Vous êtes sur la page 1sur 96

S. O. R.

: 2013-14
DISTRICT :- VADODARA
DATA INPUT - A
No. Particular Unit Material Rate Reference of
Rs. source
1 2 3 4 5
A - MATERIAL
1 Cement OPC MT 5800.00 R&B
2 Unslacked lime Qtl 200.00 R&B
3 Blasting power kg 60.00 R&B
4 Fuse Each 130.00 R&B
5 Mild steel bars Qtl. 4200.00 R&B
6-(i) Cold twisted bars/HYSD Qtl. 4400.00 R&B
(ii) TMT Bars FE-415 Qtl. 4800.00 R&B
7 Water proofing material Lit/kg 50.00 R&B
8 Precast RCC Jali
A 25 mm thick Sqm 154.00 R&B
B 40 mm thick Sqm 176.00 R&B
C 50 mm thick Sqm 187.00 R&B
D 75 mm thick Sqm 220.00 R&B
E 100 mm thick Sqm 242.00 R&B
9 Through and bond stone Each 27.00 R&B
10 Planks 30 mm thick ( Kali or equivalent soft Cu.Dm 29.00 R&B
wood)
11 Planks 38mm thick ( Kali or equivalent soft Cu.Dm 30.00 R&B
wood)
12 Ballies 80 mm dia m 32.00 R&B
13 Ballies 125 mm dia m 42.00 R&B
14 Battens 50 mm x 25 mm Cu Dm 28.00 R&B
15 Battens 50 mm x 50mm Cu Dm 28.00 R&B
16 Battens 75 mm x 50 mm Cu Dm 28.00 R&B
17 Battens 75 mm x 100 mm Cu Dm 28.00 R&B
18 Clamps in two semicircular halves of M.S. kg 70.00 R&B
flat 40 mm x 3 mm
19-A Plain G.I.Sheet 10 mm thick Qtl 6700.00 R&B
20 Bolts 12mm dia, 10 cm long. kg 75.00 R&B
21 Indian teak wood Cu. Dm 65.00 R&B
22 Country wood Cu. Dm 30.00 R&B
23 Anodized Alluminium Butt hinges
A 100 mm x 63 mm x 3.2 mm 10 Nos 281.00 R&B
B 75 mm x 63 mm x 3.2 mm 10 Nos 185.00 R&B
C 75 mm x 45 mm x 3.2 mm 10 Nos 153.00 R&B
D 50 mm x 45 mm x 3.2 mm 10 Nos 145.00 R&B
24 Anodized Alluminium Screws
A 40 mm 100 Nos 92.00 R&B
B 30 mm 100 Nos 86.00 R&B
C 20 mm 100 Nos 58.00 R&B
25 Iron Hinges
A 100 mm x 58 mm x 1.9 mm 10 Nos 144.00 R&B
B 100 mm x 58 mm x 1.4 mm 10 Nos 138.00 R&B
C 75 mm x 47 mm x 1.7 mm 10 Nos 121.00 R&B
D 50 mm x 37 mm x 1.5 mm 10 Nos 109.00 R&B
26 Iron Screw
A 40 mm 100 Nos 144.00 R&B
B 30 mm 100 Nos 121.00 R&B
C 20 mm 100 Nos 92.00 R&B
27 Commericial Ply wood sheet
A 12 mm thick Sqm 425.00 R&B
B 19 mm thick Sqm 530.00 R&B
C 25 mm thick Sqm 590.00 R&B
28 Partical board sheet
A 12 mm thick Sqm 285.00 R&B
B 19 mm thick Sqm 365.00 R&B
C 25 mm thick Sqm 475.00 R&B
D 35 mm thick Sqm 630.00 R&B
29 Hard board sheet 40 mm thick Sqm 170.00 R&B
30-A Plain Asbestos sheet 5 mm thick Sqm 200.00 R&B
31 Non-decorative type 35 mm thick door Sqm 1470.00 R&B
shutters
32 Non-decorative type 25 mm thick door Sqm 1113.00 R&B
shutters
32-A Vision penel for door No 40.00 R&B
33 Nickel plated bright finished MS plane m 179.00 R&B
hinges
34 Nickel plated screw 25 mm size 100 Nos 184.00 R&B
35 Wire gauge of 0.56 mm Sqm 189.00 R&B
36 Wire gauge of 0.71 mm Sqm 242.00 R&B
37 M.S. Flat / plate Qtl 5040.00 R&B
38 Deodar wood battens and planks Cu. Dm 28.00 R&B
39 Wooden plugs Each 1.10 R&B
40 Decorative ply wood 4 m thick Sqm 350.00 R&B
41 T-iron bracket 40 mmx 40 mm x 6 mm Qtl 5520.00 R&B
42 Hard drawn steel wire fabric Sqm 288.00 R&B
43 Hood cover 0.9 mm thick m 155.00 R&B
44 Hood cover 1.25 mm thick m 162.00 R&B
45 Rolling shutter having width below 3.5 m Sqm 2645.00 R&B
46 Extra cost of R.S. having width 3.5 m & Sqm 322.00 R&B
abve coil type spring
47 Coil type spring Each 230.00 R&B
48 Structural steel MS channel joist, tees, Qtl 5290.00 R&B
Gusset plate etc.
49 M S sheet 1 mm thick Qtl 5800.00 R&B
50-A Pulleys 25 mm dia Each 127.00 R&B
B Pulleys 38 mm dia Each 132.00 R&B
51 27.5 cm long wire spring grade No. 2 for Each 753.00 R&B
rolling shutter
52 Sheet glass ordinary quality
A 3 mm thick Sqm 221.00 R&B
B 4 mm thick Sqm 233.00 R&B
53 Sheet glass selected quality
A 5 mm thick Sqm 315.00 R&B
B 6 mm thick Sqm 347.00 R&B
54 Ground glass ( frosted or obscured on one
side)
A 3 mm thick Sqm 247.00 R&B
B 4 mm thick Sqm 284.00 R&B
C 5 mm thick Sqm 357.00 R&B
55-A Plain glass 3 mm thick Sqm 242.00 R&B
B Plain glass 4 mm thick Sqm 252.00 R&B
56 Wired figured glass 6.4 mm thick Sqm 431.00 R&B
57 Light shade Pigment Kg. 95.00 R&B
58 Medium shade pigment Kg. 95.00 R&B
59 Dark Shade Pigment Kg. 89.00 R&B
60 White cement MT 20000.00 R&B
61 Marble chips upto 4mm size Qtl 872.00 R&B
62 Marble powder cum 1838.00 R&B
63 22mm thick Chequered terrazo tiles
A Light Shade Sqm 158.00 R&B
B Dark Shade Sqm 147.00 R&B
64 20mm thick Terrazo tiles
A Light Shade Sqm 137.00 R&B
B Dark Shade Sqm 126.00 R&B
65 28mm thick Chequered Terrazo tiles
A Light Shade Sqm 173.00 R&B
B Dark Shade Sqm 163.00 R&B
66 White glazed tiles (15cmx15cmx6mm) 10 Nos 90.00 R&B
67 Pre cast cement concrete tiles Sqm 105.00 R&B
68 Rough kota stone slab
A 25mm thick Sqm 204.00 R&B
B 40mm thick Sqm 275.00 R&B
69 Polished kota stone slab
A 25mm thick Sqm 275.00 R&B
B 30mm thick Sqm 286.00 R&B
C 40mm thick Sqm 308.00 R&B
70 Marble slab 18 to 20 mm thick Sqm 825.00 R&B
71 0.8mm thick corrugated G.I.Sheet class-III Qtl. 6325.00 R&B
72 0.8mm thick plain G.I.Sheet class-III Qtl. 6153.00 R&B
73 0.8mm thick semi-circular G.I.sheet class-III Qtl. 6153.00 R&B

74 G.I.Seam bolts and nuts 25mmx7mm 10 Nos 138.00 R&B


75 G.I.Plain Washer 100 Nos 104.00 R&B
76 G.I.Bitumen Washer 100 Nos 58.00 R&B
77 G.I.J Or L Hooks 10 Nos 104.00 R&B
78 Corrugaed A.C.Sheets
A 6mm thick Sqm 235.00 R&B
B 7mm thick Sqm 246.00 R&B
79 A.C.sheet ridge 1.22M.Long Pair 203.00 R&B
80 A.C.socketed Half round Gutter
A 150mm dia Each 219.00 R&B
B 300mm dia Each 235.00 R&B
81 A.C.North light Curves Each 300.00 R&B
82 Manglore tiles 1000 Nos 3600.00 R&B
83 Fibre base bitumen saturated under layer Sqm 105.00 R&B
type-I
84 Residual Bitumen MT 7875.00 R&B
85 Fibre base self finished felt type-II grade Sqm 121.00 R&B
86 Fuel steam coal Qtl. 200.00 R&B
87 A.C.pipe 2.0 M long
A 80mm dia Each 68.00 R&B
B 100mm dia Each 79.00 R&B
88 Bat clamps 80mm dia Each 15.00 R&B
89 Bat Clamps 100mm dia Each 21.00 R&B
90 A.C.Bend without Door
A 80 mm dia Each 20.00 R&B
B 100 mm dia Each 23.00 R&B
91 - A Offset (I) 50mm - 80mm dia Each 25.00 R&B
B Offset (II) 50mm - 100mm dia Each 29.00 R&B
C Offset (I) 75mm- 80mm dia Each 25.00 R&B
D Offset (II) 75mm - 100mm dia Each 30.00 R&B
92 Junction Equal Single
A 80mm dia Each 33.00 R&B
B 100mm dia Each 41.00 R&B
93 Junction Equal Double
A 80mm dia Each 35.00 R&B
B 100mm dia Each 39.00 R&B
94 Standard Shoe
A 80mm dia Each 29.00 R&B
B 100mm dia Each 33.00 R&B
95 Fibre Insulation Board
A 12mm dia Sqm 221.00 R&B
B 18mm dia Sqm 320.00 R&B
C 25mm dia Sqm 410.00 R&B
96 - A Plywood Sheet 9mm thick Sqm 330.00 R&B
B Plywood Sheet 6mm thick Sqm 215.00 R&B
97 Lime for white washing Qtl 420.00 R&B
98 Distemper primer lit 80.00 R&B
99 Dry Distemper Kg 50.00 R&B
100 Oil Bound Distemper Kg 70.00 R&B
101 Water proofing cement paints lit 40.00 R&B
102 Plastic Emulsion paint lit 230.00 R&B
103 Enamel Paint lit 210.00 R&B
104 Bituminous Paint lit 60.00 R&B
105 Enamel Primer lit 135.00 R&B
106 Spirit lit 60.00 R&B
107 Bees wax Kg 85.00 R&B
108 Linseed oil lit 140.00 R&B
109 Turpentine oil lit 55.00 R&B
110 Kerosene lit 45.00 R&B
111 Varnish lit 85.00 R&B
112 Coal tar lit 33.00 R&B
113 Synthetic Enamel paint lit 210.00 R&B
114 Black Japan Paint lit 60.00 R&B
115 White Paint lit 205.00 R&B
116 Ready mixed red lead paint lit 100.00 R&B
117 Shella kg 65.00 R&B
118 G.I.Barbed wire Qtl 8000.00 R&B
119 Glasses 2 mm to 3 mm thick Sqm 175.00 R&B
120 Emulsion with Dialdrin lit 175.00 R&B
121 Black stone for cookuing platform ( 1.50 Each 650.00 R&B
Sqm)
122 Gun metal for bib Tab
A 15 mm dia No. 187.00 R&B
B 20 mm dia No. 209.00 R&B
123 Gun metal wheel valve
A 25 mm dia No. 495.00 R&B
B 40 mm dia No. 781.00 R&B
124 Brass screw down bib tap
A 15 mm dia No. 193.00 R&B
B 20 mm dia No. 242.00 R&B
125 Chroum plated brass bib tap
A 15 mm dia No. 220.00 R&B
B 20 mm dia No. 253.00 R&B
126 - A Pillar tap 15 mm dia No. 363.00 R&B
127 - A Brass stop cock 15 mm dia No. 242.00 R&B
128 C.I. Nahni trap No. 187.00 R&B
129 Urinal
A Flat back No. 514.00 R&B
B Squatting type No. 589.00 R&B
130 Rubber plug No. 18.00 R&B
131 White vtrious china water closet No. 401.00 R&B
Squattin pan (Indian type) 580 mm size
132 White vitrious china wash sown W.C. No. 696.00 R&B
( European type)
133 White vitrious china foot-rest for W.C. pair 75.00 R&B
134 White viitrious china 100 mm P or S trap Each 102.00 R&B
135 Flushing cistern white citrious with C P Each 1870.00 R&B
brass handle etc.12.5 lit low level
136 C.I. flushing cistern with fittings 12.5 lit High Each 880.00 R&B
level
137 Black plastic sheet with cover wiith C P Each 342.00 R&B
brass hinges and rubber butterss white
vitrious china
138 Flat back wash basin 550 mm x 400 mm Each 615.00 R&B
139 White vitrious cbins sink 600 mm x 450 mm Each 1712.00 R&B
x 150 mm
140 100 mm dia cast iron gratting Each 44.00 R&B
141 C P brass shower rose 100 mm dia Each 330.00 R&B
142 Beveled edge mirror 600 mm x 450 mm Each 321.00 R&B
143 600 mmx 20mm C P brass towel rail with Each 418.00 R&B
pair of C P brass brackets
144 600mm x 120mm glass self with C P guard Each 231.00 R&B
rail and brackets
145 C P brass toilet paper holder of standard Each 303.00 R&B
size
146 Glazed stone ware pipes
A 100 mm dia 600mm long No 41.00 R&B
B 150 mm dia 600mm long No 59.00 R&B
147 S W gully trap 150mmx100mm size No 75.00 R&B
148 G S W fitting bends
A 100 mm dia Each 59.00 R&B
B 150 mm dia Each 70.00 R&B
149 Taper G S W bans 100mm x 150 mm Each 86.00 R&B
150 G S W half round channel 150 mm dia 600 Each 54.00 R&B
mm long piece
151 C I Steps 50cmx15cmx2.25cm Each 154.00 R&B
152 - A C I cover 300mmx300mm (7 kg) Each 550.00 R&B
B C I cover 455mmx610mm (15 kg) Each 1128.00 R&B
C C I cover 500mmx700mm (25 kg) Each 1568.00 R&B
D C I cover 600mmx850mm (65 kg) Each 5060.00 R&B
153 C I cover manholes ( 38 kg) Each 7810.00 R&B
154 Diesel lit 54.07 R&B

