ÚČEL VYDÁNÍ / ISSUE STATUS

PRO SCHVÁLENÍ ZÁKAZNÍKEM / FOR APPROVAL BY CLIENT


UVOLNĚNO PRO REALIZACI / RELEASE FOR CONSTRUCTION
OSTATNÍ / OTHERS

Limits modif ication, protections add 27.04.17 Šíma Viduna Klečatský Krbec a
Popis změny Datum Vypracoval Kontroloval Schválil HIP Rev.
Nature of Revision Date Elaborated by Checked by Approved by Chief Engineer
Projekt/Project

GRATI COMBINED CYCLE POWER PLANT (PEAKER) EXTENSION


PROJECT 450 MW
Název dokumentu/Document title

TRIPS & ALARMS SETTING

PRO100190 DD 09.11.16 Ším a Viduna Klečatský Krnec


Číslo projektu Stupeň projektu Datum Vypracoval Kontroloval Schválil HIP
Project No. Project Stage Date Elaborated by Checked by Approved by Chief Engineer

Elektronický soubor / Electronic f ile: P100190-IC-00015_A.doc


Č. dokumentu projektu / Project - Doc. No.:
P100190-IC-00015 A
Č. dokumentu autora / Originator Doc. No.:
Pr6010428 a
Č. balíku SPWR-Archivní / Archive package. No.: Rev.
Pr 6010428
Content:

1. LUBRICATING OIL PRESSURE .................................................................................................................. 3


2. TRIPPING OIL PRESSURE ........................................................................................................................ 4
3. LP TURBINE OUTLET STEAM PRESSURE (VACUUM) ................................................................................ 5
4. TURBINE OVERSPEED – CONTROL SYSTEM ............................................................................................ 6
5. TURBINE OVERSPEED – OPS (PROTECH GII) ........................................................................................... 7
6. TURBINE SPEED – FAILURE OF MEASUREMENT TCS ............................................................................... 8
7. SUM TRIP OF VIBRATION MONITORING SYSTEM (MMS) ....................................................................... 9
8. TEMPERATURE GRADIENT OF THE THRUST BEARING........................................................................... 10
9. SUM OF GENERATOR PROTECTIONS .................................................................................................... 11
10. SUM OF FIRE PROTECTIONS ................................................................................................................. 12
11. SUM OF BIOLER PROTECTIONS ............................................................................................................ 13
12. SUM OF SHUT-DOWN PUSH BUTTONS ................................................................................................ 14
13. RADIAL BEARING TEMPERATURE (TURBINE) ........................................................................................ 15
14. RADIAL BEARING TEMPERATURE (GENERATOR) .................................................................................. 16
15. THRUST BEARING TEMPERATURE ........................................................................................................ 17
16. STATOR WINDING TEMPERATURE ....................................................................................................... 18
17. GENERATOR COLD AIR TEMPERATURE ................................................................................................ 19
18. GENERATOR HOT AIR TEMPERATURE .................................................................................................. 20
19. STEAM TEMPERATURE BEFORE HP STOP VALVE .................................................................................. 21
20. STEAM TEMPERATURE BEFORE IP STOP VALVE ................................................................................... 22
21. STEAM PRESSURE BEFORE HP STOP VALVE .......................................................................................... 23
22. STEAM PRESSURE BEFORE IP STOP VALVE ........................................................................................... 24
23. THERMAL STRESS HP ........................................................................................................................... 25
24. THERMAL STRESS IP ............................................................................................................................. 26
25. LEVEL IN MAIN OIL TANK ..................................................................................................................... 27
26. LEVEL IN CONDENSER COLLECTOR ....................................................................................................... 28
27. LEVEL IN HIGH PRESSURE HYDRAULIC TANK ........................................................................................ 29
28. TEMPERATURE IN HIGH PRESSURE HYDRAULIC TANK.......................................................................... 30
29. TEMPERATURE HP TURBINE CASE OUTLET........................................................................................... 31
30. TEMPERATURE LP TURBINE CASE OUTLET ........................................................................................... 32
31. PRESSURE HP TURBINE CASE OUTLET .................................................................................................. 33
32. TEMPERATURE OF GLAND STEAM ....................................................................................................... 34

