5.75 49910.90
6.04 67302.71
6.33 70507.60
6.61 73712.49
6.90 76917.38
7.19 80122.27
7.48 83327.16
7.76 86532.05
8.05 89736.94
16.75 600555.20
16.75 122688.51
6.90 136313.27
5.75 27470.28
6.04 98207.92
6.33 102884.49
6.61 107561.06
6.90 112278.29
7.19 116995.52
7.48 121712.76
7.76 126267.33
8.05 130943.90
8.34 135620.46
8.63 140297.03
8.91 144973.60
9.20 149650.17
9.49 154367.40
8500.00 8500.00
8500.00 8500.00
8500.00 8500.00
3223856.7
2755790.2
468066.5
0.0
4680.7
463,385.83
G.M.
6 mm cement 100 Sq.m.
plaster to ceiling 5.48
1:4
Superior Plaster
Plain or Moulded
Cement Mortar
Bands
Pointing on Brick
Work
Pointing on Stone
Work
Painting
The theoretical
consumptions of
various principle
material obtained
through supply in
the contract shall
be worked out on
the following basis:
–
Miscellaneous
1 Quantity of lead per Per Joint 0.9 Kg
Joint (Pig lead and
lead wood)
2 The Quantity of
lead and spun yarn
required for
different of size of
pipes shall be as
under
50 mm dia 0.77 Kg
80 mm dia 0.8 Kg
4 Measurements for
Pipe lines
Length shall be
measured along the
centre line of pipe
and fittings. Pipe
fittings and specials
like bends
junctions, tail
pieces and joints
shall not be
measured
seperately. The cost
of these shall be
deemed to be
included in the
quoted rates,
against the
respective item of
pipes.
5 Trenches : The
width & depth of
trenches for
different diametre
of GI / CI pipes shall
be as under
15 to 50 mm 300 mm 600mm
Exceeding 50 but 450mm 750mm
not exceeding 100
mm pipe
6 Making of white
wash cream for
white wash.
the approximate
quantity of water to
be added in making
cream shall be five
liters per kg of lime
10% zinc oxide
shall also be
added .
7 Making of Putty.
Cement Motar
0.232
Spun Yarn per Joint
0.18 Kg
0.2 Kg
0.1 Kg
0.25 Kg
0.056 Kg
0.076 Kg
0.076 Kg
0.09 Kg