155 Premoulded bitumineous joint filler


A 12 mm size Sqm 761.00 R&B
B 20 mm size / 18 mm size Sqm 840.00 R&B
C 25 mm size Sqm 1103.00 R&B
156 Soft brush Each 42.00 R&B
157 Thick wire brush Each 76.00 R&B
158 - A Hectometer stone as per type design Each 126.00 R&B
159 - B Ordinary K M stone (for N H S H & MDR) Each 473.00 R&B
160 - A Ordinary K M Stone for ODR & VR) Each 420.00 R&B
161 - A 5 th KM stone as per IRC type design Each 788.00 R&B
162 - A Indicator stone as per IRC type design Each 116.00 R&B
163 M S Road sign board/ Village Name Board
A Non reflective type Each 1854.00 R&B
B Reflective type Each 3267.00 R&B
164 M S village name board or junction board Each 3713.00 R&B
165 Marble year plate ( 20x15x2.50 cm) Each 215.00 R&B
166 Marble number plate Each 215.00 R&B
167 I.S. class NP2 RCC heavy duty Non
pressure pipe
A 300 mm dia m 363.00 R&B
B 450 mm dia m 660.00 R&B
C 600 mm dia m 880.00 R&B
D 750 mm dia / 800 mm dia m 1320.00 R&B
E 900 mm dia m 1650.00 R&B
F 1000 mm dia m 1870.00 R&B
G 1200 mm dia m 2090.00 R&B
168 I.S. class NP3 RCC heavy duty Non
pressure pipe
A 300 mm dia m 413.00 R&B
B 450 mm dia m 798.00 R&B
C 600 mm dia m 1265.00 R&B
D 800 mm dia m 1898.00 R&B
E 900 mm dia m 2420.00 R&B
F 1100 mm dia m 3630.00 R&B
G 1200 mm dia m 4180.00 R&B
169 P V C Pipes
A 20 mm dia ( 10 kg/Sqcm) m 30.00 R&B
B 25 mm dia ( 10 kg/Sqcm) m 44.00 R&B
C 32 mm dia ( 10 kg/Sqcm) m 55.00 R&B
D 40 mm dia ( 10 kg/Sqcm) m 82.00 R&B
E 50 mm dia ( 10 kg/Sqcm) m 124.00 R&B
F 75 mm dia ( 10 kg/Sqcm) m 222.00 R&B
G 110 mm dia ( 10 kg/Sqcm) m 380.00 R&B
170 P V C Pipes
D 40 mm dia ( 6 kg/Sqcm) m 55.00 R&B
E 50 mm dia ( 6 kg/Sqcm) m 80.00 R&B
F 75 mm dia ( 6 kg/Sqcm) m 152.00 R&B
G 110 mm dia ( 6 kg/Sqcm) m 288.00 R&B
171 Galvanised mild steel tubes
A 15 mm dia "B" class m 110.00 R&B
B 20 mm dia "B" class m 143.00 R&B
C 25 mm dia "B" class m 204.00 R&B
D 32 mm dia "B" class m 258.00 R&B
E 40 mm dia "B" class m 314.00 R&B
F 50 mm dia "B" class m 411.00 R&B
G 65 mm dia "B" class m 514.00 R&B
H 80 mm dia "B" class m 664.00 R&B
172 Welding charges cm 7.00 R&B
173 Grinding, polisjhing, rounding of edges of m 25.00 R&B
glass /of glazing sheet
174 Limpet washer 100 Nos 41.00 R&B
175 North light adjustable ridge pair 112.00 R&B
176 Asbestos rope m 10.00 R&B
177 Rajula stone I size to be measured) each 91.00 R&B
178 Bilimora bricks 1000 Nos 4280.00 R&B
179 GIMS tee 65mmx65mm each 316.00 R&B
180 GIMS nut 5mm thick 80mm dia each 75.00 R&B
181 C.I. Spigot & Socket soil pipe
A 75 mm dia No 1348.00 R&B
B 100 mm dia No 1623.00 R&B
182 C I cowel
A 75 mm dia No 341.00 R&B
B 100 mm dia No 473.00 R&B
183 Waste pipe for wash basin C I
A 32 mm dia No 73.00 R&B
B 40 mm dia No 96.00 R&B
184 M I fisher union
A 32 mm dia No 88.00 R&B
B 40 mm dia No 99.00 R&B
185 C P brass screw and washers 25 m size No 20.00 R&B
186 Spun yarn kg 57.00 R&B
187 GSW junction
A 100 mm dia No 75.00 R&B
B 150 mm dia No 139.00 R&B
188 C I gratting 100mmx100mm No 80.00 R&B
189 C I cap grill as per standard design No 61.00 R&B
190 Gauge plate Qtl 5500.00 R&B
191 Hire charges for
A Roller Hr 770.00 R&B
B Boiler Hr 165.00 R&B
C Bituminous mixer Hr 220.00 R&B
192 Labour charges for hot mix plant MT 468.00 R&B
193 Guard stone No 43.00 R&B
194 Boundary stone No 43.00 R&B
195 Junction board RCC No 749.00 R&B
196 Painting charges ( Board) No 54.00 R&B
197 Painting charges ( letter) No 6.00 R&B
198 Red flag No 19.00 R&B
199 - A Asphalt Grade 80/100 ( bulk) MT 44005.00 R&B
B Asphalt Grade 80/100 ( packed) MT 47505.00 R&B
C Asphalt Grade 60/70 ( bulk) MT 44966.00 R&B
D Asphalt Grade 60/70( packed) MT 48466.00 R&B
E Asphalt CRMB 50 ( bulk) MT 48775.00 R&B
F Asphalt CRMB 55 Bulk MT 49644.00 R&B
200 Binding wires kg 55.00 R&B
201 Cast steel rocker bearing MT 69300.00 R&B
202 Cast steel roller rocker bearing MT 69300.00 R&B
203 Cement bags ( empty) Each 3.30 R&B
204 High tensile steel wire MT 78430.00 R&B
205 M S fixed plate bearing MT 60500.00 R&B
206 M S rocker bearing MT 60500.00 R&B
207 M S roller bearing MT 60500.00 R&B
208 Neoprene bearing Cu cm 1.21 R&B
(480mmx310mmx48mm)
209 Oil of 30 number / Mobile Oil lit 215.00 R&B
210 Petrol lit 71.89 R&B
211 Granite slab ( 18 mm thick) One side Sqm 1870.00 R&B
polished
212 - A Vitrified granite tiles 8 mm to 10 mm thick Sqm 430.00 R&B
600 X 600 mm size LIGHT SHED
213 Ceramics tiles Sqm 360.00 R&B
Quarry Materials
214 Fine sand Cum 210.00 R&B
215 Coarse sand Cum 230.00 R&B
216 Hand broken aggregates
i 90 mm to 25 mm size Cum 230.00 R&B
ii 63mm to 40mm Cum 270.00 R&B
217 Crushed stone aggregates of hard quality
i 40 mm to 63 mm size Cum 390.00 R&B
ii 40 mm size Cum 425.00 R&B
iii 20 mm size Cum 550.00 R&B
iv 10 mm size Cum 520.00 R&B
v 10 mm to 20 mm size Cum 440.00 R&B
vi 6 mm to 10 mm size Cum 365.00 R&B
218 Brick aggregates/bats
i 40 mm size Cum 180.00 R&B
ii 20 mm size Cum 180.00 R&B
219 Bricks
i Convensional size 1000 Nos 4200.00 R&B
ii Modular size ( 20cmx20cmx10cm) 1000 Nos 4400.00 R&B
220 Rubble Cum 185.00 R&B
221 Rubble heavy ( weight not less than 40 kgs) Cum 195.00 R&B

222 Quarry spaull Cum 120.00 R&B


223 White bela stone ( size 23 cm measured) 100 Nos 3300.00 R&B
224 Screened rounded gravel
i 10 mm size Cum 210.00 R&B
ii 12 mm size Cum 210.00 R&B
225 Murrum binding material Cum 85.00 R&B
226 Unscreened gravel Cum 180.00 R&B
227 Hard murrum Cum 120.00 R&B
228 Stone dust Cum 150.00 R&B
229 Fly Ash brick (i) Convensional size ) 1000 Nos 5000.00 R&B

FROM SSNNL FOR CANALS


231 Anchor bolt Kg 75.00 SSNNL
232 Gravel Double screennned. Cum 210.00 SSNNL
233 Crude oil lit 26.00 SSNNL
234 150mm dia G.I. PIPE Gr.I Blue strip m 1154.00 SSNNL
235 100mm dia G.I. PIPE Gr.I Blue strip m 723.00 SSNNL
236 38 mm G.I. Pipe m 314.00 R&B
237 150 mm C.I. Pipe m 1292.00 SSNNL
238 SWG PIPE 200 MM DIA m 265.00 SSNNL
239 SWG PIPE 250 MM DIA m 315.00 SSNNL
240 Red oxide lit 100.00 SSNNL
241 Asphalt filler joint 20 mm m 6.70 SSNNL
242 225 mm PVC water stop m 263.00 SSNNL
243 300 mm PVC water stop m 368.00 SSNNL
244 Long. PVC STRIP m 34.70 SSNNL
245 Transverse PVC STRIP m 31.50 SSNNL
246 12 mm thick PVC sheet Sqm 3906.30 SSNNL
247 Pidilite Ps 41 Kg 465.00 SSNNL
248 Polysulphide sealent m 157.50 SSNNL
249 Bitumen paper Sqm 6.20 SSNNL
250 Tar paper Sqm 6.20 SSNNL
251 Polythelene film 100 micron Kg 131.25 SSNNL
252 PRV 50 mm dia No 189.20 SSNNL
253 PRV 150 mm dia No 461.20 SSNNL
254
255
256 Geletine Kg 60.00 R&B
257 Elec. Detonator No 11.00 SSNNL
258 Km stone 45 x 30 x 90 cm No 420.00 R&B
259 Radium paint lit 645.90 SSNNL
260 Welding rods No 15.50 SSNNL
Guage plate 5 mm thick
261 10 cm wide No 134.30 SSNNL
262 15 cm wide No 232.50 SSNNL
263 25 cm wide No 310.00 SSNNL
264 225 mm dia NP-2 Class Pipes m 246.10 SSNNL
NP-4,IRS PIPE
265 300MM m 520.00 R&B
266 450MM m 920.00 R&B
267 600MM m 1650.00 R&B
268 900MM m 3200.00 R&B
269 1000MM m 4000.00 R&B
270 1200MM m 5600.00 R&B
271 1400MM m 7750.00 R&B
272 Empty Jute bag ( 100 kg ) No. 9.00 SSNNL
273 Anchore Bolts for joist No. 2.50 SSNNL
274 Curing compound lit 31.00 SSNNL
275 Core box No 826.70 SSNNL
276 Pedestal ( 15 kg) No 430.00 SSNNL
277 Steel Assembly kg 52.90 R&B
278 Header No. 190.00 SSNNL*
279 PVC Tank 500 Lit. No. 1440.00 SSNNL
280 PVC Tank 1000 Lit. No. 2880.00 SSNNL
281 PVC Tank 1500 Lit. No. 4320.00 SSNNL
282 No.
283 No.
284 Marble Plate 30 x 30 cm No. 645.00 SSNNL
285 Marble Plate 45 x 45 cm No. 1505.00 SSNNL
286 Alluminium Decorative Rail ( With Ends) m 144.00 SSNNL
287 -- // -- ( Without Ends) m 115.00 SSNNL
288 Fuse coil m 3.25 Market
289 C.C. Pole No 100.00 SSNNL
290 Wire Net 10 Gauge ( 10 x 10 cm) Sqm 33.00 SSNNL
Gauge Plate ( Fibre Glass)
291 10 cm Rmt. 4236.00 Market
292 15 cm Rmt. 5190.00 Market
293 20 cm Rmt. 6146.00 Market
294 30 cm Rmt. 8055.00 Market
295 45 cm Rmt. 13251.00 Market
296 60 cm Rmt. 16116.00 Market
297 100 cm Rmt. 23754.00 Market
298 Grease kg 205.00 Market
299 Detonator ( Ordinary) No 51.00 Market
300 35 mm dia bit No 2500.00 SSNNL
301 75 mm dia bit No 4400.00 SSNNL
302 Bit (Toungoton Carbide Diamond 75 mm SSNNL
dia) No 6000.00
303 Core barrel Single No 1075.00 SSNNL
304 Core barrel Double No 1840.00 SSNNL
305 Casing pipe 100 mm, m 225.00 SSNNL
306 Upheaval Gauge No 2500.00 SSNNL
307 AEA ( Air Entering Agent) kg 31.00 SSNNL
308 Black Steel pipe with coupling- 75 mm dia. m 302.00 SSNNL
309 Black Steel pipe with coupling-100 mm dia. SSNNL
m 456.00
310 Counter Sunk Pluge No. 63.00 SSNNL
311 G.I.Tee ( 50-80 mm) No 130.00 SSNNL
312 Lead wool kg 44.00 SSNNL
313 G.I. Nipple 12 mm Dia).0.30 m long. No 30.00 SSNNL
314 Khanki ( 30 x 45 x 45 ) cm. No 192.00 SSNNL
315 Copper Sealing Strip No 152.00 SSNNL
316 Steam pipe (18 mm dia) kg 88.00 SSNNL
317 PVC Sealing Strip kg 46.00 SSNNL
318 Screw Bolt 18 mm diameter kg 63.00 SSNNL
319 20 mm premoulded Asphalt joint Sqm 440.00 SSNNL
320 Bitumen Sheet 12 mm Sqm 264.00 SSNNL
321 C. I. Pipe ( 45 cm long) One end 10 cm dia , SSNNL
another 15 cm dia ( Bell mouth) No. 780.00
322 C. I. Pipe ( 15 cm ) No. 517.00 SSNNL
323 Iron Grilling No. 25.00 SSNNL
324 Coupling 40 mm diameter No. 25.00 SSNNL
325 Coupling 100 mm diameter No. 50.00 SSNNL
Half round pipe
326 20 cm diameter m 81.00 SSNNL
327 30 cm diameter m 88.00 SSNNL
Non Return Alluminium Flap valve.
328 5 cm Diameter No 114.00 SSNNL
329 10 cm Diameter No 132.00 SSNNL
330 30 cm Diameter No 290.00 SSNNL
331 C.I.Double flanged pipe 300 mm SSNNL
diameter m 930.00
332 C.I. Bell mouth 300 mm diameter No 385.00 SSNNL
333 C.I. Bend 300 mm diameter No 385.00 SSNNL
334 C.I. taper 300 mm diameter No 380.00 SSNNL
335 C.I.Double flahged non rising spindal type SSNNL
sluice valve incl thurst valve worm gear,
indicator etc. No 1450.00
336 C. I. Step ( 15 x 38 cm, 35 mm thick) kg 36.00 SSNNL
337 Rust remover Lit 467.00 SSNNL
338 Silver grey S.E. paint ( Double coat) Lit 157.00 SSNNL
339 Wire brush. ( 15 x 6 Row) No 42.00 SSNNL
340 Cotton waste kg 31.00 SSNNL
341 Emery paper No 5.00 SSNNL
342 Alluminium paint lit 253.00 SSNNL
343 Resin kg 539.00 SSNNL
344 Hardner kg 511.00 SSNNL
345 Flow control agent kg 37.00 SSNNL
346 Quarts Sand kg 0.35 SSNNL

FOR CANAL GATES


347 Cast Iron ( I.S. 210 ) kg 57.00 SSNNL
348 Stainless steel ( I.S.: 1570 part-V) kg 228.00 Mech.
349 Bronze I.S.: 306 kg 380.00 SSNNL
350 Bronze I.S.: 318 kg 350.00 SSNNL
351 Rubber seals Flat 55 x 12 mm m 102.00 SSNNL
352 Rubber seals Flat 48 x 12 mm m 102.00 SSNNL
353 Welding Rods S.S. No 25.00 Mech.
354 Welding Rods M.S. No 5.00 Mech.
355 S.S. Screw No 21.00 SSNNL
356 Carbon steel ( I.S. : 1570 ) C-30 kg 48.00 SSNNL
357 Carbon steel ( I.S. : 1570 ) C-50 kg 50.00 SSNNL
358 Spherical roller thurst bearing- 29328 b No 32340.00 SSNNL
359 29324 b No 27500.00 SSNNL
360 51216 No 2833.00 SSNNL
361 Taper roller bearing 30210 No 1045.00 SSNNL
362 30209 No 363.00 SSNNL
363 30208 No 495.00 SSNNL
364 Lubricating sump gasket etc complete 506.00 SSNNL
365 Electric Motor 1 HP 200 RPM No 13860.00 SSNNL
366 1.5 HP 147 RPM No 14520.00 SSNNL
367 1.5 HP 200 RPM No 14520.00 SSNNL
368 2 HP 200 RPM No 15180.00 SSNNL
369 2 HP 228RPM No 15180.00 SSNNL
370 3 HP 228RPM No 21648.00 SSNNL
371 Electromagnetic brake > 3 MT Capacity No 3520.00 SSNNL
372 Electromagnetic brake < 3 MT Capacity No 3157.00 SSNNL
373 Manual drive mechaniisum No 12375.00 SSNNL
374 Cables for gate operation m 165.00 SSNNL
375 Contrrol cabinet and power panel No 56925.00 SSNNL
376 Fabrication charges including testing and SSNNL
painting MT 11000.00
377 Machining charges kg 10.50 Mech.
378 Second stage concreting M-20 grade. Cum SSNNL
379 Tranpotation of all components upto SSNNL
erection site. MT 215.00
380 Erection of gate and embeded parts of SSNNL
vertical gate. > 2MT (Rs. 4800) MT 4500.00
381 --- // ---- < 2MT ( Rs. 5300) MT 7600.00 SSNNL
CHECKDAM & MISC, S&I.
382 Wooden Peg No. 2.75 SSNNL
383 PVC wire mesh Sqm 23.00 Market
Cut throat device
384 0.5 Cusec Sec. 10 cm x 90 cm No 5020.00 Market
385 1.0 Cusec Sec. 20 cm x 90 cm No 11573.00 Market
386 2.0 Cusec Sec. 20 cm x 90 cm No 12650.00 Market
387 3.0 Cusec Sec. 20 cm x 90 cm No 13700.00 Market
388 4.0 Cusec Sec. 20 cm x 90 cm No 15005.00 Market
389 5 Cusec Sec. 40 cm x 180 cm No 37666.00 Market
390 6 Cusec Sec. 40 cm x 180 cm No 39955.00 Market
391 8 Cusec Sec. 40 cm x 180 cm No 42237.00 Market
392 10 Cusec Sec. 40 cm x 180 cm No 44527.00 Market
393 12 Cusec Sec. 40 cm x 180 cm No 46818.00 Market
394 15 Cusec Sec. 40 cm x 180 cm No 51792.00 Market
395 18 Cusec Sec. 40 cm x 180 cm No 53692.00 Market
396 20 Cusec Sec. 40 cm x 180 cm No 55982.00 Market
397 25Cusec Sec. 100 cm x 270 cm No 92542.00 Market
398 30 Cusec Sec. 100 cm x 270 cm No 95907.00 Market
399 35 Cusec Sec. 100 cm x 270 cm No 102645.00 Market
400 40 Cusec Sec. 100 cm x 270 cm No 109373.00 Market
401 50 Cusec Sec. 100 cm x 270 cm No 116114.00 Market
402 60 Cusec Sec. 100 cm x 270 cm No 126216.00 Market
403 70 Cusec Sec. 100 cm x 270 cm No 132858.00 Market
404 80 Cusec Sec. 100 cm x 270 cm No 143049.00 Market
Flume device
405 100 Cusecs (2.40 M throat width) No 346308.00 Market
406 150 Cusecs(2.40 M throat width) No 369058.00 Market
407 200 Cusecs(3.05M throat width) No 662915.00 Market
408 250 Cusecs(3.05 M throat width) No 679801.00 Market
409 300 Cusecs(3.66 M throat width) No 696065.00 Market
410 400 Cusecs(3.66M throat width) No 736700.00 Market
411 500 Cusecs(3.66 M throat width) No 1217136.00 Market
412 750 Cusecs(4.07 M throat width) No 1298741.00 Market
413 1000 Cusecs(6.10 M throat width) No 1376387.00 Market
414 1250 Cusecs(6.10 M throat width) No 1429880.00 Market
415 1500 Cusecs(7.62M throat width) No 1495194.00 Market
DAMs ( Concrete & Masonry)
416 Casing Pipe m 225.00 Market
417 Upheavial Gauge No. 2500.00 Market
418 Bitumen Kg. 40.00 Market
419 Anchor Bolt for joist No. 2.50 Market
420 Painting Brush No. 66.00 Market

Below mentioned rates are for the Items as per Column No.4
No. Particular Unit Year : 2012-13