Elaborated by: Šíma 2 rev.a


Pr 6010428

1. Lubricating oil pressure

Measurements: 30MAV42CP001, 30MAV42CP002, 30MAV42CP003

Logic and Activity: 2/3 selection with ACTIVATION No. 1

Nominal value 1,4 ÷ 1,6 bar(g)


Protection level L3 L2 L1 H1 H2 H3
Protection value 0,8 1 bar(g)

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start x x)*
Starting oil pump start x x
Reverse el.power prot.unblock. x

)* Emergency oil pump starts after 10 sec from pressure drops or automatically from local manostat independent from control
system : (set < 80 kPa(g)).

Testing of protection: signal 30MAV42CP901_YK01

Test conditions: Activation n.1, pressure measurements O.K.


Method of testing: Drain oil from testing branch
Implementation of test: Manually
Testing interval: 1 x every 3 month or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 3 rev.a


Pr 6010428

2. Tripping oil pressure

Measurements: 30MAX35CP301, 30MAX35CP302, 30MAX35CP303

Logic and Activity: 2/3 selection after ENGAGED

Nominal value 160 bar(g)


Protection level L3 L2 L1 H1 H2 H3
Protection value 100 bar(g)

Protection system aktivity


Protection level L3 L2 L1 H1 H2 H3
Alarm X
Intervention X

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x

Testing of protection: signal 30MAX35CP901_YK01

Test conditions: Engaged, pressure measurements O.K.


Method of testing: Drain oil from testing branch
Implementation of test: Manually
Testing interval: 1 x every 3 month or after any intervention of electric or mechanic circuits Min once a year or
after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 4 rev.a


Pr 6010428

3. LP turbine outlet steam pressure (vacuum)

Measurements: 30MAB01CP001, 30MAB01CP002, 30MAB01CP003

Logic and Activity: 2/3 selection with ACTIVATION No. 2

Nominal value -0,925 bar(g)


Protection level L3 L2 L1 H1 H2 H3
Protection value -0,67 -0,65 -0,50 bar(g)

Protection system aktivity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x X
Intervention X

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x

Testing of protection: signal 30MAB01CP901_YK01

Test conditions: Activation n.2, pressure measurements O.K.


Method of testing: Aeration of impulse measurement point
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 5 rev.a


Pr 6010428

4. Turbine overspeed – control system

Measurements: 30MAD30CS001, 30MAD30CS002, 30MAD30CS003

Logic and Activity: 2/3 selection with direct actuating

Nominal value 3000 r.p.m.


Protection level L3 L2 L1 H1 H2 H3
Protection value 3180 3300 r.p.m.

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x
Control valve closing x x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x

Testing of protection: signal 30MAD30CS901_YK01

Test conditions: Turbine on nominal speed, status not synchonized


Method of testing: Increasing of speed level above H2 during diagnostic test
Implementation of test: Automatically from control system
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after any service
intervention in hydraulic system or control system.

Elaborated by: Šíma 6 rev.a


Pr 6010428

5. Turbine overspeed – OPS (ProTech GII)

Measurements: 30MAD30CS011, 30MAD30CS012, 30MAD30CS013


Signal to TCS: 30MAD30CS011 XG56, 30MAD30CS012 XG56, 30MAD30CS013 XG56

Logic and Activity: 2/3 selection with direct actuating

Nominal value 3000 r.p.m.


Protection level L3 L2 L1 H1 H2 H3
Protection value 3310 r.p.m.

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x

Testing of protection: signal 30MAD30CS911_YK01

A) conditions for test through OPS


B) conditions for test through TCS

Test conditions: A) Anytime, all three OPS units O.K.


B) Turbine on nominal speed, status not synchonized.

