG 50MW DF(LNG/MFO) ON BARGE
Indocement
Sea Coast
LEGALITY
(Jetty) OSS
EPC O&M
CONTRACT CONTRACT
PROFITABLE OF GAS ENGINE POWER PLANT ON VESSEL?
1) Turn‐key solution
2) Mobility
3) Robust design and reliable technology(Korean mechanical technology and
ship building technology)
4) Optimal matching at different loads
5) Compliance with strict environmental standards
6) Comprehensive maintenance and operational services
7) Easy recycling Heat / Cold Energy(Desalination / Cold Storage / Ice
Manufacturing)
Location Information
Install Location
Bontang
Kalimantan
2
Project Status
BMPP is designed to use Duel Fuel Engine and it will takes 15month of
construction time to produce electricity to customer.
LNG is planned to be supply from Bontang Terminal, and Mini LNGC will be used
to transport LNG from Bontang to BMPP.
3
LNG Transportation Scenario
√ LNG Supply Route
Bontang
Route Bontang – Sulawesi – Bali – BMPP ‐ Bontang
LNG Loading Spot : Bontang, East Kalimantan
Storage Capacity 15,000 m3 (7,500 m3 x 2 EA )
Indocement Bima
√ Operating Condition
Plant-BMPP
Vessel Speed NCR Base , abt. 15 Kn
√ Round Trip
Distance Abt. 2,600 km
(Bontang – Sulawesi – Bali – BMPP – Bontang)
Loading‐Unloading 1 day
Sea Days 21 days, one‐way trip, 10% sea margin
Voyage Days 3 days
Vessel Quantity One Vessel
Cargo Tank Cap. abt. 174,000 m3
4
LNG Property
The performance of the generator according to the MN applied in the above table. Need to be confirmed by generator supplier.
5
Generator Specification (1/3)
6
Generator Specification (2/3)
Planning Data – Gas Mode
7
Generator Specification (3/3)
Planning Data – Liquid Mode
8
Fuel Analysis (1/2)
Gas Consumption
9
Fuel Analysis (2/2)
Pilot Oil Consumption
10
BMPP Layout (1/3)
General Arrangement Concept
Principal Dimension
LOA : approx. 130m
Breadth (MLD.) : approx. 37m
Depth (MLD.) : approx. 9m
Operating Draught (MLD.) : 6m
11
BMPP Layout (2/3)
General Arrangement Concept Principal Dimension
LOA : approx. 130m
Breadth (MLD.) : approx. 37m
Depth (MLD.) : approx. 9m
Operating Draught (MLD.) : 6m
12
BMPP Layout (3/3)
Generating Factory Concept
13
Fuel Gas Supply Concept (1/3)
LNG Fuel Tank – Type C Cylindrical (15,000㎥)
Technical Specification
Applied Code BKI
Quantity Two
Fluid LNG
PWHT N/A
Main Material 9% Ni
14
Fuel Gas Supply Concept (2/3)
General Drawing
15
Fuel Gas Supply Concept (3/3)
Process Flow
16
Fuel Gas Supply System
FGSS Control & Safety System
17
Master Schedule
18
10 Proposal for Electric Power & Water of Islands of Indonesia
1) Most of the islands of Indonesia have been suffered from shortage of the electric power and fresh
water in the present as well as in the near future.
2) The population of the islands will be continuously increased. So, the electric power and fresh water will
be valuable more and more.
- Ours Proposal can sufficiently supply the electric power and the fresh water
for more than five thousand families and any facilities in the island.
- Fresh water generator would be highly helpful to economically produce
the fresh water without any additional heat source from sea water.
10 Proposal for Electric Power & Water of Islands of Indonesia
• More than 18.000 Freshwater generators in service
• 200 MT /day based on 50MW operation
L.T H.T
Expansion Expansion
tank tank
Grid
L.T Cooling water
L.O separator
H.F.O
H.F.O separator
service tank Sludge
Air tank
Sludge
Sea Water
Sludge tank
Drinking Tap Water In Plant
H.F.O supply H.F.O
pump settling tank Water Using
10 Proposal for Electric Power & Water of Islands of Indonesia
29