Client: Vietnam Japan Gas JSC

Project: ASP PHU MY 3 PLANT (PM3)

P'age: UNLOADING - UNPACKING & INSTALLATION / PIPING WORK / PAINTING WORK / FILLING WORK / INSULATION WORK

Period: 1-Dec-2018 to 1-August-2019

DOCUMENT LIST
VJG - IEV Date: 5-Nov-18
From
No. Name Remark
Type Date Rev.: By By Whom
AB4510_C4392_B+General+Piping+Pipe+Material+
1 Pdf 5-Nov-18 Email Mr. Huu
List
AB4510_C4393_B+General+Piping+Fitting+Material
2 Pdf 5-Nov-18 Email Mr. Huu
+List
AB4510_C4394_A+General+Piping+Fitting+Material
3 Pdf 5-Nov-18 Email Mr. Huu
+List+2
4 AB4510_C4395_B+General+Piping+Flange+List Pdf 5-Nov-18 Email Mr. Huu
AB4510_C4552_0_SKID PIPING PIPE MATERIAL
5 Pdf 5-Nov-18 Email Mr. Huu
LIST
AB4510_C4553_0_SKID PIPING FITTING
6 Pdf 5-Nov-18 Email Mr. Huu
MATERIAL LIST
7 AB4510_C4555_0_SKID PIPING FLANGE LIST Pdf 5-Nov-18 Email Mr. Huu
8 BOM Pipes & Fittings (20180211) Excel 5-Nov-18 Email Mr. Huu
AB4510_C2501_A+
9 Pdf 6-Nov-18 Email Mr. Huu
+General+Piping+Support+List+and+Detail
AB4510_C2502_A_General Piping Support Material
10 Pdf 6-Nov-18 Email Mr. Huu
List
AB4510_C2601_0_SKID PIPING SUPPORT LIST &
11 Pdf 6-Nov-18 Email Mr. Huu
DETAIL
AB4510_C2602_0_SKID PIPING SUPPORT
12 Pdf 6-Nov-18 Email Mr. Huu
MATERIAL LIST
AB4510_C4391_A+General+Piping+One+Spool+Dr
13 Pdf 6-Nov-18 Email Mr. Huu
awing
14 AB4510_C4398_A+General+Piping+Weld+List Pdf 6-Nov-18 Email Mr. Huu
15 AB4510_C4399_A+General+Piping+Cutting+List Pdf 6-Nov-18 Email Mr. Huu
AB4510_C4551_0_SKID PIPING ONESPOOL
16 Pdf 6-Nov-18 Email Mr. Huu
DRAWING
17 AB4510_C4558_0_SKID PIPING WELD LIST Pdf 6-Nov-18 Email Mr. Huu
18 AB4510_C4559_0_SKID PIPING CUTTING LIST Pdf 6-Nov-18 Email Mr. Huu
AB4510_C0113_F+MOM+Biweekly+Technical+Meet
19 Pdf 9-Nov-18 Zalo Mr. Huu
ing
20 AB4510_C2001_0+PandID+Lead+Sheet+1 Pdf 9-Nov-18 Zalo Mr. Huu
21 AB4510_C2002_A+PandID+Lead+Sheet+2 Pdf 9-Nov-18 Zalo Mr. Huu
AB4510_C2003_0+
22 Pdf 9-Nov-18 Zalo Mr. Huu
+PandID+SH111+Cooling+Water+Facilities
AB4510_C2004_A+PandID+SH.171+
23 Pdf 9-Nov-18 Zalo Mr. Huu
+Air+Compressor
24 AB4510_C2005_A+PandID+SH.221+Spray+Cooler Pdf 9-Nov-18 Zalo Mr. Huu
AB4510_C2006_A+PandID+SH.222+Evaporation+C
25 Pdf 9-Nov-18 Zalo Mr. Huu
oole
26 AB4510_C2007_A+PandID+SH.+241+MS+Adsorber Pdf 9-Nov-18 Zalo Mr. Huu
AB4510_C2008_A+PandID+SH.242+Feed+Air+MS
27 Pdf 9-Nov-18 Zalo Mr. Huu
+Regeneration+Gas+Control
AB4510_C2009_A+PandID+SH.243+IA+Seal+Gas+
28 Pdf 9-Nov-18 Zalo Mr. Huu
Header
AB4510_C2010_A+PandID+SH.281+Boosting+Air+
29 Pdf 9-Nov-18 Zalo Mr. Huu
Compressor
AB4510_C2011_A+PandID+SH.331+Warm+Expansi
30 Pdf 9-Nov-18 Zalo Mr. Huu
on+Turbine
AB4510_C2012_A+PandID+SH.332+Cold+Expansi
31 Pdf 9-Nov-18 Zalo Mr. Huu
on+Turbine
AB4510_C2013_A+PandID+SH.341+Main+Heat+Ex
32 Pdf 9-Nov-18 Zalo Mr. Huu
changer+Manifold++Outer
AB4510_C2014_0+PandID+SH.342+Main+Heat+Ex
33 Pdf 9-Nov-18 Zalo Mr. Huu
changer
AB4510_C2015_A+PandID+SH.343+Main+Heat+Ex
34 Pdf 9-Nov-18 Zalo Mr. Huu
changer+Manifold+Inner
35 AB4510_C2017_A+PandID+SH.344+GOX+Product Pdf 9-Nov-18 Zalo Mr. Huu