Method of testing: A) Simulation gradually on each OPS unit


B) Increasing of speed level above H2 during diagnostic test

Implementation of test: A) Manually on OPS


B) Automatically from control system

Testing interval: A) Min once a month


Test of 2/3 hydraulic unit follows by 14 days after OPS test and this cycle is repeated.
B) Min once a year or after any intervention of electric or mechanic circuits or after any service
intervention in hydraulic system or OPS.

Elaborated by: Šíma 7 rev.a


Pr 6010428

6. Turbine speed – failure of measurement TCS

Measurements: 30MAD30CS001, 30MAD30CS002, 30MAD30CS003

Logic and Activity: 2/3 selection with direct actuating

Nominal value
Protection level L3 L2 L1 H1 H2 H3
Protection value x

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x

Testing of protection: signal 30MAD10CS902_YK01

Test conditions: Turbine shut down


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after any service
intervention in hydraulic system or OPS.

Elaborated by: Šíma 8 rev.a


Pr 6010428

7. Sum trip of vibration monitoring system (MMS)

Signal to TCS: 30CJM01EZ201_XG56, 30CJM01EZ202_XG56, 30CJM01EZ203_XG56

Logic and Activity: 2/3 selection with ACTIVATION No. 1

Nominal value
Protection level L3 L2 L1 H1 H2 H3
Protection value x

Protection system aktivity


Protection level L3 L2 L1 H1 H2 H3
Alarm x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x

Testing of protection: signal 30CJM01EZ901_YK01

Test conditions: Activation n.1 switched on.


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits.

Configuration and setting of vibration & monitoring system:

Min÷Max range L3 L1 H1 H3
30MAD10CY161,2,3 Shift thrust bearing -1 +1 mm -0,8 -0,6 0,3 0,5
30MAD10(20,30)CY001,2 Vibration turbine rotors 0 500 µm p-p 206 325
30MKD10(20)CY001,2 Vibration generator rotors 0 500 µm p-p 165 240

30MAD10(20,30)CY011,12 Turbine bearings vibration 0 20 mm/s 6,7


30MKD10(20)CY011,12,13 Generator bearing vibration 0 20 mm/s 7,5 11,8
30MAD20CY151 Shift HP rotor -4 8 mm -2,2 -1,5 4,9 5,4
30MAD30CY151 Shift IP,LP rotor -6 5 mm -4 -3,3 2,3 3

Elaborated by: Šíma 9 rev.a


Pr 6010428

8. Temperature gradient of the thrust bearing

Signal to TCS: 30MAD10CT011A,B_YH38, 30MAD10CT012A,B_YH38


30MAD10CT013A,B_YH38, 30MAD10CT014A,B_YH38

Logic and Activity: 2/3 selection with ACTIVATION No. 2 and if temp thrust bear.>80°C

Nominal value °C/sec


Protection level L3 L2 L1 H1 H2 H3
Protection value 2°C/sec

Protection system aktivity


Protection level L3 L2 L1 H1 H2 H3
Alarm X
Intervention X

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm X
Stop valve closing X
Control valve closing X
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. X

Testing of protection: signal 30MAD10CT912_YK01

Test conditions: Activation n.2 switched on.


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 10 rev.a


Pr 6010428

9. Sum of generator protections

Signal to TCS: 30CHA01EZ005_XK01, 30CHA01EZ006_XK01, 30CHA01EZ007_XK01


Logic and Activity: 2/3 selection with ACTIVATION No. 2

Nominal value
Protection level L3 L2 L1 H1 H2 H3
Protection value x

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x

Testing of protection: signal 30CHA01EZ901_YK01

Test conditions: Activation n.2 switched on.