1 2 3 4
Through & bond stone No
Boundary stone No 43.00 SSNL
Guard stone 20x20x75 No 43.00 SSNL
Lime KG 4.20 SSNL
Radium paint Lit 645.90 SSNL
Red oxide Lit 100.00 SSNL
Sign board with angles No 1700.00 SSNL
Geletine KG 60.00 SSNL
Elec. Detonator No. 11.00 SSNL
Km stone 45x 30x 90 cm No. 420.00 SSNL
Kerosene S81 Per liter 45.00 Market
Nut Kg 75.00 G 16A & B
Housing assembly No. 125.00 G 16A & B
Bearing No. 630.00 G 17A
Bearing No. 810.00 G 17B
75 cm 4 inch MS pipe (out let) No. 300.00 G12
Flanges No. 198.00 G12
19-B C.R.C.Sheet Qtl. 6200.00 R&B
22 - A Glass 2mm to 3mm thick Sqm. 170.00 R&B
30 - B Plain Asbestos sheet 6 mm thick Sqm 210.00 R&B
30 - C Plain Asbestos sheet 7 mm thick Sqm 221.00 R&B
126 - B Pillar tap 20 mm dia No. 418.00 R&B
127 - B Brass stop cocl 20 mm dia No. 264.00 R&B
158 - B Hectometer precast R.C.C.stone as per Each 315.00 R&B
type design
160 - B Ordinary K M precast R.C.C.stone (for N H Each 840.00 R&B
S H & MDR)
159 - B Ordinary K M precast R.C.C.Stone for ODR Each 735.00 R&B
& VR)
161 - B 5 th KM precast R.C.C.stone as per IRC Each 1260.00 R&B
type design
162 - B Indicator stone as per RCC type design Each 315.00 R&B
167 I.S. class NP2 RCC heavy duty Non Each 770.00 R&B
pressure pipe - 500 mm dia
167 - F1 I.S. class NP2 RCC heavy duty Non Each 2200.00 R&B
pressure pipe - 1100 mm dia
I.S. class NP3 RCC heavy duty Non
168 pressure pipe
H 1400 mm dia m 5830.00 R&B
I 1600 mm dia m 7700.00 R&B
J 1800 mm dia m 9900.00 R&B
170 P V C Pipes
A 20 mm dia ( 6 kg/Sqcm) m 28.00 R&B
B 25 mm dia ( 6 kg/Sqcm) m 42.00 R&B
C 32 mm dia ( 6 kg/Sqcm) m 52.00 R&B
199 Asphalt
G CRMB 60 bulk tonne 43041.00 R&B
212 - B Vitrified granite tiles 8 mm to 10 mm thick Sqm 538.00 R&B
600 X 600 mm size DARK SHED
212 -C Vitrified granite tiles 8 mm to 10 mm thick Sqm 990.00 R&B
36'' X 36'' size
214 Alluminium section any size Plain Kg 200.00 R&B
215 A Powder coating to Alluminium secton Kg 35.00 R&B
215 B Anodised to Alluminium section Kg 50.00 R&B
216 Rubber Gasket for glass beading Rmt 10.00 R&B
217 TMT Bar FE 500 D Quintal 5200.00 R&B
218 Weather Proof acrylic exterior emulsion Ltr 230.00 R&B
paint
219 A R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 520.00 R&B
Class NP=4 300 mm dia .
219 B R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 920.00 R&B
Class NP=4 450 mm dia .
219 C R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 1650.00 R&B
Class NP=4 600 mm dia .
219 D R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 3200.00 R&B
Class NP=4 900 mm dia .
219 E R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 4000.00 R&B
Class NP=4 1000 mm dia .
219 F R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 5600.00 R&B
Class NP=4 1200 mm dia .
219 G R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 7750.00 R&B
Class NP=4 1400 mm dia .
219 H R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 10200.00 R&B
Class NP=4 1600 mm dia .
219 I R.C.C. Heavy Duty Non pressure Pipe I.S. Meter 12700.00 R&B
Class NP=4 1800 mm dia .
220 A Glass bricks 19 x 19 x 10 CM NO 115.00 R&B
220 B Glass bricks 19 x 19 x 8CM NO 110.00 R&B
221 Floor spring heavy duty No 2500.00 R&B
222 A S.S. Stopper 60 cm long of ASIS 304 No 500.00 R&B
222 B S.S. Stopper 30 cm long of ASIS 304 Grade No 250.00 R&B

222 C S.S. Stopper 20 cm long of ASIS 304 Grade No 175.00 R&B

223 A S.S. Aldrop 20 cm long of ASIS 304 Grade No 300.00 R&B


223 B S.S. Alldrop 25 cm long of ASIS 304 Grade No 450.00 R&B
223 C S.S. Aldrop 30 cm long of ASIS 304 Grade No 550.00 R&B
224 A S.S. Handle for Door 10 Cm size of ASIS No 75.00 R&B
304 Grade
224 B S.S. Handle for Door 15 Cm size of ASIS No 105.00 R&B
304 Grade
224 C S.S. Pipe Handle for Door 15 cm size of No 1200.00 R&B
ASIS 304 Grade
225 A S.S. Railling Sq. pipe 50 mm x 16 G ASIS Rmt. 1394.00 R&B
304 Grade
225 B S.S. Railling Sq. pipe 32x32mm x 16G ASIS Rmt. 630.00 R&B
304 Grade
225 C S.S. Railling Sq. pipe 16x16 G mm x 16G Rmt. 508.00 R&B
ASIS 304 Grade
226 C.P. Pillar cock 15 mm O Heavy duty swan NO 890.00 R&B
neck
227 C.P. Angle stop cock 15 mm O Heavy duty No 560.00 R&B
with cap
228 C.P. Bib cock 15 mm O Heavy duty with cap No 550.00 R&B
229 Concealed cock 15 mm O Heavy duty with No 675.00 R&B
cap
230A Glass 12mm thick Sqmtr 1130.00 R&B
230 B Glass 10 mm thick Sqmtr 965.00 R&B
230 C Glass 8 mm thick Sqmtr 750.00 R&B
231 A Labour Charges Half round edge for Granite Rmt. 100.00 R&B

231 B Labour Charges Quarter round edge for Rmt. 60.00 R&B
Granite
231 C Labour charges edge finished for Granite Rmt. 50.00 R&B
231 D Labour Charges Half round edge for Rmt. 60.00 R&B
Kota/Marble round edge for Kota/Marble
231 E Labour Charges quarter round edge for Rmt. 40.00 R&B
Kota/Marble
232 A S.S. Sink Glosy ASIS 304 Grade x 1 mm NO 2600.00 R&B
thick with over all size 610 x 560 mm &
bowl size 560 x 410 x 200
232 B S.S. Sink Glosy ASIS 304 Grade x 1 mm NO 1800.00 R&B
thick with over all size 510 x 432 mm & bowl
size 445 x 368 x 190
232 C S.S. Sink Glosy ASIS 304 Grade x 1 mm NO 1550.00 R&B
thick with over all size 485x 410 mm & bowl
size 410 x 365 x 165
233 A Alluminium Composite pannel 3 mm thick Sqmtr 900.00 R&B
233 B Alluminium Composite pannel 4 mm thick Sqmtr 1000.00 R&B
234 Multy wall plycarbonate sheet 6 mm thick Sqmtr 1080.00 R&B
235 A S.S. Door /window Hinghes 4"x1"x1" NO 75.00 R&B
235 B S.S. Door /window Hinghes 3"x3/4"x3/4" NO 30.00 R&B
235 C S.S. Door /window Hinghes 3"x3/4"x3/4" NO 25.00 R&B
236 Jet Spray heavy duty with S.S. Braided hos NO 425.00 R&B
60 cm long
237 Health Fauset Heavy duty with hook with No 800.00 R&B
fitting.
S. O. R. : 2013-14
DISTRICT :- VADODARA
DATA INPUT -B
Sr.No Category of labour Unit Total Rate Reference of
source
Rs./ Day

1 Mazoor ( Male) Each 194.50 R&B


2 Mazoor ( Female) Each 194.50 R&B
3 Bhistie Each 196.30 R&B
4 Mate Each 194.50 R&B
5 Excavator Each 194.50 R&B
6 Breaker Each 194.50 R&B
7 Hole driller Each 194.50 R&B
8 Bullock with driver for mortar mill Each 207.80 R&B
9 Chowkidar Each 194.50 R&B
10 Mason ( 1 st class) Each 207.80 R&B
11 Mason ( 2 nd class) Each 199.90 R&B
12 Bandhani Each 194.50 R&B
13 Carpenter (1 st class) Each 207.80 R&B
14 Carpenter (2 nd class) Each 199.90 R&B
15 Mistry Each 196.30 R&B
16 Blacksmith (1 st class) Each 207.80 R&B
17 Blacksmith (2 nd class) Each 199.90 R&B
18 Welder Each 196.30 R&B
19 Fitter Each 196.30 R&B
20 Glassier Each 199.90 R&B
21 Painter Each 199.90 R&B
22 White washer Each 196.30 R&B
23 Polisher Each 196.30 R&B
24 Plumber Each 207.80 R&B
25 Plumber/Fitter Asstt. Each 199.90 R&B
26 Sprayman Each 199.90 R&B
27 Hand cart with mazdoor Each 309.40 R&B
28 Crane man with Helper Each 347.00 R&B
29 Extra labour for sinking and chiselling Each 1259.40 R&B
30 Supervisor for machinery Each 207.80 R&B
31 Winch Operator Each 199.90 R&B
32 Compressor Operator Each 207.80 R&B
33 ELECTRICIAN Each 199.90 SSNNL

34 KARKOON Each 196.30 SSNNL

35 Sawer Each 196.30 SSNNL

36 Rock cutter Each 196.30 SSNNL

37 Helper Each 194.50 SSNNL

38 Tapkar Each 196.30 MIC


39 Khalasi Each 194.50 R&B
Note: 1. The above basic rate for skilled and unskilled labour ate adopted as Notification of Labour an
Employment Departmentdate 11/02/2009 Labour Commissioner letter dated 26/09/12 for increas
in DA.
2 Zone - II shall comprise all the areas in the state of Gujarat other than the limits of Municipal
Corporation.
S. O. R. : 2013-14
DISTRICT :-VADODARA
DATA INPUT : C
C - MACHINERY
Sr.No Name of machinery Unit Rate in Reference of
Rs./unit source
1 2 3 4 5
1 Hydraulic Excavator Ex-200 LC Hour Annexure-1 SSNNL
96 HP/115 HP/120 HP 2510.00
2 Excavator - 275 HP Mech
3 Excavator - 210 HP Mech
4 TIPPER / DUMPER / WATER Hour Annexure-2 SSNNL
TANKER 1070.00
5 Dumper 180 HP / 210 HP Hour 1708.00 Mech
6 Dumper 280 HP Hour 1307.00 Mech
7 Dumper 320 HP Hour Mech
8 Dumper 380 HP / 400 HP Hour Mech
9 Tripper 90 HP Hour Mech
10 DOZER Hour 5680.00 Annexure-3 SSNNL
11 DOZER 165 HP Hour 2415.00 Mech
12 DOZER 180 HP Hour Mech
13 DOZER 300 HP Hour Mech
14 DOZER 410 HP Hour 5161.00 Mech
15 AIR COMPRESSOR Hour 600.00 Annexure-4 SSNNL
16 JACK HAMMER with Hour Annexure-5 SSNNL
compressure 880.00
17 Jack hammer with compressure Hour 880.00 Mech
18 VIBRATORY COMPACTOR Hour Annexure-6 SSNNL
( ROLLER) 1890.00
19 JCB-4CX Hour 1450.00 Annexure-7 SSNNL
20 TRACTOR WITH TRAILOR Hour 440.00 Annexure-8 SSNNL
21 OIL ENGINE Hour 220.00 Annexure-9 SSNNL
22 Cost of Hiring and running Hour Annexure-10 SSNNL
charges of way bacning &
transportation 467.00
23 LOADER Hour 1020.00 Annexure-11 SSNNL
24 LOADER - 208 / 275 HP Hour Mech
25 LOADER - 388 HP Hour Mech
26 DRAGLINE 140 hp / 125 hp Hour Mech
27 SHAVEL / DRAGLINE 230 hp Hour Mech
28 DRAGLINE 320 hp Hour Mech
29 WEIGH BATCHING AND MIXING Hour Annexure-12 SSNNL
PLANT 2040.00
30 DIESEL GENERATING SET Hour 1410.00 Annexure-13 SSNNL
31 TRANSIT MIXER Hour 1620.00 Annexure-14 SSNNL
32 PAVER Hour 2080.00 Annexure-15 SSNNL
33 Vibrator Hour 100.00 Annexure-17 SSNNL
34 Scrapper 425 Hp Hour Mech
35 Sheep foot Rollar Hour. Market
36 Water Pump (10 H.P.) Hour. 160.00 SSNNL.
37 Water Pump HP/Hour. Market
38 Wagon drilling Machine Hour. Market
39 Groutting Pump Hour. Market
40 Gunniting Machine Hour. Market
41 Concrete Mixture Machine Hour. Market
42 Cost of Hiring and running cum 100.60 Annexure-18
charges of Weigh batching &
mixing
43 Truck Hour. 412.50 R&B
44 Truck - 33 TON Hour SSNNL
45 PCR for Rolling Hour SSNNL
46 Truck Hour. 412.50 R&B
47 Bharat 80 D Tractor Hour. Mech
dozer 180 na badle 192 hp che.
dozer 300 na badle 310 hp che.

same sentence to check


S. O. R. : 2013-14
DISTRICT :- VADODARA
DATA INPUT :D
D - LUMPSUM PROVISIONS
No. Particular Unit Material Rate Reference
of source
Rs. Unit
1 2 3 4 5 6
1 Hire charges for truck w/o diesel 3300.00 day R&B
10 mm dia bolts for Metal expansion joint
2 34.10 For fixing 1m lengh SSNNL
3 Welding hold fast with MS plate( labour) 51.15 For fixing 1m lengh SSNNL
4 Fixing in position expansion joint (labour) 18.15 For fixing 1m lengh SSNNL
5 Non corroding jali 17.05 For 100 mm AC pipe weep hole
6 Marble plate fixing charges 45.43 for 1 marble plate SSNNL
7 Lettering Charges 102.30 for 1 marble plate SSNNL
8 MS grill erection and painting 1395.10 MT SSNNL
9 GI pipe iron gratting and hold fast. 45.10 For one water spout
10 Scaffolding for plaster 140.00 For 100 m2 pointing
11 Carting of Stoneware pipes 1.73 Per No. SSNNL
12 Diesel pump set 10 hp 160.00 Hp/hr SSNNL
13 Membrane curing 826.70 100m2 SSNNL
14 Mech.Mixure 130.00 per Cum SSNNL
15 gunny cloth 7.20 for 10m2 asphalt painting
16 Scaffolding 41.30 For one Cum masonry
17 Heating charges for asphalt 258.40 MT SSNNL
18 Water charge to fill in tanker 300.00 10000 ltr SSNNL
19 Charges of road roller 3900.00 per day SSNNL
20 Charges of crane 35.00 Cum of conct SSNNL
21 Fabrication charges for pipe railing 3.85 Kg SSNNL
22 Fabrication and fixing charges for str. Steel 7.70 Kg SSNNL
Lumpsum charges for hot mix plant, paver,
23 roller, dumper 465.00 Per MT SSNNL
Cost of pipe line or Utilising water 100 m
away from the line and its instalation its
maintenance labour cost for 10 Hp./Hr.
( Rs. 86/- per day 0f 8 hours)
24 10.75 Per Hour SSNNL
25 Nut-Bolt 75.00 SSNNL
26 Welding Rod (Check dam) X SSNNL
27 Water charges for 1 HP pump 0.00 SSNNL
for 225 mm dia for 8 hour.. 230.00 SSNNL
for 300 mm dia for 8 hour.. 287.50 SSNNL
for 450 mm dia for 8 hour.. 402.50 SSNNL
28 Welding , hold fast 57.50 SSNNL
29 Asphalt filler joint 20 mm deep 34.50 SSNNL
30 Labour for fixing expansion joint 69.00 SSNNL
31 Cement for fixing 13.80 SSNNL
32 Hire charges for machine boat 287.50 Hour SSNNL
33 Hire charges for manual boat 57.50 Hour SSNNL
34 Bolt 92.00 SSNNL
35 Labour charges for steel gate 2530.00 SSNNL
36 G. I. Staple or binding wire 57.50 SSNNL
37 Cement for anchor bar 23.00 SSNNL
38 Drilling charge for anchore bar 34.50 SSNNL
39 Welding Charges 23.00 SSNNL
40 Centering / Shutering Struting / Scaffolding 230.00 SSNNL
41 Hire charge of vibrator 23.00
CHECKDAM & MISC, S&I.
Carriage ( LS )
41 Through stone 5.75 No (L.S.)
42 Pedastal (15 Kg) 5.75 No (L.S.)
43 Nut Bolt (Check Dam) 2.30 (L.S.)
44 Welding Rod (Check Dam) 5.75 (L.S.)
45 Curing Compound 1.15 (L.S.)
46 Core box 115.00 (L.S.)
47 Stone (25 x 15 x 17.5) 5.75 (L.S.)
48 Carriage of m/c. Boat 230.00 Hr. (L.S.)
49 Carriage of Manual Boat 23.00 Hr. (L.S.)
50 PVC wire mesh 2.30 S.M.(L.S.)
51 75 mm 4 Inch M.S. Pipe with flanges 11.50 No (L.S.)
52 Aldrin emulsion 2.30 S.M.(L.S.)
53 Wire net 10 gauge (10 x 10 cm) 2.30 S.M.(L.S.)
54 Kerosene 1.15 (L.S.)
55 Oil 1.15 (L.S.)
56 Grease 1.15 (L.S.)
Labour Charges (L.S )

57 Water charges for 1 HP

58 Pump for 8 Hr (225 mm dia) 230.00 (L.S.)


59 Pump for 8 Hr (300 mm dia) 287.50 (L.S.)
60 Pump for 8 Hr (450 mm dia) 402.50 (L.S.)

Lumpsum Items (Masonry Dams)