36 AB4510_C2018_A+PandID+SH.345+GAN+Product Pdf 9-Nov-18 Zalo Mr. Huu

1 OF 4
AB4510_C2019_A+PandID+SH.351+Rectifying+Col
37 Pdf 9-Nov-18 Zalo Mr. Huu
umn
38 AB4510_C2020_A+PandID+SH.352+Subcooler Pdf 9-Nov-18 Zalo Mr. Huu
39 AB4510_C2021_0+PandID+SH.353+LIN+Product Pdf 9-Nov-18 Zalo Mr. Huu
40 AB4510_C2022_0+PandID+SH.354+LOX+Product Pdf 9-Nov-18 Zalo Mr. Huu
AB4510_C2023_A+PandID+SH.361+LOX+Boosting
41 Pdf 9-Nov-18 Zalo Mr. Huu
+Pump-1
AB4510_C2024_A+PandID+SH.362+LOX+Boosting
42 Pdf 9-Nov-18 Zalo Mr. Huu
+Pump-2
AB4510_C2025_A+PandID+SH.411+Crude+Argon+
43 Pdf 9-Nov-18 Zalo Mr. Huu
+Deoxo+Column
AB4510_C2026_A+PandID+SH.441+Crude+LAr+Pu
44 Pdf 9-Nov-18 Zalo Mr. Huu
mp-1
AB4510_C2027_A+PandID+SH.442+Crude+LAr+Pu
45 Pdf 9-Nov-18 Zalo Mr. Huu
mp-2
AB4510_C2028_A+PandID+SH.412+Pure+Argon+C
46 Pdf 9-Nov-18 Zalo Mr. Huu
olumn
AB4510_C2029_A+PandID+SH.355+Waste+Liquefi
47 Pdf 9-Nov-18 Zalo Mr. Huu
ed+Gas+Drainage
AB4510_C2030_A+PandID+SH.112+Cooling+Water
48 Pdf 9-Nov-18 Zalo Mr. Huu
+Header
49 AB4510 - P&ID-PM3 - Rev1 ACAD 9-Nov-18 Zalo Mr. Huu
50 Pipe line changed Pdf 9-Nov-18 Zalo Mr. Huu
51
52
53
54

2 OF 4
Client: Vietnam Japan Gas JSC
Project: ASP PHU MY 3 PLANT (PM3)

P'age: UNLOADING - UNPACKING & INSTALLATION / PIPING WORK / PAINTING WORK / FILLING WORK / INSULATION WORK

Period: 1-Dec-2018 to 1-August-2019

CORRESPONDING MONITORING LIST


VJG - IEV Date: 5-Nov-18
From To Status
No. Name Confirmed IEV's keeping Concerned point Remark
PIC Type Detail Date PIC Status Date Status PIC Date
by
Mr. Thien -
1 KOM between VJG - IEV Email
VJG
BOM of Piping & Fitting issue after KOM for
2 Mr. Huu - VJG Email RE: KOM for Installation Job 19-Oct-18
checking in advance
3 BOM of Piping & Fitting issue officially Mr. Huu - VJG Email RE: KOM for Installation Job 25-Oct-18
4 Material clarification Mr. Huu - VJG Email RE: KOM for Installation Job 2-Nov-18 Tuan Received Email 2-Nov-18 Kept Hoang 2-Nov-18 \\172.16.49.254\File-Server\5. Project\1.3 PROJECT- ON GOING\180028-00 VJG Piping work\600. Construction phase\650. Submission control\651. Material submission\1. Issued fr Client\2018-11-02

