RESUMEN DE RESULTADOS DE LOS ANALISIS DE BONDAD DE

MEJOR AJUSTE KOLMOGOROV-SMIRNOV


DISTRIBUCI ESTACION DOS DE MAYO Y JACAS GRANDE
ON D calc. Max. (1) D tabla (2)
Normal 0.1748 0.3041
Gumbel 0.1071 0.3041
LN2P 0.1045 0.3041
LN3P 0.0743 0.3041
LP3 0.0734 0.3041
Mejor ajuste LP3
Periodo Precip. Corrección
Retorno (mm) intervalo fijo

Años XT'(mm) XT (mm)

5 39.4100 44.5333
10 47.1000 53.2230
20 55.4700 62.6811
25 58.3400 65.9242
50 67.8900 76.7157
100 78.5200 88.7276
200 90.3300 102.0729
500 108.0000 122.0400
Riesgo de excedencia (%) durante la vida útil para diferentes tiempos de retorno.

Años de Vida Útil


Período de
Retorno
(años) 10 20 25 50 100
10 65.13% 87.84% 92.82% 99.48% 99.99%
15 49.84% 74.84% 82.18% 96.82% 99.90%
20 40.13% 64.15% 72.26% 92.31% 99.41%
25 33.52% 55.80% 63.96% 87.01% 98.31%
50 18.29% 33.24% 39.65% 63.58% 86.74%
100 9.56% 18.21% 22.22% 39.50% 63.40%
500 1.98% 3.92% 4.88% 9.30% 18.14%
1000 1.00% 1.98% 2.47% 4.88% 9.52%
10000 0.10% 0.20% 0.25% 0.50% 0.75%

Valores de periodo de retorno T (años).


RIESGO
VIDA ÚTIL DE LAS OBRAS (n años)
ADMISIBLE
K 1 2 3 5 10 20 25 50 100 200
0,01 100 199 299 498 995 1990 2488 4975 9950 19900
0,02 50 99 149 248 495 990 1238 2475 4950 9900
0,05 20 39 59 98 195 390 488 975 1950 3900
0,10 10 19 29 48 95 190 238 475 950 1899
0,20 5 10 14 23 45 90 113 225 449 897
0,25 4 7 11 18 35 70 87 174 348 695
0,50 2 3 5 8 15 29 37 73 154 289
0,75 1,3 2 2,7 4,1 7,7 15 18 37 73 144
0,99 1 1,11 1,27 1,66 2,7 5 5,9 11 22 44
En ese sentido, a continuacion, se muestra el tiempo de retorno calculado en funcion de las condideraciones del item 3.6 manual de
Hidrologia, Hidraulica y Drenaje.

ALCANTARIL DRENAJE
ALCANTARIL DEFENSAS
OBRA DE PUENTE LAS DE LA
LAS SUBDRENES RIBEREÑA
DRENAJE S MAYORES Y PLATAFORM
MENORES S
BADENES A

n(Vida util de
40 25 15 15 15 40
las Obras)
R(Riesgo
25.00% 30.00% 35.00% 40.00% 40.00% 25.00%
Admisible)

Tr Calculado 139.54 70.59 35.32 29.87 29.87 139.54

Tr Empleado 140 70 35 30 30 140


TIEMPO DE CONCENTRACIÓN (hr)

TIEMPO DE
N° PUENTE US MEDIA DURACION
HATHAWA BRANSBY
KIRPICH CORP. GEOMETRIC (MIN)
Y WILLIAMS
ING. A

1 OLIVA 0.57 1.06 1.85 1.84 1.20 72.00

TLAG = TIEMPO DE RETARDO

· Fórmula de Kirpich:

L 0 . 77
T c  0 . 06628 0 . 385
S
· Fórmula del US Corps of Engineers (Temez):

L 0 . 76
Tc  0 .3 0 . 19
S
· Fórmula de Bransby - Williams:

