Vous êtes sur la page 1sur 26

INDSAO INFRATECH

NAME OF CONTRACTOR: SINI PRASAB SAHU


PROJECT: KPWS , Faridabad TOWER - 2 BHK AND 3 BHK
WORK: Plaster Work BILL DATE : AUG-2019
BILL No : 02 PERIOD :
Quantity
Item No Item Description Percentag Unit
e% Previous This Bill Total
A 2BHK
1 1st floor 100% 8680.2 0.0 8680.2 Sf
2 2nd floor 100% 11147.4 0.0 11147.4 Sf
3 3rd floor 100% 11147.4 0.0 11147.4 Sf
4 4th floor 100% 11147.4 0.0 11147.4 Sf
5 5th floor 100% 11147.4 0.0 11147.4 Sf
6 6th floor 100% 11147.4 0.0 11147.4 Sf
7 7th floor 100% 11147.4 0.0 11147.4 Sf
8 8th floor 100% 11147.4 0.0 11147.4 Sf
9 9th floor 100% 11147.4 0.0 11147.4 Sf
10 External plaster 100% 35854.0 35854.0 Sf
11 Pargola & Parapet 100% 7324.7 0.0 7324.7 Sf
B 4BHK
1 5th floor 100% 19755.5 19755.5 Sf
C 3BHK
1 Stilt 100% 4777.4 4777.4 Sf
2 2nd floor 100% 16266.3 16266.3 Sf
3 3rd floor 100% 16266.3 16266.3 Sf
4 4th floor 100% 16266.3 16266.3 Sf
5 5th floor 100% 16266.3 16266.3 Sf
6 6th floor 100% 16266.3 16266.3 Sf
7 7th floor 100% 16266.3 16266.3 Sf
8 8th floor 100% 16266.3 16266.3 Sf
9 9th floor 100% 16266.3 16266.3 Sf
10 10th floor 100% 16266.3 16266.3 Sf
11 11th floor 100% 16266.3 16266.3 Sf
12 12th floor 100% 16266.3 16266.3 Sf
13 13th floor 100% 16266.3 16266.3 Sf
14 14th floor 100% 16266.3 16266.3 Sf
D Monkey lift opertar
1 May 100% 1.0 1.0 Nos
2 June 100% 1.0 1.0 Nos
3 July 100% 1.0 1.0 Nos
TOTAL 133713.8 0.0 133713.8
Less last bill amount
TOTAL
Deductions
Secuirty
T.D.S. @1%
AMOUNT
NET AMOUNT

Petty contactor Billing Engineer P.M.


Rate Amount Remark

5.75 49910.90
6.04 67302.71
6.33 70507.60
6.61 73712.49
6.90 76917.38
7.19 80122.27
7.48 83327.16
7.76 86532.05
8.05 89736.94
16.75 600555.20
16.75 122688.51

6.90 136313.27

5.75 27470.28
6.04 98207.92
6.33 102884.49
6.61 107561.06
6.90 112278.29
7.19 116995.52
7.48 121712.76
7.76 126267.33
8.05 130943.90
8.34 135620.46
8.63 140297.03
8.91 144973.60
9.20 149650.17
9.49 154367.40

8500.00 8500.00
8500.00 8500.00
8500.00 8500.00
3223856.7
2755790.2
468066.5
0.0
4680.7
463,385.83

G.M.
6 mm cement 100 Sq.m.                                
plaster to ceiling                        5.48
1:4

2 6 mm cement 100 Sq.m.                                


plaster to ceiling                        7.34
1:3

3 Neat cement 100 Sq.m.                                


punning                        4.40

Pebble Dash Plaster

1 Pebble dash plaster


with a mixer of
washed pebble or
crushed stone 6
mm to 12.5 mm in
two layers under
layer 12 mm, top
layer 1:3

a) 1:04 100 Sq.m.                                


                     23.18

b) 1:05 100 Sq.m.                                


                     21.16
c) 1:05 100 Sq.m.                                
                     19.44

Superior Plaster

1 18 mm thick plaster 100 Sq.m.                                


with terrazo finish                      23.28
and polished

2 Extra if white 100 Sq.m.                                


cement is used                        8.60
instead of ordinary
cement in top layer
of 18 mm
plastering with
terrazo finish

Plain or Moulded
Cement Mortar
Bands

1 12 mm thick in 100 mtr 1 cm wide                                


cement mortar 1:4                        0.11
all types

2 18 mm thick in 100 mtr 1 cm wide                                


cement mortar 1:4                        0.15
all types
3 18 mm thick in two 100 mtr 1 cm wide                                
coats                        0.14

Pointing on Brick
Work

1 Flush pointing 1:3 100 Sq.m.                                


                       3.06

2 Raised pointing 1:3 100 Sq.m.                                


                       4.08

Pointing on Stone 
Work

1 Flush pointing 1:3 100 Sq.m.                                


                       2.34

2 Raised pointing 1:3 100 Sq.m.                                


                       4.70

3 Making Plinth Sq.m.                                


Protection-50 mm                        0.22
thick CC 1:3:6 over
75 mm thick dry
brick ballast

Painting
The theoretical
consumptions of
various principle
material obtained
through supply in
the contract shall
be worked out on
the following basis:

S. No. Item One or more coats  Two or more coats


(old work per 10 sq. on new work or
meters) completely
scrapped surface
per 10 sq. meters.