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 11 rev.a


Pr 6010428

10. Sum of fire protections

Signal to TCS: 30MAY01EZ010_XG56, 30MAY01EZ011_XG56, 30MAY01EZ012_XG56

Logic and Activity: 2/3 selection with direct actuating

Nominal value
Protection level L3 L2 L1 H1 H2 H3
Protection value x

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x
Control oil pumps stop x
Vacuum breaker open x
Main steam valve closed x

Testing of protection: signal 30MAY01EZ910_YK01

Test conditions: Status Engaged, main steam valve opened, at least one pump of HP hydraulic in operation,
vacuum breaker closed.
Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 12 rev.a


Pr 6010428

11. Sum of Bioler protections

Signal to TCS: 30MAY01EZ021_XG56, 30MAY01EZ022_XG56, 30MAY01EZ023_XG56

Logic and Activity: 2/3 selection with direct actuating

Nominal value
Protection level L3 L2 L1 H1 H2 H3
Protection value x

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x
Control oil pumps stop x
Vacuum breaker open x
Main steam valve closed x

Testing of protection: signal 30MAY01EZ920_YK01

Test conditions: Status Engaged, main steam valve opened, at least one pump of HP hydraulic in operation,
vacuum breaker closed.
Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 13 rev.a


Pr 6010428

12. Sum of shut-down push buttons

Machine room, Control room and Operator panel

Signal to TCS: 30MAY01CH001_XG56, 30MAY01CH002_XG56, 30MAY01CH003_XG56

Logic and Activity: 2/3 selection (for HW push buttons) with direct actuating

Nominal value
Protection level L3 L2 L1 H1 H2 H3
Protection value x* x**

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Intervention x x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x x
Control valve closing x x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x x

*) hardware push-buttons – Machine room, Control room


**) software – Operator panel

Testing of protection: signal 30MAY02CH901_YK01

Test conditions: Service: Engaged, control valves closed


Operation: Turbine in operation on warming speed
Method of testing: Intervention to push-button
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 14 rev.a


Pr 6010428

13. Radial bearing temperature (turbine)

Measurements: 30MAD10CT001A,B, 30MAD10CT002A,B front HP


30MAD10CT003A,B, 30MAD10CT004A,B front HP
30MAD20CT001A,B,30 MAD20CT002A,B front IP
30MAD20CT003A,B, 30MAD20CT004A,B front IP
30MAD30CT001A,B, 30MAD30CT002A,B rear LP
30MAD30CT003A,B, 30MAD30CT004A,B rear LP

Logic and Activity: 2/3 selection for each bearing with ACTIVATION No. 1

Nominal value 80 ÷ 90 °C
Protection level L3 L2 L1 H1 H2 H3
Protection value *105 *120 °C

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x
*Limits can be changed during commissioning on the site.

Testing of protection: signals 30MAD10CT901_YK01, 30MAD20CT901_YK01, 30MAD30CT901_YK01

Test conditions: Activation n.1switched on, turbine shut down.


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 15 rev.a


Pr 6010428

14. Radial bearing temperature (generator)

Measurements: 30MKD10CT001A, MKD10CT001B, 30MKD10CT002 front


30MKD20CT001A, MKD20CT001B, 30MKD20CT002 rear

Logic and Activity: 2/3 selection for each bearing with ACTIVATION No. 1

Nominal value 122 °C


Protection level L3 L2 L1 H1 H2 H3
Protection value 127 132 °C

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x
*Limits can be changed during commissioning on the site.

Testing of protection: signal 30MKD10CT901_YK01, 30MKD20CT901_YK01

Test conditions: Activation n.1switched on, turbine shut down.


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 16 rev.a


Pr 6010428

15. Thrust bearing temperature

Measurements: 30MAD10CT011A,B_XH15, 30MAD10CT012A,B_XH15


30MAD10CT013A,B_XH15, 30MAD10CT014A,B_XH15

Logic and Activity: 4 x 1/2 selection with ACTIVATION No. 1

Nominal value 80÷90 °C


Protection level L3 L2 L1 H1 H2 H3
Protection value 105 120 °C

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x

Testing of protection: signal 30MAD10CT911_YK01, 30MAD10CT913_YK01

Test conditions: Activation n.1switched on, turbine shut down.