L
T c  0 . 2433
A 0 .1 S 0 .2

· Fórmula de Hathaway

( L .n ) 0 . 467
T c  36 . 60
Donde: S 0 .234
Tc = Tiempo de concentración en horas.
L = Longitud del cauce en Km.
S = Pendiente en m/m.
A = Área Km2.
K= 69.29979576
m= 0.219578294
n= 0.537521437
Período de Retorno (T) en años
Duración (t) (minutos)
10 25 50 90 100 200 500
10 33.33 40.75 47.45 53.99 55.25 64.34 78.68
20 22.96 28.08 32.69 37.20 38.07 44.33 54.20
30 18.46 22.58 26.29 29.91 30.61 35.65 43.59
40 15.82 19.34 22.52 25.63 26.23 30.54 37.34
50 14.03 17.16 19.98 22.73 23.26 27.09 33.12
60 12.72 15.56 18.11 20.61 21.09 24.56 30.03
70 11.71 14.32 16.67 18.97 19.41 22.61 27.64
80 10.90 13.33 15.52 17.66 18.07 21.04 25.73
90 10.23 12.51 14.57 16.57 16.96 19.75 24.15
100 9.67 11.82 13.76 15.66 16.03 18.66 22.82
110 9.18 11.23 13.08 14.88 15.23 17.73 21.68
120 8.76 10.72 12.48 14.20 14.53 16.92 20.69
Período de
Retorno (T) en
años
N°01 0BRA DE ARTE TC(MIN) PUENTES Y
DEFENSA
RIBEREÑA

140
1 OLIVA 72.00 20.59
CALCULO HIDROLOGICO ESTUDIO DEFINITIVO: "INSTALACION D

COORDENADAS DE
DESCARGA COTA (MSNM)
CODIG COEFICIE LONGITUD
NOMBRE DE
O SUB- NTE DE AREA AREA PERIMET DEL
N° RIO O
CUENC ESCORR (KM2) (HA) RO (KM) CAUCE
QUEBRADA
A ENTIA ESTE NORTE (M)

MAX MIN
14825789.1 1 PAICARAN C-1 0.45 207782.13 9056369.13 14.82579 1482.579 19.642 7126 4250 2925
O DEFINITIVO: "INSTALACION DEL PUENTE MODULAR OLIVA, DISTRITO DE RAGASH, PROVINCIA DE SIHUAS, DEPARTAMENTO DE ANCASH".

CAUDAL
I (MM/H)
COTA (MSNM) (M3/S)
INDICE TIEMPO
DESNI PENDIE
PENDIEN PENDIE DE DE ESTACION A ESTRUCTURA
VEL NTE MET.
TE (MM) NTE (%) COMPA DURACIO USAR TR=140 EXISTENTE
(M) (%0) TR=140
CIDAD N (MIN) PUENTE
PUENTES
S
MED
3587.5 1325 0.186 18.594 185.939 1.44 72.0048 20.5900 SIHUAS MAT MATCH 82.5270 PUENTE RUSTICO
DIMENSIONES

ESTRUCTURA DE
RECOMEND. REEMPLAZO O
NUEVA
LARGO(M) ANCHO (M)

REEMPLAZAR PUENTE MODULAR 18.288 4.2


MEMORIA DE CALCULO

* CALCULO HIDRAULICO DE LA SECCION DEL BADEN:


Para determinar el tirante en el badén se utilizo la fórmula de vertederos de cresta ancha:

Donde:
Q :Caudal (m3/s).
L :Ancho del agua sobre el badén (m).
h :Tirante de agua sobre el badén (m).