1 Distemper with dry 1.0 Kg.  1.50 Kg.


distemper.

2 Finishing with 2.20 Kg.  5.47 Kg. (Three or


waterproofing more coat)
cement paint.
3 Painting with plastic 0.73 Litre  1.21 Litre
emulsion paint.

4 Painting with 0.61 Litre  1.0 Litre


enamel paint.

5 Painting with 0.70 Litre  1.16 Litre


synthetic enamel
paint.

The material for


filling in holes,
cracks, with putty
etc. shall be
arranged by the
contractor at no
extra cost. One
percent water
charges shall be
recovered from the
gross amount of the
bill.

Miscellaneous
1 Quantity of lead per Per Joint  0.9 Kg
Joint (Pig lead and
lead wood)

2 The Quantity of
lead and spun yarn
required for
different of size of
pipes shall be as
under

For Water Supply


lines

Nominal size of Lead per Joint  Depth of lead joint


pipe

100 mm 2.2 Kg  45 mm


150 mm 3.4 Kg  50 mm
80 mm 1.8 Kg   45 mm
250 mm 6.1 Kg  50 mm
For Soil , Waste,
Vent & Anti
syphonage pipes

50 mm dia 0.77 Kg

80 mm dia 0.8 Kg

100 m dia 0.98 Kg

150 mm dia 1.2 Kg


3 Disinfection of CI/DI
pipe lines

All CI / DI pipe lines 0.5 gram / Lit


shall be disinfected
by flushing with
water containing
bleaching powder
at 0.5gm per liter of
water.

4 Measurements for
Pipe lines
Length shall be
measured along the
centre line of pipe
and fittings. Pipe
fittings and specials
like bends
junctions, tail
pieces and joints
shall not be
measured
seperately. The cost
of these shall be
deemed to be
included in the
quoted rates,
against the
respective item of
pipes.

5 Trenches : The
width & depth of
trenches for
different diametre
of GI / CI pipes shall
be as under

Dia of pipe Width of Trench  Depth of Trench

For G.I pipes

15 to 50 mm 300 mm  600mm
Exceeding 50 but 450mm  750mm
not exceeding 100
mm pipe

exceeding 100 but 600 mm  900mm


not exceeding 140
mm pipe

For C.I pipes

80 mm to 150 mm 550mm  1000mm

For Sewerage line : 500


Excavation

every 1.5 m vertical                                


depth = 0.5mtr                   500.00
offset either side to
be considered.

bottom = dia of 500                                


pipe + 0.20 mtr                   500.00
either side.

6 Making of white
wash cream for
white wash.
the approximate
quantity of water to
be added in making
cream shall be five
liters per kg of lime
10% zinc oxide
shall also be
added .

7 Making of Putty.

For 100 sqm area


putty shall consist
of 30 kg chalk mitti,
700 grams safeda
and 1350 ml
synthetic varnish.

Painting  Coverage Qty  coverage

POP upto 5 mm  thk 5 kgs  SQM

POP upto 12 mm  12kgs  SQM


thk
White Wash 0.3 kgs  SQM

OBD Primer 0.7kgs  10SQM

OBD Paint 1.5 kgs  10SQM

Synthetic Enamel 1 Lts  10SQM


Paint

Plastic Emulsion  1.25 Lts  10SQM


Paint

Snowcem  Primer 0.8 Lts  10SQM

Snocem (Plus)   3.84 kgs  10SQM


Paint

Primer-snocem plus 2.2kgs  10SQM

Ace Exterior Paint 1.68 kgs  10SQM

Sandtex Matt Finish 3.28 lts  10SQM

Cement Motar

Ratio cement  sand


1:03 510 kgs  1.05 cum

1:04 380 kgs  1.05 cum

1:05 310 kgs  1.05 cum

1:06 250 kgs  1.05 cum


0.0734

0.232
Spun Yarn per Joint

0.18 Kg
0.2 Kg
0.1 Kg
0.25 Kg

0.056 Kg

0.076 Kg

0.076 Kg

0.09 Kg

Vous aimerez peut-être aussi