BOM of Piping & Fitting issue officially,


5 Mr. Huu - VJG Email RE: KOM for Installation Job 2-Nov-18 Tuan Received Email 2-Nov-18 Kept Hoang 2-Nov-18 \\172.16.49.254\File-Server\5. Project\1.3 PROJECT- ON GOING\180028-00 VJG Piping work\600. Construction phase\650. Submission control\651. Material submission\1. Issued fr Client\2018-11-02

Update BOM fr Japanese side


6 Weekly report Hoang - IEV Email RE: KOM for Installation Job 2-Nov-18 Mr. Thien Received Phone 2-Nov-18 Kept Hoang 2-Nov-18 \\172.16.49.254\File-Server\5. Project\1.3 PROJECT- ON GOING\180028-00 VJG Piping work\600. Construction phase\640. Time control\643. Weekly report

BOM of Piping & Fitting issue officially,


7 Mr. Huu - VJG Email RE: KOM for Installation Job 5-Nov-18 Hoang Received Email 5-Nov-18 Kept Hoang 5-Nov-18 \\172.16.49.254\File-Server\5. Project\1.3 PROJECT- ON GOING\180028-00 VJG Piping work\600. Construction phase\650. Submission control\651. Material submission\1. Issued fr Client\2018-11-02

Update BOM fr Vietnamese side


Mr. Hung -
8 VJG HSE requirement Email HSE Regulation 1-Oct-18 Binh/Hoang Received Email 18-Oct-18 Kept Binh 18-Oct-18
VJG
Mr. Hung -
9 Site's Road load model Email MOS for Cold Box 23-Oct-18 Binh/Hoang Received Email 23-Oct-18 Kept Binh 23-Oct-18
VJG
10 Isometric & support dwg Mr. Huu - VJG Email RE: KOM for Installation Job 6-Nov-18 Hoang Received Email 6-Nov-18 Kept Hoang 6-Nov-18 \\172.16.49.254\File-Server\5. Project\1.3 PROJECT- ON GOING\180028-00 VJG Piping work\600. Construction phase\650. Submission control\651. Material submission\1. Issued fr Client\2018-11-06\Iso + Support Drawing and Support material- from Japan

11 P&ID & Pipe line changed Mr. Huu - VJG Email Phone zalo 9-Nov-18 Hoang Received Zalo 9-Nov-18 Kept Hoang 9-Nov-18 \\172.16.49.254\File-Server\5. Project\1.3 PROJECT- ON GOING\180028-00 VJG Piping work\600. Construction phase\650. Submission control\651. Material submission\1. Issued fr Client\2018-11-09

3 OF 4
Client: Vietnam Japan Gas JSC
Project: ASP PHU MY 3 PLANT (PM3)

P'age: UNLOADING - UNPACKING & INSTALLATION / PIPING WORK / PAINTING WORK / FILLING WORK / INSULATION WORK

Period: 1-Dec-2018 to 1-August-2019

CORRESPONDING MONITORING LIST


IEV - Subcons Date: 5-Nov-18
From To Status
No. Name Confirmed IEV's keeping Concerned point Remark
PIC Type Detail Date PIC Status Date Status PIC Date
by
IEV - KOM Agenda
1 JPS sent data for KOM Nr. Manh Email Re: VJG - LOA from IEV 1-Nov-18 Hoang Received Email 1-Nov-18 Kept Hoang 1-Nov-18 \\172.16.49.254\File-Server\5. Project\1.3 PROJECT- ON GOING\180028-00 VJG Piping work\600. Construction phase\610. Human resource\612. Subcons\1. JPS

issue? Not yet


IEV - KOM Agenda
2 GHP sent data for KOM Mr. Tung Email Re: VJG - LOA from IEV 1-Nov-18 Hoang Received Email 1-Nov-18 Kept Hoang 1-Nov-18 \\172.16.49.254\File-Server\5. Project\1.3 PROJECT- ON GOING\180028-00 VJG Piping work\600. Construction phase\610. Human resource\612. Subcons\2. GHP

issue? Not yet


3

10

11

4 OF 4