CALCULO DE BADENES HIDRAULICO DE LA SECCION DEL BADEN


N° PROG. OBRA DE ARTE Q(M3/S) Ltotal
1 3 Err:509 Err:509 Err:509 27
2 7 Err:509 Err:509 Err:509 24
3 9 Err:509 Err:509 Err:509 20
4 12 Err:509 Err:509 Err:509 32
5 17 Err:509 Err:509 Err:509 24
6 22 Err:509 Err:509 Err:509 64
7 24 Err:509 Err:509 Err:509 20
8 24 Err:509 Err:509 Err:509 35
9 35 Err:509 Err:509 Err:509 364
10 35 Err:509 Baden Err:509 12
11 35 Err:509 Baden Err:509 12
12 42 Err:509 Err:509 Err:509 48
13 43 Err:509 Err:509 Err:509 48
14 44 Err:509 Err:509 Err:509 15
15 45 Err:509 Err:509 Err:509 36
16 46 Err:509 Err:509 Err:509 92
17 47 Err:509 Err:509 Err:509 15
18 48 Err:509 Err:509 Err:509 36
19 51 Err:509 Err:509 Err:509 32
20 55 Err:509 Err:509 Err:509 32
21 56 Err:509 Err:509 Err:509 28
22 60 Err:509 Err:509 Err:509 24
23 63 Err:509 Err:509 Err:509 28
24 64 Err:509 Err:509 Err:509 28
25 66 Err:509 Err:509 Err:509 28
26 67 Err:509 Err:509 Err:509 12
27 68 Err:509 Err:509 Err:509 21
28 69 Err:509 Err:509 Err:509 32
29 71 Err:509 Err:509 Err:509 21
30 73 Err:509 Err:509 Err:509 21
31 74 Err:509 Err:509 Err:509 28
32 75 Err:509 Err:509 Err:509 72
33 76 Err:509 Err:509 Err:509 40
34 77 Err:509 Err:509 Err:509 12
35 80 Err:509 Err:509 Err:509 40
36 81 Err:509 Err:509 Err:509 20
37 82 Err:509 Err:509 Err:509 40
38 83 Err:509 Err:509 Err:509 27
39 84 Err:509 Err:509 Err:509 20
40 85 Err:509 Err:509 Err:509 32
41 88 Err:509 Err:509 Err:509 27
42 89 Err:509 Err:509 Err:509 15
43 90 Err:509 Err:509 Err:509 12
44 91 Err:509 Err:509 Err:509 40
45 92 Err:509 Err:509 Err:509 52
46 93 Err:509 Err:509 Err:509 27
47 94 Err:509 Err:509 Err:509 15
48 100 Err:509 Err:509 Err:509 21
49 106 Err:509 Err:509 Err:509 20
50 108 Err:509 Err:509 Err:509 21
51 109 Err:509 Err:509 Err:509 20
52 110 Err:509 Err:509 Err:509 20
53 112 Err:509 Err:509 Err:509 21
54 114 Err:509 Err:509 Err:509 15
55 116 Err:509 Err:509 Err:509 18
56 118 Err:509 Err:509 Err:509 15
57 120 Err:509 Err:509 Err:509 20
58 121 Err:509 Err:509 Err:509 20
59 124 Err:509 Err:509 Err:509 27
60 126 Err:509 Err:509 Err:509 20
61 132 Err:509 Baden Err:509 100
PROG. L(m) n S Ymax.(m)

