Sanction issued for electrical & civil works and status of civil and
electrical works to be updated which was to be completed by
Mar.’19.
Continuing Schemes
4. Replacement of 20 kW MW Tx by 20 kW MW Transmitter at
Tawang.
Transmitter has been taken in regular service. ZO intimated that
twist in mast observed, re-examined by IIT Guwahati and targeted
to be completed by Oct.’19.
Advance A/T placed for SITC of Regional Archive Centre with Media
Management System at AIR Guwahati. Layout plan of equipment
issued on 07.08.2019 by Studio Design Section.