61 Item No.22 Fixture (A.-3) 20.70 L.S.
62 Item No.23 Scaffolding 287.50 L.S.
63 Item No.24 (C) 287.50 L.S.
64 Item No.25 (C) 28.75 L.S.
65 Item No.26 (C) 28.75 L.S.
66 Item No.27 (C) 28.75 L.S.
67 Item No.28 (C) 3.45 L.S.
68 Item No.29 (C) 287.50 L.S.
69 Item No.30 (C) 28.75 L.S.
70 Item No.31 (C) 287.50 L.S.
71 Item No. 32 (2) (E) 1127.00 L.S.
72 Item No.32 ( 3 ) (E) 1150.00 L.S.
73 Item No.32 ( 4 ) (E) 1132.75 L.S.
74 Item No.32 ( 5 ) (E) 1282.25 L.S.
75 Item No.32 ( 6 ) (E) 1276.50 L.S.
76 Item No.32 ( 7 ) (E) 1380.00 L.S.
77 Item No.32 ( 8 ) (E) 1357.00 L.S.
78 Item No.32 ( 9 ) (E) 1380.00 L.S.
79 Item No.32 ( 10 ) (E) 1380.00 L.S.
80 Item No.32 ( 11 ) (E) 1380.00 L.S.
81 Item No.32 ( 12 ) (E) 1362.75 L.S.
82 Item No.32 ( 13 ) (E) 1483.50 L.S.
83 Item No.32 ( 14 ) (E) 1466.25 L.S.
84 Item No.32 ( 15 ) (E) 1454.75 L.S.
85 Item No.32 ( 16 ) (E) 1518.00 L.S.
86 Item No.32 ( 17 ) (E) 1569.75 L.S.
87 Item No.33 ( i ) (D) 1380.00 L.S.
88 Item No.33 ( ii ) (D) 1380.00 L.S.
89 Item No.34 (D) 1150.00 L.S.
90 Item No.35 (D) 86.25 L.S.
91 Item No.35 (E) 115.00 L.S.
92 Item No.36 (E) 126.50 L.S.
93 Item No.37 (A-4) 172.50 L.S.
94 Item No.37 (E) 345.00 L.S.
95 Item No.38 (C) 132.25 L.S.
96 Item No.39 (C) 132.25 L.S.
97 Item No.40 (A-4) 17.25 L.S.
98 Item No.40 (B) 172.50 L.S.
99 Item No.40 (c) 17.25 L.S.
100 Item No.43 (B-1) 201.25 L.S.
101 Item No.43 (B-2) 80.50 L.S.
102 Item No.43 (C) 34.50 L.S.
103 Item No.45 (A-2) 5.75 L.S.
104 Item No.45 (A-3) 17.25 L.S.
105 Item No.45 (C) 34.50 L.S.
106 Item No.46 (A-2) 5.75 L.S.
107 Item No.46 (A-3) 17.25 L.S.
108 Item No.46 (C) 34.50 L.S.
109 Item No.47 ( i ) (C) 40.25 L.S.
110 Item No.47 ( ii ) (C) 40.25 L.S.
111 Item No.48 (C) 0.00 L.S.
112 Item No.49 (C) 28.75 L.S.
113 Item No.50 (C) 0.00 L.S.
114 Item No.51 (i) (B) 28.75 L.S.
115 Item No.51 (i) (C) 11.50 L.S.
116 Item No.51 (ii) (B) 28.75 L.S.
117 Item No.51 (ii) (C) 11.50 L.S.
118 Item No.51 (iii) (B) 57.50 L.S.
119 Item No.51 (iii) (C) 11.50 L.S.
120 Item No.52 (B) 28.75 L.S.
121 Item No.52 (C) 11.50 L.S.
122 Item No.53 (B) 11.50 L.S.
123 Item No.53 (C) 11.50 L.S.
124 Item No.54 (C) 11.50 L.S.
125 Item No.55 (A-2) 1.15 L.S.
126 Item No.55 (C) 3.45 L.S.
127 Item No.56 (C) 920.00 L.S.
128 Item No.57 (C) 3825.00 L.S.
129 Item No.58 (A) 13.80 L.S.
130 Item No.58 (C) 3.45 L.S.
131 Item No.59 (C) 3.45 L.S.
132 Item No.59 (A) 13.80 L.S.
133 Item No.60 (C) 69.00 L.S.
Labour charges for casting including painting
134 3.45 Kg

Lumpsum Items (Canal)


Item No.G15 (A) lab charges for threading
1 500.00 L.S.
2 Item No.G15 (B) lab charges for threading 550.00 L.S.
3 Item No.G15 (C) lab charges for threading 600.00 L.S.
4 lab chrges for removing old parts rust and 100.00
fixing new rod incl cutting fixingloasding
unloading and carting at the site
L.S.
Item No.G15 (A) & (B)
Item No.G16 (A) & (B)
Item No.G17 (A) & (B)
5 Item No.S11 Steel unloading 30.00 L.S.
Centering and Scaffolding (for Item No.D) 2.00
6 L.S.
INPUT DATA SHEET

Sr. No. Item Rate Unit


A B C D 5
Cement 290.00 Bag 6
Sand 210.00 CM 7
Gravel 210.00 CM 8
Rubble 185.00 CM 9
Through stone 27.00 No 10
Metal (H.B.) (6-10 mm) 365.00 CM 11
Kapachi (upto 20 mm ) 550.00 CM 12
Metal (40 mm Nominal size) 425.00 CM 13

M.S. Steel 42000.00 MT 14


Cold twisted bars (HYSD) 44000.00 MT 15
TMT Bars FE-415 48000.00 MT 16
Binding Wire 55.00 Kg 17

Steel Assembly 52.90 Kg 18

Pedastal (15 Kg) 430.00 No 19


Nut Bolt 75.00 L.S. 20
Welding Rod X L.S. 21
Curing compund 31.00 Lit 22
Lime 4.20 Kg 23
Red flag 19.00 No 24
Wooden Pegs 2.75 No 25
Dressed Stone 14.00 No 26
Core box 826.70 No 27
Stone (25 x 15 x 17.5) 15.00 No 28
Gelatine 60.00 Kg 29
Detonator (Ord) 51.00 No 30
Detonator (Elect.) 11.00 No 31
Fuse Coil 3.25 No 32
M.S. Steel 52.90 Kg 33
G.I.Sheet (1 mm) 6700.00 Qtl 34
Brick 4200.00 Th.No 35
PVC Tank 500 lit. 1440.00 No 36
PVC Tank 1000 lit. 2880.00 No 37
PVC Tank 1500 lit. 4320.00 No 38
PVC Tank 2000 lit. 0.00 No 39
PVC Tank 5000 lit. 0.00 No 40
PVC wire mesh 23.00 S.M. 41
Oil Paint 210.00 Lit 42
Marbal Plate 30 x 30 645.00 No 43

26
Sr. No. Item Rate Unit
A B C D 5
Marbal Plate 45 x 45 1505.00 No 44
Barbed Wire 80.00 Kg 45
CC Pole 100.00 No 46
Structural steel 52900.00 MT 47
Alluminium Deco. Rail (With ends) 144.00 Rmt 48
Alluminium Deco. Rail (Without ends) 115.00 Rmt 49

Wire net 10 gauge (10 x 10 cm) 33.00 S.M. 50


Kerosene 45.00 Lit 51
Oil 215.00 Lit 52
Grease 205.00 Kg 53
Gauge plate (Fibre glass) 10 cm 4236.00 S.M. 54
15 cm 5190.00 S.M. 55
20 cm 6146.00 S.M. 56
30 cm 8055.00 S.M. 57
45 cm 13251.00 S.M. 58
60 cm 16116.00 S.M. 59
100 cm 23754.00 S.M. 60
Cement 5800.00 MT 61
Cut throat device 62
(a) 0.5 Cusec Sec. 10 cm x 90 cm 5020.00 No 63
(b) 1.0 Cusec Sec. 20 cm x 90 cm 11573.00 No 64
(c) 2.0 Cusec Sec. 20 cm x 90 cm 12650.00 No
(d) 3.0 Cusec Sec. 20 cm x 90 cm 13700.00 No
(e) 4.0 Cusec Sec. 20 cm x 90 cm 15005.00 No
(f) 5 Cusec Sec. 40 cm x 180 cm 37666.00 No 65
(g) 6 Cusec Sec. 40 cm x 180 cm 39955.00 No
(h) 8 Cusec Sec. 40 cm x 180 cm 42237.00 No
(i) 10 Cusec Sec. 40 cm x 180 cm 44527.00 No 66
(j) 12 Cusec Sec. 40 cm x 180 cm 46818.00 No
(k) 15 Cusec Sec. 40 cm x 180 cm 51792.00 No
(l) 18 Cusec Sec. 40 cm x 180 cm 53692.00 No
(m) 20 Cusec Sec. 40 cm x 180 cm 55982.00 No 67
(n) 25Cusec Sec. 100 cm x 270 cm 92542.00 No
(O) 30 Cusec Sec. 100 cm x 270 cm 95907.00 No
(p) 35 Cusec Sec. 100 cm x 270 cm 102645.00 No
(q) 40 Cusec Sec. 100 cm x 270 cm 109373.00 No
( r) 50 Cusec Sec. 100 cm x 270 cm 116114.00 No 68
(s) 60 Cusec Sec. 100 cm x 270 cm 126216.00 No
(t) 70 Cusec Sec. 100 cm x 270 cm 132858.00 No
(u) 80 Cusec Sec. 100 cm x 270 cm 143049.00 No 69
Flume device 70
(a) 100 Cusecs (2.40 M throat width) 346308.00 No 71
(b) 150 Cusecs(2.40 M throat width) 369058.00 No 72
(c) 200 Cusecs(3.05M throat width) 662915.00 No 73
27
Sr. No. Item Rate Unit
A B C D 5
(d) 250 Cusecs(3.05 M throat width) 679801.00 No
(e) 300 Cusecs(3.66 M throat width) 696065.00 No 74
(f) 400 Cusecs(3.66M throat width) 736700.00 No
(g) 500 Cusecs(3.66 M throat width) 1217136.00 No 75
(h) 750 Cusecs(4.07 M throat width) 1298741.00 No
(i) 1000 Cusecs(6.10 M throat width) 1376387.00 No 76
(j) 1250 Cusecs(6.10 M throat width) 1429880.00 No

28
Sr. No. Item Rate Unit
A B C D 5
(k) 1500 Cusecs(7.62M throat width) 1495194.00 No 77
Cold twisted bars (HYSD) 44000.00 M.T. 78
79
80
81
82
Labour (Daily wages) 83
Mason 1st 207.80 No 84
Mason 2nd 199.90 No 85
Labour 194.50 No 86
Bhisti 196.30 No 87
Blacksmith 199.90 No 88
Carpainter 2nd 199.90 No 89
Painter 199.90 No 90
Carriage 91
Cement 0.00 Bag 92
Sand 0.00 C.M. 93
Metal 0.00 C.M. 94
Rubble 0.00 C.M. 95
Through stone 5.75 No (L.S.) 96
Gravel 0.00 C.M. 97
M.S. Steel 0.00 MT 98
Steel Assembly 0.00 MT 99
Pedastal (15 Kg) 5.75 No (L.S.) 100
Nut Bolt (Check Dam) 2.30 (L.S.) 101
Welding Rod (Check Dam) 5.75 (L.S.) 102
Kapachi 0.00 C.M. 103
Curing Compound 1.15 (L.S.) 104
Core box 115.00 (L.S.) 105
Stone (25 x 15 x 17.5) 5.75 (L.S.) 106
Timber 0.00 C.M. 107
Brick 0.00 Th.No 108
Carriage of m/c. Boat 230.00 Hr. (L.S.) 109
Carriage of Manual Boat 23.00 Hr. (L.S.) 110
PVC wire mesh 2.30 S.M.(L.S.) 111
4 Inch AC pipe 100 dia 0.00 Rmt 112
75 mm 4 Inch M.S. Pipe with flanges 11.50 No (L.S.) 113

NP2 Pipe 225 mm 0.00 Rmt 114


NP2 Pipe 300 mm 0.00 Rmt 115
NP2 Pipe 450 mm 0.00 Rmt 116
Aldrin emulsion 2.30 S.M.(L.S.) 117
Wire net 10 gauge (10 x 10 cm) 2.30 S.M.(L.S.) 118
Kerosene 1.15 (L.S.) 119
29
Sr. No. Item Rate Unit
A B C D 5
Oil 1.15 (L.S.) 120
Grease 1.15 (L.S.) 121

30
Sr. No. Item Rate Unit
A B C D 5
Labour Charges (L.S.) 0.00 122
Water charges for 1 HP 0.00 123
Pump for 8 Hr (225 mm dia) 230.00 (L.S.) 124
Pump for 8 Hr (300 mm dia) 287.50 (L.S.) 125
Pump for 8 Hr (450 mm dia) 402.50 (L.S.) 126
Lum sum Items 127
Fabrication charges 7.70 Kg 128
Welding hold fast 51.15 L.S. 129
Asphalt filler joint 20 mm deep 18.15 L.S. 130
Labour for fixing expansion joint 69.00 L.S. 131
Cement for fixing 13.80 L.S. 132
Hire charges for Machine boats 287.50 Hr 133
Hire charges for Manual boats 57.50 Hr 134
Hire charges for machinery like jack 880.00 Hr. 135
hammer with compressure
Brick bat 180.00 CM 136
Aldrop 92.00 L.S. 137
Bolt 92.00 L.S. 138
Labour charges for steel gate 2530.00 L.S. 139
GI Steple or binding wire 57.50 L.S. 140
Cement Slurry for anchor bar 23.00 L.S. 141
Drilling charges for anchor bar 34.50 L.S. 142

31
CHECK DAMS OTHER THAN S.P.P.W.C.S.
ABSTRACT
RATE 2013-14
ITEM
DESCRIPTION OF ITEM UNIT
NO.

1 2 3 4

C1 Excavation for foundation in all sorts of soil including sandy and


gravelly soils, soft murrum, hard murrum including depositing the
excavated stuff as and where directed including back filling the
trenches with suitable excavated stuff etc. complete for lead upto
50 m. and lift as under. (By Manual)

(a) Lift upto 1.5 m C.M. 122.54


(b) Lift 1.5 m to 3.0 m C.M. 126.94
(c) Lift 3.0 m to 4.5 m C.M. 133.85
(d) Lift 4.5 m to 6.0 m C.M. 141.65
(e) Each additional 1.5 m lift upto 12 m. C.M. 14.74
C2 Excavation for foundation in soft rock including depositing the
excavated stuff as and where directed including back filling the
trenches with suitable excavated stuff etc. complete for lead upto
50 m and lift as under. (By Manual)
(a) Lift upto 1.5 m C.M. 317.65
(b) Lift 1.5 m to 3.0 m C.M. 322.19
(c) Lift 3.0 m to 4.5 m C.M. 335.85
(d) Lift 4.5 m to 6.0 m C.M. 353.98
(e) Each additional 1.5 m lift upto 12 m. C.M. 16.60
C3 Excavation for foundation in hard rock upto 3 m. including C.M. 464.40
blasting and chiselling if necessary, sorting out and stacking
separately the useable rubble, including depositing the
excavated stuff as and where directed including back filling the
trenches with suitable excavated stuff etc. complete for lead upto
50 m. and all lift. (By Machinery)

C4 Providing & laying concrete of cement, sand and metal in M-10 C.M. 2632.60
(equivalent to cement concrete of 1:3:6 grade including
tamping, watering and curing, smooth finishing where
required etc. complete for lead 50 mt. and lift 2.50 mt.

C5 Filling in foundation with cement concrete of cement, sand and C.M. 2398.20
gravel in M.10 (equivalent to cement concrete of 1:3:6) grade
including tamping, watering and curing, smooth finishing
where required etc. complete for lead 50 mt. and lift 2.50 mt.
C6 Providing and laying Random Rubble Masonary in foundation C.M. 1626.10
upto the top of the check dam in mortar of cement and sand
in 1:6 proportion including striking out joints with curing
watering etc. complete.
C7 Plain cement concrete of cement sand and metal (unvibrated) in C.M. 3091.00
1:2:4 proportion laid in situ including temping smooth finishing
watering and curing for lead upto 50 m. and lift upto 1.5 m.
RATE 2013-14
ITEM
DESCRIPTION OF ITEM UNIT
NO.

C8A Providing and laying M-15 Grade plain/ reinforced ordinary


portland cement concrete of various grade with cement, sand
and coarse aggregate including centering, shuttering, batching,
mixing transporting, placing, vibrating curing etc. complete. M-
15(MSA-40)
(a) with water curing C.M. 3091.00
(b) with membrane curing C.M. 3166.00
C8B Providing and laying M-20 Grade plain/ reinforced ordinary
portland cement concrete of various grade with cement, sand
and coarse aggregate including centering, shuttering, batching,
mixing trasporting, placing, vibrating curing etc. complete. M-
20(MSA-40)

(a) with water curing C.M. 3426.20


(b) with membrane curing C.M. 3501.20
C9 Providing and Placing in position reinforce bars, including cutting,
bending, welding joints where necessary hooking etc. complete
as per drawing for all lead and lift.
(a) H.Y.S.D. M.T. 57305.30
(B) TMT / CRS M.T. 62200.38
(c) M.S. M.T. 54848.30
C10 Providing and Fixing M.S. Gate with necessary hoisting
arrangement embedments fixing etc. complete for the following
sizes.
(a) Size (0.80 x 0.80) m No. 6490.00
(b) Size (1.0 x 1.0 ) m No. 10150.00
(c) Size (1.20 x 1.20) m No. 14615.00
C11 Providing and Fixing 1.2 m long M. S. Anchor bars of 16 mm No. 246.20
dia for anchoring by drilling 35 mm dia hole in foundation strata
including necessary cutting, bending, hoisting bars and grouting
the holes with cement slurry etc. complete (0.60 m to be
embedded in rock and 0.60 m above the ground / concrete
structure).
C12 Filling in foundation with concrete of cement, sand and metal in CM 2254.20
M-7.5(equivalent to cement concrete of 1:4:8 grade including
tamping, watering and curing, smooth finishing where
required etc. complete for lead 50 mt. and lift 2.50 mt.

C13 Excavation for foundation in all sorts of soil including sandy and CM 53.80
gravelly soils, soft murrum, hard murrum including depositing the
excavated stuff as and where directed including back filling the
trenches with suitable excavated stuff etc. complete for lead upto
50 m. and with all lifts. ( By Machinery)
C14 Excavation for foundation in soft rock including depositing the CM 108.70
excavated stuff as and where directed including back filling the
trenches with suitable excavated stuff etc. complete for lead upto
50 m and all lifts. ( By Machinery )
RATE 2013-14
ITEM
DESCRIPTION OF ITEM UNIT
NO.