1 Err:509 27.00 0.025 0.025 0.35


2 Err:509 24.00 0.025 0.025 0.35
3 Err:509 20.00 0.025 0.025 0.35
4 Err:509 32.00 0.025 0.025 0.35
5 Err:509 24.00 0.025 0.025 0.35
6 Err:509 64.00 0.025 0.025 0.35
7 Err:509 20.00 0.025 0.025 0.35
8 Err:509 35.00 0.025 0.025 0.35
9 Err:509 364.00 0.025 0.025 0.35
10 Err:509 12.00 0.025 0.025 0.35
11 Err:509 12.00 0.025 0.025 0.35
12 Err:509 48.00 0.025 0.025 0.35
13 Err:509 48.00 0.025 0.025 0.35
14 Err:509 15.00 0.025 0.025 0.35
15 Err:509 36.00 0.025 0.025 0.35
16 Err:509 92.00 0.025 0.025 0.35
17 Err:509 15.00 0.025 0.025 0.35
18 Err:509 36.00 0.025 0.025 0.35
19 Err:509 32.00 0.025 0.025 0.35
20 Err:509 32.00 0.025 0.025 0.35
21 Err:509 28.00 0.025 0.025 0.35
22 Err:509 24.00 0.025 0.025 0.35
23 Err:509 28.00 0.025 0.025 0.35
24 Err:509 28.00 0.025 0.025 0.35
25 Err:509 28.00 0.025 0.025 0.35
26 Err:509 12.00 0.025 0.025 0.35
27 Err:509 21.00 0.025 0.025 0.35
28 Err:509 32.00 0.025 0.025 0.35
29 Err:509 21.00 0.025 0.025 0.35
30 Err:509 21.00 0.025 0.025 0.35
31 Err:509 28.00 0.025 0.025 0.35
32 Err:509 72.00 0.025 0.025 0.35
33 Err:509 40.00 0.025 0.025 0.35
34 Err:509 12.00 0.025 0.025 0.35
35 Err:509 40.00 0.025 0.025 0.35
36 Err:509 20.00 0.025 0.025 0.35
37 Err:509 40.00 0.025 0.025 0.35
38 Err:509 27.00 0.025 0.025 0.35
39 Err:509 20.00 0.025 0.025 0.35
40 Err:509 32.00 0.025 0.025 0.35
41 Err:509 27.00 0.025 0.025 0.35
42 Err:509 15.00 0.025 0.025 0.35
43 Err:509 12.00 0.025 0.025 0.35
44 Err:509 40.00 0.025 0.025 0.35
45 Err:509 52.00 0.025 0.025 0.35
46 Err:509 27.00 0.025 0.025 0.35
47 Err:509 15.00 0.025 0.025 0.35
48 Err:509 21.00 0.025 0.025 0.35
49 Err:509 20.00 0.025 0.025 0.35
50 Err:509 21.00 0.025 0.025 0.35
51 Err:509 20.00 0.025 0.025 0.35
52 Err:509 20.00 0.025 0.025 0.35
53 Err:509 21.00 0.025 0.025 0.35
54 Err:509 15.00 0.025 0.025 0.35
55 Err:509 18.00 0.025 0.025 0.35
56 Err:509 15.00 0.025 0.025 0.35
57 Err:509 20.00 0.025 0.025 0.35
58 Err:509 20.00 0.025 0.025 0.35
59 Err:509 27.00 0.025 0.025 0.35
60 Err:509 20.00 0.025 0.025 0.35
61 Err:509 100.00 0.025 0.025 0.35

DATOS:
Borde Libre (m) = 0.30 m.
Pendiente transversal = 0.025
Tirante maximo = 0.35
Pendiente longitudinal = 0.05

Comparacion Caudal Hidraulico e Hidrologico

N° baden Prog. Q2 max Q1 max Q2>Q1


1 Err:509 9.35 Err:509 Err:509
2 Err:509 8.31 Err:509 Err:509
3 Err:509 6.92 Err:509 Err:509
4 Err:509 11.08 Err:509 Err:509
5 Err:509 8.31 Err:509 Err:509
6 Err:509 22.16 Err:509 Err:509
7 Err:509 6.92 Err:509 Err:509
8 Err:509 12.12 Err:509 Err:509
9 Err:509 126.05 Err:509 Err:509
10 Err:509 4.15 Err:509 Err:509
11 Err:509 4.15 Err:509 Err:509
12 Err:509 16.62 Err:509 Err:509
13 Err:509 16.62 Err:509 Err:509
14 Err:509 5.19 Err:509 Err:509
15 Err:509 12.46 Err:509 Err:509
16 Err:509 31.86 Err:509 Err:509
17 Err:509 5.19 Err:509 Err:509
18 Err:509 12.46 Err:509 Err:509
19 Err:509 11.08 Err:509 Err:509
20 Err:509 11.08 Err:509 Err:509
21 Err:509 9.69 Err:509 Err:509
22 Err:509 8.31 Err:509 Err:509
23 Err:509 9.69 Err:509 Err:509
24 Err:509 9.69 Err:509 Err:509
25 Err:509 9.69 Err:509 Err:509
26 Err:509 4.15 Err:509 Err:509
27 Err:509 7.27 Err:509 Err:509
28 Err:509 11.08 Err:509 Err:509
29 Err:509 7.27 Err:509 Err:509
30 Err:509 7.27 Err:509 Err:509
31 Err:509 9.69 Err:509 Err:509
32 Err:509 24.93 Err:509 Err:509
33 Err:509 13.85 Err:509 Err:509
34 Err:509 4.15 Err:509 Err:509
35 Err:509 13.85 Err:509 Err:509
36 Err:509 6.92 Err:509 Err:509
37 Err:509 13.85 Err:509 Err:509
38 Err:509 9.35 Err:509 Err:509
39 Err:509 6.92 Err:509 Err:509
40 Err:509 11.08 Err:509 Err:509
41 Err:509 9.35 Err:509 Err:509
42 Err:509 5.19 Err:509 Err:509
43 Err:509 4.15 Err:509 Err:509
44 Err:509 13.85 Err:509 Err:509
45 Err:509 18.01 Err:509 Err:509
46 Err:509 9.35 Err:509 Err:509
47 Err:509 5.19 Err:509 Err:509
48 Err:509 7.27 Err:509 Err:509
49 Err:509 6.92 Err:509 Err:509
50 Err:509 7.27 Err:509 Err:509
51 Err:509 6.92 Err:509 Err:509
52 Err:509 6.92 Err:509 Err:509
53 Err:509 7.27 Err:509 Err:509
54 Err:509 5.19 Err:509 Err:509
55 Err:509 6.23 Err:509 Err:509
56 Err:509 5.19 Err:509 Err:509
57 Err:509 6.92 Err:509 Err:509
58 Err:509 6.92 Err:509 Err:509
59 Err:509 9.35 Err:509 Err:509
60 Err:509 6.92 Err:509 Err:509
61 Err:509 34.63 Err:509 PAV.RIGIDO