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 17 rev.a


Pr 6010428

16. Stator winding temperature

Measurements: 30MKA01CT011, 012, 013


30MKA01CT021, 022, 023
30MKA01CT031, 032, 033

Logic and Activity: 1/9 selection with ACTIVATION No. 2

Nominal value 109 °C


Protection level L3 L2 L1 H1 H2 H3
Protection value 126 131 °C

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x
*Limits will be add later

Testing of protection: signal 30MKA01CT930_YK01

Test conditions: Activation n.2 switched on, turbine shut down.


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 18 rev.a


Pr 6010428

17. Generator cold air temperature

Measurements: 30MKA01CT051A, 30MKA01CT051B, 30MKA01CT052A


30MKA01CT053A, 30MKA01CT053B, 30MKA01CT054A

Logic and Activity: 2x2/3 selection for each side with speed > 2850rpm

Nominal value < 55 °C


Protection level L3 L2 L1 H1 H2 H3
Protection value 59 64 °C

Protection system aktivity


Protection level L3 L2 L1 H1 H2 H3
Alarm x X
Intervention X

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x
*Limits will be add later

Testing of protection: signal MKA01CT951_YK01

Test conditions: Activation n.2 switched on, turbine shut down.


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 19 rev.a


Pr 6010428
18. Generator hot air temperature

Measurements: MKA01CT061A, MKA01CT061B, MKA01CT062A

Logic and Activity: 2/3 selection for each side with speed > 2850rpm

Nominal value < 91 °C


Protection level L3 L2 L1 H1 H2 H3
Protection value * * °C

Protection system aktivity


Protection level L3 L2 L1 H1 H2 H3
Alarm x X
Intervention X

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x
*Limits will be add later

Testing of protection: signal MKA01CT961_YK01

Test conditions: Activation n.2 switched on, turbine shut down.


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 20 rev.a


Pr 6010428

19. Steam temperature before HP stop valve

Measurements: 30LBA20CT001, CT002, CT003

Logic and Activity: 2/3 selection with ACTIVATION No. 2 for high limit
2/3 selection after syncronization for low limit

Nominal value 548 °C


Protection level L3 L2 L1 H1 H2 H3
Protection value x*) x*) 563,5 569,5 583,4 °C

Protection system aktivity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x x X X
Intervention x X

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x x x x
Stop valve closing x x
Control valve closing x x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x x

*) Low limit is generated according to value of pressure behind 1st HP wheel MAA01CP001:

0÷47bar L1..477°C, L3...450°C


130bar L1...522°C, L3...496°C

Testing of protection: signal 30LBA20CT901_YK01, 30LBA20CT902_YK01

Test conditions: Turbine shut down.


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 21 rev.a


Pr 6010428

20. Steam temperature before IP stop valve

Measurements: 30LBB30CT001, CT002, CT003

Logic and Activity: 2/3 selection with ACTIVATION No. 2 for high limit
2/3 selection after syncronization for low limit

Nominal value 548 °C


Protection level L3 L2 L1 H1 H2 H3
Protection value 455 505 563,2 569,2 583,2 °C

Protection system aktivity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x x X X
Intervention x X

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x x x x
Stop valve closing x x
Control valve closing x x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x x

Testing of protection: signal 30LBB30CT901_YK01, 30LBB30CT902_YK01

Test conditions: Turbine shut down.


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 22 rev.a


Pr 6010428

21. Steam pressure before HP stop valve

Measurements: 30LBA20CP001, CT002, CT003

Logic and Activity: 2/3 selection with ACTIVATION No. 2

Nominal value 124 bar


Protection level L3 L2 L1 H1 H2 H3
Protection value 137,6 157,4 bar

Protection system aktivity


Protection level L3 L2 L1 H1 H2 H3
Alarm x X
Intervention X

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x

Testing of protection: signal 30LBA20CP901_YK01

Test conditions: Turbine shut down.