C15 Providing and fixing in position the name and number plate of No. 1840.60
white marble of 2.5 cm. thickness size including engraving the
letters and filling with lead etc.complete.(45x45) cm
RATE 2013-14
ITEM
DESCRIPTION OF ITEM UNIT
NO.

SURVEY & INVESTIGATION.


S1 Surveying including chaining, ranging and levelling including Km2 3432.40
jungle cutting etc. complete.
(A) Basin Survey (0.45 Km2 /day)
S2 Surveying including chaining, ranging and levelling including
jungle cutting etc. complete.
(B) Dam vicinity Survey (0.12 Km2/ day) Km2 12871.20
S3 Surveying including chaining, ranging and levelling including
jungle cutting etc. complete.
(C) Dam Alignment Survey (3 Km/day) Km 449.80
S4 Taking fly levels for connecting and changing of B.M. (Single Km 195.90
levelling)
S5 Taking fly levels for connecting and changing of B.M. (Double Km 326.48
levelling)
S6 Providing and fixing B.M. & C.L. Stone of 20 cm x 20 cm x 75 cm No. 286.90
in CC 1:3:6 at site of work including necessary excavation etc.
complete.
S7 Providing wooden core boxes of required size for diamond No. 967.30
drilling machine as suggested by Geologist without Japan
painting.
S8 Revenue Survey charges for joint measurement for land to be Ha. 1371.15
acquired etc.
S9 Demarcation of road alignment including marking out road line by Km. 186.00
providing and fixing wooden pegs or steel rods of required size at
every 25 m to 50 m distance including excavating trenches on
both sides of 0.30 m x 0.30 m including supply of labourers and
all material for every work etc. complete.
S10 Surveying for road work including ranging, chaining, paving, Km. 1544.60
levelling and compass survey including all labourer and material
etc. complete.
S11 Dog bailing the centre and toe line of embankment /cutting. Km. 2269.08

S12 Providing and fixing stones of 25 cm x 15 cm x 17.5 cm size of No. 66.60


approved quality for centre line or apex point including
excavation and concreting (1:2:4) and fixing the stone including
casting of stone etc. complete.
S13 Contour survey work for preparing contour map by taking cross Km2 12871.20
section at every 30 m interval with grid of 30 m x 30 m including
all labour materials & instruments etc. complete.

S14 Providing temporary motorable service road during construction Km. 124763.08
including watering and maintaining the same etc. complete.

S15 Surveying including chaining, ranging, levelling jungle cutting etc. Ha. 96.80
complete of canal alignment.
RATE 2013-14
ITEM
DESCRIPTION OF ITEM UNIT
NO.

MISCELLANEOUS
M1 Providing and laying burnt brick pitching (Class II) in cement Sq.M. 341.20
mortar 1:6 including laying to correct slope, after necessary
trimming of earthwork filling the joint with mortar curing, watering
etc. complete.

M2 Providing and fixing metal expansion joint as per drawing etc. Rmt. 788.40
complete consisting of 50 mm x 50 mm x 6 mm size two angles
and 100 mm x 6 mm M.S. Plate with 6 mm x 20 mm x 25 cm long
hold fasts at 50 cm c/c on both side of expansion joint.

M3 Providing P.V.C. water tank of required capacity as per ISI


Standard and fixing the same in position and completing the
same with necessary fitting etc. complete.

(i) 500 lit No. 2029.40


(ii) 1000 lit No. 3714.20
(iii) 1500 lit No. 5512.70
M4 Providing and laying flexible type Gabion of size 1 m x 1 m x 0.5 Sq.M. 254.50
m consisting of rubble put in cage of PVC wire mesh 10 cm x 12
cm dia 2.7 mm / 3.7 mm (ID/OD) laid on the surface or slope etc.
complete.
M5 Painting gauze patta of following width on masonary or concrete
surface with characters painted with oil paint of specified colour
and quality in distinct colour over pre painted dried surface in two
coats as directed etc. complete.
10 cm Rmt. 14.30
15 cm Rmt. 19.10
30 cm Rmt. 28.90
M6 Providing and fixing 4 point thick barbed wire fencing in 7 rows Rmt. 366.20
between two connecting posts as per detailed drawings with
precast 1:2:4 R.C.C. posts of size 10 cm. and 8 cm. square
respectively at bottom and top with necessary reinforcement of 6
mm dia. 4 Nos. of M.S. bars and 6 mm dia. M.S. rings at 30 cm.
C/I 210 cm. long at 2.5 m. C/L embeded in a pit of 45 cm x 45
cm x 60 cm in 1:4:8 brick bats cement concrete including
excavation for posts, cutting, fixing etc. complete.

M7 Constructing R.C.C. pillar of 1:2:4 of C.C. 0.45 m x 0.45 m x 1.65 No. 4039.50
m above G.I. with Kapachi as aggregate including excavating
foundation as per drawing including 1:4:8 gravel concrete for
foundation including providing reinforcement and sand faced
cement plaster as per detailed drawings.
M8 Providing and fixing 16 mm dia alluminium rails for curtains Rmt. 284.70
including iron oxidized fastening etc. complete.
M9 Strengthening with jacketing inside well of syphon with 10 cm SM 841.70
thick RCC of M.15 grade with necessary curved form work with
lateral and verticals supports with watering curing etc. complete
as directed.
RATE 2013-14
ITEM
DESCRIPTION OF ITEM UNIT
NO.

M10 Fencing of wire net of 10 gauge in 10 cm x 10 cm size supported SM 401.70


with angles of 45 mm x 45 mm x 5 mm fitted in C.C. block of mix
1:3:6 (size 30 cm x 30 cm x 45 cm) with angles height above
ground level as 1.8 m and every fifth pole supported with two
additional cross angles.
RATE 2013-14
ITEM
DESCRIPTION OF ITEM UNIT
NO.

M11 Providing gauge plate of following size of material fibre glass Rmt
reinforced plastic with engraved bands width and figures with
necessary clits and fasteners and fixing the same at the site of
work etc. complete as directed.
(a) 10 cm RM 5013.10
(b) 15 cm RM 6129.20
(c) 20 cm RM 7247.80
(d) 30 cm RM 9481.30
(e) 45 cm RM 15617.50
(f) 60 cm RM 18969.60
(g) 100 cm RM 27906.00
RATE 2013-14
ITEM
DESCRIPTION OF ITEM UNIT
NO.

M12 Supply of Fibre glass plastic (FRP) measuring cut throat flume
for accurate measurement of water flowing through channels with
moulded engraved gauze marking in Lit/Sec. and also in
centimeter including discharge table, capacity, marking, flow
direction, pipe stiffner, hold fasts and sand treatment on back
side of flume etc. (Rate is inclusive of transportation of flume
device to Division Office).

(a) 0.5 Cusec Sec. 10 cm x 90 cm No. 5923.60


(b) 1.0 Cusec Sec. 20 cm x 90 cm No. 13656.20
(c) 2.0 Cusec Sec. 20 cm x 90 cm No. 14927.00
(d) 3.0 Cusec Sec. 20 cm x 90 cm No. 16166.00
(e) 4.0 Cusec Sec. 20 cm x 90 cm No. 17705.90
(f) 5 Cusec Sec. 40 cm x 180 cm No. 44445.90
(g) 6 Cusec Sec. 40 cm x 180 cm No. 47146.90
(h) 8 Cusec Sec. 40 cm x 180 cm No. 49839.70
(i) 10 Cusec Sec. 40 cm x 180 cm No. 52541.90
(j) 12 Cusec Sec. 40 cm x 180 cm No. 55245.30
(k) 15 Cusec Sec. 40 cm x 180 cm No. 61114.60
(l) 18 Cusec Sec. 40 cm x 180 cm No. 63356.60
(m) 20 Cusec Sec. 40 cm x 180 cm No. 66058.80
(n) 25Cusec Sec. 100 cm x 270 cm No. 109199.60
(o) 30 Cusec Sec. 100 cm x 270 cm No. 113170.30
(p) 35 Cusec Sec. 100 cm x 270 cm No. 121121.10
(q) 40 Cusec Sec. 100 cm x 270 cm No. 129060.20
(r) 50 Cusec Sec. 100 cm x 270 cm No. 137014.60
(s) 60 Cusec Sec. 100 cm x 270 cm No. 148934.90
(t) 70 Cusec Sec. 100 cm x 270 cm No. 156772.50
(u) 80 Cusec Sec. 100 cm x 270 cm No. 168797.90
M13 Supply of Fibre glass reinforced plastic (FRP) measuring Parshall
flume with mechanical gauze recorder for accurate
measurement of water flowing through channels with moulded
engraved gauze marking in Lit/Sec. and also in centimeter
including discharge table, capacity, marking, flow direction, pipe
stiffner, hold fasts and sand treatment of back side of flume etc.
(Rate is inclusive of transportation of flume device to Division
Office).
(a) 100 Cusecs (2.40 M throat width) No. 408643.50
(b) 150 Cusecs(2.40 M throat width) No. 435488.50
(c) 200 Cusecs(3.05M throat width) No. 782239.70
(d) 250 Cusecs(3.05 M throat width) No. 802165.20
(e) 300 Cusecs(3.66 M throat width) No. 821356.70
(f) 400 Cusecs(3.66M throat width) No. 869306.00
(g) 500 Cusecs(3.66 M throat width) No. 1436220.50
(h) 750 Cusecs(4.07 M throat width) No. 1532514.40
(i) 1000 Cusecs(6.10 M throat width) No. 1624136.70
(j) 1250 Cusecs(6.10 M throat width) No. 1687258.40
(k) 1500 Cusecs(7.62M throat width) No. 1764329.00
RATE 2013-14
ITEM
DESCRIPTION OF ITEM UNIT
NO.

M14 Deepening of tank in all sorts of soil including soft & hard murrum C.M. 59.70
including depositing the excavated stuff in uniform layers
including breaking clods in tank's banks or as and where directed
etc. complete within lead of 1.00 km.and with all lifts.(By
machinery)
RATE ANALYSIS 2013-2014
MISCELLANEOUS

ITEM- M1 Providing & laying burnt brick pitching (Class II) in cement mortar 1:6 including laying to correct slope,
after necessary trimming the earthwork filling the joint with mortar curing, watering etc. complete.

brick on edge
(SOR CELL Vol.3 Page 282)
Unit SM
Rate for 1 SM
Sr. No. Description Quantity Unit Rate per Amount
Unit

(A) MATERIALS :
Brick 0.049 Th.No. 4200.00 205.80
Sand 0.025 Cum 210.00 5.25
Cement 0.13 Bag 290.00 37.70
248.75
(B) CARRIAGE:
Brick 0.049 Th.No 0.00
Sand 0.025 Cum 0.00
Cement 0.13 Bag 0.00
0.00

(C) LABOUR :
Mazdoor 0.15 No 194.50 29.18
Mason 0.08 No 199.90 15.99
45.17

Total (A+B+C) 293.92

(D) Water Charges at 1 % of A + B + C Rs. 2.94


( If necessary )
(E) Tools and Plants at 1 % of A + B + C Rs. 2.94
(F) Contractor's Profit & O/H charges at 15% of A + Rs. 38.43
B+C
(G) Sundries Rs. 0.00
Labour cess 1% Rs. 2.94
Total A + B + C + D + E + F+ G = Rs. 341.17

Rate per SM = 341.20

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
ITEM- M2 Providing and fixing metal expansion joint as per drawing etc. complete consisting of 50 mm x 50 mm x
6 mm size two angles and 100 mm x 6 mm M.S. Plate with 6 mm x 20 mm x 25 cm long hold fasts at
50 cm c/c on both side of expansion joint.

(SOR CELL Vol.4 Page 769) 7


Unit RMT
Rate for 1 RMT
Sr. No. Description Quantity Unit Rate per UnitAmount

(A) MATERIALS :
Steel 0.01445 M.T 42000.00 606.90
10 MM DIA BOLTS @
3.33 Nos. @ 1 meter.

Welding hold fast with L.S. 51.15 51.15


M.S. Plate.

Cost of 20 mm L.S. 18.15 18.15


premoulded asphalt filler
joint 20 sm deep (Rate/
SM ) x 0.20

Total 676.20
(B) CARRIAGE:
Steel 0.01445 M.T 0.00

(C) LABOUR : L.S. 69.00 69.00

Total (A + B + C) 745.20

(D) Water Charges at 1 % of A + B + C Rs. 7.45


( If necessary )
(E) Tools and Plants at 1 % of A + B + C Rs. 7.45
(F) Contractor's Profit & O/H charges at 15% of A + Rs. 20.75
B+C
(G) Sundries Rs. 0.00
Labour cess 1% Rs. 7.45
Total A + B 788.30

Rate per Rmt = 788.40


ltd.to 788.40

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
ITEM- M3 Providing P.V.C. water tank of required capacity as per ISI standard & fixing the same in position and
completing the same with necessary fitting etc. complete.

(I) 500 Liter As per Market inquiry

Unit : No.
Rate for 1 No.
Sr. No. Description Quantity Unit Rate per UnitAmount

(A) MATERIALS :
500 liter Tank 1 No 1440.00 1440.00
1440.00

(B) CARRIAGE:
500 liter Tank 1 No 0.00
0.00

(C) LABOUR :
Plumber 0.50 No 199.90 99.95
Labour 1.00 No 194.50 194.50
294.45

Total (A + B + C) 1734.45

(D) Water Charges at 1 % of A + B + C Rs. 0.00


( If necessary )
(E) Tools and Plants at 1 % of A + B + C Rs. 17.34
(F) Contractor's Profit & O/H charges at 15% of A + Rs. 260.17
B+C
(G) Sundries Rs.
Labour cess 1% Rs. 17.34
Total A + B 2029.31

Rate of 1 No2029.40

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
(II) 1000 Liter As per Market inquiry

Unit : No.
Rate for 1 No.
Sr. No. Description Quantity Unit Rate per UnitAmount

(A) MATERIALS :
1000 liter Tank 1 No 2880.00 2880.00
2880.00

(B) CARRIAGE:
1000 liter Tank 1 No 0.00
0.00

(C) LABOUR :
Plumber 0.50 No 199.90 99.95
Labour 1.00 No 194.50 194.50
294.45

Total (A + B + C) 3174.45

(D) Water Charges at 1 % of A + B + C Rs. 0.00


( If necessary )
(E) Tools and Plants at 1 % of A + B + C Rs. 31.745
(F) Contractor's Profit & O/H charges at 15% of A + Rs. 476.168
B+C
(G) Sundries Rs.
Labour cess 1% Rs. 31.74
Total A + B 3714.11

Rate of 1 No3714.20

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
(III) 1500 Liter As per Market inquiry

Unit : No.
Rate for 1 No.
Sr. No. Description Quantity Unit Rate per UnitAmount

(A) MATERIALS :
1500 liter Tank 1 No 4320.00 4320.00
4320.00

(B) CARRIAGE:
1500 liter Tank 1 No 0.00
0.00

(C) LABOUR :
Plumber 0.50 No 199.90 99.95
Labour 1.50 No 194.50 291.75
391.70

Total (A + B + C) 4711.70

(D) Water Charges at 1 % of A + B + C Rs.


( If necessary )

(E) Tools and Plants at 1 % of A + B + C Rs. 47.12


(F) Contractor's Profit & O/H charges at 15% of A + Rs. 706.76
B+C
(G) Sundries Rs.
Labour cess 1% Rs. 47.12
Total A + B + C + D + E + F+ G = Rs.
5512.69

Rate of 1 No. = Rs. 5512.70

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
ITEM- M-4 Providing & laying flexible type Gabion of size 1 m x 1 m x 0.5 m consisting of rubble put in cage of
PVC wire mesh 10 cm x 12 cm dia 2.7 mm / 3.7 mm (ID/OD) laid on the surface or slope etc
complete.

( As per field experience)

Unit : SM
Rate for 100 SM
Sr. No. Description Quantity Unit Rate per UnitAmount

(A) MATERIALS
Rubble (100 x 0.5 x 62.5 C.M. 185.00 11562.50
1.25)

Wire Mesh (PVC) 400.00 Sq.M. 23.00 9200.00

20762.50

(B) CARRIAGE
Rubble (100 x 0.5 x 62.5 C.M. 0.00
1.25)

Wire Mesh (PVC) 400.00 Sq.M. 0.00

0.00

(C) LABOUR
Mason 1.00 No. 207.80 207.80
Labour 4.00 No. 194.50 778.00
985.80

Total (A +B + C) 21748.30

(D) Water Charges at 1 % of A + B + C Rs.


( If necessary )
(E) Tools and Plants at 1 % of A + B + C Rs. 217.48
(F) Contractor's Profit & O/H charges at 15% of A + Rs. 3262.25
B+C
(G) Sundries Rs.
Labour cess 1% Rs. 217.48
Total A + B + C + D + E + F+ G = Rs. 25445.51

Rate per S.M. = Rs. 254.50

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.

ITEM- M-5 Painting gauze patta of following width on masonry or concrete surface with characters painted with oil
paint of specified colour & quality in distinct colour over pre painted dried surface in two coats as
directed etc complete.

( As per field experience)


(a) 10 cm
Unit Rmt
Rate for 100 Rmt
Sr. No. Description Quantity Unit Rate per UnitAmount

(A) MATERIALS :
Oil Paint 2 lit 210.00 420.00
RATE ANALYSIS : YEAR 2011-12

ITEM- S1 Surveying including chaining ranging and leveling including jungle cutting etc. complete as detailed
below.

A. Basin survey or.


Rate for 0.45 km2 / day as shown in sheet herewith.
Unit : km2
Rate for 0.45 km2
Sr. No. Description Quantity Unit Rate per Unit Amount
(A) MATERIALS :
1 Lime ( Khadi) 10 Kg. 4.20 42.00
2 Red flag 3 No. 19.00 57.00
3 Wooden Pegs 25 No. 2.75 68.75
Sub Total (A) Rs. 167.75
(Note : Above material consumption is for 1 km2 survey )
(B) LABOUR :
1 Mazdoor 7 No. 194.50 1361.50

Sub-Total (B) Rs. 1361.50

Total (A) + (B) = Rs. 1529.25


Labour cess 1% 15.29
Rate of 1 km2 survey Rs. 3432.32

Rs. 3432.40 per km2

0.45 km2 per day with party of 7 labourers.