EJEMPLOS DE LONGITUDES DE BADENES CON DISTINTOS TIPOS DE LUZ

L(m) n S Ymax.(m) s1 A

5.00 0.025 0.025 0.35 0.05 0.875


8.00 0.025 0.025 0.35 0.05 1.4
10.00 0.025 0.025 0.35 0.05 1.75
12.00 0.025 0.025 0.35 0.05 2.1
15.00 0.025 0.025 0.35 0.05 2.625
20.00 0.025 0.025 0.35 0.05 3.5
30.00 0.025 0.025 0.35 0.05 5.25
40.00 0.025 0.025 0.35 0.05 7
50.00 0.025 0.025 0.35 0.05 8.75
60.00 0.025 0.025 0.35 0.05 10.5
70.00 0.025 0.025 0.35 0.05 12.25
80.00 0.025 0.025 0.35 0.05 14
90.00 0.025 0.025 0.35 0.05 15.75
100.00 0.025 0.025 0.35 0.05 17.5
2
 Q 
h 3  
 1 .45  L 
L total: L - 2 x (0.2+0.3)
h total: h - borde libre

SECCION DEL BADEN


L h h < 0.35
26.00 Err:509 Err:509 1
23.00 Err:509 Err:509 2
19.00 Err:509 Err:509 3
31.00 Err:509 Err:509 4
23.00 Err:509 Err:509 5
63.00 Err:509 Err:509 6
19.00 Err:509 Err:509 7
34.00 Err:509 Err:509
363.00 Err:509 Err:509 8
11.00 Err:509 Err:509
11.00 Err:509 Err:509
47.00 Err:509 Err:509 9
47.00 Err:509 Err:509 10
14.00 Err:509 Err:509 11
35.00 Err:509 Err:509 12
91.00 Err:509 Err:509 13
14.00 Err:509 Err:509 14
35.00 Err:509 Err:509 15
31.00 Err:509 Err:509 16
31.00 Err:509 Err:509 17
27.00 Err:509 Err:509 18
23.00 Err:509 Err:509 19
27.00 Err:509 Err:509 20
27.00 Err:509 Err:509 21
27.00 Err:509 Err:509 22
11.00 Err:509 Err:509 23
20.00 Err:509 Err:509 24
31.00 Err:509 Err:509 25
20.00 Err:509 Err:509 26
20.00 Err:509 Err:509 27
27.00 Err:509 Err:509 28
71.00 Err:509 Err:509 29
39.00 Err:509 Err:509 30
11.00 Err:509 Err:509 31
39.00 Err:509 Err:509 32
19.00 Err:509 Err:509 33
39.00 Err:509 Err:509 34
26.00 Err:509 Err:509 35
19.00 Err:509 Err:509 36
31.00 Err:509 Err:509 37
26.00 Err:509 Err:509 38
14.00 Err:509 Err:509 39
11.00 Err:509 Err:509 40
39.00 Err:509 Err:509 41
51.00 Err:509 Err:509 42
26.00 Err:509 Err:509 43
14.00 Err:509 Err:509 44
20.00 Err:509 Err:509 45
19.00 Err:509 Err:509 46
20.00 Err:509 Err:509 47
19.00 Err:509 Err:509 48
19.00 Err:509 Err:509 49
20.00 Err:509 Err:509 50
14.00 Err:509 Err:509 51
17.00 Err:509 Err:509 52
14.00 Err:509 Err:509 53
19.00 Err:509 Err:509 54
19.00 Err:509 Err:509 55
26.00 Err:509 Err:509 56
19.00 Err:509 Err:509 57
99.00 0.350 OK 58
Q2max.
s1 A x(m) P R V(m/s)
(m3/s)
0.05 4.725 13.505 27.009 0.17 1.98 9.35
0.05 4.2 12.005 24.010 0.17 1.98 8.31
0.05 3.5 10.006 20.012 0.17 1.98 6.92