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 23 rev.a


Pr 6010428
22. Steam pressure before IP stop valve

Measurements: 30LBB30CP001, CT002, CT003

Logic and Activity: 2/3 selection with ACTIVATION No. 2

Nominal value 28,5 bar


Protection level L3 L2 L1 H1 H2 H3
Protection value 32 36,7 bar

Protection system aktivity


Protection level L3 L2 L1 H1 H2 H3
Alarm x X
Intervention X

Protection level L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x

Testing of protection: signal 30LBB30CP901_YK01

Test conditions: Turbine shut down.


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 24 rev.a


Pr 6010428

23. Thermal stress HP

Measurements: 30MAA01T905, 30MAA01CT906, 30MAA01CT907

Logic and Activity: calculation min, max value with ACTIVATION No. 2

Nominal value ±22 ÷ ±36 °C


Protection level L3 L2 L1 H1 H2 H3
Protection value x* x* x* x* °C

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x x
Intervention x x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x x x
Stop valve closing x x
Control valve closing x x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x x

*) Values are calculated according to type of start.

Testing of protection: signal 30MAA01CT905_YK01

Test conditions: Turbine shut down


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 25 rev.a


Pr 6010428

24. Thermal stress IP

Measurements: 30MAB01CT905, 30MAB01CT906, 30MAB01CT907

Logic and Activity: calculation min, max value with ACTIVATION No. 2

Nominal value ±22 ÷ ±36 °C


Protection level L3 L2 L1 H1 H2 H3
Protection value x* x* x* x* °C

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x x
Intervention x x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x x x
Stop valve closing x x
Control valve closing x x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start
Reverse el.power prot.unblock. x x

*) Values are calculated according to type of start.

Testing of protection: signal 30MAB01CT905_YK01

Test conditions: Turbine shut down


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 26 rev.a


Pr 6010428

25. Level in main oil tank

Measurements: 30MAV10CL001, CL002, CL003

Logic and Activity: 2/3 selection with ACTIVATION No. 1

Nominal value 410 mm


Protection level L3 L2 L1 H1 H2 H3
Protection value 120 170 220 600 mm

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x x x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x x x
Stop valve closing x
Control valve closing x
Extraction flaps closing
Emergency oil pump start
Starting oil pump start - blocked x
Reverse el.power prot.unblock. x
*Limits will be add later

Testing of protection: signal 30MAV10CL901_YK01

Test conditions: Turbine in operation, sensors O.K.


Method of testing: drain of bypass sensor
Implementation of test: Manually
Testing interval: Min once a 3 month or after any intervention of electric or mechanic circuits or after C.R. or
G.R.

Elaborated by: Šíma 27 rev.a


Pr 6010428

26. Level in condenser collector

Measurements: 30MAG10CL101, CL102, CL103

Logic and Activity: 2/3 selection with ACTIVATION No. 1

Nominal value 842 mm


Protection level L3 L2 L1 H1 H2 H3
Protection value 150 300 900 942 1012 mm

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x
Control valve closing x
Extraction flaps closing x
Emergency oil pump start
Starting oil pump start - blocked
Reverse el.power prot.unblock. x
*Limits will be add later

Testing of protection: signal 30MAG10CL901_XK01

Test conditions: Turbine in operation, sensors O.K.


Method of testing: drain of bypass sensor
Implementation of test: Manually
Testing interval: Min once a 3 month or after any intervention of electric or mechanic circuits or after C.R. or
G.R.

Elaborated by: Šíma 28 rev.a


Pr 6010428

27. Level in high pressure hydraulic tank

Measurements: 30MAX01CL211_XG55, CL221_XG55, CL231_XG55

Logic and Activity: 2/3 selection with ACTIVATION No. 1

Nominal value 0 ÷199 mm


Protection level L3 L2 L1 H1 H2 H3
Protection value x* x* mm

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x
Control valve closing x
Extraction flaps closing x
Emergency oil pump start
Starting oil pump start - blocked
Reverse el.power prot.unblock. x
*These limits are done by binary sensors. Setting is done from the tank cover.