( 3 Cross sections of I km each at 150 m interval on main base line. level reading at every 30 m intervals)

Area = ( 3 x 0.15 ) x km2 = 0.45 km2


Labour required per party : Nos
2 Ranging
2 Chaining
2 Levelling Staff
1 Instrument
Total 7 Nos.

Nos. of day required to survey 1 km2.


1 km

(1) (2) (3)

150 m 150 m 150 m 150 m Main base line

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12

ITEM- S2 Surveying including chaining ranging and leveling including jungle cutting etc. complete as detailed
below.
B. Dam Vicinity survey etc.
Rate for 0.12 km2 / day as shown in sheet herewith.
Unit : km2
Rate for 0.12 km2
Sr. No. Description Quantity Unit Rate per Unit Amount
(A) MATERIALS :
1 Lime ( Khadi) 10 Kg. 4.20 42.00
2 Red flag 3 No. 19.00 57.00
3 Wooden Pegs 25 No. 2.75 68.75
Sub-Total (A) Rs. 167.75
(Note : Above material consumption is for 1 km2 survey )
(B) LABOUR :
1 Mazdoor 7 No. 194.50 1361.50

Sub-Total (B) Rs. 1361.50

Total (A) + (B) = Rs. 1529.25


Labour cess 1% 15.29
Rate of 1 km2 survey Rs.

Rate of material + cost of 12871.19


0.12
Rs. 12871.20 per km2

Dam Vicinity survey 0.12 km2 per day with party of 7 labourers.

( 4 Cross sections of 0.5 km each at every 30 m interval on main base line on either side.)

Linear efficiency = 4 km / day.

Area covered = 1 km x 0.12 km = 0.12 km2


No. of days required to survey 1 km2 = 1 / 0.12
500 m

30 m 30 m 30 m 30 m Main base line


500 m

120 m

Executive Engineer,
Vadodara Irrigation Division,
RATE ANALYSIS : YEAR 2011-12

Vadodara.
RATE ANALYSIS : YEAR 2011-12

ITEM- S3 Surveying including chaining ranging and leveling including jungle cutting etc. complete as detailed
below.
C. Dam alignment survey etc.
Rate for 3.0 km / day as shown in sheet herewith.
Unit : km
Rate for 3 Km
Sr. No. Description Quantity Unit Rate per Unit Amount

(A) MATERIALS :
1 Lime ( Khadi) 5 Kg. 4.20 21.00
2 Red flag 3 No. 19.00 57.00
3 Wooden Pegs 33 No. 2.75 90.75

Sub-Total (A) Rs. 168.75

(B) LABOUR :
1 Mazdoor 6 No. 194.50 1167.00

Sub-Total (B) Rs. 1167.00

Total (A) + (B) = Rs. 1335.75


Labour cess 1% 13.36
Rate of 3.0 km survey Rs.

Rate of 1 km survey Rs. = 449.70

449.80

Dam alignment survey 3.0 km per day with party of 6 labourers.

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12

ITEM- S4 Taking fly levels for connecting and changing of B. M. (Single levelling).

Unit : km
Rate for : 3 km
Sr. No. Description Quantity Unit Rate per Unit Amount

1 Taking fly levels for connecting and changing of B.M.


Single levelling per day with party of 3 labours.
3.0 km

LABOUR : 3 No. 194.50 583.50


Labour cess 1% 5.84

Labour required per party : Nos.


2 Levelling Staff
1 Instrument

Total 3 Nos.

Rate of 3.0 km survey Rs.

Rate of 1 km survey Rs. = 196.45

LTD to 10% SAY 195.90

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12

ITEM- S5 Taking fly levels for connecting and changing of B. M. (Double levelling).

Unit : km
Rate for 3 Km
Sr. No. Description Quantity Unit Rate per Unit Amount

1 Taking fly levels for connecting and changing of B.M.


Double levelling per day with party of 5 labours.
3.0 km

LABOUR : 5 No. 194.50 972.50


Labour cess 1% 9.73

Labour required per party : Nos


2 Levelling Staff
1 Instrument
2 Additional Misc.

Total 5 Nos.

Rate of 3.0 km survey Rs. 982.23

Rate of 1 km survey Rs. = 327.41

LTD to 10% SAY 326.48

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12

ITEM- S6 Providing and fixing B. M. and C. L. stone of 20 cm x 20 cm x 75 cm. In C.C. 1:3:6 at site of work.

Unit : No.
Rate for : 5 No
Sr. No. Description Quantity Unit Rate per Unit Amount

(A) MATERIALS :
1 Cement (O.P.C.) 0.072 MT 5800.00 417.60
2 Sand 0.150 m3 210.00 31.50
3 Gravel/Metal/Coarse aggregate 0.290 m3 210.00 60.90
4 Dressed Stone size (20 x 20 x 75 cm.) 5 No. 15.00 75.00

Sub-Total (A) Rs. 585.00


(B) LABOUR :
1 Mason (Semi-skilled) 0.50 No. 199.90 99.95
2 Mazdoor (Male) 3 No. 194.50 583.50

Sub-Total (B) Rs. 683.45

Total (A) + (B) = Rs. 1268.45

(C) Water Charges at 1 % of A+B. ( If necessary ) Rs. 12.68


(D) Tools and Plants at 1 %.of A+B Rs. 12.68
(E) Contractor's Profit & O/H charges at 15 %.of A+B Rs. 127.63
Labour cess 1% Rs. 12.68
Total A + B + C + D + E = Rs. 1434.13

Rate of fixing 5 stones = Rs. 1434.13

Rate of fixing 1 stones = Rs. 286.83

286.90

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12

ITEM- S7 Providing wooden core-boxes of required size for diamond drilling machine as per specification suggested
by Geologist without Japan painting.

Unit : No.
Rate for 1 No
Sr. No. Description Quantity Unit Rate per Unit Amount

(A) MATERIALS : L.S No 826.70 826.70

(B) CARRIAGE: L.S

(C) LABOUR : L.S

Total A + B + C = Rs. 826.70

(D) Water Charges at 1 % of A+B+C. ( If necessary ) Rs.


(E) Tools and Plants at 1 %.of A+B+C Rs. 8.27
(F) Contractor's Profit & O/H charges at 15 %.of A+B+C Rs. 124.01
Labour cess 1% Rs. 8.27
Total A + B + C + D + E + F= Rs. 967.24

Rate of 1 No Rs. 967.30

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12

ITEM- S8
Revenue survey charges for joint measurements for land to be acquired etc.

Unit : Hactare
Rate for 1 Hactare

SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT


NO. UNIT. Rs.

(A) LABOUR

Labours 7 No. 194.50 1361.50


Labour cess 1% 13.62

Grand Total (A) Rs. 1375.12

Rate for one hact. Rs. 1375.12

LTD to 10% 1371.15

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12

ITEM- S9 Demarcation of road alignments including marking out road line by


providing and fixing wooden pegs or steel rod of required size at every
25 m to 50 m including excavating trenches on both sides of 0.30 x 0.30 m.
including supplying of labourers and all materials for every work etc.
complete.

( Rate for 3.50 km )


Unit : KM
Rate for 3.5 KM

SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT


NO. UNIT. Rs.

(A) MATERIALS
1 Lime ( Khadi) 4 kg 4.20 16.80
2 Red flag 3 No. 19.00 57.00
3 Wooden Pegs 34 No. 2.75 93.50
167.30

(B) LABOUR 2 No. 194.50 389.00

Total (A + B) 556.30

(C) Tools and Plants at 1 % on (A+B) Rs. 5.56


(D) Contractor's Profit and overhead charges at 83.445
15 % on (A+B) Rs.
Labour cess 1% Rs. 5.56
Grand Total (A+B+C+D) Rs. 650.87

Rate for one 3.50 km Rs. 650.87

Rate for one km Rs. 186.00

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12

ITEM- S10
Surveying for road work including ranging chaining paving levelling and
compass surveying including all labour material and instruments etc.
complete.

Unit : KM
Rate for 1 KM

SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT


NO. UNIT. Rs.
(A) MATERIALS :
1 Lime ( Khadi) 10 kg 4.20 42.00
2 Red flag 3 No. 19.00 57.00
3 Wooden Pegs 25 No. 2.75 68.75
Sub-Total (A) Rs. 167.75
(B) LABOUR :
1 Mazdoor 7 No. 194.50 1361.50
Sub-Total (B) Rs. 1361.50

Total (A + B) 1529.25
Labour cess 1% 15.29
1544.54

1 km approach road alignment survey will involve @ 3.80 km of linear survey per
day as shown in separate sheet.

Daily output @ 3.80 km linear survey as shown in sheet.

No. of days required for 1 km of approach road survey = 1.0 day


( which will invllve 3.80 km of survey in a day)
Total cost = Cost of material + Cost of labours for 1 day )

Rate of 1 km survey Rs. = 1544.60

Approach road alignment surey.


Task work output per day per party of 7 labours.
1 km on main center line with cross sections of 15 m length on either side of
centre line at every 25 m interval plus survey for alternative survey for structures
and repeat for errors etc. total 3.80 km of linear survey.

One km of road alignment will include.


(i) Center line 1 km
(ii) Cross sections of 15 m
length on either side of
center line at every 25 m
intervel.
1000 = 40 x (0.15 x 2 ) = 1.2 km
1.20 km.
25
(iii) One alternative 0.5 km
(iv) Survey of any structures. 0.8 km
(v) Repeate for errors. 0.3 km
Total : 3.8 km
Executive Engineer,
Vadodara Irrigation Division,
RATE ANALYSIS : YEAR 2011-12

Vadodara.
RATE ANALYSIS : YEAR 2011-12

ITEM- S11 Dog bailing the centre and toe line of embankment / cutting.

Unit : KM
Rate for 1 KM

SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT


NO. UNIT. Rs.

LABOUR

Labours 10 No. 194.50 1945.00

Tools and Plants at 1 % Rs. 19.45


Contractor's Profit and overhead charges at 15% Rs. 291.75
Labour cess 1% 19.45

Grand Total Rs. 2275.65

Rate for one km Rs. 2269.08


LTD to 10%

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12

ITEM- S12 Providing and fixing stones of 25 cm x 15 cm x 17.5 cms. size of approved quality for centre line or
apex point including excavation (1 : 2 : 4) concreting and fixing the stones including casting of stones etc.
complete.

Unit : No.
Rate for 1 No

SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT


NO. UNIT. Rs.

(A) MATERIALS
Stone of required size 1 No. 15.00 15.00
(25 x 15 x 17.5)
Cement 0.005 MT 5800.00 29.00
Sand 0.0042 m3 210.00 0.88
Gravel 0.0084 m3 210.00 1.764

Sub-Total (A) Rs. 46.646

(B) CARRAGE OF MATERIALS


Stone of required size 1 No.
Cement 0.005 MT
Sand 0.0042 m3
Gravel 0.0084 m3
Sub-Total (B) Rs.

(C) LABOUR

Labour 0.05 No. 194.50 9.73


Sub-Total (C) Rs. 9.73

Total ( A + B + C) Rs. 56.37

(D) Water charges at 1% Rs. 0.56


on (A+B+C)
(E) Tools and Plants at 1% Rs. 0.56
on (A+B+C)
(F) Contractor's Profit and overhead charges at 8.46
15 % on (A+B+C) Rs.
Labour cess 1% 0.56
Grand Total (A+B+C+D+E+F) Rs. 66.52

Rate for one No. Rs. 66.60

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12

ITEM- S13 Contour survey work for preparing contour made by taking C/s. at every 30 m. Intervals in a grid of 30 x 30
m including all labour materials and instruments.

Rate for 0.12 km2 / day as shown in sheet herewith.


Unit : km2
Rate for 0.12 km2
Sr. No. Description Quantity Unit Rate per Unit Amount

(A) MATERIALS :
1 Lime ( Khadi) 10 Kg. 4.20 42.00
2 Red flag 3 No. 19.00 57.00
3 Wooden Pegs 25 No. 2.75 68.75
Sub-Total (A) Rs. 167.75
(Note : Above material consumption is for 1 km2 survey )
(B) LABOUR :
1 Mazdoor 7 No. 194.50 1361.50

Sub-Total (B) Rs. 1361.50

Total (A) + (B) = Rs. 1529.25


Labour 1% 15.29
cess
Rate of 1 km2 survey Rs. 1544.54
Rs. 12871.20 per km2

Dam Vicinity survey 0.12 km2 per day with party of 7 labourers.

(4 Cross sections of 0.5 km each at every 30 m interval on main base line on either side.)

Linear efficiency = 4 km / day.

Area covered = 1 km x 0.12 km = 0.12 km2


No. of days required to survey 1 km2 = 1 / 0.12
500 m

30 m 30 m 30 m 30 m Main base line


500 m

120 m

Executive Engineer,
RATE ANALYSIS : YEAR 2011-12

Vadodara Irrigation Division,


Vadodara.
RATE ANALYSIS : YEAR 2011-12

ITEM-S14 Providing temparory motarable service road during construction including


watering and maintaining the same etc. complete.

Unit : KM
Rate for 1 KM
Sr. No. Description Quantity Unit Rate per Unit Amount

(A) MATERIALS :

(B) CARRIAGE:
(C) LABOUR :

labour 525 no 194.50 102112.50


bhisti 20 no 196.30 3926.00

106038.50

(D) Water charges @ 1 % (A + B +C) 1060.39


(E) Tools and Plants at 1 % of A + B + C 1060.39
(F) Contractor's Profit and O/H charges at 15% of 15905.775
A+B+C
Labour cess 1% 1060.39
Total A + B + C + D + E + F = Rs. 125125.43

LTD to 10% Rate of 1 KM = Rs. 124763.08

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR 2011-12

ITEM- S15 Surveying including chaining ranging and levelling including jungle cutting in command area.

Rate for 18 ha / day as shown in sheet herewith.


Unit : ha
Rate for 18 ha
Sr. No. Description Quantity Unit Rate per Unit Amount
(A) MATERIALS :
1 Lime ( Khadi) 10 Kg. 4.20 42.00
2 Red flag 3 No. 19.00 57.00
3 Wooden Pegs 25 No. 2.75 68.75
Sub-Total (A) Rs. 167.75
(Note : Above material consumption is for 1 km canal alignment survey )
(B) LABOUR :
1 Mazdoor 8 No. 194.50 1556.00
Sub-Total (B) Rs. 1556.00

Total (A) + (B) = Rs. 1723.75


Labour 1% 17.24
cess
1740.99
Rate of 18 ha. survey per day Rs. 1740.99

Rate for 1 ha. survey Rs. = 96.72

96.80

Total Area = ( 3 x 0.06 ) x 1 km = 0.18 km2


i.e. 18 ha / day.

Survey party :
2 Ranging
2 Chaining
2 Levelling Staff
1 Level Instrument
1 Water man/clearence
Total 8 Laburers party

Nos. of day required to survey 1 km2.


hence 8 labourers party per day will carryout a survey work of 18 hactares.
Total linear distance = 3 x 1 + 0.6 x 3
= 3.18 km / day.
CROSS SECTION

1 km

(1) (2)

60 m 60 m 60 m Main base line


RATE ANALYSIS : YEAR 2011-12

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C1 Excavation for foundation in all sorts of soil including sandy and gravelly soils, soft
murrum, hard murrum including depositing the excavated stuff as and where directed
including back filling the trenches with suitable excavated stuff etc. complete for lead upto
50 m. and lift as under. (By Manual)

(a) Lift upto 1.5 m (SOR CELL Vol.3 Page 118)


Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.
(A) MATERIALS

(A) Total Rs. 0.00


(B) CARRAGE OF MATERIALS

(B) Total Rs. 0.00


(C) LABOUR
Labour 0.54 No. 194.50 105.03
0.00
0.00
0.00
(C) Total Rs. 105.03

TOTAL Rs. (A + B + C) 105.03

(D) Cenering & scaffolding charges 5% Rs. 0.00


(E) Water Charges at 1 % of A+B+C. Rs. 0.00
(F) Tools and Plants at 1 % of A+B+C Rs. 1.05
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 15.75
(H) Labour cess 1% 1.05
Grand Total (A+B+C+D+E+F+G) Rs. 122.89

LTD to 10% Rate for one CM Rs. 122.54

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C1 Excavation for foundation in all sorts of soil including sandy and gravelly soils, soft
murrum, hard murrum including depositing the excavated stuff as and where directed
including back filling the trenches with suitable excavated stuff etc. complete for lead upto
50 m. and lift as under. (By Manual)

(b) Lift 1.5 m to 3.00 m.


Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.

(A) MATERIALS

(A) Total Rs. 0.00


(B) CARRAGE OF MATERIALS

(B) Total Rs.: 0.00


(C) LABOUR
Labour 0.56 No. 194.50 108.92
0.00
0.00
0.00
(C) Total Rs. 108.92

TOTAL Rs. (A + B + C) 108.92

(D) Cenering & scaffolding charges 5% Rs. 0.00


(E) Water Charges at 1 % of A+B+C. Rs. 0.00
(F) Tools and Plants at 1 % of A+B+C Rs. 1.09
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 16.34
(H) Labour cess 1% 1.09
Grand Total (A+B+C+D+E+F+G) Rs. 127.44

LTD to 10% Rate for one CM Rs. 126.94

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C1 Excavation for foundation in all sorts of soil including sandy and gravelly soils, soft
murrum, hard murrum including depositing the excavated stuff as and where directed
including back filling the trenches with suitable excavated stuff etc. complete for lead upto
50 m. and lift as under. (By Manual)

(c) Lift 3.0 m to 4.50 m.


Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.