0.05 5.6 16.004 32.008 0.17 1.98 11.08
0.05 4.2 12.005 24.010 0.17 1.98 8.31
0.05 11.2 32.002 64.004 0.17 1.98 22.16
0.05 3.5 10.006 20.012 0.17 1.98 6.92
0.05 6.125 17.503 35.007 0.17 1.98 12.12
0.05 63.7 182.000 364.001 0.17 1.98 126.05
0.05 2.1 6.010 12.020 0.17 1.98 4.15
0.05 2.1 6.010 12.020 0.17 1.98 4.15
0.05 8.4 24.003 48.005 0.17 1.98 16.62
0.05 8.4 24.003 48.005 0.17 1.98 16.62
0.05 2.625 7.508 15.016 0.17 1.98 5.19
0.05 6.3 18.003 36.007 0.17 1.98 12.46
0.05 16.1 46.001 92.003 0.17 1.98 31.86
0.05 2.625 7.508 15.016 0.17 1.98 5.19
0.05 6.3 18.003 36.007 0.17 1.98 12.46
0.05 5.6 16.004 32.008 0.17 1.98 11.08
0.05 5.6 16.004 32.008 0.17 1.98 11.08
0.05 4.9 14.004 28.009 0.17 1.98 9.69
0.05 4.2 12.005 24.010 0.17 1.98 8.31
0.05 4.9 14.004 28.009 0.17 1.98 9.69
0.05 4.9 14.004 28.009 0.17 1.98 9.69
0.05 4.9 14.004 28.009 0.17 1.98 9.69
0.05 2.1 6.010 12.020 0.17 1.98 4.15
0.05 3.675 10.506 21.012 0.17 1.98 7.27
0.05 5.6 16.004 32.008 0.17 1.98 11.08
0.05 3.675 10.506 21.012 0.17 1.98 7.27
0.05 3.675 10.506 21.012 0.17 1.98 7.27
0.05 4.9 14.004 28.009 0.17 1.98 9.69
0.05 12.6 36.002 72.003 0.17 1.98 24.93
0.05 7 20.003 40.006 0.17 1.98 13.85
0.05 2.1 6.010 12.020 0.17 1.98 4.15
0.05 7 20.003 40.006 0.17 1.98 13.85
0.05 3.5 10.006 20.012 0.17 1.98 6.92
0.05 7 20.003 40.006 0.17 1.98 13.85
0.05 4.725 13.505 27.009 0.17 1.98 9.35
0.05 3.5 10.006 20.012 0.17 1.98 6.92
0.05 5.6 16.004 32.008 0.17 1.98 11.08
0.05 4.725 13.505 27.009 0.17 1.98 9.35
0.05 2.625 7.508 15.016 0.17 1.98 5.19
0.05 2.1 6.010 12.020 0.17 1.98 4.15
0.05 7 20.003 40.006 0.17 1.98 13.85
0.05 9.1 26.002 52.005 0.17 1.98 18.01
0.05 4.725 13.505 27.009 0.17 1.98 9.35
0.05 2.625 7.508 15.016 0.17 1.98 5.19
0.05 3.675 10.506 21.012 0.17 1.98 7.27
0.05 3.5 10.006 20.012 0.17 1.98 6.92
0.05 3.675 10.506 21.012 0.17 1.98 7.27
0.05 3.5 10.006 20.012 0.17 1.98 6.92
0.05 3.5 10.006 20.012 0.17 1.98 6.92
0.05 3.675 10.506 21.012 0.17 1.98 7.27
0.05 2.625 7.508 15.016 0.17 1.98 5.19
0.05 3.15 9.007 18.014 0.17 1.98 6.23
0.05 2.625 7.508 15.016 0.17 1.98 5.19
0.05 3.5 10.006 20.012 0.17 1.98 6.92
0.05 3.5 10.006 20.012 0.17 1.98 6.92
0.05 4.725 13.505 27.009 0.17 1.98 9.35
0.05 3.5 10.006 20.012 0.17 1.98 6.92
0.05 17.5 50.001 100.002 0.17 1.98 34.63
DISTINTOS TIPOS DE LUZ