Testing of protection: signal 30MAX01CL911_YK01

Test conditions: Turbine in operation, sensors O.K.


Method of testing: drain of bypass sensor
Implementation of test: Manually
Testing interval: Min once a 3 month or after any intervention of electric or mechanic circuits or after C.R. or
G.R.

Elaborated by: Šíma 29 rev.a


Pr 6010428

28. Temperature in high pressure hydraulic tank

Measurements: 30MAX01CL011, CL021, CL031

Logic and Activity: 2/3 selection with ACTIVATION No. 1

Nominal value 25÷45 °C


Protection level L3 L2 L1 H1 H2 H3
Protection value 50 75 °C

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x
Control valve closing x
Extraction flaps closing x
Emergency oil pump start
Starting oil pump start - blocked
Reverse el.power prot.unblock. x

Testing of protection: signal 30MAX01CT911_YK01

Test conditions: Turbine in operation, sensors O.K.


Method of testing: drain of bypass sensor
Implementation of test: Manually
Testing interval: Min once a 3 month or after any intervention of electric or mechanic circuits or after C.R. or
G.R.

Elaborated by: Šíma 30 rev.a


Pr 6010428

29. Temperature HP turbine case outlet

Measurements: 30MAA01CT005, CT006, CT007

Logic and Activity: 2/3 selection with ACTIVATION No. 1

Nominal value 351,4 °C


Protection level L3 L2 L1 H1 H2 H3
Protection value 430 450 °C

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x
Control valve closing x
Extraction flaps closing x
Emergency oil pump start
Starting oil pump start - blocked
Reverse el.power prot.unblock. x

Testing of protection: signal 30MAA01CT915_YK01

Test conditions: Turbine shut down.


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 31 rev.a


Pr 6010428

30. Temperature LP turbine case outlet

Measurements: 30MAB01CT005, CT006, CT007

Logic and Activity: 2/3 selection with ACTIVATION No. 1

Nominal value 40÷60 °C


Protection level L3 L2 L1 H1 H2 H3
Protection value 90 120 130 °C

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x x
Stop valve closing x
Control valve closing x
Extraction flaps closing x
Emergency oil pump start
Starting oil pump start - blocked
Reverse el.power prot.unblock. x

Testing of protection: signal 30MAB01CT901_YK01

Test conditions: Turbine shut down.


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 32 rev.a


Pr 6010428

31. Pressure HP turbine case outlet

Measurements: 30LBC30CP001, CP002, CP003

Logic and Activity: 2/3 selection with ACTIVATION No. 1

Nominal value 31,8 bar(g)


Protection level L3 L2 L1 H1 H2 H3
Protection value 35,6 40,9 bar(g)

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x
Control valve closing x
Extraction flaps closing x
Emergency oil pump start
Starting oil pump start - blocked
Reverse el.power prot.unblock. x

Testing of protection: signal 3LBC30CP901_YK01

Test conditions: Turbine shut down.


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 33 rev.a


Pr 6010428

32. Temperature of gland steam

Measurements: 30MAW40CT002, 003, 004

Logic and Activity: 2/3 selection with ACTIVATION No. 1

Nominal value 31,8 °C


Protection level L3 L2 L1 H1 H2 H3
Protection value 170 180 420 °C

Protection system activity


Protection level L3 L2 L1 H1 H2 H3
Alarm x x x
Intervention x

Protection system intervention


Protection level L3 L2 L1 H1 H2 H3
Alarm x x
Stop valve closing x
Control valve closing x
Extraction flaps closing x
Emergency oil pump start
Starting oil pump start - blocked
Reverse el.power prot.unblock. x

Testing of protection: signal 30MAW40CT905_YK01

Test conditions: Turbine shut down.


Method of testing: Simulation in control system
Implementation of test: Manually
Testing interval: Min once a year or after any intervention of electric or mechanic circuits or after C.R. or G.R.

Elaborated by: Šíma 34 rev.a