(A) MATERIALS

(A) Total Rs. 0.00


(B) CARRAGE OF MATERIALS

(B) Total Rs. 0.00


(C) LABOUR
Labour 0.59 No. 194.50 114.76
0.00
0.00
0.00
(C) Total Rs. 114.76

TOTAL Rs. (A + B + C) 114.76

(D) Cenering & scaffolding charges 5% Rs. 0.00


(E) Water Charges at 1 % of A+B+C. Rs. 0.00
(F) Tools and Plants at 1 % of A+B+C Rs. 1.15
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 17.21
(H) Labour cess 1% 1.15
Grand Total (A+B+C+D+E+F+G) Rs. 134.26

LTD to 10% Rate for one CM Rs. 133.85

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C1 Excavation for foundation in all sorts of soil including sandy and gravelly soils, soft
murrum, hard murrum including depositing the excavated stuff as and where directed
including back filling the trenches with suitable excavated stuff etc. complete for lead upto
50 m. and lift as under. (By Manual)

(d) Lift 4.50 m to 6.00 m.


Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.

(A) MATERIALS

(A) Total Rs. 0.00


(B) CARRAGE OF MATERIALS

(B) Total Rs. 0.00


(C) LABOUR
Labour 0.63 No. 194.50 122.54
0.00
0.00
0.00
(C) Total Rs. 122.54

TOTAL Rs. (A + B + C) 122.54

(D) Cenering & scaffolding charges 5% Rs. 0.00


(E) Water Charges at 1 % of A+B+C. Rs. 0.00
(F) Tools and Plants at 1 % of A+B+C Rs. 1.23
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 18.38
(H) Labour cess 1% 1.23
Grand Total (A+B+C+D+E+F+G) Rs. 143.37

LTD to 10% Rate for one CM Rs. 141.65

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.

ITEM :C1 Excavation for foundation in all sorts of soil including sandy and gravelly soils, soft
murrum, hard murrum including depositing the excavated stuff as and where directed
including back filling the trenches with suitable excavated stuff etc. complete for lead upto
50 m. and lift as under. (By Manual)
RATE ANALYSIS : YEAR - 2012-13

(e) Each addl. 1.5 m lift upto 12 m.


Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.

(A) MATERIALS

(A) Total Rs. 0.00


(B) CARRAGE OF MATERIALS

(B) Total Rs. 0.00


(C) LABOUR
Labour 0.07 No. 194.50 12.64
0.00
0.00
0.00
(C) Total Rs. 12.64

TOTAL Rs. (A + B + C) 12.64

(D) Cenering & scaffolding charges 5% Rs. 0.00


(E) Water Charges at 1 % of A+B+C. Rs. 0.00
(F) Tools and Plants at 1 % of A+B+C Rs. 0.13
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 1.90
(H) Labour cess 1% 0.13
Grand Total (A+B+C+D+E+F+G) Rs. 14.79

LTD to 10% Rate for one CM Rs. 14.74

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C2 Excavation for foundation in soft rock including depositing the excavated stuff as and
where directed including back filling the trenches with suitable excavated stuff etc.
complete for lead upto 50 m and lift as under. (By Manual)

(a) Lift upto 1.5 m (SOR CELL Vol.3 Page 123)


Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.

(A) MATERIALS

(A) Total Rs. 0.00


(B) CARRAGE OF MATERIALS

(B) Total Rs. 0.00


(C) LABOUR
Labour 1.40 No. 194.50 272.30
0.00
0.00
0.00
(C) Total Rs. 272.30

TOTAL Rs. (A + B + C) 272.30

(D) Cenering & scaffolding charges 5% Rs. 0.00


(E) Water Charges at 1 % of A+B+C. Rs. 0.00
(F) Tools and Plants at 1 % of A+B+C Rs. 2.72
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 40.85
(H) Labour cess 1% 2.72
Grand Total (A+B+C+D+E+F+G) Rs. 318.59

LTD to 10% Rate for one CM Rs. 317.65

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C2 Excavation for foundation in soft rock including depositing the excavated stuff as and
where directed including back filling the trenches with suitable excavated stuff etc.
complete for lead upto 50 m and lift as under. (By Manual)

(b) Lift 1.5 m to 3.00 m.


Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.
(A) MATERIALS

(A) Total Rs. 0.00


(B) CARRAGE OF MATERIALS
(B) Total Rs. 0.00
(C) LABOUR
Labour 1.42 No. 194.50 276.19
0.00
0.00
0.00
(C) Total Rs. 276.19

TOTAL Rs. (A + B + C) 276.19

(D) Cenering & scaffolding charges 5% Rs. 0.00


(E) Water Charges at 1 % of A+B+C. Rs. 0.00
(F) Tools and Plants at 1 % of A+B+C Rs. 2.76
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 41.43
(H) Labour cess 1% 2.76
Grand Total (A+B+C+D+E+F+G) Rs. 323.14

LTD to 10% Rate for one CM Rs. 322.19

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C2 Excavation for foundation in soft rock including depositing the excavated stuff as and
where directed including back filling the trenches with suitable excavated stuff etc.
complete for lead upto 50 m and lift as under. (By Manual)

(c) Lift 3.0 m to 4.50 m.


Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.

(A) MATERIALS

(A) Total Rs. 0.00


(B) CARRAGE OF MATERIALS

(B) Total Rs. 0.00


(C) LABOUR
Labour 1.48 No. 194.50 287.86
0.00
0.00
0.00
(C) Total Rs. 287.86

TOTAL Rs. (A + B + C) 287.86

(D) Cenering & scaffolding charges 5% Rs. 0.00


(E) Water Charges at 1 % of A+B+C. Rs. 0.00
(F) Tools and Plants at 1 % of A+B+C Rs. 2.88
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 43.18
(H) Labour cess 1% 2.88
Grand Total (A+B+C+D+E+F+G) Rs. 336.80

LTD to 10% Rate for one CM Rs. 335.85

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C2
Excavation for foundation in soft rock including depositing the excavated stuff as and
where directed including back filling the trenches with suitable excavated stuff etc.
complete for lead upto 50 m and lift as under. (By Manual)
(d) Lift 4.50 m to 6.00 m.
Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.

(A) MATERIALS

(A) Total Rs. 0.00


(B) CARRAGE OF MATERIALS

(B) Total Rs. 0.00


(C) LABOUR
Labour 1.56 No. 194.50 303.42
0.00
0.00
0.00
(C) Total Rs. 303.42

TOTAL Rs. (A + B + C) 303.42

(D) Cenering & scaffolding charges 5% Rs. 0.00


(E) Water Charges at 1 % of A+B+C. Rs. 0.00
(F) Tools and Plants at 1 % of A+B+C Rs. 3.03
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 45.51
(H) Labour cess 1% 3.03
Grand Total (A+B+C+D+E+F+G) Rs. 355.00

LTD to 10% Rate for one CM Rs. 353.98

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C2 Excavation for foundation in soft rock including depositing the excavated stuff as and
where directed including back filling the trenches with suitable excavated stuff etc.
complete for lead upto 50 m and lift as under. (By Manual)

(e) Each addl. 1.5 m lift upto 12 m.


Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.

(A) MATERIALS

(A) Total Rs. 0.00


(B) CARRAGE OF MATERIALS

(B) Total Rs. 0.00


(C) LABOUR
Labour 0.073 No. 194.50 14.20
0.00
0.00
0.00
(C) Total Rs. 14.20

TOTAL Rs. (A + B + C) 14.20

(D) Cenering & scaffolding charges 5% Rs. 0.00


(E) Water Charges at 1 % of A+B+C. Rs. 0.00
(F) Tools and Plants at 1 % of A+B+C Rs. 0.14
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 2.13
(H) Labour cess 1% 0.14
Grand Total (A+B+C+D+E+F+G) Rs. 16.61

Rate for one CM Rs. 16.60

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C3 Excavation for foundation in hard rock upto 3 m. including blasting and chiselling if
necessary, sorting out and stacking separately the useable rubble, including depositing the
excavated stuff as and where directed including back filling the trenches with suitable
excavated stuff etc. complete for lead upto 50 m. and all lift. (By Machinery)

(SOR CELL Vol.3 Page 126)


Unit : CM
Rate for 1 CM
SR. NO. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
UNIT. RS.
(A) MATERIALS
1 Gelatine 0.16 Kg. 60.00 9.60
2 Detonator (Ord.) 0.00 No. 51.00 0.00
3 Detonator (Elect.) 1.00 No. 11.00 11.00
4 Fuse Coil 1.80 No. 3.25 5.85
(A) Total Rs. 26.45
(B) CARRAGE OF MATERIALS
(B) Total Rs. 0
(C) Hire charges for machinery
like jack hammer with
compressure 0.2 Hr. 880.00 176.00
(C) Total Rs. 176.00
(D) LABOUR
Labour 1.00 No. 194.50 194.50
0.00
0.00
0.00
(D) Total Rs. 194.50
TOTAL Rs. (A + B + C) 396.95

(E) Cenering & scaffolding charges 5% Rs. 0.00


(F) Water Charges at 1 % of A+B+C. Rs. 0.00
(G) Tools and Plants at 1 % of A+B+C Rs. 3.97
(H) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 59.54
(H) Labour cess 1% 3.97
Grand Total (A+B+C+D+E+F+G+H) Rs. 464.43

Rate for one CM Rs. 464.40

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C4 Providing & laying concrete of cement, sand and metal in M-10 (equivalent to cement
concrete of 1:3:6 ) grade including tamping, watering and curing, smooth finishing
where required etc. complete for lead 50 mt. and lift 2.50 mt.

(SOR CELL Vol.3 Page 141)


Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.
(A) MATERIALS
1 Cement 4.40 Bag 290.00 1276.00
2 Sand 0.456 C.M. 210.00 95.76
3 Metal 0.92 C.M. 425.00 391.00
(A) Total Rs. 1762.76
(B) CARRAGE OF MATERIALS
1 Cement 4.50 Bag 0.00
2 Sand 0.456 C.M. 0.00
3 Metal 0.92 C.M. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Mason 1st Class 0.05 No. 207.80 10.39
Mason 2nd Class 0.10 No. 199.90 19.99
Labour 1.90 No. 194.50 369.55
Bhisti 0.30 No. 196.30 58.89
(C) Total Rs. 458.82
TOTAL Rs. (A + B + C) 2221.58
(D) Cenering & scaffolding charges 0.5% Rs. 11.11
(E) Water Charges at 1 % of A+B+C. Rs. 22.22
(F) Tools and Plants at 1 % of A+B+C Rs. 22.22
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 333.24
(H) Labour cess 1% 22.22
Grand Total (A+B+C+D+E+F+G) Rs. 2632.57

Rate for one CM Rs. 2632.60

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C5
Filling in foundation with concrete of cement, sand and gravel in M.10 (equivalent to
cement concrete of 1:3:6 ) grade including tamping, watering and curing, smooth
finishing where required etc. complete for lead 50 mt. and lift 2.50 mt.

(SOR CELL Vol.3 Page 141)


Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.

(A) MATERIALS
1 Cement 4.40 Bag 290.00 1276.00
2 Sand 0.456 C.M. 210.00 95.76
3 Gravel 0.92 C.M. 210.00 193.20
(A) Total Rs. 1564.96
(B) CARRAGE OF MATERIALS
1 Cement 6.40 Bag 0.00
2 Sand 0.445 C.M. 0.00
3 Gravel 0.89 C.M. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Mason 1st Class 0.05 No. 207.80 10.39
Mason 2nd Class 0.10 No. 199.90 19.99
Labour 1.90 No. 194.50 369.55
Bhisti 0.30 No. 196.30 58.89
(C) Total Rs. 458.82

TOTAL Rs. (A + B + C) 2023.78

(D) Cenering & scaffolding charges 0.5% Rs. 10.12


(E) Water Charges at 1 % of A+B+C. Rs. 20.24
(F) Tools and Plants at 1 % of A+B+C Rs. 20.24
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 303.57
(H) Labour cess 1% 20.24
Grand Total (A+B+C+D+E+F+G) Rs. 2398.18

Rate for one CM Rs. 2398.20

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C6 Providing and laying Random Rubble Masonary in foundation upto the top of the check
dam in mortar of cement and sand in 1:6 proportion including striking out joints with
curing watering etc. complete.

Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.

(A) MATERIALS
1 Cement 1.75 Bag 290.00 507.50
2 Sand 0.35 C.M. 210.00 73.50
3 Rubble 1.25 C.M. 185.00 231.25
(A) Total Rs. 812.25
(B) CARRAGE OF MATERIALS
1 Cement 1.75 Bag 0.00
2 Sand 0.35 C.M. 0.00
3 Rubble 1.25 C.M. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Mason 1st Class 0.20 No. 207.80 41.56
Mason 2nd Class 0.50 No. 199.90 99.95
Labour 2.00 No. 194.50 389.00
Bhisti 0.15 No. 196.30 29.45
(C) Total Rs. 559.96

TOTAL Rs. (A + B + C) 1372.21

(D) Cenering & scaffolding charges 0.5% Rs. 6.86


(E) Water Charges at 1 % of A+B+C. Rs. 13.72
(F) Tools and Plants at 1 % of A+B+C Rs. 13.72
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 205.83
(H) Labour cess 1% 13.72
Grand Total (A+B+C+D+E+F+G) Rs. 1626.06

Rate for one CM Rs. 1626.10

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C7 Plain cement concrete of cement sand and metal (unvibrated) in 1:2:4 proportion laid in
situ including temping smooth finishing watering and curing for lead upto 50 m. and lift
upto 1.5 m.

(SOR CELL Vol.4 Page 41)


Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.

(A) MATERIALS
1 Cement 5.60 Bag 290.00 1624.00
2 Sand 0.445 C.M. 210.00 93.45
3 Metal 0.89 C.M. 425.00 378.25
(A) Total Rs. 2095.70
(B) CARRAGE OF MATERIALS
1 Cement 5.40 Bag 0.00
2 Sand 0.445 C.M. 0.00
3 Metal 0.89 C.M. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Mason 1st Class 0.05 No. 207.80 10.39
Mason 2nd Class 0.10 No. 199.90 19.99
Labour 1.90 No. 194.50 369.55
Bhisti 0.30 No. 196.30 58.89
(C) Total Rs. 458.82

TOTAL Rs. (A + B + C) 2554.52

(D) Cenering & scaffolding charges 3% Rs. 76.64


(E) Water Charges at 1 % of A+B+C. Rs. 25.55
(F) Tools and Plants at 1 % of A+B+C Rs. 25.55
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 383.18
(H) Labour cess 1% 25.55
Grand Total (A+B+C+D+E+F+G) Rs. 3090.97

Rate for one CM Rs. 3091.00

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C8A
Providing and laying M-15 Grade plain/ reinforced ordinary portland cement concrete of
various grade with cement, sand and coarse aggregate including centering, shuttering,
batching, mixing transporting, placing, vibrating curing etc. complete.

M15 (a) with water curing. (SOR CELL Vol.4 Page 41)
Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.

(A) MATERIALS
1 Cement 5.60 Bag 290.00 1624.00
2 Sand 0.445 C.M. 210.00 93.45
3 Metal 0.89 C.M. 425.00 378.25
(A) Total Rs. 2095.70
(B) CARRAGE OF MATERIALS
1 Cement 5.40 Bag 0.00
2 Sand 0.445 C.M. 0.00
3 Metal 0.89 C.M. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Mason 1st Class 0.05 No. 207.80 10.39
Mason 2nd Class 0.10 No. 199.90 19.99
Labour 1.90 No. 194.50 369.55
Bhisti 0.30 No. 196.30 58.89
(C) Total Rs. 458.82
TOTAL Rs. (A + B + C) 2554.52

(D) Cenering & scaffolding charges 3% Rs. 76.64


(E) Water Charges at 1 % of A+B+C. Rs. 25.55
(F) Tools and Plants at 1 % of A+B+C Rs. 25.55
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 383.18
(H) Labour cess 1% 25.55
Grand Total (A+B+C+D+E+F+G) Rs. 3090.97

Rate for one CM Rs. 3091.00

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C8A
Providing and laying M-15 Grade plain/ reinforced ordinary portland cement concrete of
various grade with cement, sand and coarse aggregate including centering, shuttering,
batching, mixing transporting, placing, vibrating curing etc. complete.

M15 (b) with Membrane curing. (SOR CELL Vol.4 Page 41)
Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.
(A) MATERIALS
1 Cement 5.60 Bag 290.00 1624.00
2 Sand 0.445 C.M. 210.00 93.45
3 Metal 0.89 C.M. 425.00 378.25
4 Curing compound 2.00 Lit. 31.00 62.00
(A) Total Rs. 2157.70
(B) CARRAGE OF MATERIALS
1 Cement 5.40 Bag 0.00
2 Sand 0.445 C.M. 0.00
3 Metal 0.89 C.M. 0.00
4 Curing compound 2.00 Lit. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Mason 1st Class 0.05 No. 207.80 10.39
Mason 2nd Class 0.10 No. 199.90 19.99
Labour 1.90 No. 194.50 369.55
Bhisti 0.30 No. 196.30 58.89
(C) Total Rs. 458.82
TOTAL Rs. (A + B + C) 2616.52
(D) Cenering & scaffolding charges 3% Rs. 78.50
(E) Water Charges at 1 % of A+B+C. Rs. 26.17
(F) Tools and Plants at 1 % of A+B+C Rs. 26.17
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 392.48
(H) Labour cess 1% 26.17
Grand Total (A+B+C+D+E+F+G) Rs. 3165.99

Rate for one CM Rs. 3166.00

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C8B
Providing and laying M-20 Grade plain/ reinforced ordinary portland cement concrete of
various grade with cement, sand and coarse aggregate including centering, shuttering,
batching, mixing transporting, placing, vibrating curing etc. complete.

(a) with water curing. MAS-40


Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.