Qmax.
x(m) P R V(m/s)
(m3/s)

2.524 5.049 0.17 1.97 1.72


4.015 8.031 0.17 1.97 2.76
5.012 10.024 0.17 1.98 3.46
6.010 12.020 0.17 1.98 4.15
7.508 15.016 0.17 1.98 5.19
10.006 20.012 0.17 1.98 6.92
15.004 30.008 0.17 1.98 10.39
20.003 40.006 0.17 1.98 13.85
25.002 50.005 0.17 1.98 17.31
30.002 60.004 0.17 1.98 20.78
35.002 70.003 0.17 1.98 24.24
40.002 80.003 0.17 1.98 27.70
45.001 90.003 0.17 1.98 31.16
50.001 100.002 0.17 1.98 34.63
MEMORIA DE CALCULO

* CALCULO HIDRAULICO DE LAS ALCANTARILLAS:

Para determinar las secciones de las alcantarillas se utilizo:

Formula de Manning:
1 2 1
Q AR 3 S 2
n
Donde:
Q : Caudal (m3/s).
A : Area hidráulica (m2).
R : Radio hidráulico (m).
P : Perímetro mojado (m).
S : Pendiente (m).
n : Coeficiente de rugosidad

Se parte del concepto de que la descarga critica se produce cuando el tirante de agua es igual
a 0.6887 D, siendo D el diametro de la alcantarilla. Asi mismo, el area encerrada dentro del
perimetro mojado de la seccion critica es:

A = 0.5768 x D 2

Basandonos en la formula deducida por el ARMCO donde:

R = Area = 0.5768 D2 = 0.2946 D


perimetro mojado 1.9778 D

En la formula de Manning quedaria:

D= 1.6685 x (n x Q)0.375
S0.1875

Segun el manual para el Diseño de caminos no pavimentados de bajo Volumen de Transi


el Cuadro N° 4.1.2e se indica para el tubo metalico corrugado se tiene un valor de coeficiente
de rugosidad de Manning de 0.024
Dimensionamiento de estructuras en Quebradas con Cauce Definido
HIDROLOGIA HID
Q MAX Calculado DIAMETRO
D DIAMETRO
Tipo de Obra D
N° PROG. S n campo
CALCULADO
de Arte (m 3/s) CALCULADO
(") (m)
(m) (")
1 Err:509PUENTE MODULAR 82.53 0.03 0.024 4.161 1.64 163.8 2.03
2 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
4 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
5 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
6 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
8 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
10 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
11 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
13 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
14 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
15 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
16 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
18 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
20 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
21 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
23 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
25 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
26 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
27 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
28 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
29 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
30 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
31 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
32 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
33 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
35 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
38 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
46 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
47 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
49 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
51 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
55 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
58 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
59 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
62 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
67 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
69 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
75 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
76 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
83 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
84 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
92 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
93 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
94 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
95 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
96 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
98 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
99 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
100 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
101 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
102 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
104 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
108 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
110 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
112 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
114 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
116 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
119 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
120 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
122 Err:509 Err:509 Err:509 0.03 0.024 Err:509 Err:509 Err:509 Err:509
de agua es igual
ada dentro del

Nota:
QMAX = Caudal máximo hidrológico
S = Pendiente del fondo m/m

n = Coeficiente de rugosidad de Manning


or de coeficiente
Cauce Definido
HIDRAULICA
DIAMETRO A Q MAX
Q MAX
USAR (m 3/s) Qmax > Qcal
(plg) (m 3/s)
(93.8%)
80 12.205 11.448 error
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

Vous aimerez peut-être aussi