(A) MATERIALS
1 Cement 6.60 Bag 290.00 1914.00
2 Sand 0.414 C.M. 210.00 86.94
3 Metal 0.829 C.M. 425.00 352.33
(A) Total Rs. 2353.27
(B) CARRAGE OF MATERIALS
1 Cement 8.10 Bag 0.00
2 Sand 0.414 C.M. 0.00
3 Metal 0.829 C.M. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Mason 1st Class 0.05 No. 207.80 10.39
Mason 2nd Class 0.10 No. 199.90 19.99
Labour 2.00 No. 194.50 389.00
Bhisti 0.30 No. 196.30 58.89
(C) Total Rs. 478.27

TOTAL Rs. (A + B + C) 2831.54

(D) Cenering & scaffolding charges 3% Rs. 84.95


(E) Water Charges at 1 % of A+B+C. Rs. 28.32
(F) Tools and Plants at 1 % of A+B+C Rs. 28.32
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 424.73
(H) Labour cess 1% 28.32
Grand Total (A+B+C+D+E+F+G) Rs. 3426.16

Rate for one CM Rs. 3426.20

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
ITEM :C8B
Providing and laying M-20 Grade plain/ reinforced ordinary portland cement concrete of
various grade with cement, sand and coarse aggregate including centering, shuttering,
batching, mixing transporting, placing, vibrating curing etc. complete.
RATE ANALYSIS : YEAR - 2012-13

(b) with Membrane curing.MAS-40


Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.

(A) MATERIALS
1 Cement 6.60 Bag 290.00 1914.00
2 Sand 0.414 C.M. 210.00 86.94
3 Metal 0.829 C.M. 425.00 352.33
4 Curing compound 2.00 Lit. 31.00 62.00
(A) Total Rs. 2415.27
(B) CARRAGE OF MATERIALS
1 Cement 8.10 Bag 0.00
2 Sand 0.414 C.M. 0.00
3 Metal 0.83 C.M. 0.00
4 Curing compound 2.00 Lit. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Mason 1st Class 0.05 No. 207.80 10.39
Mason 2nd Class 0.10 No. 199.90 19.99
Labour 2.00 No. 194.50 389.00
Bhisti 0.30 No. 196.30 58.89
(C) Total Rs. 478.27
TOTAL Rs. (A + B + C) 2893.54
(D) Cenering & scaffolding charges 3% Rs. 86.81
(E) Water Charges at 1 % of A+B+C. Rs. 28.94
(F) Tools and Plants at 1 % of A+B+C Rs. 28.94
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 434.03
(H) Labour cess 1% 28.94
Grand Total (A+B+C+D+E+F+G) Rs. 3501.18

Rate for one CM Rs. 3501.20

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

Item : C9
Providing and Placing in position HYSD reinforce bars, including cutting, bending, welding
joints where necessary hooking etc. complete as per drawing for all lead and lift.

(A) High yield strength deformed (HYSD tor steel)


Unit MT
Rate for : 1 MT

SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT


NO. UNIT. RS.

(A) MATERIALS
1 Steel 1.05 MT 44000.00 46200.00
2 Binding Wire 7.50 kg 55.00 412.50
(A) Total Rs. 46612.50

(B) CARRAGE OF MATERIALS


1 Steel 1.05 MT 0.00
2 Binding Wire 7.50 kg 0.00
(B) Total Rs. 0.00

(C) LABOUR
Labour 6 No. 194.50 1167.00
Blacksmith 6 No, 199.90 1199.40
(C) Total Rs. 2366.40

TOTAL Rs. (A + B + C) 48978.90

(D) Tools and Plants at 1 % of A+B+C Rs. 489.79


(E) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 7346.835
(F) Labour cess 1% 489.79
Grand Total (A+B+C+D+E) Rs. 57305.31
Rate for one MT Rs. 57305.30

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

Item : C9
Providing and Placing in position MS/HYSD reinforce bars, including cutting, bending,
welding joints where necessary hooking etc. complete as per drawing for all lead and lift.

(B) TMT/CRS
Unit MT
Rate for : 1 MT

SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT


NO. UNIT. RS.

(A) MATERIALS
1 Steel 1.05 MT 48000.00 50400.00
2 Binding Wire 7.50 kg 55.00 412.50
(A) Total Rs. 50812.50

(B) CARRAGE OF MATERIALS


1 Steel 1.05 MT 0.00
2 Binding Wire 7.50 kg 0.00
(B) Total Rs. 0.00

(C) LABOUR
Labour 6 No. 194.50 1167.00
Blacksmith 6 No, 199.90 1199.40
(C) Total Rs. 2366.40

TOTAL Rs. (A + B + C) 53178.90

(D) Tools and Plants at 1 % of A+B+C Rs. 531.79


(E) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 7976.84
(F) Labour cess 1% 531.79
Grand Total (A+B+C+D+E) Rs. 62219.31

LTD TO 10% Rate for one MT Rs. 62200.38

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

Item : C9
Providing and Placing in position M.S. reinforce bars, including cutting, bending, welding
joints where necessary hooking etc. complete as per drawing for all lead and lift.

(C) (SOR CELL Vol.2 Page 190)


Unit MT
Rate for : 1 MT

SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT


NO. UNIT. RS.

(A) MATERIALS
1 Steel 1.05 MT 42000.00 44100.00
2 Binding Wire 7.50 kg 55.00 412.50
(A) Total Rs. 44512.50

(B) CARRAGE OF MATERIALS


1 Steel 1.05 MT 0.00
2 Binding Wire 7.50 kg 0.00
(B) Total Rs. 0.00

(C) LABOUR
Labour 6 No. 194.50 1167.00
Blacksmith 6 No, 199.90 1199.40
(C) Total Rs. 2366.40

TOTAL Rs. (A + B + C) 46878.90

(D) Tools and Plants at 1 % of A+B+C Rs. 468.79


(E) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 7031.835
(F) Labour cess 1% 468.79
Grand Total (A+B+C+D+E) Rs. 54848.31

Rate for one MT Rs. 54848.30

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C10 Providing and Fixing M.S. Gate with necessary hoisting arrangement
embedments fixing etc. complete for the following sizes.
(a) Size (0.80 x 0.80) m
(b) Size ( 1.0 x 1.0 ) m
(c) size (1.2 x 1.2 ) m
Unit : No. (As per Calculation)
Rate for : 1 No.
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.

(A) MATERIALS
1 Steel Assembly 135 Kg. 52.90 7141.50
2 Padestal with accesssaries 1 No. 430.00 430.00
3 Nut - Bolt L.S. 75.00 75.00
4 Welding Rods L.S. X X
(A) Total Rs. 7646.50

(B) CARRAGE OF MATERIALS


1 Steel Assembly 135 Kg. 0.00
2 Padestal with accesssaries 1 No. 0.00
3 Nut - Bolt L.S. 0.00
4 Welding Rods L.S. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Labour 0.25 No. 194.50 48.625
Fabrication Charges 135 Kg. 7.70 1039.50
(C) Total Rs. 1088.125

TOTAL Rs. (A + B + C) 8734.625

(D) Tools and Plants at 1 % of A+B+C Rs. 87.35


(E) Contractor's Profit & O/H charges at 15 % of A+B+C 1310.19
(F) Labour cess 1% 87.35
Grand Total (A+B+C+D+E+F) Rs. 10219.51

Rate for one No. Rs. 10219.51

Say Rs. 10219.50

(a) Size (0.80 x 0.80) m 0.64 6490.00 6541.00


(b) Size ( 1.0 x 1.0 ) m 1 10150.00 10220.00
(c) Size (1.2 x 1.2 ) m 1.44 14615.00 14717.00

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM C11
Providing and Fixing 1.2 m long M. S. Anchor bars of 16 mm dia for anchoring by
drilling 35 mm dia hole in foundation strata including necessary cutting, bending,
hoisting bars and grouting the holes with cement slurry etc. complete (0.60 m to be
embedded in rock and 0.60 m above the ground / concrete structure).

Unit : No
Rate for : 1 No.

SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT


NO. UNIT. RS.
(A) MATERIALS
1 MS Bar 0.75 m in ground & 0.75 m 2.37 Kg. 44.00 104.28
above ground
2 Cement Slurry. L.S. 23.00 23.00
(A) Total Rs. 127.28
(B) CARRAGE OF MATERIALS

1 MS Bar 0.75 m in ground & 0.75 m 2.37 Kg. 0.00


above ground

(B) Total Rs. 0.00

(C) LABOUR
Labour 0.25 No. 194.50 48.625
Drilling charges L.S 34.50 34.50
(C) Total Rs. 83.125

TOTAL Rs. (A + B + C) 210.405

(D) Tools and Plants at 1 % of A+B+C Rs. 2.10


(E) Contractor's Profit & O/H charges at 15 % of A+B+C 31.56
(F) Labour cess 1% 2.10
Grand Total (A+B+C+D+E+F) Rs. 246.17

Rate for one No. Rs. 246.17


Say Rs. 246.20

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS : YEAR - 2012-13

ITEM :C-12
Filling in foundation with concrete of cement, sand and metal in M-7.5 (equivalent to
cement concrete of 1:4:8 ) grade including tamping, watering and curing, smooth
finishing where required etc. complete for lead 50 mt. and lift 2.50 mt.

Unit : CM
Rate for 1 CM
SR. PARTICULARS QUANTITY UNIT RATE PER AMOUNT
NO. UNIT. RS.
(A) MATERIALS
1 Cement 3.40 Bag 290.00 986.00
2 Sand 0.470 C.M. 210.00 98.70
3 Metal 0.89 C.M. 425.00 378.25
(A) Total Rs. 1462.95
(B) CARRAGE OF MATERIALS
1 Cement 4.50 Bag 0.00
2 Sand 0.456 C.M. 0.00
3 Metal 0.92 C.M. 0.00
(B) Total Rs. 0.00
(C) LABOUR
Mason 1st Class 0.05 No. 207.80 10.39
Mason 2nd Class 0.10 No. 199.90 19.99
Labour 1.80 No. 194.50 350.10
Bhisti 0.30 No. 196.30 58.89
(C) Total Rs. 439.37
TOTAL Rs. (A + B + C) 1902.32
(D) Cenering & scaffolding charges 0.5% Rs. 9.51
(E) Water Charges at 1 % of A+B+C. Rs. 19.02
(F) Tools and Plants at 1 % of A+B+C Rs. 19.02
(G) Contractor's Profit & O/H charges at 15 % of A+B+C Rs. 285.35
(H) Labour cess 1% 19.02
Grand Total (A+B+C+D+E+F+G) Rs. 2254.25

Rate for one CM Rs. 2254.20

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.
RATE ANALYSIS - YEAR : 2013-14
ITEM NO. C-13 (For canals having capacity beyond 8.5 cumecs)
Excavation for foundation in all sorts of soil including sandy and gravelly soils, soft murrum, hard murrum
including depositing the excavated stuff as and where directed including back filling the trenches with
suitable excavated stuff etc. complete for lead upto 50 m. and with all lifts. ( By Machinery)

Excluding dewatering.

1. EXCAVATION AND LOADING .

Excavation with poclane Ex.280 Model


Bucket capacity = 0.90 Cum
OUTPUT OF BUCKET CAPACITY 0.96 Cum IS AVAILABLE IN CWC WORKING GROUP REPORT TABLE (F)
FOR OUTPUT OF 0.90 Cum BUCKET CAPACITY, MULTIPLIED BY 0.94.
Ideal production fo = 161 soil + 176.00 sand
Ideal production fo = 151.34 soil + 165.44 sand
Average 158.39 Cum
Factors affecting the out put

1. Factor for depth


of cut and angle
of swing
= 0.98 ( % of optimum depth = 100 )
optimum depth and swing factor
(swing=75) (C.W.C group report table G).

2. Operating factor
(Excellent) (tabl = 0.92

3. Job management factor


(Excellent management condition
and Good job condition (table D). 0.78

4. Bucket fill factor (table E) 1.00

Out put per hour = 158.39 x 0.98 x 0.92 x 0.78 x 1.00


= 111.39 Cum/hours.

Hourly use rate of excavator Rs. 2510.00 per/hours. (Annexure -1)

Cost of excavation. = 2510.00 = 22.53 Rs/Cum………(A)


111.39
II. TRANSPORTATION.

Cost of Transportation
Dumper carriage capacity = 10 M.Ton.
Density = 1.6 m.ton / Cum
Body capacity = 10 = 6.25 Cum
1.6
CYCLE TIME
BODY CAPACITY
LOADING TIME = -----------------------------
EXCAVATOR OUTPUT

6.25 X 60.00
= --------------------------
111.39
= 3.37 MIN.

LOADED HAUL TIME 0.05 X 60.00


( SPEED = 30 KMPH ) = -------------------------------
30
= 0.10 MIN.

UNLOADING,TURNING, DUMPING & SPOTTING TIME 3.30 MIN.


( AS PER CWC W.G.R. P.NO. 90 )
EMPTY HAUL TIME 0.05 X 60.00
( SPEED = 40 KMPH )= -------------------------------
40
= 0.075 MIN.
TOTAL CYCLE TIME = 6.84 MIN.

TOTAL NO. OF TRIPS PER WORKING HOUR OF 50 MIN.


= 50.00 / 6.84
= 7.31 TRIPS
OUTPUT OF TIPPER = 6.25 X 7.31
= 45.68 Cum/hr
Hourly use rate of Dumper 1070.00 Rs./hour. (Annexure -2)

Transportation cost per Cum = Hourly use rate = 1070.00 = 23.43 Rs./hr.
Out put 45.68
Total cost of excavation,
Loading, Unloading and
transportation.= (A) = 22.53 + 23.43 = Rs. 45.96

III Cost of dressing the section, breaking clods & spreading Rs. 0.00
in uniform layers @ 20 % of cost of excavation.
Total 45.96
Add for Labour cess 1% 0.46
Tools & Plant 1% 0.46
Contractor's profit & Over heads 15% 6.89

TOTAL 53.77

Rate per Cum = Rs. 53.80

Executive Engineer,
Vadodara Irrigation Division
Vadodara.
RATE ANALYSIS - YEAR : 2013-14
ITEM NO. C -14 (For canals having capacity beyond 8.5 cumecs)

Excavation for foundation in soft rock including depositing the excavated stuff as and where directed including
back filling the trenches with suitable excavated stuff etc. complete for lead upto 50 m and all lifts. ( By
Machinery )

Excluding dewatering.

1. EXCAVATION AND LOADING .

Excavation with poclane Ex.280 Model


Bucket capacity = 0.90 Cum
OUTPUT OF BUCKET CAPACITY 0.96 Cum IS AVAILABLE IN CWC WORKING GROUP REPORT TABLE (F)
FOR OUTPUT OF 0.90 Cum BUCKET CAPACITY, MULTIPLIED BY 0.94.
Ideal production for 0.96 Cum B.C. 99 ( common excavation in rocks & roots)
Ideal production for 0.90 Cum B.C. 93.06

93.06 Cum
Factors affecting the out put
1. Factor for depth
of cut and angle
of swing = 0.98 ( % of optimum depth = 100 )
optimum depth and swing factor
(swing=75) (C.W.C group report table G).

2. Operating factor
(Excellent) (tabl = 0.92

3. Job management factor


(Excellent management condition
and Good job conditi = 0.78

4. Bucket fill factor (table E) 0.75

Out put per hour = 93.06 x 0.98 x 0.92 x 0.78 x 0.75


= 49.08 Cum/hours.

Hourly use rate of excavator Rs. 2510.00 per/hours. (Annexure -1)

Cost of excavation. = 2510.00 = 51.14 Rs/Cum………(A)


49.08
II. TRANSPORTATION.

Cost of Transportation
Dumper carriage capacity 10 M.Ton.
Density = 2.1 m.ton / Cum
Body capacity = 10 = 4.76 Cum
2.1

CYCLE TIME
BODY CAPACITY
LOADING TIME = -----------------------------
EXCAVATOR OUTPUT
4.76 X 60.00
= --------------------------
49.08
= 5.82 MIN.
LOADED HAUL TIME 0.05 X 60.00
( SPEED = 30 KMPH ) = -------------------------------
30
= 0.10 MIN.

UNLOADING,TURNING, DUMPING & SPOTTING TIME 3.30 MIN.


( AS PER CWC W.G.R. P.NO. 90 )
EMPTY HAUL TIME 0.05 X 60.00
( SPEED = 40 KMPH ) = -------------------------------
40
= 0.075 MIN.

TOTAL CYCLE TIME = 9.30 MIN.


TOTAL NO. OF TRIPS PER WORKING HOUR OF 50 MIN.
= 50.00 / 9.30
= 5.38 TRIPS
OUTPUT OF TIPPER = 4.76 X 5.38
= 25.60 Cum/hr

Hourly use rate of Dumper = 1070.00 Rs./hour. (Annexure -2)

Transportation cost per Cum = Hourly use rate = 1070.00 = 41.79 Rs./hr. (B).
Out put 25.60
Total cost of excavation,
Loading, Unloading and
transportation.= (A) = 51.14 + 41.79 Rs. 92.93

Cost of dressing the section, breaking clods & spread @20% Rs. 0.00
in uniform layers @ 20 % of cost of excavation.

Total = Rs. 92.93


Add for Labour cess 1% 0.93
Tools & Plant 1% 0.93
Contractor's profit & Over heads 15% 13.94

TOTAL 108.73

Rate per Cum = Rs. 108.70

Executive Engineer,
Vadodara Irrigation Division
Vadodara.
RATE ANALYSIS - YEAR : 2013-14
ITEM-
C-15 Providing and fixing in position the name and number plate of white marble of 2.5 cm. thickness
size including engraving the letters and filling with lead etc.complete.(45x45) cm

( As per field experience)

Unit : No.
Rate for 1 No
Sr. No. Description Quantity Unit Rate per Unit Amount

(A) MATERIALS :
marble plate 1 No. 1505.00 1505.00
cement LS 25.00 25.00

1530.00

(B) CARRIAGE:
marble plate 1 No. 0.00
0.00

(C) LABOUR :

Mason 2nd 0.30 No. 199.90 59.97

59.97

Total ( A+ B + C ) 1589.97

(D) Water Charges at 1 % of A + B + C Rs. 0.00


(E) (Tools
If necessary ) at 1 % of A + B + C
and Plants Rs. 0.00
(F) Contractor's Profit & O/H charges at 15% of A + B + C Rs. 234.75
(G) Sundries Rs. 0.00
Labour cess 1% Rs. 15.90
Total A + B + C + D + E + F+ G = Rs. 1840.62

Rate per No. =Rs. 1840.60

Executive Engineer,
Vadodara Irrigation Division,
Vadodara.